Documente Academic
Documente Profesional
Documente Cultură
Description
Unit
SK
SK
/U` w`
1.Main Building
G+2 Residential Building
A: SUB STRUCTURE
A1.
Birr
127,081.94
A2.
Concrete Work
Birr
149,241.32
A3.
Stone Masonry
Birr
32,640.00
Birr
308,963.26
Concrete Work
Birr
291,080.16
B2.
Block Work
Birr
96,981.33
B3.
Roofing
Birr
97,861.88
B4.
Birr
29,300.00
B5.
Metal Work
Birr
88,960.00
B6.
Finishing
Birr
186,201.09
B7.
Flooring
Birr
222,651.88
B8.
Painting
Birr
34,522.97
B9.
Glazing
Birr
13,452.98
Birr
121,575.00
Birr
300,050.00
Birr
1,482,637.28
Birr
1,791,600.54
15%VAT
Birr
268,740.08
TOTAL
Birr
2,060,340.62
Description
Unit
}^ l.
SK
Y`
SK
Contract
Qty
Rate
<K S
Total Contract
Amount
<Ku< M
/U` w`
1.Main Building
1.01
1.02
1.03
1.04
1.05
1- SITE CLEARING
Clear of site to a depth of 20 cm and grub
debris and grabbed materials from site.
m2
375.00
5.00
1,875.00
Bulk excavation
Bulk excavation in ordinary soil to a depth not
exceeding 1500mm
m3
187.50
22.00
4,125.00
60.20
25.00
1,504.88
20.07
30.00
601.95
m3
108.80
25.00
2,720.00
m3
54.40
60.00
3,264.00
71.24
60.00
4,274.40
Disposal
Cart away excavated materials per the
instruction of the engineer .
m3
2,110.90
35.00
73,881.54
m3
348.35
60.00
20,901.11
m2
40.00
13,934.07
127,081.94
Fill
1.06
1.07
1.08
1.09
1.10
348.35
Total carried to summary
A 2 - CONCRETE WORK
SUB STRUCTURE
2.01
50mm thick lean concrete in concrete class C5, with minimum cement content of 150kg/m 3
under footings, floor slab. ,Beam and stone
foundation wall .
m2
296.39
65.00
19,265.51
In footings
m3
7.86
1,800.00
14,140.80
2.03
In foundation column
m3
1.16
1,800.00
2,095.20
2.05
Grade Beam
m3
10.88
1,800.00
19,584.00
2.06
m3
147.46
270.00
1,700.00
39,814.88
Footings
m2
22.56
75.00
1,692.00
2.09
Foundation columns
m2
19.40
75.00
1,455.00
87.04
75.00
6,528.00
2.11
Grade Beam
2.13
2.14
Kg
Kg
Kg
18.00
Kg
170.50
18.00
3,068.93
Kg
719.96
18.00
12,959.36
Kg
499.72
18.00
8,995.00
Kg
61.06
18.00
1,099.05
Kg
18.00
1,030.20
22.00
18.00
18,543.59
-
149,241.32
m3
54.40
600.00
32,640.00
32,640.00
B. SUPER STRUCTURE
B1- CONCRETE WORK
Reinforced concrete in concrete class C-25,
with minimum cement of 360kg/M3 cast into
form work and vibrated around road
reinforcement. Form work and steel measured
separate.
1.01
In elevation column
1.02
m3
5.83
1,800.00
10,497.60
m3
20.06
1,800.00
36,108.00
1.03
m3
7.38
1,800.00
13,289.11
1.04
m2
253.53
270.00
68,451.75
m2
97.20
75.00
7,290.00
m2
221.68
75.00
16,626.00
Elevation column
1.07
1.08
m2
31.24
85.00
2,655.23
1.09
m2
253.53
75.00
19,014.38
1.11
Kg
22.00
Kg
2,737.22
18.00
49,269.95
Kg
938.84
18.00
16,899.11
Kg
625.31
18.00
11,255.61
Kg
541.84
18.00
9,753.06
Kg
1,665.02
18.00
29,970.36
Kg
18.00
Kg
18.00
Kg
18.00
291,080.16
2.01
2.02
m2
382.81
170.00
65,078.13
m2
212.69
150.00
31,903.21
3.01
3.02
3.03
3.04
3.05
B3. Roofing
Apply average thickness of 3cm cement screed
over the terrace concrete.
96,981.33
m2
17.33
55.00
952.88
m2
11.70
140.00
1,638.00
m2
173.22
550.00
95,271.00
ml
160.00
ml
130.00
97,861.88
4.01
No
15.00
1,800.00
27,000.00
4.02
No
1.00
2,300.00
2,300.00
29,300.00
No
1.00
2,025.00
No
2.00
2,600.00
No
1.00
2,500.00
No
3.00
2,600.00
Type W5:size160x230cm
No
2.00
4,400.00
No
2.00
5,000.00
B. Doors
5.4
No
1.00
14,000.00
14,000.00
5.6
No
4.00
5,100.00
20,400.00
5.7
No
6.00
2,400.00
14,400.00
5.8
No
1.00
6,000.00
6,000.00
5.9
No
2.00
3,700.00
7,400.00
5.11
ml
44.60
600.00
26,760.00
88,960.00
B6. Finishing
6.01
m2
595.50
55.00
32,752.53
6.02
m2
882.30
50.00
44,115.02
6.03
m2
882.30
55.00
48,526.52
m2
595.50
23.00
13,696.51
6.1
m2
882.30
25.00
22,057.51
6.06
m2
119.30
210.00
25,053.00
6.04
186,201.09
B7. Flooring
Ceramic Tiles
7.01
7.02
7.03
m2
253.53
55.00
13,943.88
m2
253.53
180.00
45,634.50
m2
132.00
190.00
25,080.00
m2
202.00
65.00
13,130.00
m2
69.44
650.00
45,136.00
ml
26.40
160.00
4,224.00
ml
13.20
160.00
2,112.00
ml
37.30
160.00
5,968.00
ml
8.45
130.00
1,098.50
m2
202.00
65.00
13,130.00
m2
202.00
180.00
36,360.00
ml
101.00
40.00
4,040.00
Marble Tiles
7.04
7.05
7.06
7.07
7.08
7.09
7.11
7.12
7.13
m2
32.00
65.00
2,080.00
7.14
m2
32.00
280.00
8,960.00
7.15
ml
27.00
65.00
1,755.00
222,651.88
B8 . Painting
8.01
m2
808.19
20.00
16,163.77
8.02
m2
378.04
22.00
8,316.95
8.03
m2
382.81
20.00
7,656.25
8.04
m2
119.30
20.00
2,386.00
34,522.97
B9. Glazing
Supply and fix glass glazing to windows and
doors :9.01
m2
74.74
Total carried to summary
180.00
13,452.98
13,452.98
l.
Description
Unit
No Elm
Y`
w |
SK
G+1 Residential Building
S >
Length
Width
Height
Positive
Qty
Y O r
e |
tS|
A- SUB -STRUCTURE
A1-Excavation and Earth work
1.01
1.02
1.03
1.04
1.05
1.06
1.07
m2
15.000
25.00
Total
375.00
375.00
15.000
25.00
0.50
Total
187.50
187.50
5
4
2
1.70
2.00
2.20
1.70
2.00
2.20
1.50
1.50
1.50
Total
21.68
24.00
14.52
60.20
5
4
2
1.70
2.00
2.20
1.70
2.00
2.20
0.50
0.50
0.50
Total
7.23
8.00
4.84
20.07
m3
m3
2
15.00
1.00
1.00
30.00
2.70
1.00
1.00
10.80
11.00
1.00
1.00
33.00
5.00
1.00
1.00
5.00
10.00
1.00
1.00
30.00
Total
108.80
15.00
m3
2
15.00
0.50
1.00
2.70
0.50
1.00
5.40
11.00
0.50
1.00
16.50
5.00
0.50
1.00
2.50
10.00
0.50
1.00
15.00
Total
54.40
2.00
28.90
m3
5
1.70
1.70
Negative
Qty
}ki
S
4
2
5
4
2
5
4
3
F2 (Footing 2 )
F3 (Footing 3 )
F1 (Footing Pad )
F2 (Footing Pad )
F3 (Footing Pad )
C1 with F1
C2 with F2
C3 with F3
2.00
2.20
1.20
1.40
1.60
0.20
0.20
0.20
2.00
2.20
1.20
1.40
1.60
0.30
0.30
0.30
2.00
2.00
0.30
0.40
0.50
1.70
1.60
1.50
32.00
19.36
80.26
1.09
1
1
1.11
71.24
0.20
0.50
75.00
187.50
60.20
20.07
108.80
Total
451.56
0.50
0.50
0.50
0.50
0.50
Total
5.23
13.50
7.50
6.25
41.25
73.73
Total
10.46
27.00
15.00
12.50
82.50
147.46
Total
14.45
16.00
9.68
40.13
Total
30.00
10.80
33.00
5.00
30.00
108.80
Total
1.10
Total
15.000
15.000
25.00
25.00
1
2
1
1
3
3.88
5.00
3.00
2.50
5.50
2.70
2.70
5.00
5.00
5.00
1
2
1
1
3
3.88
5.00
3.00
2.50
5.50
2.70
2.70
5.00
5.00
5.00
m2
A 2. Concrete work
2.01
m2
5
4
2
m
m2
2
4
3
1
3
1.70
2.00
2.20
1.70
2.00
2.20
15.00
2.70
11.00
5.00
10.00
1.00
1.00
1.00
1.00
1.00
147.46
2.16
3.14
2.56
0.51
0.38
0.27
9.02
Total
296.39
In footing
F1 (Footing Pad )
F2 (Footing Pad )
F3 (Footing Pad )
2.03
In foundation column
GradeBeam
1.20
1.40
1.60
0.30
0.40
0.50
Total
2.16
3.14
2.56
7.86
5
4
3
0.20
0.20
0.20
0.30
0.30
0.30
1.70
1.60
1.50
Total
0.51
0.38
0.27
1.16
2
4
3
1
3
15.00
2.70
11.00
5.00
10.00
0.25
0.25
0.25
0.25
0.25
0.40
0.40
0.40
0.40
0.40
Total
3.00
1.08
3.30
0.50
3.00
10.88
m3
1.20
1.40
1.60
m3
C1 with F1
C2 with F2
C3 with F3
2.05
5
4
2
m2
147.46
147.46
2.08
2.09
m2
5
4
2
1.20
1.40
1.60
1.20
1.40
1.60
0.30
0.40
0.50
Total
7.2
8.96
6.4
22.56
0.20
0.30
1.70
8.5
C2 with F2
C3 with F3
2.11
2.13
GradeBeam
Service Quarter AxesA&B
Service Quarter Axes1,2,3&4
Main Building Axes 2,3&4
Main Building Axis D
Main Building Axes C,E&F
4
3
0.20
0.20
0.30
0.30
1.60
1.50
Total
6.4
4.5
19.40
2
4
3
1
3
15.00
2.70
11.00
5.00
10.00
0.25
0.25
0.25
0.25
0.25
0.40
0.40
0.40
0.40
0.40
Total
24.00
8.64
26.40
4.00
24.00
87.04
kg
#REF!
#REF!
kg
#REF!
#REF!
kg
#REF!
#REF!
kg
#REF!
#REF!
kg
#REF!
#REF!
kg
#REF!
#REF!
kg
#REF!
#REF!
kg
#REF!
#REF!
#REF!
A3- STONE MASONRY
3.01
m3
2
15.00
0.50
1.00
2.70
0.50
1.00
15.00
5.40
11.00
0.50
1.00
16.50
5.00
0.50
1.00
2.50
10.00
0.50
1.00
15.00
Total
54.40
B. SUPER STRUCTURE
B1- CONCRETE WORK
Reinforced concrete in concrete class C25, with minimum cement of 360kg/M3
cast into form work and vibrated around
road reinforcement. Form work and steel
measured separate.
1.01
In elevation column
m3
Ground Floor
Column Type 1
Column Type 2
Column Type 3
1st Floor
Column Type 1
Column Type 2
Column Type 3
2nd Floor
Column Type 1
Column Type 2
Column Type 3
1.02
0.30
0.30
0.30
2.70
2.70
2.70
0.81
0.65
0.49
5
4
3
0.20
0.20
0.20
0.30
0.30
0.30
2.70
2.70
2.70
0.81
0.65
0.49
5
4
3
0.20
0.20
0.20
0.30
0.30
0.30
2.70
2.70
2.70
Total
0.81
0.65
0.49
5.83
3
1
3
11.00
5.00
10.00
0.25
0.25
0.25
0.35
0.35
0.35
3
1
3
11.00
5.00
10.00
0.25
0.25
0.25
0.35
0.35
0.35
2.89
0.44
2.63
0.00
2.89
0.44
2.63
Total
11.90
0.30
0.30
0.30
0.30
0.30
Total
2.25
0.81
2.48
0.38
2.25
8.16
Total
20.06
0.15
0.25
0.17
0.17
Total
4.95
1.63
0.63
0.18
7.38
2
4
3
1
3
15.00
2.70
11.00
5.00
10.00
0.25
0.25
0.25
0.25
0.25
6
2
24
12
5.000
2.50
1.10
1.10
1.10
1.30
0.28
0.160
1
1
3.00
5.00
2.50
5.00
m3
Stair Case
Landing beam
Trade &Riser
1.04
0.20
0.20
0.20
m3
TopTop Beam
Service Quarter AxesA&B
Service Quarter Axes1,2,3&4
Main Building Axes 2,3&4
Main Building Axis D
Main Building Axes C,E&F
1.03
5
4
3
m2
First Floor
15.00
12.50
3
2
1
5.50
2.40
3.00
Total
82.50
4.80
4.50
119.30
Total
15.00
12.50
82.50
2.40
4.50
116.90
5.00
1.00
1.50
Second Floor
1
1
3
1
1
3.00
5.00
2.50
5.50
2.40
3.00
5.00
5.00
1.00
1.50
6.30
2.75
17.33
Total
17.33
Total
253.53
13.50
10.80
8.10
Elevation column
m2
Ground Floor
Column Type 1
Column Type 2
Column Type 3
1st Floor
Column Type 1
Column Type 2
Column Type 3
2nd Floor
Column Type 1
Column Type 2
Column Type 3
1.07
0.30
0.30
0.30
2.70
2.70
2.70
5
4
3
0.20
0.20
0.20
0.30
0.30
0.30
2.70
2.70
2.70
5
4
3
0.20
0.20
0.20
0.30
0.30
0.30
2.70
2.70
2.70
13.50
10.80
8.10
13.50
10.80
8.10
Total
97.20
3
1
3
11.00
5.00
10.00
0.25
0.25
0.25
0.35
0.35
0.35
31.35
4.75
28.50
3
1
3
11.00
5.00
10.00
0.25
0.25
0.25
0.35
0.35
0.35
31.35
4.75
28.50
Total
129.20
0.30
0.30
0.30
0.30
0.30
Total
25.50
9.18
28.05
4.25
25.50
92.48
Total
221.68
0.15
0.35
0.17
Total
22.00
4.75
4.49
31.24
2
4
3
1
3
15.00
2.70
11.00
5.00
10.00
0.25
0.25
0.25
0.25
0.25
4
2
24
Stair Case
Landing beam
Trade &Riser
1.09
0.20
0.20
0.20
m2
TopTop Beam
Service Quarter AxesA&B
Service Quarter Axes1,2,3&4
Main Building Axes 2,3&4
Main Building Axis D
Main Building Axes C,E&F
1.08
5
4
3
m2
5.000
2.50
1.10
1.10
0.25
0.28
First Floor
1
1
3
2
1
3.00
5.00
2.50
5.50
2.40
3.00
5.00
5.00
1.00
1.50
Total
15.00
12.50
82.50
4.80
4.50
119.30
Total
15.00
12.50
82.50
2.40
4.50
116.90
Second Floor
1
1
3
1
1
3.00
5.00
2.50
5.50
2.40
3.00
5.00
5.00
1.00
1.50
6.30
2.75
17.33
Total
17.33
Total
253.53
B2 . Block Work
( Super- structure )
2.01
m2
2
1
1
2
1
2
1
2.50
15.00
11.50
4.70
4.00
5.20
4.30
2.70
2.70
2.70
2.70
2.70
2.70
2.70
13.50
39.75
30.48
24.91
10.80
27.56
11.40
4
2
2
4
2
4
2
2.50
15.00
11.50
4.70
4.00
5.20
4.30
2.70
2.70
2.70
2.70
2.70
2.70
2.70
27.00
79.50
60.95
49.82
21.60
55.12
22.79
475.17
1
4
6
1
2
2.70
1.70
0.80
2.00
3.10
4.30
2.50
2.50
2.50
2.50
1
2
1
3
2
2
1.35
1.10
1.30
0.75
1.60
1.50
1.95
2.00
1.60
2.90
2.30
2.75
11.61
17.00
12.00
5.00
15.50
2.63
4.40
2.08
6.53
7.36
8.25
92.36
2.02
Total
382.81
2.70
27.00
m2
Ground Floor
2.50
1
2
1
1
1
1
1
4.40
2.90
5.50
2.25
0.73
0.50
4.61
2.70
2.70
2.70
2.70
2.70
2.70
2.70
11.66
15.37
14.58
6.08
1.93
1.33
12.22
6
12
2
4
2
1
3.50
0.50
2.40
3.60
3.25
3.80
2.70
2.70
2.70
2.70
2.70
2.70
56.70
15.90
12.72
38.16
17.55
10.07
1.60
2.10
3.36
15
0.80
2.10
25.20
241.25
Total
3.01
B3. Roofing
Apply average thickness of 3cm cement
screed over the terrace concrete.
m2
6.30
2.750
17.33
Total
3.02
3.03
1.00
2.400
1.50
3.000
7.20
Total
4.50
11.70
Total
20.70
26.91
21.20
26.32
78.09
173.22
Total
Total
m2
4.60
6.90
4.00
4.70
5.70
4.500
3.900
5.300
5.600
13.70
ml
1
1
3.05
17.33
1
1
1
1
1
3.04
212.69
ml
1
1
28.56
No
No
15
Total
15.00
15.00
Total
1.00
1.00
Total
1.00
1.00
Total
2.00
2.00
Total
1.00
1.00
Total
3.00
3.00
Total
2.00
2.00
Total
2.00
2.00
Total
1.00
1.00
Total
4.00
4.00
Total
6.00
6.00
Total
1.00
1.00
Total
2.00
2.00
No
No
No
No
No
No
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00
3.00
2.00
2.00
B. Doors
5.4
5.6
5.7
5.8
5.9
5.11
No
No
No
No
No
1
1
1
1
1
1
4
6
1
2
ml
4
3
3
3.20
2.20
2.40
12.80
6.60
7.20
6.00
Total
18.00
44.60
Total
382.81
425.38
808.19
6. Finishing
6.01
m2
1
2
6.02
382.81
212.69
0.30
0.30
0.30
2.70
2.70
2.70
8.10
6.48
4.86
5
4
3
0.30
0.30
0.30
2.70
2.70
2.70
8.10
6.48
4.86
5
4
3
0.20
0.20
0.20
1.00
0.20
0.20
0.20
0.30
0.30
0.30
2.70
2.70
2.70
Total
8.10
6.48
4.86
53.46
3
1
3
11.00
5.00
10.00
0.25
0.25
0.25
21.45
3.25
19.50
3
1
3
11.00
5.00
10.00
0.25
0.25
0.25
0.20
0.20
0.20
0.20
0.20
0.20
0.20
Total
88.40
21.45
3.25
19.50
2
4
3
1
3
15.00
2.70
11.00
5.00
10.00
0.25
0.25
0.25
0.25
0.25
0.20
0.20
0.20
0.20
0.20
Total
19.50
7.02
21.45
3.25
19.50
70.72
4
2
24
5.000
2.50
1.10
1.10
0.25
0.28
0.15
0.35
0.17
Total
22.00
4.75
4.49
31.24
1
1
3
2
1
3.00
5.00
2.50
5.50
2.40
3.00
5.00
5.00
1.00
1.50
Total
15.00
12.50
82.50
4.80
4.50
119.30
m2
Stair Case
Landing beam
Trade &Riser
0.20
0.20
0.20
TopTop Beam
Service Quarter AxesA&B
Service Quarter Axes1,2,3&4
Main Building Axes 2,3&4
Main Building Axis D
Main Building Axes C,E&F
Stair case and landing
5
4
3
m2
First Floor
Second Floor
1
1
3
3.00
5.00
2.50
5.50
5.00
5.00
15.00
12.50
82.50
1
1
2.40
3.00
1.00
1.50
Total
2.40
4.50
116.90
6.03
6.30
6.05
17.33
Total
17.33
Total
378.04
Total
382.81
382.81
Total
808.19
808.19
Total
378.04
378.04
Total
15.00
12.50
82.50
4.80
4.50
119.30
Total
53.00
53.00
Total
53.00
Total
132.00
132.00
Total
202.00
202.00
1
6.04
2.75
382.81
m2
6.07
m2
1
1
3
2
1
3.00
5.00
2.50
5.50
2.40
3.00
5.00
5.00
1.00
1.50
B7. Flooring
Ceramic Tiles
6.02
6.03
m2
m2
m2
Marble Tiles
Marble Tiles
6.05
6.06
m2
m2
6.07
ml
24
ml
12
Total
26.40
26.40
Total
13.20
13.20
Total
4.30
6.80
4.80
2.00
6.20
12.00
1.20
37.30
Total
1.35
2.20
1.30
2.25
3.20
3.00
8.45
0.32
1.10
0.15
ml
1
4
6
1
2
15
1
6.10
1.10
6.09
69.44
69.44
6.08
Total
4.30
1.70
0.80
2.00
3.10
0.80
1.20
ml
1
2
1
3
2
2
1.35
1.10
1.30
0.75
1.60
1.50
m2
202.00
Total
m2
202.00
202.00
Total
202.00
202.00
ml
101.00
Total
101.00
Terrazzo Tiles
30mm thick cement and sand screed with
cement mortar mix 1:3 to receive terrazzo
tiles.
m2
32.00
Total
Supply and lay 3mm terrazzo tiles
flooring.
m2
32.00
32.00
Total
ml
32.00
32.00
27.00
Total
27.00
Total
808.19
808.19
Total
378.04
378.04
Total
382.81
382.81
Total
119.30
119.30
Total
28.56
46.18
74.74
B8 . Painting
8.01
8.02
8.03
8.04
m2
m2
m2
m2
119.30
12. Glazing
12.01
m2
Windows
Doors
Page _______
Sir
N0
}^ l.
1
2
3
4
5
12
Structure : Footing
Location
x
F1
F2
F3
Shape
iY
Bar No
nTr l Y
1
2
2
Dim ()
No of
Bar
No of
Mem
Length
Total
10
12
14
16
20
24
nTr l Y
nr
nr
lS /`S/
/U` nr
mE6
mE8
mE10
mE12
mE14
mE16
mE20
mE24
0.00
1.580
0.00
0.00
2.470
0.00
0.00
3.555
0.00
14
14
14
18
22
26
5
4
2
1.62
2.06
2.30
Total Length
Unit Weight kg/m
Total weight in kg
90
88
52
145.80
181.28
119.60
0.00
0.222
0.00
0.00
0.395
0.00
0.00
0.617
0.00
Checked by : ______________
0.00
0.888
0.00
446.68
1.212
541.38
Approved by _________
Sir
N0
}^ l.
1
2
3
4
5
6
7
x
C1
C2
C3
Shape
iY
Bar No
nTr l Y
Main.B
St
Dim ()
No of
Bar
No of
Mem
Length
Total
10
12
14
16
20
24
nTr l Y
nr
nr
lS /`S/
/U` nr
mE6
mE8
mE10
mE12
mE14
mE16
mE20
mE24
16
8
16
8
16
20
8
6
10
8
9
4
4
8
5
5
4
4
2
2
2
2.93
0.90
2.93
0.90
3.09
3.09
0.90
Total Length
Unit Weight kg/m
Total weight in kg
30
50
32
36
8
8
16
87.90
45.00
93.76
32.40
24.72
24.72
14.40
0.00
0.222
0.00
91.80
0.395
36.26
0.00
0.617
0.00
Checked by : ___________
0.00
0.888
0.00
0.00
1.212
0.00
206.38
1.580
326.08
Approved by _________
24.72
2.470
61.06
0.00
3.555
0.00
Page _______
Sir
N0
}^ l.
at Axis1,2,3,4
of Service
quarter
1
2
3
4 at AxisC,D&F
5
6
7
at AxisD
8
10 at Axis2,3&4
11
12
12
Shape
iY
Bar No
nTr l Y
Dim ()
No of
Bar
No of
Mem
Length
Total
10
12
14
16
20
24
nTr l Y
nr
nr
lS /`S/
/U` nr
mE6
mE8
mE10
mE12
mE14
mE16
mE20
mE24
0.00
2.470
0.00
0.00
3.555
0.00
12
12
12
16
14
14
16
14
16
14
14
8
4
4
4
2
2
2
2
2
2
2
2
551
4
3.50
2
12.00
2
5.00
3
10.13
3
5.15
3
6.23
1
5.83
1
5.13
3
11.23
3
5.75
3
5.73
1
1.30
Total Length
Unit Weight kg/m
Total weight in kg
16
8
8
6
6
6
2
2
6
6
6
551
56.00
96.00
40.00
30.90
30.90
37.35
11.65
10.25
67.35
34.50
34.35
0.00
0.222
0.00
716.30
716.30
0.395
282.94
0.00
0.617
0.00
Checked by _________________
192.00
0.888
170.50
147.35
1.212
178.59
109.90
1.580
173.64
Approved by _________
Page _______
Sir
N0
}^ l.
1 Ground floor
slab
Shape
iY
Bar No
nTr l Y
Dim ()
No of
Bar
No of
Mem
Length
Total
nTr l Y
nr
nr
lS /`S/
/U` nr
mE6
150
12.000
Total Length
Unit Weight kg/m
Total weight in kg
150
10
12
14
16
20
24
mE8
mE10
mE12
mE14
mE16
mE20
mE24
0.00
0.617
0.00
0.00
0.888
0.00
0.00
1.212
0.00
0.00
1.580
0.00
0.00
2.470
0.00
0.00
3.555
0.00
20
24
1800.00
0.00
0.222
0.00
1800.00
0.395
711.00
Checked by : ________________
Bar /Diametr
Summery To Sub Stracture / Kg
6
-
8
1,030.20
10
-
Approved by _________
12
14
170.50
719.96
16
499.72
61.06
Page _______
Sir
N0
}^ l.
1
2
x
1 stF light
2 nd light
Shape
iY
Bar No
nTr l Y
Main.B
1
2
3
4
5
1
2
3
4
5
Dim ()
No of
Bar
No of
Mem
Length
Total
10
12
14
16
20
24
nTr l Y
nr
nr
lS /`S/
/U` nr
mE6
mE8
mE10
mE12
mE14
mE16
mE20
mE24
0.00
1.212
0.000
0.00
1.580
0.000
0.00
2.470
0.000
0.00
3.555
0.000
16
14
14
8
14
8
12
12
12
49
12
34
2
2
2
2
2
2
5.390
2.53
2.03
0.85
1.63
1.20
24
24
24
98
24
68
16
14
14
8
8
12
12
12
49
34
2
2
2
2
2
5.41
2.41
2.61
0.85
1.63
24
24
24
98
68
Total Length
Unit Weight kg/m
Total weight in kg
129.36
60.72
48.72
83.30
39.00
81.60
129.84
57.84
62.64
83.30
110.50
0.00
0.222
0.000
358.70
0.395
141.687
0.00 528.12
0.617
0.888
0.000 468.971
Checked by : _________________
Approved by _________
Page _______
Sir
N0
Location
}^ l.
1
2
3
4
6
Shape
iY
Bar No
nTr l Y
Dim ()
No of
Bar
No of
Mem
Length
Total
10
12
14
16
20
24
nTr l Y
nr
nr
lS /`S/
/U` nr
mE6
mE8
mE10
mE12
mE14
mE16
mE20
mE24
488.40
174.72
322.32
425.68
110.50
1521.62
0.617
938.84
0.00
0.888
0.00
0.00
1.212
0.00
0.00
1.580
0.00
0.00
2.470
0.00
0.00
3.555
0.00
8
8
8
8
8
8
8
8
8
8
8
8
10
10
10
10
10
18
20
93
57
47
48
48
18
11
18
42
16
74
32
68
68
34
2
5.13
2
6.13
2
7.08
2
7.00
2
8.55
2
7.23
2
6.78
2
2.35
2
2.95
1
8.07
1
5.95
1
8.74
2
3.30
2
2.73
2
2.37
2
3.13
1
3.25
Total Length
Unit Weight kg/m
Total weight in kg
36
40
186
114
94
96
96
36
22
18
42
16
148
64
136
136
34
184.5
245
1315.95
798
803.7
693.6
650.4
84.42
64.9
145.26
249.9
139.84
0.00
0.222
0.00
5375.47
0.395
2123.31
Checked by : ______________
Approved by _________
Page _______
Sir
N0
Location
}^ l.
1 at AxisC&E
2
2
2
2
4 at AxisD,F,F'
6
7
8
9
at Axis2
at Axis 3& 4
Shape
iY
Bar No
nTr l Y
Dim ()
No of
Bar
No of
Mem
Length
Total
10
12
14
16
20
24
nTr l Y
nr
nr
lS /`S/
/U` nr
mE6
mE8
mE10
mE12
mE14
mE16
mE20
mE24
0.00
2.470
0.00
0.00
3.555
0.00
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
14
8
2
1
3
3
3
2
3
3
2
8
5
2
8
2
4
8
395
2
10.825
2
3.300
2
2.000
2
5.150
2
5.225
3
5.725
3
1.720
3
5.125
1
7.200
1
3.000
1
6.600
2
11.200
2
2.660
2
1.830
2
1.400
2
5.750
1
1.100
Total Length
Unit Weight kg/m
Total weight in kg
4
2
6
6
6
6
9
9
2
8
5
4
16
4
8
16
395
43.30
6.60
12.00
30.90
31.35
34.35
15.48
46.13
14.40
24.00
33.00
44.80
42.56
7.32
11.20
92.00
0.00
0.222
0.00
434.50
434.50
0.395
171.63
0.00
0.617
0.00
Checked by ________________
0.00
0.888
0.00
92.00
1.212
111.50
397.39
1.580
627.87
Approved by _________
Page _______
Sir
N0
Location
x
at Axis A&B
service q
2
3
4
5
6
at Axis A&B
service q
8
9
10 at Axis 2,3& 4
13
14
15
18 at Axis C,E,F
19
20
22
at Axis D
23
24
}^ l.
Shape
iY
Bar No
nTr l Y
Dim ()
No of
Bar
No of
Mem
Length
Total
10
12
14
16
20
24
nTr l Y
nr
nr
lS /`S/
/U` nr
mE6
mE8
mE10
mE12
mE14
mE16
mE20
mE24
0.00
2.47
0.000
0.00
3.555
0.000
12
12
12
12
12
2
2
2
2
2
12
12
16
16
16
16
14
14
14
14
14
8
2
2
2
2
2
3
2
2
2
2
2
553
2
2
2
2
2
6.860
5.560
4.050
6.225
9.000
4
4
4
4
4
27.44
22.24
16.20
24.90
36.00
4
2.93
4
3.230
3
7.400
3
5.95
3
5.725
3
6.78
3
9.25
3
2.86
3
8.75
1
3.58
1
3.08
1
1.00
Total Length
Unit Weight kg/m
Total weight in kg
8
8
6
6
6
9
6
6
6
2
2
553
23.44
25.84
44.40
35.70
34.35
60.98
55.50
17.16
52.50
7.16
6.16
0.00
0.222
0.000
553.00
553.00
0.395
218.435
0.00 176.06
0.617
0.888
0.000 156.341
Checked by _____________
Reinforcement Bar Measurement Take Off - Sheets
Clint :W/ro Hewan Umar
138.48
1.212
167.838
175.43
1.580
277.172
Approved by _________
Date _12 /_07_/2010
Page _______
Location
}^ l.
C1
C2
Shape
iY
Bar No
nTr l Y
Main.B
C3
C4
Sq
nTr l Y
nr
16
14
16
14
20
16
14
12
8
8
10
4
10
4
4
10
6
4
72
14
nr
lS /`S/
5
5
4
4
2
2
2
8
2
8
3.700
3.185
3.700
3.185
3.700
3.185
3.185
3.700
0.90
0.70
Total Length
Unit Weight kg/m
Total weight in kg
/U` nr
mE6
50
20
40
16
8
20
12
32
144
112
mE8
mE10
12
14
16
20
24
mE12
mE14
mE16
mE20
mE24
0.00
2.470
0.00
0.00
3.555
0.00
20
24
185.00
63.70
148.00
50.96
29.60
63.70
38.22
118.40
129.60
78.40
0.00
0.222
0.00
208.00
0.395
82.16
0.00
0.617
0.00
0.00
0.888
0.00
Checked by ___________
Bar /Diametr
Summery To Super Stracture / Kg
Unit Price
Total Length
Unit Weight kg/m
Total weight in kg
216.58
1.212
262.49
481.00
1.580
759.98
Approved by _________
10
12
14
16
0.000
2737.220
938.840 625.312
541.837
1665.020
0.000
0.000
55.00
12.00
0.222
20.65
63.00
12.00
0.395
13.29
90.000 125.000
12.00
12.00
0.617
0.888
12.16
11.73
210.000
12.00
1.212
14.44
260.000
12.00
1.580
13.71
460.000
12.00
2.470
15.52
585.000
12.00
3.555
13.71
Description
}^ l.
SK
Unit
Y` SK
Contract Qty
<K
S
Rate
No
1.00
18,000.00
18,000.00
No
1.00
12,000.00
12,000.00
L
<Ku< M
/U` w`
ELECTRICAL INSTALLATIONS
ELECTRICAL WORKS AND INSTALL
SUPPLY AND INSTALL
DISTRIBUTION BOARDS
1
1-1
Flush mounted distribution board MDBDervice with lockable door, complete with
bus terminals of 96A/3ph rating, neutral and
earth bars, and consisting of :main switch of 32A/3ph
MDB- and consisting
3pc 25A.ACB 3p
5pc16A.ACB 3p
4pc 10A.ACB1p
1pc 6A.ACB1p
All complete with three units reserve spaces
Ditto as item No. 1-1 but for SDBResidenceTY1 consisting of:96A/3P
main switch of 32A/3ph
4pc16A.ACB3p
2pc 10A.ACB 1p
1pc 6A.ACB 1p
1-2
2
2-1
No.
43.00
130.00
5,590.00
NO
12.00
60.00
720.00
Item
No.
Description
}^ l.
SK
Unit
Y` SK
Contract Qty
<K
S
Rate
L
<Ku< M
80.00
/U` w`
240.00
NO
3.00
NO
16.00
105.00
1,680.00
NO
2.00
125.00
250.00
3-5 Inrermidate
NO
4.00
95.00
380.00
No.
32.00
110.00
3,520.00
NO
25.00
45.00
1,125.00
No.
7.00
120.00
840.00
No.
2.00
110.00
220.00
No.
1.00
115.00
115.00
4
4-1
4.1.4
NO
10.00
110.00
1,100.00
NO
10.00
95.00
950.00
NO
2.00
35.00
70.00
Item
No.
Y` SK
Contract Qty
<K
S
No.
8.00
80.00
640.00
No.
1.00
1800.00
1,800.00
No.
8.00
110.00
880.00
7 TV Outlet points
7-1 TV out let point fed through PVC insulated
conductors of 2x0.8 mm. sq.( 75 Ohm) in
conduit of f 13.5mm including junction boxes
with covers for flush mountingas well as TV
socket type LEGRAND Decor 718 41 or
equivalent.
NO
10.00
85.00
850.00
NO
2.00
95.00
190.00
-
NO
2.00
50.00
100.00
-
}^ l.
6
Description
SK
Unit
Rate
L
<Ku< M
/U` w`
6-2
Buzzer for flush mounting with transformer of
220/12 V,50 VA and call cancelling push
button to indicate 20 positions) etc..
FEEDER CABLES
-
Item
No.
Description
Y` SK
Contract Qty
<K
S
mt.
15.00
130.00
mt.
150.00
80.00
1,950.00
12,000.00
mt.
120.00
75.00
9,000.00
mt.
130.00
60.00
mt.
75.00
55.00
7,800.00
4,125.00
mt.
85.00
45.00
3,825.00
mt.
95.00
38.00
3,610.00
No.
2.00
750.00
1,500.00
-
mt.
25.00
19.00
475.00
mt.
75.00
15.00
1,125.00
mt.
85.00
11.00
935.00
mt.
55.00
9.00
495.00
mt.
45.00
7.00
315.00
mt.
150.00
5.00
750.00
No.
1.00
1,500.00
1,500.00
}^ l.
SK
Unit
Rate
L
<Ku< M
/U` w`
8-1
Cables from kwh meter to MDB ( tentative
measurment) and type of cable NYY
4.15.5/kW, size of 4x70/35x16 mmsq.
No.
5.00
430.00
2,150.00
Item
No.
Y` SK
Contract Qty
<K
S
No.
24.00
490.00
11,760.00
-
No.
12.00
480.00
5,760.00
No.
2.00
620.00
1,240.00
}^ l.
Description
SK
Unit
Rate
<Ku< M
/U` w`
-
121,575.00
Description
Unit
SK
Y`
SK
Contract
Qty
<K
S
Rate
Contract Total
Amount
<Ku< M
/U` w`
B11.Sanitery Installation
1.01
1.02
1.03
15mm
20 mm
ml
ml
190.00
120
40.00
45.00
7,600.00
5,400.00
No
300.00
40.00
12,000.00
No
No
137.00
35.00
25.00
45.00
3,425.00
1,575.00
No
32.00
1,100.00
35,200.00
No
32.00
1,700.00
54,400.00
1.04
1.05
SANITARY FIXTURES
Supply and install hand was basin, size:
500 x 405mm made of white vitreous
china including cold and hot water mixer
tap, plug, chain, trap, support and all
required accessories of approved quality.
Item
No.
}^ l.
1.06
1.07
Description
Unit
SK
Y`
SK
Contract
Qty
<K
S
Rate
Contract Total
Amount
<Ku< M
/U` w`
13.00
950.00
12,350.00
No
6.00
2,300.00
13,800.00
Item
No.
}^ l.
1.08
1.09
1.10
1.11
1.12
1.13
1.14
1.15
1.16
Description
Unit
SK
Y`
SK
Contract
Qty
<K
S
Rate
Contract Total
Amount
<Ku< M
/U` w`
No
3.00
650.00
1,950.00
No
18.00
1,200.00
21,600.00
No
1.00
13,000.00
13,000.00
No
32.00
70.00
2,240.00
No
32.00
65.00
2,080.00
32.00
55.00
1,760.00
No
32.00
120.00
3,840.00
No
32.00
200.00
6,400.00
No.
2.00
8,500.00
17,000.00
No
Item
No.
}^ l.
1.16
Description
Unit
SK
Y`
SK
Contract
Qty
<K
S
Rate
Contract Total
Amount
<Ku< M
/U` w`
50 mm
100 mm
ml
ml
140.00
200.00
45.00
65.00
6,300.00
13,000.00
200 mm
ml
50.00
65.00
3,250.00
-
1.17
1.18
No
8.00
85.00
680.00
-
No
4.00
7,500.00
30,000.00
Item
No.
}^ l.
1.19
Description
Unit
SK
Y`
SK
Rate
Contract Total
Amount
<Ku< M
/U` w`
1.20
Contract
Qty
<K
S
12.00
1,600.00
19,200.00
1.00
12,000.00
12,000.00
No
300,050.00