Sunteți pe pagina 1din 26

02

03May2012

NRN NRN

DIFC

RDD/BR

BR BR

01 03

20Mar2012

DIFC

RDD/BR

12Feb2013

NRN

DIFC

RDD/BR

KB BR

THIS DRAWING HAS BEEN PREPARED, REVIEWED, AND APPROVED BY SARGENT & LUNDY LLC

BLOCK-2 FIBER OPTIC CABLE TAB


SARGENT & LUNDY LLC 55 EAST MONROE STREET CHICAGO, ILLINOIS 60603-5780

BJG 02/27/2012

RDD/BR 02/12/2013 ELECTRICAL

1-0923053.01 3OS
Page 1 of 197

EE-681707

03

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


Cable Length Summary Block-2 COMM

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 4.0) Run Date: 2/12/2013 3:44 pm

1. 2. 3. 4. 5. 6.

Total Est Actual Pulled Est Unpulled On Order Over/Short Field Dev

= = = = = =

Total calculated lengths of cables in the cable tab. Actual cable lengths pulled. Estimated length to be pulled. Cable quantity ordered. Estimate of cables excess (+) or shortage (-) quantity. Overpull (+%) when field pulled lengths are above design estimates; Underpull (-%) when field pulled lengths are below design estimates. Length A B C = A - B1 D E=D-B-C B - B1 F = ---------- x 100% B1 ( B1 is the total estimated length of pulled cables, whereas B is the actual length pulled. )

Illustration
Total Est Actual Pulled Est Unpulled On Order Over/Short Field Dev

No. of Cables X Y<=X -

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


Cable Length Summary Block-2 COMM

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company


Length in Meters
On Order Over/ Short Field Dev Weight of CU

INTELAGEN - CMS (03.7.860 - 4.0) 3:44 pm 2/12/2013 Run Date:

Type Code

Furnish Spec

Description

Total # Cables

Total Pulled

Total Est

Actual Pulled

Est Unpulled

FIBER04 RG-58

QC-1023

4C FIBER OPTIC 62.5/125UM CO-AXIAL CABLE RG-58 C/U Overall Totals:

73 3 76

0 0 0

15505 1062 16,567

0 0 0

15505 1062 16,567

0 0 0

(15505) (1062)

0% 0%

Report Filter = ( CABLE_NUMBER Like 'C2%') AND (CABLE_SEG_CODE = 'CO' OR CABLE_SEG_CODE = 'T') AND CABLE_STATUS = 'Released'

Page 2 of 2

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


Cable Tabulation Block-2 COMM
Description:
Furnish Spec: Installation Spec: Budget Ref No: Compartment:: Pull Length(m): No. of Cables: Type Code: End Length(m):

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 4.0) Run Date:


Cable No. :
Seg Code: System: Startup Code:
Cable From End: Equipment No:

2/12/2013

3:57 pm
Rev:

Service:
Routed Length (m): Allowance (m): Total Length (m):
Cable To End: Equipment No:

Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg:

Shield: Ground: Jacket: End Length(m):

Description: Zone: Location Dwg:


Routing Information: Remarks:

Description: North: Wiring Dwg: Zone: Schematic Dwg: Location Dwg: Schematic Dwg:

Route Points:

ITEM

DESCRIPTION

Cable No. No. of Cables Description Voltage Rating Shield Insulation Jacket Rev. System Service Ground Seg Code Type Code Routed Length Allowance Pull Length Budget Ref No Option 1 / 2 / 3 Startup Code Furnished Spec Installation Spec From/To Equipment Number From/To Description Compartment End Length Wiring Drawing Location Drawing North / East / Elevation Zone Remarks Route Points Filter Criteria

Unique identifying number assigned the cable(s). Identifies number of physical cables associated with cable number. (e.g. A cable number for a power feed may include three(3) 1/C cables). Description of the type of cable (e.g. 7/C #14). Voltage rating of cables insulation system (e.g. 600V) Optional - when included is used to indicate that cable has and overall shield Type of cable insulation material (e.g. XLPE). Type of cable jacket material (e.g. PVC) Design revision status of the cable. Plant system to which the cable is assigned (e.g. CD - which would be the Condensate System). Description of service for which cable is used (e.g. Condensate Booster Pump A). Optional - when included specifies special grounding requirement (e.g. #2 Bare CU - may be specified when using non-metallic conduit). Segregation Code assigned to cable (e.g. MV - which would be Medium Voltage Power) Unique code assigned to each different cable type. Automatically calculated length which includes the length of the raceway path through which a cable is routed and also includes any end lengths which may be manually input to account for the cable segment between the last raceway point and the connected equipment (see end length). Automatically calculated contingency allowance based on the total routed length. Optional - when included identifies actual installed cable lengths. Optional - when included identifies budget reference numbers associated with cables. Optional - when included identifies optional cable information. Optional - when included identifies Start/Construction code Contract responsible for providing the cable Contract responsible for installing the cable Identifying numbers of equipment between which cable is routed. Description of equipment between which cable is routed. Optional - when included identifies equipment compartment to which cable is to be terminated (e.g. switchgear cubicle). Optional - when included identifies additional lengths which may be input to account for the cable segment between the last raceway point and the connected equipment (see Rtd Length). Optional - when included may be used to identify Master Schematic or other wiring drawing on which cable terminations are defined. Optional - when included may be used to identify document(s) providing unique equipment installation details. Optional - not required if zone is identified. Identifies the East - North grid location and Elevation of Equipment Optional - not required when North / East / Elevation coordinates are identified. Identifies name or pre-defined zone in which equipment is located. Optional - when included identifies optional notes, references, etc. Optional - Identifies the cables installation route through the raceway system. Optional - shown only on the last page of cable tabulation and identifies the additional constraints used in the generation of the report.

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-2 COMM

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 4.0) Run Date: 2/12/2013 3:57 pm


Rev: 00 Description:
4C FIBER OPTIC 62.5/125UM
Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 5 Elevation: Schematic: ED-693631

Cable: C20CMA4004
Seg Code: CO System: CMA Startup Code:

Service: DATA RETRIEVAL PANEL FOR BLOCK-2


Routed Length (m): Allowance (m): Total Length (m): 33 4 37 Option 1: DATA RETRIEVAL PNL Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693631 5

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C20BBE Compartment: Description: 4.16KV UNIT SWBD BUS A Equip Location: Zone: East: North: Location Dwg: EA-681122 Wiring Dwg:

Cable To End: Equipment No: C20CMA01 Compartment: Description: 4.16KV UNIT SWGR DATA RETRIEVAL PANEL (BLK-2) North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Routing Information: Remarks: Route: CABLE C20-TK-067 C20-TK-069 C20-TK-071 C20-TK-074 C20-TK-073 C20-TK-062 CABLE

Cable: C20CPB6001
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 10 Elevation: Schematic: ED-694669

Service: BLOCK-2 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 540 23 563 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694669 35

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C20SW63 Compartment: Description: NETWORK SW63 IN ST2 ELEC ROOM Equip Location: Zone: East: North: Location Dwg: EA-681112 Wiring Dwg:

Cable To End: Equipment No: P00SW171 Compartment: Description: NETWORK SW171 IN CCB North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681131

Routing Information: Remarks: Route: CABLE C24-TK-054 C24-TK-053 C24-TK-052 C24-TK-050 C24-TK-049 C24-TK-219 C24-TK-216 CABLE C24-TK-215B C24-TK-218 C20-EMH-009 C20-D066-44 C30-EMH-007 C30-D063-43 C30-EMH-008 C30-D065-61 C30-EMH-009 C30-D066-61 C30-EMH-010 C30-D070-61 C30-EMH-011 C30-D071-63 C00-EMH-171 C00-D351-58 C00-EMH-004 C00-D003-64 C00-EMH-003 C00-D002-63 C00-EMH-002 C00-D001-115 CABLE C00-TK-037 C00-TK-032 C00-TK-023 C00-TK-022 P00-TK-064B P00-TK-063B P00-TK-062B P00-TK-061B P00-TK-060B P00-TK-059B FIELD ROUTED

Cable: C20CPB6002
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 10 Elevation: Schematic: ED-694669

Service: BLOCK-2 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 540 23 563 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694669 35

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C20SW64 Compartment: Description: NETWORK SW64 IN ST2 ELEC ROOM Equip Location: Zone: North: East: Location Dwg: EA-681112 Wiring Dwg:

Cable To End: Equipment No: P00SW172 Compartment: Description: NETWORK SW172 IN CCB North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681131

Routing Information: Remarks: Route: CABLE C24-TK-054 C24-TK-053 C24-TK-052 C24-TK-050 C24-TK-049 C24-TK-219 C24-TK-216 CABLE C24-TK-215B C24-TK-218 C20-EMH-009 C20-D066-44 C30-EMH-007 C30-D063-43 C30-EMH-008 C30-D065-61 C30-EMH-009 C30-D066-61 C30-EMH-010 C30-D070-61 C30-EMH-011 C30-D071-63 C00-EMH-171 C00-D351-58 C00-EMH-004 C00-D003-64 C00-EMH-003 C00-D002-63 C00-EMH-002 C00-D001-115 CABLE C00-TK-037 C00-TK-032 C00-TK-023 C00-TK-022 P00-TK-064B P00-TK-063B P00-TK-062B P00-TK-061B P00-TK-060B P00-TK-059B FIELD ROUTED

Page 1 of 22

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-2 COMM

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 4.0) Run Date: 2/12/2013 3:57 pm


Rev: 00 Description:
4C FIBER OPTIC 62.5/125UM
Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 10 Elevation: Schematic: ED-694669

Cable: C20CPB6003
Seg Code: CO System: CPB Startup Code:

Service: BLOCK-2 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 719 29 748 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694669 35

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C20SW196 Compartment: Description: NETWORK SW196 IN BLK-2 MVLV BLDG Equip Location: Zone: East: North: Location Dwg: EA-681122 Wiring Dwg:

Cable To End: Equipment No: P00SW171 Compartment: Description: NETWORK SW171 IN CCB North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681131

Routing Information: Remarks: Route: CABLE C20-TK-142 C20-TK-144 C20-TK-148 C20-TK-151 C20-TK-153 C20-TK-159 C20-TK-231 C20-TK-233 C20-TK-236 C20-TK-237 C20-TK-211 C20-TK-207B C24-TK-201B C24-TK-203B C24-TK-205B C24-TK-207B C24-TK-209B C24-TK-211B C24-TK-213B C24-TK-215B C24-TK-218 C20-EMH-009 C20-D066-41 C30-EMH-007 C30-D063-41 C30-EMH-008 C30-D065-62 C30-EMH-009 C30-D066-65 C30-EMH-010 C30-D070-65 C30-EMH-011 C30-D071-64 C00-EMH-171 C00-D351-60 C00-EMH-004 C00-D003-62 C00-EMH-003 C00-D002-64 C00-EMH-002 C00-D001-116 CABLE C00-TK-037 C00-TK-032 C00-TK-023 C00-TK-022 P00-TK-064B P00-TK-063B P00-TK-062B P00-TK-061B P00-TK-060B P00-TK-059B FIELD ROUTED

Cable: C20CPB6004
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 10 Elevation: Schematic: ED-694669

Service: BLOCK-2 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 719 29 748 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694669 35

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C20SW197 Compartment: Description: NETWORK SW197 IN BLK-2 MVLV BLDG Equip Location: Zone: North: East: Location Dwg: EA-681122 Wiring Dwg:

Cable To End: Equipment No: P00SW172 Compartment: Description: NETWORK SW172 IN CCB North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681131

Routing Information: Remarks: Route: CABLE C20-TK-142 C20-TK-144 C20-TK-148 C20-TK-151 C20-TK-153 C20-TK-159 C20-TK-231 C20-TK-233 C20-TK-236 C20-TK-237 C20-TK-211 C20-TK-207B C24-TK-201B C24-TK-203B C24-TK-205B C24-TK-207B C24-TK-209B C24-TK-211B C24-TK-213B C24-TK-215B C24-TK-218 C20-EMH-009 C20-D066-41 C30-EMH-007 C30-D063-41 C30-EMH-008 C30-D065-62 C30-EMH-009 C30-D066-65 C30-EMH-010 C30-D070-65 C30-EMH-011 C30-D071-64 C00-EMH-171 C00-D351-60 C00-EMH-004 C00-D003-62 C00-EMH-003 C00-D002-64 C00-EMH-002 C00-D001-116 CABLE C00-TK-037 C00-TK-032 C00-TK-023 C00-TK-022 P00-TK-064B P00-TK-063B P00-TK-062B P00-TK-061B P00-TK-060B P00-TK-059B FIELD ROUTED

Cable: C20CPB6005
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 10 Elevation: Schematic: ED-694669

Service: BLOCK-2 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 719 29 748 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694669 35

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C20SW198 Compartment: Description: NETWORK SW198 IN BLK-2 MVLV BLDG Equip Location: Zone: North: East: Location Dwg: EA-681122 Wiring Dwg:

Cable To End: Equipment No: P00SW171 Compartment: Description: NETWORK SW171 IN CCB North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681131

Routing Information: Remarks: Route: CABLE C20-TK-142 C20-TK-144 C20-TK-148 C20-TK-151 C20-TK-153 C20-TK-159 C20-TK-231 C20-TK-233 C20-TK-236 C20-TK-237 C20-TK-211 C20-TK-207B C24-TK-201B C24-TK-203B C24-TK-205B C24-TK-207B C24-TK-209B C24-TK-211B C24-TK-213B C24-TK-215B C24-TK-218 C20-EMH-009 C20-D066-44 C30-EMH-007 C30-D063-43 C30-EMH-008 C30-D065-61 C30-EMH-009 C30-D066-61 C30-EMH-010 C30-D070-61 C30-EMH-011 C30-D071-63 C00-EMH-171 C00-D351-58 C00-EMH-004 C00-D003-64 C00-EMH-003 C00-D002-63 C00-EMH-002 C00-D001-115 CABLE C00-TK-037 C00-TK-032 C00-TK-023 C00-TK-022 P00-TK-064B P00-TK-063B P00-TK-062B P00-TK-061B P00-TK-060B P00-TK-059B FIELD ROUTED

Page 2 of 22

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-2 COMM

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 4.0) Run Date: 2/12/2013 3:57 pm


Rev: 00 Description:
4C FIBER OPTIC 62.5/125UM
Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 10 Elevation: Schematic: ED-694669

Cable: C20CPB6006
Seg Code: CO System: CPB Startup Code:

Service: BLOCK-2 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 719 29 748 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694669 35

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C20SW199 Compartment: Description: NETWORK SW199 IN BLK-2 MVLV BLDG Equip Location: Zone: East: North: Location Dwg: EA-681122 Wiring Dwg:

Cable To End: Equipment No: P00SW172 Compartment: Description: NETWORK SW172 IN CCB North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681131

Routing Information: Remarks: Route: CABLE C20-TK-142 C20-TK-144 C20-TK-148 C20-TK-151 C20-TK-153 C20-TK-159 C20-TK-231 C20-TK-233 C20-TK-236 C20-TK-237 C20-TK-211 C20-TK-207B C24-TK-201B C24-TK-203B C24-TK-205B C24-TK-207B C24-TK-209B C24-TK-211B C24-TK-213B C24-TK-215B C24-TK-218 C20-EMH-009 C20-D066-41 C30-EMH-007 C30-D063-41 C30-EMH-008 C30-D065-62 C30-EMH-009 C30-D066-65 C30-EMH-010 C30-D070-65 C30-EMH-011 C30-D071-64 C00-EMH-171 C00-D351-60 C00-EMH-004 C00-D003-62 C00-EMH-003 C00-D002-64 C00-EMH-002 C00-D001-116 CABLE C00-TK-037 C00-TK-032 C00-TK-023 C00-TK-022 P00-TK-064B P00-TK-063B P00-TK-062B P00-TK-061B P00-TK-060B P00-TK-059B FIELD ROUTED

Cable: C20CPB6007
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 10 Elevation: Schematic: ED-694669

Service: BLOCK-2 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 719 29 748 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694669 35

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C20SW200 Compartment: Description: NETWORK SW200 IN BLK-2 MVLV BLDG Equip Location: Zone: North: East: Location Dwg: EA-681122 Wiring Dwg:

Cable To End: Equipment No: P00SW171 Compartment: Description: NETWORK SW171 IN CCB North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681131

Routing Information: Remarks: Route: CABLE C20-TK-142 C20-TK-144 C20-TK-148 C20-TK-151 C20-TK-153 C20-TK-159 C20-TK-231 C20-TK-233 C20-TK-236 C20-TK-237 C20-TK-211 C20-TK-207B C24-TK-201B C24-TK-203B C24-TK-205B C24-TK-207B C24-TK-209B C24-TK-211B C24-TK-213B C24-TK-215B C24-TK-218 C20-EMH-009 C20-D066-41 C30-EMH-007 C30-D063-41 C30-EMH-008 C30-D065-62 C30-EMH-009 C30-D066-65 C30-EMH-010 C30-D070-65 C30-EMH-011 C30-D071-64 C00-EMH-171 C00-D351-60 C00-EMH-004 C00-D003-62 C00-EMH-003 C00-D002-64 C00-EMH-002 C00-D001-116 CABLE C00-TK-037 C00-TK-032 C00-TK-023 C00-TK-022 P00-TK-064B P00-TK-063B P00-TK-062B P00-TK-061B P00-TK-060B P00-TK-059B FIELD ROUTED

Cable: C20CPB6008
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 10 Elevation: Schematic: ED-694669

Service: BLOCK-2 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 719 29 748 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694669 35

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C20SW201 Compartment: Description: NETWORK SW201 IN BLK-2 MVLV BLDG Equip Location: Zone: North: East: Location Dwg: EA-681122 Wiring Dwg:

Cable To End: Equipment No: P00SW172 Compartment: Description: NETWORK SW172 IN CCB North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681131

Routing Information: Remarks: Route: CABLE C20-TK-142 C20-TK-144 C20-TK-148 C20-TK-151 C20-TK-153 C20-TK-159 C20-TK-231 C20-TK-233 C20-TK-236 C20-TK-237 C20-TK-211 C20-TK-207B C24-TK-201B C24-TK-203B C24-TK-205B C24-TK-207B C24-TK-209B C24-TK-211B C24-TK-213B C24-TK-215B C24-TK-218 C20-EMH-009 C20-D066-44 C30-EMH-007 C30-D063-43 C30-EMH-008 C30-D065-61 C30-EMH-009 C30-D066-61 C30-EMH-010 C30-D070-61 C30-EMH-011 C30-D071-63 C00-EMH-171 C00-D351-58 C00-EMH-004 C00-D003-64 C00-EMH-003 C00-D002-63 C00-EMH-002 C00-D001-115 CABLE C00-TK-037 C00-TK-032 C00-TK-023 C00-TK-022 P00-TK-064B P00-TK-063B P00-TK-062B P00-TK-061B P00-TK-060B P00-TK-059B FIELD ROUTED

Page 3 of 22

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-2 COMM

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 4.0) Run Date: 2/12/2013 3:57 pm


Rev: 00 Description:
4C FIBER OPTIC 62.5/125UM
Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 11 Elevation: Schematic: ED-694669

Cable: C20CPB6009
Seg Code: CO System: CPB Startup Code:

Service: BLOCK-2 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 11 2 13 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694669 0

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C21-CPB-66-GH-013 Compartment: Description: B2H1T I/O CABINET-1_TMR Equip Location: Zone: East: North: Location Dwg: EA-681122 Wiring Dwg: Routing Information: Remarks: Route: FIELD ROUTED

Cable To End: Equipment No: C21-CPB-66-GH-011 Compartment: Description: B2H1T CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Cable: C20CPB6010
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 11 Elevation: Schematic: ED-694669

Service: BLOCK-2 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 11 2 13 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694669 0

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C21-CPB-66-GH-013 Compartment: Description: B2H1T I/O CABINET-1_TMR Equip Location: Zone: East: North: Location Dwg: EA-681122 Wiring Dwg: Routing Information: Remarks: Route: FIELD ROUTED

Cable To End: Equipment No: C21-CPB-66-GH-011 Compartment: Description: B2H1T CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Cable: C20CPB6011
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 11 Elevation: Schematic: ED-694669

Service: BLOCK-2 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 11 2 13 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694669 0

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C21-CPB-66-GH-013 Compartment: Description: B2H1T I/O CABINET-1_TMR Equip Location: Zone: North: East: Location Dwg: EA-681122 Wiring Dwg: Routing Information: Remarks: Route: FIELD ROUTED

Cable To End: Equipment No: C21-CPB-66-GH-011 Compartment: Description: B2H1T CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Cable: C20CPB6012
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 6 Elevation: Schematic: ED-694669

Service: BLOCK-2 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 12 2 14 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694669 6

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C21-CPB-66-GH-012 Compartment: Description: B2H1T I/O CABINET-2_TMR Equip Location: Zone: North: East: Location Dwg: EA-681122 Wiring Dwg: Routing Information: Remarks: Route: CABLE C20-TK-151 CABLE

Cable To End: Equipment No: C21-CPB-66-GH-011 Compartment: Description: B2H1T CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Page 4 of 22

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-2 COMM

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 4.0) Run Date: 2/12/2013 3:57 pm


Rev: 00 Description:
4C FIBER OPTIC 62.5/125UM
Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 6 Elevation: Schematic: ED-694669

Cable: C20CPB6013
Seg Code: CO System: CPB Startup Code:

Service: BLOCK-2 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 12 2 14 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694669 6

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C21-CPB-66-GH-012 Compartment: Description: B2H1T I/O CABINET-2_TMR Equip Location: Zone: East: North: Location Dwg: EA-681122 Wiring Dwg: Routing Information: Remarks: Route: CABLE C20-TK-151 CABLE

Cable To End: Equipment No: C21-CPB-66-GH-011 Compartment: Description: B2H1T CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Cable: C20CPB6014
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 6 Elevation: Schematic: ED-694669

Service: BLOCK-2 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 12 2 14 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694669 6

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C21-CPB-66-GH-012 Compartment: Description: B2H1T I/O CABINET-2_TMR Equip Location: Zone: East: North: Location Dwg: EA-681122 Wiring Dwg: Routing Information: Remarks: Route: CABLE C20-TK-151 CABLE

Cable To End: Equipment No: C21-CPB-66-GH-011 Compartment: Description: B2H1T CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Cable: C20CPB6015
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 5 Elevation: Schematic: ED-694669

Service: BLOCK-2 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 14 3 17 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694669 9

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C21-CPB-66-GH-003 Compartment: Description: B2H1 I/O CABINET-2_SIMP Equip Location: Zone: North: East: Location Dwg: EA-681122 Wiring Dwg: Routing Information: Remarks: Route: CABLE C20-TK-148 CABLE

Cable To End: Equipment No: C21-CPB-66-GH-001 Compartment: Description: B2H1 CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Cable: C20CPB6016
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 5 Elevation: Schematic: ED-694669

Service: BLOCK-2 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 14 3 17 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694669 9

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C21-CPB-66-GH-003 Compartment: Description: B2H1 I/O CABINET-2_SIMP Equip Location: Zone: North: East: Location Dwg: EA-681122 Wiring Dwg: Routing Information: Remarks: Route: CABLE C20-TK-148 CABLE

Cable To End: Equipment No: C21-CPB-66-GH-001 Compartment: Description: B2H1 CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Page 5 of 22

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-2 COMM

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 4.0) Run Date: 2/12/2013 3:57 pm


Rev: 00 Description:
4C FIBER OPTIC 62.5/125UM
Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 6 Elevation: Schematic: ED-694669

Cable: C20CPB6017
Seg Code: CO System: CPB Startup Code:

Service: BLOCK-2 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 15 3 18 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694669 9

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C21-CPB-66-GH-004 Compartment: Description: B2H1 I/O CABINET-3_SIMP Equip Location: Zone: East: North: Location Dwg: EA-681122 Wiring Dwg: Routing Information: Remarks: Route: CABLE C20-TK-148 CABLE

Cable To End: Equipment No: C21-CPB-66-GH-001 Compartment: Description: B2H1 CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Cable: C20CPB6018
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 6 Elevation: Schematic: ED-694669

Service: BLOCK-2 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 15 3 18 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694669 9

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C21-CPB-66-GH-004 Compartment: Description: B2H1 I/O CABINET-3_SIMP Equip Location: Zone: East: North: Location Dwg: EA-681122 Wiring Dwg: Routing Information: Remarks: Route: CABLE C20-TK-148 CABLE

Cable To End: Equipment No: C21-CPB-66-GH-001 Compartment: Description: B2H1 CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Cable: C20CPB6019
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 11 Elevation: Schematic: ED-694669

Service: BLOCK-2 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 11 2 13 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694669 0

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C22-CPB-66-GH-013 Compartment: Description: B2H2T I/O CABINET-1_TMR Equip Location: Zone: North: East: Location Dwg: EA-681122 Wiring Dwg: Routing Information: Remarks: Route: FIELD ROUTED

Cable To End: Equipment No: C22-CPB-66-GH-011 Compartment: Description: B2H2T CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Cable: C20CPB6020
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 11 Elevation: Schematic: ED-694669

Service: BLOCK-2 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 11 2 13 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694669 0

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C22-CPB-66-GH-013 Compartment: Description: B2H2T I/O CABINET-1_TMR Equip Location: Zone: North: East: Location Dwg: EA-681122 Wiring Dwg: Routing Information: Remarks: Route: FIELD ROUTED

Cable To End: Equipment No: C22-CPB-66-GH-011 Compartment: Description: B2H2T CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Page 6 of 22

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-2 COMM

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 4.0) Run Date: 2/12/2013 3:57 pm


Rev: 00 Description:
4C FIBER OPTIC 62.5/125UM
Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 11 Elevation: Schematic: ED-694669

Cable: C20CPB6021
Seg Code: CO System: CPB Startup Code:

Service: BLOCK-2 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 11 2 13 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694669 0

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C22-CPB-66-GH-013 Compartment: Description: B2H2T I/O CABINET-1_TMR Equip Location: Zone: East: North: Location Dwg: EA-681122 Wiring Dwg: Routing Information: Remarks: Route: FIELD ROUTED

Cable To End: Equipment No: C22-CPB-66-GH-011 Compartment: Description: B2H2T CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Cable: C20CPB6022
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 5 Elevation: Schematic: ED-694669

Service: BLOCK-2 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 14 3 17 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694669 9

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C22-CPB-66-GH-012 Compartment: Description: B2H2T I/O CABINET-2_TMR Equip Location: Zone: East: North: Location Dwg: EA-681122 Wiring Dwg: Routing Information: Remarks: Route: CABLE C20-TK-141 CABLE

Cable To End: Equipment No: C22-CPB-66-GH-011 Compartment: Description: B2H2T CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Cable: C20CPB6023
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 5 Elevation: Schematic: ED-694669

Service: BLOCK-2 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 14 3 17 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694669 9

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C22-CPB-66-GH-012 Compartment: Description: B2H2T I/O CABINET-2_TMR Equip Location: Zone: North: East: Location Dwg: EA-681122 Wiring Dwg: Routing Information: Remarks: Route: CABLE C20-TK-141 CABLE

Cable To End: Equipment No: C22-CPB-66-GH-011 Compartment: Description: B2H2T CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Cable: C20CPB6024
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 5 Elevation: Schematic: ED-694669

Service: BLOCK-2 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 14 3 17 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694669 9

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C22-CPB-66-GH-012 Compartment: Description: B2H2T I/O CABINET-2_TMR Equip Location: Zone: North: East: Location Dwg: EA-681122 Wiring Dwg: Routing Information: Remarks: Route: CABLE C20-TK-141 CABLE

Cable To End: Equipment No: C22-CPB-66-GH-011 Compartment: Description: B2H2T CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Page 7 of 22

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-2 COMM

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 4.0) Run Date: 2/12/2013 3:57 pm


Rev: 00 Description:
4C FIBER OPTIC 62.5/125UM
Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 6 Elevation: Schematic: ED-694669

Cable: C20CPB6025
Seg Code: CO System: CPB Startup Code:

Service: BLOCK-2 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 15 3 18 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694669 5

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C22-CPB-66-GH-003 Compartment: Description: B2H2 I/O CABINET-2_SIMP Equip Location: Zone: East: North: Location Dwg: EA-681122 Wiring Dwg: Routing Information: Remarks: Route: CABLE C20-TK-139 C20-TK-137 CABLE

Cable To End: Equipment No: C22-CPB-66-GH-001 Compartment: Description: B2H2 CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Cable: C20CPB6026
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 6 Elevation: Schematic: ED-694669

Service: BLOCK-2 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 15 3 18 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694669 5

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C22-CPB-66-GH-003 Compartment: Description: B2H2 I/O CABINET-2_SIMP Equip Location: Zone: East: North: Location Dwg: EA-681122 Wiring Dwg: Routing Information: Remarks: Route: CABLE C20-TK-139 C20-TK-137 CABLE

Cable To End: Equipment No: C22-CPB-66-GH-001 Compartment: Description: B2H2 CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Cable: C20CPB6027
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 7 Elevation: Schematic: ED-694669

Service: BLOCK-2 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 16 3 19 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694669 5

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C22-CPB-66-GH-004 Compartment: Description: B2H2 I/O CABINET-3_SIMP Equip Location: Zone: North: East: Location Dwg: EA-681122 Wiring Dwg: Routing Information: Remarks: Route: CABLE C20-TK-139 C20-TK-137 CABLE

Cable To End: Equipment No: C22-CPB-66-GH-001 Compartment: Description: B2H2 CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Cable: C20CPB6028
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 7 Elevation: Schematic: ED-694669

Service: BLOCK-2 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 16 3 19 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694669 5

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C22-CPB-66-GH-004 Compartment: Description: B2H2 I/O CABINET-3_SIMP Equip Location: Zone: North: East: Location Dwg: EA-681122 Wiring Dwg: Routing Information: Remarks: Route: CABLE C20-TK-139 C20-TK-137 CABLE

Cable To End: Equipment No: C22-CPB-66-GH-001 Compartment: Description: B2H2 CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Page 8 of 22

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-2 COMM

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 4.0) Run Date: 2/12/2013 3:57 pm


Rev: 00 Description:
4C FIBER OPTIC 62.5/125UM
Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 7 Elevation: Schematic: ED-694669

Cable: C20CPB6029
Seg Code: CO System: CPB Startup Code:

Service: BLOCK-2 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 12 2 14 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694669 5

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C23-CPB-66-GH-013 Compartment: Description: B2H3T I/O CABINET-1_TMR Equip Location: Zone: East: North: Location Dwg: EA-681122 Wiring Dwg: Routing Information: Remarks: Route: CABLE C20-TK-143 CABLE

Cable To End: Equipment No: C23-CPB-66-GH-011 Compartment: Description: B2H3T CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Cable: C20CPB6030
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 7 Elevation: Schematic: ED-694669

Service: BLOCK-2 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 12 2 14 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694669 5

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C23-CPB-66-GH-013 Compartment: Description: B2H3T I/O CABINET-1_TMR Equip Location: Zone: East: North: Location Dwg: EA-681122 Wiring Dwg: Routing Information: Remarks: Route: CABLE C20-TK-143 CABLE

Cable To End: Equipment No: C23-CPB-66-GH-011 Compartment: Description: B2H3T CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Cable: C20CPB6031
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 7 Elevation: Schematic: ED-694669

Service: BLOCK-2 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 12 2 14 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694669 5

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C23-CPB-66-GH-013 Compartment: Description: B2H3T I/O CABINET-1_TMR Equip Location: Zone: North: East: Location Dwg: EA-681122 Wiring Dwg: Routing Information: Remarks: Route: CABLE C20-TK-143 CABLE

Cable To End: Equipment No: C23-CPB-66-GH-011 Compartment: Description: B2H3T CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Cable: C20CPB6032
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 5 Elevation: Schematic: ED-694669

Service: BLOCK-2 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 13 3 16 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694669 5

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C23-CPB-66-GH-012 Compartment: Description: B2H3T I/O CABINET-2_TMR Equip Location: Zone: North: East: Location Dwg: EA-681122 Wiring Dwg: Routing Information: Remarks: Route: CABLE C20-TK-140 C20-TK-143 CABLE

Cable To End: Equipment No: C23-CPB-66-GH-011 Compartment: Description: B2H3T CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Page 9 of 22

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-2 COMM

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 4.0) Run Date: 2/12/2013 3:57 pm


Rev: 00 Description:
4C FIBER OPTIC 62.5/125UM
Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 5 Elevation: Schematic: ED-694669

Cable: C20CPB6033
Seg Code: CO System: CPB Startup Code:

Service: BLOCK-2 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 13 3 16 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694669 5

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C23-CPB-66-GH-012 Compartment: Description: B2H3T I/O CABINET-2_TMR Equip Location: Zone: East: North: Location Dwg: EA-681122 Wiring Dwg: Routing Information: Remarks: Route: CABLE C20-TK-140 C20-TK-143 CABLE

Cable To End: Equipment No: C23-CPB-66-GH-011 Compartment: Description: B2H3T CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Cable: C20CPB6034
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 5 Elevation: Schematic: ED-694669

Service: BLOCK-2 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 13 3 16 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694669 5

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C23-CPB-66-GH-012 Compartment: Description: B2H3T I/O CABINET-2_TMR Equip Location: Zone: East: North: Location Dwg: EA-681122 Wiring Dwg: Routing Information: Remarks: Route: CABLE C20-TK-140 C20-TK-143 CABLE

Cable To End: Equipment No: C23-CPB-66-GH-011 Compartment: Description: B2H3T CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Cable: C20CPB6035
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 8 Elevation: Schematic: ED-694669

Service: BLOCK-2 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 13 3 16 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694669 5

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C23-CPB-66-GH-003 Compartment: Description: B2H3 I/O CABINET-2_SIMP Equip Location: Zone: North: East: Location Dwg: EA-681122 Wiring Dwg: Routing Information: Remarks: Route: CABLE C20-TK-165 CABLE

Cable To End: Equipment No: C23-CPB-66-GH-001 Compartment: Description: B2H3 CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Cable: C20CPB6036
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 8 Elevation: Schematic: ED-694669

Service: BLOCK-2 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 13 3 16 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694669 5

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C23-CPB-66-GH-003 Compartment: Description: B2H3 I/O CABINET-2_SIMP Equip Location: Zone: North: East: Location Dwg: EA-681122 Wiring Dwg: Routing Information: Remarks: Route: CABLE C20-TK-165 CABLE

Cable To End: Equipment No: C23-CPB-66-GH-001 Compartment: Description: B2H3 CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Page 10 of 22

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-2 COMM

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 4.0) Run Date: 2/12/2013 3:57 pm


Rev: 00 Description:
4C FIBER OPTIC 62.5/125UM
Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 10 Elevation: Schematic: ED-694669

Cable: C20CPB6037
Seg Code: CO System: CPB Startup Code:

Service: BLOCK-2 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 15 3 18 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694669 5

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C23-CPB-66-GH-004 Compartment: Description: B2H3 I/O CABINET-3_SIMP Equip Location: Zone: East: North: Location Dwg: EA-681122 Wiring Dwg: Routing Information: Remarks: Route: CABLE C20-TK-165 CABLE

Cable To End: Equipment No: C23-CPB-66-GH-001 Compartment: Description: B2H3 CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Cable: C20CPB6038
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 10 Elevation: Schematic: ED-694669

Service: BLOCK-2 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 15 3 18 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694669 5

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C23-CPB-66-GH-004 Compartment: Description: B2H3 I/O CABINET-3_SIMP Equip Location: Zone: East: North: Location Dwg: EA-681122 Wiring Dwg: Routing Information: Remarks: Route: CABLE C20-TK-165 CABLE

Cable To End: Equipment No: C23-CPB-66-GH-001 Compartment: Description: B2H3 CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Cable: C20CPB6039
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 18 Elevation: Schematic: ED-694669

Service: BLOCK-2 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 18 3 21 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694669 0

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C20-CPB-66-GH-023 Compartment: Description: B2BT I/O CABINET-2_TMR Equip Location: Zone: North: East: Location Dwg: EA-681122 Wiring Dwg: Routing Information: Remarks: Route: FIELD ROUTED

Cable To End: Equipment No: C20-CPB-66-GH-021 Compartment: Description: B2BT CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Cable: C20CPB6040
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 18 Elevation: Schematic: ED-694669

Service: BLOCK-2 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 18 3 21 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694669 0

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C20-CPB-66-GH-023 Compartment: Description: B2BT I/O CABINET-2_TMR Equip Location: Zone: North: East: Location Dwg: EA-681122 Wiring Dwg: Routing Information: Remarks: Route: FIELD ROUTED

Cable To End: Equipment No: C20-CPB-66-GH-021 Compartment: Description: B2BT CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Page 11 of 22

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-2 COMM

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 4.0) Run Date: 2/12/2013 3:57 pm


Rev: 00 Description:
4C FIBER OPTIC 62.5/125UM
Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 18 Elevation: Schematic: ED-694669

Cable: C20CPB6041
Seg Code: CO System: CPB Startup Code:

Service: BLOCK-2 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 18 3 21 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694669 0

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C20-CPB-66-GH-023 Compartment: Description: B2BT I/O CABINET-2_TMR Equip Location: Zone: East: North: Location Dwg: EA-681122 Wiring Dwg: Routing Information: Remarks: Route: FIELD ROUTED

Cable To End: Equipment No: C20-CPB-66-GH-021 Compartment: Description: B2BT CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Cable: C20CPB6042
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 7 Elevation: Schematic: ED-694669

Service: BLOCK-2 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 19 3 22 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694669 12

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C20-CPB-66-GH-024 Compartment: Description: B2BT I/O CABINET-3_SIMP Equip Location: Zone: East: North: Location Dwg: EA-681122 Wiring Dwg: Routing Information: Remarks: Route: CABLE C20-TK-133 CABLE

Cable To End: Equipment No: C20-CPB-66-GH-021 Compartment: Description: B2BT CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Cable: C20CPB6043
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 7 Elevation: Schematic: ED-694669

Service: BLOCK-2 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 19 3 22 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694669 12

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C20-CPB-66-GH-024 Compartment: Description: B2BT I/O CABINET-3_SIMP Equip Location: Zone: North: East: Location Dwg: EA-681122 Wiring Dwg: Routing Information: Remarks: Route: CABLE C20-TK-133 CABLE

Cable To End: Equipment No: C20-CPB-66-GH-021 Compartment: Description: B2BT CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Cable: C20CPB6044
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 5 Elevation: Schematic: ED-694669

Service: BLOCK-2 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 16 3 19 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694669 7

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C20-CPB-66-GH-004 Compartment: Description: B2C I/O CABINET-3_SIMP Equip Location: Zone: North: East: Location Dwg: EA-681122 Wiring Dwg: Routing Information: Remarks: Route: CABLE C20-TK-149 C20-TK-150 CABLE

Cable To End: Equipment No: C20-CPB-66-GH-001 Compartment: Description: B2C CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Page 12 of 22

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-2 COMM

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 4.0) Run Date: 2/12/2013 3:57 pm


Rev: 00 Description:
4C FIBER OPTIC 62.5/125UM
Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 5 Elevation: Schematic: ED-694669

Cable: C20CPB6045
Seg Code: CO System: CPB Startup Code:

Service: BLOCK-2 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 16 3 19 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694669 7

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C20-CPB-66-GH-004 Compartment: Description: B2C I/O CABINET-3_SIMP Equip Location: Zone: East: North: Location Dwg: EA-681122 Wiring Dwg: Routing Information: Remarks: Route: CABLE C20-TK-149 C20-TK-150 CABLE

Cable To End: Equipment No: C20-CPB-66-GH-001 Compartment: Description: B2C CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Cable: C20CPB6046
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 7 Elevation: Schematic: ED-694669

Service: BLOCK-2 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 18 3 21 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694669 7

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C20-CPB-66-GH-005 Compartment: Description: B2C I/O CABINET-4_SIMP Equip Location: Zone: East: North: Location Dwg: EA-681122 Wiring Dwg: Routing Information: Remarks: Route: CABLE C20-TK-149 C20-TK-150 CABLE

Cable To End: Equipment No: C20-CPB-66-GH-001 Compartment: Description: B2C CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Cable: C20CPB6047
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 7 Elevation: Schematic: ED-694669

Service: BLOCK-2 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 18 3 21 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694669 7

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C20-CPB-66-GH-005 Compartment: Description: B2C I/O CABINET-4_SIMP Equip Location: Zone: North: East: Location Dwg: EA-681122 Wiring Dwg: Routing Information: Remarks: Route: CABLE C20-TK-149 C20-TK-150 CABLE

Cable To End: Equipment No: C20-CPB-66-GH-001 Compartment: Description: B2C CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Cable: C20CPB6048
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 5 Elevation: Schematic: ED-694669

Service: BLOCK-2 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 11 2 13 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694669 6

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C20-CPB-66-GH-012 Compartment: Description: B2E I/O CABINET-1_SIMP Equip Location: Zone: North: East: Location Dwg: EA-681122 Wiring Dwg: Routing Information: Remarks: Route: CABLE C20-TK-145 CABLE

Cable To End: Equipment No: C20-CPB-66-GH-011 Compartment: Description: B2E CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Page 13 of 22

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-2 COMM

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 4.0) Run Date: 2/12/2013 3:57 pm


Rev: 00 Description:
4C FIBER OPTIC 62.5/125UM
Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 5 Elevation: Schematic: ED-694669

Cable: C20CPB6049
Seg Code: CO System: CPB Startup Code:

Service: BLOCK-2 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 11 2 13 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694669 6

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C20-CPB-66-GH-012 Compartment: Description: B2E I/O CABINET-1_SIMP Equip Location: Zone: East: North: Location Dwg: EA-681122 Wiring Dwg: Routing Information: Remarks: Route: CABLE C20-TK-145 CABLE

Cable To End: Equipment No: C20-CPB-66-GH-011 Compartment: Description: B2E CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Cable: C20CPB6050
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 6 Elevation: Schematic: ED-694669

Service: BLOCK-2 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 13 3 16 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694669 7

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C20-CPB-66-GH-011 Compartment: Description: B2E CONTROLLER CABINET Equip Location: Zone: East: North: Location Dwg: EA-681122 Wiring Dwg: Routing Information: Remarks: Route: CABLE C20-TK-145 CABLE

Cable To End: Equipment No: C20-CPB-66-GH-013 Compartment: Description: B2E I/O CABINET-2_SIMP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Cable: C20CPB6051
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 6 Elevation: Schematic: ED-694669

Service: BLOCK-2 FIBER OPTIC CABLE (DCS)


Routed Length (m): Allowance (m): Total Length (m): 13 3 16 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694669 7

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C20-CPB-66-GH-011 Compartment: Description: B2E CONTROLLER CABINET Equip Location: Zone: North: East: Location Dwg: EA-681122 Wiring Dwg: Routing Information: Remarks: Route: CABLE C20-TK-145 CABLE

Cable To End: Equipment No: C20-CPB-66-GH-013 Compartment: Description: B2E I/O CABINET-2_SIMP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Page 14 of 22

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-2 COMM

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 4.0) Run Date: 2/12/2013 3:57 pm


Rev: 00 Description:
4C FIBER OPTIC 62.5/125UM
Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 10 Elevation: Schematic: ED-694679

Cable: C20CPB6079
Seg Code: CO System: CPB Startup Code:

Service: BLOCK-2 MODBUS CABLE


Routed Length (m): Allowance (m): Total Length (m): 318 14 332 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694679 5

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C20-PAB-55-GH-010 Compartment: Description: BLK-2 DBRS FLTR CNTL PNL Equip Location: Zone: East: North: Location Dwg: EA-681112 Wiring Dwg:

Cable To End: Equipment No: C20-CPB-66-GN-001 Compartment: Description: B2C NETWORK CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Routing Information: Remarks: Route: FIELD ROUTED C24-TK-038 C24-TK-044 C24-TK-045 C24-TK-046 C24-TK-222 C24-TK-221 C24-TK-219 C24-TK-216 C24-TK-214 C24-TK-212 C24-TK-210 C24-TK-208 C24-TK-206 C24-TK-204 C24-TK-202 C20-TK-208 C20-TK-212B C20-TK-217B C20-TK-218B C20-TK-223B C20-TK-158 C20-TK-154 C20-TK-150 C20-TK-149 C20-TK-145 C20-TK-143 C20-TK-140 C20-TK-165 CABLE

Cable: C20CPB6080
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 10 Elevation: Schematic: ED-694679

Service: BLOCK-2 MODBUS CABLE


Routed Length (m): Allowance (m): Total Length (m): 318 14 332 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694679 5

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C20-PAB-55-GH-010 Compartment: Description: BLK-2 DBRS FLTR CNTL PNL Equip Location: Zone: North: East: Location Dwg: EA-681112 Wiring Dwg:

Cable To End: Equipment No: C20-CPB-66-GN-001 Compartment: Description: B2C NETWORK CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Routing Information: Remarks: Route: FIELD ROUTED C24-TK-038 C24-TK-044 C24-TK-045 C24-TK-046 C24-TK-222 C24-TK-221 C24-TK-219 C24-TK-216 C24-TK-214 C24-TK-212 C24-TK-210 C24-TK-208 C24-TK-206 C24-TK-204 C24-TK-202 C20-TK-208 C20-TK-212B C20-TK-217B C20-TK-218B C20-TK-223B C20-TK-158 C20-TK-154 C20-TK-150 C20-TK-149 C20-TK-145 C20-TK-143 C20-TK-140 C20-TK-165 CABLE

Cable: C20CPB6084
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 15 Elevation: Schematic: ED-694680

Service: BLOCK-2 MODBUS CABLE


Routed Length (m): Allowance (m): Total Length (m): 284 13 297 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694680 5

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C21-MBR-10-GH-001 Compartment: Description: DIVERTER DAMPER LCP Equip Location: Zone: East: North: Location Dwg: EA-685856 Wiring Dwg:

Cable To End: Equipment No: C20-CPB-66-GN-001 Compartment: Description: B2C NETWORK CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Routing Information: Remarks: Route: FIELD ROUTED C21-TK-041 C21-TK-042 C21-TK-044 C21-TK-045 C21-TK-046 C21-TK-051 CABLE C21-TK-323 C21-TK-322 C21-TK-311 C21-TK-302 C21-TK-301 C21-TK-101 C21-TK-203 C21-TK-102 C21-TK-201 C21-TK-517 C21-TK-518A C21-TK-519A C21-TK-520A C21-TK-521A C21-TK-523A C20-TK-206A C20-TK-210A C20-TK-219A C20-TK-218A C20-TK-223A C20-TK-158 C20-TK-151 C20-TK-148 C20-TK-144 C20-TK-142 CABLE

Page 15 of 22

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-2 COMM

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 4.0) Run Date: 2/12/2013 3:57 pm


Rev: 00 Description:
4C FIBER OPTIC 62.5/125UM
Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 15 Elevation: Schematic: ED-694680

Cable: C20CPB6085
Seg Code: CO System: CPB Startup Code:

Service: BLOCK-2 MODBUS CABLE


Routed Length (m): Allowance (m): Total Length (m): 284 13 297 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694680 5

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C21-MBR-10-GH-001 Compartment: Description: DIVERTER DAMPER LCP Equip Location: Zone: East: North: Location Dwg: EA-685856 Wiring Dwg:

Cable To End: Equipment No: C20-CPB-66-GN-001 Compartment: Description: B2C NETWORK CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Routing Information: Remarks: Route: FIELD ROUTED C21-TK-041 C21-TK-042 C21-TK-044 C21-TK-045 C21-TK-046 C21-TK-051 CABLE C21-TK-323 C21-TK-322 C21-TK-311 C21-TK-302 C21-TK-301 C21-TK-101 C21-TK-203 C21-TK-102 C21-TK-201 C21-TK-517 C21-TK-518A C21-TK-519A C21-TK-520A C21-TK-521A C21-TK-523A C20-TK-206A C20-TK-210A C20-TK-219A C20-TK-218A C20-TK-223A C20-TK-158 C20-TK-151 C20-TK-148 C20-TK-144 C20-TK-142 CABLE

Cable: C20CPB6088
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 15 Elevation: Schematic: ED-694680

Service: BLOCK-2 MODBUS CABLE


Routed Length (m): Allowance (m): Total Length (m): 183 9 192 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694680 5

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C22-MBR-10-GH-001 Compartment: Description: DIVERTER DAMPER LCP Equip Location: Zone: North: East: Location Dwg: EA-685856 Wiring Dwg:

Cable To End: Equipment No: C20-CPB-66-GN-001 Compartment: Description: B2C NETWORK CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Routing Information: Remarks: Route: FIELD ROUTED C22-TK-041 C22-TK-042 C22-TK-044 C22-TK-045 C22-TK-046 C22-TK-051 CABLE C22-TK-323 C22-TK-322 C22-TK-311 C22-TK-302 C22-TK-301 C22-TK-101 C22-TK-203 C22-TK-102 C22-TK-201 C22-TK-517 C22-TK-518A C22-TK-520A C20-TK-247A C20-TK-162A C20-TK-161A C20-TK-140 C20-TK-143 CABLE

Cable: C20CPB6089
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 15 Elevation: Schematic: ED-694680

Service: BLOCK-2 MODBUS CABLE


Routed Length (m): Allowance (m): Total Length (m): 183 9 192 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694680 5

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C22-MBR-10-GH-001 Compartment: Description: DIVERTER DAMPER LCP Equip Location: Zone: East: North: Location Dwg: EA-685856 Wiring Dwg:

Cable To End: Equipment No: C20-CPB-66-GN-001 Compartment: Description: B2C NETWORK CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Routing Information: Remarks: Route: FIELD ROUTED C22-TK-041 C22-TK-042 C22-TK-044 C22-TK-045 C22-TK-046 C22-TK-051 CABLE C22-TK-323 C22-TK-322 C22-TK-311 C22-TK-302 C22-TK-301 C22-TK-101 C22-TK-203 C22-TK-102 C22-TK-201 C22-TK-517 C22-TK-518A C22-TK-520A C20-TK-247A C20-TK-162A C20-TK-161A C20-TK-140 C20-TK-143 CABLE

Page 16 of 22

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-2 COMM

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 4.0) Run Date: 2/12/2013 3:57 pm


Rev: 00 Description:
4C FIBER OPTIC 62.5/125UM
Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 7 Elevation: Schematic: ED-694681

Cable: C20CPB6102
Seg Code: CO System: CPB Startup Code:

Service: BLOCK-2 MODBUS CABLE


Routed Length (m): Allowance (m): Total Length (m): 280 13 293 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694681 7

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C200102 Compartment: Description: GENERATOR CONT & PROT PNL BLK-2 Equip Location: Zone: East: North: Location Dwg: EA-681112 Wiring Dwg:

Cable To End: Equipment No: C20-CPB-66-GN-001 Compartment: Description: B2C NETWORK CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Routing Information: Remarks: Route: CABLE C24-TK-052 C24-TK-050 C24-TK-049 C24-TK-219 C24-TK-216 C24-TK-214 C24-TK-212 C24-TK-210 C24-TK-208 C24-TK-206 C24-TK-204 C24-TK-202 C20-TK-208 C20-TK-212B C20-TK-217B C20-TK-218B C20-TK-223B C20-TK-158 C20-TK-151 C20-TK-148 C20-TK-144 C20-TK-142 CABLE

Cable: C20CPB6103
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 9 Elevation: Schematic: ED-694681

Service: BLOCK-2 MODBUS CABLE


Routed Length (m): Allowance (m): Total Length (m): 651 27 678 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694681 8

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C20BPA01 Compartment: Description: VFD PANEL FOR CW PUMP#1A BLOCK-2 Equip Location: Zone: North: East: Location Dwg: EA-681133 Wiring Dwg:

Cable To End: Equipment No: C20-CPB-66-GN-001 Compartment: Description: B2C NETWORK CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Routing Information: Remarks: Route: CABLE C00-TK-141 C00-TK-142 C00-TK-146 C00-TK-152 C00-TK-157 C00-TK-163 C00-TK-162 C00-TK-172 CABLE C00-EMH-179 C00-D363-04 C00-EMH-176 C00-D359-27 C00-EMH-174 C00-D353-31 C00-EMH-171 C30-D071-61 C30-EMH-011 C30-D070-64 C30-EMH-010 C30-D066-59 C30-EMH-009 C30-D065-60 C30-EMH-008 C30-D063-40 C30-EMH-007 C20-D066-42 C20-EMH-009 C24-TK-218 C24-TK-215B C24-TK-213B C24-TK-211B C24-TK-209B C24-TK-207B C24-TK-205B C24-TK-203B C24-TK-201B C20-TK-207B C20-TK-211 C20-TK-237 C20-TK-236 C20-TK-233 C20-TK-231 C20-TK-159 C20-TK-153 C20-TK-151 C20-TK-148 C20-TK-144 C20-TK-142 CABLE

Cable: C20CPB6104
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 9 Elevation: Schematic: ED-694681

Service: BLOCK-2 MODBUS CABLE


Routed Length (m): Allowance (m): Total Length (m): 651 27 678 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694681 8

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C20BPA01 Compartment: Description: VFD PANEL FOR CW PUMP#1A BLOCK-2 Equip Location: Zone: North: East: Location Dwg: EA-681133 Wiring Dwg:

Cable To End: Equipment No: C20-CPB-66-GN-001 Compartment: Description: B2C NETWORK CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Routing Information: Remarks: Route: CABLE C00-TK-141 C00-TK-142 C00-TK-146 C00-TK-152 C00-TK-157 C00-TK-163 C00-TK-162 C00-TK-172 CABLE C00-EMH-179 C00-D363-04 C00-EMH-176 C00-D359-27 C00-EMH-174 C00-D353-31 C00-EMH-171 C30-D071-61 C30-EMH-011 C30-D070-64 C30-EMH-010 C30-D066-59 C30-EMH-009 C30-D065-60 C30-EMH-008 C30-D063-40 C30-EMH-007 C20-D066-42 C20-EMH-009 C24-TK-218 C24-TK-215B C24-TK-213B C24-TK-211B C24-TK-209B C24-TK-207B C24-TK-205B C24-TK-203B C24-TK-201B C20-TK-207B C20-TK-211 C20-TK-237 C20-TK-236 C20-TK-233 C20-TK-231 C20-TK-159 C20-TK-153 C20-TK-151 C20-TK-148 C20-TK-144 C20-TK-142 CABLE

Page 17 of 22

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-2 COMM

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 4.0) Run Date: 2/12/2013 3:57 pm


Rev: 00 Description:
4C FIBER OPTIC 62.5/125UM
Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 8 Elevation: Schematic: ED-694681

Cable: C20CPB6105
Seg Code: CO System: CPB Startup Code:

Service: BLOCK-2 MODBUS CABLE


Routed Length (m): Allowance (m): Total Length (m): 635 26 661 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694681 8

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C20BPA02 Compartment: Description: VFD PANEL FOR CW PUMP#1B BLOCK-2 Equip Location: Zone: East: North: Location Dwg: EA-681133 Wiring Dwg:

Cable To End: Equipment No: C20-CPB-66-GN-001 Compartment: Description: B2C NETWORK CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Routing Information: Remarks: Route: CABLE C00-TK-145 C00-TK-150 C00-TK-172 CABLE C00-EMH-179 C00-D363-04 C00-EMH-176 C00-D359-27 C00-EMH-174 C00-D353-31 C00-EMH-171 C30-D071-62 C30-EMH-011 C30-D070-64 C30-EMH-010 C30-D066-59 C30-EMH-009 C30-D065-60 C30-EMH-008 C30-D063-40 C30-EMH-007 C20-D066-42 C20-EMH-009 C24-TK-218 C24-TK-215B C24-TK-213B C24-TK-211B C24-TK-209B C24-TK-207B C24-TK-205B C24-TK-203B C24-TK-201B C20-TK-207B C20-TK-211 C20-TK-237 C20-TK-236 C20-TK-233 C20-TK-231 C20-TK-159 C20-TK-153 C20-TK-154 C20-TK-150 C20-TK-149 C20-TK-145 C20-TK-142 CABLE

Cable: C20CPB6106
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 8 Elevation: Schematic: ED-694681

Service: BLOCK-2 MODBUS CABLE


Routed Length (m): Allowance (m): Total Length (m): 635 26 661 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694681 8

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C20BPA02 Compartment: Description: VFD PANEL FOR CW PUMP#1B BLOCK-2 Equip Location: Zone: North: East: Location Dwg: EA-681133 Wiring Dwg:

Cable To End: Equipment No: C20-CPB-66-GN-001 Compartment: Description: B2C NETWORK CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Routing Information: Remarks: Route: CABLE C00-TK-145 C00-TK-150 C00-TK-172 CABLE C00-EMH-179 C00-D363-04 C00-EMH-176 C00-D359-27 C00-EMH-174 C00-D353-31 C00-EMH-171 C30-D071-62 C30-EMH-011 C30-D070-64 C30-EMH-010 C30-D066-59 C30-EMH-009 C30-D065-60 C30-EMH-008 C30-D063-40 C30-EMH-007 C20-D066-42 C20-EMH-009 C24-TK-218 C24-TK-215B C24-TK-213B C24-TK-211B C24-TK-209B C24-TK-207B C24-TK-205B C24-TK-203B C24-TK-201B C20-TK-207B C20-TK-211 C20-TK-237 C20-TK-236 C20-TK-233 C20-TK-231 C20-TK-159 C20-TK-153 C20-TK-154 C20-TK-150 C20-TK-149 C20-TK-145 C20-TK-142 CABLE

Cable: C20CPB6107
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04

Service: BLOCK-2 MODBUS CABLE


Routed Length (m): Allowance (m): Total Length (m): 394 17 411 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694681 7

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: End Length(m): 15 Equipment No: C20ATA02 Compartment: Description: M2- HYDRAN ONLINE MONITORING SYSTEM FOR UAT (BLOCK-2) Equip Location: Zone: North: East: Elevation: Location Dwg: EA-681112 Wiring Dwg: Schematic: ED-694681

Cable To End: Equipment No: C20-CPB-66-GN-001 Compartment: Description: B2C NETWORK CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Routing Information: Remarks: Route: CABLE C20-D064-19 C20-EMH-008 C20-D065-40 C20-EMH-009 C24-TK-218 C24-TK-215B C24-TK-213B C24-TK-211B C24-TK-209B C24-TK-207B C24-TK-205B C24-TK-203B C24-TK-201B C20-TK-207B C20-TK-211 C20-TK-237 C20-TK-236 C20-TK-235 C20-TK-001 C20-TK-024 C20-TK-022 C20-TK-051 C20-TK-052 C20-TK-055 C20-TK-054 C20-TK-050 C20-TK-116 C20-TK-121 C20-TK-125 C20-TK-146 C20-TK-147 C20-TK-145 C20-TK-142 CABLE

Page 18 of 22

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-2 COMM

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 4.0) Run Date: 2/12/2013 3:57 pm


Rev: 00 Description:
4C FIBER OPTIC 62.5/125UM
Pull Length(m): No. of Cables: 1 Type Code: FIBER04

Cable: C20CPB6109
Seg Code: CO System: CPB Startup Code:

Service: BLOCK-2 MODBUS CABLE


Routed Length (m): Allowance (m): Total Length (m): 396 17 413 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694681 7

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C20ATA01 Compartment: End Length(m): 15 Description: MS 3000 ONLINE MONITORING SYSTEM FOR GSU XFMR (BLOCK-2) Equip Location: Zone: East: Elevation: North: Location Dwg: EA-681112 Wiring Dwg: Schematic: ED-694681

Cable To End: Equipment No: C20-CPB-66-GN-001 Compartment: Description: B2C NETWORK CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Routing Information: Remarks: Route: CABLE C20-D064-20 C20-EMH-008 C20-D065-40 C20-EMH-009 C24-TK-218 C24-TK-215B C24-TK-213B C24-TK-211B C24-TK-209B C24-TK-207B C24-TK-205B C24-TK-203B C24-TK-201B C20-TK-207B C20-TK-211 C20-TK-237 C20-TK-236 C20-TK-235 C20-TK-001 C20-TK-024 C20-TK-022 C20-TK-051 C20-TK-052 C20-TK-055 C20-TK-054 C20-TK-050 C20-TK-116 C20-TK-121 C20-TK-125 C20-TK-146 C20-TK-147 C20-TK-145 C20-TK-142 CABLE

Cable: C20CPB6110
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 15 Elevation: Schematic: ED-694681

Service: BLOCK-2 MODBUS CABLE


Routed Length (m): Allowance (m): Total Length (m): 402 18 420 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694681 7

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C20-QFW-31-AN-001 Compartment: Description: SEAL AIR COMPRESSOR Equip Location: Zone: North: East: Location Dwg: EA-681112 Wiring Dwg:

Cable To End: Equipment No: C20-CPB-66-GN-001 Compartment: Description: B2C NETWORK CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Routing Information: Remarks: Route: FIELD ROUTED C24-TK-011 C24-TK-009 C24-TK-008 C24-TK-006 C24-TK-002 C24-TK-051 C24-TK-050 C24-TK-049 C24-TK-219 C24-TK-216 CABLE C24-TK-215B C24-TK-213B C24-TK-211B C24-TK-209B C24-TK-207B C24-TK-205B C24-TK-203B C24-TK-201B C20-TK-207B C20-TK-211 C20-TK-237 C20-TK-236 C20-TK-235 C20-TK-001 C20-TK-024 C20-TK-022 C20-TK-051 C20-TK-052 C20-TK-055 C20-TK-054 C20-TK-050 C20-TK-116 C20-TK-121 C20-TK-125 C20-TK-146 C20-TK-147 C20-TK-145 C20-TK-142 CABLE

Cable: C20CPB6111
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 7 Elevation: Schematic: ED-694681

Service: BLOCK-2 MODBUS CABLE


Routed Length (m): Allowance (m): Total Length (m): 280 13 293 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694681 7

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C200102 Compartment: Description: GENERATOR CONT & PROT PNL BLK-2 Equip Location: Zone: North: East: Location Dwg: EA-681112 Wiring Dwg:

Cable To End: Equipment No: C20-CPB-66-GN-001 Compartment: Description: B2C NETWORK CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Routing Information: Remarks: Route: CABLE C24-TK-052 C24-TK-050 C24-TK-049 C24-TK-219 C24-TK-216 C24-TK-214 C24-TK-212 C24-TK-210 C24-TK-208 C24-TK-206 C24-TK-204 C24-TK-202 C20-TK-208 C20-TK-212B C20-TK-217B C20-TK-218B C20-TK-223B C20-TK-158 C20-TK-151 C20-TK-148 C20-TK-144 C20-TK-142 CABLE

Page 19 of 22

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-2 COMM

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 4.0) Run Date: 2/12/2013 3:57 pm


Rev: 00 Description:
4C FIBER OPTIC 62.5/125UM
Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 15 Elevation: Schematic: ED-694680

Cable: C20CPB6112
Seg Code: CO System: CPB Startup Code:

Service: BLOCK-2 MODBUS CABLE


Routed Length (m): Allowance (m): Total Length (m): 206 10 216 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694680 5

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C23-MBR-10-GH-001 Compartment: Description: DIVERTER DAMPER LCP Equip Location: Zone: East: North: Location Dwg: EA-685856 Wiring Dwg:

Cable To End: Equipment No: C20-CPB-66-GN-001 Compartment: Description: B2C NETWORK CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Routing Information: Remarks: Route: FIELD ROUTED C23-TK-041 C23-TK-042 C23-TK-044 C23-TK-045 C23-TK-046 C23-TK-051 CABLE C23-TK-325 C23-TK-324 C23-TK-323 C23-TK-322 C23-TK-311 C23-TK-302 C23-TK-301 C23-TK-101 C23-TK-203 C23-TK-102 C23-TK-201 C23-TK-517 C23-TK-518 C20-TK-209 C20-TK-213 C20-TK-226B C20-TK-228 C20-TK-159 C20-TK-153 C20-TK-154 C20-TK-150 C20-TK-149 C20-TK-145 CABLE

Cable: C20CPB6113
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 15 Elevation: Schematic: ED-694680

Service: BLOCK-2 MODBUS CABLE


Routed Length (m): Allowance (m): Total Length (m): 206 10 216 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694680 5

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C23-MBR-10-GH-001 Compartment: Description: DIVERTER DAMPER LCP Equip Location: Zone: North: East: Location Dwg: EA-685856 Wiring Dwg:

Cable To End: Equipment No: C20-CPB-66-GN-001 Compartment: Description: B2C NETWORK CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Routing Information: Remarks: Route: FIELD ROUTED C23-TK-041 C23-TK-042 C23-TK-044 C23-TK-045 C23-TK-046 C23-TK-051 CABLE C23-TK-325 C23-TK-324 C23-TK-323 C23-TK-322 C23-TK-311 C23-TK-302 C23-TK-301 C23-TK-101 C23-TK-203 C23-TK-102 C23-TK-201 C23-TK-517 C23-TK-518 C20-TK-209 C20-TK-213 C20-TK-226B C20-TK-228 C20-TK-159 C20-TK-153 C20-TK-154 C20-TK-150 C20-TK-149 C20-TK-145 CABLE

Cable: C20CPB6125
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

CO-AXIAL CABLE RG-58 C/U


Pull Length(m): No. of Cables: 1 Type Code: RG-58 End Length(m): 35 Elevation: Schematic: ED-694674

Service: BLOCK-2 CO-AXIAL CABLE


Routed Length (m): Allowance (m): Total Length (m): 719 29 748 Option 1: CO-AXIAL CABLE Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694674 10

Furnish Spec: Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: P00-CPB-65-GH-007 Compartment: Description: CCB NETWORK CAB-1 IN CCR Equip Location: Zone: East: North: Location Dwg: EA-790506 Wiring Dwg:

Cable To End: Equipment No: C20-CPB-66-GN-001 Compartment: Description: B2C NETWORK CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681122

Routing Information: Remarks: Route: FIELD ROUTED P00-TK-059B P00-TK-060B P00-TK-061B P00-TK-062B P00-TK-063B P00-TK-064B C00-TK-022 C00-TK-023 C00-TK-032 C00-TK-037 CABLE C00-D001-116 C00-EMH-002 C00-D002-64 C00-EMH-003 C00-D003-62 C00-EMH-004 C00-D351-60 C00-EMH-171 C30-D071-64 C30-EMH-011 C30-D070-65 C30-EMH-010 C30-D066-65 C30-EMH-009 C30-D065-62 C30-EMH-008 C30-D063-41 C30-EMH-007 C20-D066-41 C20-EMH-009 C24-TK-218 C24-TK-215B C24-TK-213B C24-TK-211B C24-TK-209B C24-TK-207B C24-TK-205B C24-TK-203B C24-TK-201B C20-TK-207B C20-TK-211 C20-TK-237 C20-TK-236 C20-TK-233 C20-TK-231 C20-TK-159 C20-TK-153 C20-TK-151 C20-TK-148 C20-TK-144 C20-TK-142 CABLE

Page 20 of 22

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-2 COMM

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 4.0) Run Date: 2/12/2013 3:57 pm


Rev: 00 Description:
CO-AXIAL CABLE RG-58 C/U
Pull Length(m): No. of Cables: 1 Type Code: RG-58 End Length(m): 0 Elevation: Schematic: ED-694674

Cable: C20CPB6126
Seg Code: CO System: CPB Startup Code:

Service: BLOCK-2 CO-AXIAL CABLE


Routed Length (m): Allowance (m): Total Length (m): 20 3 23 Option 1: CO-AXIAL CABLE Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694674 20

Furnish Spec: Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: P00-CPB-65-GH-007 Compartment: Description: CCB NETWORK CAB-1 IN CCR Equip Location: Zone: East: North: Location Dwg: EA-790506 Wiring Dwg: Routing Information: Remarks: Route: FIELD ROUTED

Cable To End: Equipment No: C20-CFA-77-GK-101 Compartment: Description: SYSTEM 1 DAQ(NO MONITOR)- BLOCK-2 CMS North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681131

Cable: C20CPB6127
Seg Code: CO System: CPB Startup Code:

Rev: 00

Description:

CO-AXIAL CABLE RG-58 C/U


Pull Length(m): No. of Cables: 1 Type Code: RG-58 End Length(m): 5 Elevation: Schematic: ED-694674

Service: BLOCK-2 CO-AXIAL CABLE


Routed Length (m): Allowance (m): Total Length (m): 278 13 291 Option 1: CO-AXIAL CABLE Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694674 5

Furnish Spec: Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C20-CPB-66-GN-001 Compartment: Description: B2C NETWORK CABINET Equip Location: Zone: East: North: Location Dwg: EA-681122 Wiring Dwg:

Cable To End: Equipment No: C200102 Compartment: Description: GENERATOR CONT & PROT PNL BLK-2 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681112

Routing Information: Remarks: Route: CABLE C20-TK-142 C20-TK-145 C20-TK-149 C20-TK-150 C20-TK-154 C20-TK-158 C20-TK-223B C20-TK-218B C20-TK-217B C20-TK-212B C20-TK-208 C24-TK-202 C24-TK-204 C24-TK-206 C24-TK-208 C24-TK-210 C24-TK-212 C24-TK-214 C24-TK-216 C24-TK-219 C24-TK-049 C24-TK-050 C24-TK-052 CABLE

Cable: C20CPB6200
Seg Code: CO System: CPB Startup Code:
Cable From End: Equipment No: C20-CFA-77-GH-001 Description: BLOCK-2 CMS-01 Equip Location: Zone: Location Dwg: EA-681122

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 6

Service: BLOCK-2 CMS FIBER OPTIC CABLE


Routed Length (m): Allowance (m): Total Length (m): 702 29 731 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694790 35

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: East:

Elevation: Schematic: ED-694790

Cable To End: Equipment No: C00-CFA-77-GH-002 Compartment: Description: CMS PATCH PANEL PP-11 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681131

Routing Information: Remarks: Route: CABLE C20-TK-136 C20-TK-139 C20-TK-144 C20-TK-148 C20-TK-151 C20-TK-153 C20-TK-159 C20-TK-231 C20-TK-233 C20-TK-236 C20-TK-237 C20-TK-211 C20-TK-207B C24-TK-201B C24-TK-203B C24-TK-205B C24-TK-207B C24-TK-209B C24-TK-211B C24-TK-213B C24-TK-215B C24-TK-218 C20-EMH-009 C20-D066-41 C30-EMH-007 C30-D063-41 C30-EMH-008 C30-D065-61 C30-EMH-009 C30-D066-61 C30-EMH-010 C30-D070-65 C30-EMH-011 C30-D071-63 C00-EMH-171 C00-D351-58 C00-EMH-004 C00-D003-62 C00-EMH-003 C00-D002-63 C00-EMH-002 C00-D001-115 CABLE C00-TK-037 C00-TK-032 C00-TK-023 C00-TK-022 P00-TK-064B P00-TK-063B P00-TK-062B P00-TK-061B FIELD ROUTED

Page 21 of 22

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-2 COMM

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 4.0) Run Date: 2/12/2013 3:57 pm


Rev: 00 Description:
4C FIBER OPTIC 62.5/125UM
Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 6 East: Elevation: Schematic: ED-694790

Cable: C20CPB6201
Seg Code: CO System: CPB Startup Code:
Cable From End: Equipment No: C20-CFA-77-GH-001 Description: BLOCK-2 CMS-01 Equip Location: Zone: Location Dwg: EA-681122

Service: BLOCK-2 CMS FIBER OPTIC CABLE


Routed Length (m): Allowance (m): Total Length (m): 702 29 731 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694790 35

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg:

Cable To End: Equipment No: C00-CFA-77-GH-002 Compartment: Description: CMS PATCH PANEL PP-11 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681131

Routing Information: Remarks: Route: CABLE C20-TK-136 C20-TK-139 C20-TK-144 C20-TK-148 C20-TK-151 C20-TK-153 C20-TK-159 C20-TK-231 C20-TK-233 C20-TK-236 C20-TK-237 C20-TK-211 C20-TK-207B C24-TK-201B C24-TK-203B C24-TK-205B C24-TK-207B C24-TK-209B C24-TK-211B C24-TK-213B C24-TK-215B C24-TK-218 C20-EMH-009 C20-D066-40 C30-EMH-007 C30-D063-43 C30-EMH-008 C30-D065-62 C30-EMH-009 C30-D066-65 C30-EMH-010 C30-D070-61 C30-EMH-011 C30-D071-64 C00-EMH-171 C00-D351-60 C00-EMH-004 C00-D003-64 C00-EMH-003 C00-D002-64 C00-EMH-002 C00-D001-116 CABLE C00-TK-037 C00-TK-032 C00-TK-023 C00-TK-022 P00-TK-064B P00-TK-063B P00-TK-062B P00-TK-061B FIELD ROUTED

Cable: C20CPB6202
Seg Code: CO System: CPB Startup Code:
Cable From End: Equipment No: C20-CFA-77-GH-004 Description: BLOCK-2 CMS-01 STG Equip Location: Zone: Location Dwg: EA-681112

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 6

Service: BLOCK-2 CMS FIBER OPTIC CABLE


Routed Length (m): Allowance (m): Total Length (m): 522 22 544 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694790 35

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: East:

Elevation: Schematic: ED-694790

Cable To End: Equipment No: C00-CFA-77-GH-002 Compartment: Description: CMS PATCH PANEL PP-11 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681131

Routing Information: Remarks: Route: CABLE C24-TK-061 C24-TK-062 C24-TK-057 C24-TK-053 C24-TK-052 C24-TK-050 C24-TK-049 C24-TK-219 C24-TK-216 CABLE C24-TK-215B C24-TK-218 C20-EMH-009 C20-D066-41 C30-EMH-007 C30-D063-41 C30-EMH-008 C30-D065-61 C30-EMH-009 C30-D066-61 C30-EMH-010 C30-D070-65 C30-EMH-011 C30-D071-63 C00-EMH-171 C00-D351-58 C00-EMH-004 C00-D003-62 C00-EMH-003 C00-D002-63 C00-EMH-002 C00-D001-115 CABLE C00-TK-037 C00-TK-032 C00-TK-023 C00-TK-022 P00-TK-064B P00-TK-063B P00-TK-062B P00-TK-061B FIELD ROUTED

Cable: C20CPB6203
Seg Code: CO System: CPB Startup Code:
Cable From End: Equipment No: C20-CFA-77-GH-004 Description: BLOCK-2 CMS-01 STG Equip Location: Zone: Location Dwg: EA-681112

Rev: 00

Description:

4C FIBER OPTIC 62.5/125UM


Pull Length(m): No. of Cables: 1 Type Code: FIBER04 End Length(m): 6

Service: BLOCK-2 CMS FIBER OPTIC CABLE


Routed Length (m): Allowance (m): Total Length (m): 526 22 548 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-694790 35

Furnish Spec: QC-1023 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: East:

Elevation: Schematic: ED-694790

Cable To End: Equipment No: C00-CFA-77-GH-002 Compartment: Description: CMS PATCH PANEL PP-11 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681131

Routing Information: Remarks: Route: CABLE C24-TK-061 C24-TK-062 C24-TK-057 C24-TK-054 C24-TK-053 C24-TK-052 C24-TK-050 C24-TK-049 C24-TK-219 C24-TK-216 CABLE C24-TK-215B C24-TK-218 C20-EMH-009 C20-D066-40 C30-EMH-007 C30-D063-43 C30-EMH-008 C30-D065-62 C30-EMH-009 C30-D066-65 C30-EMH-010 C30-D070-61 C30-EMH-011 C30-D071-64 C00-EMH-171 C00-D351-60 C00-EMH-004 C00-D003-64 C00-EMH-003 C00-D002-64 C00-EMH-002 C00-D001-116 CABLE C00-TK-037 C00-TK-032 C00-TK-023 C00-TK-022 P00-TK-064B P00-TK-063B P00-TK-062B P00-TK-061B FIELD ROUTED

Total Cables:

76

Report Filter = ( CABLE_NUMBER Like 'C2%') AND (CABLE_SEG_CODE = 'CO' OR CABLE_SEG_CODE = 'T') AND CABLE_STATUS = 'Released'

Page 22 of 22