BLOCK-1 LV POWER CABLE TAB


SARGENT & LUNDY LLC 55 EAST MONROE STREET CHICAGO, ILLINOIS 60603-5780

NRN 06/30/2011

RDD/BR 07/31/2012 ELECTRICAL

1-0923053.01 3OS
Page 1 of 197

EE-681701

05

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


Cable Length Summary Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:02 pm

1. 2. 3. 4. 5. 6.

Total Est Actual Pulled Est Unpulled On Order Over/Short Field Dev

= = = = = =

Total calculated lengths of cables in the cable tab. Actual cable lengths pulled. Estimated length to be pulled. Cable quantity ordered. Estimate of cables excess (+) or shortage (-) quantity. Overpull (+%) when field pulled lengths are above design estimates; Underpull (-%) when field pulled lengths are below design estimates. Length A B C = A - B1 D E=D-B-C B - B1 F = ---------- x 100% B1 ( B1 is the total estimated length of pulled cables, whereas B is the actual length pulled. )

Illustration
Total Est Actual Pulled Est Unpulled On Order Over/Short Field Dev

No. of Cables X Y<=X -

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


Cable Length Summary Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company


Length in Meters
On Order Over/ Short Field Dev

INTELAGEN - CMS (03.7.860 - 3.2) 2:02 pm 7/31/2012 Run Date:

Type Code

Furnish Spec

Description

Total # Cables

Total Pulled

Total Est

Actual Pulled

Est Unpulled

13006 14006 16306 20026 20046 20066 20106 20156 20166 20256 20356 20506 20956 20C156 23006 30026 30046 30066 30106 30156 30166 30256 30356 30506 30706 30956 31206 31506 32406 40026 40046 40066

QC-1020 QC-1020 QC-1020 QC-1021 QC-1021 QC-1021 QC-1021 QC-1021 QC-1021 QC-1021 QC-1021 QC-1021 QC-1021 QC-1022 QC-1020 QC-1021 QC-1021 QC-1021 QC-1021 QC-1021 QC-1021 QC-1021 QC-1021 QC-1021 QC-1021 QC-1021 QC-1020 QC-1020 QC-1020 QC-1021 QC-1021 QC-1021

1C X 300 SQ.MM, 0.6/1kV 1C X 400 SQ.MM, 0.6/1kV 1C X 630 SQ.MM, 0.6/1kV 2C X 2.5 SQ.MM, 0.6/1kV 2C X 4 SQ.MM, 0.6/1kV 2C X 6 SQ.MM, 0.6/1kV 2C X 10 SQ.MM, 0.6/1kV 2C X 1.5 SQ.MM, 0.6/1kV 2C X 16 SQ.MM, 0.6/1kV 2C X 25 SQ.MM, 0.6/1kV 2C X 35 SQ.MM, 0.6/1kV 2C X 50 SQ.MM, 0.6/1kV 2C X 95 SQ.MM, 0.6/1kV 20C X 1.5 SQ.MM, 0.6/1kV 2C X 300 SQ.MM, 0.6/1kV 3C X 2.5 SQ.MM, 0.6/1kV 3C X 4 SQ.MM, 0.6/1kV 3C X 6 SQ.MM, 0.6/1kV 3C X 10 SQ.MM, 0.6/1kV 3C X 1.5 SQ.MM, 0.6/1kV 3C X 16 SQ.MM, 0.6/1kV 3C X 25 SQ.MM, 0.6/1kV 3C X 35 SQ.MM, 0.6/1kV 3C X 50 SQ.MM, 0.6/1kV 3C X 70 SQ.MM, 0.6/1kV 3C X 95 SQ.MM, 0.6/1kV 3C X 120 SQ.MM, 0.6/1kV 3C X 150 SQ.MM, 0.6/1kV 3C X 240 SQ.MM, 0.6/1kV 4C X 2.5 SQ.MM, 0.6/1kV 4C X 4 SQ.MM, 0.6/1kV 4C X 6 SQ.MM, 0.6/1kV Page 2 of 3

3 53 118 38 19 4 25 72 9 13 20 2 6 1 26 60 11 23 4 54 6 7 3 10 2 18 3 7 5 44 59 37

3 53 118 35 18 3 22 57 6 12 20 2 6 0 26 39 11 23 3 35 4 5 3 10 0 17 3 7 5 40 20 28

672 1499 4549 2242 929 398 1903 4945 811 1832 3120 333 1096 302 1020 3704 1879 3882 635 6415 1421 1307 327 1679 333 3385 779 1371 963 8032 5403 6419

660 1333 4187 987 1004 382 1775 3407 515 1793 3200 340 1140 0 985 3662 1954 4072 464 4006 1010 1124 332 1643 0 3321 690 1284 1147 7223 3852 5306

0 0 0 759 19 21 70 1781 321 212 0 0 0 302 0 564 0 0 179 2787 414 308 0 0 333 172 0 0 0 789 1588 1213

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

(660) (1333) (4187) (1746) (1023) (403) (1845) (5188) (836) (2005) (3200) (340) (1140) (302) (985) (4226) (1954) (4072) (643) (6793) (1424) (1432) (332) (1643) (333) (3493) (690) (1284) (1147) (8012) (5440) (6519)

-2% -11% -8% -33% 10% 1% -3% 8% 5% 11% 3% 2% 4% 0% -3% 17% 4% 5% 2% 10% 0% 13% 2% -2% 0% 3% -11% -6% 19% 0% 1% 2%

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


Cable Length Summary Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company


Length in Meters
On Order Over/ Short Field Dev

INTELAGEN - CMS (03.7.860 - 3.2) 2:02 pm 7/31/2012 Run Date:

Type Code

Furnish Spec

Description

Total # Cables

Total Pulled

Total Est

Actual Pulled

Est Unpulled

40106 40156 40166 40256 40356 40506 40706 40956 41856

QC-1021 QC-1021 QC-1021 QC-1021 QC-1021 QC-1021 QC-1021 QC-1021 QC-1020

4C X 10 SQ.MM, 0.6/1kV 4C X 1.5 SQ.MM, 0.6/1kV 4C X 16 SQ.MM, 0.6/1kV 4C X 25 SQ.MM, 0.6/1kV 4C X 35 SQ.MM, 0.6/1kV 4C X 50 SQ.MM, 0.6/1kV 4C X 70 SQ.MM, 0.6/1kV 4C X 95 SQ.MM, 0.6/1kV 4C X 185 SQ.MM, 0.6/1kV Overall Totals:

22 220 6 16 13 3 8 4 4
1,058

21 214 4 16 12 1 6 4 3
915

3839 39234 1211 2425 2257 244 859 210 325


124,189

3785 38893 794 2568 2152 177 897 215 138


112,417

89 638 457 0 27 88 93 0 190


13,414

0 0 0 0 0 0 0 0 0
0

(3874) (39531) (1251) (2568) (2179) (265) (990) (215) (328)

1% 1% 5% 6% -3% 13% 17% 2% 2%

Report Filter = ( CABLE_NUMBER Like 'C1%') AND CABLE_SEG_CODE = 'L' AND CABLE_STATUS = 'Released'

Page 3 of 3

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


Cable Tabulation Block-1 LV
Description:
Furnish Spec: Installation Spec: Budget Ref No: Compartment:: Pull Length(m): No. of Cables: Type Code: End Length(m):

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date:


Cable No. :
Seg Code: System: Startup Code:
Cable From End: Equipment No:

7/31/2012

2:05 pm
Rev:

Service:
Routed Length (m): Allowance (m): Total Length (m):
Cable To End: Equipment No:

Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg:

Shield: Ground: Jacket: End Length(m):

Description: Zone: Location Dwg:


Routing Information: Remarks:

Description: North: Wiring Dwg: Zone: Schematic Dwg: Location Dwg: Schematic Dwg:

Route Points:

ITEM

DESCRIPTION

Cable No. No. of Cables Description Voltage Rating Shield Insulation Jacket Rev. System Service Ground Seg Code Type Code Routed Length Allowance Pull Length Budget Ref No Option 1 / 2 / 3 Startup Code Furnished Spec Installation Spec From/To Equipment Number From/To Description Compartment End Length Wiring Drawing Location Drawing North / East / Elevation Zone Remarks Route Points Filter Criteria

Unique identifying number assigned the cable(s). Identifies number of physical cables associated with cable number. (e.g. A cable number for a power feed may include three(3) 1/C cables). Description of the type of cable (e.g. 7/C #14). Voltage rating of cables insulation system (e.g. 600V) Optional - when included is used to indicate that cable has and overall shield Type of cable insulation material (e.g. XLPE). Type of cable jacket material (e.g. PVC) Design revision status of the cable. Plant system to which the cable is assigned (e.g. CD - which would be the Condensate System). Description of service for which cable is used (e.g. Condensate Booster Pump A). Optional - when included specifies special grounding requirement (e.g. #2 Bare CU - may be specified when using non-metallic conduit). Segregation Code assigned to cable (e.g. MV - which would be Medium Voltage Power) Unique code assigned to each different cable type. Automatically calculated length which includes the length of the raceway path through which a cable is routed and also includes any end lengths which may be manually input to account for the cable segment between the last raceway point and the connected equipment (see end length). Automatically calculated contingency allowance based on the total routed length. Optional - when included identifies actual installed cable lengths. Optional - when included identifies budget reference numbers associated with cables. Optional - when included identifies optional cable information. Optional - when included identifies Start/Construction code Contract responsible for providing the cable Contract responsible for installing the cable Identifying numbers of equipment between which cable is routed. Description of equipment between which cable is routed. Optional - when included identifies equipment compartment to which cable is to be terminated (e.g. switchgear cubicle). Optional - when included identifies additional lengths which may be input to account for the cable segment between the last raceway point and the connected equipment (see Rtd Length). Optional - when included may be used to identify Master Schematic or other wiring drawing on which cable terminations are defined. Optional - when included may be used to identify document(s) providing unique equipment installation details. Optional - not required if zone is identified. Identifies the East - North grid location and Elevation of Equipment Optional - not required when North / East / Elevation coordinates are identified. Identifies name or pre-defined zone in which equipment is located. Optional - when included identifies optional notes, references, etc. Optional - Identifies the cables installation route through the raceway system. Optional - shown only on the last page of cable tabulation and identifies the additional constraints used in the generation of the report.

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
1C X 630 SQ.MM, 0.6/1kV
Pull Length(m): 17 No. of Cables: 1 Type Code: 16306 End Length(m): 4 Elevation: Schematic: ED-690991

Cable: C10BFA1001
Seg Code: L System: BFA Startup Code:

Service: INCOMER-1 TO UNIT 480V SWITCHBOARD


Routed Length (m): Allowance (m): Total Length (m): 19 3 22 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690991 7

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFT01 Compartment: Description: 4.16/0.48KV BAT FOR BLK-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-093A C10-TL-079A CABLE

Cable To End: Equipment No: C10BFA Compartment: 7F Description: 480V UNIT SWBD BUS A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BFA1002
Seg Code: L System: BFA Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 17 No. of Cables: 1 Type Code: 16306 End Length(m): 4 Elevation: Schematic: ED-690991

Service: INCOMER-1 TO UNIT 480V SWITCHBOARD


Routed Length (m): Allowance (m): Total Length (m): 19 3 22 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690991 7

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFT01 Compartment: Description: 4.16/0.48KV BAT FOR BLK-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-093A C10-TL-079A CABLE

Cable To End: Equipment No: C10BFA Compartment: 7F Description: 480V UNIT SWBD BUS A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BFA1003
Seg Code: L System: BFA Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 17 No. of Cables: 1 Type Code: 16306 End Length(m): 4 Elevation: Schematic: ED-690991

Service: INCOMER-1 TO UNIT 480V SWITCHBOARD


Routed Length (m): Allowance (m): Total Length (m): 19 3 22 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690991 7

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFT01 Compartment: Description: 4.16/0.48KV BAT FOR BLK-1 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-093A C10-TL-079A CABLE

Cable To End: Equipment No: C10BFA Compartment: 7F Description: 480V UNIT SWBD BUS A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BFA1004
Seg Code: L System: BFA Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 17 No. of Cables: 1 Type Code: 16306 End Length(m): 4 Elevation: Schematic: ED-690991

Service: INCOMER-1 TO UNIT 480V SWITCHBOARD


Routed Length (m): Allowance (m): Total Length (m): 19 3 22 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690991 7

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFT01 Compartment: Description: 4.16/0.48KV BAT FOR BLK-1 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-093A C10-TL-079A CABLE

Cable To End: Equipment No: C10BFA Compartment: 7F Description: 480V UNIT SWBD BUS A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Page 1 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
1C X 630 SQ.MM, 0.6/1kV
Pull Length(m): 17 No. of Cables: 1 Type Code: 16306 End Length(m): 4 Elevation: Schematic: ED-690991

Cable: C10BFA1005
Seg Code: L System: BFA Startup Code:

Service: INCOMER-1 TO UNIT 480V SWITCHBOARD


Routed Length (m): Allowance (m): Total Length (m): 19 3 22 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690991 7

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFT01 Compartment: Description: 4.16/0.48KV BAT FOR BLK-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-093A C10-TL-079A CABLE

Cable To End: Equipment No: C10BFA Compartment: 7F Description: 480V UNIT SWBD BUS A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BFA1006
Seg Code: L System: BFA Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 17 No. of Cables: 1 Type Code: 16306 End Length(m): 4 Elevation: Schematic: ED-690991

Service: INCOMER-1 TO UNIT 480V SWITCHBOARD


Routed Length (m): Allowance (m): Total Length (m): 19 3 22 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690991 7

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFT01 Compartment: Description: 4.16/0.48KV BAT FOR BLK-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-093A C10-TL-079A CABLE

Cable To End: Equipment No: C10BFA Compartment: 7F Description: 480V UNIT SWBD BUS A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BFA1007
Seg Code: L System: BFA Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 17 No. of Cables: 1 Type Code: 16306 End Length(m): 4 Elevation: Schematic: ED-690991

Service: INCOMER-1 TO UNIT 480V SWITCHBOARD


Routed Length (m): Allowance (m): Total Length (m): 19 3 22 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690991 7

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFT01 Compartment: Description: 4.16/0.48KV BAT FOR BLK-1 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-093A C10-TL-079A CABLE

Cable To End: Equipment No: C10BFA Compartment: 7F Description: 480V UNIT SWBD BUS A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BFA1008
Seg Code: L System: BFA Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 17 No. of Cables: 1 Type Code: 16306 End Length(m): 4 Elevation: Schematic: ED-690991

Service: INCOMER-1 TO UNIT 480V SWITCHBOARD


Routed Length (m): Allowance (m): Total Length (m): 19 3 22 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690991 7

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFT01 Compartment: Description: 4.16/0.48KV BAT FOR BLK-1 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-093A C10-TL-079A CABLE

Cable To End: Equipment No: C10BFA Compartment: 7F Description: 480V UNIT SWBD BUS A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Page 2 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
1C X 630 SQ.MM, 0.6/1kV
Pull Length(m): 17 No. of Cables: 1 Type Code: 16306 End Length(m): 4 Elevation: Schematic: ED-690991

Cable: C10BFA1009
Seg Code: L System: BFA Startup Code:

Service: INCOMER-1 TO UNIT 480V SWITCHBOARD


Routed Length (m): Allowance (m): Total Length (m): 19 3 22 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690991 7

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFT01 Compartment: Description: 4.16/0.48KV BAT FOR BLK-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-093A C10-TL-079A CABLE

Cable To End: Equipment No: C10BFA Compartment: 7F Description: 480V UNIT SWBD BUS A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BFA1010
Seg Code: L System: BFA Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 17 No. of Cables: 1 Type Code: 16306 End Length(m): 4 Elevation: Schematic: ED-690991

Service: INCOMER-1 TO UNIT 480V SWITCHBOARD


Routed Length (m): Allowance (m): Total Length (m): 19 3 22 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690991 7

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFT01 Compartment: Description: 4.16/0.48KV BAT FOR BLK-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-093A C10-TL-079A CABLE

Cable To End: Equipment No: C10BFA Compartment: 7F Description: 480V UNIT SWBD BUS A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BFA1011
Seg Code: L System: BFA Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 17 No. of Cables: 1 Type Code: 16306 End Length(m): 4 Elevation: Schematic: ED-690991

Service: INCOMER-1 TO UNIT 480V SWITCHBOARD


Routed Length (m): Allowance (m): Total Length (m): 19 3 22 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690991 7

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFT01 Compartment: Description: 4.16/0.48KV BAT FOR BLK-1 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-093A C10-TL-079A CABLE

Cable To End: Equipment No: C10BFA Compartment: 7F Description: 480V UNIT SWBD BUS A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BFA1012
Seg Code: L System: BFA Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 17 No. of Cables: 1 Type Code: 16306 End Length(m): 4 Elevation: Schematic: ED-690991

Service: INCOMER-1 TO UNIT 480V SWITCHBOARD


Routed Length (m): Allowance (m): Total Length (m): 19 3 22 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690991 7

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFT01 Compartment: Description: 4.16/0.48KV BAT FOR BLK-1 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-093A C10-TL-079A CABLE

Cable To End: Equipment No: C10BFA Compartment: 7F Description: 480V UNIT SWBD BUS A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Page 3 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
1C X 630 SQ.MM, 0.6/1kV
Pull Length(m): 17 No. of Cables: 1 Type Code: 16306 End Length(m): 4 Elevation: Schematic: ED-690991

Cable: C10BFA1013
Seg Code: L System: BFA Startup Code:

Service: INCOMER-1 TO UNIT 480V SWITCHBOARD


Routed Length (m): Allowance (m): Total Length (m): 19 3 22 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690991 7

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFT01 Compartment: Description: 4.16/0.48KV BAT FOR BLK-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-093B C10-TL-079B CABLE

Cable To End: Equipment No: C10BFA Compartment: 7F Description: 480V UNIT SWBD BUS A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BFA1014
Seg Code: L System: BFA Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 17 No. of Cables: 1 Type Code: 16306 End Length(m): 4 Elevation: Schematic: ED-690991

Service: INCOMER-1 TO UNIT 480V SWITCHBOARD


Routed Length (m): Allowance (m): Total Length (m): 19 3 22 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690991 7

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFT01 Compartment: Description: 4.16/0.48KV BAT FOR BLK-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-093B C10-TL-079B CABLE

Cable To End: Equipment No: C10BFA Compartment: 7F Description: 480V UNIT SWBD BUS A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BFA1015
Seg Code: L System: BFA Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 17 No. of Cables: 1 Type Code: 16306 End Length(m): 4 Elevation: Schematic: ED-690991

Service: INCOMER-1 TO UNIT 480V SWITCHBOARD


Routed Length (m): Allowance (m): Total Length (m): 19 3 22 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690991 7

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFT01 Compartment: Description: 4.16/0.48KV BAT FOR BLK-1 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-093B C10-TL-079B CABLE

Cable To End: Equipment No: C10BFA Compartment: 7F Description: 480V UNIT SWBD BUS A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BFA1016
Seg Code: L System: BFA Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 17 No. of Cables: 1 Type Code: 16306 End Length(m): 4 Elevation: Schematic: ED-690991

Service: INCOMER-1 TO UNIT 480V SWITCHBOARD


Routed Length (m): Allowance (m): Total Length (m): 19 3 22 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690991 7

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFT01 Compartment: Description: 4.16/0.48KV BAT FOR BLK-1 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-093B C10-TL-079B CABLE

Cable To End: Equipment No: C10BFA Compartment: 7F Description: 480V UNIT SWBD BUS A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Page 4 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
1C X 630 SQ.MM, 0.6/1kV
Pull Length(m): 17 No. of Cables: 1 Type Code: 16306 End Length(m): 4 Elevation: Schematic: ED-690991

Cable: C10BFA1017
Seg Code: L System: BFA Startup Code:

Service: INCOMER-1 TO UNIT 480V SWITCHBOARD


Routed Length (m): Allowance (m): Total Length (m): 19 3 22 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690991 7

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFT01 Compartment: Description: 4.16/0.48KV BAT FOR BLK-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-093B C10-TL-079B CABLE

Cable To End: Equipment No: C10BFA Compartment: 7F Description: 480V UNIT SWBD BUS A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BFA1018
Seg Code: L System: BFA Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 17 No. of Cables: 1 Type Code: 16306 End Length(m): 4 Elevation: Schematic: ED-690991

Service: INCOMER-1 TO UNIT 480V SWITCHBOARD


Routed Length (m): Allowance (m): Total Length (m): 19 3 22 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690991 7

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFT01 Compartment: Description: 4.16/0.48KV BAT FOR BLK-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-093B C10-TL-079B CABLE

Cable To End: Equipment No: C10BFA Compartment: 7F Description: 480V UNIT SWBD BUS A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BFA1019
Seg Code: L System: BFA Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 17 No. of Cables: 1 Type Code: 16306 End Length(m): 4 Elevation: Schematic: ED-690991

Service: INCOMER-1 TO UNIT 480V SWITCHBOARD


Routed Length (m): Allowance (m): Total Length (m): 19 3 22 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690991 7

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFT01 Compartment: Description: 4.16/0.48KV BAT FOR BLK-1 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-093B C10-TL-079B CABLE

Cable To End: Equipment No: C10BFA Compartment: 7F Description: 480V UNIT SWBD BUS A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BFA1020
Seg Code: L System: BFA Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 17 No. of Cables: 1 Type Code: 16306 End Length(m): 4 Elevation: Schematic: ED-690991

Service: INCOMER-1 TO UNIT 480V SWITCHBOARD


Routed Length (m): Allowance (m): Total Length (m): 19 3 22 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690991 7

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFT01 Compartment: Description: 4.16/0.48KV BAT FOR BLK-1 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-093B C10-TL-079B CABLE

Cable To End: Equipment No: C10BFA Compartment: 7F Description: 480V UNIT SWBD BUS A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Page 5 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
1C X 630 SQ.MM, 0.6/1kV
Pull Length(m): 17 No. of Cables: 1 Type Code: 16306 End Length(m): 4 Elevation: Schematic: ED-690991

Cable: C10BFA1021
Seg Code: L System: BFA Startup Code:

Service: INCOMER-1 TO UNIT 480V SWITCHBOARD


Routed Length (m): Allowance (m): Total Length (m): 19 3 22 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690991 7

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFT01 Compartment: Description: 4.16/0.48KV BAT FOR BLK-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-093B C10-TL-079B CABLE

Cable To End: Equipment No: C10BFA Compartment: 7F Description: 480V UNIT SWBD BUS A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BFA1022
Seg Code: L System: BFA Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 17 No. of Cables: 1 Type Code: 16306 End Length(m): 4 Elevation: Schematic: ED-690991

Service: INCOMER-1 TO UNIT 480V SWITCHBOARD


Routed Length (m): Allowance (m): Total Length (m): 19 3 22 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690991 7

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFT01 Compartment: Description: 4.16/0.48KV BAT FOR BLK-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-093B C10-TL-079B CABLE

Cable To End: Equipment No: C10BFA Compartment: 7F Description: 480V UNIT SWBD BUS A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BFA1023
Seg Code: L System: BFA Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 17 No. of Cables: 1 Type Code: 16306 End Length(m): 4 Elevation: Schematic: ED-690991

Service: INCOMER-1 TO UNIT 480V SWITCHBOARD


Routed Length (m): Allowance (m): Total Length (m): 19 3 22 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690991 7

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFT01 Compartment: Description: 4.16/0.48KV BAT FOR BLK-1 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-093B C10-TL-079B CABLE

Cable To End: Equipment No: C10BFA Compartment: 7F Description: 480V UNIT SWBD BUS A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BFA1024
Seg Code: L System: BFA Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 17 No. of Cables: 1 Type Code: 16306 End Length(m): 4 Elevation: Schematic: ED-690991

Service: INCOMER-1 TO UNIT 480V SWITCHBOARD


Routed Length (m): Allowance (m): Total Length (m): 19 3 22 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690991 7

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFT01 Compartment: Description: 4.16/0.48KV BAT FOR BLK-1 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-093B C10-TL-079B CABLE

Cable To End: Equipment No: C10BFA Compartment: 7F Description: 480V UNIT SWBD BUS A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Page 6 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
1C X 630 SQ.MM, 0.6/1kV
Pull Length(m): 17 No. of Cables: 1 Type Code: 16306 End Length(m): 4 Elevation: Schematic: ED-690991

Cable: C10BFA1025
Seg Code: L System: BFA Startup Code:

Service: INCOMER-1 TO UNIT 480V SWITCHBOARD


Routed Length (m): Allowance (m): Total Length (m): 19 3 22 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690991 7

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFT01 Compartment: Description: 4.16/0.48KV BAT FOR BLK-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-093B C10-TL-079B CABLE

Cable To End: Equipment No: C10BFA Compartment: 7F Description: 480V UNIT SWBD BUS A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BFA1028
Seg Code: L System: BFA Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 26 No. of Cables: 1 Type Code: 16306 End Length(m): 9 Elevation: Schematic: ED-690994

Service: FEED-1 TO STEAM TURBINE MAIN MCC


Routed Length (m): Allowance (m): Total Length (m): 23 3 26 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690994 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFA Compartment: 4F Description: 480V UNIT SWBD BUS A Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-058A C10-TL-061A CABLE

Cable To End: Equipment No: C10BJE Compartment: 14.1 Description: BLK-1 STEAM TURBINE MAIN MCC North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BFA1029
Seg Code: L System: BFA Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 26 No. of Cables: 1 Type Code: 16306 End Length(m): 9 Elevation: Schematic: ED-690994

Service: FEED-1 TO STEAM TURBINE MAIN MCC


Routed Length (m): Allowance (m): Total Length (m): 23 3 26 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690994 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFA Compartment: 4F Description: 480V UNIT SWBD BUS A Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-058A C10-TL-061A CABLE

Cable To End: Equipment No: C10BJE Compartment: 14.1 Description: BLK-1 STEAM TURBINE MAIN MCC North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BFA1030
Seg Code: L System: BFA Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 26 No. of Cables: 1 Type Code: 16306 End Length(m): 9 Elevation: Schematic: ED-690994

Service: FEED-1 TO STEAM TURBINE MAIN MCC


Routed Length (m): Allowance (m): Total Length (m): 23 3 26 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690994 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFA Compartment: 4F Description: 480V UNIT SWBD BUS A Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-058A C10-TL-061A CABLE

Cable To End: Equipment No: C10BJE Compartment: 14.1 Description: BLK-1 STEAM TURBINE MAIN MCC North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Page 7 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
1C X 630 SQ.MM, 0.6/1kV
Pull Length(m): 26 No. of Cables: 1 Type Code: 16306 End Length(m): 9 Elevation: Schematic: ED-690994

Cable: C10BFA1031
Seg Code: L System: BFA Startup Code:

Service: FEED-1 TO STEAM TURBINE MAIN MCC


Routed Length (m): Allowance (m): Total Length (m): 23 3 26 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690994 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFA Compartment: 4F Description: 480V UNIT SWBD BUS A Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-058A C10-TL-061A CABLE

Cable To End: Equipment No: C10BJE Compartment: 14.1 Description: BLK-1 STEAM TURBINE MAIN MCC North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BFA1032
Seg Code: L System: BFA Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 26 No. of Cables: 1 Type Code: 16306 End Length(m): 9 Elevation: Schematic: ED-690994

Service: FEED-1 TO STEAM TURBINE MAIN MCC


Routed Length (m): Allowance (m): Total Length (m): 23 3 26 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690994 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFA Compartment: 4F Description: 480V UNIT SWBD BUS A Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-058A C10-TL-061A CABLE

Cable To End: Equipment No: C10BJE Compartment: 14.1 Description: BLK-1 STEAM TURBINE MAIN MCC North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BFA1033
Seg Code: L System: BFA Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 26 No. of Cables: 1 Type Code: 16306 End Length(m): 9 Elevation: Schematic: ED-690994

Service: FEED-1 TO STEAM TURBINE MAIN MCC


Routed Length (m): Allowance (m): Total Length (m): 23 3 26 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690994 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFA Compartment: 4F Description: 480V UNIT SWBD BUS A Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-058A C10-TL-061A CABLE

Cable To End: Equipment No: C10BJE Compartment: 14.1 Description: BLK-1 STEAM TURBINE MAIN MCC North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BFA1034
Seg Code: L System: BFA Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 26 No. of Cables: 1 Type Code: 16306 End Length(m): 9 Elevation: Schematic: ED-690994

Service: FEED-1 TO STEAM TURBINE MAIN MCC


Routed Length (m): Allowance (m): Total Length (m): 23 3 26 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690994 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFA Compartment: 4F Description: 480V UNIT SWBD BUS A Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-058A C10-TL-061A CABLE

Cable To End: Equipment No: C10BJE Compartment: 14.1 Description: BLK-1 STEAM TURBINE MAIN MCC North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Page 8 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
1C X 400 SQ.MM, 0.6/1kV
Pull Length(m): 28 No. of Cables: 1 Type Code: 14006 End Length(m): 5 Elevation: Schematic: ED-690996

Cable: C10BFA1035
Seg Code: L System: BFA Startup Code:

Service: FEED-1 TO HRSG MCC-1


Routed Length (m): Allowance (m): Total Length (m): 27 3 30 Option 1: Option 2: Option 3: Compartment: 10.1 North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690996 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFA Compartment: 2F Description: 480V UNIT SWBD BUS A Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-055A C10-TL-058A C10-TL-061A C10-TL-039A C10-TL-030A CABLE

Cable: C10BFA1036
Seg Code: L System: BFA Startup Code:

Rev: 01

Description:

1C X 400 SQ.MM, 0.6/1kV


Pull Length(m): 28 No. of Cables: 1 Type Code: 14006 End Length(m): 5 Elevation: Schematic: ED-690996

Service: FEED-1 TO HRSG MCC-1


Routed Length (m): Allowance (m): Total Length (m): 27 3 30 Option 1: Option 2: Option 3: Compartment: 10.1 North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690996 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFA Compartment: 2F Description: 480V UNIT SWBD BUS A Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-055A C10-TL-058A C10-TL-061A C10-TL-039A C10-TL-030A CABLE

Cable: C10BFA1037
Seg Code: L System: BFA Startup Code:

Rev: 01

Description:

1C X 400 SQ.MM, 0.6/1kV


Pull Length(m): 28 No. of Cables: 1 Type Code: 14006 End Length(m): 5 Elevation: Schematic: ED-690996

Service: FEED-1 TO HRSG MCC-1


Routed Length (m): Allowance (m): Total Length (m): 27 3 30 Option 1: Option 2: Option 3: Compartment: 10.1 North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690996 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFA Compartment: 2F Description: 480V UNIT SWBD BUS A Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-055A C10-TL-058A C10-TL-061A C10-TL-039A C10-TL-030A CABLE

Cable: C10BFA1038
Seg Code: L System: BFA Startup Code:

Rev: 01

Description:

1C X 400 SQ.MM, 0.6/1kV


Pull Length(m): 28 No. of Cables: 1 Type Code: 14006 End Length(m): 5 Elevation: Schematic: ED-690996

Service: FEED-1 TO HRSG MCC-1


Routed Length (m): Allowance (m): Total Length (m): 27 3 30 Option 1: Option 2: Option 3: Compartment: 10.1 North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690996 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFA Compartment: 2F Description: 480V UNIT SWBD BUS A Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-055A C10-TL-058A C10-TL-061A C10-TL-039A C10-TL-030A CABLE

Page 9 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
1C X 400 SQ.MM, 0.6/1kV
Pull Length(m): 28 No. of Cables: 1 Type Code: 14006 End Length(m): 5 Elevation: Schematic: ED-690996

Cable: C10BFA1039
Seg Code: L System: BFA Startup Code:

Service: FEED-1 TO HRSG MCC-1


Routed Length (m): Allowance (m): Total Length (m): 27 3 30 Option 1: Option 2: Option 3: Compartment: 10.1 North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690996 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFA Compartment: 2F Description: 480V UNIT SWBD BUS A Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-055A C10-TL-058A C10-TL-061A C10-TL-039A C10-TL-030A CABLE

Cable: C10BFA1040
Seg Code: L System: BFA Startup Code:

Rev: 01

Description:

1C X 400 SQ.MM, 0.6/1kV


Pull Length(m): 28 No. of Cables: 1 Type Code: 14006 End Length(m): 5 Elevation: Schematic: ED-690996

Service: FEED-1 TO HRSG MCC-1


Routed Length (m): Allowance (m): Total Length (m): 27 3 30 Option 1: Option 2: Option 3: Compartment: 10.1 North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690996 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFA Compartment: 2F Description: 480V UNIT SWBD BUS A Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-055A C10-TL-058A C10-TL-061A C10-TL-039A C10-TL-030A CABLE

Cable: C10BFA1041
Seg Code: L System: BFA Startup Code:

Rev: 01

Description:

1C X 400 SQ.MM, 0.6/1kV


Pull Length(m): 31 No. of Cables: 1 Type Code: 14006 End Length(m): 5 Elevation: Schematic: ED-690996

Service: FEED-1 TO HRSG MCC-1


Routed Length (m): Allowance (m): Total Length (m): 27 3 30 Option 1: Option 2: Option 3: Compartment: 10.1 North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690996 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFA Compartment: 2F Description: 480V UNIT SWBD BUS A Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-055A C10-TL-058A C10-TL-061A C10-TL-039A C10-TL-030A CABLE

Cable: C10BFA1042
Seg Code: L System: BFA Startup Code:

Rev: 00

Description:

1C X 400 SQ.MM, 0.6/1kV


Pull Length(m): 30 No. of Cables: 1 Type Code: 14006 End Length(m): 10 Elevation: Schematic: ED-690998

Service: FEED-1 TO HRSG MCC-2


Routed Length (m): Allowance (m): Total Length (m): 30 4 34 Option 1: Option 2: Option 3: Compartment: 1.1 North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690998 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFA Compartment: 3F Description: 480V UNIT SWBD BUS A Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-058C C10-TL-061C C10-TL-039C C10-TL-030C C10-TL-014B CABLE

Page 10 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
1C X 400 SQ.MM, 0.6/1kV
Pull Length(m): 30 No. of Cables: 1 Type Code: 14006 End Length(m): 10 Elevation: Schematic: ED-690998

Cable: C10BFA1043
Seg Code: L System: BFA Startup Code:

Service: FEED-1 TO HRSG MCC-2


Routed Length (m): Allowance (m): Total Length (m): 30 4 34 Option 1: Option 2: Option 3: Compartment: 1.1 North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690998 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFA Compartment: 3F Description: 480V UNIT SWBD BUS A Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-058C C10-TL-061C C10-TL-039C C10-TL-030C C10-TL-014B CABLE

Cable: C10BFA1044
Seg Code: L System: BFA Startup Code:

Rev: 00

Description:

1C X 400 SQ.MM, 0.6/1kV


Pull Length(m): 30 No. of Cables: 1 Type Code: 14006 End Length(m): 10 Elevation: Schematic: ED-690998

Service: FEED-1 TO HRSG MCC-2


Routed Length (m): Allowance (m): Total Length (m): 30 4 34 Option 1: Option 2: Option 3: Compartment: 1.1 North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690998 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFA Compartment: 3F Description: 480V UNIT SWBD BUS A Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-058C C10-TL-061C C10-TL-039C C10-TL-030C C10-TL-014B CABLE

Cable: C10BFA1045
Seg Code: L System: BFA Startup Code:

Rev: 00

Description:

1C X 400 SQ.MM, 0.6/1kV


Pull Length(m): 30 No. of Cables: 1 Type Code: 14006 End Length(m): 10 Elevation: Schematic: ED-690998

Service: FEED-1 TO HRSG MCC-2


Routed Length (m): Allowance (m): Total Length (m): 30 4 34 Option 1: Option 2: Option 3: Compartment: 1.1 North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690998 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFA Compartment: 3F Description: 480V UNIT SWBD BUS A Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-058C C10-TL-061C C10-TL-039C C10-TL-030C C10-TL-014B CABLE

Cable: C10BFA1046
Seg Code: L System: BFA Startup Code:

Rev: 00

Description:

1C X 400 SQ.MM, 0.6/1kV


Pull Length(m): 30 No. of Cables: 1 Type Code: 14006 End Length(m): 10 Elevation: Schematic: ED-690998

Service: FEED-1 TO HRSG MCC-2


Routed Length (m): Allowance (m): Total Length (m): 30 4 34 Option 1: Option 2: Option 3: Compartment: 1.1 North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690998 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFA Compartment: 3F Description: 480V UNIT SWBD BUS A Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-058C C10-TL-061C C10-TL-039C C10-TL-030C C10-TL-014B CABLE

Page 11 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
1C X 400 SQ.MM, 0.6/1kV
Pull Length(m): 30 No. of Cables: 1 Type Code: 14006 End Length(m): 10 Elevation: Schematic: ED-690998

Cable: C10BFA1047
Seg Code: L System: BFA Startup Code:

Service: FEED-1 TO HRSG MCC-2


Routed Length (m): Allowance (m): Total Length (m): 30 4 34 Option 1: Option 2: Option 3: Compartment: 1.1 North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690998 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFA Compartment: 3F Description: 480V UNIT SWBD BUS A Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-058C C10-TL-061C C10-TL-039C C10-TL-030C C10-TL-014B CABLE

Cable: C10BFA1048
Seg Code: L System: BFA Startup Code:

Rev: 00

Description:

1C X 400 SQ.MM, 0.6/1kV


Pull Length(m): 30 No. of Cables: 1 Type Code: 14006 End Length(m): 10 Elevation: Schematic: ED-690998

Service: FEED-1 TO HRSG MCC-2


Routed Length (m): Allowance (m): Total Length (m): 30 4 34 Option 1: Option 2: Option 3: Compartment: 1.1 North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690998 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFA Compartment: 3F Description: 480V UNIT SWBD BUS A Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-058C C10-TL-061C C10-TL-039C C10-TL-030C C10-TL-014B CABLE

Cable: C10BFA1049
Seg Code: L System: BFA Startup Code:

Rev: 00

Description:

1C X 400 SQ.MM, 0.6/1kV


Pull Length(m): 32 No. of Cables: 1 Type Code: 14006 End Length(m): 6 Elevation: Schematic: ED-691000

Service: FEED-1 TO HRSG MCC-3


Routed Length (m): Allowance (m): Total Length (m): 32 4 36 Option 1: Option 2: Option 3: Compartment: 9.1 North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691000 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFA Compartment: 1F Description: 480V UNIT SWBD BUS A Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-055B C10-TL-058B C10-TL-061B C10-TL-039B C10-TL-030B C10-TL-014A C10-TL-013A CABLE

Cable: C10BFA1050
Seg Code: L System: BFA Startup Code:

Rev: 00

Description:

1C X 400 SQ.MM, 0.6/1kV


Pull Length(m): 32 No. of Cables: 1 Type Code: 14006 End Length(m): 6 Elevation: Schematic: ED-691000

Service: FEED-1 TO HRSG MCC-3


Routed Length (m): Allowance (m): Total Length (m): 32 4 36 Option 1: Option 2: Option 3: Compartment: 9.1 North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691000 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFA Compartment: 1F Description: 480V UNIT SWBD BUS A Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-055B C10-TL-058B C10-TL-061B C10-TL-039B C10-TL-030B C10-TL-014A C10-TL-013A CABLE

Page 12 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
1C X 400 SQ.MM, 0.6/1kV
Pull Length(m): 32 No. of Cables: 1 Type Code: 14006 End Length(m): 6 Elevation: Schematic: ED-691000

Cable: C10BFA1051
Seg Code: L System: BFA Startup Code:

Service: FEED-1 TO HRSG MCC-3


Routed Length (m): Allowance (m): Total Length (m): 32 4 36 Option 1: Option 2: Option 3: Compartment: 9.1 North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691000 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFA Compartment: 1F Description: 480V UNIT SWBD BUS A Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-055B C10-TL-058B C10-TL-061B C10-TL-039B C10-TL-030B C10-TL-014A C10-TL-013A CABLE

Cable: C10BFA1052
Seg Code: L System: BFA Startup Code:

Rev: 00

Description:

1C X 400 SQ.MM, 0.6/1kV


Pull Length(m): 32 No. of Cables: 1 Type Code: 14006 End Length(m): 6 Elevation: Schematic: ED-691000

Service: FEED-1 TO HRSG MCC-3


Routed Length (m): Allowance (m): Total Length (m): 32 4 36 Option 1: Option 2: Option 3: Compartment: 9.1 North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691000 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFA Compartment: 1F Description: 480V UNIT SWBD BUS A Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-055B C10-TL-058B C10-TL-061B C10-TL-039B C10-TL-030B C10-TL-014A C10-TL-013A CABLE

Cable: C10BFA1053
Seg Code: L System: BFA Startup Code:

Rev: 00

Description:

1C X 400 SQ.MM, 0.6/1kV


Pull Length(m): 32 No. of Cables: 1 Type Code: 14006 End Length(m): 6 Elevation: Schematic: ED-691000

Service: FEED-1 TO HRSG MCC-3


Routed Length (m): Allowance (m): Total Length (m): 32 4 36 Option 1: Option 2: Option 3: Compartment: 9.1 North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691000 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFA Compartment: 1F Description: 480V UNIT SWBD BUS A Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-055B C10-TL-058B C10-TL-061B C10-TL-039B C10-TL-030B C10-TL-014A C10-TL-013A CABLE

Cable: C10BFA1054
Seg Code: L System: BFA Startup Code:

Rev: 00

Description:

1C X 400 SQ.MM, 0.6/1kV


Pull Length(m): 32 No. of Cables: 1 Type Code: 14006 End Length(m): 6 Elevation: Schematic: ED-691000

Service: FEED-1 TO HRSG MCC-3


Routed Length (m): Allowance (m): Total Length (m): 32 4 36 Option 1: Option 2: Option 3: Compartment: 9.1 North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691000 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFA Compartment: 1F Description: 480V UNIT SWBD BUS A Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-055B C10-TL-058B C10-TL-061B C10-TL-039B C10-TL-030B C10-TL-014A C10-TL-013A CABLE

Page 13 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
1C X 400 SQ.MM, 0.6/1kV
Pull Length(m): 32 No. of Cables: 1 Type Code: 14006 End Length(m): 6 Elevation: Schematic: ED-691000

Cable: C10BFA1055
Seg Code: L System: BFA Startup Code:

Service: FEED-1 TO HRSG MCC-3


Routed Length (m): Allowance (m): Total Length (m): 32 4 36 Option 1: Option 2: Option 3: Compartment: 9.1 North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691000 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFA Compartment: 1F Description: 480V UNIT SWBD BUS A Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-055B C10-TL-058B C10-TL-061B C10-TL-039B C10-TL-030B C10-TL-014A C10-TL-013A CABLE

Cable: C10BFA1056
Seg Code: L System: BFA Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 45 No. of Cables: 1 Type Code: 16306 End Length(m): 8 Elevation: Schematic: ED-691002

Service: FEED TO BLOCK-1 INST. AIR MCC-A


Routed Length (m): Allowance (m): Total Length (m): 41 4 45 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691002 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFA Compartment: 6F Description: 480V UNIT SWBD BUS A Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJC Compartment: 5.1 Description: BLK-1 / INST AIR MCC-A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-058C C10-TL-061C C10-TL-039C C10-TL-030C C10-TL-014B C10-TL-012C C10-TL-009C C10-TL-008C CABLE

Cable: C10BFA1057
Seg Code: L System: BFA Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 45 No. of Cables: 1 Type Code: 16306 End Length(m): 8 Elevation: Schematic: ED-691002

Service: FEED TO BLOCK-1 INST. AIR MCC-A


Routed Length (m): Allowance (m): Total Length (m): 41 4 45 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691002 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFA Compartment: 6F Description: 480V UNIT SWBD BUS A Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJC Compartment: 5.1 Description: BLK-1 / INST AIR MCC-A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-058C C10-TL-061C C10-TL-039C C10-TL-030C C10-TL-014B C10-TL-012C C10-TL-009C C10-TL-008C CABLE

Cable: C10BFA1058
Seg Code: L System: BFA Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 45 No. of Cables: 1 Type Code: 16306 End Length(m): 8 Elevation: Schematic: ED-691002

Service: FEED TO BLOCK-1 INST. AIR MCC-A


Routed Length (m): Allowance (m): Total Length (m): 41 4 45 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691002 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFA Compartment: 6F Description: 480V UNIT SWBD BUS A Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJC Compartment: 5.1 Description: BLK-1 / INST AIR MCC-A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-058C C10-TL-061C C10-TL-039C C10-TL-030C C10-TL-014B C10-TL-012C C10-TL-009C C10-TL-008C CABLE

Page 14 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
1C X 630 SQ.MM, 0.6/1kV
Pull Length(m): 45 No. of Cables: 1 Type Code: 16306 End Length(m): 8 Elevation: Schematic: ED-691002

Cable: C10BFA1059
Seg Code: L System: BFA Startup Code:

Service: FEED TO BLOCK-1 INST. AIR MCC-A


Routed Length (m): Allowance (m): Total Length (m): 41 4 45 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691002 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFA Compartment: 6F Description: 480V UNIT SWBD BUS A Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJC Compartment: 5.1 Description: BLK-1 / INST AIR MCC-A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-058C C10-TL-061C C10-TL-039C C10-TL-030C C10-TL-014B C10-TL-012C C10-TL-009C C10-TL-008C CABLE

Cable: C10BFA1060
Seg Code: L System: BFA Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 45 No. of Cables: 1 Type Code: 16306 End Length(m): 8 Elevation: Schematic: ED-691002

Service: FEED TO BLOCK-1 INST. AIR MCC-A


Routed Length (m): Allowance (m): Total Length (m): 41 4 45 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691002 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFA Compartment: 6F Description: 480V UNIT SWBD BUS A Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJC Compartment: 5.1 Description: BLK-1 / INST AIR MCC-A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-058C C10-TL-061C C10-TL-039C C10-TL-030C C10-TL-014B C10-TL-012C C10-TL-009C C10-TL-008C CABLE

Cable: C10BFA1061
Seg Code: L System: BFA Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 45 No. of Cables: 1 Type Code: 16306 End Length(m): 8 Elevation: Schematic: ED-691002

Service: FEED TO BLOCK-1 INST. AIR MCC-A


Routed Length (m): Allowance (m): Total Length (m): 41 4 45 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691002 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFA Compartment: 6F Description: 480V UNIT SWBD BUS A Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJC Compartment: 5.1 Description: BLK-1 / INST AIR MCC-A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-058C C10-TL-061C C10-TL-039C C10-TL-030C C10-TL-014B C10-TL-012C C10-TL-009C C10-TL-008C CABLE

Cable: C10BFA1062
Seg Code: L System: BFA Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 45 No. of Cables: 1 Type Code: 16306 End Length(m): 8 Elevation: Schematic: ED-691002

Service: FEED TO BLOCK-1 INST. AIR MCC-A


Routed Length (m): Allowance (m): Total Length (m): 41 4 45 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691002 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFA Compartment: 6F Description: 480V UNIT SWBD BUS A Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJC Compartment: 5.1 Description: BLK-1 / INST AIR MCC-A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-058C C10-TL-061C C10-TL-039C C10-TL-030C C10-TL-014B C10-TL-012C C10-TL-009C C10-TL-008C CABLE

Page 15 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
1C X 630 SQ.MM, 0.6/1kV
Pull Length(m): 45 No. of Cables: 1 Type Code: 16306 End Length(m): 8 Elevation: Schematic: ED-691002

Cable: C10BFA1063
Seg Code: L System: BFA Startup Code:

Service: FEED TO BLOCK-1 INST. AIR MCC-A


Routed Length (m): Allowance (m): Total Length (m): 41 4 45 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691002 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFA Compartment: 6F Description: 480V UNIT SWBD BUS A Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJC Compartment: 5.1 Description: BLK-1 / INST AIR MCC-A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-058C C10-TL-061C C10-TL-039C C10-TL-030C C10-TL-014B C10-TL-012C C10-TL-009C C10-TL-008C CABLE

Cable: C10BFA1064
Seg Code: L System: BFA Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 45 No. of Cables: 1 Type Code: 16306 End Length(m): 8 Elevation: Schematic: ED-691002

Service: FEED TO BLOCK-1 INST. AIR MCC-A


Routed Length (m): Allowance (m): Total Length (m): 41 4 45 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691002 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFA Compartment: 6F Description: 480V UNIT SWBD BUS A Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJC Compartment: 5.1 Description: BLK-1 / INST AIR MCC-A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-058C C10-TL-061C C10-TL-039C C10-TL-030C C10-TL-014B C10-TL-012C C10-TL-009C C10-TL-008C CABLE

Cable: C10BFA1065
Seg Code: L System: BFA Startup Code:

Rev: 00

Description:

1C X 400 SQ.MM, 0.6/1kV


Pull Length(m): 48 No. of Cables: 1 Type Code: 14006 End Length(m): 8 Elevation: Schematic: ED-691002

Service: FEED TO BLOCK-1 INST. AIR MCC-A


Routed Length (m): Allowance (m): Total Length (m): 41 4 45 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691002 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFA Compartment: 6F Description: 480V UNIT SWBD BUS A Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJC Compartment: 5.1 Description: BLK-1 / INST AIR MCC-A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-058C C10-TL-061C C10-TL-039C C10-TL-030C C10-TL-014B C10-TL-012C C10-TL-009C C10-TL-008C CABLE

Cable: C10BFA1066
Seg Code: L System: BFA Startup Code:

Rev: 00

Description:

1C X 400 SQ.MM, 0.6/1kV


Pull Length(m): 40 No. of Cables: 1 Type Code: 14006 End Length(m): 8 Elevation: Schematic: ED-691002

Service: FEED TO BLOCK-1 INST. AIR MCC-A


Routed Length (m): Allowance (m): Total Length (m): 41 4 45 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691002 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFA Compartment: 6F Description: 480V UNIT SWBD BUS A Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJC Compartment: 5.1 Description: BLK-1 / INST AIR MCC-A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-058C C10-TL-061C C10-TL-039C C10-TL-030C C10-TL-014B C10-TL-012C C10-TL-009C C10-TL-008C CABLE

Page 16 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
1C X 630 SQ.MM, 0.6/1kV
Pull Length(m): 20 No. of Cables: 1 Type Code: 16306 End Length(m): 4 Elevation: Schematic: ED-690992

Cable: C10BFB1001
Seg Code: L System: BFB Startup Code:

Service: INCOMER-2 TO UNIT 480V SWITCHBOARD


Routed Length (m): Allowance (m): Total Length (m): 20 3 23 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690992 7

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BHT01 Compartment: Description: 4.16/0.48KV BAT FOR BLK-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-098A C10-TL-078A CABLE

Cable To End: Equipment No: C10BFB Compartment: 9F Description: 480V UNIT SWBD BUS B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BFB1002
Seg Code: L System: BFB Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 20 No. of Cables: 1 Type Code: 16306 End Length(m): 4 Elevation: Schematic: ED-690992

Service: INCOMER-2 TO UNIT 480V SWITCHBOARD


Routed Length (m): Allowance (m): Total Length (m): 20 3 23 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690992 7

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BHT01 Compartment: Description: 4.16/0.48KV BAT FOR BLK-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-098A C10-TL-078A CABLE

Cable To End: Equipment No: C10BFB Compartment: 9F Description: 480V UNIT SWBD BUS B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BFB1003
Seg Code: L System: BFB Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 20 No. of Cables: 1 Type Code: 16306 End Length(m): 4 Elevation: Schematic: ED-690992

Service: INCOMER-2 TO UNIT 480V SWITCHBOARD


Routed Length (m): Allowance (m): Total Length (m): 20 3 23 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690992 7

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BHT01 Compartment: Description: 4.16/0.48KV BAT FOR BLK-1 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-098A C10-TL-078A CABLE

Cable To End: Equipment No: C10BFB Compartment: 9F Description: 480V UNIT SWBD BUS B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BFB1004
Seg Code: L System: BFB Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 20 No. of Cables: 1 Type Code: 16306 End Length(m): 4 Elevation: Schematic: ED-690992

Service: INCOMER-2 TO UNIT 480V SWITCHBOARD


Routed Length (m): Allowance (m): Total Length (m): 20 3 23 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690992 7

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BHT01 Compartment: Description: 4.16/0.48KV BAT FOR BLK-1 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-098A C10-TL-078A CABLE

Cable To End: Equipment No: C10BFB Compartment: 9F Description: 480V UNIT SWBD BUS B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Page 17 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
1C X 630 SQ.MM, 0.6/1kV
Pull Length(m): 20 No. of Cables: 1 Type Code: 16306 End Length(m): 4 Elevation: Schematic: ED-690992

Cable: C10BFB1005
Seg Code: L System: BFB Startup Code:

Service: INCOMER-2 TO UNIT 480V SWITCHBOARD


Routed Length (m): Allowance (m): Total Length (m): 20 3 23 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690992 7

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BHT01 Compartment: Description: 4.16/0.48KV BAT FOR BLK-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-098A C10-TL-078A CABLE

Cable To End: Equipment No: C10BFB Compartment: 9F Description: 480V UNIT SWBD BUS B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BFB1006
Seg Code: L System: BFB Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 20 No. of Cables: 1 Type Code: 16306 End Length(m): 4 Elevation: Schematic: ED-690992

Service: INCOMER-2 TO UNIT 480V SWITCHBOARD


Routed Length (m): Allowance (m): Total Length (m): 20 3 23 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690992 7

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BHT01 Compartment: Description: 4.16/0.48KV BAT FOR BLK-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-098A C10-TL-078A CABLE

Cable To End: Equipment No: C10BFB Compartment: 9F Description: 480V UNIT SWBD BUS B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BFB1007
Seg Code: L System: BFB Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 20 No. of Cables: 1 Type Code: 16306 End Length(m): 4 Elevation: Schematic: ED-690992

Service: INCOMER-2 TO UNIT 480V SWITCHBOARD


Routed Length (m): Allowance (m): Total Length (m): 20 3 23 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690992 7

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BHT01 Compartment: Description: 4.16/0.48KV BAT FOR BLK-1 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-098A C10-TL-078A CABLE

Cable To End: Equipment No: C10BFB Compartment: 9F Description: 480V UNIT SWBD BUS B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BFB1008
Seg Code: L System: BFB Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 20 No. of Cables: 1 Type Code: 16306 End Length(m): 4 Elevation: Schematic: ED-690992

Service: INCOMER-2 TO UNIT 480V SWITCHBOARD


Routed Length (m): Allowance (m): Total Length (m): 20 3 23 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690992 7

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BHT01 Compartment: Description: 4.16/0.48KV BAT FOR BLK-1 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-098A C10-TL-078A CABLE

Cable To End: Equipment No: C10BFB Compartment: 9F Description: 480V UNIT SWBD BUS B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Page 18 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
1C X 630 SQ.MM, 0.6/1kV
Pull Length(m): 20 No. of Cables: 1 Type Code: 16306 End Length(m): 4 Elevation: Schematic: ED-690992

Cable: C10BFB1009
Seg Code: L System: BFB Startup Code:

Service: INCOMER-2 TO UNIT 480V SWITCHBOARD


Routed Length (m): Allowance (m): Total Length (m): 20 3 23 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690992 7

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BHT01 Compartment: Description: 4.16/0.48KV BAT FOR BLK-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-098A C10-TL-078A CABLE

Cable To End: Equipment No: C10BFB Compartment: 9F Description: 480V UNIT SWBD BUS B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BFB1010
Seg Code: L System: BFB Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 20 No. of Cables: 1 Type Code: 16306 End Length(m): 4 Elevation: Schematic: ED-690992

Service: INCOMER-2 TO UNIT 480V SWITCHBOARD


Routed Length (m): Allowance (m): Total Length (m): 20 3 23 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690992 7

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BHT01 Compartment: Description: 4.16/0.48KV BAT FOR BLK-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-098A C10-TL-078A CABLE

Cable To End: Equipment No: C10BFB Compartment: 9F Description: 480V UNIT SWBD BUS B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BFB1011
Seg Code: L System: BFB Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 20 No. of Cables: 1 Type Code: 16306 End Length(m): 4 Elevation: Schematic: ED-690992

Service: INCOMER-2 TO UNIT 480V SWITCHBOARD


Routed Length (m): Allowance (m): Total Length (m): 20 3 23 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690992 7

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BHT01 Compartment: Description: 4.16/0.48KV BAT FOR BLK-1 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-098A C10-TL-078A CABLE

Cable To End: Equipment No: C10BFB Compartment: 9F Description: 480V UNIT SWBD BUS B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BFB1012
Seg Code: L System: BFB Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 20 No. of Cables: 1 Type Code: 16306 End Length(m): 4 Elevation: Schematic: ED-690992

Service: INCOMER-2 TO UNIT 480V SWITCHBOARD


Routed Length (m): Allowance (m): Total Length (m): 20 3 23 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690992 7

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BHT01 Compartment: Description: 4.16/0.48KV BAT FOR BLK-1 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-098A C10-TL-078A CABLE

Cable To End: Equipment No: C10BFB Compartment: 9F Description: 480V UNIT SWBD BUS B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Page 19 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
1C X 630 SQ.MM, 0.6/1kV
Pull Length(m): 20 No. of Cables: 1 Type Code: 16306 End Length(m): 4 Elevation: Schematic: ED-690992

Cable: C10BFB1013
Seg Code: L System: BFB Startup Code:

Service: INCOMER-2 TO UNIT 480V SWITCHBOARD


Routed Length (m): Allowance (m): Total Length (m): 20 3 23 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690992 7

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BHT01 Compartment: Description: 4.16/0.48KV BAT FOR BLK-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-098B C10-TL-078B CABLE

Cable To End: Equipment No: C10BFB Compartment: 9F Description: 480V UNIT SWBD BUS B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BFB1014
Seg Code: L System: BFB Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 20 No. of Cables: 1 Type Code: 16306 End Length(m): 4 Elevation: Schematic: ED-690992

Service: INCOMER-2 TO UNIT 480V SWITCHBOARD


Routed Length (m): Allowance (m): Total Length (m): 20 3 23 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690992 7

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BHT01 Compartment: Description: 4.16/0.48KV BAT FOR BLK-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-098B C10-TL-078B CABLE

Cable To End: Equipment No: C10BFB Compartment: 9F Description: 480V UNIT SWBD BUS B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BFB1015
Seg Code: L System: BFB Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 20 No. of Cables: 1 Type Code: 16306 End Length(m): 4 Elevation: Schematic: ED-690992

Service: INCOMER-2 TO UNIT 480V SWITCHBOARD


Routed Length (m): Allowance (m): Total Length (m): 20 3 23 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690992 7

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BHT01 Compartment: Description: 4.16/0.48KV BAT FOR BLK-1 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-098B C10-TL-078B CABLE

Cable To End: Equipment No: C10BFB Compartment: 9F Description: 480V UNIT SWBD BUS B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BFB1016
Seg Code: L System: BFB Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 20 No. of Cables: 1 Type Code: 16306 End Length(m): 4 Elevation: Schematic: ED-690992

Service: INCOMER-2 TO UNIT 480V SWITCHBOARD


Routed Length (m): Allowance (m): Total Length (m): 20 3 23 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690992 7

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BHT01 Compartment: Description: 4.16/0.48KV BAT FOR BLK-1 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-098B C10-TL-078B CABLE

Cable To End: Equipment No: C10BFB Compartment: 9F Description: 480V UNIT SWBD BUS B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Page 20 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
1C X 630 SQ.MM, 0.6/1kV
Pull Length(m): 20 No. of Cables: 1 Type Code: 16306 End Length(m): 4 Elevation: Schematic: ED-690992

Cable: C10BFB1017
Seg Code: L System: BFB Startup Code:

Service: INCOMER-2 TO UNIT 480V SWITCHBOARD


Routed Length (m): Allowance (m): Total Length (m): 20 3 23 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690992 7

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BHT01 Compartment: Description: 4.16/0.48KV BAT FOR BLK-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-098B C10-TL-078B CABLE

Cable To End: Equipment No: C10BFB Compartment: 9F Description: 480V UNIT SWBD BUS B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BFB1018
Seg Code: L System: BFB Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 20 No. of Cables: 1 Type Code: 16306 End Length(m): 4 Elevation: Schematic: ED-690992

Service: INCOMER-2 TO UNIT 480V SWITCHBOARD


Routed Length (m): Allowance (m): Total Length (m): 20 3 23 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690992 7

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BHT01 Compartment: Description: 4.16/0.48KV BAT FOR BLK-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-098B C10-TL-078B CABLE

Cable To End: Equipment No: C10BFB Compartment: 9F Description: 480V UNIT SWBD BUS B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BFB1019
Seg Code: L System: BFB Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 20 No. of Cables: 1 Type Code: 16306 End Length(m): 4 Elevation: Schematic: ED-690992

Service: INCOMER-2 TO UNIT 480V SWITCHBOARD


Routed Length (m): Allowance (m): Total Length (m): 20 3 23 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690992 7

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BHT01 Compartment: Description: 4.16/0.48KV BAT FOR BLK-1 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-098B C10-TL-078B CABLE

Cable To End: Equipment No: C10BFB Compartment: 9F Description: 480V UNIT SWBD BUS B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BFB1020
Seg Code: L System: BFB Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 20 No. of Cables: 1 Type Code: 16306 End Length(m): 4 Elevation: Schematic: ED-690992

Service: INCOMER-2 TO UNIT 480V SWITCHBOARD


Routed Length (m): Allowance (m): Total Length (m): 20 3 23 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690992 7

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BHT01 Compartment: Description: 4.16/0.48KV BAT FOR BLK-1 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-098B C10-TL-078B CABLE

Cable To End: Equipment No: C10BFB Compartment: 9F Description: 480V UNIT SWBD BUS B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Page 21 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
1C X 630 SQ.MM, 0.6/1kV
Pull Length(m): 20 No. of Cables: 1 Type Code: 16306 End Length(m): 4 Elevation: Schematic: ED-690992

Cable: C10BFB1021
Seg Code: L System: BFB Startup Code:

Service: INCOMER-2 TO UNIT 480V SWITCHBOARD


Routed Length (m): Allowance (m): Total Length (m): 20 3 23 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690992 7

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BHT01 Compartment: Description: 4.16/0.48KV BAT FOR BLK-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-098B C10-TL-078B CABLE

Cable To End: Equipment No: C10BFB Compartment: 9F Description: 480V UNIT SWBD BUS B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BFB1022
Seg Code: L System: BFB Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 20 No. of Cables: 1 Type Code: 16306 End Length(m): 4 Elevation: Schematic: ED-690992

Service: INCOMER-2 TO UNIT 480V SWITCHBOARD


Routed Length (m): Allowance (m): Total Length (m): 20 3 23 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690992 7

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BHT01 Compartment: Description: 4.16/0.48KV BAT FOR BLK-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-098B C10-TL-078B CABLE

Cable To End: Equipment No: C10BFB Compartment: 9F Description: 480V UNIT SWBD BUS B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BFB1023
Seg Code: L System: BFB Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 20 No. of Cables: 1 Type Code: 16306 End Length(m): 4 Elevation: Schematic: ED-690992

Service: INCOMER-2 TO UNIT 480V SWITCHBOARD


Routed Length (m): Allowance (m): Total Length (m): 20 3 23 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690992 7

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BHT01 Compartment: Description: 4.16/0.48KV BAT FOR BLK-1 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-098B C10-TL-078B CABLE

Cable To End: Equipment No: C10BFB Compartment: 9F Description: 480V UNIT SWBD BUS B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BFB1024
Seg Code: L System: BFB Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 20 No. of Cables: 1 Type Code: 16306 End Length(m): 4 Elevation: Schematic: ED-690992

Service: INCOMER-2 TO UNIT 480V SWITCHBOARD


Routed Length (m): Allowance (m): Total Length (m): 20 3 23 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690992 7

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BHT01 Compartment: Description: 4.16/0.48KV BAT FOR BLK-1 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-098B C10-TL-078B CABLE

Cable To End: Equipment No: C10BFB Compartment: 9F Description: 480V UNIT SWBD BUS B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Page 22 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
1C X 630 SQ.MM, 0.6/1kV
Pull Length(m): 20 No. of Cables: 1 Type Code: 16306 End Length(m): 4 Elevation: Schematic: ED-690992

Cable: C10BFB1025
Seg Code: L System: BFB Startup Code:

Service: INCOMER-2 TO UNIT 480V SWITCHBOARD


Routed Length (m): Allowance (m): Total Length (m): 20 3 23 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690992 7

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BHT01 Compartment: Description: 4.16/0.48KV BAT FOR BLK-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-098B C10-TL-078B CABLE

Cable To End: Equipment No: C10BFB Compartment: 9F Description: 480V UNIT SWBD BUS B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BFB1028
Seg Code: L System: BFB Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 17 No. of Cables: 1 Type Code: 16306 End Length(m): 9 Elevation: Schematic: ED-690995

Service: FEED-2 TO STEAM TURBINE MAIN MCC


Routed Length (m): Allowance (m): Total Length (m): 14 3 17 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690995 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFB Compartment: 13F Description: 480V UNIT SWBD BUS B Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-061A CABLE

Cable To End: Equipment No: C10BJE Compartment: 15.1 Description: BLK-1 STEAM TURBINE MAIN MCC North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BFB1029
Seg Code: L System: BFB Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 17 No. of Cables: 1 Type Code: 16306 End Length(m): 9 Elevation: Schematic: ED-690995

Service: FEED-2 TO STEAM TURBINE MAIN MCC


Routed Length (m): Allowance (m): Total Length (m): 14 3 17 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690995 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFB Compartment: 13F Description: 480V UNIT SWBD BUS B Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-061A CABLE

Cable To End: Equipment No: C10BJE Compartment: 15.1 Description: BLK-1 STEAM TURBINE MAIN MCC North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BFB1030
Seg Code: L System: BFB Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 17 No. of Cables: 1 Type Code: 16306 End Length(m): 9 Elevation: Schematic: ED-690995

Service: FEED-2 TO STEAM TURBINE MAIN MCC


Routed Length (m): Allowance (m): Total Length (m): 14 3 17 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690995 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFB Compartment: 13F Description: 480V UNIT SWBD BUS B Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-061A CABLE

Cable To End: Equipment No: C10BJE Compartment: 15.1 Description: BLK-1 STEAM TURBINE MAIN MCC North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Page 23 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
1C X 630 SQ.MM, 0.6/1kV
Pull Length(m): 17 No. of Cables: 1 Type Code: 16306 End Length(m): 9 Elevation: Schematic: ED-690995

Cable: C10BFB1031
Seg Code: L System: BFB Startup Code:

Service: FEED-2 TO STEAM TURBINE MAIN MCC


Routed Length (m): Allowance (m): Total Length (m): 14 3 17 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690995 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFB Compartment: 13F Description: 480V UNIT SWBD BUS B Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-061A CABLE

Cable To End: Equipment No: C10BJE Compartment: 15.1 Description: BLK-1 STEAM TURBINE MAIN MCC North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BFB1032
Seg Code: L System: BFB Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 17 No. of Cables: 1 Type Code: 16306 End Length(m): 9 Elevation: Schematic: ED-690995

Service: FEED-2 TO STEAM TURBINE MAIN MCC


Routed Length (m): Allowance (m): Total Length (m): 14 3 17 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690995 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFB Compartment: 13F Description: 480V UNIT SWBD BUS B Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-061A CABLE

Cable To End: Equipment No: C10BJE Compartment: 15.1 Description: BLK-1 STEAM TURBINE MAIN MCC North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BFB1033
Seg Code: L System: BFB Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 17 No. of Cables: 1 Type Code: 16306 End Length(m): 9 Elevation: Schematic: ED-690995

Service: FEED-2 TO STEAM TURBINE MAIN MCC


Routed Length (m): Allowance (m): Total Length (m): 14 3 17 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690995 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFB Compartment: 13F Description: 480V UNIT SWBD BUS B Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-061A CABLE

Cable To End: Equipment No: C10BJE Compartment: 15.1 Description: BLK-1 STEAM TURBINE MAIN MCC North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BFB1034
Seg Code: L System: BFB Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 17 No. of Cables: 1 Type Code: 16306 End Length(m): 9 Elevation: Schematic: ED-690995

Service: FEED-2 TO STEAM TURBINE MAIN MCC


Routed Length (m): Allowance (m): Total Length (m): 14 3 17 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690995 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFB Compartment: 13F Description: 480V UNIT SWBD BUS B Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-061A CABLE

Cable To End: Equipment No: C10BJE Compartment: 15.1 Description: BLK-1 STEAM TURBINE MAIN MCC North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Page 24 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
1C X 400 SQ.MM, 0.6/1kV
Pull Length(m): 18 No. of Cables: 1 Type Code: 14006 End Length(m): 9 Elevation: Schematic: ED-690997

Cable: C10BFB1035
Seg Code: L System: BFB Startup Code:

Service: FEED-2 TO HRSG MCC-1


Routed Length (m): Allowance (m): Total Length (m): 18 3 21 Option 1: Option 2: Option 3: Compartment: 10.1 North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690997 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFB Compartment: 14F Description: 480V UNIT SWBD BUS B Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-061A C10-TL-039A C10-TL-030A CABLE

Cable To End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Cable: C10BFB1036
Seg Code: L System: BFB Startup Code:

Rev: 00

Description:

1C X 400 SQ.MM, 0.6/1kV


Pull Length(m): 18 No. of Cables: 1 Type Code: 14006 End Length(m): 9 Elevation: Schematic: ED-690997

Service: FEED-2 TO HRSG MCC-1


Routed Length (m): Allowance (m): Total Length (m): 18 3 21 Option 1: Option 2: Option 3: Compartment: 10.1 North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690997 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFB Compartment: 14F Description: 480V UNIT SWBD BUS B Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-061A C10-TL-039A C10-TL-030A CABLE

Cable To End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Cable: C10BFB1037
Seg Code: L System: BFB Startup Code:

Rev: 00

Description:

1C X 400 SQ.MM, 0.6/1kV


Pull Length(m): 18 No. of Cables: 1 Type Code: 14006 End Length(m): 9 Elevation: Schematic: ED-690997

Service: FEED-2 TO HRSG MCC-1


Routed Length (m): Allowance (m): Total Length (m): 18 3 21 Option 1: Option 2: Option 3: Compartment: 10.1 North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690997 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFB Compartment: 14F Description: 480V UNIT SWBD BUS B Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-061A C10-TL-039A C10-TL-030A CABLE

Cable To End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Cable: C10BFB1038
Seg Code: L System: BFB Startup Code:

Rev: 00

Description:

1C X 400 SQ.MM, 0.6/1kV


Pull Length(m): 18 No. of Cables: 1 Type Code: 14006 End Length(m): 9 Elevation: Schematic: ED-690997

Service: FEED-2 TO HRSG MCC-1


Routed Length (m): Allowance (m): Total Length (m): 18 3 21 Option 1: Option 2: Option 3: Compartment: 10.1 North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690997 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFB Compartment: 14F Description: 480V UNIT SWBD BUS B Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-061A C10-TL-039A C10-TL-030A CABLE

Cable To End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Page 25 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
1C X 400 SQ.MM, 0.6/1kV
Pull Length(m): 18 No. of Cables: 1 Type Code: 14006 End Length(m): 9 Elevation: Schematic: ED-690997

Cable: C10BFB1039
Seg Code: L System: BFB Startup Code:

Service: FEED-2 TO HRSG MCC-1


Routed Length (m): Allowance (m): Total Length (m): 18 3 21 Option 1: Option 2: Option 3: Compartment: 10.1 North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690997 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFB Compartment: 14F Description: 480V UNIT SWBD BUS B Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-061A C10-TL-039A C10-TL-030A CABLE

Cable To End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Cable: C10BFB1040
Seg Code: L System: BFB Startup Code:

Rev: 00

Description:

1C X 400 SQ.MM, 0.6/1kV


Pull Length(m): 18 No. of Cables: 1 Type Code: 14006 End Length(m): 9 Elevation: Schematic: ED-690997

Service: FEED-2 TO HRSG MCC-1


Routed Length (m): Allowance (m): Total Length (m): 18 3 21 Option 1: Option 2: Option 3: Compartment: 10.1 North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690997 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFB Compartment: 14F Description: 480V UNIT SWBD BUS B Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-061A C10-TL-039A C10-TL-030A CABLE

Cable To End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Cable: C10BFB1041
Seg Code: L System: BFB Startup Code:

Rev: 00

Description:

1C X 400 SQ.MM, 0.6/1kV


Pull Length(m): 18 No. of Cables: 1 Type Code: 14006 End Length(m): 9 Elevation: Schematic: ED-690997

Service: FEED-2 TO HRSG MCC-1


Routed Length (m): Allowance (m): Total Length (m): 18 3 21 Option 1: Option 2: Option 3: Compartment: 10.1 North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690997 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFB Compartment: 14F Description: 480V UNIT SWBD BUS B Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-061A C10-TL-039A C10-TL-030A CABLE

Cable To End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Cable: C10BFB1042
Seg Code: L System: BFB Startup Code:

Rev: 00

Description:

1C X 400 SQ.MM, 0.6/1kV


Pull Length(m): 19 No. of Cables: 1 Type Code: 14006 End Length(m): 8 Elevation: Schematic: ED-690999

Service: FEED-2 TO HRSG MCC-2


Routed Length (m): Allowance (m): Total Length (m): 19 3 22 Option 1: Option 2: Option 3: Compartment: 2.1 North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690999 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFB Compartment: 15F Description: 480V UNIT SWBD BUS B Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-061C C10-TL-039C C10-TL-030C C10-TL-014B CABLE

Page 26 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
1C X 400 SQ.MM, 0.6/1kV
Pull Length(m): 20 No. of Cables: 1 Type Code: 14006 End Length(m): 8 Elevation: Schematic: ED-690999

Cable: C10BFB1043
Seg Code: L System: BFB Startup Code:

Service: FEED-2 TO HRSG MCC-2


Routed Length (m): Allowance (m): Total Length (m): 19 3 22 Option 1: Option 2: Option 3: Compartment: 2.1 North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690999 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFB Compartment: 15F Description: 480V UNIT SWBD BUS B Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-061C C10-TL-039C C10-TL-030C C10-TL-014B CABLE

Cable: C10BFB1044
Seg Code: L System: BFB Startup Code:

Rev: 00

Description:

1C X 400 SQ.MM, 0.6/1kV


Pull Length(m): 20 No. of Cables: 1 Type Code: 14006 End Length(m): 8 Elevation: Schematic: ED-690999

Service: FEED-2 TO HRSG MCC-2


Routed Length (m): Allowance (m): Total Length (m): 19 3 22 Option 1: Option 2: Option 3: Compartment: 2.1 North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690999 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFB Compartment: 15F Description: 480V UNIT SWBD BUS B Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-061C C10-TL-039C C10-TL-030C C10-TL-014B CABLE

Cable: C10BFB1045
Seg Code: L System: BFB Startup Code:

Rev: 00

Description:

1C X 400 SQ.MM, 0.6/1kV


Pull Length(m): 20 No. of Cables: 1 Type Code: 14006 End Length(m): 8 Elevation: Schematic: ED-690999

Service: FEED-2 TO HRSG MCC-2


Routed Length (m): Allowance (m): Total Length (m): 19 3 22 Option 1: Option 2: Option 3: Compartment: 2.1 North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690999 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFB Compartment: 15F Description: 480V UNIT SWBD BUS B Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-061C C10-TL-039C C10-TL-030C C10-TL-014B CABLE

Cable: C10BFB1046
Seg Code: L System: BFB Startup Code:

Rev: 00

Description:

1C X 400 SQ.MM, 0.6/1kV


Pull Length(m): 20 No. of Cables: 1 Type Code: 14006 End Length(m): 8 Elevation: Schematic: ED-690999

Service: FEED-2 TO HRSG MCC-2


Routed Length (m): Allowance (m): Total Length (m): 19 3 22 Option 1: Option 2: Option 3: Compartment: 2.1 North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690999 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFB Compartment: 15F Description: 480V UNIT SWBD BUS B Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-061C C10-TL-039C C10-TL-030C C10-TL-014B CABLE

Page 27 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
1C X 400 SQ.MM, 0.6/1kV
Pull Length(m): 20 No. of Cables: 1 Type Code: 14006 End Length(m): 8 Elevation: Schematic: ED-690999

Cable: C10BFB1047
Seg Code: L System: BFB Startup Code:

Service: FEED-2 TO HRSG MCC-2


Routed Length (m): Allowance (m): Total Length (m): 19 3 22 Option 1: Option 2: Option 3: Compartment: 2.1 North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690999 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFB Compartment: 15F Description: 480V UNIT SWBD BUS B Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-061C C10-TL-039C C10-TL-030C C10-TL-014B CABLE

Cable: C10BFB1048
Seg Code: L System: BFB Startup Code:

Rev: 00

Description:

1C X 400 SQ.MM, 0.6/1kV


Pull Length(m): 20 No. of Cables: 1 Type Code: 14006 End Length(m): 8 Elevation: Schematic: ED-690999

Service: FEED-2 TO HRSG MCC-2


Routed Length (m): Allowance (m): Total Length (m): 19 3 22 Option 1: Option 2: Option 3: Compartment: 2.1 North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-690999 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFB Compartment: 15F Description: 480V UNIT SWBD BUS B Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-061C C10-TL-039C C10-TL-030C C10-TL-014B CABLE

Cable: C10BFB1049
Seg Code: L System: BFB Startup Code:

Rev: 00

Description:

1C X 400 SQ.MM, 0.6/1kV


Pull Length(m): 20 No. of Cables: 1 Type Code: 14006 End Length(m): 8 Elevation: Schematic: ED-691001

Service: FEED-2 TO HRSG MCC-3


Routed Length (m): Allowance (m): Total Length (m): 21 3 24 Option 1: Option 2: Option 3: Compartment: 10.1 North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691001 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFB Compartment: 16F Description: 480V UNIT SWBD BUS B Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-061B C10-TL-039B C10-TL-030B C10-TL-014A C10-TL-013A CABLE

Cable: C10BFB1050
Seg Code: L System: BFB Startup Code:

Rev: 00

Description:

1C X 400 SQ.MM, 0.6/1kV


Pull Length(m): 20 No. of Cables: 1 Type Code: 14006 End Length(m): 8 Elevation: Schematic: ED-691001

Service: FEED-2 TO HRSG MCC-3


Routed Length (m): Allowance (m): Total Length (m): 21 3 24 Option 1: Option 2: Option 3: Compartment: 10.1 North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691001 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFB Compartment: 16F Description: 480V UNIT SWBD BUS B Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-061B C10-TL-039B C10-TL-030B C10-TL-014A C10-TL-013A CABLE

Page 28 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
1C X 400 SQ.MM, 0.6/1kV
Pull Length(m): 20 No. of Cables: 1 Type Code: 14006 End Length(m): 8 Elevation: Schematic: ED-691001

Cable: C10BFB1051
Seg Code: L System: BFB Startup Code:

Service: FEED-2 TO HRSG MCC-3


Routed Length (m): Allowance (m): Total Length (m): 21 3 24 Option 1: Option 2: Option 3: Compartment: 10.1 North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691001 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFB Compartment: 16F Description: 480V UNIT SWBD BUS B Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-061B C10-TL-039B C10-TL-030B C10-TL-014A C10-TL-013A CABLE

Cable: C10BFB1052
Seg Code: L System: BFB Startup Code:

Rev: 00

Description:

1C X 400 SQ.MM, 0.6/1kV


Pull Length(m): 20 No. of Cables: 1 Type Code: 14006 End Length(m): 8 Elevation: Schematic: ED-691001

Service: FEED-2 TO HRSG MCC-3


Routed Length (m): Allowance (m): Total Length (m): 21 3 24 Option 1: Option 2: Option 3: Compartment: 10.1 North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691001 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFB Compartment: 16F Description: 480V UNIT SWBD BUS B Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-061B C10-TL-039B C10-TL-030B C10-TL-014A C10-TL-013A CABLE

Cable: C10BFB1053
Seg Code: L System: BFB Startup Code:

Rev: 00

Description:

1C X 400 SQ.MM, 0.6/1kV


Pull Length(m): 20 No. of Cables: 1 Type Code: 14006 End Length(m): 8 Elevation: Schematic: ED-691001

Service: FEED-2 TO HRSG MCC-3


Routed Length (m): Allowance (m): Total Length (m): 21 3 24 Option 1: Option 2: Option 3: Compartment: 10.1 North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691001 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFB Compartment: 16F Description: 480V UNIT SWBD BUS B Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-061B C10-TL-039B C10-TL-030B C10-TL-014A C10-TL-013A CABLE

Cable: C10BFB1054
Seg Code: L System: BFB Startup Code:

Rev: 00

Description:

1C X 400 SQ.MM, 0.6/1kV


Pull Length(m): 20 No. of Cables: 1 Type Code: 14006 End Length(m): 8 Elevation: Schematic: ED-691001

Service: FEED-2 TO HRSG MCC-3


Routed Length (m): Allowance (m): Total Length (m): 21 3 24 Option 1: Option 2: Option 3: Compartment: 10.1 North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691001 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFB Compartment: 16F Description: 480V UNIT SWBD BUS B Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-061B C10-TL-039B C10-TL-030B C10-TL-014A C10-TL-013A CABLE

Page 29 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
1C X 400 SQ.MM, 0.6/1kV
Pull Length(m): 20 No. of Cables: 1 Type Code: 14006 End Length(m): 8 Elevation: Schematic: ED-691001

Cable: C10BFB1055
Seg Code: L System: BFB Startup Code:

Service: FEED-2 TO HRSG MCC-3


Routed Length (m): Allowance (m): Total Length (m): 21 3 24 Option 1: Option 2: Option 3: Compartment: 10.1 North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691001 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFB Compartment: 16F Description: 480V UNIT SWBD BUS B Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-061B C10-TL-039B C10-TL-030B C10-TL-014A C10-TL-013A CABLE

Cable: C10BFB1056
Seg Code: L System: BFB Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 44 No. of Cables: 1 Type Code: 16306 End Length(m): 13 Elevation: Schematic: ED-691003

Service: FEED TO BLOCK-1 INST. AIR MCC-B


Routed Length (m): Allowance (m): Total Length (m): 40 4 44 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691003 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFB Compartment: 10F Description: 480V UNIT SWBD BUS B Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJD Compartment: 1.1 Description: BLK-1 / INST AIR MCC-B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-061B C10-TL-039B C10-TL-030B C10-TL-014A C10-TL-013A C10-TL-005B C10-TL-006B C10-TL-007B CABLE

Cable: C10BFB1057
Seg Code: L System: BFB Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 44 No. of Cables: 1 Type Code: 16306 End Length(m): 13 Elevation: Schematic: ED-691003

Service: FEED TO BLOCK-1 INST. AIR MCC-B


Routed Length (m): Allowance (m): Total Length (m): 40 4 44 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691003 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFB Compartment: 10F Description: 480V UNIT SWBD BUS B Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJD Compartment: 1.1 Description: BLK-1 / INST AIR MCC-B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-061B C10-TL-039B C10-TL-030B C10-TL-014A C10-TL-013A C10-TL-005B C10-TL-006B C10-TL-007B CABLE

Cable: C10BFB1058
Seg Code: L System: BFB Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 44 No. of Cables: 1 Type Code: 16306 End Length(m): 13 Elevation: Schematic: ED-691003

Service: FEED TO BLOCK-1 INST. AIR MCC-B


Routed Length (m): Allowance (m): Total Length (m): 40 4 44 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691003 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFB Compartment: 10F Description: 480V UNIT SWBD BUS B Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJD Compartment: 1.1 Description: BLK-1 / INST AIR MCC-B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-061B C10-TL-039B C10-TL-030B C10-TL-014A C10-TL-013A C10-TL-005B C10-TL-006B C10-TL-007B CABLE

Page 30 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
1C X 630 SQ.MM, 0.6/1kV
Pull Length(m): 44 No. of Cables: 1 Type Code: 16306 End Length(m): 13 Elevation: Schematic: ED-691003

Cable: C10BFB1059
Seg Code: L System: BFB Startup Code:

Service: FEED TO BLOCK-1 INST. AIR MCC-B


Routed Length (m): Allowance (m): Total Length (m): 40 4 44 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691003 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFB Compartment: 10F Description: 480V UNIT SWBD BUS B Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJD Compartment: 1.1 Description: BLK-1 / INST AIR MCC-B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-061B C10-TL-039B C10-TL-030B C10-TL-014A C10-TL-013A C10-TL-005B C10-TL-006B C10-TL-007B CABLE

Cable: C10BFB1060
Seg Code: L System: BFB Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 44 No. of Cables: 1 Type Code: 16306 End Length(m): 13 Elevation: Schematic: ED-691003

Service: FEED TO BLOCK-1 INST. AIR MCC-B


Routed Length (m): Allowance (m): Total Length (m): 40 4 44 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691003 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFB Compartment: 10F Description: 480V UNIT SWBD BUS B Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJD Compartment: 1.1 Description: BLK-1 / INST AIR MCC-B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-061B C10-TL-039B C10-TL-030B C10-TL-014A C10-TL-013A C10-TL-005B C10-TL-006B C10-TL-007B CABLE

Cable: C10BFB1061
Seg Code: L System: BFB Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 44 No. of Cables: 1 Type Code: 16306 End Length(m): 13 Elevation: Schematic: ED-691003

Service: FEED TO BLOCK-1 INST. AIR MCC-B


Routed Length (m): Allowance (m): Total Length (m): 40 4 44 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691003 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFB Compartment: 10F Description: 480V UNIT SWBD BUS B Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJD Compartment: 1.1 Description: BLK-1 / INST AIR MCC-B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-061B C10-TL-039B C10-TL-030B C10-TL-014A C10-TL-013A C10-TL-005B C10-TL-006B C10-TL-007B CABLE

Cable: C10BFB1062
Seg Code: L System: BFB Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 44 No. of Cables: 1 Type Code: 16306 End Length(m): 13 Elevation: Schematic: ED-691003

Service: FEED TO BLOCK-1 INST. AIR MCC-B


Routed Length (m): Allowance (m): Total Length (m): 40 4 44 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691003 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFB Compartment: 10F Description: 480V UNIT SWBD BUS B Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJD Compartment: 1.1 Description: BLK-1 / INST AIR MCC-B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-061B C10-TL-039B C10-TL-030B C10-TL-014A C10-TL-013A C10-TL-005B C10-TL-006B C10-TL-007B CABLE

Page 31 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
1C X 630 SQ.MM, 0.6/1kV
Pull Length(m): 44 No. of Cables: 1 Type Code: 16306 End Length(m): 13 Elevation: Schematic: ED-691003

Cable: C10BFB1063
Seg Code: L System: BFB Startup Code:

Service: FEED TO BLOCK-1 INST. AIR MCC-B


Routed Length (m): Allowance (m): Total Length (m): 40 4 44 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691003 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFB Compartment: 10F Description: 480V UNIT SWBD BUS B Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJD Compartment: 1.1 Description: BLK-1 / INST AIR MCC-B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-061B C10-TL-039B C10-TL-030B C10-TL-014A C10-TL-013A C10-TL-005B C10-TL-006B C10-TL-007B CABLE

Cable: C10BFB1064
Seg Code: L System: BFB Startup Code:

Rev: 00

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 44 No. of Cables: 1 Type Code: 16306 End Length(m): 13 Elevation: Schematic: ED-691003

Service: FEED TO BLOCK-1 INST. AIR MCC-B


Routed Length (m): Allowance (m): Total Length (m): 40 4 44 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691003 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFB Compartment: 10F Description: 480V UNIT SWBD BUS B Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJD Compartment: 1.1 Description: BLK-1 / INST AIR MCC-B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-061B C10-TL-039B C10-TL-030B C10-TL-014A C10-TL-013A C10-TL-005B C10-TL-006B C10-TL-007B CABLE

Cable: C10BFB1065
Seg Code: L System: BFB Startup Code:

Rev: 00

Description:

1C X 400 SQ.MM, 0.6/1kV


Pull Length(m): 40 No. of Cables: 1 Type Code: 14006 End Length(m): 13 Elevation: Schematic: ED-691003

Service: FEED TO BLOCK-1 INST. AIR MCC-B


Routed Length (m): Allowance (m): Total Length (m): 40 4 44 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691003 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFB Compartment: 10F Description: 480V UNIT SWBD BUS B Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJD Compartment: 1.1 Description: BLK-1 / INST AIR MCC-B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-061B C10-TL-039B C10-TL-030B C10-TL-014A C10-TL-013A C10-TL-005B C10-TL-006B C10-TL-007B CABLE

Cable: C10BFB1066
Seg Code: L System: BFB Startup Code:

Rev: 00

Description:

1C X 400 SQ.MM, 0.6/1kV


Pull Length(m): 18 No. of Cables: 1 Type Code: 14006 End Length(m): 12 Elevation: Schematic: ED-691004

Service: FEED-1 TO BLOCK-1 ESSENTIAL MCC


Routed Length (m): Allowance (m): Total Length (m): 19 3 22 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691004 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFB Compartment: 12F Description: 480V UNIT SWBD BUS B Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-061A C10-TL-039A CABLE

Cable To End: Equipment No: C10BJA Compartment: 1.1 Description: BLK-1 ESSENTIAL MCC North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Page 32 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
1C X 400 SQ.MM, 0.6/1kV
Pull Length(m): 18 No. of Cables: 1 Type Code: 14006 End Length(m): 12 Elevation: Schematic: ED-691004

Cable: C10BFB1067
Seg Code: L System: BFB Startup Code:

Service: FEED-1 TO BLOCK-1 ESSENTIAL MCC


Routed Length (m): Allowance (m): Total Length (m): 19 3 22 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691004 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFB Compartment: 12F Description: 480V UNIT SWBD BUS B Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-061A C10-TL-039A CABLE

Cable To End: Equipment No: C10BJA Compartment: 1.1 Description: BLK-1 ESSENTIAL MCC North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BFB1068
Seg Code: L System: BFB Startup Code:

Rev: 00

Description:

1C X 400 SQ.MM, 0.6/1kV


Pull Length(m): 18 No. of Cables: 1 Type Code: 14006 End Length(m): 12 Elevation: Schematic: ED-691004

Service: FEED-1 TO BLOCK-1 ESSENTIAL MCC


Routed Length (m): Allowance (m): Total Length (m): 19 3 22 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691004 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFB Compartment: 12F Description: 480V UNIT SWBD BUS B Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-061A C10-TL-039A CABLE

Cable To End: Equipment No: C10BJA Compartment: 1.1 Description: BLK-1 ESSENTIAL MCC North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BFB1069
Seg Code: L System: BFB Startup Code:

Rev: 00

Description:

1C X 400 SQ.MM, 0.6/1kV


Pull Length(m): 18 No. of Cables: 1 Type Code: 14006 End Length(m): 12 Elevation: Schematic: ED-691004

Service: FEED-1 TO BLOCK-1 ESSENTIAL MCC


Routed Length (m): Allowance (m): Total Length (m): 19 3 22 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691004 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFB Compartment: 12F Description: 480V UNIT SWBD BUS B Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-061A C10-TL-039A CABLE

Cable To End: Equipment No: C10BJA Compartment: 1.1 Description: BLK-1 ESSENTIAL MCC North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BFB1070
Seg Code: L System: BFB Startup Code:

Rev: 00

Description:

1C X 400 SQ.MM, 0.6/1kV


Pull Length(m): 18 No. of Cables: 1 Type Code: 14006 End Length(m): 10 Elevation: Schematic: ED-691004

Service: FEED-1 TO BLOCK-1 ESSENTIAL MCC


Routed Length (m): Allowance (m): Total Length (m): 17 3 20 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691004 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFB Compartment: 12F Description: 480V UNIT SWBD BUS B Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-061A C10-TL-039A CABLE

Cable To End: Equipment No: C10BJA Compartment: 1.1 Description: BLK-1 ESSENTIAL MCC North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Page 33 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
1C X 400 SQ.MM, 0.6/1kV
Pull Length(m): 18 No. of Cables: 1 Type Code: 14006 End Length(m): 12 Elevation: Schematic: ED-691004

Cable: C10BFB1071
Seg Code: L System: BFB Startup Code:

Service: FEED-1 TO BLOCK-1 ESSENTIAL MCC


Routed Length (m): Allowance (m): Total Length (m): 19 3 22 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691004 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFB Compartment: 12F Description: 480V UNIT SWBD BUS B Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-061A C10-TL-039A CABLE

Cable To End: Equipment No: C10BJA Compartment: 1.1 Description: BLK-1 ESSENTIAL MCC North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BFB1072
Seg Code: L System: BFB Startup Code:

Rev: 00

Description:

1C X 400 SQ.MM, 0.6/1kV


Pull Length(m): 18 No. of Cables: 1 Type Code: 14006 End Length(m): 12 Elevation: Schematic: ED-691004

Service: FEED-1 TO BLOCK-1 ESSENTIAL MCC


Routed Length (m): Allowance (m): Total Length (m): 19 3 22 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691004 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFB Compartment: 12F Description: 480V UNIT SWBD BUS B Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-061A C10-TL-039A CABLE

Cable To End: Equipment No: C10BJA Compartment: 1.1 Description: BLK-1 ESSENTIAL MCC North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BFB1073
Seg Code: L System: BFB Startup Code:

Rev: 00

Description:

1C X 400 SQ.MM, 0.6/1kV


Pull Length(m): 41 No. of Cables: 1 Type Code: 14006 End Length(m): 13 Elevation: Schematic: ED-691003

Service: FEED TO BLOCK-1 INST. AIR MCC-B


Routed Length (m): Allowance (m): Total Length (m): 40 4 44 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691003 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BFB Compartment: 10F Description: 480V UNIT SWBD BUS B Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJD Compartment: 1.1 Description: BLK-1 / INST AIR MCC-B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-061B C10-TL-039B C10-TL-030B C10-TL-014A C10-TL-013A C10-TL-005B C10-TL-006B C10-TL-007B CABLE

Page 34 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
4C X 2.5 SQ.MM, 0.6/1kV
Pull Length(m): 245 No. of Cables: 1 Type Code: 40026 End Length(m): 7 Elevation: Schematic: ED-692855

Cable: C10BJA1001
Seg Code: L System: BJA Startup Code:

Service: VAPOR EXTRACTOR MOTOR NO 1 (VXM-1)


Routed Length (m): Allowance (m): Total Length (m): 225 11 236 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692855 8

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJA Compartment: 3.2 Description: BLK-1 ESSENTIAL MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10JBVXM1 Compartment: Description: JUNCTION BOX- JB/VXM-1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-029A C10-TL-015A C10-TL-003A C10-TL-002A C10-TL-024A C10-TL-023A C10-TL-223A C10-TL-222A C14-TL-202A C14-TL-204A C14-TL-207A C14-TL-049A C14-TL-050A C14-TL-051 C14-TL-002 C14-TL-006B C14-TL-008C C14-TL-009B C14-TL-011B C14-TL-012 C14-TL-025 C14-TL-026 C14-TL-030B C14-TL-031 C14-C-1039

Cable: C10BJA1002
Seg Code: L System: BJA Startup Code:

Rev: 01

Description:

3C X 240 SQ.MM, 0.6/1kV


Pull Length(m): 430 No. of Cables: 1 Type Code: 32406 End Length(m): 7 Elevation: Schematic: ED-692856

Service: LUBE OIL PUMP MOTOR-1 (BPM-1)


Routed Length (m): Allowance (m): Total Length (m): 219 11 230 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692856 8

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJA Compartment: 3.6 Description: BLK-1 ESSENTIAL MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10JBBPM1 Compartment: Description: JUNCTION BOX- JB/BPM-1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-029A C10-TL-015A C10-TL-003A C10-TL-002A C10-TL-024A C10-TL-023A C10-TL-223A C10-TL-222A C14-TL-202A C14-TL-204A C14-TL-207A C14-TL-049A C14-TL-050A C14-TL-051 C14-TL-002 C14-TL-006B C14-TL-008C C14-TL-009B C14-TL-011B C14-TL-012 C14-TL-025 C14-TL-026 C14-TL-030B C14-C-1040

Cable: C10BJA1003
Seg Code: L System: BJA Startup Code:

Rev: 01

Description:

3C X 95 SQ.MM, 0.6/1kV
Pull Length(m): 219 No. of Cables: 1 Type Code: 30956 End Length(m): 7 Elevation: Schematic: ED-692857

Service: BEARING LIFT OIL PUMP MOTOR (88QB-1)


Routed Length (m): Allowance (m): Total Length (m): 224 11 235 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692857 8

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJA Compartment: 3.5 Description: BLK-1 ESSENTIAL MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10JB88QB1 Compartment: Description: JUNCTION BOX- JB/88QB-1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-029A C10-TL-015A C10-TL-003A C10-TL-002A C10-TL-024A C10-TL-023A C10-TL-223A C10-TL-222A C14-TL-202A C14-TL-204A C14-TL-207A C14-TL-049A C14-TL-050A C14-TL-051 C14-TL-002 C14-TL-006B C14-TL-008C C14-TL-009B C14-TL-011B C14-TL-012 C14-TL-025 C14-TL-026 C14-TL-027B C14-TL-029 C14-C-1041

Page 35 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
4C X 10 SQ.MM, 0.6/1kV
Pull Length(m): 200 No. of Cables: 1 Type Code: 40106 End Length(m): 5 Elevation: Schematic: ED-692858

Cable: C10BJA1004
Seg Code: L System: BJA Startup Code:

Service: TURNING GEAR MOTOR (TGM)


Routed Length (m): Allowance (m): Total Length (m): 181 9 190 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692858 2

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJA Compartment: 3.4 Description: BLK-1 ESSENTIAL MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10JB4A Compartment: Description: JUNCTION BOX- JB/4A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-060C C10-TL-059C C10-TL-043C C10-TL-042C C10-TL-017C C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-098 C14-TL-067 C14-TL-066 C14-TL-071 C14-TL-073 C14-TL-078 C14-TL-077 C14-EC-039

Cable: C10BJA1005
Seg Code: L System: BJA Startup Code:

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 188 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-692864

Service: TURNING GEAR MOTOR / PIGGY BACK MOTOR (PBM)


Routed Length (m): Allowance (m): Total Length (m): 181 9 190 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692864 2

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJA Compartment: 3.1 Description: BLK-1 ESSENTIAL MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10JB4A Compartment: Description: JUNCTION BOX- JB/4A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-060C C10-TL-059C C10-TL-043C C10-TL-042C C10-TL-017C C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-098 C14-TL-067 C14-TL-066 C14-TL-071 C14-TL-073 C14-TL-078 C14-TL-077 C14-EC-039

Cable: C10BJA1006
Seg Code: L System: BJA Startup Code:

Rev: 01

Description:

3C X 120 SQ.MM, 0.6/1kV


Pull Length(m): 241 No. of Cables: 1 Type Code: 31206 End Length(m): 8 Elevation: Schematic: ED-692859

Service: INSTRUMENT AIR COMPRESSOR-2


Routed Length (m): Allowance (m): Total Length (m): 260 12 272 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJA Compartment: 4.1.1 Description: BLK-1 ESSENTIAL MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-QFA-31-AN-002 Compartment: End Length(m): 14 Description: INSTRUMENT AIR COMPRESSOR North: 1674.50 Equip Location: Zone: East: 2264.90 Elevation: 6.40 Wiring Dwg: Location Dwg: EA-681141 Schematic: ED-692859

Routing Information: Remarks: Route: CABLE C10-TL-038C C10-TL-032D C10-TL-033D C10-TL-034 CABLE C10-TL-008A C10-TL-035A C10-TL-066B C10-TL-068B C10-TL-070B C10-TL-102B C10-TL-109A C10-TL-107A C10-TL-164A C10-TL-201A C12-TL-520A C12-TL-519A C12-TL-518A C12-TL-516A C12-TL-515A C12-TL-514 C12-TL-512A C12-TL-511A C12-D001-01 C12-EMH-001 C10-D030-05 C10-EMH-012 C10-D031-05 C10-EMH-013 C10-D029-05 C10-EMH-011 C10-D026-05 CABLE C10-TL-201 CABLE C10-D027-08 C10-C-1015

Page 36 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
4C X 185 SQ.MM, 0.6/1kV
Pull Length(m): 32 No. of Cables: 1 Type Code: 41856 End Length(m): 5 Elevation: Schematic: ED-692860

Cable: C10BJA1007
Seg Code: L System: BJA Startup Code:

Service: BLOCK DC BATTERY CHARGER-2


Routed Length (m): Allowance (m): Total Length (m): 26 3 29 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692860 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJA Compartment: 4.2 Description: BLK-1 ESSENTIAL MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BTL02 Compartment: Description: 125V BATTERY CHARGER-B FOR BLK-1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-038A C10-TL-039A C10-TL-059A C10-TL-043A C10-TL-044A C10-TL-053A CABLE

Cable: C10BJA1008
Seg Code: L System: BJA Startup Code:

Rev: 02

Description:

4C X 95 SQ.MM, 0.6/1kV
Pull Length(m): 50 No. of Cables: 1 Type Code: 40956 End Length(m): 7 Elevation: Schematic: ED-692861

Service: BLOCK UPS-1 INVERTER-2


Routed Length (m): Allowance (m): Total Length (m): 43 4 47 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692861 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJA Compartment: 4.3 Description: BLK-1 ESSENTIAL MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BRU02 Compartment: Description: 120V AC BLK-1 UPS-1B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-060B C10-TL-059B C10-TL-043B C10-TL-042B C10-TL-017B C10-TL-018B C10-TL-020B CABLE C10-TL-021 C10-TL-048 C10-TL-118 C10-TL-122 CABLE

Cable: C10BJA1009
Seg Code: L System: BJA Startup Code:

Rev: 02

Description:

4C X 95 SQ.MM, 0.6/1kV
Pull Length(m): 60 No. of Cables: 1 Type Code: 40956 End Length(m): 7 Elevation: Schematic: ED-692862

Service: BLOCK UPS-2 INVERTER-2


Routed Length (m): Allowance (m): Total Length (m): 53 4 57 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692862 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJA Compartment: 4.4 Description: BLK-1 ESSENTIAL MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BRU04 Compartment: Description: 120V AC BLK-1 UPS-2B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-060B C10-TL-059B C10-TL-043B C10-TL-042B C10-TL-017B C10-TL-018B C10-TL-020B CABLE C10-TL-021 C10-TL-048 C10-TL-118 C10-TL-122 C10-TL-125 C10-TL-128 CABLE

Page 37 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
3C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 205 No. of Cables: 1 Type Code: 30156 End Length(m): 7 Elevation: Schematic: ED-692855

Cable: C10BJA1015
Seg Code: L System: BJA Startup Code:

Service: VAPOR EXTRACTOR MOTOR NO 1 (VXM-1)


Routed Length (m): Allowance (m): Total Length (m): 225 11 236 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692855 8

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJA Compartment: 3.2 Description: BLK-1 ESSENTIAL MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10JBVXM1 Compartment: Description: JUNCTION BOX- JB/VXM-1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-029A C10-TL-015A C10-TL-003A C10-TL-002A C10-TL-024A C10-TL-023A C10-TL-223A C10-TL-222A C14-TL-202A C14-TL-204A C14-TL-207A C14-TL-049A C14-TL-050A C14-TL-051 C14-TL-002 C14-TL-006B C14-TL-008C C14-TL-009B C14-TL-011B C14-TL-012 C14-TL-025 C14-TL-026 C14-TL-030B C14-TL-031 C14-C-1039

Cable: C10BJA1016
Seg Code: L System: BJA Startup Code:

Rev: 01

Description:

3C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 229 No. of Cables: 1 Type Code: 30026 End Length(m): 7 Elevation: Schematic: ED-692856

Service: LUBE OIL PUMP MOTOR-1 (BPM-1)


Routed Length (m): Allowance (m): Total Length (m): 219 11 230 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692856 8

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJA Compartment: 3.6 Description: BLK-1 ESSENTIAL MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10JBBPM1 Compartment: Description: JUNCTION BOX- JB/BPM-1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-029A C10-TL-015A C10-TL-003A C10-TL-002A C10-TL-024A C10-TL-023A C10-TL-223A C10-TL-222A C14-TL-202A C14-TL-204A C14-TL-207A C14-TL-049A C14-TL-050A C14-TL-051 C14-TL-002 C14-TL-006B C14-TL-008C C14-TL-009B C14-TL-011B C14-TL-012 C14-TL-025 C14-TL-026 C14-TL-030B C14-C-1040

Cable: C10BJA1017
Seg Code: L System: BJA Startup Code:

Rev: 01

Description:

3C X 4 SQ.MM, 0.6/1kV
Pull Length(m): 245 No. of Cables: 1 Type Code: 30046 End Length(m): 7 Elevation: Schematic: ED-692857

Service: BEARING LIFT OIL PUMP MOTOR (88QB-1)


Routed Length (m): Allowance (m): Total Length (m): 224 11 235 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692857 8

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJA Compartment: 3.5 Description: BLK-1 ESSENTIAL MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10JB88QB1 Compartment: Description: JUNCTION BOX- JB/88QB-1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-029A C10-TL-015A C10-TL-003A C10-TL-002A C10-TL-024A C10-TL-023A C10-TL-223A C10-TL-222A C14-TL-202A C14-TL-204A C14-TL-207A C14-TL-049A C14-TL-050A C14-TL-051 C14-TL-002 C14-TL-006B C14-TL-008C C14-TL-009B C14-TL-011B C14-TL-012 C14-TL-025 C14-TL-026 C14-TL-027B C14-TL-029 C14-C-1041

Page 38 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
3C X 2.5 SQ.MM, 0.6/1kV
Pull Length(m): 200 No. of Cables: 1 Type Code: 30026 End Length(m): 5 Elevation: Schematic: ED-692858

Cable: C10BJA1018
Seg Code: L System: BJA Startup Code:

Service: TURNING GEAR MOTOR (TGM)


Routed Length (m): Allowance (m): Total Length (m): 181 9 190 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692858 2

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJA Compartment: 3.4 Description: BLK-1 ESSENTIAL MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10JBTGM Compartment: Description: JUNCTION BOX- JB/TGM North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-060C C10-TL-059C C10-TL-043C C10-TL-042C C10-TL-017C C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-098 C14-TL-067 C14-TL-066 C14-TL-071 C14-TL-073 C14-TL-078 C14-TL-077 C14-EC-039

Cable: C10BJA1019
Seg Code: L System: BJA Startup Code:

Rev: 03

Description:

3C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 192 No. of Cables: 1 Type Code: 30156 End Length(m): 5 Elevation: Schematic: ED-692858

Service: TURNING GEAR MOTOR (TGM)


Routed Length (m): Allowance (m): Total Length (m): 181 9 190 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692858 2

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJA Compartment: 3.4 Description: BLK-1 ESSENTIAL MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10JB4A Compartment: Description: JUNCTION BOX- JB/4A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: CABLE NOT REQUIRED AS PER LATEST MSD Route: CABLE C10-TL-060C C10-TL-059C C10-TL-043C C10-TL-042C C10-TL-017C C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-098 C14-TL-067 C14-TL-066 C14-TL-071 C14-TL-073 C14-TL-078 C14-TL-077 C14-EC-039

Cable: C10BJA1020
Seg Code: L System: BJA Startup Code:

Rev: 02

Description:

3C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 200 No. of Cables: 1 Type Code: 30026 End Length(m): 5 Elevation: Schematic: ED-692864

Service: TURNING GEAR MOTOR / PIGGY BACK MOTOR (PBM)


Routed Length (m): Allowance (m): Total Length (m): 181 9 190 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692864 2

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJA Compartment: 3.1 Description: BLK-1 ESSENTIAL MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10JBPBM Compartment: Description: JUNCTION BOX- JB/PBM North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-060C C10-TL-059C C10-TL-043C C10-TL-042C C10-TL-017C C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-098 C14-TL-067 C14-TL-066 C14-TL-071 C14-TL-073 C14-TL-078 C14-TL-077 C14-EC-039

Page 39 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
4C X 2.5 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40026 End Length(m): 5 Elevation: Schematic: ED-692858

Cable: C10BJA1023
Seg Code: L System: BJA Startup Code:

Service: TURNING GEAR MOTOR (TGM)


Routed Length (m): Allowance (m): Total Length (m): 181 9 190 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692858 2

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJA Compartment: 3.4 Description: BLK-1 ESSENTIAL MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10JB4A Compartment: Description: JUNCTION BOX- JB/4A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-060C C10-TL-059C C10-TL-043C C10-TL-042C C10-TL-017C C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-098 C14-TL-067 C14-TL-066 C14-TL-071 C14-TL-073 C14-TL-078 C14-TL-077 C14-EC-039

Cable: C10BJC1001
Seg Code: L System: BJC Startup Code:

Rev: 01

Description:

3C X 120 SQ.MM, 0.6/1kV


Pull Length(m): 223 No. of Cables: 1 Type Code: 31206 End Length(m): 8 Elevation: Schematic: ED-693189

Service: INSTRUMENT AIR COMPRESSOR-1


Routed Length (m): Allowance (m): Total Length (m): 246 12 258 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJC Compartment: 3.6.1 Description: BLK-1 / INST AIR MCC-A Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-QFA-31-AN-001 Compartment: End Length(m): 10 Description: INSTRUMENT AIR COMPRESSOR North: 1670.80 Equip Location: Zone: East: 2264.90 Elevation: 6.40 Wiring Dwg: Location Dwg: EA-681141 Schematic: ED-693189

Routing Information: Remarks: Route: CABLE C10-TL-008A C10-TL-035A C10-TL-066B C10-TL-068B C10-TL-070B C10-TL-102B C10-TL-109A C10-TL-107A C10-TL-164A C10-TL-201A C12-TL-520A C12-TL-519A C12-TL-518A C12-TL-516A C12-TL-515A C12-TL-514 C12-TL-512A C12-TL-511A C12-D001-01 C12-EMH-001 C10-D030-01 C10-EMH-012 C10-D031-01 C10-EMH-013 C10-D029-01 C10-EMH-011 C10-D026-01 CABLE C10-TL-201 CABLE C10-D027-07 C10-C-1014

Cable: C10BJC1002
Seg Code: L System: BJC Startup Code:

Rev: 01

Description:

4C X 35 SQ.MM, 0.6/1kV
Pull Length(m): 237 No. of Cables: 1 Type Code: 40356 End Length(m): 8 Elevation: Schematic: ED-693190

Service: INSTRUMENT AIR DRYER-1


Routed Length (m): Allowance (m): Total Length (m): 243 12 255 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJC Compartment: 3.1.1 Description: BLK-1 / INST AIR MCC-A Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-QFA-31-AT-013 Compartment: End Length(m): 10 Description: INSTRUMENT AIR DRYER North: 1673.60 Equip Location: Zone: East: 2268.90 Elevation: 6.10 Wiring Dwg: Location Dwg: EA-681141 Schematic: ED-693190

Routing Information: Remarks: Route: CABLE C10-TL-008A C10-TL-035A C10-TL-066B C10-TL-068B C10-TL-070B C10-TL-102B C10-TL-109A C10-TL-107A C10-TL-164A C10-TL-201A C12-TL-520A C12-TL-519A C12-TL-518A C12-TL-516A C12-TL-515A C12-TL-514 C12-TL-512A C12-TL-511A C12-D001-03 C12-EMH-001 C10-D030-03 C10-EMH-012 C10-D031-03 C10-EMH-013 C10-D029-03 C10-EMH-011 C10-D026-03 CABLE C10-TL-201 CABLE C10-D027-03 C10-C-1018

Page 40 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 235 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-693192

Cable: C10BJC1004
Seg Code: L System: BJC Startup Code:

Service: MOV ON BACK UP LINE FROM SERVICE AIR SYSTEM TO INSTRUMENT AI


Routed Length (m): Allowance (m): Total Length (m): 235 11 246 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJC Compartment: 3.1.2 Description: BLK-1 / INST AIR MCC-A Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-SCB-32-AA-002 Compartment: End Length(m): 5 Description: C10 SA-IA INTCN MOV North: 1814.42 Equip Location: Zone: East: 2268.60 Elevation: 4.61 Wiring Dwg: Location Dwg: EA-681141 Schematic: ED-693192

Routing Information: Remarks: Route: CABLE C10-TL-008A C10-TL-035A C10-TL-066B C10-TL-068B C10-TL-070B C10-TL-102B C10-TL-109A C10-TL-107A C10-TL-164A C10-TL-201A C12-TL-520A C12-TL-519A C12-TL-518A C12-TL-516A C12-TL-515A C12-TL-514 C12-TL-512A C12-TL-511A C12-D001-04 C12-EMH-001 C10-D030-04 C10-EMH-012 C10-D031-04 C10-EMH-013 C10-D029-04 C10-EMH-011 C10-D026-04 CABLE C10-TL-201 CABLE C10-D027-03 C10-C-1019

Cable: C10BJC1005
Seg Code: L System: BJC Startup Code:

Rev: 01

Description:

4C X 95 SQ.MM, 0.6/1kV
Pull Length(m): 50 No. of Cables: 1 Type Code: 40956 End Length(m): 5 Elevation: Schematic: ED-693193

Service: BLOCK UPS-1 INVERTER-1


Routed Length (m): Allowance (m): Total Length (m): 46 4 50 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693193 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJC Compartment: 2.1 Description: BLK-1 / INST AIR MCC-A Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BRU01 Compartment: Description: 120V AC BLK-1 UPS-1A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-009D C10-TL-012D C10-TL-013B C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-019 C10-TL-045 C10-TL-046 C10-TL-120 CABLE

Cable: C10BJC1006
Seg Code: L System: BJC Startup Code:

Rev: 01

Description:

4C X 95 SQ.MM, 0.6/1kV
Pull Length(m): 55 No. of Cables: 1 Type Code: 40956 End Length(m): 5 Elevation: Schematic: ED-693194

Service: BLOCK UPS-2 INVERTER-1


Routed Length (m): Allowance (m): Total Length (m): 52 4 56 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693194 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJC Compartment: 4.1 Description: BLK-1 / INST AIR MCC-A Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BRU03 Compartment: Description: 120V AC BLK-1 UPS-2A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-009D C10-TL-012D C10-TL-013B C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-019 C10-TL-045 C10-TL-046 C10-TL-120 C10-TL-123 C10-TL-126 CABLE

Page 41 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
4C X 185 SQ.MM, 0.6/1kV
Pull Length(m): 40 No. of Cables: 1 Type Code: 41856 End Length(m): 11 Elevation: Schematic: ED-693195

Cable: C10BJC1007
Seg Code: L System: BJC Startup Code:

Service: BLOCK DC BATTERY CHARGER-1


Routed Length (m): Allowance (m): Total Length (m): 37 4 41 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693195 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJC Compartment: 4.2 Description: BLK-1 / INST AIR MCC-A Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BTL01 Compartment: Description: 125V BATTERY CHARGER-A FOR BLK-1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-009A C10-TL-011A C10-TL-032A C10-TL-031A C10-TL-030A C10-TL-039A C10-TL-059A C10-TL-043A C10-TL-044A CABLE

Cable: C10BJC1008
Seg Code: L System: BJC Startup Code:

Rev: 02

Description:

3C X 35 SQ.MM, 0.6/1kV
Pull Length(m): 30 No. of Cables: 1 Type Code: 30356 End Length(m): 5 Elevation: Schematic: ED-693196

Service: BLOCK INDOOR LIGHTING DB


Routed Length (m): Allowance (m): Total Length (m): 17 3 20 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJC Compartment: 4.1.1 Description: BLK-1 / INST AIR MCC-A Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-007A C10-TL-035D CABLE

Cable To End: Equipment No: C10BLT50 Compartment: End Length(m): 5 Description: BLOCK 1 220/127V AIR COMPRESSOR LIGHTING TRANSFORMER North: Equip Location: Zone: East: Elevation: Wiring Dwg: Location Dwg: EA-681121 Schematic: ED-693196

Cable: C10BJC1009
Seg Code: L System: BJC Startup Code:

Rev: 03

Description:

4C X 35 SQ.MM, 0.6/1kV
Pull Length(m): 30 No. of Cables: 1 Type Code: 40356 End Length(m): 5 Elevation: Schematic: ED-693197

Service: WELDING RECEPTACLE BAT + MV/LV SWGR + UPS ROOM


Routed Length (m): Allowance (m): Total Length (m): 27 3 30 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693197 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJC Compartment: 3.2.1 Description: BLK-1 / INST AIR MCC-A Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJC10GA Compartment: Description: JB FOR BLOCK-1 MV/LV WELDING RECEPTACLE North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-008A C10-TL-009A C10-TL-011A C10-TL-032A C10-TL-031A C10-TL-030A C10-TL-029A CABLE

Cable: C10BJC1010
Seg Code: L System: BJC Startup Code:

Rev: 03

Description:

4C X 35 SQ.MM, 0.6/1kV
Pull Length(m): 43 No. of Cables: 1 Type Code: 40356 End Length(m): 5 Elevation: Schematic: ED-693197

Service: WELDING RECEPTACLE BAT + MV/LV SWGR + UPS ROOM


Routed Length (m): Allowance (m): Total Length (m): 34 4 38 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693197 8

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJC10GA Compartment: Description: JB FOR BLOCK-1 MV/LV WELDING RECEPTACLE Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJS01 Compartment: Description: WELDING RECEPTACLE-1 FOR BLOCK-1 (63A) North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-028B C10-TL-027B C10-TL-026B CABLE C10-TL-051B C10-TL-052 C10-TL-056 C10-TL-093A C10-C-1013

Page 42 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 03 Description:
4C X 35 SQ.MM, 0.6/1kV
Pull Length(m): 64 No. of Cables: 1 Type Code: 40356 End Length(m): 5 Elevation: Schematic: ED-693197

Cable: C10BJC1011
Seg Code: L System: BJC Startup Code:

Service: WELDING RECEPTACLE BAT + MV/LV SWGR + UPS ROOM


Routed Length (m): Allowance (m): Total Length (m): 144 8 152 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJC10GA Compartment: Description: JB FOR BLOCK-1 MV/LV WELDING RECEPTACLE Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJS08 Compartment: End Length(m): 10 Description: WELDING RECEPTACLE GROUND FLOOR FOR STG BUILDING (63A) North: Equip Location: Zone: East: Elevation: Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-693197

Routing Information: Remarks: Route: CABLE C10-TL-028B C10-TL-027B C10-TL-026B CABLE C10-TL-022C C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-211 C14-TL-212 C14-TL-043 C14-TL-042 CABLE

Cable: C10BJC1012
Seg Code: L System: BJC Startup Code:

Rev: 01

Description:

4C X 185 SQ.MM, 0.6/1kV


Pull Length(m): No. of Cables: 1 Type Code: 41856 End Length(m): 5 Elevation: Schematic: ED-693198

Service: RECEPTACLE FOR TRAFO. OIL FILTERATION GSU & UAT


Routed Length (m): Allowance (m): Total Length (m): 181 9 190 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJC Compartment: 3.4.1 Description: BLK-1 / INST AIR MCC-A Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJR02 Compartment: End Length(m): 10 Description: RECEPTACLE FOR TRANSFORMER OIL FILTERATION (200A) GSU/UAT North: Equip Location: Zone: East: Elevation: Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-693198

Routing Information: Remarks: Route: CABLE C10-TL-009A C10-TL-011A C10-TL-037A C10-TL-063A C10-TL-060A C10-TL-039A C10-TL-029A C10-TL-015A C10-TL-003A C10-TL-002A C10-TL-001A C10-TL-226A C10-TL-225A C14-TL-201A C14-TL-203A C14-TL-205A C10-EMH-007 C10-D065-05 C10-EMH-006 C10-D064-04 C14-C-1042

Cable: C10BJC1013
Seg Code: L System: BJC Startup Code:

Rev: 01

Description:

4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): 277 No. of Cables: 1 Type Code: 40046 End Length(m): 8 Elevation: Schematic: ED-693199

Service: CHEMICAL WASTE COLLECTION PIT SUMP PUMP LCP


Routed Length (m): Allowance (m): Total Length (m): 257 12 269 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693199 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJC Compartment: 3.2.2 Description: BLK-1 / INST AIR MCC-A Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-RTM-37-GH-001 Compartment: Description: B1 CHEM DRN SMP PNL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681141

Routing Information: Remarks: Route: CABLE C10-TL-008A C10-TL-035A C10-TL-066B C10-TL-068B C10-TL-070B C10-TL-102B C10-TL-109A C10-TL-107A C10-TL-164A C10-TL-201A C12-TL-520A C12-TL-519A C12-TL-518A C12-TL-516A C12-TL-515A C12-TL-514 C12-TL-512A C12-TL-511A C12-D001-01 C12-EMH-001 C10-D030-05 C10-EMH-012 C10-D031-05 C10-EMH-013 C10-D029-05 C10-EMH-011 C10-D026-05 CABLE C10-TL-201 CABLE C10-D027-05 C10-C-1022

Page 43 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
3C X 50 SQ.MM, 0.6/1kV
Pull Length(m): 194 No. of Cables: 1 Type Code: 30506 End Length(m): 5 Elevation: Schematic: ED-693200

Cable: C10BJC1014
Seg Code: L System: BJC Startup Code:

Service: CONTROL CABINET GSU SUPPLY-1


Routed Length (m): Allowance (m): Total Length (m): 185 9 194 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJC Compartment: 3.3.1 Description: BLK-1 / INST AIR MCC-A Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BAT01 Compartment: End Length(m): 8 Description: GENERATOR STEP-UP XFMR FOR BLK-1 North: 1733.00 Equip Location: Zone: East: 2292.20 Elevation: 4.10 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-693200

Routing Information: Remarks: Route: CABLE C10-TL-009B C10-TL-011B C10-TL-037B C10-TL-063B C10-TL-060B C10-TL-059B C10-TL-043B C10-TL-044B C10-TL-053B C10-TL-051A C10-TL-022A C10-TL-024B C10-TL-001B C10-TL-226B C10-TL-225B C14-TL-201B C14-TL-203B C14-TL-205B C10-EMH-007 C10-D065-05 C10-EMH-006 C10-D064-05

Cable: C10BJC1015
Seg Code: L System: BJC Startup Code:

Rev: 01

Description:

4C X 25 SQ.MM, 0.6/1kV
Pull Length(m): 194 No. of Cables: 1 Type Code: 40256 End Length(m): 5 Elevation: Schematic: ED-693201

Service: CONTROL CABINET UAT SUPPLY-1


Routed Length (m): Allowance (m): Total Length (m): 184 9 193 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693201 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJC Compartment: 3.3.2 Description: BLK-1 / INST AIR MCC-A Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BBT01 Compartment: Description: UNIT AUXILIARY XFMR (UAT) BLK-1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-008A C10-TL-009A C10-TL-011A C10-TL-037A C10-TL-063A C10-TL-060A C10-TL-039A C10-TL-029A C10-TL-015A C10-TL-003A C10-TL-002A C10-TL-001A C10-TL-226A C10-TL-225A C14-TL-201A C14-TL-203A C14-TL-205A C10-EMH-007 C10-D065-05 C10-EMH-006 C10-D064-13

Cable: C10BJC1016
Seg Code: L System: BJC Startup Code:

Rev: 00

Description:

4C X 70 SQ.MM, 0.6/1kV
Pull Length(m): 82 No. of Cables: 1 Type Code: 40706 End Length(m): 0 Elevation: Schematic: ED-693202

Service: ROOF TOP PACKAGE MV/LV-1-1


Routed Length (m): Allowance (m): Total Length (m): 26 3 29 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693202 25

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJC Compartment: 3.5.1 Description: BLK-1 / INST AIR MCC-A Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: C10-C-1027

Cable To End: Equipment No: C10-SAM-61-AH-001 Compartment: Description: SWITCH GEAR ROOM 1-FL RTPU-001 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Page 44 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
4C X 25 SQ.MM, 0.6/1kV
Pull Length(m): 68 No. of Cables: 1 Type Code: 40256 End Length(m): 0 Elevation: Schematic: ED-693203

Cable: C10BJC1017
Seg Code: L System: BJC Startup Code:

Service: ROOF TOP PACKAGE MV/LV-2-1


Routed Length (m): Allowance (m): Total Length (m): 26 3 29 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693203 25

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJC Compartment: 2.2.1 Description: BLK-1 / INST AIR MCC-A Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: C10-C-1029

Cable To End: Equipment No: C10-SAM-61-AH-003 Compartment: Description: SWITCH GEAR ROOM 2-FL RTPU-003 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BJC1020
Seg Code: L System: BJC Startup Code:

Rev: 01

Description:

4C X 6 SQ.MM, 0.6/1kV
Pull Length(m): 260 No. of Cables: 1 Type Code: 40066 End Length(m): 7 Elevation: Schematic: ED-693206

Service: STG BUILDING CW MISC. EQUIPMENT CURB AREA SUMP PUMP LCP
Routed Length (m): Allowance (m): Total Length (m): 240 11 251 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693206 15

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJC Compartment: 3.5.2 Description: BLK-1 / INST AIR MCC-A Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-RTP-58-GH-002 Compartment: Description: B1 STG SEA WTR SMP PNL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-009A C10-TL-011A C10-TL-032A C10-TL-031A C10-TL-030A C10-TL-029A C10-TL-041 C10-TL-017A C10-TL-018A C10-TL-020A C10-TL-023A C10-TL-223A C10-TL-222A C14-TL-202A C14-TL-204A C14-TL-207A C14-TL-049A C14-TL-050A C14-TL-051 C14-TL-002 C14-TL-006B C14-TL-008C C14-TL-009B C14-TL-011B C14-TL-012 C14-TL-025 C14-TL-026 C14-TL-027B C14-TL-029 C14-C-1038

Cable: C10BJC1021
Seg Code: L System: BJC Startup Code:

Rev: 01

Description:

4C X 6 SQ.MM, 0.6/1kV
Pull Length(m): 130 No. of Cables: 1 Type Code: 40066 End Length(m): 8 Elevation: Schematic: ED-693207

Service: HRSG BLOWDOWN SUMP PUMP-1


Routed Length (m): Allowance (m): Total Length (m): 114 7 121 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJC Compartment: 1.3 Description: BLK-1 / INST AIR MCC-A Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-HAN-55-AP-001 Compartment: End Length(m): 20 Description: HRSG BLOWDOWN SUMP PUMP North: 1718.60 Equip Location: Zone: East: 2229.00 Elevation: 3.50 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-693207

Routing Information: Remarks: Route: CABLE C10-TL-008B C10-TL-035B C10-TL-066C C10-TL-068C C10-TL-070C C10-TL-102C C10-TL-109B C10-TL-107B C10-TL-164B C10-TL-201B C12-TL-520B C12-TL-519B C12-TL-518B C12-TL-516B C12-C-1002

Page 45 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
4C X 6 SQ.MM, 0.6/1kV
Pull Length(m): 130 No. of Cables: 1 Type Code: 40066 End Length(m): 8 Elevation: Schematic: ED-693208

Cable: C10BJC1022
Seg Code: L System: BJC Startup Code:

Service: HRSG BLOWDOWN SUMP PUMP-3


Routed Length (m): Allowance (m): Total Length (m): 114 7 121 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJC Compartment: 1.4 Description: BLK-1 / INST AIR MCC-A Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-HAN-55-AP-003 Compartment: End Length(m): 20 Description: HRSG BLOWDOWN SUMP PUMP North: 1721.60 Equip Location: Zone: East: 2229.00 Elevation: 3.50 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-693208

Routing Information: Remarks: Route: CABLE C10-TL-008B C10-TL-035B C10-TL-066C C10-TL-068C C10-TL-070C C10-TL-102C C10-TL-109B C10-TL-107B C10-TL-164B C10-TL-201B C12-TL-520B C12-TL-519B C12-TL-518B C12-TL-516B C12-C-1004

Cable: C10BJC1023
Seg Code: L System: BJC Startup Code:

Rev: 01

Description:

4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): 145 No. of Cables: 1 Type Code: 40046 End Length(m): 5 Elevation: Schematic: ED-693209

Service: ST VENT AND DRAIN SUMP PUMP-2


Routed Length (m): Allowance (m): Total Length (m): 134 7 141 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJC Compartment: 1.2 Description: BLK-1 / INST AIR MCC-A Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-LCL-57-AP-002 Compartment: End Length(m): 8 Description: STEAM TURBINE VENT & DRAIN SUMP PUMP North: 1774.70 Equip Location: Zone: East: 2309.70 Elevation: 3.30 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-693209

Routing Information: Remarks: Route: CABLE C10-TL-009D C10-TL-012D C10-TL-013B C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-020D C10-TL-022C C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-211 C14-C-1034

Cable: C10BJC1024
Seg Code: L System: BJC Startup Code:

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 277 No. of Cables: 1 Type Code: 40156 End Length(m): 7 Elevation: Schematic: ED-693210

Service: CONDENSER SUMP DEWATERING SUMP PUMP-1 LCP


Routed Length (m): Allowance (m): Total Length (m): 258 12 270 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693210 20

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJC Compartment: 3.6.1 Description: BLK-1 / INST AIR MCC-A Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-RTP-58-GH-001 Compartment: Description: B1 COND SEA WTR SMP PNL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-009A C10-TL-011A C10-TL-032A C10-TL-031A C10-TL-030A C10-TL-029A C10-TL-041 C10-TL-017A C10-TL-018A C10-TL-020A C10-TL-023A C10-TL-223A C10-TL-222A C14-TL-202A C14-TL-204A C14-TL-207A C14-TL-049A C14-TL-050A C14-TL-051 C14-TL-002 C14-TL-006B C14-TL-008C C14-TL-009B C14-TL-011B C14-TL-012 C14-TL-013 C14-TL-019 C14-TL-020 C14-TL-021 C14-C-1037

Page 46 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
4C X 6 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40066 End Length(m): 8 Elevation: Schematic: ED-693211

Cable: C10BJC1025
Seg Code: L System: BJC Startup Code:

Service: SANITARY LIFTWELL PUMP LCP-STG AREA


Routed Length (m): Allowance (m): Total Length (m): 188 9 197 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693211 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJC Compartment: 4.5.1 Description: BLK-1 / INST AIR MCC-A Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-GQB-54-GH-002 Compartment: Description: B1 STG SNT LIFT STN PNL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-009D C10-TL-012D C10-TL-013B C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-020D C10-TL-022C C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-211 C14-TL-212 C14-TL-043 C14-TL-042 C14-TL-040 C14-C-1122 C10-D067-01

Cable: C10BJC1026
Seg Code: L System: BJC Startup Code:

Rev: 01

Description:

4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): 250 No. of Cables: 1 Type Code: 40046 End Length(m): 6 Elevation: Schematic: ED-693212

Service: COMPRESSOR BUILDING HOIST


Routed Length (m): Allowance (m): Total Length (m): 234 11 245 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693212 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJC Compartment: 3.7.1 Description: BLK-1 / INST AIR MCC-A Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-SMQ-31-BZ-001 Compartment: Description: IA/SA COMP. BUILDING HOIST North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681141

Routing Information: Remarks: Route: CABLE C10-TL-008B C10-TL-035B C10-TL-066C C10-TL-068C C10-TL-070C C10-TL-102C C10-TL-109B C10-TL-107B C10-TL-164B C10-TL-201B C12-TL-520B C12-TL-519B C12-TL-518B C12-TL-516B C12-TL-515B C12-TL-513 C12-TL-512B C12-TL-511B C12-D001-02 C12-EMH-001 C10-D030-02 C10-EMH-012 C10-D031-02 C10-EMH-013 C10-D029-02 C10-EMH-011 C10-D026-02 CABLE C10-TL-201 CABLE C10-D027-09 C10-C-1020

Cable: C10BJC1027
Seg Code: L System: BJC Startup Code:

Rev: 00

Description:

4C X 6 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40066 End Length(m): 5 Elevation: Schematic: ED-693213

Service: MSU-PSH-001-SWAS
Routed Length (m): Allowance (m): Total Length (m): 139 8 147 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693213 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJC Compartment: 3.3.2 Description: BLK-1 / INST AIR MCC-A Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C12-SAE-61-AN-001 Description: PSH MSU IU-001 Equip Location: Zone: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-008C C10-TL-035C C10-TL-066D C10-TL-068D C10-TL-070D C10-TL-102D C10-TL-109C C10-TL-107C C10-TL-164C C10-TL-201C C12-TL-520C C12-TL-519C C12-TL-518C C12-TL-517 C12-TL-201 C12-TL-102 C12-TL-203 C12-TL-101 C12-TL-110 C12-TL-111 C12-TL-112 FIELD ROUTED

Page 47 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
3C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 59 No. of Cables: 1 Type Code: 30156 End Length(m): 5 Elevation: Schematic: ED-693214

Cable: C10BJC1028
Seg Code: L System: BJC Startup Code:

Service: 127V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 53 4 57 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693214 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJC Compartment: 2.2 Description: BLK-1 / INST AIR MCC-A Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BFT01 Compartment: Description: 4.16/0.48KV BAT FOR BLK-1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-009D C10-TL-012D C10-TL-013B C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-020D C10-TL-022C C10-TL-051B C10-TL-052 C10-TL-056 C10-TL-093A CABLE

Cable: C10BJC1029
Seg Code: L System: BJC Startup Code:

Rev: 02

Description:

3C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 200 No. of Cables: 1 Type Code: 30156 End Length(m): 5 Elevation: Schematic: ED-693214

Service: 127V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 180 9 189 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693214 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJC Compartment: 2.2 Description: BLK-1 / INST AIR MCC-A Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BAU01 Description: NGR FOR UAT BLK-1 Equip Location: Zone: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-009A C10-TL-011A C10-TL-037A C10-TL-063A C10-TL-060A C10-TL-039A C10-TL-029A C10-TL-015A C10-TL-003A C10-TL-002A C10-TL-001A C10-TL-226A C10-TL-225A C14-TL-201A C14-TL-203A C14-TL-205A C10-EMH-007 C10-D065-05 C10-EMH-006 C10-D064-04

Cable: C10BJC1030
Seg Code: L System: BJC Startup Code:

Rev: 01

Description:

3C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 64 No. of Cables: 1 Type Code: 30156 End Length(m): 5 Elevation: Schematic: ED-693214

Service: 127V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 59 5 64 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693214 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJC Compartment: 2.2 Description: BLK-1 / INST AIR MCC-A Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BHT01 Compartment: Description: 4.16/0.48KV BAT FOR BLK-1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-009D C10-TL-012D C10-TL-013B C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-020D C10-TL-022C C10-TL-051B C10-TL-052 C10-TL-056 C10-TL-082 C10-TL-080 C10-TL-098A CABLE

Page 48 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
3C X 35 SQ.MM, 0.6/1kV
Pull Length(m): 172 No. of Cables: 1 Type Code: 30356 End Length(m): 10 Elevation: Schematic: ED-693214

Cable: C10BJC1031
Seg Code: L System: BJC Startup Code:

Service: 127V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 160 8 168 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693214 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJC Compartment: 2.2 Description: BLK-1 / INST AIR MCC-A Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BAC01 Compartment: Description: GENERATOR CIRCUIT BRKR (GCB) BLK-1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-009D C10-TL-012D C10-TL-013B C10-TL-004B C10-TL-016A CABLE C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-098 C14-TL-067 C14-TL-066 C14-TL-070 C14-C-1115

Cable: C10BJC1032
Seg Code: L System: BJC Startup Code:

Rev: 01

Description:

3C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 47 No. of Cables: 1 Type Code: 30026 End Length(m): 8 Elevation: Schematic: ED-693214

Service: 127V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 30 4 34 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693214 7

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJC Compartment: 2.2 Description: BLK-1 / INST AIR MCC-A Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-036C C10-TL-065B C10-TL-071 CABLE

Cable To End: Equipment No: C10BBE Compartment: Description: 4.16KV UNIT SWBD BUS A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BJC1033
Seg Code: L System: BJC Startup Code:

Rev: 02

Description:

3C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 48 No. of Cables: 1 Type Code: 30026 End Length(m): 7 Elevation: Schematic: ED-693214

Service: 127V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 36 4 40 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693214 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJC Compartment: 2.2 Description: BLK-1 / INST AIR MCC-A Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BFA Compartment: Description: 480V UNIT SWBD BUS A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-009A C10-TL-011A C10-TL-037A C10-TL-063A C10-TL-060A C10-TL-061A C10-TL-058A CABLE

Cable: C10BJC1034
Seg Code: L System: BJC Startup Code:

Rev: 02

Description:

3C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 31 No. of Cables: 1 Type Code: 30156 End Length(m): 7 Elevation: Schematic: ED-693214

Service: 127V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 27 3 30 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693214 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJC Compartment: 2.2 Description: BLK-1 / INST AIR MCC-A Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10CHA01 Compartment: Description: UAT PROTECTION PNL-1 (BLK-1) North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-034 C10-TL-036D C10-TL-064D C10-TL-062 CABLE

Page 49 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
3C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 59 No. of Cables: 1 Type Code: 30156 End Length(m): 5 Elevation: Schematic: ED-693214

Cable: C10BJC1035
Seg Code: L System: BJC Startup Code:

Service: 127V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 51 4 55 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693214 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJC Compartment: 2.2 Description: BLK-1 / INST AIR MCC-A Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-CPB-66-GH-001 Compartment: Description: B1C CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-009D C10-TL-012D C10-TL-013B C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-020D CABLE C10-TL-021 C10-TL-048 C10-TL-118 C10-TL-122 C10-TL-125 CABLE

Cable: C10BJC1036
Seg Code: L System: BJC Startup Code:

Rev: 00

Description:

3C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 66 No. of Cables: 1 Type Code: 30026 End Length(m): 5 Elevation: Schematic: ED-693214

Service: 127V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 51 4 55 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693214 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJC Compartment: 2.2 Description: BLK-1 / INST AIR MCC-A Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-CPB-66-GH-002 Compartment: Description: B1C I/O CABINET-1_TMR North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-009D C10-TL-012D C10-TL-013B C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-020D CABLE C10-TL-021 C10-TL-048 C10-TL-118 C10-TL-122 C10-TL-125 CABLE

Cable: C10BJC1037
Seg Code: L System: BJC Startup Code:

Rev: 00

Description:

3C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 65 No. of Cables: 1 Type Code: 30156 End Length(m): 5 Elevation: Schematic: ED-693214

Service: 127V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 55 5 60 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693214 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJC Compartment: 2.2 Description: BLK-1 / INST AIR MCC-A Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-CPB-66-GH-011 Compartment: Description: B1E CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-009D C10-TL-012D C10-TL-013B C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-020D CABLE C10-TL-021 C10-TL-048 C10-TL-118 C10-TL-122 C10-TL-125 C10-TL-128 CABLE

Page 50 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
3C X 2.5 SQ.MM, 0.6/1kV
Pull Length(m): 79 No. of Cables: 1 Type Code: 30026 End Length(m): 5 Elevation: Schematic: ED-693214

Cable: C10BJC1038
Seg Code: L System: BJC Startup Code:

Service: 127V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 55 5 60 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693214 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJC Compartment: 2.2 Description: BLK-1 / INST AIR MCC-A Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-CPB-66-GH-012 Compartment: Description: B1E I/O CABINET-1_SIMP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-009D C10-TL-012D C10-TL-013B C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-020D CABLE C10-TL-021 C10-TL-048 C10-TL-118 C10-TL-122 C10-TL-125 C10-TL-128 CABLE

Cable: C10BJC1039
Seg Code: L System: BJC Startup Code:

Rev: 01

Description:

3C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 67 No. of Cables: 1 Type Code: 30026 End Length(m): 7 Elevation: Schematic: ED-693214

Service: 127V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 51 4 55 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693214 7

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJC Compartment: 2.2 Description: BLK-1 / INST AIR MCC-A Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BBF Compartment: Description: 4.16KV UNIT SWBD BUS B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-034 C10-TL-036D C10-TL-064D C10-TL-062 C10-TL-058D C10-TL-055D C10-TL-056 C10-TL-082 CABLE

Cable: C10BJC1040
Seg Code: L System: BJC Startup Code:

Rev: 02

Description:

3C X 4 SQ.MM, 0.6/1kV
Pull Length(m): 170 No. of Cables: 1 Type Code: 30046 End Length(m): 7 Elevation: Schematic: ED-693214

Service: 127V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 154 8 162 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693214 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJC Compartment: 2.2 Description: BLK-1 / INST AIR MCC-A Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10CHB02 Compartment: Description: STG#1 INTERFACE PANEL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-009B C10-TL-011B C10-TL-037B C10-TL-063B C10-TL-060B C10-TL-059B C10-TL-043B C10-TL-044B C10-TL-053B C10-TL-051A C10-TL-025A C10-TL-219A C10-TL-218A C10-TL-217A C10-TL-221A C14-TL-202B C14-TL-204B C14-TL-207B C14-TL-049B C14-TL-050B C14-TL-052A C14-TL-053A C14-TL-054A C14-TL-055A C14-TL-056A CABLE

Page 51 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
3C X 2.5 SQ.MM, 0.6/1kV
Pull Length(m): 66 No. of Cables: 1 Type Code: 30026 End Length(m): 5 Elevation: Schematic: ED-693214

Cable: C10BJC1041
Seg Code: L System: BJC Startup Code:

Service: 127V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 51 4 55 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693214 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJC Compartment: 2.2 Description: BLK-1 / INST AIR MCC-A Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-CPB-66-GH-003 Compartment: Description: B1C I/O CABINET-2_TMR North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-009D C10-TL-012D C10-TL-013B C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-020D CABLE C10-TL-021 C10-TL-048 C10-TL-118 C10-TL-122 C10-TL-125 CABLE

Cable: C10BJC1042
Seg Code: L System: BJC Startup Code:

Rev: 00

Description:

3C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 68 No. of Cables: 1 Type Code: 30026 End Length(m): 5 Elevation: Schematic: ED-693214

Service: 127V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 51 4 55 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693214 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJC Compartment: 2.2 Description: BLK-1 / INST AIR MCC-A Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-CPB-66-GH-004 Compartment: Description: B1C I/O CABINET-3_SIMP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-009D C10-TL-012D C10-TL-013B C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-020D CABLE C10-TL-021 C10-TL-048 C10-TL-118 C10-TL-122 C10-TL-125 CABLE

Cable: C10BJC1043
Seg Code: L System: BJC Startup Code:

Rev: 00

Description:

3C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 80 No. of Cables: 1 Type Code: 30156 End Length(m): 5 Elevation: Schematic: ED-693214

Service: 127V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 55 5 60 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693214 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJC Compartment: 2.2 Description: BLK-1 / INST AIR MCC-A Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-CPB-66-GH-013 Compartment: Description: B1E I/O CABINET-2_SIMP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-009D C10-TL-012D C10-TL-013B C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-020D CABLE C10-TL-021 C10-TL-048 C10-TL-118 C10-TL-122 C10-TL-125 C10-TL-128 CABLE

Page 52 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
3C X 2.5 SQ.MM, 0.6/1kV
Pull Length(m): 35 No. of Cables: 1 Type Code: 30026 End Length(m): 7 Elevation: Schematic: ED-693214

Cable: C10BJC1044
Seg Code: L System: BJC Startup Code:

Service: 127V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 27 3 30 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693214 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJC Compartment: 2.2 Description: BLK-1 / INST AIR MCC-A Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10CHD01 Compartment: Description: UNIT 4.16KV SWBD (BLK-1) HSBT PANEL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-034 C10-TL-036D C10-TL-064D C10-TL-062 CABLE

Cable: C10BJC1045
Seg Code: L System: BJC Startup Code:

Rev: 00

Description:

3C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 35 No. of Cables: 1 Type Code: 30026 End Length(m): 7 Elevation: Schematic: ED-693214

Service: 127V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 27 3 30 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693214 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJC Compartment: 2.2 Description: BLK-1 / INST AIR MCC-A Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10CMA01 Compartment: Description: 4.16KV UNIT SWGR DATA RETRIEVAL PANEL (BLK-1) North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-034 C10-TL-036D C10-TL-064D C10-TL-062 CABLE

Cable: C10BJC1046
Seg Code: L System: BJC Startup Code:

Rev: 01

Description:

3C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 30 No. of Cables: 1 Type Code: 30156 End Length(m): 5 Elevation: Schematic: ED-693214

Service: 127V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 25 3 28 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693214 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJC Compartment: 2.2 Description: BLK-1 / INST AIR MCC-A Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJD Compartment: Description: BLK-1 / INST AIR MCC-B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-007A C10-TL-006A C10-TL-010A C10-TL-009A C10-TL-008A CABLE

Page 53 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
3C X 25 SQ.MM, 0.6/1kV
Pull Length(m): 235 No. of Cables: 1 Type Code: 30256 End Length(m): 5 Elevation: Schematic: ED-693214

Cable: C10BJC1047
Seg Code: L System: BJC Startup Code:

Service: 127V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 218 11 229 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693214 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJC Compartment: 2.2 Description: BLK-1 / INST AIR MCC-A Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-CPC-77-GH-001 Description: BLK-1 IA/ SA PLC PNL Equip Location: Zone: Location Dwg: EA-681141

Routing Information: Remarks: Route: CABLE C10-TL-008A C10-TL-035A C10-TL-066B C10-TL-068B C10-TL-070B C10-TL-102B C10-TL-109A C10-TL-107A C10-TL-164A C10-TL-201A C12-TL-520A C12-TL-519A C12-TL-518A C12-TL-516A C12-TL-515A C12-TL-514 C12-TL-512A C12-TL-511A C12-D001-01 C12-EMH-001 C10-D030-01 C10-EMH-012 C10-D031-01 C10-EMH-013 C10-D029-01 C10-EMH-011 C10-D026-01 C10-TL-201 CABLE

Cable: C10BJC1048
Seg Code: L System: BJC Startup Code:

Rev: 01

Description:

3C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 32 No. of Cables: 1 Type Code: 30156 End Length(m): 7 Elevation: Schematic: ED-693214

Service: 127V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 27 3 30 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693214 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJC Compartment: 2.2 Description: BLK-1 / INST AIR MCC-A Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10CHA03 Description: UAT AVR PNL (BLK-1) Equip Location: Zone: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-034 C10-TL-036D C10-TL-064D C10-TL-062 CABLE

Cable: C10BJC1049
Seg Code: L System: BJC Startup Code:

Rev: 02

Description:

3C X 10 SQ.MM, 0.6/1kV
Pull Length(m): 194 No. of Cables: 1 Type Code: 30106 End Length(m): 5 Elevation: Schematic: ED-693214

Service: 127V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 185 9 194 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693214 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJC Compartment: 2.2 Description: BLK-1 / INST AIR MCC-A Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BAA01 Compartment: Description: ISO PHASE BUS DUCT & TAP OFF TO UAT, BLOCK-1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-009A C10-TL-011A C10-TL-037A C10-TL-063A C10-TL-060A C10-TL-039A C10-TL-029A C10-TL-015A C10-TL-003A C10-TL-002A C10-TL-001A C10-TL-226A C10-TL-225A C14-TL-201A C14-TL-203A C14-TL-205A C10-EMH-007 C10-D065-05 C10-EMH-006 C10-D064-13

Page 54 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
1C X 300 SQ.MM, 0.6/1kV
Pull Length(m): 219 No. of Cables: 1 Type Code: 13006 End Length(m): 5 Elevation: Schematic: ED-693217

Cable: C10BJC1050
Seg Code: L System: BJC Startup Code:

Service: STG OIL DEFLECTOR


Routed Length (m): Allowance (m): Total Length (m): 214 10 224 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693217 10

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJC Compartment: 4.7 Description: BLK-1 / INST AIR MCC-A Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-QFW-31-AN-001 Compartment: Description: SEAL AIR COMPRESSOR North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-008A C10-TL-009A C10-TL-011A C10-TL-032A C10-TL-031A C10-TL-030A C10-TL-029A C10-TL-041 C10-TL-017A C10-TL-018A C10-TL-020A C10-TL-023A C10-TL-223A C10-TL-222A C14-TL-202A C14-TL-204A C14-TL-207A C14-TL-049A C14-TL-050A C14-TL-051 C14-TL-002 C14-TL-006B C14-TL-008C C14-TL-009B C14-TL-011B CABLE

Cable: C10BJC1051
Seg Code: L System: BJC Startup Code:

Rev: 00

Description:

3C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 67 No. of Cables: 1 Type Code: 30026 End Length(m): 5 Elevation: Schematic: ED-693214

Service: 127V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 51 4 55 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693214 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJC Compartment: 2.2 Description: BLK-1 / INST AIR MCC-A Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-CPB-66-GH-005 Compartment: Description: B1C I/O CABINET-4_SIMP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-009D C10-TL-012D C10-TL-013B C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-020D CABLE C10-TL-021 C10-TL-048 C10-TL-118 C10-TL-122 C10-TL-125 CABLE

Cable: C10BJC1052
Seg Code: L System: BJC Startup Code:

Rev: 02

Description:

3C X 6 SQ.MM, 0.6/1kV
Pull Length(m): 205 No. of Cables: 1 Type Code: 30066 End Length(m): 7 Elevation: Schematic: ED-693214

Service: 127V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 154 8 162 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693214 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJC Compartment: 2.2 Description: BLK-1 / INST AIR MCC-A Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10CHB01 Compartment: Description: GSU#1 MECHANICAL PROTECTION PANEL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-009B C10-TL-011B C10-TL-037B C10-TL-063B C10-TL-060B C10-TL-059B C10-TL-043B C10-TL-044B C10-TL-053B C10-TL-051A C10-TL-025A C10-TL-219A C10-TL-218A C10-TL-217A C10-TL-221A C14-TL-202B C14-TL-204B C14-TL-207B C14-TL-049B C14-TL-050B C14-TL-052A C14-TL-053A C14-TL-054A C14-TL-055A C14-TL-056A CABLE

Page 55 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
4C X 35 SQ.MM, 0.6/1kV
Pull Length(m): 163 No. of Cables: 1 Type Code: 40356 End Length(m): 10 Elevation: Schematic: ED-693215

Cable: C10BJC1053
Seg Code: L System: BJC Startup Code:

Service: ROOF TOP PACKAGE UNIT-1 STG BLDG


Routed Length (m): Allowance (m): Total Length (m): 155 8 163 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693215 15

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJC Compartment: 2.2.2 Description: BLK-1 / INST AIR MCC-A Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-SA-61-AN-015 Compartment: Description: STG-ELECT RM- RTPU-001 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-009D C10-TL-010C C10-TL-005D C10-TL-004B CABLE C10-TL-003A C10-TL-002A C10-TL-024A C10-TL-023A C10-TL-223A C10-TL-222A C14-TL-202A C14-TL-204A C14-TL-207A C14-TL-049A C14-TL-050A C14-C-1043

Cable: C10BJC1054
Seg Code: L System: BJC Startup Code:

Rev: 00

Description:

4C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): No. of Cables: 1 Type Code: 40026 End Length(m): 5 Elevation: Schematic: ED-693216

Service: FAF-CA-1 AIR COMP BLDG


Routed Length (m): Allowance (m): Total Length (m): 242 12 254 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693216 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJC Compartment: Description: BLK-1 / INST AIR MCC-A Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-SA-62-AN-001 Compartment: Description: IA/SA BLDG-PLANT RM- FAF-001 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681141

Routing Information: Remarks: Route: CABLE C10-TL-008A C10-TL-035A C10-TL-066B C10-TL-068B C10-TL-070B C10-TL-102B C10-TL-109A C10-TL-107A C10-TL-164A C10-TL-201A C12-TL-520A C12-TL-519A C12-TL-518A C12-TL-516A C12-TL-515A C12-TL-514 C12-TL-512A C12-TL-511A C12-D001-04 C12-EMH-001 C10-D030-04 C10-EMH-012 C10-D031-04 C10-EMH-013 C10-D029-04 C10-EMH-011 C10-D026-04 CABLE C10-TL-201 CABLE C10-D027-02 C10-C-1023

Cable: C10BJC1055
Seg Code: L System: BJC Startup Code:

Rev: 00

Description:

1C X 300 SQ.MM, 0.6/1kV


Pull Length(m): 217 No. of Cables: 1 Type Code: 13006 End Length(m): 5 Elevation: Schematic: ED-693217

Service: STG OIL DEFLECTOR


Routed Length (m): Allowance (m): Total Length (m): 214 10 224 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693217 10

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJC Compartment: 4.7 Description: BLK-1 / INST AIR MCC-A Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-QFW-31-AN-001 Compartment: Description: SEAL AIR COMPRESSOR North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-008A C10-TL-009A C10-TL-011A C10-TL-032A C10-TL-031A C10-TL-030A C10-TL-029A C10-TL-041 C10-TL-017A C10-TL-018A C10-TL-020A C10-TL-023A C10-TL-223A C10-TL-222A C14-TL-202A C14-TL-204A C14-TL-207A C14-TL-049A C14-TL-050A C14-TL-051 C14-TL-002 C14-TL-006B C14-TL-008C C14-TL-009B C14-TL-011B CABLE

Page 56 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
1C X 300 SQ.MM, 0.6/1kV
Pull Length(m): 224 No. of Cables: 1 Type Code: 13006 End Length(m): 5 Elevation: Schematic: ED-693217

Cable: C10BJC1056
Seg Code: L System: BJC Startup Code:

Service: STG OIL DEFLECTOR


Routed Length (m): Allowance (m): Total Length (m): 214 10 224 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693217 10

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJC Compartment: 4.7 Description: BLK-1 / INST AIR MCC-A Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-QFW-31-AN-001 Compartment: Description: SEAL AIR COMPRESSOR North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-008A C10-TL-009A C10-TL-011A C10-TL-032A C10-TL-031A C10-TL-030A C10-TL-029A C10-TL-041 C10-TL-017A C10-TL-018A C10-TL-020A C10-TL-023A C10-TL-223A C10-TL-222A C14-TL-202A C14-TL-204A C14-TL-207A C14-TL-049A C14-TL-050A C14-TL-051 C14-TL-002 C14-TL-006B C14-TL-008C C14-TL-009B C14-TL-011B CABLE

Cable: C10BJC1057
Seg Code: L System: BJC Startup Code:

Rev: 00

Description:

3C X 70 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 30706 End Length(m): 5 Elevation: Schematic: ED-693218

Service: CRANE-1 FOR STEAM TURBINE BLDG A


Routed Length (m): Allowance (m): Total Length (m): 133 7 140 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693218 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJC Compartment: 3.1 Description: BLK-1 / INST AIR MCC-A Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C00-SMM-46-BZ-001 Compartment: Description: BRIDGE CRANE-A1 STG BUILDING-1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-031D C10-TL-014C C10-TL-013B C10-TL-004B C10-TL-016A CABLE C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-098 CABLE

Cable: C10BJC1060
Seg Code: L System: BJC Startup Code:

Rev: 00

Description:

3C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 35 No. of Cables: 1 Type Code: 30026 End Length(m): 7 Elevation: Schematic: ED-693214

Service: 127V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 27 3 30 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693214 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJC Compartment: 2.2 Description: BLK-1 / INST AIR MCC-A Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10CEJ01 Compartment: Description: 4.16KV UNIT SWGR FAULT RECORDER PANEL-1 (BLK-1) North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-034 C10-TL-036D C10-TL-064D C10-TL-062 CABLE

Page 57 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
3C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 30156 End Length(m): 5 Elevation: Schematic: ED-693214

Cable: C10BJC1061
Seg Code: L System: BJC Startup Code:

Service: 127V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 64 5 69 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693214 14

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJC Compartment: 2.2 Description: BLK-1 / INST AIR MCC-A Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-CPB-66-GN-001 Compartment: Description: B1C NETWORK CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-009D C10-TL-012D C10-TL-013B C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-020D CABLE C10-TL-021 C10-TL-048 C10-TL-118 C10-TL-122 C10-TL-125 C10-TL-128 CABLE

Cable: C10BJD1001
Seg Code: L System: BJD Startup Code:

Rev: 01

Description:

3C X 120 SQ.MM, 0.6/1kV


Pull Length(m): 226 No. of Cables: 1 Type Code: 31206 End Length(m): 5 Elevation: Schematic: ED-693226

Service: SERVICE AIR COMPRESSOR


Routed Length (m): Allowance (m): Total Length (m): 238 11 249 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJD Compartment: 4.4.1 Description: BLK-1 / INST AIR MCC-B Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-SCA-32-AN-001 Compartment: End Length(m): 10 Description: SERVICE AIR COMPRESSOR North: 1677.90 Equip Location: Zone: East: 2264.90 Elevation: 6.40 Wiring Dwg: Location Dwg: EA-681141 Schematic: ED-693226

Routing Information: Remarks: Route: CABLE C10-TL-008B C10-TL-035B C10-TL-066C C10-TL-068C C10-TL-070C C10-TL-102C C10-TL-109B C10-TL-107B C10-TL-164B C10-TL-201B C12-TL-520B C12-TL-519B C12-TL-518B C12-TL-516B C12-TL-515B C12-TL-513 C12-TL-512B C12-TL-511B C12-D001-02 C12-EMH-001 C10-D030-02 C10-EMH-012 C10-D031-02 C10-EMH-013 C10-D029-02 C10-EMH-011 C10-D026-02 CABLE C10-TL-201 CABLE C10-D027-09 C10-C-1016

Cable: C10BJD1002
Seg Code: L System: BJD Startup Code:

Rev: 01

Description:

4C X 35 SQ.MM, 0.6/1kV
Pull Length(m): 240 No. of Cables: 1 Type Code: 40356 End Length(m): 8 Elevation: Schematic: ED-693227

Service: INSTRUMENT AIR DRYER-2


Routed Length (m): Allowance (m): Total Length (m): 238 11 249 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJD Compartment: 4.1.1 Description: BLK-1 / INST AIR MCC-B Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-QFA-31-AT-014 Compartment: End Length(m): 10 Description: INSTRUMENT AIR DRYER North: 1678.50 Equip Location: Zone: East: 2268.90 Elevation: 6.10 Wiring Dwg: Location Dwg: EA-681141 Schematic: ED-693227

Routing Information: Remarks: Route: CABLE C10-TL-008A C10-TL-035A C10-TL-066B C10-TL-068B C10-TL-070B C10-TL-102B C10-TL-109A C10-TL-107A C10-TL-164A C10-TL-201A C12-TL-520A C12-TL-519A C12-TL-518A C12-TL-516A C12-TL-515A C12-TL-514 C12-TL-512A C12-TL-511A C12-D001-04 C12-EMH-001 C10-D030-04 C10-EMH-012 C10-D031-04 C10-EMH-013 C10-D029-04 C10-EMH-011 C10-D026-04 CABLE C10-TL-201 CABLE C10-D027-01 C10-C-1017

Page 58 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
3C X 50 SQ.MM, 0.6/1kV
Pull Length(m): 50 No. of Cables: 1 Type Code: 30506 End Length(m): 5 Elevation: Schematic: ED-693230

Cable: C10BJD1005
Seg Code: L System: BJD Startup Code:

Service: BLOCK UPS-1 BYPASS TRANSFORMER


Routed Length (m): Allowance (m): Total Length (m): 45 4 49 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693230 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJD Compartment: 5.3.1 Description: BLK-1 / INST AIR MCC-B Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BRV01 Compartment: Description: BYPASS XFMR FOR BLK-1 UPS-1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-006C C10-TL-005D C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-019 C10-TL-045 C10-TL-046 C10-TL-120 C10-TL-123 CABLE

Cable: C10BJD1006
Seg Code: L System: BJD Startup Code:

Rev: 02

Description:

3C X 50 SQ.MM, 0.6/1kV
Pull Length(m): 53 No. of Cables: 1 Type Code: 30506 End Length(m): 5 Elevation: Schematic: ED-693231

Service: BLOCK UPS-2 BYPASS TRANSFORMER


Routed Length (m): Allowance (m): Total Length (m): 49 4 53 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693231 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJD Compartment: 5.4.1 Description: BLK-1 / INST AIR MCC-B Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BRV03 Compartment: Description: BYPASS XFMR FOR BLK-1 UPS-2 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-006C C10-TL-005D C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-019 C10-TL-045 C10-TL-046 C10-TL-120 C10-TL-123 C10-TL-126 CABLE

Cable: C10BJD1007
Seg Code: L System: BJD Startup Code:

Rev: 01

Description:

3C X 150 SQ.MM, 0.6/1kV


Pull Length(m): 23 No. of Cables: 1 Type Code: 31506 End Length(m): 5 Elevation: Schematic: ED-693232

Service: BLOCK OUTDOOR LIGHTING DB


Routed Length (m): Allowance (m): Total Length (m): 17 3 20 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJD Compartment: 4.6 Description: BLK-1 / INST AIR MCC-B Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-007A C10-TL-035D CABLE

Cable To End: Equipment No: C10BLT49 Compartment: End Length(m): 5 Description: BLOCK 1 380/220V AIR COMPRESSOR LIGHTING TRANSFORMER North: Equip Location: Zone: East: Elevation: Wiring Dwg: Location Dwg: EA-681121 Schematic: ED-693232

Cable: C10BJD1008
Seg Code: L System: BJD Startup Code:

Rev: 01

Description:

4C X 185 SQ.MM, 0.6/1kV


Pull Length(m): 66 No. of Cables: 1 Type Code: 41856 End Length(m): 12 Elevation: Schematic: ED-693233

Service: RECEPTACLE FOR TRAFO. OIL FILTRATION BAT


Routed Length (m): Allowance (m): Total Length (m): 60 5 65 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJD Compartment: 5.7.1 Description: BLK-1 / INST AIR MCC-B Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJR01 Compartment: End Length(m): 14 Description: RECEPTACLE FOR BAT TRANSFORMER OIL FILTERATION (200A) North: Equip Location: Zone: East: Elevation: Wiring Dwg: Location Dwg: EA-681121 Schematic: ED-693233

Routing Information: Remarks: Route: CABLE C10-TL-034 C10-TL-036D C10-TL-064D C10-TL-062 C10-TL-058D C10-TL-055D C10-TL-056 C10-C-1013

Page 59 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 03 Description:
4C X 70 SQ.MM, 0.6/1kV
Pull Length(m): 176 No. of Cables: 1 Type Code: 40706 End Length(m): 5 Elevation: Schematic: ED-693234

Cable: C10BJD1009
Seg Code: L System: BJD Startup Code:

Service: WELDING RECEPTACLES GSU/UAT + LUBE OIL PURIFIER


Routed Length (m): Allowance (m): Total Length (m): 148 8 156 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693234 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJD Compartment: 4.2.2 Description: BLK-1 / INST AIR MCC-B Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJD10GA Compartment: Description: JB FOR BLOCK-1 GSU/UAT WELDING RECEPTACLE North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-007A C10-TL-006A C10-TL-005A CABLE C10-TL-003A C10-TL-002A C10-TL-001A C10-TL-226A C10-TL-225A C14-TL-201A C14-TL-203A C14-TL-205A C10-EMH-007 C10-D065-05 C10-EMH-006 C10-D063-01 FIELD ROUTED

Cable: C10BJD1010
Seg Code: L System: BJD Startup Code:

Rev: 02

Description:

3C X 50 SQ.MM, 0.6/1kV
Pull Length(m): 185 No. of Cables: 1 Type Code: 30506 End Length(m): 8 Elevation: Schematic: ED-693235

Service: CONTROL CABINET GSU SUPPLY-2


Routed Length (m): Allowance (m): Total Length (m): 168 9 177 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJD Compartment: 4.3.1 Description: BLK-1 / INST AIR MCC-B Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BAT01 Compartment: End Length(m): 5 Description: GENERATOR STEP-UP XFMR FOR BLK-1 North: 1733.00 Equip Location: Zone: East: 2292.20 Elevation: 4.10 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-693235

Routing Information: Remarks: Route: CABLE C10-TL-007A C10-TL-006A C10-TL-005A CABLE C10-TL-003A C10-TL-002A C10-TL-001A C10-TL-226A C10-TL-225A C14-TL-201A C14-TL-203A C14-TL-205A C10-EMH-007 C10-D065-05 C10-EMH-006 C10-D064-05

Cable: C10BJD1011
Seg Code: L System: BJD Startup Code:

Rev: 01

Description:

4C X 25 SQ.MM, 0.6/1kV
Pull Length(m): 196 No. of Cables: 1 Type Code: 40256 End Length(m): 5 Elevation: Schematic: ED-693236

Service: CONTROL CABINET UAT SUPPLY-2


Routed Length (m): Allowance (m): Total Length (m): 187 9 196 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693236 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJD Compartment: 4.3.2 Description: BLK-1 / INST AIR MCC-B Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BBT01 Compartment: Description: UNIT AUXILIARY XFMR (UAT) BLK-1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-007A C10-TL-006A C10-TL-010A C10-TL-011A C10-TL-037A C10-TL-063A C10-TL-060A C10-TL-039A C10-TL-029A C10-TL-015A C10-TL-003A C10-TL-002A C10-TL-001A C10-TL-226A C10-TL-225A C14-TL-201A C14-TL-203A C14-TL-205A C10-EMH-007 C10-D065-05 C10-EMH-006 C10-D064-13

Page 60 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
4C X 2.5 SQ.MM, 0.6/1kV
Pull Length(m): 165 No. of Cables: 1 Type Code: 40026 End Length(m): 10 Elevation: Schematic: ED-693237

Cable: C10BJD1012
Seg Code: L System: BJD Startup Code:

Service: GCB DISCONNECTOR AND EARTH SWITCH MOTOR SUPPLY


Routed Length (m): Allowance (m): Total Length (m): 157 8 165 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693237 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJD Compartment: 4.4.1 Description: BLK-1 / INST AIR MCC-B Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BAC01 Compartment: Description: GENERATOR CIRCUIT BRKR (GCB) BLK-1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-006C C10-TL-005D C10-TL-004B C10-TL-016A CABLE C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-098 C14-TL-067 C14-TL-066 C14-TL-070 C14-C-1115

Cable: C10BJD1013
Seg Code: L System: BJD Startup Code:

Rev: 00

Description:

4C X 70 SQ.MM, 0.6/1kV
Pull Length(m): 90 No. of Cables: 1 Type Code: 40706 End Length(m): 0 Elevation: Schematic: ED-693238

Service: ROOF TOP PACKAGE MV/LV-1-2


Routed Length (m): Allowance (m): Total Length (m): 26 3 29 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693238 25

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJD Compartment: 5.7.2 Description: BLK-1 / INST AIR MCC-B Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: C10-C-1028

Cable To End: Equipment No: C10-SAM-61-AH-002 Compartment: Description: SWITCH GEAR ROOM 1-FL RTPU-002 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BJD1014
Seg Code: L System: BJD Startup Code:

Rev: 00

Description:

4C X 25 SQ.MM, 0.6/1kV
Pull Length(m): 78 No. of Cables: 1 Type Code: 40256 End Length(m): 0 Elevation: Schematic: ED-693239

Service: ROOF TOP PACKAGE MV/LV-2-2


Routed Length (m): Allowance (m): Total Length (m): 26 3 29 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693239 25

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJD Compartment: 5.5.2 Description: BLK-1 / INST AIR MCC-B Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: C10-C-1030

Cable To End: Equipment No: C10-SAM-61-AH-004 Compartment: Description: SWITCH GEAR ROOM 2-FL RTPU-004 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Page 61 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40156 End Length(m): 10 Elevation: Schematic: ED-693242

Cable: C10BJD1017
Seg Code: L System: BJD Startup Code:

Service: CONDENSER SUMP DEWATERING SUMP PUMP-2 LCP


Routed Length (m): Allowance (m): Total Length (m): 210 10 220 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJD Compartment: 4.1.1 Description: BLK-1 / INST AIR MCC-B Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-RTP-58-AP-004 Compartment: End Length(m): 10 Description: BLCK-1 CONDENSER DEWATERING PIT SUBMERSIBLE PUMP North: 1747.10 Equip Location: Zone: East: 2330.50 Elevation: 0.50 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-693242

Routing Information: Remarks: Route: CABLE C10-TL-006C C10-TL-005D C10-TL-004B C10-TL-016A CABLE C10-TL-018B C10-TL-020B C10-TL-022A C10-TL-025A C10-TL-219A C10-TL-218A C10-TL-217A C10-TL-221A C14-TL-202B C14-TL-204B C14-TL-207B C14-TL-049B C14-TL-050B C14-TL-052A C14-TL-053A C14-TL-054A C14-TL-055A C14-TL-065A C14-TL-003 C14-TL-008A CABLE C14-TL-009A C14-TL-011A C14-TL-023 C14-TL-024 C14-TL-026 C14-TL-027B C14-TL-029 FIELD ROUTED

Cable: C10BJD1018
Seg Code: L System: BJD Startup Code:

Rev: 01

Description:

4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): 138 No. of Cables: 1 Type Code: 40046 End Length(m): 5 Elevation: Schematic: ED-693243

Service: ST VENT AND DRAIN SUMP PUMP-1


Routed Length (m): Allowance (m): Total Length (m): 131 7 138 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJD Compartment: 2.3 Description: BLK-1 / INST AIR MCC-B Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-LCL-57-AP-001 Compartment: End Length(m): 8 Description: STEAM TURBINE VENT & DRAIN SUMP PUMP North: 1774.00 Equip Location: Zone: East: 2309.70 Elevation: 3.30 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-693243

Routing Information: Remarks: Route: CABLE C10-TL-006C C10-TL-005D C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-020D C10-TL-022C C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-211 C14-C-1035

Cable: C10BJD1019
Seg Code: L System: BJD Startup Code:

Rev: 01

Description:

4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): 138 No. of Cables: 1 Type Code: 40046 End Length(m): 5 Elevation: Schematic: ED-693244

Service: ST VENT AND DRAIN SUMP PUMP-3


Routed Length (m): Allowance (m): Total Length (m): 131 7 138 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJD Compartment: 2.4 Description: BLK-1 / INST AIR MCC-B Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-LCL-57-AP-003 Compartment: End Length(m): 8 Description: STEAM TURBINE VENT & DRAIN SUMP PUMP North: 1775.50 Equip Location: Zone: East: 2309.70 Elevation: 3.30 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-693244

Routing Information: Remarks: Route: CABLE C10-TL-006C C10-TL-005D C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-020D C10-TL-022C C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-211 C14-C-1033

Page 62 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
4C X 10 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40106 End Length(m): 5 Elevation: Schematic: ED-693245

Cable: C10BJD1020
Seg Code: L System: BJD Startup Code:

Service: SANITARY LIFTWELL PUMP LCP-HRSG AREA


Routed Length (m): Allowance (m): Total Length (m): 83 6 89 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693245 3

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJD Compartment: 4.1.2 Description: BLK-1 / INST AIR MCC-B Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-GQB-54-GH-001 Compartment: Description: B1 HRSG SNT LIFT STN PNL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-006C C10-TL-005C C10-TL-004A C10-TL-015C C10-TL-028A C10-TL-027A C10-TL-026A C10-TL-025B C10-TL-219B C10-TL-218B C10-TL-216 C10-TL-214 C10-TL-211 C13-TL-518 C13-TL-517 C13-C-1304

Cable: C10BJD1021
Seg Code: L System: BJD Startup Code:

Rev: 01

Description:

4C X 6 SQ.MM, 0.6/1kV
Pull Length(m): 125 No. of Cables: 1 Type Code: 40066 End Length(m): 8 Elevation: Schematic: ED-693246

Service: HRSG BLOWDOWN SUMP PUMP-2


Routed Length (m): Allowance (m): Total Length (m): 114 7 121 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJD Compartment: 2.5 Description: BLK-1 / INST AIR MCC-B Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-HAN-55-AP-002 Compartment: End Length(m): 20 Description: HRSG BLOWDOWN SUMP PUMP North: 1720.10 Equip Location: Zone: East: 2229.00 Elevation: 3.50 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-693246

Routing Information: Remarks: Route: CABLE C10-TL-008B C10-TL-035B C10-TL-066C C10-TL-068C C10-TL-070C C10-TL-102C C10-TL-109B C10-TL-107B C10-TL-164B C10-TL-201B C12-TL-520B C12-TL-519B C12-TL-518B C12-TL-516B C12-C-1003

Cable: C10BJD1022
Seg Code: L System: BJD Startup Code:

Rev: 00

Description:

4C X 6 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40066 End Length(m): 5 Elevation: Schematic: ED-693247

Service: MSU-PSH-002-SWAS
Routed Length (m): Allowance (m): Total Length (m): 139 8 147 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693247 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJD Compartment: 5.6.1 Description: BLK-1 / INST AIR MCC-B Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C12-SAE-61-AN-002 Description: PSH MSU IU-002 Equip Location: Zone: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-008C C10-TL-035C C10-TL-066D C10-TL-068D C10-TL-070D C10-TL-102D C10-TL-109C C10-TL-107C C10-TL-164C C10-TL-201C C12-TL-520C C12-TL-519C C12-TL-518C C12-TL-517 C12-TL-201 C12-TL-102 C12-TL-203 C12-TL-101 C12-TL-110 C12-TL-111 C12-TL-112 FIELD ROUTED

Page 63 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
3C X 95 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 30956 End Length(m): 8 Elevation: Schematic: ED-693248

Cable: C10BJD1023
Seg Code: L System: BJD Startup Code:

Service: STG BUILDING ELEVATOR


Routed Length (m): Allowance (m): Total Length (m): 163 9 172 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693248 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJD Compartment: 5.3.2 Description: BLK-1 / INST AIR MCC-B Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C00-SNL-85-AZ-001 Compartment: Description: STG BLK#1 ELEVATOR North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-006C C10-TL-005D C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-020D C10-TL-022C C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-211 C14-TL-212 C14-TL-043 C14-TL-042 C14-TL-040 C14-C-1123

Cable: C10BJD1024
Seg Code: L System: BJD Startup Code:

Rev: 00

Description:

3C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): No. of Cables: 1 Type Code: 30026 End Length(m): 5 Elevation: Schematic: ED-693249

Service: 220V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 26 3 29 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693249 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJD Compartment: 3.1 Description: BLK-1 / INST AIR MCC-B Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-SAM-62-AN-001 Compartment: Description: BATTERY ROOM RT-EXT-F-001 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-006C C10-TL-005C C10-TL-004A CABLE C10-TL-003A C10-TL-002A CABLE

Cable: C10BJD1025
Seg Code: L System: BJD Startup Code:

Rev: 00

Description:

3C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): No. of Cables: 1 Type Code: 30026 End Length(m): 5 Elevation: Schematic: ED-693249

Service: 220V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 26 3 29 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693249 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJD Compartment: 3.1 Description: BLK-1 / INST AIR MCC-B Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-SAM-62-AN-002 Compartment: Description: BATTERY ROOM RT-EXT-F-002 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-006C C10-TL-005C C10-TL-004A CABLE C10-TL-003A C10-TL-002A CABLE

Page 64 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
3C X 6 SQ.MM, 0.6/1kV
Pull Length(m): 60 No. of Cables: 1 Type Code: 30066 End Length(m): 5 Elevation: Schematic: ED-693249

Cable: C10BJD1026
Seg Code: L System: BJD Startup Code:

Service: 220V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 33 4 37 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693249 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJD Compartment: 3.1 Description: BLK-1 / INST AIR MCC-B Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-SAM-61-AN-006 Compartment: Description: NOVEC ROOM MSU IU-01 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-007A C10-TL-035D C10-TL-066E C10-TL-068E FIELD ROUTED

Cable: C10BJD1027
Seg Code: L System: BJD Startup Code:

Rev: 00

Description:

3C X 6 SQ.MM, 0.6/1kV
Pull Length(m): 60 No. of Cables: 1 Type Code: 30066 End Length(m): 5 Elevation: Schematic: ED-693249

Service: 220V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 33 4 37 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693249 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJD Compartment: 3.1 Description: BLK-1 / INST AIR MCC-B Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-SAM-61-AN-008 Compartment: Description: NOVEC ROOM MSU IU-02 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-007A C10-TL-035D C10-TL-066E C10-TL-068E FIELD ROUTED

Cable: C10BJD1028
Seg Code: L System: BJD Startup Code:

Rev: 00

Description:

3C X 25 SQ.MM, 0.6/1kV
Pull Length(m): 242 No. of Cables: 1 Type Code: 30256 End Length(m): 5 Elevation: Schematic: ED-693249

Service: 220V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 218 11 229 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693249 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJD Compartment: 3.1 Description: BLK-1 / INST AIR MCC-B Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-SA-61-AN-001 Compartment: Description: IA/SA BLDG-ELECT RM- MSU-IU-001 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681141

Routing Information: Remarks: Route: CABLE C10-TL-008A C10-TL-035A C10-TL-066B C10-TL-068B C10-TL-070B C10-TL-102B C10-TL-109A C10-TL-107A C10-TL-164A C10-TL-201A C12-TL-520A C12-TL-519A C12-TL-518A C12-TL-516A C12-TL-515A C12-TL-514 C12-TL-512A C12-TL-511A C12-D001-04 C12-EMH-001 C10-D030-04 C10-EMH-012 C10-D031-04 C10-EMH-013 C10-D029-04 C10-EMH-011 C10-D026-04 CABLE C10-TL-201 CABLE

Page 65 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
3C X 25 SQ.MM, 0.6/1kV
Pull Length(m): 242 No. of Cables: 1 Type Code: 30256 End Length(m): 5 Elevation: Schematic: ED-693249

Cable: C10BJD1029
Seg Code: L System: BJD Startup Code:

Service: 220V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 218 11 229 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693249 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJD Compartment: 3.1 Description: BLK-1 / INST AIR MCC-B Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-SA-61-AN-002 Compartment: Description: IA/SA BLDG-ELECT RM- MSU-IU-002 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681141

Routing Information: Remarks: Route: CABLE C10-TL-008A C10-TL-035A C10-TL-066B C10-TL-068B C10-TL-070B C10-TL-102B C10-TL-109A C10-TL-107A C10-TL-164A C10-TL-201A C12-TL-520A C12-TL-519A C12-TL-518A C12-TL-516A C12-TL-515A C12-TL-514 C12-TL-512A C12-TL-511A C12-D001-04 C12-EMH-001 C10-D030-04 C10-EMH-012 C10-D031-04 C10-EMH-013 C10-D029-04 C10-EMH-011 C10-D026-04 CABLE C10-TL-201 CABLE

Cable: C10BJD1030
Seg Code: L System: BJD Startup Code:

Rev: 00

Description:

3C X 25 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 30256 End Length(m): 5 Elevation: Schematic: ED-693249

Service: 220V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 146 8 154 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693249 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJD Compartment: 3.1 Description: BLK-1 / INST AIR MCC-B Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-SA-61-AN-017 Compartment: Description: STG-NOVEC RM- MSU-IU-001 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-006C C10-TL-005D C10-TL-004B C10-TL-016A CABLE C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-098 C14-TL-067 C14-TL-066 C14-TL-070 CABLE

Cable: C10BJD1031
Seg Code: L System: BJD Startup Code:

Rev: 00

Description:

3C X 25 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 30256 End Length(m): 5 Elevation: Schematic: ED-693249

Service: 220V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 146 8 154 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693249 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJD Compartment: 3.1 Description: BLK-1 / INST AIR MCC-B Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-SA-61-AN-018 Compartment: Description: STG-NOVEC RM-MSU-IU-002 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-006C C10-TL-005D C10-TL-004B C10-TL-016A CABLE C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-098 C14-TL-067 C14-TL-066 C14-TL-070 CABLE

Page 66 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
3C X 2.5 SQ.MM, 0.6/1kV
Pull Length(m): 45 No. of Cables: 1 Type Code: 30026 End Length(m): 8 Elevation: Schematic: ED-693249

Cable: C10BJD1033
Seg Code: L System: BJD Startup Code:

Service: 220V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 30 4 34 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693249 7

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJD Compartment: 3.1 Description: BLK-1 / INST AIR MCC-B Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-036C C10-TL-065B C10-TL-071 CABLE

Cable To End: Equipment No: C10BBE Compartment: Description: 4.16KV UNIT SWBD BUS A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BJD1034
Seg Code: L System: BJD Startup Code:

Rev: 02

Description:

3C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 68 No. of Cables: 1 Type Code: 30026 End Length(m): 7 Elevation: Schematic: ED-693249

Service: 220V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 51 4 55 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693249 7

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJD Compartment: 3.1 Description: BLK-1 / INST AIR MCC-B Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BBF Compartment: Description: 4.16KV UNIT SWBD BUS B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-034 C10-TL-036D C10-TL-064D C10-TL-062 C10-TL-058D C10-TL-055D C10-TL-056 C10-TL-082 CABLE

Cable: C10BJD1035
Seg Code: L System: BJD Startup Code:

Rev: 01

Description:

3C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 32 No. of Cables: 1 Type Code: 30156 End Length(m): 7 Elevation: Schematic: ED-693249

Service: 220V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 27 3 30 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693249 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJD Compartment: 3.1 Description: BLK-1 / INST AIR MCC-B Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10CHA03 Description: UAT AVR PNL (BLK-1) Equip Location: Zone: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-034 C10-TL-036D C10-TL-064D C10-TL-062 CABLE

Cable: C10BJD1036
Seg Code: L System: BJD Startup Code:

Rev: 01

Description:

3C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 31 No. of Cables: 1 Type Code: 30156 End Length(m): 7 Elevation: Schematic: ED-693249

Service: 220V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 27 3 30 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693249 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJD Compartment: 3.1 Description: BLK-1 / INST AIR MCC-B Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10CHA01 Compartment: Description: UAT PROTECTION PNL-1 (BLK-1) North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-034 C10-TL-036D C10-TL-064D C10-TL-062 CABLE

Page 67 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
3C X 2.5 SQ.MM, 0.6/1kV
Pull Length(m): 42 No. of Cables: 1 Type Code: 30026 End Length(m): 7 Elevation: Schematic: ED-693249

Cable: C10BJD1037
Seg Code: L System: BJD Startup Code:

Service: 220V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 35 4 39 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693249 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJD Compartment: 3.1 Description: BLK-1 / INST AIR MCC-B Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BTL01 Compartment: Description: 125V BATTERY CHARGER-A FOR BLK-1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-006A C10-TL-010A C10-TL-011A C10-TL-032A C10-TL-031A C10-TL-030A C10-TL-039A C10-TL-059A C10-TL-043A C10-TL-044A CABLE

Cable: C10BJD1038
Seg Code: L System: BJD Startup Code:

Rev: 02

Description:

3C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 53 No. of Cables: 1 Type Code: 30026 End Length(m): 7 Elevation: Schematic: ED-693249

Service: 220V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 47 4 51 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693249 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJD Compartment: 3.1 Description: BLK-1 / INST AIR MCC-B Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BRA Compartment: Description: 120V AC BLK-1 UPSDB-1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-006C C10-TL-005D C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-019 C10-TL-045 C10-TL-046 C10-TL-120 C10-TL-123 CABLE

Cable: C10BJD1039
Seg Code: L System: BJD Startup Code:

Rev: 02

Description:

3C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 64 No. of Cables: 1 Type Code: 30026 End Length(m): 7 Elevation: Schematic: ED-693249

Service: 220V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 57 5 62 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693249 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJD Compartment: 3.1 Description: BLK-1 / INST AIR MCC-B Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-006C C10-TL-005D C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-019 C10-TL-045 C10-TL-046 C10-TL-120 C10-TL-123 C10-TL-126 C10-TL-129 CABLE

Cable: C10BJD1040
Seg Code: L System: BJD Startup Code:

Rev: 01

Description:

3C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 31 No. of Cables: 1 Type Code: 30156 End Length(m): 7 Elevation: Schematic: ED-693249

Service: 220V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 27 3 30 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693249 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJD Compartment: 3.1 Description: BLK-1 / INST AIR MCC-B Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10CHD01 Compartment: Description: UNIT 4.16KV SWBD (BLK-1) HSBT PANEL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-034 C10-TL-036D C10-TL-064D C10-TL-062 CABLE

Page 68 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
3C X 4 SQ.MM, 0.6/1kV
Pull Length(m): 163 No. of Cables: 1 Type Code: 30046 End Length(m): 7 Elevation: Schematic: ED-693249

Cable: C10BJD1041
Seg Code: L System: BJD Startup Code:

Service: 220V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 156 8 164 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693249 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJD Compartment: 3.1 Description: BLK-1 / INST AIR MCC-B Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10CHB01 Compartment: Description: GSU#1 MECHANICAL PROTECTION PANEL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-006B C10-TL-010B C10-TL-011B C10-TL-037B C10-TL-063B C10-TL-060B C10-TL-059B C10-TL-043B C10-TL-044B C10-TL-053B C10-TL-051A C10-TL-025A C10-TL-219A C10-TL-218A C10-TL-217A C10-TL-221A C14-TL-202B C14-TL-204B C14-TL-207B C14-TL-049B C14-TL-050B C14-TL-052A C14-TL-053A C14-TL-054A C14-TL-055A C14-TL-056A CABLE

Cable: C10BJD1042
Seg Code: L System: BJD Startup Code:

Rev: 00

Description:

4C X 35 SQ.MM, 0.6/1kV
Pull Length(m): 181 No. of Cables: 1 Type Code: 40356 End Length(m): 10 Elevation: Schematic: ED-693250

Service: ROOF TOP PACKAGE UNIT-2 STG BLDG


Routed Length (m): Allowance (m): Total Length (m): 153 8 161 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693250 15

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJD Compartment: 5.2.1 Description: BLK-1 / INST AIR MCC-B Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-SA-61-AN-016 Compartment: Description: STG-ELECT RM- RTPU-002 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-006C C10-TL-005D C10-TL-004B CABLE C10-TL-003A C10-TL-002A C10-TL-024A C10-TL-023A C10-TL-223A C10-TL-222A C14-TL-202A C14-TL-204A C14-TL-207A C14-TL-049A C14-TL-050A C14-C-1044

Cable: C10BJD1043
Seg Code: L System: BJD Startup Code:

Rev: 00

Description:

4C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 244 No. of Cables: 1 Type Code: 40026 End Length(m): 5 Elevation: Schematic: ED-693251

Service: FAF-CA-2 AIR COMP BLDG


Routed Length (m): Allowance (m): Total Length (m): 240 11 251 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693251 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJD Compartment: 5.2.2 Description: BLK-1 / INST AIR MCC-B Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-SA-62-AN-002 Compartment: Description: IA/SA BLDG-PLANT RM- FAF-002 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681141

Routing Information: Remarks: Route: CABLE C10-TL-008A C10-TL-035A C10-TL-066B C10-TL-068B C10-TL-070B C10-TL-102B C10-TL-109A C10-TL-107A C10-TL-164A C10-TL-201A C12-TL-520A C12-TL-519A C12-TL-518A C12-TL-516A C12-TL-515A C12-TL-514 C12-TL-512A C12-TL-511A C12-D001-04 C12-EMH-001 C10-D030-04 C10-EMH-012 C10-D031-04 C10-EMH-013 C10-D029-04 C10-EMH-011 C10-D026-04 CABLE C10-TL-201 CABLE C10-D027-04 C10-C-1024

Page 69 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
4C X 35 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40356 End Length(m): 5 Elevation: Schematic: ED-693252

Cable: C10BJD1044
Seg Code: L System: BJD Startup Code:

Service: WELDING RECEPTACLE AIR COMPRESSOR BLDG


Routed Length (m): Allowance (m): Total Length (m): 24 3 27 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693252 6

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJD Compartment: 5.1.1 Description: BLK-1 / INST AIR MCC-B Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJS02 Compartment: Description: WELDING RECEPTACLE-2 FOR BLOCK-1 (63A) North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-006B C10-TL-005B C10-TL-013A C10-TL-014A C10-TL-030B CABLE

Cable: C10BJD1045
Seg Code: L System: BJD Startup Code:

Rev: 03

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 196 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-693253

Service: MOV AT AUX. STM DRN POT TO ATM COND RER TNK HDR ISO MOV
Routed Length (m): Allowance (m): Total Length (m): 177 9 186 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJD Compartment: 5.1.2 Description: BLK-1 / INST AIR MCC-B Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-LBG-46-AA-018 Compartment: End Length(m): 15 Description: C10 AUX DRN 034/CST MOV North: 1783.40 Equip Location: Zone: East: 2341.00 Elevation: 13.10 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-693253

Routing Information: Remarks: Route: CABLE C10-TL-006C C10-TL-005C C10-TL-004A CABLE C10-TL-003B C10-TL-002B C10-TL-024B C10-TL-023B C10-TL-223B C10-TL-222B C14-TL-202C C14-TL-204C C14-TL-207C C14-TL-049C C14-TL-099A C14-TL-097A C14-TL-093A C14-TL-091A CABLE C14-TL-089 C14-TL-087 C14-TL-085 C14-TL-083 C14-TL-082 FIELD ROUTED

Cable: C10BJD1047
Seg Code: L System: BJD Startup Code:

Rev: 00

Description:

3C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 180 No. of Cables: 1 Type Code: 30156 End Length(m): 7 Elevation: Schematic: ED-693249

Service: 220V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 161 8 169 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693249 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJD Compartment: 3.1 Description: BLK-1 / INST AIR MCC-B Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BRI Compartment: Description: 120V AC STG UPS-1 SUB-DB North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-007B C10-TL-006B C10-TL-010B C10-TL-011B C10-TL-037B C10-TL-063B C10-TL-060B C10-TL-059B C10-TL-043B C10-TL-044B C10-TL-053B C10-TL-051A C10-TL-025A C10-TL-219A C10-TL-218A C10-TL-217A C10-TL-221A C14-TL-202B C14-TL-204B C14-TL-207B C14-TL-049B C14-TL-050B C14-TL-052A C14-TL-053A C14-TL-054A C14-TL-055A C14-TL-065A CABLE

Page 70 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
3C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 185 No. of Cables: 1 Type Code: 30156 End Length(m): 7 Elevation: Schematic: ED-693249

Cable: C10BJD1048
Seg Code: L System: BJD Startup Code:

Service: 220V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 161 8 169 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693249 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJD Compartment: 3.1 Description: BLK-1 / INST AIR MCC-B Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BRE Compartment: Description: 120V AC STG UPS-2 SUB-DB North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-007B C10-TL-006B C10-TL-010B C10-TL-011B C10-TL-037B C10-TL-063B C10-TL-060B C10-TL-059B C10-TL-043B C10-TL-044B C10-TL-053B C10-TL-051A C10-TL-025A C10-TL-219A C10-TL-218A C10-TL-217A C10-TL-221A C14-TL-202B C14-TL-204B C14-TL-207B C14-TL-049B C14-TL-050B C14-TL-052A C14-TL-053A C14-TL-054A C14-TL-055A C14-TL-065A CABLE

Cable: C10BJD1049
Seg Code: L System: BJD Startup Code:

Rev: 01

Description:

3C X 4 SQ.MM, 0.6/1kV
Pull Length(m): 33 No. of Cables: 1 Type Code: 30046 End Length(m): 7 Elevation: Schematic: ED-693249

Service: 220V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 27 3 30 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693249 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJD Compartment: 3.1 Description: BLK-1 / INST AIR MCC-B Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10CEJ01 Compartment: Description: 4.16KV UNIT SWGR FAULT RECORDER PANEL-1 (BLK-1) North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-034 C10-TL-036D C10-TL-064D C10-TL-062 CABLE

Cable: C10BJD1050
Seg Code: L System: BJD Startup Code:

Rev: 00

Description:

3C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 175 No. of Cables: 1 Type Code: 30156 End Length(m): 7 Elevation: Schematic: ED-693249

Service: 220V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 154 8 162 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693249 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJD Compartment: 3.1 Description: BLK-1 / INST AIR MCC-B Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BUB Compartment: Description: 125V DC STG DC SUB-DB North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-007B C10-TL-006B C10-TL-010B C10-TL-011B C10-TL-037B C10-TL-063B C10-TL-060B C10-TL-059B C10-TL-043B C10-TL-044B C10-TL-053B C10-TL-051A C10-TL-025A C10-TL-219A C10-TL-218A C10-TL-217A C10-TL-221A C14-TL-202B C14-TL-204B C14-TL-207B C14-TL-049B C14-TL-050B C14-TL-052A C14-TL-059A C14-TL-060A C14-TL-061A CABLE

Page 71 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
4C X 35 SQ.MM, 0.6/1kV
Pull Length(m): 236 No. of Cables: 1 Type Code: 40356 End Length(m): 5 Elevation: Schematic: ED-693252

Cable: C10BJD1051
Seg Code: L System: BJD Startup Code:

Service: WELDING RECEPTACLE AIR COMPRESSOR BLDG


Routed Length (m): Allowance (m): Total Length (m): 245 12 257 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693252 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJS02 Compartment: Description: WELDING RECEPTACLE-2 FOR BLOCK-1 (63A) Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJS26 Compartment: Description: WELDING RECEPTACLE FOR AIR COMP BUILDING (63A) North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681141

Routing Information: Remarks: Route: CABLE C10-TL-030A C10-TL-031A C10-TL-032A C10-TL-011A C10-TL-009A C10-TL-008A C10-TL-035A C10-TL-066B C10-TL-068B C10-TL-070B C10-TL-102B C10-TL-109A C10-TL-107A C10-TL-164A C10-TL-201A C12-TL-520A C12-TL-519A C12-TL-518A C12-TL-516A C12-TL-515A C12-TL-514 C12-TL-512A C12-TL-511A C12-D001-01 C12-EMH-001 C10-D030-01 C10-EMH-012 C10-D031-01 C10-EMH-013 C10-D029-01 C10-EMH-011 C10-D026-01 C10-TL-201 C10-D027-09 C10-C-1021

Cable: C10BJD1052
Seg Code: L System: BJD Startup Code:

Rev: 00

Description:

3C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): No. of Cables: 1 Type Code: 30156 End Length(m): 7 Elevation: Schematic: ED-693249

Service: 220V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 156 8 164 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693249 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJD Compartment: 3.1 Description: BLK-1 / INST AIR MCC-B Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10CHB02 Compartment: Description: STG#1 INTERFACE PANEL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-006B C10-TL-010B C10-TL-011B C10-TL-037B C10-TL-063B C10-TL-060B C10-TL-059B C10-TL-043B C10-TL-044B C10-TL-053B C10-TL-051A C10-TL-025A C10-TL-219A C10-TL-218A C10-TL-217A C10-TL-221A C14-TL-202B C14-TL-204B C14-TL-207B C14-TL-049B C14-TL-050B C14-TL-052A C14-TL-053A C14-TL-054A C14-TL-055A C14-TL-056A CABLE

Cable: C10BJD1053
Seg Code: L System: BJD Startup Code:

Rev: 00

Description:

3C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): No. of Cables: 1 Type Code: 30156 End Length(m): 7 Elevation: Schematic: ED-693249

Service: 220V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 156 8 164 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693249 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJD Compartment: 3.1 Description: BLK-1 / INST AIR MCC-B Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10CHC01 Compartment: Description: GSU BLK-1 RTCC PNL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-006B C10-TL-010B C10-TL-011B C10-TL-037B C10-TL-063B C10-TL-060B C10-TL-059B C10-TL-043B C10-TL-044B C10-TL-053B C10-TL-051A C10-TL-025A C10-TL-219A C10-TL-218A C10-TL-217A C10-TL-221A C14-TL-202B C14-TL-204B C14-TL-207B C14-TL-049B C14-TL-050B C14-TL-052A C14-TL-053A C14-TL-054A C14-TL-055A C14-TL-056A CABLE

Page 72 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
3C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 30156 End Length(m): 5 Elevation: Schematic: ED-693249

Cable: C10BJD1054
Seg Code: L System: BJD Startup Code:

Service: 220V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 187 9 196 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693249 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJD Compartment: 3.1 Description: BLK-1 / INST AIR MCC-B Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BBT01 Compartment: Description: UNIT AUXILIARY XFMR (UAT) BLK-1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-007A C10-TL-006A C10-TL-010A C10-TL-011A C10-TL-037A C10-TL-063A C10-TL-060A C10-TL-039A C10-TL-029A C10-TL-015A C10-TL-003A C10-TL-002A C10-TL-001A C10-TL-226A C10-TL-225A C14-TL-201A C14-TL-203A C14-TL-205A C10-EMH-007 C10-D065-05 C10-EMH-006 C10-D064-13 CABLE

Cable: C10BJD1055
Seg Code: L System: BJD Startup Code:

Rev: 00

Description:

4C X 70 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40706 End Length(m): 10 Elevation: Schematic: ED-693234

Service: WELDING RECEPTACLES GSU/UAT + LUBE OIL PURIFIER


Routed Length (m): Allowance (m): Total Length (m): 59 5 64 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693234 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJD10GA Compartment: Description: JB FOR BLOCK-1 GSU/UAT WELDING RECEPTACLE Equip Location: Zone: North: East: Location Dwg: EA-681111 Wiring Dwg:

Cable To End: Equipment No: C10BJS04 Compartment: Description: WELDING RECEPTACLE FOR GSU/UAT (63A) North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: FIELD ROUTED C10-D063-01 C10-EMH-006 C10-D064-04 C14-C-1042

Cable: C10BJD1056
Seg Code: L System: BJD Startup Code:

Rev: 00

Description:

4C X 70 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40706 End Length(m): 10 Elevation: Schematic: ED-693234

Service: WELDING RECEPTACLES GSU/UAT + LUBE OIL PURIFIER


Routed Length (m): Allowance (m): Total Length (m): 26 3 29 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693234 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJD10GA Compartment: Description: JB FOR BLOCK-1 GSU/UAT WELDING RECEPTACLE Equip Location: Zone: North: East: Location Dwg: EA-681111 Wiring Dwg:

Cable To End: Equipment No: C10BJS05 Compartment: Description: WELDING RECEPTACLE FOR STG BUILDING (63A) North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: FIELD ROUTED C14-TL-053A C14-TL-059A C14-TL-060A C14-TL-061A CABLE

Page 73 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
3C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 250 No. of Cables: 1 Type Code: 30156 End Length(m): 7 Elevation: Schematic: ED-693249

Cable: C10BJD1057
Seg Code: L System: BJD Startup Code:

Service: 220V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 27 3 30 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693249 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJD Compartment: 3.1 Description: BLK-1 / INST AIR MCC-B Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10CMA01 Compartment: Description: 4.16KV UNIT SWGR DATA RETRIEVAL PANEL (BLK-1) North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-034 C10-TL-036D C10-TL-064D C10-TL-062 CABLE

Cable: C10BJE1001
Seg Code: L System: BJE Startup Code:

Rev: 02

Description:

3C X 4 SQ.MM, 0.6/1kV
Pull Length(m): 196 No. of Cables: 1 Type Code: 30046 End Length(m): 5 Elevation: Schematic: ED-692403

Service: GENERATOR SPACE HEATER (23HG-1,2)


Routed Length (m): Allowance (m): Total Length (m): 177 9 186 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692403 30

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 5.1.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10JB508 Compartment: Description: JUNCTION BOX- JB/508 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: CABLE NOT REQUIRED AS PER LATEST MSD Route: CABLE C10-TL-063C C10-TL-060C C10-TL-059C C10-TL-043C C10-TL-042C C10-TL-017C C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-098 C14-TL-067 C14-TL-066 C14-TL-071 C14-C-1266

Cable: C10BJE1002
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

4C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 255 No. of Cables: 1 Type Code: 40026 End Length(m): 5 Elevation: Schematic: ED-692404

Service: VAPOR EXTRACTOR MOTOR NO 2 (VXM-2)


Routed Length (m): Allowance (m): Total Length (m): 233 11 244 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692404 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 1.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10JBVXM2 Compartment: Description: JUNCTION BOX- JB/VXM-2 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-064A C10-TL-063A C10-TL-060A C10-TL-059A C10-TL-043A C10-TL-042A C10-TL-017A C10-TL-018A C10-TL-020A C10-TL-023A C10-TL-223A C10-TL-222A C14-TL-202A C14-TL-204A C14-TL-207A C14-TL-049A C14-TL-050A C14-TL-051 C14-TL-002 C14-TL-006B C14-TL-008C C14-TL-009B C14-TL-011B C14-TL-012 C14-TL-025 C14-TL-026 C14-TL-027B C14-TL-029 C14-C-1267

Page 74 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
3C X 240 SQ.MM, 0.6/1kV
Pull Length(m): 228 No. of Cables: 1 Type Code: 32406 End Length(m): 5 Elevation: Schematic: ED-692405

Cable: C10BJE1003
Seg Code: L System: BJE Startup Code:

Service: LUBE OIL PUMP MOTOR-2 (BPM-2)


Routed Length (m): Allowance (m): Total Length (m): 228 11 239 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692405 10

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 1.8 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10JBBPM2 Compartment: Description: JUNCTION BOX- JB/BPM-2 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-064A C10-TL-063A C10-TL-060A C10-TL-059A C10-TL-043A C10-TL-042A C10-TL-017A C10-TL-018A C10-TL-020A C10-TL-023A C10-TL-223A C10-TL-222A C14-TL-202A C14-TL-204A C14-TL-207A C14-TL-049A C14-TL-050A C14-TL-051 C14-TL-002 C14-TL-006B C14-TL-008C C14-TL-009B C14-TL-011B C14-TL-012 C14-TL-025 C14-TL-026 C14-TL-027B C14-C-1270

Cable: C10BJE1004
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

4C X 25 SQ.MM, 0.6/1kV
Pull Length(m): 194 No. of Cables: 1 Type Code: 40256 End Length(m): 5 Elevation: Schematic: ED-692406

Service: GLAND EXHAUSTER BLOWER MOTOR NO 1


Routed Length (m): Allowance (m): Total Length (m): 188 9 197 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692406 20

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 1.4 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10JBGXM1 Compartment: Description: JUNCTION BOX- JB/GXM-1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-064C C10-TL-063C C10-TL-060C C10-TL-059C C10-TL-043C C10-TL-042C C10-TL-017C C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-097B C14-TL-093B C14-TL-091B C14-TL-089 C14-TL-088 C14-TL-090 C14-C-1272

Cable: C10BJE1005
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

4C X 25 SQ.MM, 0.6/1kV
Pull Length(m): 194 No. of Cables: 1 Type Code: 40256 End Length(m): 5 Elevation: Schematic: ED-692407

Service: GLAND EXHAUSTER BLOWER MOTOR NO 2


Routed Length (m): Allowance (m): Total Length (m): 188 9 197 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692407 20

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 1.5 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10JBGXM2 Compartment: Description: JUNCTION BOX- JB/GXM-2 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-064C C10-TL-063C C10-TL-060C C10-TL-059C C10-TL-043C C10-TL-042C C10-TL-017C C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-097B C14-TL-093B C14-TL-091B C14-TL-089 C14-TL-088 C14-TL-090 C14-C-1274

Page 75 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
4C X 25 SQ.MM, 0.6/1kV
Pull Length(m): 248 No. of Cables: 1 Type Code: 40256 End Length(m): 5 Elevation: Schematic: ED-692408

Cable: C10BJE1006
Seg Code: L System: BJE Startup Code:

Service: HYDRAULIC FLUID PUMP MOTOR-A (HFPM-A)


Routed Length (m): Allowance (m): Total Length (m): 240 11 251 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692408 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 1.6 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10JBHFPMA Compartment: Description: JUNCTION BOX- JB/HFPM-A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-064A C10-TL-063A C10-TL-060A C10-TL-059A C10-TL-043A C10-TL-042A C10-TL-017A C10-TL-018A C10-TL-020A C10-TL-023A C10-TL-223A C10-TL-222A C14-TL-202A C14-TL-204A C14-TL-207A C14-TL-049A C14-TL-050A C14-TL-051 C14-TL-002 C14-TL-006B C14-TL-008C C14-TL-009B C14-TL-011B C14-TL-012 C14-TL-025 C14-TL-026 C14-TL-030B C14-TL-031 C14-TL-033 C14-TL-034 C14-C-1276

Cable: C10BJE1007
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

4C X 25 SQ.MM, 0.6/1kV
Pull Length(m): 242 No. of Cables: 1 Type Code: 40256 End Length(m): 5 Elevation: Schematic: ED-692409

Service: HYDRAULIC FLUID PUMP MOTOR-B (HFPM-B)


Routed Length (m): Allowance (m): Total Length (m): 233 11 244 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692409 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 1.7 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10JBHFPMB Compartment: Description: JUNCTION BOX- JB/HFPM-B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-064A C10-TL-063A C10-TL-060A C10-TL-059A C10-TL-043A C10-TL-042A C10-TL-017A C10-TL-018A C10-TL-020A C10-TL-023A C10-TL-223A C10-TL-222A C14-TL-202A C14-TL-204A C14-TL-207A C14-TL-049A C14-TL-050A C14-TL-051 C14-TL-002 C14-TL-006B C14-TL-008C C14-TL-009B C14-TL-011B C14-TL-012 C14-TL-025 C14-TL-026 C14-TL-027B C14-TL-029 C14-C-1278

Cable: C10BJE1008
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): 255 No. of Cables: 1 Type Code: 40046 End Length(m): 5 Elevation: Schematic: ED-692410

Service: HEATING/COOLING CIRCULATION PUMP MOTOR (HCCM)


Routed Length (m): Allowance (m): Total Length (m): 234 11 245 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692410 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 1.3 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10JBHCCM Compartment: Description: JUNCTION BOX- JB/HCCM North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-064A C10-TL-063A C10-TL-060A C10-TL-059A C10-TL-043A C10-TL-042A C10-TL-017A C10-TL-018A C10-TL-020A C10-TL-023A C10-TL-223A C10-TL-222A C14-TL-202A C14-TL-204A C14-TL-207A C14-TL-049A C14-TL-050A C14-TL-051 C14-TL-002 C14-TL-006B C14-TL-008C C14-TL-009B C14-TL-011B C14-TL-012 C14-TL-025 C14-TL-026 C14-TL-030B C14-TL-031 C14-C-1279

Page 76 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
4C X 2.5 SQ.MM, 0.6/1kV
Pull Length(m): 148 No. of Cables: 1 Type Code: 40026 End Length(m): 5 Elevation: Schematic: ED-692412

Cable: C10BJE1010
Seg Code: L System: BJE Startup Code:

Service: EXCITATION FAN-1


Routed Length (m): Allowance (m): Total Length (m): 132 7 139 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692412 3

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 2.2 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-FP-FU1 Compartment: Description: GENERATOR EXCITATION SKID FAN-1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: CABLE ROUTED UPTO- C101017 CONSIDERING IT IS TERMINATED IN THE FUSE BOX (FP-FU-1). Route: CABLE C10-TL-063B C10-TL-060B C10-TL-059B C10-TL-043B C10-TL-044B C10-TL-053B C10-TL-051A C10-TL-025A C10-TL-219A C10-TL-218A C10-TL-217A C10-TL-221A C14-TL-202B C14-TL-204B C14-TL-207B C14-TL-049B C14-TL-050B C14-TL-052A C14-TL-059A C14-TL-058A CABLE

Cable: C10BJE1011
Seg Code: L System: BJE Startup Code:

Rev: 00

Description:

4C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 172 No. of Cables: 1 Type Code: 40026 End Length(m): 8 Elevation: Schematic: ED-692413

Service: EXCITATION FAN-2


Routed Length (m): Allowance (m): Total Length (m): 163 9 172 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692413 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 2.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-FP-FU2 Compartment: Description: GENERATOR EXCITATION SKID FAN-2 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: CABLE ROUTED UPTO- C101017 CONSIDERING IT IS TERMINATED IN THE FUSE BOX (FP-FU-2). Route: CABLE C10-TL-063D C10-TL-060D C10-TL-059D C10-TL-043D C10-TL-044C C10-TL-053C C10-TL-051B C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-211 C14-TL-212 C14-TL-043 C14-TL-042 C14-TL-040 C14-C-1220

Cable: C10BJE1012
Seg Code: L System: BJE Startup Code:

Rev: 00

Description:

4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): 211 No. of Cables: 1 Type Code: 40046 End Length(m): 5 Elevation: Schematic: ED-692414

Service: GAS DRYER BLOWER MOTOR (FM-2996IA/B)


Routed Length (m): Allowance (m): Total Length (m): 191 10 201 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 1.2 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10JBR6B Compartment: End Length(m): 30 Description: DISCONNECT SWITCH FOR HYDROGEN DRYER FM-2996A/B North: Equip Location: Zone: East: Elevation: Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-692414

Routing Information: Remarks: Route: CABLE C10-TL-060C C10-TL-059C C10-TL-043C C10-TL-042C C10-TL-017C C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-098 C14-TL-067 C14-TL-066 C14-TL-071 C14-TL-073 CABLE

Page 77 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
3C X 150 SQ.MM, 0.6/1kV
Pull Length(m): 226 No. of Cables: 1 Type Code: 31506 End Length(m): 5 Elevation: Schematic: ED-692415

Cable: C10BJE1013
Seg Code: L System: BJE Startup Code:

Service: AUX. CIRC WATER BOOSTER PUMP-1 QCCPP FACILITIES


Routed Length (m): Allowance (m): Total Length (m): 243 12 255 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 1.9 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-PGP-56-AP-001 Compartment: End Length(m): 10 Description: AUXILIARY COOLING WATER BOOSTER PUMP North: 1725.20 Equip Location: Zone: East: 2359.80 Elevation: 5.10 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-692415

Routing Information: Remarks: Route: CABLE C10-TL-064A C10-TL-063A C10-TL-060A C10-TL-059A C10-TL-043A C10-TL-042A C10-TL-017A C10-TL-018A C10-TL-020A C10-TL-023A C10-TL-223A C10-TL-222A C14-TL-202A C14-TL-204A C14-TL-207A C14-TL-049A C14-TL-050A C14-TL-051 C14-TL-002 C14-TL-006B C14-TL-008C C14-TL-009B C14-TL-011B C14-TL-012 C14-TL-013 C14-TL-014 C14-TL-015 C14-TL-016 C14-C-1001

Cable: C10BJE1014
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

3C X 150 SQ.MM, 0.6/1kV


Pull Length(m): 213 No. of Cables: 1 Type Code: 31506 End Length(m): 5 Elevation: Schematic: ED-692416

Service: AUX. CIRC WATER BOOSTER PUMP-2 QCCPP FACILITIES


Routed Length (m): Allowance (m): Total Length (m): 235 11 246 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 2.11 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-PGP-56-AP-002 Compartment: End Length(m): 10 Description: AUXILIARY COOLING WATER BOOSTER PUMP North: 1725.20 Equip Location: Zone: East: 2355.80 Elevation: 5.10 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-692416

Routing Information: Remarks: Route: CABLE C10-TL-064A C10-TL-063A C10-TL-060A C10-TL-059A C10-TL-043A C10-TL-042A C10-TL-017A C10-TL-018A C10-TL-020A C10-TL-023A C10-TL-223A C10-TL-222A C14-TL-202A C14-TL-204A C14-TL-207A C14-TL-049A C14-TL-050A C14-TL-051 C14-TL-002 C14-TL-006B C14-TL-008C C14-TL-009B C14-TL-011B C14-TL-012 C14-TL-013 C14-TL-014 C14-TL-015 C14-C-1002

Cable: C10BJE1015
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): 206 No. of Cables: 1 Type Code: 40046 End Length(m): 7 Elevation: Schematic: ED-692417

Service: CEP-1 DISCHARGE ISOLATION MOV


Routed Length (m): Allowance (m): Total Length (m): 187 9 196 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 5.1.2 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-LCA-46-AA-001 Compartment: End Length(m): 10 Description: C10 COND/CEP-A DIS MOV North: 1741.30 Equip Location: Zone: East: 2319.30 Elevation: 5.80 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-692417

Routing Information: Remarks: Route: CABLE C10-TL-063A C10-TL-060A C10-TL-059A C10-TL-043A C10-TL-042A C10-TL-017A C10-TL-018A C10-TL-020A C10-TL-023A C10-TL-223A C10-TL-222A C14-TL-202A C14-TL-204A C14-TL-207A C14-TL-049A C14-TL-050A C14-TL-051 C14-TL-002 C14-TL-006B C14-TL-007 C14-C-1003

Page 78 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): 206 No. of Cables: 1 Type Code: 40046 End Length(m): 7 Elevation: Schematic: ED-692418

Cable: C10BJE1016
Seg Code: L System: BJE Startup Code:

Service: CEP-2 DISCHARGE ISOLATION MOV


Routed Length (m): Allowance (m): Total Length (m): 187 9 196 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 5.2.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-LCA-46-AA-002 Compartment: End Length(m): 10 Description: C10 COND/CEP-B DIS MOV North: 1743.80 Equip Location: Zone: East: 2319.30 Elevation: 5.80 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-692418

Routing Information: Remarks: Route: CABLE C10-TL-063A C10-TL-060A C10-TL-059A C10-TL-043A C10-TL-042A C10-TL-017A C10-TL-018A C10-TL-020A C10-TL-023A C10-TL-223A C10-TL-222A C14-TL-202A C14-TL-204A C14-TL-207A C14-TL-049A C14-TL-050A C14-TL-051 C14-TL-002 C14-TL-006B C14-TL-007 C14-C-1004

Cable: C10BJE1017
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): 200 No. of Cables: 1 Type Code: 40046 End Length(m): 7 Elevation: Schematic: ED-692419

Service: CEP-3 DISCHARGE ISOLATION MOV


Routed Length (m): Allowance (m): Total Length (m): 187 9 196 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 5.2.2 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-LCA-46-AA-003 Compartment: End Length(m): 10 Description: C10 COND/CEP-C DIS MOV North: 1746.30 Equip Location: Zone: East: 2319.30 Elevation: 5.80 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-692419

Routing Information: Remarks: Route: CABLE C10-TL-063A C10-TL-060A C10-TL-059A C10-TL-043A C10-TL-042A C10-TL-017A C10-TL-018A C10-TL-020A C10-TL-023A C10-TL-223A C10-TL-222A C14-TL-202A C14-TL-204A C14-TL-207A C14-TL-049A C14-TL-050A C14-TL-051 C14-TL-002 C14-TL-006B C14-TL-007 C14-C-1005

Cable: C10BJE1018
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

4C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 170 No. of Cables: 1 Type Code: 40026 End Length(m): 10 Elevation: Schematic: ED-692420

Service: CEP MIN. RECIRCULATION BYPASS MOV


Routed Length (m): Allowance (m): Total Length (m): 154 8 162 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 5.3.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-LCA-46-AA-004 Compartment: End Length(m): 13 Description: C10 COND/MIN RECIRC CV BYP MOV North: 1771.40 Equip Location: Zone: East: 2316.20 Elevation: 13.40 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-692420

Routing Information: Remarks: Route: CABLE C10-TL-063B C10-TL-060B C10-TL-059B C10-TL-043B C10-TL-042B C10-TL-017B C10-TL-018B C10-TL-020B C10-TL-023B C10-TL-223B C10-TL-222B C14-TL-202C C14-TL-204C C14-TL-207C C14-TL-049C C14-TL-099A C14-TL-097A C14-TL-093A C14-C-1006

Page 79 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 129 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-692421

Cable: C10BJE1019
Seg Code: L System: BJE Startup Code:

Service: CRH LEAD DRAIN MOV


Routed Length (m): Allowance (m): Total Length (m): 122 7 129 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 9.5.2 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-LBC-46-AA-008 Compartment: End Length(m): 10 Description: C10 CRH TO AUX HDR DRN CST MOV North: 1774.48 Equip Location: Zone: East: 2308.75 Elevation: 9.72 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-692421

Routing Information: Remarks: Route: CABLE C10-TL-063D C10-TL-060D C10-TL-059D C10-TL-043D C10-TL-044C C10-TL-053C C10-TL-051B C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-210 C14-C-1007

Cable: C10BJE1022
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 190 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-692424

Service: SEAL STEAM FEED HEADER DRAIN LINE MOV


Routed Length (m): Allowance (m): Total Length (m): 177 9 186 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 9.6.2 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-MAW-48-AA-001 Compartment: End Length(m): 12 Description: C10 SEAL STM HDR LOW POINT DRN MOV North: 1760.10 Equip Location: Zone: East: 2326.90 Elevation: 4.50 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-692424

Routing Information: Remarks: Route: CABLE C10-TL-063D C10-TL-060D C10-TL-059D C10-TL-043D C10-TL-044C C10-TL-053C C10-TL-051B C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-210 C14-TL-046 C14-TL-045 C14-TL-044 C14-TL-038 C14-TL-037 C14-C-1012

Cable: C10BJE1023
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

4C X 16 SQ.MM, 0.6/1kV
Pull Length(m): 186 No. of Cables: 1 Type Code: 40166 End Length(m): 10 Elevation: Schematic: ED-692425

Service: LOCAL STARTER PANEL OF CTCS FOR CW


Routed Length (m): Allowance (m): Total Length (m): 167 9 176 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692425 12

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 13.2.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-PAH-55-GH-001 Compartment: Description: BLK-1 COND OLTCS PNL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-060D C10-TL-059D C10-TL-043D C10-TL-044C C10-TL-053C C10-TL-051B C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-210 C14-TL-046 C14-TL-045 C14-TL-044 C14-TL-038 C14-C-1008

Page 80 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
4C X 16 SQ.MM, 0.6/1kV
Pull Length(m): 265 No. of Cables: 1 Type Code: 40166 End Length(m): 5 Elevation: Schematic: ED-692426

Cable: C10BJE1024
Seg Code: L System: BJE Startup Code:

Service: LOCAL STARTER PANEL OF CTCS FOR ACW-QCCPP FACILITIES


Routed Length (m): Allowance (m): Total Length (m): 243 12 255 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692426 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 13.1.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-PGP-56-GH-001 Compartment: Description: BLK-1 H/EX OLTCS CNTL PNL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-064A C10-TL-063A C10-TL-060A C10-TL-059A C10-TL-043A C10-TL-042A C10-TL-017A C10-TL-018A C10-TL-020A C10-TL-023A C10-TL-223A C10-TL-222A C14-TL-202A C14-TL-204A C14-TL-207A C14-TL-049A C14-TL-050A C14-TL-051 C14-TL-002 C14-TL-006B C14-TL-008C C14-TL-009B C14-TL-011B C14-TL-012 C14-TL-013 C14-TL-014 C14-TL-015 C14-TL-016 C14-C-1009

Cable: C10BJE1025
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

4C X 6 SQ.MM, 0.6/1kV
Pull Length(m): 225 No. of Cables: 1 Type Code: 40066 End Length(m): 10 Elevation: Schematic: ED-692427

Service: CONDENSER INLET MOV-1


Routed Length (m): Allowance (m): Total Length (m): 208 10 218 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 5.4.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-PAB-55-AA-010 Compartment: End Length(m): 8 Description: C10 CIRC H20/COND H20 BOX IN 010 MOV North: 1756.20 Equip Location: Zone: East: 2351.10 Elevation: 5.90 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-692427

Routing Information: Remarks: Route: CABLE C10-TL-063D C10-TL-060D C10-TL-059D C10-TL-043D C10-TL-044C C10-TL-053C C10-TL-051B C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-210 C14-TL-046 C14-TL-045 C14-TL-044 C14-TL-038 C14-TL-036 C14-TL-033 C14-TL-032 C14-TL-035 C14-C-1013

Cable: C10BJE1026
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

4C X 6 SQ.MM, 0.6/1kV
Pull Length(m): 217 No. of Cables: 1 Type Code: 40066 End Length(m): 10 Elevation: Schematic: ED-692428

Service: CONDENSER INLET MOV-2


Routed Length (m): Allowance (m): Total Length (m): 205 10 215 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692428 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 5.5.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-PAB-55-AA-011 Compartment: Description: C10 CIRC H20/COND H20 BOX IN 011 MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-063D C10-TL-060D C10-TL-059D C10-TL-043D C10-TL-044C C10-TL-053C C10-TL-051B C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-210 C14-TL-046 C14-TL-045 C14-TL-044 C14-TL-038 C14-TL-036 C14-TL-033 C14-TL-032 C14-TL-035 C14-C-1014

Page 81 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
4C X 6 SQ.MM, 0.6/1kV
Pull Length(m): 225 No. of Cables: 1 Type Code: 40066 End Length(m): 10 Elevation: Schematic: ED-692429

Cable: C10BJE1027
Seg Code: L System: BJE Startup Code:

Service: CONDENSER OUTLET MOV-1


Routed Length (m): Allowance (m): Total Length (m): 205 10 215 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 5.5.2 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-PAB-55-AA-012 Compartment: End Length(m): 5 Description: C10 BALL STNR 001 DIS MOV North: 1747.10 Equip Location: Zone: East: 2351.00 Elevation: 5.90 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-692429

Routing Information: Remarks: Route: CABLE C10-TL-063D C10-TL-060D C10-TL-059D C10-TL-043D C10-TL-044C C10-TL-053C C10-TL-051B C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-210 C14-TL-046 C14-TL-045 C14-TL-044 C14-TL-038 C14-TL-036 C14-TL-033 C14-TL-032 C14-TL-035 C14-C-1015

Cable: C10BJE1028
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

4C X 6 SQ.MM, 0.6/1kV
Pull Length(m): 233 No. of Cables: 1 Type Code: 40066 End Length(m): 10 Elevation: Schematic: ED-692430

Service: CONDENSER OUTLET MOV-2


Routed Length (m): Allowance (m): Total Length (m): 213 10 223 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 5.6.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-PAB-55-AA-013 Compartment: End Length(m): 13 Description: C10 BALL STNR 002 DIS MOV North: 1761.30 Equip Location: Zone: East: 2351.00 Elevation: 5.90 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-692430

Routing Information: Remarks: Route: CABLE C10-TL-063D C10-TL-060D C10-TL-059D C10-TL-043D C10-TL-044C C10-TL-053C C10-TL-051B C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-210 C14-TL-046 C14-TL-045 C14-TL-044 C14-TL-038 C14-TL-036 C14-TL-033 C14-TL-032 C14-TL-035 C14-C-1016

Cable: C10BJE1029
Seg Code: L System: BJE Startup Code:

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 196 No. of Cables: 1 Type Code: 40156 End Length(m): 10 Elevation: Schematic: ED-692431

Service: CONDENSER WATER BOX VENT DRAIN MOV-1


Routed Length (m): Allowance (m): Total Length (m): 146 8 154 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 5.6.2 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-PAB-55-AA-007 Compartment: End Length(m): 20 Description: C10 COND/H20 BOX IN VENT 007 MOV North: 1759.20 Equip Location: Zone: East: 2322.90 Elevation: 5.30 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-692431

Routing Information: Remarks: Route: CABLE C10-TL-063D C10-TL-060D C10-TL-059D C10-TL-043D C10-TL-044C C10-TL-053C C10-TL-051B C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-210 C14-TL-046 C14-TL-045 C14-C-1010

Page 82 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 212 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-692432

Cable: C10BJE1030
Seg Code: L System: BJE Startup Code:

Service: CONDENSER WATER BOX VENT DRAIN MOV-2


Routed Length (m): Allowance (m): Total Length (m): 202 10 212 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 5.7.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-PAB-55-AA-008 Compartment: End Length(m): 15 Description: C10 COND/H20 BOX IN VENT 008 MOV North: 1749.20 Equip Location: Zone: East: 2322.90 Elevation: 5.30 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-692432

Routing Information: Remarks: Route: CABLE C10-TL-063A C10-TL-060A C10-TL-059A C10-TL-043A C10-TL-042A C10-TL-017A C10-TL-018A C10-TL-020A C10-TL-023A C10-TL-223A C10-TL-222A C14-TL-202A C14-TL-204A C14-TL-207A C14-TL-049A C14-TL-050A C14-TL-051 C14-TL-002 C14-TL-006B C14-TL-007 C14-TL-010 C14-C-1011

Cable: C10BJE1031
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

3C X 95 SQ.MM, 0.6/1kV
Pull Length(m): 180 No. of Cables: 1 Type Code: 30956 End Length(m): 11 Elevation: Schematic: ED-692433

Service: VACUUM PUMP MOTOR-1


Routed Length (m): Allowance (m): Total Length (m): 179 9 188 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692433 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 3.9 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-MAJ-47-AP-001 Compartment: Description: VACCUM PUMP MOTOR A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-063D C10-TL-060D C10-TL-059D C10-TL-043D C10-TL-044C C10-TL-053C C10-TL-051B C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-211 C14-TL-212 C14-TL-043 C14-TL-042 C14-TL-041 C10-D061-01

Cable: C10BJE1032
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

3C X 95 SQ.MM, 0.6/1kV
Pull Length(m): 183 No. of Cables: 1 Type Code: 30956 End Length(m): 11 Elevation: Schematic: ED-692434

Service: VACUUM PUMP MOTOR-2


Routed Length (m): Allowance (m): Total Length (m): 176 9 185 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692434 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 3.8 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-MAJ-47-AP-002 Compartment: Description: VACCUM PUMP MOTOR B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-063D C10-TL-060D C10-TL-059D C10-TL-043D C10-TL-044C C10-TL-053C C10-TL-051B C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-211 C14-TL-212 C14-TL-043 C14-TL-042 C14-TL-041 C10-D061-02

Page 83 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
3C X 95 SQ.MM, 0.6/1kV
Pull Length(m): 187 No. of Cables: 1 Type Code: 30956 End Length(m): 11 Elevation: Schematic: ED-692435

Cable: C10BJE1033
Seg Code: L System: BJE Startup Code:

Service: VACUUM PUMP MOTOR-3


Routed Length (m): Allowance (m): Total Length (m): 173 9 182 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692435 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 2.10 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-MAJ-47-AP-003 Compartment: Description: VACCUM PUMP MOTOR C North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-063D C10-TL-060D C10-TL-059D C10-TL-043D C10-TL-044C C10-TL-053C C10-TL-051B C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-211 C14-TL-212 C14-TL-043 C14-TL-042 C14-TL-041 C10-D061-03

Cable: C10BJE1034
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

4C X 6 SQ.MM, 0.6/1kV
Pull Length(m): 185 No. of Cables: 1 Type Code: 40066 End Length(m): 5 Elevation: Schematic: ED-692436

Service: RECIRCULATION PUMP FOR CVP-1


Routed Length (m): Allowance (m): Total Length (m): 164 9 173 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692436 9

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 2.3 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-MAJ-47-AP-004 Compartment: Description: RECIRCULATION PUMP FOR CVP A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-064D C10-TL-063D C10-TL-060D C10-TL-059D C10-TL-043D C10-TL-044C C10-TL-053C C10-TL-051B C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-211 C14-TL-212 C14-TL-043 C14-TL-042 C14-TL-040 C14-C-1017

Cable: C10BJE1035
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

4C X 6 SQ.MM, 0.6/1kV
Pull Length(m): 187 No. of Cables: 1 Type Code: 40066 End Length(m): 5 Elevation: Schematic: ED-692437

Service: RECIRCULATION PUMP FOR CVP-2


Routed Length (m): Allowance (m): Total Length (m): 170 9 179 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692437 15

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 2.4 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-MAJ-47-AP-005 Compartment: Description: RECIRCULATION PUMP FOR CVP B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-064D C10-TL-063D C10-TL-060D C10-TL-059D C10-TL-043D C10-TL-044C C10-TL-053C C10-TL-051B C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-211 C14-TL-212 C14-TL-043 C14-TL-042 C14-TL-040 C14-C-1018

Page 84 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
4C X 6 SQ.MM, 0.6/1kV
Pull Length(m): 185 No. of Cables: 1 Type Code: 40066 End Length(m): 5 Elevation: Schematic: ED-692438

Cable: C10BJE1036
Seg Code: L System: BJE Startup Code:

Service: RECIRCULATION PUMP FOR CVP-3


Routed Length (m): Allowance (m): Total Length (m): 172 9 181 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692438 17

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 2.5 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-MAJ-47-AP-006 Compartment: Description: RECIRCULATION PUMP FOR CVP C North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-064D C10-TL-063D C10-TL-060D C10-TL-059D C10-TL-043D C10-TL-044C C10-TL-053C C10-TL-051B C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-211 C14-TL-212 C14-TL-043 C14-TL-042 C14-TL-040 C14-C-1019

Cable: C10BJE1037
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

4C X 25 SQ.MM, 0.6/1kV
Pull Length(m): 157 No. of Cables: 1 Type Code: 40256 End Length(m): 5 Elevation: Schematic: ED-692439

Service: WATERBOX PRIMING PUMP MOTOR-1


Routed Length (m): Allowance (m): Total Length (m): 149 8 157 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692439 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 3.6 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-MAJ-55-AP-011 Compartment: Description: WATER BOX PRIMING PUMP- A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-064D C10-TL-063D C10-TL-060D C10-TL-059D C10-TL-043D C10-TL-044C C10-TL-053C C10-TL-051B C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-210 C14-TL-046 C14-TL-045 C14-TL-044 C14-C-1020

Cable: C10BJE1038
Seg Code: L System: BJE Startup Code:

Rev: 02

Description:

4C X 25 SQ.MM, 0.6/1kV
Pull Length(m): 158 No. of Cables: 1 Type Code: 40256 End Length(m): 5 Elevation: Schematic: ED-692440

Service: WATERBOX PRIMING PUMP MOTOR-2


Routed Length (m): Allowance (m): Total Length (m): 149 8 157 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692440 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 3.7 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-MAJ-55-AP-012 Compartment: Description: WATER BOX PRIMING PUMP- B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-064D C10-TL-063D C10-TL-060D C10-TL-059D C10-TL-043D C10-TL-044C C10-TL-053C C10-TL-051B C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-210 C14-TL-046 C14-TL-045 C14-TL-044 C14-C-1021

Page 85 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 186 No. of Cables: 1 Type Code: 40156 End Length(m): 8 Elevation: Schematic: ED-692441

Cable: C10BJE1039
Seg Code: L System: BJE Startup Code:

Service: HP STEAM TO AUX. STEAM HEADER ISOLATION MOV


Routed Length (m): Allowance (m): Total Length (m): 163 9 172 Option 1: Option 2: Option 3: Compartment: North: 1754.30 Wiring Dwg: Shield: N Ground: Jacket: PVC End Length(m): 7

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 5.7.2 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-LBA-30-AA-001 Description: C10 HP MOV Equip Location: Zone: Location Dwg: EA-681101

East: 2227.40 Elevation: 21.00 Schematic: ED-692441

Routing Information: Remarks: Route: CABLE C10-TL-063D C10-TL-060D C10-TL-059D C10-TL-043D C10-TL-044C C10-TL-053C C10-TL-051B CABLE C10-TL-025B C10-TL-219B C10-TL-218B C10-TL-216 C10-TL-214 C10-TL-211 C13-TL-518 C13-TL-517 C13-TL-516 C13-TL-201 C13-TL-102 C13-TL-203 C13-TL-101 C13-TL-301 C13-TL-302 C13-TL-311 C13-TL-312 C13-TL-314 C13-TL-316 C13-C-1001

Cable: C10BJE1040
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 105 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-692442

Service: CRH STEAM TO AUX. STEAM HEADER ISOLATION MOV


Routed Length (m): Allowance (m): Total Length (m): 103 6 109 Option 1: Option 2: Option 3: Compartment: North: 1778.93 Wiring Dwg: Shield: N Ground: Jacket: PVC End Length(m): 18

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 13.6.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-LBC-30-AA-002 Description: C10 CR MOV Equip Location: Zone: Location Dwg: EA-681101

East: 2289.39 Elevation: 21.20 Schematic: ED-692442

Routing Information: Remarks: Route: CABLE C10-TL-060A C10-TL-059A C10-TL-043A C10-TL-042A C10-TL-017A C10-TL-018A C10-TL-020A C10-TL-023A C10-TL-223A C10-TL-222A C14-TL-202A C14-C-1022

Cable: C10BJE1041
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 157 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-692443

Service: HP STEAM TO AUX. STEAM HEADER DRAIN LINE MOV


Routed Length (m): Allowance (m): Total Length (m): 128 7 135 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 13.6.2 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-LBG-46-AA-023 Compartment: End Length(m): 5 Description: C10 AUX DRN 024 MOV North: 1782.10 Equip Location: Zone: East: 2307.80 Elevation: 8.20 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-692443

Routing Information: Remarks: Route: CABLE C10-TL-060D C10-TL-059D C10-TL-043D C10-TL-044C C10-TL-053C C10-TL-051B C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-211 C14-TL-212 C14-C-1023

Page 86 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 160 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-692444

Cable: C10BJE1042
Seg Code: L System: BJE Startup Code:

Service: CRH STEAM TO AUX. STEAM HEADER DRAIN LINE MOV


Routed Length (m): Allowance (m): Total Length (m): 131 7 138 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 8.1.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-LBG-46-AA-025 Compartment: End Length(m): 6 Description: C10 AUX DRN 028 MOV North: 1782.50 Equip Location: Zone: East: 2308.70 Elevation: 8.20 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-692444

Routing Information: Remarks: Route: CABLE C10-TL-063D C10-TL-060D C10-TL-059D C10-TL-043D C10-TL-044C C10-TL-053C C10-TL-051B C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-211 C14-TL-212 C14-C-1024

Cable: C10BJE1043
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 177 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-692445

Service: HP TURBINE TO CONDENSER MOV


Routed Length (m): Allowance (m): Total Length (m): 159 8 167 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 8.1.2 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-LBC-46-AA-005 Compartment: End Length(m): 15 Description: C10 CR/COND DRN MOV North: 1759.30 Equip Location: Zone: East: 2328.20 Elevation: 4.40 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-692445

Routing Information: Remarks: Route: CABLE C10-TL-063D C10-TL-064D C10-TL-036D C10-TL-034 C10-TL-006C C10-TL-005D C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-020D C10-TL-022C C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-210 C14-TL-046 C14-TL-045 C14-C-1031

Cable: C10BJE1044
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 121 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-692446

Service: REHEAT STEAM HEADER DRAIN MOV


Routed Length (m): Allowance (m): Total Length (m): 114 7 121 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 8.2.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-LBB-46-AA-004 Compartment: End Length(m): 5 Description: C10 HR DRN POT/COND MOV North: 1770.59 Equip Location: Zone: East: 2312.73 Elevation: 7.57 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-692446

Routing Information: Remarks: Route: CABLE C10-TL-063D C10-TL-060D C10-TL-059D C10-TL-043D C10-TL-044C C10-TL-053C C10-TL-051B C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-C-1032

Page 87 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
4C X 25 SQ.MM, 0.6/1kV
Pull Length(m): 125 No. of Cables: 1 Type Code: 40256 End Length(m): 5 Elevation: Schematic: ED-692447

Cable: C10BJE1045
Seg Code: L System: BJE Startup Code:

Service: HRH BYPASS ISOLATION MOV-1


Routed Length (m): Allowance (m): Total Length (m): 108 6 114 Option 1: Option 2: Option 3: Compartment: North: 1771.80 Wiring Dwg: Shield: N Ground: Jacket: PVC End Length(m): 6

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 8.2.2 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C11-LBB-29-AA-005 Description: C11 HR BYP MOV Equip Location: Zone: Location Dwg: EA-681101

East: 2307.50 Elevation: 15.20 Schematic: ED-692447

Routing Information: Remarks: Route: CABLE C10-TL-063D C10-TL-060D C10-TL-059D C10-TL-043D C10-TL-044C C10-TL-053C C10-TL-051B C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-C-1025

Cable: C10BJE1046
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

4C X 25 SQ.MM, 0.6/1kV
Pull Length(m): 120 No. of Cables: 1 Type Code: 40256 End Length(m): 5 Elevation: Schematic: ED-692448

Service: HRH BYPASS ISOLATION MOV-2


Routed Length (m): Allowance (m): Total Length (m): 108 6 114 Option 1: Option 2: Option 3: Compartment: North: 1771.80 Wiring Dwg: Shield: N Ground: Jacket: PVC End Length(m): 6

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 8.3.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C12-LBB-29-AA-005 Description: C12 HR BYP MOV Equip Location: Zone: Location Dwg: EA-681101

East: 2309.20 Elevation: 15.20 Schematic: ED-692448

Routing Information: Remarks: Route: CABLE C10-TL-063D C10-TL-060D C10-TL-059D C10-TL-043D C10-TL-044C C10-TL-053C C10-TL-051B C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-C-1026

Cable: C10BJE1047
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

4C X 25 SQ.MM, 0.6/1kV
Pull Length(m): 125 No. of Cables: 1 Type Code: 40256 End Length(m): 5 Elevation: Schematic: ED-692449

Service: HRH BYPASS ISOLATION MOV-3


Routed Length (m): Allowance (m): Total Length (m): 108 6 114 Option 1: Option 2: Option 3: Compartment: North: 1771.80 Wiring Dwg: Shield: N Ground: Jacket: PVC End Length(m): 6

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 8.3.2 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C13-LBB-29-AA-005 Description: C13 HR BYP MOV Equip Location: Zone: Location Dwg: EA-681101

East: 2311.00 Elevation: 15.10 Schematic: ED-692449

Routing Information: Remarks: Route: CABLE C10-TL-063D C10-TL-060D C10-TL-059D C10-TL-043D C10-TL-044C C10-TL-053C C10-TL-051B C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-C-1027

Page 88 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 114 No. of Cables: 1 Type Code: 40156 End Length(m): 6 Elevation: Schematic: ED-692450

Cable: C10BJE1048
Seg Code: L System: BJE Startup Code:

Service: HRH BYPASS SPRAY WATER LINE ISOLATION MOV-1


Routed Length (m): Allowance (m): Total Length (m): 108 6 114 Option 1: Option 2: Option 3: Compartment: North: 1766.09 Wiring Dwg: Shield: N Ground: Jacket: PVC End Length(m): 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 8.4.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C11-LCE-29-AA-002 Description: C11 CEP/HR MOV Equip Location: Zone: Location Dwg: EA-681101

East: 2307.78 Elevation: 16.86 Schematic: ED-692450

Routing Information: Remarks: Route: CABLE C10-TL-063B C10-TL-060B C10-TL-059B C10-TL-043B C10-TL-044B C10-TL-053B C10-TL-051A C10-TL-025A C10-TL-219A C10-TL-218A C10-TL-217A C10-TL-221A C14-TL-202B C14-TL-204B C14-TL-207B C14-C-1028

Cable: C10BJE1049
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 114 No. of Cables: 1 Type Code: 40156 End Length(m): 6 Elevation: Schematic: ED-692451

Service: HRH BYPASS SPRAY WATER LINE ISOLATION MOV-2


Routed Length (m): Allowance (m): Total Length (m): 108 6 114 Option 1: Option 2: Option 3: Compartment: North: 1766.09 Wiring Dwg: Shield: N Ground: Jacket: PVC End Length(m): 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 8.4.2 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C12-LCE-29-AA-002 Description: C12 CEP/HR MOV Equip Location: Zone: Location Dwg: EA-681101

East: 2309.53 Elevation: 16.86 Schematic: ED-692451

Routing Information: Remarks: Route: CABLE C10-TL-063B C10-TL-060B C10-TL-059B C10-TL-043B C10-TL-044B C10-TL-053B C10-TL-051A C10-TL-025A C10-TL-219A C10-TL-218A C10-TL-217A C10-TL-221A C14-TL-202B C14-TL-204B C14-TL-207B C14-C-1029

Cable: C10BJE1050
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 124 No. of Cables: 1 Type Code: 40156 End Length(m): 6 Elevation: Schematic: ED-692452

Service: HRH BYPASS SPRAY WATER LINE ISOLATION MOV-3


Routed Length (m): Allowance (m): Total Length (m): 108 6 114 Option 1: Option 2: Option 3: Compartment: North: 1766.09 Wiring Dwg: Shield: N Ground: Jacket: PVC End Length(m): 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 8.5.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C13-LCE-29-AA-002 Description: C13 CEP/HR MOV Equip Location: Zone: Location Dwg: EA-681101

East: 2311.28 Elevation: 16.86 Schematic: ED-692452

Routing Information: Remarks: Route: CABLE C10-TL-063B C10-TL-060B C10-TL-059B C10-TL-043B C10-TL-044B C10-TL-053B C10-TL-051A C10-TL-025A C10-TL-219A C10-TL-218A C10-TL-217A C10-TL-221A C14-TL-202B C14-TL-204B C14-TL-207B C14-C-1030

Page 89 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 188 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-692453

Cable: C10BJE1051
Seg Code: L System: BJE Startup Code:

Service: HRSG LP STEAM BYPASS SPRAY WATER LINE ISOLATION MOV-1


Routed Length (m): Allowance (m): Total Length (m): 182 9 191 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 8.5.2 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C11-LCE-26-AA-001 Compartment: End Length(m): 8 Description: C11 LP BYP SPRY H20 MOV North: 1777.30 Equip Location: Zone: East: 2342.54 Elevation: 13.12 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-692453

Routing Information: Remarks: Route: CABLE C10-TL-063C C10-TL-060C C10-TL-059C C10-TL-043C C10-TL-042C C10-TL-017C C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-097B C14-TL-093B C14-TL-091B C14-TL-089 C14-TL-087 C14-TL-085 C14-TL-083 C14-TL-082 C14-C-1213

Cable: C10BJE1052
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 200 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-692454

Service: HRSG LP STEAM BYPASS SPRAY WATER LINE ISOLATION MOV-2


Routed Length (m): Allowance (m): Total Length (m): 182 9 191 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 8.6.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C12-LCE-26-AA-001 Compartment: End Length(m): 8 Description: C12 LP BYP SPRY H20 MOV North: 1777.30 Equip Location: Zone: East: 2341.90 Elevation: 13.12 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-692454

Routing Information: Remarks: Route: CABLE C10-TL-063C C10-TL-060C C10-TL-059C C10-TL-043C C10-TL-042C C10-TL-017C C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-097B C14-TL-093B C14-TL-091B C14-TL-089 C14-TL-087 C14-TL-085 C14-TL-083 C14-TL-082 C14-C-1214

Cable: C10BJE1053
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 200 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-692455

Service: HRSG LP STEAM BYPASS SPRAY WATER LINE ISOLATION MOV-3


Routed Length (m): Allowance (m): Total Length (m): 182 9 191 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 8.6.2 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C13-LCE-26-AA-001 Compartment: End Length(m): 8 Description: C13 LP BYP SPRY H20 MOV North: 1777.30 Equip Location: Zone: East: 2341.19 Elevation: 13.12 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-692455

Routing Information: Remarks: Route: CABLE C10-TL-063C C10-TL-060C C10-TL-059C C10-TL-043C C10-TL-042C C10-TL-017C C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-097B C14-TL-093B C14-TL-091B C14-TL-089 C14-TL-087 C14-TL-085 C14-TL-083 C14-TL-082 C14-C-1215

Page 90 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
4C X 10 SQ.MM, 0.6/1kV
Pull Length(m): 220 No. of Cables: 1 Type Code: 40106 End Length(m): 5 Elevation: Schematic: ED-692456

Cable: C10BJE1054
Seg Code: L System: BJE Startup Code:

Service: CLOSED COOLING WATER PUMP HOIST


Routed Length (m): Allowance (m): Total Length (m): 225 11 236 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692456 8

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 8.7.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-SMP-36-BZ-001 Compartment: Description: CLOSED COOLING WATER PUMP HOUSE SHELTER HOIST North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-063A C10-TL-060A C10-TL-059A C10-TL-043A C10-TL-042A C10-TL-017A C10-TL-018A C10-TL-020A C10-TL-023A C10-TL-223A C10-TL-222A C14-TL-202A C14-TL-204A C14-TL-207A C14-TL-049A C14-TL-050A C14-TL-051 C14-TL-002 C14-TL-006B C14-TL-008C C14-TL-009B C14-TL-011B C14-TL-012 C14-TL-013 C14-TL-019 C14-C-1216

Cable: C10BJE1055
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): 201 No. of Cables: 1 Type Code: 40046 End Length(m): 10 Elevation: Schematic: ED-692457

Service: WASTE LUBE OIL TRANSFER PUMP


Routed Length (m): Allowance (m): Total Length (m): 221 11 232 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 2.6 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-MAV-18-AP-001 Compartment: End Length(m): 7 Description: WASTE OIL TRANSFER PUMP # 1 North: 1737.99 Equip Location: Zone: East: 2337.16 Elevation: 4.70 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-692457

Routing Information: Remarks: Route: CABLE C10-TL-063A C10-TL-060A C10-TL-059A C10-TL-043A C10-TL-042A C10-TL-017A C10-TL-018A C10-TL-020A C10-TL-023A C10-TL-223A C10-TL-222A C14-TL-202A C14-TL-204A C14-TL-207A C14-TL-049A C14-TL-050A C14-TL-051 C14-TL-002 C14-TL-006B C14-TL-008C C14-TL-009B C14-TL-011B C14-TL-012 C14-TL-025 C14-TL-026 C14-C-1217

Cable: C10BJE1056
Seg Code: L System: BJE Startup Code:

Rev: 02

Description:

4C X 50 SQ.MM, 0.6/1kV
Pull Length(m): 177 No. of Cables: 1 Type Code: 40506 End Length(m): 5 Elevation: Schematic: ED-692458

Service: WELDING RECEPTACLE STG ELECTRICAL BLDG


Routed Length (m): Allowance (m): Total Length (m): 148 8 156 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692458 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 8.7.2 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BJE58GA Compartment: Description: JB FOR STG ELECTRICAL BLDG WELDING RECEPTACLE North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-063D C10-TL-060D C10-TL-059D C10-TL-043D C10-TL-044C C10-TL-053C C10-TL-051B CABLE C10-TL-022B C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-098 C14-TL-067 C14-TL-066 C14-TL-071 CABLE

Page 91 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
3C X 95 SQ.MM, 0.6/1kV
Pull Length(m): 249 No. of Cables: 1 Type Code: 30956 End Length(m): 5 Elevation: Schematic: ED-692459

Cable: C10BJE1057
Seg Code: L System: BJE Startup Code:

Service: BEARING LIFT OIL PUMP MOTOR (88QB-2)


Routed Length (m): Allowance (m): Total Length (m): 228 11 239 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692459 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 3.7 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10JB88QB2 Compartment: Description: JUNCTION BOX- JB/88QB-2 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-063A C10-TL-060A C10-TL-059A C10-TL-043A C10-TL-042A C10-TL-017A C10-TL-018A C10-TL-020A C10-TL-023A C10-TL-223A C10-TL-222A C14-TL-202A C14-TL-204A C14-TL-207A C14-TL-049A C14-TL-050A C14-TL-051 C14-TL-002 C14-TL-006B C14-TL-008C C14-TL-009B C14-TL-011B C14-TL-012 C14-TL-025 C14-TL-026 C14-TL-027B C14-TL-029 C14-C-1292

Cable: C10BJE1058
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

4C X 6 SQ.MM, 0.6/1kV
Pull Length(m): 240 No. of Cables: 1 Type Code: 40066 End Length(m): 5 Elevation: Schematic: ED-692460

Service: COOLING AIR FAN MOTOR-1 (CAFM-1)


Routed Length (m): Allowance (m): Total Length (m): 219 11 230 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692460 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 3.3 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10JBCAFM1 Compartment: Description: JUNCTION BOX- JB/CAFM1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-063A C10-TL-060A C10-TL-059A C10-TL-043A C10-TL-042A C10-TL-017A C10-TL-018A C10-TL-020A C10-TL-023A C10-TL-223A C10-TL-222A C14-TL-202A C14-TL-204A C14-TL-207A C14-TL-049A C14-TL-050A C14-TL-051 C14-TL-002 C14-TL-006B C14-TL-008C C14-TL-009B C14-TL-011B C14-TL-012 C14-TL-025 C14-TL-026 C14-C-1294

Cable: C10BJE1059
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

4C X 6 SQ.MM, 0.6/1kV
Pull Length(m): 240 No. of Cables: 1 Type Code: 40066 End Length(m): 5 Elevation: Schematic: ED-692461

Service: COOLING AIR FAN MOTOR-2 (CAFM-2)


Routed Length (m): Allowance (m): Total Length (m): 224 11 235 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692461 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 3.4 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10JBCAFM2 Compartment: Description: JUNCTION BOX- JB/CAFM2 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-064A C10-TL-063A C10-TL-060A C10-TL-059A C10-TL-043A C10-TL-042A C10-TL-017A C10-TL-018A C10-TL-020A C10-TL-023A C10-TL-223A C10-TL-222A C14-TL-202A C14-TL-204A C14-TL-207A C14-TL-049A C14-TL-050A C14-TL-051 C14-TL-002 C14-TL-006B C14-TL-008C C14-TL-009B C14-TL-011B C14-TL-012 C14-TL-025 C14-TL-026 C14-C-1296

Page 92 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
4C X 2.5 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40026 End Length(m): 5 Elevation: Schematic: ED-692462

Cable: C10BJE1060
Seg Code: L System: BJE Startup Code:

Service: COOLING AIR FAN-1 HP/IP ENCLOSURE (CFM-1)


Routed Length (m): Allowance (m): Total Length (m): 177 9 186 Option 1: CFM CABLES Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692462 15

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 6.4 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10JBCFM1 Compartment: Description: JUNCTION BOX-JB/CFM-1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-063C C10-TL-060C C10-TL-059C C10-TL-043C C10-TL-042C C10-TL-017C C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-097B C14-TL-093B C14-TL-091B C14-TL-089 C14-TL-088 C14-TL-090 FIELD ROUTED

Cable: C10BJE1061
Seg Code: L System: BJE Startup Code:

Rev: 00

Description:

4C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): No. of Cables: 1 Type Code: 40026 End Length(m): 5 Elevation: Schematic: ED-692463

Service: COOLING AIR FAN-2 HP/IP ENCLOSURE (CFM-2)


Routed Length (m): Allowance (m): Total Length (m): 151 8 159 Option 1: CFM CABLES Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692463 15

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 6.3 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10JBCFM2 Compartment: Description: JUNCTION BOX-JB/CFM-2 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-063C C10-TL-060C C10-TL-059C C10-TL-043C C10-TL-042C C10-TL-017C C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-097B C14-TL-094 C14-TL-095 FIELD ROUTED

Cable: C10BJE1062
Seg Code: L System: BJE Startup Code:

Rev: 00

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-692464

Service: COOLING AIR FAN-1 COUPLING COMPARTMENT (CFM-3)


Routed Length (m): Allowance (m): Total Length (m): 182 9 191 Option 1: CFM CABLES Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692464 15

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 6.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10JBCFM3 Compartment: Description: JUNCTION BOX-JB/CFM-3 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-063C C10-TL-060C C10-TL-059C C10-TL-043C C10-TL-042C C10-TL-017C C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-098 C14-TL-067 C14-TL-066 C14-TL-071 C14-TL-073 C14-EC-052

Page 93 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-692465

Cable: C10BJE1063
Seg Code: L System: BJE Startup Code:

Service: COOLING AIR FAN-2 COUPLING COMPARTMENT (CFM-4)


Routed Length (m): Allowance (m): Total Length (m): 182 9 191 Option 1: CFM CABLES Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692465 15

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 6.2 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10JBCFM4 Compartment: Description: JUNCTION BOX-JB/CFM-4 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-063C C10-TL-060C C10-TL-059C C10-TL-043C C10-TL-042C C10-TL-017C C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-098 C14-TL-067 C14-TL-066 C14-TL-071 C14-TL-073 C14-EC-052

Cable: C10BJE1064
Seg Code: L System: BJE Startup Code:

Rev: 00

Description:

4C X 35 SQ.MM, 0.6/1kV
Pull Length(m): 320 No. of Cables: 1 Type Code: 40356 End Length(m): 5 Elevation: Schematic: ED-692466

Service: LUBE OIL TANK HEATER (HTR 1-3)


Routed Length (m): Allowance (m): Total Length (m): 233 11 244 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692466 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 8.8.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10JB21A Compartment: Description: JUNCTION BOX- JB/21A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-064A C10-TL-063A C10-TL-060A C10-TL-059A C10-TL-043A C10-TL-042A C10-TL-017A C10-TL-018A C10-TL-020A C10-TL-023A C10-TL-223A C10-TL-222A C14-TL-202A C14-TL-204A C14-TL-207A C14-TL-049A C14-TL-050A C14-TL-051 C14-TL-002 C14-TL-006B C14-TL-008C C14-TL-009B C14-TL-011B C14-TL-012 C14-TL-025 C14-TL-026 C14-TL-030B C14-TL-031 FIELD ROUTED

Cable: C10BJE1065
Seg Code: L System: BJE Startup Code:

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 160 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-692467

Service: STEAM SEAL DUMP BYPASS VALVE (MOV-B)


Routed Length (m): Allowance (m): Total Length (m): 142 8 150 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 8.8.2 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-MOV-B Compartment: End Length(m): 5 Description: STEAM SEAL DUMP VALVE BYPASS North: 1765.85 Equip Location: Zone: East: 2321.30 Elevation: 13.61 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-692467

Routing Information: Remarks: Route: CABLE C10-TL-063C C10-TL-060C C10-TL-059C C10-TL-043C C10-TL-042C C10-TL-017C C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-097B C14-TL-094 C14-TL-095 C14-C-1246

Page 94 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 160 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-692468

Cable: C10BJE1066
Seg Code: L System: BJE Startup Code:

Service: STEAM SEAL FEED VALVE BLOCK (MOV-S1)


Routed Length (m): Allowance (m): Total Length (m): 142 8 150 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 13.5.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-MOV-S1 Compartment: End Length(m): 8 Description: STEAM SEAL FEED BLOCK VALVE North: 1772.75 Equip Location: Zone: East: 2320.38 Elevation: 13.63 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-692468

Routing Information: Remarks: Route: CABLE C10-TL-060C C10-TL-059C C10-TL-043C C10-TL-042C C10-TL-017C C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-097B C14-TL-093B C14-C-1247

Cable: C10BJE1067
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 145 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-692469

Service: STEAM SEAL FEED SUPLEMANTARY VALVE (MOV-S2)


Routed Length (m): Allowance (m): Total Length (m): 133 7 140 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 13.5.2 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-MOV-S2 Compartment: End Length(m): 8 Description: STEAM SEAL FEED VALVE BYPASS North: 1771.40 Equip Location: Zone: East: 2321.20 Elevation: 13.64 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-692469

Routing Information: Remarks: Route: CABLE C10-TL-060C C10-TL-059C C10-TL-043C C10-TL-042C C10-TL-017C C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-097B C14-C-1248

Cable: C10BJE1068
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 170 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-692470

Service: DRAIN VALVE-ADM CONTROL VLV BEFORE SEAT (MOV-SAD-1)


Routed Length (m): Allowance (m): Total Length (m): 161 8 169 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 9.1.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-LBD-26-AA-003 Compartment: End Length(m): 8 Description: C10 LP WARM UP 003 CV North: 1767.06 Equip Location: Zone: East: 2334.39 Elevation: 13.09 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-692470

Routing Information: Remarks: Route: CABLE C10-TL-060C C10-TL-059C C10-TL-043C C10-TL-042C C10-TL-017C C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-097B C14-TL-093B C14-TL-091B C14-TL-089 C14-TL-088 C14-C-1249

Page 95 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 191 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-692471

Cable: C10BJE1069
Seg Code: L System: BJE Startup Code:

Service: DRAIN VALVE-ADM CONTROL VALVE AFTER SEAT (MOV-SAD-2)


Routed Length (m): Allowance (m): Total Length (m): 166 9 175 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 9.1.2 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-LBD-26-AA-004 Compartment: End Length(m): 5 Description: C10 LP WARM UP 004 CV North: 1761.74 Equip Location: Zone: East: 2335.36 Elevation: 13.26 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-692471

Routing Information: Remarks: Route: CABLE C10-TL-060C C10-TL-059C C10-TL-043C C10-TL-042C C10-TL-017C C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-097B C14-TL-093B C14-TL-091B C14-TL-089 C14-TL-088 C14-TL-090 C14-C-1250

Cable: C10BJE1070
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 192 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-692472

Service: DRAIN VALVE STEAM PACKING RE-ENTRY (MOV-SPD)


Routed Length (m): Allowance (m): Total Length (m): 173 9 182 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 9.2.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-MOV-SPD Compartment: End Length(m): 10 Description: STEAM PACKING LINE DRAIN North: 1758.98 Equip Location: Zone: East: 2331.07 Elevation: 4.43 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-692472

Routing Information: Remarks: Route: CABLE C10-TL-060D C10-TL-059D C10-TL-043D C10-TL-044C C10-TL-053C C10-TL-051B C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-210 C14-TL-046 C14-TL-045 C14-TL-044 C14-TL-038 C14-TL-037 C14-C-1251

Cable: C10BJE1071
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 186 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-692473

Service: DRAIN VALVE MAIN STEAM LINE#1 LOW POINT (MOV-SPDV-1)


Routed Length (m): Allowance (m): Total Length (m): 167 9 176 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692473 15

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 9.2.2 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-MOV-SPDV-1 Compartment: Description: MAIN STEAM LINE LOW POINT DRAIN North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-063C C10-TL-060C C10-TL-059C C10-TL-043C C10-TL-042C C10-TL-017C C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-097B C14-TL-093B C14-TL-091B C14-TL-089 C14-C-1254

Page 96 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 181 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-692474

Cable: C10BJE1072
Seg Code: L System: BJE Startup Code:

Service: DRAIN VALVE MAIN STOP VALVE A BEFORE SEAT (MOV-SSV-1A)


Routed Length (m): Allowance (m): Total Length (m): 162 9 171 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 9.3.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-MOV-SSV-1A Compartment: End Length(m): 10 Description: STOP VALVE A BEFORE SEAT DRAIN North: 1772.52 Equip Location: Zone: East: 2330.18 Elevation: 13.32 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-692474

Routing Information: Remarks: Route: CABLE C10-TL-063C C10-TL-060C C10-TL-059C C10-TL-043C C10-TL-042C C10-TL-017C C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-097B C14-TL-093B C14-TL-091B C14-TL-089 C14-C-1255

Cable: C10BJE1073
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 168 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-692475

Service: DRAIN VALVE MAIN STOP VALVE B BEFORE SEAT (MOV-SSV-1B)


Routed Length (m): Allowance (m): Total Length (m): 156 8 164 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 9.3.2 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-MOV-SSV-1B Compartment: End Length(m): 10 Description: STOP VALVE B BEFORE SEAT DRAIN North: 1772.69 Equip Location: Zone: East: 2325.67 Elevation: 13.28 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-692475

Routing Information: Remarks: Route: CABLE C10-TL-063C C10-TL-060C C10-TL-059C C10-TL-043C C10-TL-042C C10-TL-017C C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-097B C14-TL-093B C14-TL-091B C14-C-1256

Cable: C10BJE1074
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 180 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-692476

Service: DRAIN VALVE REHEAT STOP VLV A AFTER SEAT (MOV-SSV-4A)


Routed Length (m): Allowance (m): Total Length (m): 162 9 171 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 9.4.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-MOV-SSV-4A Compartment: End Length(m): 10 Description: REHEAT VALVE A AFTER SEAT DRAIN North: 1764.83 Equip Location: Zone: East: 2331.26 Elevation: 13.70 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-692476

Routing Information: Remarks: Route: CABLE C10-TL-063C C10-TL-060C C10-TL-059C C10-TL-043C C10-TL-042C C10-TL-017C C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-097B C14-TL-093B C14-TL-091B C14-TL-089 C14-C-1257

Page 97 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 170 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-692477

Cable: C10BJE1075
Seg Code: L System: BJE Startup Code:

Service: DRAIN VALVE REHEAT STOP VLV B AFTER SEAT (MOV-SSV-4B)


Routed Length (m): Allowance (m): Total Length (m): 156 8 164 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 9.4.2 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-MOV-SSV-4B Compartment: End Length(m): 10 Description: REHEAT VALVE B AFTER SEAT DRAIN North: 1764.83 Equip Location: Zone: East: 2326.72 Elevation: 14.00 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-692477

Routing Information: Remarks: Route: CABLE C10-TL-063C C10-TL-060C C10-TL-059C C10-TL-043C C10-TL-042C C10-TL-017C C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-097B C14-TL-093B C14-TL-091B C14-C-1258

Cable: C10BJE1076
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 170 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-692478

Service: VACUUM BREAKER VALVE (MOV-VBV-1)


Routed Length (m): Allowance (m): Total Length (m): 156 8 164 Option 1: Option 2: Option 3: Compartment: North: 1749.48 Wiring Dwg: Shield: N Ground: Jacket: PVC End Length(m): 20

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 9.5.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-LCA-46-AA-005 Description: C10 VAC BRKR MOV Equip Location: Zone: Location Dwg: EA-681111

East: 2329.60 Elevation: 14.44 Schematic: ED-692478

Routing Information: Remarks: Route: CABLE C10-TL-063C C10-TL-060C C10-TL-059C C10-TL-043C C10-TL-042C C10-TL-017C C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-098 C14-TL-068 C14-C-1259

Cable: C10BJE1081
Seg Code: L System: BJE Startup Code:

Rev: 00

Description:

4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40046 End Length(m): 5 Elevation: Schematic: ED-692483

Service: EXCITATION FIELD FLASHING


Routed Length (m): Allowance (m): Total Length (m): 132 7 139 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692483 3

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 9.6.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C101017 Compartment: Description: EX2100 PNL FOR BLK-1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-063B C10-TL-060B C10-TL-059B C10-TL-043B C10-TL-044B C10-TL-053B C10-TL-051A C10-TL-025A C10-TL-219A C10-TL-218A C10-TL-217A C10-TL-221A C14-TL-202B C14-TL-204B C14-TL-207B C14-TL-049B C14-TL-050B C14-TL-052A C14-TL-059A C14-TL-058A CABLE

Page 98 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): 245 No. of Cables: 1 Type Code: 40046 End Length(m): 5 Elevation: Schematic: ED-692484

Cable: C10BJE1082
Seg Code: L System: BJE Startup Code:

Service: OIL CONDITIONER PUMP MOTOR (OCM)


Routed Length (m): Allowance (m): Total Length (m): 228 11 239 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692484 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 3.2 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-OCM Compartment: Description: OIL CONDITIONER MODULE PUMP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-064A C10-TL-063A C10-TL-060A C10-TL-059A C10-TL-043A C10-TL-042A C10-TL-017A C10-TL-018A C10-TL-020A C10-TL-023A C10-TL-223A C10-TL-222A C14-TL-202A C14-TL-204A C14-TL-207A C14-TL-049A C14-TL-050A C14-TL-051 C14-TL-002 C14-TL-006B C14-TL-008C C14-TL-009B C14-TL-011B C14-TL-012 C14-TL-025 C14-TL-026 C14-TL-030B C14-C-1045

Cable: C10BJE1083
Seg Code: L System: BJE Startup Code:

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 195 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-692485

Service: MOV AT DM WATER MAKE-UP / INITIAL FILL BYPASS LINE


Routed Length (m): Allowance (m): Total Length (m): 178 9 187 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 9.7.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-GCK-46-AA-013 Compartment: End Length(m): 5 Description: C10 COND/HW LCV BYP MOV North: 1746.79 Equip Location: Zone: East: 2337.41 Elevation: 13.41 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-692485

Routing Information: Remarks: Route: CABLE C10-TL-063C C10-TL-060C C10-TL-059C C10-TL-043C C10-TL-042C C10-TL-017C C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-098 C14-TL-067 C14-TL-066 C14-TL-071 C14-TL-073 C14-TL-078 C14-C-1225

Cable: C10BJE1084
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 200 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-692486

Service: MOV AT CONDENSATE RETURN LINE FROM MSF


Routed Length (m): Allowance (m): Total Length (m): 181 9 190 Option 1: Option 2: Option 3: Compartment: North: 1748.89 Wiring Dwg: Shield: N Ground: Jacket: PVC End Length(m): 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 9.7.2 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-GCG-46-AA-001 Description: C10 MSF COND MOV Equip Location: Zone: Location Dwg: EA-681111

East: 2330.90 Elevation: 13.46 Schematic: ED-692486

Routing Information: Remarks: Route: CABLE C10-TL-063C C10-TL-060C C10-TL-059C C10-TL-043C C10-TL-042C C10-TL-017C C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-098 C14-TL-067 C14-TL-066 C14-TL-071 C14-TL-073 C14-TL-078 C14-TL-077 C14-C-1226

Page 99 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 180 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-692487

Cable: C10BJE1085
Seg Code: L System: BJE Startup Code:

Service: CONDENSER WATER BOX DRAIN MOV-1


Routed Length (m): Allowance (m): Total Length (m): 167 9 176 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 13.4.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-PAB-55-AA-006 Compartment: End Length(m): 17 Description: C10 COND/H20 BOX OUT VENT 006 MOV North: 1759.23 Equip Location: Zone: East: 2335.21 Elevation: 5.29 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-692487

Routing Information: Remarks: Route: CABLE C10-TL-060D C10-TL-059D C10-TL-043D C10-TL-044C C10-TL-053C C10-TL-051B C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-210 C14-TL-046 C14-TL-045 C14-TL-044 C14-TL-038 C14-C-1227

Cable: C10BJE1086
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 189 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-692488

Service: CONDENSER WATER BOX DRAIN MOV-2


Routed Length (m): Allowance (m): Total Length (m): 181 9 190 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 13.4.2 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-PAB-55-AA-009 Compartment: End Length(m): 10 Description: C10 COND/H20 BOX OUT VENT 009 MOV North: 1749.17 Equip Location: Zone: East: 2335.21 Elevation: 5.29 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-692488

Routing Information: Remarks: Route: CABLE C10-TL-060D C10-TL-059D C10-TL-043D C10-TL-044C C10-TL-053C C10-TL-051B C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-210 C14-TL-046 C14-TL-045 C14-TL-044 C14-TL-038 C14-TL-036 C14-TL-034 C14-C-1228

Cable: C10BJE1087
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

4C X 16 SQ.MM, 0.6/1kV
Pull Length(m): 173 No. of Cables: 1 Type Code: 40166 End Length(m): 5 Elevation: Schematic: ED-692489

Service: CW DEBRIS FILTER CONTROL CABINET


Routed Length (m): Allowance (m): Total Length (m): 155 8 163 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692489 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 11.1.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-PAB-55-GH-010 Compartment: Description: BLK-1 DBRS FLTR CNTL PNL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-060D C10-TL-059D C10-TL-043D C10-TL-044C C10-TL-053C C10-TL-051B C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-210 C14-TL-046 C14-TL-045 C14-TL-044 C14-TL-038 C14-C-1229

Page 100 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 262 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-692490

Cable: C10BJE1088
Seg Code: L System: BJE Startup Code:

Service: TIE IN TO COMMON CCW SUPPLY HEADER MOV


Routed Length (m): Allowance (m): Total Length (m): 241 11 252 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 11.1.2 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-PGA-36-AA-004 Compartment: End Length(m): 10 Description: C10 CCW SUPPLY TO MSF HDR MOV North: 1741.92 Equip Location: Zone: East: 2362.11 Elevation: 5.19 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-692490

Routing Information: Remarks: Route: CABLE C10-TL-063A C10-TL-060A C10-TL-059A C10-TL-043A C10-TL-042A C10-TL-017A C10-TL-018A C10-TL-020A C10-TL-023A C10-TL-223A C10-TL-222A C14-TL-202A C14-TL-204A C14-TL-207A C14-TL-049A C14-TL-050A C14-TL-051 C14-TL-002 C14-TL-006B C14-TL-008C C14-TL-009B C14-TL-011B C14-TL-012 C14-TL-013 C14-TL-019 C14-TL-020 C14-TL-021 C14-C-1230

Cable: C10BJE1089
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 234 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-692491

Service: TIE IN TO COMMON CCW RETURN HEADER MOV


Routed Length (m): Allowance (m): Total Length (m): 223 11 234 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 11.2.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-PGB-36-AA-003 Compartment: End Length(m): 5 Description: C10 CCW RETURN FROM MSF HDR MOV North: 1738.92 Equip Location: Zone: East: 2348.34 Elevation: 4.60 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-692491

Routing Information: Remarks: Route: CABLE C10-TL-060A C10-TL-059A C10-TL-043A C10-TL-042A C10-TL-017A C10-TL-018A C10-TL-020A C10-TL-023A C10-TL-223A C10-TL-222A C14-TL-202A C14-TL-204A C14-TL-207A C14-TL-049A C14-TL-050A C14-TL-051 C14-TL-002 C14-TL-006B C14-TL-008C C14-TL-009B C14-TL-011B C14-TL-012 C14-TL-013 C14-TL-019 C14-TL-020 C14-C-1231

Cable: C10BJE1090
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 143 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-692492

Service: CCW SUPPLY HEADER FOR HRSG MOV


Routed Length (m): Allowance (m): Total Length (m): 135 8 143 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 11.2.2 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-PGA-36-AA-005 Compartment: End Length(m): 10 Description: C10 CCW SUPPLY TO HRSG HDR MOV North: 1785.03 Equip Location: Zone: East: 2313.21 Elevation: 10.27 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-692492

Routing Information: Remarks: Route: CABLE C10-TL-060D C10-TL-059D C10-TL-043D C10-TL-044C C10-TL-053C C10-TL-051B C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-211 C14-TL-212 C14-TL-043 C14-C-1232

Page 101 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 201 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-692493

Cable: C10BJE1091
Seg Code: L System: BJE Startup Code:

Service: CCW SUPPLY FOR STG HEADER MOV


Routed Length (m): Allowance (m): Total Length (m): 215 11 226 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 11.3.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-PGA-36-AA-002 Compartment: End Length(m): 5 Description: C10 CCW H/EX DISCHARGE MOV North: 1736.91 Equip Location: Zone: East: 2333.55 Elevation: 5.46 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-692493

Routing Information: Remarks: Route: CABLE C10-TL-060A C10-TL-059A C10-TL-043A C10-TL-042A C10-TL-017A C10-TL-018A C10-TL-020A C10-TL-023A C10-TL-223A C10-TL-222A C14-TL-202A C14-TL-204A C14-TL-207A C14-TL-049A C14-TL-050A C14-TL-051 C14-TL-002 C14-TL-006B C14-TL-008C C14-TL-009B C14-TL-011B C14-TL-012 C14-TL-025 C14-TL-024 C14-TL-028 C14-C-1233

Cable: C10BJE1092
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 212 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-692494

Service: CCW EXPANSION TANK DISCHARGE MOV


Routed Length (m): Allowance (m): Total Length (m): 192 10 202 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 11.3.2 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-PGF-36-AA-002 Compartment: End Length(m): 30 Description: C10 CCW EXP. TNK/CCW MOV North: 1730.60 Equip Location: Zone: East: 2345.22 Elevation: 19.59 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-692494

Routing Information: Remarks: Route: CABLE C10-TL-060C C10-TL-059C C10-TL-043C C10-TL-042C C10-TL-017C C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-098 C14-TL-067 C14-TL-066 C14-TL-071 C14-TL-073 C14-C-1234

Cable: C10BJE1093
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 258 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-692495

Service: BYPASS MOV OF ACW BOOSTER PUMP FOR QCCPP FACILITIES


Routed Length (m): Allowance (m): Total Length (m): 246 12 258 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 11.4.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-PGP-56-AA-006 Compartment: End Length(m): 20 Description: C10 ACW PUMP MIN RECIRC MOV North: 1726.87 Equip Location: Zone: East: 2365.20 Elevation: 5.67 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-692495

Routing Information: Remarks: Route: CABLE C10-TL-060A C10-TL-059A C10-TL-043A C10-TL-042A C10-TL-017A C10-TL-018A C10-TL-020A C10-TL-023A C10-TL-223A C10-TL-222A C14-TL-202A C14-TL-204A C14-TL-207A C14-TL-049A C14-TL-050A C14-TL-051 C14-TL-002 C14-TL-006B C14-TL-008C C14-TL-009B C14-TL-011B C14-TL-012 C14-TL-013 C14-TL-014 C14-TL-015 C14-TL-016 C14-C-1235

Page 102 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 268 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-692496

Cable: C10BJE1094
Seg Code: L System: BJE Startup Code:

Service: MOV AT DIS OF ACW BOOSTER PUMP FOR QCCPP FACILITIES


Routed Length (m): Allowance (m): Total Length (m): 246 12 258 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 11.4.2 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-PGP-56-AA-007 Compartment: End Length(m): 10 Description: CC ACW BOOSTER PUMPS DISCHARGE MOV North: 1731.21 Equip Location: Zone: East: 2364.01 Elevation: 6.33 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-692496

Routing Information: Remarks: Route: CABLE C10-TL-060A C10-TL-059A C10-TL-043A C10-TL-042A C10-TL-041 C10-TL-015A C10-TL-003A C10-TL-002A C10-TL-024A C10-TL-023A C10-TL-223A C10-TL-222A C14-TL-202A C14-TL-204A C14-TL-207A C14-TL-049A C14-TL-050A C14-TL-051 C14-TL-002 C14-TL-006B C14-TL-008C C14-TL-009B C14-TL-011B C14-TL-012 C14-TL-013 C14-TL-019 C14-TL-018 C14-TL-017 C14-C-1280

Cable: C10BJE1095
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): 178 No. of Cables: 1 Type Code: 40046 End Length(m): 5 Elevation: Schematic: ED-692497

Service: HOTWELL PUMP-1


Routed Length (m): Allowance (m): Total Length (m): 162 9 171 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692497 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 3.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-QUM-49-AP-001 Description: HOTWELL PUMP A Equip Location: Zone: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-064D C10-TL-036D C10-TL-034 C10-TL-006C C10-TL-005D C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-020D C10-TL-022C C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-210 C14-TL-046 C14-TL-045 C14-TL-044 C14-C-1244

Cable: C10BJE1096
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): 160 No. of Cables: 1 Type Code: 40046 End Length(m): 5 Elevation: Schematic: ED-692498

Service: HOTWELL PUMP-2


Routed Length (m): Allowance (m): Total Length (m): 162 9 171 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692498 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 4.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-QUM-49-AP-002 Description: HOTWELL PUMP B Equip Location: Zone: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-064D C10-TL-036D C10-TL-034 C10-TL-006C C10-TL-005D C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-020D C10-TL-022C C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-210 C14-TL-046 C14-TL-045 C14-TL-044 C14-C-1245

Page 103 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 156 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-692499

Cable: C10BJE1097
Seg Code: L System: BJE Startup Code:

Service: AUX STEAM HDR TO GLAND STEAM & TURB SEAL SYS MOV
Routed Length (m): Allowance (m): Total Length (m): 144 8 152 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 11.5.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-LBG-48-AA-001 Compartment: End Length(m): 10 Description: C10 SEAL STEAM SUPPLY MOV North: 1775.13 Equip Location: Zone: East: 2312.29 Elevation: 20.99 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-692499

Routing Information: Remarks: Route: CABLE C10-TL-060C C10-TL-059C C10-TL-043C C10-TL-042C C10-TL-017C C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-097B C14-TL-093B C14-C-1237

Cable: C10BJE1098
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 163 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-692500

Service: IP FEED WATER SPRAY TO AUX. STEAM HDR ISOLATION MOV-1


Routed Length (m): Allowance (m): Total Length (m): 155 8 163 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 11.5.2 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-LAB-30-AA-001 Compartment: End Length(m): 15 Description: C10 HP/ATMP H20 MOV North: 1753.90 Equip Location: Zone: East: 2226.00 Elevation: 20.60 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-692500

Routing Information: Remarks: Route: CABLE C10-TL-060D C10-TL-059D C10-TL-043D C10-TL-044C C10-TL-053C C10-TL-051B CABLE C10-TL-025B C10-TL-219B C10-TL-218B C10-TL-216 C10-TL-214 C10-TL-211 C13-TL-518 C13-TL-517 C13-TL-516 C13-TL-201 C13-TL-102 C13-TL-203 C13-TL-101 C13-TL-110 C13-TL-111 C13-TL-112 C13-TL-113 C13-TL-114 C13-C-1217

Cable: C10BJE1099
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 111 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-692501

Service: IP FEED WATER SPRAY TO AUX. STEAM HDR ISOLATION MOV-2


Routed Length (m): Allowance (m): Total Length (m): 105 6 111 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 11.6.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-LAB-30-AA-003 Compartment: End Length(m): 20 Description: C10 CR/ATMP H20 MOV North: 1781.00 Equip Location: Zone: East: 2281.10 Elevation: 20.60 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-692501

Routing Information: Remarks: Route: CABLE C10-TL-060A C10-TL-059A C10-TL-043A C10-TL-042A C10-TL-017A C10-TL-018A C10-TL-020A C10-TL-023A C10-TL-223A C10-TL-222A C14-TL-202A C14-C-1238

Page 104 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 162 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-692502

Cable: C10BJE1100
Seg Code: L System: BJE Startup Code:

Service: MOV AT AUX STM DRN POT TO ATMC COND RER TANK HDR ISO MOV
Routed Length (m): Allowance (m): Total Length (m): 133 7 140 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 11.6.2 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-LBG-46-AA-016 Compartment: End Length(m): 10 Description: C10 AUX DRN 033/CST MOV North: 1782.04 Equip Location: Zone: East: 2310.46 Elevation: 9.63 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-692502

Routing Information: Remarks: Route: CABLE C10-TL-060D C10-TL-059D C10-TL-043D C10-TL-044C C10-TL-053C C10-TL-051B C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-211 C14-TL-212 C14-C-1239

Cable: C10BJE1102
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 195 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-692504

Service: CRH LINE DRAIN#1 TO ATM CONDENSATE RER TANK MOV


Routed Length (m): Allowance (m): Total Length (m): 178 9 187 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 11.7.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-LBC-46-AA-006 Compartment: End Length(m): 10 Description: C10 CR/CST DRN MOV North: 1778.93 Equip Location: Zone: East: 2326.28 Elevation: 13.33 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-692504

Routing Information: Remarks: Route: CABLE C10-TL-060C C10-TL-059C C10-TL-043C C10-TL-042C C10-TL-017C C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-097B C14-TL-093B C14-TL-091B C14-TL-089 C14-TL-087 C14-TL-085 C14-TL-084 C14-C-1240

Cable: C10BJE1103
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 135 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-692505

Service: CRH LINE DRAIN#2 TO ATM CONDENSATE RER TANK MOV


Routed Length (m): Allowance (m): Total Length (m): 126 7 133 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 11.8.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-LBC-46-AA-007 Compartment: End Length(m): 10 Description: C10 CR/CST DRN MOV North: 1849.20 Equip Location: Zone: East: 2306.60 Elevation: 8.30 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-692505

Routing Information: Remarks: Route: CABLE C10-TL-060D C10-TL-059D C10-TL-043D C10-TL-044C C10-TL-053C C10-TL-051B C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-211 C14-C-1241

Page 105 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 173 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-692506

Cable: C10BJE1104
Seg Code: L System: BJE Startup Code:

Service: HRSG HP STEAM COMMON HEADER DRAIN LINE MOV-1


Routed Length (m): Allowance (m): Total Length (m): 155 8 163 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 11.8.2 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-LBA-46-AA-005 Compartment: End Length(m): 5 Description: C10 HP DRN POT MOV North: 1771.64 Equip Location: Zone: East: 2330.93 Elevation: 13.28 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-692506

Routing Information: Remarks: Route: CABLE C10-TL-060C C10-TL-059C C10-TL-043C C10-TL-042C C10-TL-017C C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-097B C14-TL-093B C14-TL-091B C14-TL-089 C14-C-1242

Cable: C10BJE1105
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 215 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-692507

Service: HRSG LP STEAM COMM HEADER DRAIN LINE MOV


Routed Length (m): Allowance (m): Total Length (m): 197 10 207 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 13.3.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-LBD-46-AA-010 Compartment: End Length(m): 15 Description: C10 LP DRN POT MOV North: 1769.77 Equip Location: Zone: East: 2340.30 Elevation: 13.23 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-692507

Routing Information: Remarks: Route: CABLE C10-TL-060C C10-TL-059C C10-TL-043C C10-TL-042C C10-TL-017C C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-097B C14-TL-093B C14-TL-091B C14-TL-089 C14-TL-087 C14-TL-085 C14-TL-083 C14-TL-082 C14-TL-081 C14-C-1243

Cable: C10BJE1109
Seg Code: L System: BJE Startup Code:

Rev: 02

Description:

4C X 16 SQ.MM, 0.6/1kV
Pull Length(m): 170 No. of Cables: 1 Type Code: 40166 End Length(m): 5 Elevation: Schematic: ED-692511

Service: DEBRIS FILTER HOIST


Routed Length (m): Allowance (m): Total Length (m): 152 8 160 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692511 20

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 12.1.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-SMP-55-BZ-001 Compartment: Description: DEBRIS FILTER HOIST North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-060D C10-TL-059D C10-TL-043D C10-TL-044C C10-TL-053C C10-TL-051B C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-210 C14-TL-046 C14-TL-045 C14-TL-044 C14-C-1219

Page 106 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
4C X 2.5 SQ.MM, 0.6/1kV
Pull Length(m): 180 No. of Cables: 1 Type Code: 40026 End Length(m): 8 Elevation: Schematic: ED-692512

Cable: C10BJE1110
Seg Code: L System: BJE Startup Code:

Service: CONDENSER VACUUM PUMP HOIST


Routed Length (m): Allowance (m): Total Length (m): 163 9 172 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692512 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 5.8.2 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-SMM-47-BZ-001 Compartment: Description: CONDENSER VACUUM PUMP HOIST North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-063D C10-TL-060D C10-TL-059D C10-TL-043D C10-TL-044C C10-TL-053C C10-TL-051B C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-211 C14-TL-212 C14-TL-043 C14-TL-042 C14-TL-040 C14-C-1220

Cable: C10BJE1111
Seg Code: L System: BJE Startup Code:

Rev: 02

Description:

4C X 10 SQ.MM, 0.6/1kV
Pull Length(m): 170 No. of Cables: 1 Type Code: 40106 End Length(m): 5 Elevation: Schematic: ED-692513

Service: CW BUTTERFLY VALVE HOIST


Routed Length (m): Allowance (m): Total Length (m): 152 8 160 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692513 20

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 5.4.2 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-SMP-55-BZ-002 Compartment: Description: CW BUTTERFLY VALVE HOIST North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-060D C10-TL-059D C10-TL-043D C10-TL-044C C10-TL-053C C10-TL-051B C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-210 C14-TL-046 C14-TL-045 C14-TL-044 C14-C-1221

Cable: C10BJE1112
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

3C X 4 SQ.MM, 0.6/1kV
Pull Length(m): 183 No. of Cables: 1 Type Code: 30046 End Length(m): 5 Elevation: Schematic: ED-692514

Service: 127V DISTRIBUTION PANEL-1


Routed Length (m): Allowance (m): Total Length (m): 164 9 173 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692514 9

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 7.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-MAJ-47-GB-013 Compartment: Description: LOCAL JUNCTION BOX FOR CVP C North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-680571

Routing Information: Remarks: CABLE NOT REQUIRED AS PER LATEST MSD Route: CABLE C10-TL-064D C10-TL-063D C10-TL-060D C10-TL-059D C10-TL-043D C10-TL-044C C10-TL-053C C10-TL-051B C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-211 C14-TL-212 C14-TL-043 C14-TL-042 C14-TL-040 C14-C-1019

Page 107 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
3C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 215 No. of Cables: 1 Type Code: 30156 End Length(m): 5 Elevation: Schematic: ED-692514

Cable: C10BJE1113
Seg Code: L System: BJE Startup Code:

Service: 127V DISTRIBUTION PANEL-1


Routed Length (m): Allowance (m): Total Length (m): 204 10 214 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692514 20

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 7.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-MAJ-55-AA-052 Compartment: Description: DRAIN TANK SOL VALVE FOR VACUUM CONTROL TANK North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: CABLE NOT REQUIRED AS PER LATEST MSD Route: CABLE C10-TL-063C C10-TL-060C C10-TL-059C C10-TL-043C C10-TL-042C C10-TL-017C C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-097B C14-TL-093B C14-TL-091B C14-TL-089 C14-TL-087 C14-TL-085 C14-TL-083 C14-TL-082 C14-TL-081 C14-C-1268

Cable: C10BJE1114
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

3C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): No. of Cables: 1 Type Code: 30156 End Length(m): 5 Elevation: Schematic: ED-692514

Service: 127V DISTRIBUTION PANEL-1


Routed Length (m): Allowance (m): Total Length (m): 142 8 150 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692514 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 7.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-MAJ-55-AA-053 Compartment: Description: MAKE UP SOL VALVE FOR WVP A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-680571

Routing Information: Remarks: CABLE NOT REQUIRED AS PER LATEST MSD Route: CABLE C10-TL-060D C10-TL-059D C10-TL-043D C10-TL-044C C10-TL-053C C10-TL-051B C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-210 C14-TL-046 C14-TL-045 C14-TL-044 C34-C-1020

Cable: C10BJE1115
Seg Code: L System: BJE Startup Code:

Rev: 02

Description:

3C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 22 No. of Cables: 1 Type Code: 30026 End Length(m): 5 Elevation: Schematic: ED-692514

Service: 127V DISTRIBUTION PANEL-1


Routed Length (m): Allowance (m): Total Length (m): 18 3 21 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692514 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 7.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C1072EBOP Compartment: Description: DC MOTOR STARTER FOR EBPM BLOCK-1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-063A C10-TL-060A C10-TL-059A C10-TL-043A CABLE

Page 108 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
3C X 10 SQ.MM, 0.6/1kV
Pull Length(m): 140 No. of Cables: 1 Type Code: 30106 End Length(m): 5 Elevation: Schematic: ED-692514

Cable: C10BJE1116
Seg Code: L System: BJE Startup Code:

Service: 127V DISTRIBUTION PANEL-1


Routed Length (m): Allowance (m): Total Length (m): 125 7 132 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692514 3

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 7.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C100102 Compartment: Description: GENERATOR CONT & PROT PNL BLK-1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-063B C10-TL-060B C10-TL-059B C10-TL-043B C10-TL-044B C10-TL-053B C10-TL-051A C10-TL-025A C10-TL-219A C10-TL-218A C10-TL-217A C10-TL-221A C14-TL-202B C14-TL-204B C14-TL-207B C14-TL-049B C14-TL-050B C14-TL-052A CABLE

Cable: C10BJE1117
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

3C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 64 No. of Cables: 1 Type Code: 30156 End Length(m): 8 Elevation: Schematic: ED-692514

Service: 127V DISTRIBUTION PANEL-1


Routed Length (m): Allowance (m): Total Length (m): 59 5 64 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692514 8

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 7.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-CPB-66-GH-021 Compartment: Description: B1BT CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-129 C10-TL-126 C10-TL-123 C10-TL-120 C10-TL-046 C10-TL-045 C10-TL-019 CABLE C10-TL-018C C10-TL-017C C10-TL-042C C10-TL-043C C10-TL-059C C10-TL-060C C10-TL-063C CABLE

Cable: C10BJE1118
Seg Code: L System: BJE Startup Code:

Rev: 00

Description:

3C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 100 No. of Cables: 1 Type Code: 30026 End Length(m): 5 Elevation: Schematic: ED-692514

Service: 127V DISTRIBUTION PANEL-1


Routed Length (m): Allowance (m): Total Length (m): 54 4 58 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692514 7

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 7.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-CPB-66-GH-022 Compartment: Description: B1BT I/O CABINET-1_TMR North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-063A C10-TL-060A C10-TL-059A C10-TL-043A C10-TL-042A C10-TL-017A C10-TL-018A CABLE C10-TL-019 C10-TL-045 C10-TL-046 C10-TL-120 C10-TL-123 C10-TL-126 C10-TL-129 CABLE

Page 109 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
3C X 50 SQ.MM, 0.6/1kV
Pull Length(m): 194 No. of Cables: 1 Type Code: 30506 End Length(m): 5 Elevation: Schematic: ED-692514

Cable: C10BJE1129
Seg Code: L System: BJE Startup Code:

Service: 127V DISTRIBUTION PANEL-1


Routed Length (m): Allowance (m): Total Length (m): 175 9 184 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692514 30

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 7.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10PDA Description: STG#1 PDA Equip Location: Zone: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-060C C10-TL-059C C10-TL-043C C10-TL-042C C10-TL-017C C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-098 C14-TL-067 C14-TL-066 C14-TL-071 C14-C-1121

Cable: C10BJE1131
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

3C X 4 SQ.MM, 0.6/1kV
Pull Length(m): 191 No. of Cables: 1 Type Code: 30046 End Length(m): 5 Elevation: Schematic: ED-692514

Service: 127V DISTRIBUTION PANEL-1


Routed Length (m): Allowance (m): Total Length (m): 180 9 189 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692514 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 7.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-PAB-55-GH-010 Compartment: Description: BLK-1 DBRS FLTR CNTL PNL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-064D C10-TL-036D C10-TL-034 C10-TL-006C C10-TL-005D C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-020D C10-TL-022C C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-210 C14-TL-046 C14-TL-045 C14-TL-044 C14-TL-038 C14-C-1269

Cable: C10BJE1132
Seg Code: L System: BJE Startup Code:

Rev: 00

Description:

3C X 6 SQ.MM, 0.6/1kV
Pull Length(m): 255 No. of Cables: 1 Type Code: 30066 End Length(m): 5 Elevation: Schematic: ED-692514

Service: 127V DISTRIBUTION PANEL-1


Routed Length (m): Allowance (m): Total Length (m): 233 11 244 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692514 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 7.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10JB21F Compartment: Description: JUNCTION BOX- JB/21F North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-064A C10-TL-063A C10-TL-060A C10-TL-059A C10-TL-043A C10-TL-042A C10-TL-017A C10-TL-018A C10-TL-020A C10-TL-023A C10-TL-223A C10-TL-222A C14-TL-202A C14-TL-204A C14-TL-207A C14-TL-049A C14-TL-050A C14-TL-051 C14-TL-002 C14-TL-006B C14-TL-008C C14-TL-009B C14-TL-011B C14-TL-012 C14-TL-025 C14-TL-026 C14-TL-027B C14-TL-029 C14-C-1046

Page 110 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
3C X 25 SQ.MM, 0.6/1kV
Pull Length(m): 145 No. of Cables: 1 Type Code: 30256 End Length(m): 5 Elevation: Schematic: ED-692514

Cable: C10BJE1133
Seg Code: L System: BJE Startup Code:

Service: 127V DISTRIBUTION PANEL-1


Routed Length (m): Allowance (m): Total Length (m): 132 7 139 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692514 3

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 7.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C101017 Compartment: Description: EX2100 PNL FOR BLK-1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-063B C10-TL-060B C10-TL-059B C10-TL-043B C10-TL-044B C10-TL-053B C10-TL-051A C10-TL-025A C10-TL-219A C10-TL-218A C10-TL-217A C10-TL-221A C14-TL-202B C14-TL-204B C14-TL-207B C14-TL-049B C14-TL-050B C14-TL-052A C14-TL-059A C14-TL-058A CABLE

Cable: C10BJE1134
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

3C X 4 SQ.MM, 0.6/1kV
Pull Length(m): 183 No. of Cables: 1 Type Code: 30046 End Length(m): 5 Elevation: Schematic: ED-692515

Service: 127V DISTRIBUTION PANEL-2


Routed Length (m): Allowance (m): Total Length (m): 164 9 173 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692515 9

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 10.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-MAJ-47-GB-011 Compartment: Description: LOCAL JUNCTION BOX FOR CVP A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-680571

Routing Information: Remarks: CABLE NOT REQUIRED AS PER LATEST MSD Route: CABLE C10-TL-064D C10-TL-063D C10-TL-060D C10-TL-059D C10-TL-043D C10-TL-044C C10-TL-053C C10-TL-051B C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-211 C14-TL-212 C14-TL-043 C14-TL-042 C14-TL-040 C14-C-1017

Cable: C10BJE1135
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

3C X 4 SQ.MM, 0.6/1kV
Pull Length(m): 183 No. of Cables: 1 Type Code: 30046 End Length(m): 5 Elevation: Schematic: ED-692515

Service: 127V DISTRIBUTION PANEL-2


Routed Length (m): Allowance (m): Total Length (m): 164 9 173 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692515 9

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 10.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-MAJ-47-GB-012 Compartment: Description: LOCAL JUNCTION BOX FOR CVP B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-680571

Routing Information: Remarks: CABLE NOT REQUIRED AS PER LATEST MSD Route: CABLE C10-TL-064D C10-TL-063D C10-TL-060D C10-TL-059D C10-TL-043D C10-TL-044C C10-TL-053C C10-TL-051B C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-211 C14-TL-212 C14-TL-043 C14-TL-042 C14-TL-040 C14-C-1018

Page 111 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
3C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 31 No. of Cables: 1 Type Code: 30156 End Length(m): 5 Elevation: Schematic: ED-692515

Cable: C10BJE1138
Seg Code: L System: BJE Startup Code:

Service: 127V DISTRIBUTION PANEL-2


Routed Length (m): Allowance (m): Total Length (m): 23 3 26 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 10.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C1072ESOP Compartment: End Length(m): 5 Description: DC MOTOR STARTER FOR EMERGENCY SEAL OIL PUMP BLOCK-1 North: Equip Location: Zone: East: Elevation: Wiring Dwg: Location Dwg: EA-681121 Schematic: ED-692515

Routing Information: Remarks: Route: CABLE C10-TL-060A C10-TL-059A C10-TL-043A C10-TL-044A C10-TL-053A CABLE

Cable: C10BJE1139
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

3C X 10 SQ.MM, 0.6/1kV
Pull Length(m): 130 No. of Cables: 1 Type Code: 30106 End Length(m): 5 Elevation: Schematic: ED-692515

Service: 127V DISTRIBUTION PANEL-2


Routed Length (m): Allowance (m): Total Length (m): 123 7 130 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692515 3

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 10.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C100102 Compartment: Description: GENERATOR CONT & PROT PNL BLK-1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-060B C10-TL-059B C10-TL-043B C10-TL-044B C10-TL-053B C10-TL-051A C10-TL-025A C10-TL-219A C10-TL-218A C10-TL-217A C10-TL-221A C14-TL-202B C14-TL-204B C14-TL-207B C14-TL-049B C14-TL-050B C14-TL-052A CABLE

Cable: C10BJE1140
Seg Code: L System: BJE Startup Code:

Rev: 00

Description:

3C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 100 No. of Cables: 1 Type Code: 30026 End Length(m): 5 Elevation: Schematic: ED-692515

Service: 127V DISTRIBUTION PANEL-2


Routed Length (m): Allowance (m): Total Length (m): 52 4 56 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692515 7

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 10.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-CPB-66-GH-023 Compartment: Description: B1BT I/O CABINET-2_TMR North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-060A C10-TL-059A C10-TL-043A C10-TL-042A C10-TL-017A C10-TL-018A CABLE C10-TL-019 C10-TL-045 C10-TL-046 C10-TL-120 C10-TL-123 C10-TL-126 C10-TL-129 CABLE

Page 112 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 160 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-692516

Cable: C10BJE1148
Seg Code: L System: BJE Startup Code:

Service: HRSG HP STEAM COMMON HEADER DRAIN LINE MOV-2


Routed Length (m): Allowance (m): Total Length (m): 149 8 157 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 11.7.2 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-LBA-46-AA-006 Compartment: End Length(m): 5 Description: C10 HP DRN POT MOV North: 1771.00 Equip Location: Zone: East: 2327.27 Elevation: 13.28 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-692516

Routing Information: Remarks: Route: CABLE C10-TL-060C C10-TL-059C C10-TL-043C C10-TL-042C C10-TL-017C C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-097B C14-TL-093B C14-TL-091B C14-C-1222

Cable: C10BJE1149
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 260 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-692517

Service: LCP BLOCKWISE AUTOMATIC BACKWASH STRAINER -1


Routed Length (m): Allowance (m): Total Length (m): 246 12 258 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692517 20

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 13.2.2 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-PGP-56-GH-021 Compartment: Description: BLK-1 BACKWASH STNR -1 PNL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-060A C10-TL-059A C10-TL-043A C10-TL-042A C10-TL-017A C10-TL-018A C10-TL-020A C10-TL-023A C10-TL-223A C10-TL-222A C14-TL-202A C14-TL-204A C14-TL-207A C14-TL-049A C14-TL-050A C14-TL-051 C14-TL-002 C14-TL-006B C14-TL-008C C14-TL-009B C14-TL-011B C14-TL-012 C14-TL-013 C14-TL-014 C14-TL-015 C14-TL-016 C14-C-1223

Cable: C10BJE1150
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 267 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-692518

Service: LCP BLOCKWISE AUTOMATIC BACKWASH STRAINER -2


Routed Length (m): Allowance (m): Total Length (m): 255 12 267 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692518 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 13.3.2 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-PGP-56-GH-022 Compartment: Description: BLK-1 BACKWASH STNR -2 PNL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-060A C10-TL-059A C10-TL-043A C10-TL-042A C10-TL-017A C10-TL-018A C10-TL-020A C10-TL-023A C10-TL-223A C10-TL-222A C14-TL-202A C14-TL-204A C14-TL-207A C14-TL-049A C14-TL-050A C14-TL-051 C14-TL-002 C14-TL-006B C14-TL-008C C14-TL-009B C14-TL-011B C14-TL-012 C14-TL-013 C14-TL-019 C14-TL-020 C14-TL-021 C14-TL-103 C14-C-1224

Page 113 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
4C X 50 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40506 End Length(m): 10 Elevation: Schematic: ED-692458

Cable: C10BJE1151
Seg Code: L System: BJE Startup Code:

Service: WELDING RECEPTACLE STG ELECTRICAL BLDG


Routed Length (m): Allowance (m): Total Length (m): 10 2 12 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE58GA Compartment: Description: JB FOR STG ELECTRICAL BLDG WELDING RECEPTACLE Equip Location: Zone: East: North: Location Dwg: EA-681111 Wiring Dwg: Routing Information: Remarks: Route: FIELD ROUTED

Cable To End: Equipment No: C10BJS06 Compartment: End Length(m): 0 Description: WELDING RECEPTACLE MEZZANINE FLOOR FOR STG BUILDING (63A) North: Equip Location: Zone: East: Elevation: Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-692458

Cable: C10BJE1152
Seg Code: L System: BJE Startup Code:

Rev: 00

Description:

4C X 50 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40506 End Length(m): 5 Elevation: Schematic: ED-692458

Service: WELDING RECEPTACLE STG ELECTRICAL BLDG


Routed Length (m): Allowance (m): Total Length (m): 71 5 76 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE58GA Compartment: Description: JB FOR STG ELECTRICAL BLDG WELDING RECEPTACLE Equip Location: Zone: East: North: Location Dwg: EA-681111 Wiring Dwg:

Cable To End: Equipment No: C10BJS07 Compartment: End Length(m): 15 Description: WELDING RECEPTACLE OPERATING FLOOR FOR STG BUILDING (63A) North: Equip Location: Zone: East: Elevation: Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-692458

Routing Information: Remarks: Route: CABLE C14-TL-071 C14-TL-073 C14-TL-074 C14-TL-075 C14-TL-080 FIELD ROUTED

Cable: C10BJE1154
Seg Code: L System: BJE Startup Code:

Rev: 02

Description:

3C X 6 SQ.MM, 0.6/1kV
Pull Length(m): 180 No. of Cables: 1 Type Code: 30066 End Length(m): 5 Elevation: Schematic: ED-692515

Service: 127V DISTRIBUTION PANEL-2


Routed Length (m): Allowance (m): Total Length (m): 171 9 180 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692515 7

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 10.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BAB01 Description: NGT FOR STG BLK-1 Equip Location: Zone: Location Dwg: EA-681111

Routing Information: Remarks: CABLE NOT REQUIRED AS PER LATEST MSD Route: CABLE C10-TL-063C C10-TL-060C C10-TL-059C C10-TL-043C C10-TL-042C C10-TL-017C C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-098 C14-TL-067 C14-TL-066 C14-TL-071 C14-TL-073 C14-C-1285

Page 114 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
3C X 70 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 30706 End Length(m): 5 Elevation: Schematic: ED-692515

Cable: C10BJE1156
Seg Code: L System: BJE Startup Code:

Service: 127V DISTRIBUTION PANEL-2


Routed Length (m): Allowance (m): Total Length (m): 184 9 193 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692515 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 10.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10MKC01 Compartment: Description: EXCITATION XFMR FOR BLK-1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-060B C10-TL-059B C10-TL-043B C10-TL-044B C10-TL-053B C10-TL-051A C10-TL-025A C10-TL-219A C10-TL-218A C10-TL-217A C10-TL-221A C14-TL-202B C14-TL-204B C14-TL-207B C14-TL-049B C14-TL-050B C14-TL-052A C14-TL-053A C14-TL-054A C14-TL-055A C14-TL-065A C14-TL-003 C14-TL-008A C14-TL-004 C14-EC-001

Cable: C10BJE1157
Seg Code: L System: BJE Startup Code:

Rev: 00

Description:

3C X 35 SQ.MM, 0.6/1kV
Pull Length(m): 130 No. of Cables: 1 Type Code: 30356 End Length(m): 5 Elevation: Schematic: ED-692515

Service: 127V DISTRIBUTION PANEL-2


Routed Length (m): Allowance (m): Total Length (m): 132 7 139 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692515 3

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 10.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C101017 Compartment: Description: EX2100 PNL FOR BLK-1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-063B C10-TL-060B C10-TL-059B C10-TL-043B C10-TL-044B C10-TL-053B C10-TL-051A C10-TL-025A C10-TL-219A C10-TL-218A C10-TL-217A C10-TL-221A C14-TL-202B C14-TL-204B C14-TL-207B C14-TL-049B C14-TL-050B C14-TL-052A C14-TL-059A C14-TL-058A CABLE

Cable: C10BJE1158
Seg Code: L System: BJE Startup Code:

Rev: 00

Description:

3C X 16 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 30166 End Length(m): 5 Elevation: Schematic: ED-692515

Service: 127V DISTRIBUTION PANEL-2


Routed Length (m): Allowance (m): Total Length (m): 161 8 169 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692515 15

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 10.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C1023KE-1 Compartment: Description: HEATER-GENERATOR COLLECTOR ENCLOSURE North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-063C C10-TL-060C C10-TL-059C C10-TL-043C C10-TL-042C C10-TL-017C C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-098 C14-TL-067 C14-TL-066 C14-TL-071 FIELD ROUTED

Page 115 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
3C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 243 No. of Cables: 1 Type Code: 30156 End Length(m): 5 Elevation: Schematic: ED-692404

Cable: C10BJE1159
Seg Code: L System: BJE Startup Code:

Service: VAPOR EXTRACTOR MOTOR NO 2 (VXM-2)


Routed Length (m): Allowance (m): Total Length (m): 233 11 244 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692404 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 1.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10JBVXM2 Compartment: Description: JUNCTION BOX- JB/VXM-2 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-064A C10-TL-063A C10-TL-060A C10-TL-059A C10-TL-043A C10-TL-042A C10-TL-017A C10-TL-018A C10-TL-020A C10-TL-023A C10-TL-223A C10-TL-222A C14-TL-202A C14-TL-204A C14-TL-207A C14-TL-049A C14-TL-050A C14-TL-051 C14-TL-002 C14-TL-006B C14-TL-008C C14-TL-009B C14-TL-011B C14-TL-012 C14-TL-025 C14-TL-026 C14-TL-027B C14-TL-029 C14-C-1267

Cable: C10BJE1160
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

3C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 244 No. of Cables: 1 Type Code: 30026 End Length(m): 5 Elevation: Schematic: ED-692405

Service: LUBE OIL PUMP MOTOR-2 (BPM-2)


Routed Length (m): Allowance (m): Total Length (m): 228 11 239 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692405 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 1.8 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10JBBPM2 Compartment: Description: JUNCTION BOX- JB/BPM-2 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-064A C10-TL-063A C10-TL-060A C10-TL-059A C10-TL-043A C10-TL-042A C10-TL-017A C10-TL-018A C10-TL-020A C10-TL-023A C10-TL-223A C10-TL-222A C14-TL-202A C14-TL-204A C14-TL-207A C14-TL-049A C14-TL-050A C14-TL-051 C14-TL-002 C14-TL-006B C14-TL-008C C14-TL-009B C14-TL-011B C14-TL-012 C14-TL-025 C14-TL-026 C14-TL-027B C14-C-1270

Cable: C10BJE1161
Seg Code: L System: BJE Startup Code:

Rev: 02

Description:

3C X 6 SQ.MM, 0.6/1kV
Pull Length(m): 250 No. of Cables: 1 Type Code: 30066 End Length(m): 5 Elevation: Schematic: ED-692408

Service: HYDRAULIC FLUID PUMP MOTOR-A (HFPM-A)


Routed Length (m): Allowance (m): Total Length (m): 234 11 245 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692408 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 1.6 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10JB21 Compartment: Description: JUNCTION BOX- JB/21 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-064A C10-TL-063A C10-TL-060A C10-TL-059A C10-TL-043A C10-TL-042A C10-TL-017A C10-TL-018A C10-TL-020A C10-TL-023A C10-TL-223A C10-TL-222A C14-TL-202A C14-TL-204A C14-TL-207A C14-TL-049A C14-TL-050A C14-TL-051 C14-TL-002 C14-TL-006B C14-TL-008C C14-TL-009B C14-TL-011B C14-TL-012 C14-TL-025 C14-TL-026 C14-TL-030B C14-TL-031 C14-C-1113

Page 116 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
3C X 6 SQ.MM, 0.6/1kV
Pull Length(m): 250 No. of Cables: 1 Type Code: 30066 End Length(m): 5 Elevation: Schematic: ED-692409

Cable: C10BJE1162
Seg Code: L System: BJE Startup Code:

Service: HYDRAULIC FLUID PUMP MOTOR-B (HFPM-B)


Routed Length (m): Allowance (m): Total Length (m): 234 11 245 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692409 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 1.7 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10JB21 Compartment: Description: JUNCTION BOX- JB/21 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-064A C10-TL-063A C10-TL-060A C10-TL-059A C10-TL-043A C10-TL-042A C10-TL-017A C10-TL-018A C10-TL-020A C10-TL-023A C10-TL-223A C10-TL-222A C14-TL-202A C14-TL-204A C14-TL-207A C14-TL-049A C14-TL-050A C14-TL-051 C14-TL-002 C14-TL-006B C14-TL-008C C14-TL-009B C14-TL-011B C14-TL-012 C14-TL-025 C14-TL-026 C14-TL-030B C14-TL-031 C14-C-1113

Cable: C10BJE1163
Seg Code: L System: BJE Startup Code:

Rev: 02

Description:

3C X 6 SQ.MM, 0.6/1kV
Pull Length(m): 245 No. of Cables: 1 Type Code: 30066 End Length(m): 5 Elevation: Schematic: ED-692410

Service: HEATING/COOLING CIRCULATION PUMP MOTOR (HCCM)


Routed Length (m): Allowance (m): Total Length (m): 234 11 245 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692410 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 1.3 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10JB21 Compartment: Description: JUNCTION BOX- JB/21 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-064A C10-TL-063A C10-TL-060A C10-TL-059A C10-TL-043A C10-TL-042A C10-TL-017A C10-TL-018A C10-TL-020A C10-TL-023A C10-TL-223A C10-TL-222A C14-TL-202A C14-TL-204A C14-TL-207A C14-TL-049A C14-TL-050A C14-TL-051 C14-TL-002 C14-TL-006B C14-TL-008C C14-TL-009B C14-TL-011B C14-TL-012 C14-TL-025 C14-TL-026 C14-TL-030B C14-TL-031 C14-C-1113

Cable: C10BJE1164
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

3C X 4 SQ.MM, 0.6/1kV
Pull Length(m): 200 No. of Cables: 1 Type Code: 30046 End Length(m): 5 Elevation: Schematic: ED-692406

Service: GLAND EXHAUSTER BLOWER MOTOR NO 1


Routed Length (m): Allowance (m): Total Length (m): 188 9 197 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692406 20

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 1.4 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10JBGXM1 Compartment: Description: JUNCTION BOX- JB/GXM-1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-064C C10-TL-063C C10-TL-060C C10-TL-059C C10-TL-043C C10-TL-042C C10-TL-017C C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-097B C14-TL-093B C14-TL-091B C14-TL-089 C14-TL-088 C14-TL-090 C14-C-1272

Page 117 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
3C X 4 SQ.MM, 0.6/1kV
Pull Length(m): 207 No. of Cables: 1 Type Code: 30046 End Length(m): 5 Elevation: Schematic: ED-692407

Cable: C10BJE1165
Seg Code: L System: BJE Startup Code:

Service: GLAND EXHAUSTER BLOWER MOTOR NO 2


Routed Length (m): Allowance (m): Total Length (m): 188 9 197 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692407 20

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 1.5 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10JBGXM2 Compartment: Description: JUNCTION BOX- JB/GXM-2 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-064C C10-TL-063C C10-TL-060C C10-TL-059C C10-TL-043C C10-TL-042C C10-TL-017C C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-097B C14-TL-093B C14-TL-091B C14-TL-089 C14-TL-088 C14-TL-090 C14-C-1274

Cable: C10BJE1166
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

3C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 245 No. of Cables: 1 Type Code: 30026 End Length(m): 5 Elevation: Schematic: ED-692459

Service: BEARING LIFT OIL PUMP MOTOR (88QB-2)


Routed Length (m): Allowance (m): Total Length (m): 228 11 239 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692459 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 3.7 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10JB88QB2 Compartment: Description: JUNCTION BOX- JB/88QB-2 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-063A C10-TL-060A C10-TL-059A C10-TL-043A C10-TL-042A C10-TL-017A C10-TL-018A C10-TL-020A C10-TL-023A C10-TL-223A C10-TL-222A C14-TL-202A C14-TL-204A C14-TL-207A C14-TL-049A C14-TL-050A C14-TL-051 C14-TL-002 C14-TL-006B C14-TL-008C C14-TL-009B C14-TL-011B C14-TL-012 C14-TL-025 C14-TL-026 C14-TL-027B C14-TL-029 C14-C-1292

Cable: C10BJE1167
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

3C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 240 No. of Cables: 1 Type Code: 30156 End Length(m): 5 Elevation: Schematic: ED-692460

Service: COOLING AIR FAN MOTOR-1 (CAFM-1)


Routed Length (m): Allowance (m): Total Length (m): 219 11 230 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692460 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 3.3 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10JBCAFM1 Compartment: Description: JUNCTION BOX- JB/CAFM1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-063A C10-TL-060A C10-TL-059A C10-TL-043A C10-TL-042A C10-TL-017A C10-TL-018A C10-TL-020A C10-TL-023A C10-TL-223A C10-TL-222A C14-TL-202A C14-TL-204A C14-TL-207A C14-TL-049A C14-TL-050A C14-TL-051 C14-TL-002 C14-TL-006B C14-TL-008C C14-TL-009B C14-TL-011B C14-TL-012 C14-TL-025 C14-TL-026 C14-C-1294

Page 118 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
3C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 240 No. of Cables: 1 Type Code: 30156 End Length(m): 5 Elevation: Schematic: ED-692461

Cable: C10BJE1168
Seg Code: L System: BJE Startup Code:

Service: COOLING AIR FAN MOTOR-2 (CAFM-2)


Routed Length (m): Allowance (m): Total Length (m): 224 11 235 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692461 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 3.4 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10JBCAFM2 Compartment: Description: JUNCTION BOX- JB/CAFM2 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-064A C10-TL-063A C10-TL-060A C10-TL-059A C10-TL-043A C10-TL-042A C10-TL-017A C10-TL-018A C10-TL-020A C10-TL-023A C10-TL-223A C10-TL-222A C14-TL-202A C14-TL-204A C14-TL-207A C14-TL-049A C14-TL-050A C14-TL-051 C14-TL-002 C14-TL-006B C14-TL-008C C14-TL-009B C14-TL-011B C14-TL-012 C14-TL-025 C14-TL-026 C14-C-1296

Cable: C10BJE1169
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

3C X 16 SQ.MM, 0.6/1kV
Pull Length(m): 255 No. of Cables: 1 Type Code: 30166 End Length(m): 5 Elevation: Schematic: ED-692415

Service: AUX. CIRC WATER BOOSTER PUMP-1 QCCPP FACILITIES


Routed Length (m): Allowance (m): Total Length (m): 243 12 255 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 1.9 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-PGP-56-AP-001 Compartment: End Length(m): 10 Description: AUXILIARY COOLING WATER BOOSTER PUMP North: 1725.20 Equip Location: Zone: East: 2359.80 Elevation: 5.10 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-692415

Routing Information: Remarks: Route: CABLE C10-TL-064A C10-TL-063A C10-TL-060A C10-TL-059A C10-TL-043A C10-TL-042A C10-TL-017A C10-TL-018A C10-TL-020A C10-TL-023A C10-TL-223A C10-TL-222A C14-TL-202A C14-TL-204A C14-TL-207A C14-TL-049A C14-TL-050A C14-TL-051 C14-TL-002 C14-TL-006B C14-TL-008C C14-TL-009B C14-TL-011B C14-TL-012 C14-TL-013 C14-TL-014 C14-TL-015 C14-TL-016 C14-C-1001

Cable: C10BJE1170
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

3C X 16 SQ.MM, 0.6/1kV
Pull Length(m): 250 No. of Cables: 1 Type Code: 30166 End Length(m): 5 Elevation: Schematic: ED-692416

Service: AUX. CIRC WATER BOOSTER PUMP-2 QCCPP FACILITIES


Routed Length (m): Allowance (m): Total Length (m): 235 11 246 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 2.11 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-PGP-56-AP-002 Compartment: End Length(m): 10 Description: AUXILIARY COOLING WATER BOOSTER PUMP North: 1725.20 Equip Location: Zone: East: 2355.80 Elevation: 5.10 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-692416

Routing Information: Remarks: Route: CABLE C10-TL-064A C10-TL-063A C10-TL-060A C10-TL-059A C10-TL-043A C10-TL-042A C10-TL-017A C10-TL-018A C10-TL-020A C10-TL-023A C10-TL-223A C10-TL-222A C14-TL-202A C14-TL-204A C14-TL-207A C14-TL-049A C14-TL-050A C14-TL-051 C14-TL-002 C14-TL-006B C14-TL-008C C14-TL-009B C14-TL-011B C14-TL-012 C14-TL-013 C14-TL-014 C14-TL-015 C14-C-1002

Page 119 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
3C X 6 SQ.MM, 0.6/1kV
Pull Length(m): 195 No. of Cables: 1 Type Code: 30066 End Length(m): 7 Elevation: Schematic: ED-692433

Cable: C10BJE1171
Seg Code: L System: BJE Startup Code:

Service: VACUUM PUMP MOTOR-1


Routed Length (m): Allowance (m): Total Length (m): 193 10 203 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692433 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 3.9 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-MAJ-47-AP-001 Compartment: Description: VACCUM PUMP MOTOR A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-064D C10-TL-036D C10-TL-034 C10-TL-006C C10-TL-005D C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-020D C10-TL-022C C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-211 C14-TL-212 C14-TL-043 C14-TL-042 C14-TL-041 C10-D061-01

Cable: C10BJE1172
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

3C X 6 SQ.MM, 0.6/1kV
Pull Length(m): 201 No. of Cables: 1 Type Code: 30066 End Length(m): 7 Elevation: Schematic: ED-692434

Service: VACUUM PUMP MOTOR-2


Routed Length (m): Allowance (m): Total Length (m): 190 10 200 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692434 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 3.8 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-MAJ-47-AP-002 Compartment: Description: VACCUM PUMP MOTOR B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-064D C10-TL-036D C10-TL-034 C10-TL-006C C10-TL-005D C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-020D C10-TL-022C C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-211 C14-TL-212 C14-TL-043 C14-TL-042 C14-TL-041 C10-D061-02

Cable: C10BJE1173
Seg Code: L System: BJE Startup Code:

Rev: 01

Description:

3C X 6 SQ.MM, 0.6/1kV
Pull Length(m): 200 No. of Cables: 1 Type Code: 30066 End Length(m): 7 Elevation: Schematic: ED-692435

Service: VACUUM PUMP MOTOR-3


Routed Length (m): Allowance (m): Total Length (m): 187 9 196 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692435 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 2.10 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-MAJ-47-AP-003 Compartment: Description: VACCUM PUMP MOTOR C North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-064D C10-TL-036D C10-TL-034 C10-TL-006C C10-TL-005D C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-020D C10-TL-022C C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-211 C14-TL-212 C14-TL-043 C14-TL-042 C14-TL-041 C10-D061-03

Page 120 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
3C X 2.5 SQ.MM, 0.6/1kV
Pull Length(m): 100 No. of Cables: 1 Type Code: 30026 End Length(m): 5 Elevation: Schematic: ED-692514

Cable: C10BJE1174
Seg Code: L System: BJE Startup Code:

Service: 127V DISTRIBUTION PANEL-1


Routed Length (m): Allowance (m): Total Length (m): 54 4 58 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692514 7

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 7.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-CPB-66-GH-024 Compartment: Description: B1BT I/O CABINET-3_SIMP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-063A C10-TL-060A C10-TL-059A C10-TL-043A C10-TL-042A C10-TL-017A C10-TL-018A CABLE C10-TL-019 C10-TL-045 C10-TL-046 C10-TL-120 C10-TL-123 C10-TL-126 C10-TL-129 CABLE

Cable: C10BJE1175
Seg Code: L System: BJE Startup Code:

Rev: 02

Description:

3C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 183 No. of Cables: 1 Type Code: 30026 End Length(m): 7 Elevation: Schematic: ED-692514

Service: 127V DISTRIBUTION PANEL-1


Routed Length (m): Allowance (m): Total Length (m): 164 9 173 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692514 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 7.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-QUM-49-AP-GH-001 Compartment: Description: HOTWELL PUMP LCP A (BLOCK-1) North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-064D C10-TL-036D C10-TL-034 C10-TL-006C C10-TL-005D C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-020D C10-TL-022C C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-210 C14-TL-046 C14-TL-045 C14-TL-044 C14-C-1271

Cable: C10BJE1176
Seg Code: L System: BJE Startup Code:

Rev: 02

Description:

3C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 183 No. of Cables: 1 Type Code: 30026 End Length(m): 7 Elevation: Schematic: ED-692514

Service: 127V DISTRIBUTION PANEL-1


Routed Length (m): Allowance (m): Total Length (m): 164 9 173 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692514 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 7.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-QUM-49-AP-GH-002 Compartment: Description: HOTWELL PUMP LCP B (BLOCK-1) North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-064D C10-TL-036D C10-TL-034 C10-TL-006C C10-TL-005D C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-020D C10-TL-022C C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-210 C14-TL-046 C14-TL-045 C14-TL-044 C14-C-1273

Page 121 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
3C X 16 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 30166 End Length(m): 5 Elevation: Schematic: ED-692515

Cable: C10BJE1177
Seg Code: L System: BJE Startup Code:

Service: 127V DISTRIBUTION PANEL-2


Routed Length (m): Allowance (m): Total Length (m): 234 11 245 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692515 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 10.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10JB21 Compartment: 10.1 Description: JUNCTION BOX- JB/21 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-064A C10-TL-063A C10-TL-060A C10-TL-059A C10-TL-043A C10-TL-042A C10-TL-017A C10-TL-018A C10-TL-020A C10-TL-023A C10-TL-223A C10-TL-222A C14-TL-202A C14-TL-204A C14-TL-207A C14-TL-049A C14-TL-050A C14-TL-051 C14-TL-002 C14-TL-006B C14-TL-008C C14-TL-009B C14-TL-011B C14-TL-012 C14-TL-025 C14-TL-026 C14-TL-030B C14-TL-031 C14-C-1113

Cable: C10BJE1178
Seg Code: L System: BJE Startup Code:

Rev: 00

Description:

3C X 10 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 30106 End Length(m): 5 Elevation: Schematic: ED-692515

Service: 127V DISTRIBUTION PANEL-2


Routed Length (m): Allowance (m): Total Length (m): 170 9 179 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692515 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 10.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BBT01 Compartment: Description: UNIT AUXILIARY XFMR (UAT) BLK-1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-063A C10-TL-060A C10-TL-039A C10-TL-029A C10-TL-015A C10-TL-003A C10-TL-002A C10-TL-001A C10-TL-226A C10-TL-225A C14-TL-201A C14-TL-203A C14-TL-205A C10-EMH-007 C10-D065-05 C10-EMH-006 C10-D064-13

Cable: C10BJE1179
Seg Code: L System: BJE Startup Code:

Rev: 00

Description:

3C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): No. of Cables: 1 Type Code: 30156 End Length(m): 5 Elevation: Schematic: ED-692515

Service: 127V DISTRIBUTION PANEL-2


Routed Length (m): Allowance (m): Total Length (m): 22 3 25 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692515 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 10.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-060C C10-TL-063C C10-TL-064C CABLE

Cable To End: Equipment No: C10-CYF-88-GL-011 Compartment: Description: BLK-1 MV_LV BLDG SLAVE CLOCK North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Page 122 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
3C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 30156 End Length(m): 5 Elevation: Schematic: ED-692515

Cable: C10BJE1180
Seg Code: L System: BJE Startup Code:

Service: 127V DISTRIBUTION PANEL-2


Routed Length (m): Allowance (m): Total Length (m): 142 8 150 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692515 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 10.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-CYF-88-GL-016 Compartment: Description: BLK-1 STG ELEC BLDG SLAVE CLOCK-1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-063B C10-TL-060B C10-TL-059B C10-TL-043B C10-TL-044B C10-TL-053B C10-TL-051A C10-TL-025A C10-TL-219A C10-TL-218A C10-TL-217A C10-TL-221A C14-TL-202B C14-TL-204B C14-TL-207B C14-TL-049B C14-TL-050B C14-TL-052A C14-TL-059A C14-TL-058A C14-TL-056A C14-TL-065A CABLE

Cable: C10BJE1181
Seg Code: L System: BJE Startup Code:

Rev: 00

Description:

3C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 150 No. of Cables: 1 Type Code: 30156 End Length(m): 5 Elevation: Schematic: ED-692515

Service: 127V DISTRIBUTION PANEL-2


Routed Length (m): Allowance (m): Total Length (m): 166 9 175 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692515 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 10.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-CYF-88-GL-017 Compartment: Description: BLK-1 STG ELEC BLDG SLAVE CLOCK-2 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-063D C10-TL-038C C10-TL-031D C10-TL-032D C10-TL-011C C10-TL-010C C10-TL-006C C10-TL-005D C10-TL-004B C10-TL-016A CABLE C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-098 C14-TL-067 C14-TL-066 C14-TL-070 FIELD ROUTED

Cable: C10BJE1182
Seg Code: L System: BJE Startup Code:

Rev: 00

Description:

3C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 240 No. of Cables: 1 Type Code: 30156 End Length(m): 240 Elevation: Schematic: ED-692515

Service: 127V DISTRIBUTION PANEL-2


Routed Length (m): Allowance (m): Total Length (m): 240 11 251 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692515 0

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 10.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: CABLE ALREADY PULLED BEFORE ISSUENCE. Route: FIELD ROUTED

Cable To End: Equipment No: C10-CYF-88-GL-006 Compartment: Description: BLK-1 IA_SA BLDG SLAVE CLOCK North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681141

Page 123 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
3C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 30156 End Length(m): 5 Elevation: Schematic: ED-692514

Cable: C10BJE1183
Seg Code: L System: BJE Startup Code:

Service: 127V DISTRIBUTION PANEL-1


Routed Length (m): Allowance (m): Total Length (m): 18 3 21 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692514 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 7.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10SP-EBPM Compartment: Description: SPACE HEATER FOR EBPM BLOCK-1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-063A C10-TL-060A C10-TL-059A C10-TL-043A CABLE

Cable: C10BJE1184
Seg Code: L System: BJE Startup Code:

Rev: 00

Description:

3C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): No. of Cables: 1 Type Code: 30156 End Length(m): 5 Elevation: Schematic: ED-692515

Service: 127V DISTRIBUTION PANEL-2


Routed Length (m): Allowance (m): Total Length (m): 23 3 26 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692515 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 10.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10SP-ESOP Compartment: Description: SPACE HEATER FOR ESOP BLOCK-1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-060A C10-TL-059A C10-TL-043A C10-TL-044A C10-TL-053A CABLE

Cable: C10BJE1185
Seg Code: L System: BJE Startup Code:

Rev: 00

Description:

4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40046 End Length(m): 5 Elevation: Schematic: ED-692403

Service: GENERATOR SPACE HEATER (23HG-1,2)


Routed Length (m): Allowance (m): Total Length (m): 177 9 186 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692403 30

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 5.1.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10JB508 Compartment: Description: JUNCTION BOX- JB/508 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-063C C10-TL-060C C10-TL-059C C10-TL-043C C10-TL-042C C10-TL-017C C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-098 C14-TL-067 C14-TL-066 C14-TL-071 C14-C-1266

Page 124 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
3C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 30156 End Length(m): 5 Elevation: Schematic: ED-692462

Cable: C10BJE1186
Seg Code: L System: BJE Startup Code:

Service: COOLING AIR FAN-1 HP/IP ENCLOSURE (CFM-1)


Routed Length (m): Allowance (m): Total Length (m): 177 9 186 Option 1: CFM CABLES Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692462 15

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 6.4 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10JBCFM1 Compartment: Description: JUNCTION BOX-JB/CFM-1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-063C C10-TL-060C C10-TL-059C C10-TL-043C C10-TL-042C C10-TL-017C C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-097B C14-TL-093B C14-TL-091B C14-TL-089 C14-TL-088 C14-TL-090 FIELD ROUTED

Cable: C10BJE1187
Seg Code: L System: BJE Startup Code:

Rev: 00

Description:

3C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): No. of Cables: 1 Type Code: 30156 End Length(m): 5 Elevation: Schematic: ED-692463

Service: COOLING AIR FAN-2 HP/IP ENCLOSURE (CFM-2)


Routed Length (m): Allowance (m): Total Length (m): 151 8 159 Option 1: CFM CABLES Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692463 15

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 6.3 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10JBCFM2 Compartment: Description: JUNCTION BOX-JB/CFM-2 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-063C C10-TL-060C C10-TL-059C C10-TL-043C C10-TL-042C C10-TL-017C C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-097B C14-TL-094 C14-TL-095 FIELD ROUTED

Cable: C10BJE1188
Seg Code: L System: BJE Startup Code:

Rev: 00

Description:

3C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): No. of Cables: 1 Type Code: 30156 End Length(m): 5 Elevation: Schematic: ED-692464

Service: COOLING AIR FAN-1 COUPLING COMPARTMENT (CFM-3)


Routed Length (m): Allowance (m): Total Length (m): 182 9 191 Option 1: CFM CABLES Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692464 15

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 6.1 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10JBCFM3 Compartment: Description: JUNCTION BOX-JB/CFM-3 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-063C C10-TL-060C C10-TL-059C C10-TL-043C C10-TL-042C C10-TL-017C C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-098 C14-TL-067 C14-TL-066 C14-TL-071 C14-TL-073 C14-EC-052

Page 125 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
3C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 30156 End Length(m): 5 Elevation: Schematic: ED-692465

Cable: C10BJE1189
Seg Code: L System: BJE Startup Code:

Service: COOLING AIR FAN-2 COUPLING COMPARTMENT (CFM-4)


Routed Length (m): Allowance (m): Total Length (m): 182 9 191 Option 1: CFM CABLES Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692465 15

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BJE Compartment: 6.2 Description: BLK-1 STEAM TURBINE MAIN MCC Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10JBCFM4 Compartment: Description: JUNCTION BOX-JB/CFM-4 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-063C C10-TL-060C C10-TL-059C C10-TL-043C C10-TL-042C C10-TL-017C C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-098 C14-TL-067 C14-TL-066 C14-TL-071 C14-TL-073 C14-EC-052

Cable: C10BJF1001
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 178 No. of Cables: 1 Type Code: 40026 End Length(m): 5 Elevation: Schematic: ED-691523

Service: HRSG BFP - LUBE OIL PUMP - 2A


Routed Length (m): Allowance (m): Total Length (m): 174 9 183 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691523 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 3.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LAB-45-AP-012 Compartment: Description: BLK#1 HRSG#2 BFP-A OIL PUMP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-012A C10-TL-009A C10-TL-008A C10-TL-035A C10-TL-066B C10-TL-068B C10-TL-070B C10-TL-102B C10-TL-109A C10-TL-107A C10-TL-164A C10-TL-201A C12-TL-520A C12-TL-519A C12-TL-518A C12-TL-516A C12-TL-515A C12-TL-514 C12-TL-512A C12-TL-511A CABLE C12-D001-03 C12-EMH-001 C12-EC-010

Cable: C10BJF1002
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

4C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 173 No. of Cables: 1 Type Code: 40026 End Length(m): 5 Elevation: Schematic: ED-691524

Service: HRSG BFP - LUBE OIL PUMP - 2B


Routed Length (m): Allowance (m): Total Length (m): 177 9 186 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691524 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 3.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LAB-45-AP-022 Compartment: Description: BLK#1 HRSG#2 BFP-B OIL PUMP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-012A C10-TL-009A C10-TL-008A C10-TL-035A C10-TL-066B C10-TL-068B C10-TL-070B C10-TL-102B C10-TL-109A C10-TL-107A C10-TL-164A C10-TL-201A C12-TL-520A C12-TL-519A C12-TL-518A C12-TL-516A C12-TL-515A C12-TL-514 C12-TL-512A C12-TL-511A CABLE C12-D001-02 C12-EMH-001 C12-EC-007

Page 126 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
4C X 2.5 SQ.MM, 0.6/1kV
Pull Length(m): 174 No. of Cables: 1 Type Code: 40026 End Length(m): 5 Elevation: Schematic: ED-691525

Cable: C10BJF1003
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Service: HRSG BFP - LUBE OIL PUMP - 2C


Routed Length (m): Allowance (m): Total Length (m): 180 9 189 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691525 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 3.3 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LAB-45-AP-032 Compartment: Description: BLK#1 HRSG#2 BFP-C OIL PUMP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-012A C10-TL-009A C10-TL-008A C10-TL-035A C10-TL-066B C10-TL-068B C10-TL-070B C10-TL-102B C10-TL-109A C10-TL-107A C10-TL-164A C10-TL-201A C12-TL-520A C12-TL-519A C12-TL-518A C12-TL-516A C12-TL-515A C12-TL-514 C12-TL-512A C12-TL-511A CABLE C12-D001-01 C12-EMH-001 C12-EC-004

Cable: C10BJF1004
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 157 No. of Cables: 1 Type Code: 40026 End Length(m): 5 Elevation: Schematic: ED-691514

Service: HRSG BFP- HP DISCHARGE MOV - 2A


Routed Length (m): Allowance (m): Total Length (m): 157 8 165 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 4.5.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LAB-45-AA-001 Compartment: End Length(m): 5 Description: C12 FW/FWP-A DIS ISO MOV North: 1699.70 Equip Location: Zone: East: 2222.30 Elevation: 13.30 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-691514

Routing Information: Remarks: Route: CABLE C10-TL-012A C10-TL-009A C10-TL-008A C10-TL-035A C10-TL-066B C10-TL-068B C10-TL-070B C10-TL-102B C10-TL-109A C10-TL-107A C10-TL-164A C10-TL-201A C12-TL-520A C12-TL-519A C12-TL-518A C12-TL-516A C12-TL-515A C12-TL-514 C12-TL-510A C12-TL-507 C12-TL-505 C12-C-1103

Cable: C10BJF1005
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 160 No. of Cables: 1 Type Code: 40026 End Length(m): 5 Elevation: Schematic: ED-691515

Service: HRSG BFP- HP DISCHARGE MOV - 2B


Routed Length (m): Allowance (m): Total Length (m): 161 8 169 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 4.6.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LAB-45-AA-005 Compartment: End Length(m): 5 Description: C12 FW/FWP-B DIS ISO MOV North: 1699.80 Equip Location: Zone: East: 2218.30 Elevation: 13.30 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-691515

Routing Information: Remarks: Route: CABLE C10-TL-012A C10-TL-009A C10-TL-008A C10-TL-035A C10-TL-066B C10-TL-068B C10-TL-070B C10-TL-102B C10-TL-109A C10-TL-107A C10-TL-164A C10-TL-201A C12-TL-520A C12-TL-519A C12-TL-518A C12-TL-516A C12-TL-515A C12-TL-514 C12-TL-510A C12-TL-507 C12-TL-505 C12-TL-503 C12-C-1104

Page 127 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
4C X 2.5 SQ.MM, 0.6/1kV
Pull Length(m): 181 No. of Cables: 1 Type Code: 40026 End Length(m): 5 Elevation: Schematic: ED-691516

Cable: C10BJF1006
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Service: HRSG BFP- HP DISCHARGE MOV - 2C


Routed Length (m): Allowance (m): Total Length (m): 165 9 174 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 4.6.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LAB-45-AA-009 Compartment: End Length(m): 5 Description: C12 FW/FWP-C DIS ISO MOV North: 1699.80 Equip Location: Zone: East: 2214.30 Elevation: 13.30 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-691516

Routing Information: Remarks: Route: CABLE C10-TL-012A C10-TL-009A C10-TL-008A C10-TL-035A C10-TL-066B C10-TL-068B C10-TL-070B C10-TL-102B C10-TL-109A C10-TL-107A C10-TL-164A C10-TL-201A C12-TL-520A C12-TL-519A C12-TL-518A C12-TL-516A C12-TL-515A C12-TL-514 C12-TL-510A C12-TL-507 C12-TL-505 C12-TL-503 C12-TL-501 C12-C-1105

Cable: C10BJF1007
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 165 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691517

Service: HRSG BFP - HP DISCHARGE MOV EQUALIZING MOV- 2A


Routed Length (m): Allowance (m): Total Length (m): 157 8 165 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691517 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 4.7.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LAB-45-AA-012 Compartment: Description: RESERVED; MOV INTEGRAL VALVE; SEE VENDOR DWG. North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-012A C10-TL-009A C10-TL-008A C10-TL-035A C10-TL-066B C10-TL-068B C10-TL-070B C10-TL-102B C10-TL-109A C10-TL-107A C10-TL-164A C10-TL-201A C12-TL-520A C12-TL-519A C12-TL-518A C12-TL-516A C12-TL-515A C12-TL-514 C12-TL-510A C12-TL-507 C12-TL-505 C12-C-1106

Cable: C10BJF1008
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 170 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691518

Service: HRSG BFP - HP DISCHARGE MOV EQUALIZING MOV- 2B


Routed Length (m): Allowance (m): Total Length (m): 161 8 169 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691518 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 5.5.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LAB-45-AA-013 Compartment: Description: RESERVED; MOV INTEGRAL VALVE; SEE VENDOR DWG. North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-012A C10-TL-009A C10-TL-008A C10-TL-035A C10-TL-066B C10-TL-068B C10-TL-070B C10-TL-102B C10-TL-109A C10-TL-107A C10-TL-164A C10-TL-201A C12-TL-520A C12-TL-519A C12-TL-518A C12-TL-516A C12-TL-515A C12-TL-514 C12-TL-510A C12-TL-507 C12-TL-505 C12-TL-503 C12-C-1107

Page 128 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 174 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691519

Cable: C10BJF1009
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Service: HRSG BFP - HP DISCHARGE MOV EQUALIZING MOV- 2C


Routed Length (m): Allowance (m): Total Length (m): 165 9 174 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691519 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 11.3.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LAB-45-AA-014 Compartment: Description: RESERVED; MOV INTEGRAL VALVE; SEE VENDOR DWG. North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-012A C10-TL-009A C10-TL-008A C10-TL-035A C10-TL-066B C10-TL-068B C10-TL-070B C10-TL-102B C10-TL-109A C10-TL-107A C10-TL-164A C10-TL-201A C12-TL-520A C12-TL-519A C12-TL-518A C12-TL-516A C12-TL-515A C12-TL-514 C12-TL-510A C12-TL-507 C12-TL-505 C12-TL-503 C12-TL-501 C12-C-1108

Cable: C10BJF1010
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 03

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 167 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691520

Service: HRSG BFP - IP DISCHARGE MOV - 2A


Routed Length (m): Allowance (m): Total Length (m): 159 8 167 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 11.3.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LAB-45-AA-003 Compartment: End Length(m): 7 Description: C12 FW//FWP-A IP DIS ISO MOV North: 1701.70 Equip Location: Zone: East: 2220.00 Elevation: 13.30 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-691520

Routing Information: Remarks: Route: CABLE C10-TL-012A C10-TL-009A C10-TL-008A C10-TL-035A C10-TL-066B C10-TL-068B C10-TL-070B C10-TL-102B C10-TL-109A C10-TL-107A C10-TL-164A C10-TL-201A C12-TL-520A C12-TL-519A C12-TL-518A C12-TL-516A C12-TL-515A C12-TL-514 C12-TL-510A C12-TL-507 C12-TL-505 C12-C-1109

Cable: C10BJF1011
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 03

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 170 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691521

Service: HRSG BFP - IP DISCHARGE MOV - 2B


Routed Length (m): Allowance (m): Total Length (m): 163 9 172 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 9.1.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LAB-45-AA-007 Compartment: End Length(m): 7 Description: C12 FW//FWP-B IP DIS ISO MOV North: 1701.70 Equip Location: Zone: East: 2216.10 Elevation: 13.30 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-691521

Routing Information: Remarks: Route: CABLE C10-TL-012A C10-TL-009A C10-TL-008A C10-TL-035A C10-TL-066B C10-TL-068B C10-TL-070B C10-TL-102B C10-TL-109A C10-TL-107A C10-TL-164A C10-TL-201A C12-TL-520A C12-TL-519A C12-TL-518A C12-TL-516A C12-TL-515A C12-TL-514 C12-TL-510A C12-TL-507 C12-TL-505 C12-TL-503 C12-C-1110

Page 129 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 03 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 174 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691522

Cable: C10BJF1012
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Service: HRSG BFP - IP DISCHARGE MOV - 2C


Routed Length (m): Allowance (m): Total Length (m): 165 9 174 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 11.2.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LAB-45-AA-011 Compartment: End Length(m): 5 Description: C12 FW//FWP-C IP DIS ISO MOV North: 1701.70 Equip Location: Zone: East: 2212.10 Elevation: 13.30 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-691522

Routing Information: Remarks: Route: CABLE C10-TL-012A C10-TL-009A C10-TL-008A C10-TL-035A C10-TL-066B C10-TL-068B C10-TL-070B C10-TL-102B C10-TL-109A C10-TL-107A C10-TL-164A C10-TL-201A C12-TL-520A C12-TL-519A C12-TL-518A C12-TL-516A C12-TL-515A C12-TL-514 C12-TL-510A C12-TL-507 C12-TL-505 C12-TL-503 C12-TL-501 C12-C-1111

Cable: C10BJF1013
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 03

Description:

4C X 10 SQ.MM, 0.6/1kV
Pull Length(m): 184 No. of Cables: 1 Type Code: 40106 End Length(m): 5 Elevation: Schematic: ED-691526

Service: HP HYDRAULIC PUMP LCP-UNIT-1


Routed Length (m): Allowance (m): Total Length (m): 188 9 197 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691526 15

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 4.1.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LBA-25-GH-001 Compartment: Description: BLK-1 HRSG-2 # HP BYP HSU PANEL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-012C C10-TL-009C C10-TL-008C C10-TL-035C C10-TL-066D C10-TL-068D C10-TL-070D C10-TL-102D C10-TL-109C C10-TL-107C C10-TL-164C C10-TL-201C C12-TL-520C C12-TL-519C C12-TL-518C C12-TL-517 C12-TL-201 C12-TL-102 C12-TL-203 C12-TL-101 C12-TL-110 C12-TL-111 C12-TL-112 C12-TL-113 C12-TL-114 C12-TL-115 C12-TL-117 C12-C-1112

Cable: C10BJF1014
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 10 SQ.MM, 0.6/1kV
Pull Length(m): 125 No. of Cables: 1 Type Code: 40106 End Length(m): 5 Elevation: Schematic: ED-691527

Service: HRH HYDRAULIC PUMP LCP-UNIT1


Routed Length (m): Allowance (m): Total Length (m): 112 7 119 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691527 7

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 4.1.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LBB-29-GH-001 Compartment: Description: BLK-1 HRSG-2 # IP BYP HSU PANEL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-012D C10-TL-013B C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-020D C10-TL-022C C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C12-C-1113

Page 130 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
4C X 10 SQ.MM, 0.6/1kV
Pull Length(m): 197 No. of Cables: 1 Type Code: 40106 End Length(m): 10 Elevation: Schematic: ED-691528

Cable: C10BJF1015
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Service: LP HYDRAULIC PUMP FOR LCP-UNIT1


Routed Length (m): Allowance (m): Total Length (m): 176 9 185 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691528 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 4.2.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LBD-26-GH-001 Compartment: Description: BLK-1 HRSG-2 # LP BYP HSU PANEL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-032C C10-TL-037C C10-TL-063C C10-TL-060C C10-TL-059C C10-TL-043C C10-TL-042C C10-TL-017C C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-097B C14-TL-093B C14-TL-091B CABLE C14-TL-089 C14-TL-087 C14-TL-086 C14-C-1106

Cable: C10BJF1016
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 03

Description:

4C X 10 SQ.MM, 0.6/1kV
Pull Length(m): 179 No. of Cables: 1 Type Code: 40106 End Length(m): 5 Elevation: Schematic: ED-691529

Service: FEED TO MCC OF CHEMICAL FEED SYSTEM FOR HRSG #2


Routed Length (m): Allowance (m): Total Length (m): 151 8 159 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691529 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 4.2.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-QCC-39-GW-001 Compartment: Description: CHEMICAL FEED SYSTEM MCC FOR HRSG #2 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685564

Routing Information: Remarks: Route: CABLE C10-TL-012B C10-TL-009B C10-TL-008B C10-TL-035B C10-TL-066C C10-TL-068C C10-TL-070C C10-TL-102C C10-TL-109B C10-TL-107B C10-TL-164B C10-TL-201B C12-TL-520B C12-TL-519B C12-TL-518B C12-TL-516B C12-TL-515B C12-TL-513 C12-TL-512B C12-C-1131

Cable: C10BJF1017
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 25 SQ.MM, 0.6/1kV
Pull Length(m): 150 No. of Cables: 1 Type Code: 40256 End Length(m): 5 Elevation: Schematic: ED-691530

Service: HRSG REHEATER TO IP TURBINE MOV-UNIT1


Routed Length (m): Allowance (m): Total Length (m): 138 8 146 Option 1: Option 2: Option 3: Compartment: North: 1776.70 Wiring Dwg: Shield: N Ground: Jacket: PVC End Length(m): 7

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 4.7.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LBB-29-AA-001 Description: C12 HR MOV Equip Location: Zone: Location Dwg: EA-681111

East: 2317.70 Elevation: 10.20 Schematic: ED-691530

Routing Information: Remarks: Route: CABLE C10-TL-031D C10-TL-014C C10-TL-013B C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-020D C10-TL-022C C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-211 C14-TL-212 C14-TL-043 C14-C-1107

Page 131 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 146 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691531

Cable: C10BJF1018
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Service: HRSG REHEATER TO IP TURBINE MOV (EQUALIZING VALVE)-UNIT1


Routed Length (m): Allowance (m): Total Length (m): 138 8 146 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691531 7

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 4.8.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LBB-29-AA-008 Description: C12 HR EQUAL. MOV Equip Location: Zone: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-031D C10-TL-014C C10-TL-013B C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-020D C10-TL-022C C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-211 C14-TL-212 C14-TL-043 C14-C-1108

Cable: C10BJF1019
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 135 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691532

Service: HRSG REHEATER DRAIN MOV-2A


Routed Length (m): Allowance (m): Total Length (m): 128 7 135 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 4.8.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LBB-46-AA-004 Compartment: End Length(m): 7 Description: C12 HR DRN POT/CST 004 MOV North: 1776.00 Equip Location: Zone: East: 2306.60 Elevation: 8.20 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-691532

Routing Information: Remarks: Route: CABLE C10-TL-012D C10-TL-013B C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-020D C10-TL-022C C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-211 C12-C-1114

Cable: C10BJF1020
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 132 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691533

Service: HRSG REHEATER DRAIN MOV-2B


Routed Length (m): Allowance (m): Total Length (m): 125 7 132 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 11.6.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LBB-46-AA-007 Compartment: End Length(m): 10 Description: C12 HR DRN POT/CST 007 MOV North: 1775.20 Equip Location: Zone: East: 2310.90 Elevation: 8.20 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-691533

Routing Information: Remarks: Route: CABLE C10-TL-012D C10-TL-013B C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-020D C10-TL-022C C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-210 C12-C-1115

Page 132 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 185 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691534

Cable: C10BJF1021
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Service: HRSG REHEATER DRAIN MOV-2C


Routed Length (m): Allowance (m): Total Length (m): 170 9 179 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 11.6.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LBB-46-AA-010 Compartment: End Length(m): 20 Description: C12 HR DRN POT/COND MOV North: 1719.50 Equip Location: Zone: East: 2225.80 Elevation: 9.20 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-691534

Routing Information: Remarks: Route: CABLE C10-TL-012C C10-TL-009C C10-TL-008C C10-TL-035C C10-TL-066D C10-TL-068D C10-TL-070D C10-TL-102D C10-TL-109C C10-TL-107C C10-TL-164C C10-TL-201C C12-TL-520C C12-TL-519C C12-TL-518C C12-TL-517 C12-TL-201 C12-TL-102 C12-TL-203 C12-TL-101 C12-TL-110 C12-TL-111 C12-TL-112 C12-TL-113 C12-C-1116

Cable: C10BJF1022
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 03

Description:

3C X 240 SQ.MM, 0.6/1kV


Pull Length(m): 165 No. of Cables: 1 Type Code: 32406 End Length(m): 5 Elevation: Schematic: ED-691535

Service: ELEVATOR MAIN POWER


Routed Length (m): Allowance (m): Total Length (m): 165 9 174 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691535 20

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No: Compartment: 9.7 North: Wiring Dwg: East:

Cable To End: Equipment No: C10-HNE-96-GH-001 Compartment: Description: ELEVATOR CONTROL PANEL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-012C C10-TL-009C C10-TL-008C C10-TL-035C C10-TL-066D C10-TL-068D C10-TL-070D C10-TL-102D C10-TL-109C C10-TL-107C C10-TL-164C C10-TL-201C C12-TL-520C C12-TL-519C C12-TL-518C C12-TL-517 C12-TL-201 C12-TL-102 C12-TL-203 C12-TL-101 C12-TL-301 C12-TL-302 C12-TL-311 C12-TL-312 C12-C-1137

Cable: C10BJF1023
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 180 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691536

Service: HRSG HP STEAM DRAIN LINE MOV-2A


Routed Length (m): Allowance (m): Total Length (m): 165 9 174 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 5.1.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LBA-46-AA-007 Compartment: End Length(m): 15 Description: C12 HP DRN POT MOV North: 1717.20 Equip Location: Zone: East: 2225.20 Elevation: 10.20 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-691536

Routing Information: Remarks: Route: CABLE C10-TL-012C C10-TL-009C C10-TL-008C C10-TL-035C C10-TL-066D C10-TL-068D C10-TL-070D C10-TL-102D C10-TL-109C C10-TL-107C C10-TL-164C C10-TL-201C C12-TL-520C C12-TL-519C C12-TL-518C C12-TL-517 C12-TL-201 C12-TL-102 C12-TL-203 C12-TL-101 C12-TL-110 C12-TL-111 C12-TL-112 C12-TL-113 C12-C-1117

Page 133 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 181 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691537

Cable: C10BJF1024
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Service: HRSG HP STEAM DRAIN LINE MOV-2B


Routed Length (m): Allowance (m): Total Length (m): 165 9 174 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 5.1.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LBA-46-AA-008 Compartment: End Length(m): 15 Description: C12 HP DRN POT MOV North: 1715.70 Equip Location: Zone: East: 2223.80 Elevation: 10.40 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-691537

Routing Information: Remarks: Route: CABLE C10-TL-012C C10-TL-009C C10-TL-008C C10-TL-035C C10-TL-066D C10-TL-068D C10-TL-070D C10-TL-102D C10-TL-109C C10-TL-107C C10-TL-164C C10-TL-201C C12-TL-520C C12-TL-519C C12-TL-518C C12-TL-517 C12-TL-201 C12-TL-102 C12-TL-203 C12-TL-101 C12-TL-110 C12-TL-111 C12-TL-112 C12-TL-113 C12-C-1132

Cable: C10BJF1025
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 133 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691538

Service: HRSG HP STEAM DRAIN LINE MOV-2C


Routed Length (m): Allowance (m): Total Length (m): 126 7 133 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 5.2.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LBA-46-AA-005 Compartment: End Length(m): 5 Description: C12 HP DRN POT MOV North: 1778.70 Equip Location: Zone: East: 2305.20 Elevation: 8.10 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-691538

Routing Information: Remarks: Route: CABLE C10-TL-012D C10-TL-013B C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-020D C10-TL-022C C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-211 C12-C-1103

Cable: C10BJF1026
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 169 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691539

Service: HRSG HP BYPASS SPRAY WATER LINE ISOLATION MOV-UNIT2


Routed Length (m): Allowance (m): Total Length (m): 165 9 174 Option 1: Option 2: Option 3: Compartment: North: 1702.50 Wiring Dwg: Shield: N Ground: Jacket: PVC End Length(m): 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 5.2.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LAB-25-AA-002 Description: C12 IP FW SPLY MOV Equip Location: Zone: Location Dwg: EA-681101

East: 2213.30 Elevation: 12.80 Schematic: ED-691539

Routing Information: Remarks: Route: CABLE C10-TL-012A C10-TL-009A C10-TL-008A C10-TL-035A C10-TL-066B C10-TL-068B C10-TL-070B C10-TL-102B C10-TL-109A C10-TL-107A C10-TL-164A C10-TL-201A C12-TL-520A C12-TL-519A C12-TL-518A C12-TL-516A C12-TL-515A C12-TL-514 C12-TL-510A C12-TL-507 C12-TL-505 C12-TL-503 C12-TL-501 C12-C-1120

Page 134 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 167 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691540

Cable: C10BJF1027
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Service: HRSG#2 LP STEAM DRAIN LINE MOV 1


Routed Length (m): Allowance (m): Total Length (m): 135 8 143 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 5.3.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LBD-46-AA-010 Compartment: End Length(m): 5 Description: C12 LP DRN POT/CST MOV North: 1781.30 Equip Location: Zone: East: 2310.50 Elevation: 9.60 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-691540

Routing Information: Remarks: Route: CABLE C10-TL-012D C10-TL-013B C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-020D C10-TL-022C C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-211 C14-TL-212 C14-TL-043 C12-C-1121

Cable: C10BJF1028
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 170 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691541

Service: HRSG#2 LP STEAM DRAIN LINE MOV-2


Routed Length (m): Allowance (m): Total Length (m): 165 9 174 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 5.3.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LBD-46-AA-011 Compartment: End Length(m): 15 Description: C12 LP DRN POT/CST MOV North: 1718.20 Equip Location: Zone: East: 2218.40 Elevation: 8.80 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-691541

Routing Information: Remarks: Route: CABLE C10-TL-012C C10-TL-009C C10-TL-008C C10-TL-035C C10-TL-066D C10-TL-068D C10-TL-070D C10-TL-102D C10-TL-109C C10-TL-107C C10-TL-164C C10-TL-201C C12-TL-520C C12-TL-519C C12-TL-518C C12-TL-517 C12-TL-201 C12-TL-102 C12-TL-203 C12-TL-101 C12-TL-110 C12-TL-111 C12-TL-112 C12-TL-113 C12-C-1122

Cable: C10BJF1029
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 161 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691542

Service: HRSG#2 LP STEAM DRAIN LINE MOV-3


Routed Length (m): Allowance (m): Total Length (m): 165 9 174 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 5.4.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LBD-46-AA-012 Compartment: End Length(m): 15 Description: C12 LP DRN POT/CST MOV North: 1718.20 Equip Location: Zone: East: 2219.20 Elevation: 8.70 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-691542

Routing Information: Remarks: Route: CABLE C10-TL-012C C10-TL-009C C10-TL-008C C10-TL-035C C10-TL-066D C10-TL-068D C10-TL-070D C10-TL-102D C10-TL-109C C10-TL-107C C10-TL-164C C10-TL-201C C12-TL-520C C12-TL-519C C12-TL-518C C12-TL-517 C12-TL-201 C12-TL-102 C12-TL-203 C12-TL-101 C12-TL-110 C12-TL-111 C12-TL-112 C12-TL-113 C12-C-1123

Page 135 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 170 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691543

Cable: C10BJF1030
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Service: HRSG#2 LP STEAM DRAIN LINE MOV-4


Routed Length (m): Allowance (m): Total Length (m): 165 9 174 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 5.4.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LBD-46-AA-013 Compartment: End Length(m): 15 Description: C12 LP DRN POT/CST MOV North: 1702.61 Equip Location: Zone: East: 2211.29 Elevation: 13.69 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-691543

Routing Information: Remarks: Route: CABLE C10-TL-012C C10-TL-009C C10-TL-008C C10-TL-035C C10-TL-066D C10-TL-068D C10-TL-070D C10-TL-102D C10-TL-109C C10-TL-107C C10-TL-164C C10-TL-201C C12-TL-520C C12-TL-519C C12-TL-518C C12-TL-517 C12-TL-201 C12-TL-102 C12-TL-203 C12-TL-101 C12-TL-110 C12-TL-111 C12-TL-112 C12-TL-113 C12-C-1124

Cable: C10BJF1031
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

4C X 10 SQ.MM, 0.6/1kV
Pull Length(m): 186 No. of Cables: 1 Type Code: 40106 End Length(m): 5 Elevation: Schematic: ED-691544

Service: BOILER FEED WATER PUMP HOIST - UNIT-2


Routed Length (m): Allowance (m): Total Length (m): 162 9 171 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691544 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 5.5.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-SML-45-BZ-001 Compartment: Description: BFP SHELTER HOIST UNIT#12 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-012A C10-TL-009A C10-TL-008A C10-TL-035A C10-TL-066B C10-TL-068B C10-TL-070B C10-TL-102B C10-TL-109A C10-TL-107A C10-TL-164A C10-TL-201A C12-TL-520A C12-TL-519A C12-TL-518A C12-TL-516A C12-TL-515A C12-TL-514 C12-TL-510A C12-TL-507 C12-TL-505 C12-C-1125

Cable: C10BJF1032
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 35 SQ.MM, 0.6/1kV
Pull Length(m): 195 No. of Cables: 1 Type Code: 40356 End Length(m): 5 Elevation: Schematic: ED-691545

Service: GUILLOTINE DAMPER SEAL AIR FAN LCP


Routed Length (m): Allowance (m): Total Length (m): 201 10 211 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691545 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 4.3.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-MBR-90-GH-004 Compartment: Description: GUILIOTINE DAMPER SEAL AIR FAN LCP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685564

Routing Information: Remarks: Route: CABLE C10-TL-012C C10-TL-009C C10-TL-008C C10-TL-035C C10-TL-066D C10-TL-068D C10-TL-070D C10-TL-102D C10-TL-109C C10-TL-107C C10-TL-164C C10-TL-201C C12-TL-520C C12-TL-519C C12-TL-518C C12-TL-517 C12-TL-201 C12-TL-102 C12-TL-203 C12-TL-204 C12-TL-205 C12-TL-206 C12-TL-207 C12-TL-208 C12-TL-209 C12-TL-210 C12-TL-211 2CL-A26

Page 136 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 180 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691546

Cable: C10BJF1033
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Service: STACK DAMPER


Routed Length (m): Allowance (m): Total Length (m): 167 9 176 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691546 20

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 5.6.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-HNE-90-AA-001 Description: STACK DAMPER Equip Location: Zone: Location Dwg: EA-685564

Routing Information: Remarks: Route: CABLE C10-TL-012C C10-TL-009C C10-TL-008C C10-TL-035C C10-TL-066D C10-TL-068D C10-TL-070D C10-TL-102D C10-TL-109C C10-TL-107C C10-TL-164C C10-TL-201C C12-TL-520C C12-TL-519C C12-TL-518C C12-TL-517 C12-TL-201 C12-TL-102 C12-TL-203 C12-TL-101 C12-TL-301 C12-TL-302 C12-TL-311 C12-TL-322 C12-C-1133

Cable: C10BJF1034
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

3C X 95 SQ.MM, 0.6/1kV
Pull Length(m): 172 No. of Cables: 1 Type Code: 30956 End Length(m): 5 Elevation: Schematic: ED-691547

Service: LP RECIRC PUMP-1


Routed Length (m): Allowance (m): Total Length (m): 178 9 187 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691547 15

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 3.5 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LCA-92-AP-001 Compartment: Description: CPH RECIRCULATION PUMP-A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685564

Routing Information: Remarks: Route: CABLE C10-TL-012C C10-TL-009C C10-TL-008C C10-TL-035C C10-TL-066D C10-TL-068D C10-TL-070D C10-TL-102D C10-TL-109C C10-TL-107C C10-TL-164C C10-TL-201C C12-TL-520C C12-TL-519C C12-TL-518C C12-TL-517 C12-TL-201 C12-TL-102 C12-TL-203 C12-TL-101 C12-TL-110 C12-TL-111 C12-TL-112 C12-TL-113 2CL-A08

Cable: C10BJF1035
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

3C X 95 SQ.MM, 0.6/1kV
Pull Length(m): 182 No. of Cables: 1 Type Code: 30956 End Length(m): 5 Elevation: Schematic: ED-691547

Service: LP RECIRC PUMP-1


Routed Length (m): Allowance (m): Total Length (m): 178 9 187 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691547 15

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 3.5 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LCA-92-AP-001 Compartment: Description: CPH RECIRCULATION PUMP-A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685564

Routing Information: Remarks: Route: CABLE C10-TL-012C C10-TL-009C C10-TL-008C C10-TL-035C C10-TL-066D C10-TL-068D C10-TL-070D C10-TL-102D C10-TL-109C C10-TL-107C C10-TL-164C C10-TL-201C C12-TL-520C C12-TL-519C C12-TL-518C C12-TL-517 C12-TL-201 C12-TL-102 C12-TL-203 C12-TL-101 C12-TL-110 C12-TL-111 C12-TL-112 C12-TL-113 2CL-A08

Page 137 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
4C X 6 SQ.MM, 0.6/1kV
Pull Length(m): 170 No. of Cables: 1 Type Code: 40066 End Length(m): 5 Elevation: Schematic: ED-691549

Cable: C10BJF1036
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Service: HOIST-A
Routed Length (m): Allowance (m): Total Length (m): 168 9 177 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691549 15

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 5.6.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-HNE-94-AZ-051 Description: HOIST A Equip Location: Zone: Location Dwg: EA-685564

Routing Information: Remarks: Route: CABLE C10-TL-012C C10-TL-009C C10-TL-008C C10-TL-035C C10-TL-066D C10-TL-068D C10-TL-070D C10-TL-102D C10-TL-109C C10-TL-107C C10-TL-164C C10-TL-201C C12-TL-520C C12-TL-519C C12-TL-518C C12-TL-517 C12-TL-201 C12-TL-102 C12-TL-203 C12-TL-101 C12-TL-301 C12-TL-302 C12-TL-311 C12-TL-322 2CL-D67

Cable: C10BJF1037
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

4C X 6 SQ.MM, 0.6/1kV
Pull Length(m): 191 No. of Cables: 1 Type Code: 40066 End Length(m): 5 Elevation: Schematic: ED-691550

Service: HOIST-B
Routed Length (m): Allowance (m): Total Length (m): 182 9 191 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691550 15

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 5.7.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-HNE-95-AZ-051 Description: HOIST B Equip Location: Zone: Location Dwg: EA-685564

Routing Information: Remarks: Route: CABLE C10-TL-012C C10-TL-009C C10-TL-008C C10-TL-035C C10-TL-066D C10-TL-068D C10-TL-070D C10-TL-102D C10-TL-109C C10-TL-107C C10-TL-164C C10-TL-201C C12-TL-520C C12-TL-519C C12-TL-518C C12-TL-517 C12-TL-201 C12-TL-102 C12-TL-203 C12-TL-101 C12-TL-301 C12-TL-302 C12-TL-311 C12-TL-312 C12-TL-314 2CL-D68

Cable: C10BJF1038
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

4C X 70 SQ.MM, 0.6/1kV
Pull Length(m): 146 No. of Cables: 1 Type Code: 40706 End Length(m): 5 Elevation: Schematic: ED-691551

Service: HRSG WELDING RECEPTACLE


Routed Length (m): Allowance (m): Total Length (m): 144 8 152 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691551 15

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 5.7.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-BLH-LP-01 Compartment: Description: HRSG WELDING RECEPTACLE North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-012C C10-TL-009C C10-TL-008C C10-TL-035C C10-TL-066D C10-TL-068D C10-TL-070D C10-TL-102D C10-TL-109C C10-TL-107C C10-TL-164C C10-TL-201C C12-TL-520C C12-TL-519C C12-TL-518C C12-TL-517 C12-TL-201 C12-TL-102 C12-TL-203 2CL-C60

Page 138 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 178 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691552

Cable: C10BJF1039
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Service: HP DESH SPRAY WATER LINE STOP MOV


Routed Length (m): Allowance (m): Total Length (m): 169 9 178 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691552 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 5.8.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LAE-90-AA-001 Compartment: Description: HP DESH SPRAY WATER LINE STOP MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-012B C10-TL-009B C10-TL-008B C10-TL-035B C10-TL-066C C10-TL-068C C10-TL-070C C10-TL-102C C10-TL-109B C10-TL-107B C10-TL-164B C10-TL-201B C12-TL-520B C12-TL-519B C12-TL-518B C12-TL-516B C12-TL-515B C12-TL-513 C12-TL-510B C12-TL-508 C12-TL-509 C12-TL-116 2CL-B60

Cable: C10BJF1040
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 188 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691553

Service: HP DESH SPRAY TCV BYPASS MOV


Routed Length (m): Allowance (m): Total Length (m): 186 9 195 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691553 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 5.8.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LAE-90-AA-002 Compartment: Description: HP DESH SPRAY TCV BYPASS MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-012B C10-TL-009B C10-TL-008B C10-TL-035B C10-TL-066C C10-TL-068C C10-TL-070C C10-TL-102C C10-TL-109B C10-TL-107B C10-TL-164B C10-TL-201B C12-TL-520B C12-TL-519B C12-TL-518B C12-TL-516B C12-TL-515B C12-TL-513 C12-TL-510B C12-TL-508 C12-TL-509 C12-TL-116 C12-TL-117 C12-TL-118 2CL-B70

Cable: C10BJF1041
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): 185 No. of Cables: 1 Type Code: 40046 End Length(m): 5 Elevation: Schematic: ED-691554

Service: COLD REHEATER STEAM STOP MOV


Routed Length (m): Allowance (m): Total Length (m): 180 9 189 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691554 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 11.5.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LBC-90-AA-001 Compartment: Description: COLD REHEATER STEAM STOP MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-012B C10-TL-009B C10-TL-008B C10-TL-035B C10-TL-066C C10-TL-068C C10-TL-070C C10-TL-102C C10-TL-109B C10-TL-107B C10-TL-164B C10-TL-201B C12-TL-520B C12-TL-519B C12-TL-518B C12-TL-516B C12-TL-515B C12-TL-513 C12-TL-510B C12-TL-508 C12-TL-509 C12-TL-116 C12-TL-115 2CL-B49

Page 139 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 169 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691555

Cable: C10BJF1042
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Service: COLD REHEATER STEAM DRAIN MOV


Routed Length (m): Allowance (m): Total Length (m): 177 9 186 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691555 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 11.5.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LBC-90-AA-002 Compartment: Description: COLD REHEATER STEAM DRAIN MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-012B C10-TL-009B C10-TL-008B C10-TL-035B C10-TL-066C C10-TL-068C C10-TL-070C C10-TL-102C C10-TL-109B C10-TL-107B C10-TL-164B C10-TL-201B C12-TL-520B C12-TL-519B C12-TL-518B C12-TL-516B C12-TL-515B C12-TL-513 C12-TL-510B C12-TL-508 C12-TL-509 C12-TL-116 C12-TL-115 2CL-A18

Cable: C10BJF1043
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 198 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691556

Service: IP DRUM LEVEL CV STOP


Routed Length (m): Allowance (m): Total Length (m): 199 10 209 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691556 15

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 6.1.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-HAC-94-AA-001 Compartment: Description: IP DRUM LEVEL CV STOP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-012C C10-TL-009C C10-TL-008C C10-TL-035C C10-TL-066D C10-TL-068D C10-TL-070D C10-TL-102D C10-TL-109C C10-TL-107C C10-TL-164C C10-TL-201C C12-TL-520C C12-TL-519C C12-TL-518C C12-TL-517 C12-TL-201 C12-TL-102 C12-TL-203 C12-TL-101 C12-TL-301 C12-TL-302 C12-TL-311 C12-TL-312 C12-TL-314 C12-TL-316 C12-TL-317 2CL-D38

Cable: C10BJF1044
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 197 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691557

Service: DEAERATOR VENT STOP MOV


Routed Length (m): Allowance (m): Total Length (m): 192 10 202 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691557 7

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 6.1.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-HAD-97-AA-001 Compartment: Description: DEAERATOR VENT STOP MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-012C C10-TL-009C C10-TL-008C C10-TL-035C C10-TL-066D C10-TL-068D C10-TL-070D C10-TL-102D C10-TL-109C C10-TL-107C C10-TL-164C C10-TL-201C C12-TL-520C C12-TL-519C C12-TL-518C C12-TL-517 C12-TL-201 C12-TL-102 C12-TL-203 C12-TL-101 C12-TL-301 C12-TL-302 C12-TL-311 C12-TL-312 C12-TL-314 C12-TL-316 2CL-D26

Page 140 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 189 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691558

Cable: C10BJF1045
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Service: HOT REHEAT STEAM DRAIN MOV


Routed Length (m): Allowance (m): Total Length (m): 181 9 190 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691558 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 6.2.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-HAJ-90-AA-001 Compartment: Description: HOT REHEAT STEAM DRAIN MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-012B C10-TL-009B C10-TL-008B C10-TL-035B C10-TL-066C C10-TL-068C C10-TL-070C C10-TL-102C C10-TL-109B C10-TL-107B C10-TL-164B C10-TL-201B C12-TL-520B C12-TL-519B C12-TL-518B C12-TL-516B C12-TL-515B C12-TL-513 C12-TL-510B C12-TL-508 C12-TL-509 C12-TL-116 C12-TL-115 C12-TL-114 2CL-B32

Cable: C10BJF1046
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

4C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 214 No. of Cables: 1 Type Code: 40026 End Length(m): 5 Elevation: Schematic: ED-691559

Service: LP DRUM PEGGING STEAM STOP MOV


Routed Length (m): Allowance (m): Total Length (m): 194 10 204 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691559 15

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 6.2.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LBA-96-AA-001 Compartment: Description: LP DRUM PEGGING STEAM STOP MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-012C C10-TL-009C C10-TL-008C C10-TL-035C C10-TL-066D C10-TL-068D C10-TL-070D C10-TL-102D C10-TL-109C C10-TL-107C C10-TL-164C C10-TL-201C C12-TL-520C C12-TL-519C C12-TL-518C C12-TL-517 C12-TL-201 C12-TL-102 C12-TL-203 C12-TL-101 C12-TL-301 C12-TL-302 C12-TL-311 C12-TL-312 C12-TL-314 C12-TL-316 2CL-D18

Cable: C10BJF1047
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): 153 No. of Cables: 1 Type Code: 40046 End Length(m): 5 Elevation: Schematic: ED-691560

Service: HOT REHEAT STEAM VENT MOV


Routed Length (m): Allowance (m): Total Length (m): 155 8 163 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691560 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 6.3.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LBB-90-AA-001 Compartment: Description: HOT REHEAT STEAM VENT MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-012C C10-TL-009C C10-TL-008C C10-TL-035C C10-TL-066D C10-TL-068D C10-TL-070D C10-TL-102D C10-TL-109C C10-TL-107C C10-TL-164C C10-TL-201C C12-TL-520C C12-TL-519C C12-TL-518C C12-TL-517 C12-TL-201 C12-TL-102 C12-TL-203 C12-TL-204 C12-TL-205 C12-TL-206 2CL-C06

Page 141 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 194 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691561

Cable: C10BJF1048
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Service: HP DRUM CONTINUOUS B/D MOV


Routed Length (m): Allowance (m): Total Length (m): 195 10 205 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691561 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 6.3.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-HAD-91-AA-002 Compartment: Description: HP DRUM CONTINUOUS B/D MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-012C C10-TL-009C C10-TL-008C C10-TL-035C C10-TL-066D C10-TL-068D C10-TL-070D C10-TL-102D C10-TL-109C C10-TL-107C C10-TL-164C C10-TL-201C C12-TL-520C C12-TL-519C C12-TL-518C C12-TL-517 C12-TL-201 C12-TL-102 C12-TL-203 C12-TL-101 C12-TL-301 C12-TL-302 C12-TL-311 C12-TL-322 C12-TL-323 2CL-D60 P-08 2CL-D57

Cable: C10BJF1049
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 189 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691562

Service: HP DRUM INTMIT B/D MOV


Routed Length (m): Allowance (m): Total Length (m): 194 10 204 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691562 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 6.4.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-HAD-91-AA-001 Compartment: Description: HP DRUM INTMIT B/D MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-012B C10-TL-009B C10-TL-008B C10-TL-035B C10-TL-066C C10-TL-068C C10-TL-070C C10-TL-102C C10-TL-109B C10-TL-107B C10-TL-164B C10-TL-201B C12-TL-520B C12-TL-519B C12-TL-518B C12-TL-516B C12-TL-515B C12-TL-513 C12-TL-510B C12-TL-508 C12-TL-509 C12-TL-116 C12-TL-117 C12-TL-118 C12-TL-119 2CL-B83

Cable: C10BJF1050
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 10 SQ.MM, 0.6/1kV
Pull Length(m): 225 No. of Cables: 1 Type Code: 40106 End Length(m): 5 Elevation: Schematic: ED-691563

Service: HP DRUM LEVEL CV(100%) STOP MOV


Routed Length (m): Allowance (m): Total Length (m): 205 10 215 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691563 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 6.4.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-HAC-90-AA-001 Compartment: Description: HP DRUM LEVEL CV(100%) STOP MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-012C C10-TL-009C C10-TL-008C C10-TL-035C C10-TL-066D C10-TL-068D C10-TL-070D C10-TL-102D C10-TL-109C C10-TL-107C C10-TL-164C C10-TL-201C C12-TL-520C C12-TL-519C C12-TL-518C C12-TL-517 C12-TL-201 C12-TL-102 C12-TL-203 C12-TL-101 C12-TL-301 C12-TL-302 C12-TL-311 C12-TL-322 C12-TL-323 2CL-D60 P-08 2CL-D54

Page 142 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 213 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691564

Cable: C10BJF1051
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Service: HP DRUM LEVEL CV(30%) STOP MOV


Routed Length (m): Allowance (m): Total Length (m): 206 10 216 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691564 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 6.5.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-HAC-90-AA-002 Compartment: Description: HP DRUM LEVEL CV(30%) STOP MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-012C C10-TL-009C C10-TL-008C C10-TL-035C C10-TL-066D C10-TL-068D C10-TL-070D C10-TL-102D C10-TL-109C C10-TL-107C C10-TL-164C C10-TL-201C C12-TL-520C C12-TL-519C C12-TL-518C C12-TL-517 C12-TL-201 C12-TL-102 C12-TL-203 C12-TL-101 C12-TL-301 C12-TL-302 C12-TL-311 C12-TL-322 C12-TL-323 2CL-D60 P-08 2CL-D55

Cable: C10BJF1052
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 167 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691565

Service: HP DESH DRAIN MOV


Routed Length (m): Allowance (m): Total Length (m): 169 9 178 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691565 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 6.5.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-HAH-90-AA-001 Compartment: Description: HP DESH DRAIN MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-012B C10-TL-009B C10-TL-008B C10-TL-035B C10-TL-066C C10-TL-068C C10-TL-070C C10-TL-102C C10-TL-109B C10-TL-107B C10-TL-164B C10-TL-201B C12-TL-520B C12-TL-519B C12-TL-518B C12-TL-516B C12-TL-515B C12-TL-513 C12-TL-510B C12-TL-508 C12-TL-509 C12-TL-116 2CL-B53

Cable: C10BJF1053
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 191 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691566

Service: HP SH3 OUTLET DRAIN MOV


Routed Length (m): Allowance (m): Total Length (m): 199 10 209 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691566 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 6.6.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LBA-90-AA-001 Compartment: Description: HP SH3 OUTLET DRAIN MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-012B C10-TL-009B C10-TL-008B C10-TL-035B C10-TL-066C C10-TL-068C C10-TL-070C C10-TL-102C C10-TL-109B C10-TL-107B C10-TL-164B C10-TL-201B C12-TL-520B C12-TL-519B C12-TL-518B C12-TL-516B C12-TL-515B C12-TL-513 C12-TL-510B C12-TL-508 C12-TL-509 C12-TL-116 C12-TL-117 C12-TL-118 C12-TL-119 C12-TL-120 2CL-B94

Page 143 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
4C X 6 SQ.MM, 0.6/1kV
Pull Length(m): 182 No. of Cables: 1 Type Code: 40066 End Length(m): 5 Elevation: Schematic: ED-691567

Cable: C10BJF1054
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Service: HP FEED WATER STOP MOV


Routed Length (m): Allowance (m): Total Length (m): 171 9 180 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691567 7

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 6.6.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LAB-90-AA-001 Compartment: Description: HP FEED WATER STOP MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-012B C10-TL-009B C10-TL-008B C10-TL-035B C10-TL-066C C10-TL-068C C10-TL-070C C10-TL-102C C10-TL-109B C10-TL-107B C10-TL-164B C10-TL-201B C12-TL-520B C12-TL-519B C12-TL-518B C12-TL-516B C12-TL-515B C12-TL-513 C12-TL-510B C12-TL-508 C12-TL-509 C12-TL-116 2CL-B56

Cable: C10BJF1055
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 180 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691568

Service: HP FEED WATER STOP BYPASS MOV


Routed Length (m): Allowance (m): Total Length (m): 171 9 180 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691568 7

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 6.7.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LAB-90-AA-002 Compartment: Description: HP FEED WATER STOP BYPASS MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-012B C10-TL-009B C10-TL-008B C10-TL-035B C10-TL-066C C10-TL-068C C10-TL-070C C10-TL-102C C10-TL-109B C10-TL-107B C10-TL-164B C10-TL-201B C12-TL-520B C12-TL-519B C12-TL-518B C12-TL-516B C12-TL-515B C12-TL-513 C12-TL-510B C12-TL-508 C12-TL-509 C12-TL-116 2CL-B98

Cable: C10BJF1056
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 185 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691569

Service: HP STEAM DRAIN MOV


Routed Length (m): Allowance (m): Total Length (m): 173 9 182 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691569 7

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 6.7.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LBA-90-AA-005 Compartment: Description: HP STEAM DRAIN MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-012C C10-TL-009C C10-TL-008C C10-TL-035C C10-TL-066D C10-TL-068D C10-TL-070D C10-TL-102D C10-TL-109C C10-TL-107C C10-TL-164C C10-TL-201C C12-TL-520C C12-TL-519C C12-TL-518C C12-TL-517 C12-TL-201 C12-TL-221 C12-TL-223 2CL-C48 P-05 2CL-C63

Page 144 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
4C X 6 SQ.MM, 0.6/1kV
Pull Length(m): 165 No. of Cables: 1 Type Code: 40066 End Length(m): 5 Elevation: Schematic: ED-691570

Cable: C10BJF1057
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Service: HP STEAM STOP MOV


Routed Length (m): Allowance (m): Total Length (m): 152 8 160 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691570 7

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 6.8.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LBA-90-AA-003 Compartment: Description: HP STEAM STOP MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-012C C10-TL-009C C10-TL-008C C10-TL-035C C10-TL-066D C10-TL-068D C10-TL-070D C10-TL-102D C10-TL-109C C10-TL-107C C10-TL-164C C10-TL-201C C12-TL-520C C12-TL-519C C12-TL-518C C12-TL-517 C12-TL-201 C12-TL-221 C12-TL-223 2CL-C44

Cable: C10BJF1058
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 220 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691571

Service: HP STEAM VENT MOV


Routed Length (m): Allowance (m): Total Length (m): 192 10 202 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691571 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 6.8.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LBA-90-AA-002 Compartment: Description: HP STEAM VENT MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-012C C10-TL-009C C10-TL-008C C10-TL-035C C10-TL-066D C10-TL-068D C10-TL-070D C10-TL-102D C10-TL-109C C10-TL-107C C10-TL-164C C10-TL-201C C12-TL-520C C12-TL-519C C12-TL-518C C12-TL-517 C12-TL-201 C12-TL-102 C12-TL-203 C12-TL-101 C12-TL-301 C12-TL-302 C12-TL-311 C12-TL-322 C12-TL-323 2CL-D60 P-08 2CL-D59

Cable: C10BJF1059
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 225 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691572

Service: IP DRUM CONT. B/D MOV


Routed Length (m): Allowance (m): Total Length (m): 197 10 207 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691572 15

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 11.4.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-HAD-95-AA-002 Compartment: Description: IP DRUM CONT. B/D MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-012C C10-TL-009C C10-TL-008C C10-TL-035C C10-TL-066D C10-TL-068D C10-TL-070D C10-TL-102D C10-TL-109C C10-TL-107C C10-TL-164C C10-TL-201C C12-TL-520C C12-TL-519C C12-TL-518C C12-TL-517 C12-TL-201 C12-TL-102 C12-TL-203 C12-TL-101 C12-TL-301 C12-TL-302 C12-TL-311 C12-TL-312 C12-TL-314 C12-TL-316 C12-TL-317 2CL-D30

Page 145 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 186 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691573

Cable: C10BJF1060
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Service: IP DRUM INTMIT B/D MOV


Routed Length (m): Allowance (m): Total Length (m): 192 10 202 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691573 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 11.4.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-HAD-95-AA-001 Compartment: Description: IP DRUM INTMIT B/D MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-012B C10-TL-009B C10-TL-008B C10-TL-035B C10-TL-066C C10-TL-068C C10-TL-070C C10-TL-102C C10-TL-109B C10-TL-107B C10-TL-164B C10-TL-201B C12-TL-520B C12-TL-519B C12-TL-518B C12-TL-516B C12-TL-515B C12-TL-513 C12-TL-510B C12-TL-508 C12-TL-509 C12-TL-116 C12-TL-117 C12-TL-118 C12-TL-119 2CL-B80

Cable: C10BJF1061
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 178 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691574

Service: IP FEED WATER STOP MOV


Routed Length (m): Allowance (m): Total Length (m): 181 9 190 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691574 9

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 8.1.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LAB-94-AA-001 Compartment: Description: IP FEED WATER STOP MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-012B C10-TL-009B C10-TL-008B C10-TL-035B C10-TL-066C C10-TL-068C C10-TL-070C C10-TL-102C C10-TL-109B C10-TL-107B C10-TL-164B C10-TL-201B C12-TL-520B C12-TL-519B C12-TL-518B C12-TL-516B C12-TL-515B C12-TL-513 C12-TL-510B C12-TL-508 C12-TL-509 C12-TL-116 C12-TL-117 2CL-B63

Cable: C10BJF1062
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 213 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691575

Service: IP FEED WATER STOP BYPASS MOV


Routed Length (m): Allowance (m): Total Length (m): 204 10 214 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691575 7

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 8.1.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LAB-94-AA-002 Compartment: Description: IP FEED WATER STOP BYPASS MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-012C C10-TL-009C C10-TL-008C C10-TL-035C C10-TL-066D C10-TL-068D C10-TL-070D C10-TL-102D C10-TL-109C C10-TL-107C C10-TL-164C C10-TL-201C C12-TL-520C C12-TL-519C C12-TL-518C C12-TL-517 C12-TL-201 C12-TL-102 C12-TL-203 C12-TL-101 C12-TL-110 C12-TL-111 C12-TL-112 C12-TL-113 C12-TL-114 C12-TL-115 C12-TL-117 2CL-D44

Page 146 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 174 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691576

Cable: C10BJF1063
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Service: IP STEAM DRAIN MOV


Routed Length (m): Allowance (m): Total Length (m): 177 9 186 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691576 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 8.2.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LBA-95-AA-003 Compartment: Description: IP STEAM DRAIN MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-012B C10-TL-009B C10-TL-008B C10-TL-035B C10-TL-066C C10-TL-068C C10-TL-070C C10-TL-102C C10-TL-109B C10-TL-107B C10-TL-164B C10-TL-201B C12-TL-520B C12-TL-519B C12-TL-518B C12-TL-516B C12-TL-515B C12-TL-513 C12-TL-510B C12-TL-508 C12-TL-509 C12-TL-116 C12-TL-115 2CL-B45

Cable: C10BJF1064
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

4C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 135 No. of Cables: 1 Type Code: 40026 End Length(m): 5 Elevation: Schematic: ED-691577

Service: IP STEAM STOP MOV


Routed Length (m): Allowance (m): Total Length (m): 139 8 147 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691577 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 8.2.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LBA-95-AA-002 Description: IP STEAM STOP MOV Equip Location: Zone: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-012C C10-TL-009C C10-TL-008C C10-TL-035C C10-TL-066D C10-TL-068D C10-TL-070D C10-TL-102D C10-TL-109C C10-TL-107C C10-TL-164C C10-TL-201C C12-TL-520C C12-TL-519C C12-TL-518C C12-TL-517 C12-TL-201 C12-TL-102 C12-TL-221 C12-TL-223 2CL-C29

Cable: C10BJF1065
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 122 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691578

Service: IP STEAM VENT MOV


Routed Length (m): Allowance (m): Total Length (m): 122 7 129 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691578 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 8.3.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LBA-95-AA-001 Description: IP STEAM VENT MOV Equip Location: Zone: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-012C C10-TL-009C C10-TL-008C C10-TL-035C C10-TL-066D C10-TL-068D C10-TL-070D C10-TL-102D C10-TL-109C C10-TL-107C C10-TL-164C C10-TL-201C C12-TL-520C C12-TL-519C C12-TL-518C C12-TL-517 C12-TL-201 2CL-C22

Page 147 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 195 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691579

Cable: C10BJF1066
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Service: LP DRUM INTMIT B/D MOV


Routed Length (m): Allowance (m): Total Length (m): 192 10 202 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691579 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 8.3.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-HAD-98-AA-001 Compartment: Description: LP DRUM INTMIT B/D MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-012B C10-TL-009B C10-TL-008B C10-TL-035B C10-TL-066C C10-TL-068C C10-TL-070C C10-TL-102C C10-TL-109B C10-TL-107B C10-TL-164B C10-TL-201B C12-TL-520B C12-TL-519B C12-TL-518B C12-TL-516B C12-TL-515B C12-TL-513 C12-TL-510B C12-TL-508 C12-TL-509 C12-TL-116 C12-TL-117 C12-TL-118 C12-TL-119 2CL-B78

Cable: C10BJF1067
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

4C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 203 No. of Cables: 1 Type Code: 40026 End Length(m): 5 Elevation: Schematic: ED-691580

Service: LP FEED WATER STOP MOV


Routed Length (m): Allowance (m): Total Length (m): 190 10 200 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691580 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 8.4.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LCA-91-AA-001 Compartment: Description: LP FEED WATER STOP MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-012C C10-TL-009C C10-TL-008C C10-TL-035C C10-TL-066D C10-TL-068D C10-TL-070D C10-TL-102D C10-TL-109C C10-TL-107C C10-TL-164C C10-TL-201C C12-TL-520C C12-TL-519C C12-TL-518C C12-TL-517 C12-TL-201 C12-TL-102 C12-TL-203 C12-TL-101 C12-TL-301 C12-TL-302 C12-TL-311 C12-TL-312 C12-TL-314 C12-TL-316 2CL-D23

Cable: C10BJF1068
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 187 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691581

Service: LP STEAM DRAIN MOV


Routed Length (m): Allowance (m): Total Length (m): 186 9 195 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691581 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 8.4.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LBD-90-AA-004 Compartment: Description: LP STEAM DRAIN MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-012B C10-TL-009B C10-TL-008B C10-TL-035B C10-TL-066C C10-TL-068C C10-TL-070C C10-TL-102C C10-TL-109B C10-TL-107B C10-TL-164B C10-TL-201B C12-TL-520B C12-TL-519B C12-TL-518B C12-TL-516B C12-TL-515B C12-TL-513 C12-TL-510B C12-TL-508 C12-TL-509 C12-TL-116 C12-TL-117 C12-TL-118 2CL-B65

Page 148 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
4C X 2.5 SQ.MM, 0.6/1kV
Pull Length(m): 179 No. of Cables: 1 Type Code: 40026 End Length(m): 10 Elevation: Schematic: ED-691582

Cable: C10BJF1069
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Service: LP STEAM STOP MOV


Routed Length (m): Allowance (m): Total Length (m): 187 9 196 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 8.5.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LBD-90-AA-002 Compartment: End Length(m): 15 Description: C12 LP STEAM LINE MOV FROM HRSG North: 1782.10 Equip Location: Zone: East: 2336.00 Elevation: 13.00 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-691582

Routing Information: Remarks: Route: CABLE C10-TL-038B C10-TL-029B C10-TL-015B C10-TL-003B C10-TL-002B C10-TL-024B C10-TL-023B C10-TL-223B C10-TL-222B C14-TL-202C C14-TL-204C C14-TL-207C C14-TL-049C C14-TL-099A C14-TL-097A C14-TL-093A C14-TL-091A CABLE C14-TL-089 C14-TL-087 C14-TL-085 C14-TL-083 C14-TL-082 C14-C-1109

Cable: C10BJF1070
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 189 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691583

Service: LP STEAM VENT MOV


Routed Length (m): Allowance (m): Total Length (m): 185 9 194 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691583 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 8.5.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LBD-90-AA-001 Compartment: Description: HRSG LP STEAM VENT MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-012C C10-TL-009C C10-TL-008C C10-TL-035C C10-TL-066D C10-TL-068D C10-TL-070D C10-TL-102D C10-TL-109C C10-TL-107C C10-TL-164C C10-TL-201C C12-TL-520C C12-TL-519C C12-TL-518C C12-TL-517 C12-TL-201 C12-TL-102 C12-TL-221 C12-TL-223 2CL-C48 P-05 2CL-C46

Cable: C10BJF1071
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 160 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691584

Service: RH DESUPERHEATER SPRAY WATER STOP MOV


Routed Length (m): Allowance (m): Total Length (m): 194 10 204 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691584 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 8.6.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LAF-90-AA-001 Compartment: Description: RH DESUPERHEATER SPRAY WATER STOP MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-012C C10-TL-009C C10-TL-008C C10-TL-035C C10-TL-066D C10-TL-068D C10-TL-070D C10-TL-102D C10-TL-109C C10-TL-107C C10-TL-164C C10-TL-201C C12-TL-520C C12-TL-519C C12-TL-518C C12-TL-517 C12-TL-201 C12-TL-102 C12-TL-203 C12-TL-101 C12-TL-110 C12-TL-111 C12-TL-112 2CL-B25 P-03 2CL-B21

Page 149 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 210 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691585

Cable: C10BJF1072
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Service: RH DESH SPRAY WATER CV BYPASS STOP MOV


Routed Length (m): Allowance (m): Total Length (m): 192 10 202 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691585 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 8.6.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LAF-90-AA-002 Compartment: Description: RH DESH SPRAY WATER CV BYPASS STOP MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-012C C10-TL-009C C10-TL-008C C10-TL-035C C10-TL-066D C10-TL-068D C10-TL-070D C10-TL-102D C10-TL-109C C10-TL-107C C10-TL-164C C10-TL-201C C12-TL-520C C12-TL-519C C12-TL-518C C12-TL-517 C12-TL-201 C12-TL-102 C12-TL-203 C12-TL-101 C12-TL-110 C12-TL-111 C12-TL-112 2CL-B25 P-03 2CL-C20

Cable: C10BJF1073
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 210 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691586

Service: RH2 OUTLET STEAM DRAIN MOV


Routed Length (m): Allowance (m): Total Length (m): 186 9 195 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691586 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 8.7.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LBB-90-AA-002 Compartment: Description: RH2 OUTLET STEAM DRAIN MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-012C C10-TL-009C C10-TL-008C C10-TL-035C C10-TL-066D C10-TL-068D C10-TL-070D C10-TL-102D C10-TL-109C C10-TL-107C C10-TL-164C C10-TL-201C C12-TL-520C C12-TL-519C C12-TL-518C C12-TL-517 C12-TL-201 C12-TL-102 C12-TL-203 C12-TL-101 C12-TL-110 C12-TL-111 C12-TL-112 2CL-B04

Cable: C10BJF1074
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 146 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691587

Service: CONDENSATE FEED WATER STOP MOV


Routed Length (m): Allowance (m): Total Length (m): 134 7 141 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691587 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 8.7.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LCA-90-AA-001 Compartment: Description: CONDENSATE FEED WATER STOP MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-012C C10-TL-009C C10-TL-008C C10-TL-035C C10-TL-066D C10-TL-068D C10-TL-070D C10-TL-102D C10-TL-109C C10-TL-107C C10-TL-164C C10-TL-201C C12-TL-520C C12-TL-519C C12-TL-518C C12-TL-517 C12-TL-201 C12-TL-102 C12-TL-203 2CL-C10

Page 150 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 185 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691588

Cable: C10BJF1075
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Service: HP STEAM BYPASS MOV


Routed Length (m): Allowance (m): Total Length (m): 171 9 180 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691588 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 8.8.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LBA-90-AA-004 Compartment: Description: HP STEAM BYPASS MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-012C C10-TL-009C C10-TL-008C C10-TL-035C C10-TL-066D C10-TL-068D C10-TL-070D C10-TL-102D C10-TL-109C C10-TL-107C C10-TL-164C C10-TL-201C C12-TL-520C C12-TL-519C C12-TL-518C C12-TL-517 C12-TL-201 C12-TL-221 C12-TL-223 2CL-C48 P-05 2CL-C43

Cable: C10BJF1076
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 186 No. of Cables: 1 Type Code: 40156 End Length(m): 10 Elevation: Schematic: ED-691589

Service: LP STEAM STOP BYPASS MOV


Routed Length (m): Allowance (m): Total Length (m): 187 9 196 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691589 15

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 8.8.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LBD-90-AA-003 Compartment: Description: INTERGRAL BYPASS MOV OF C12-LBD-90-AA-002 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-038B C10-TL-029B C10-TL-015B C10-TL-003B C10-TL-002B C10-TL-024B C10-TL-023B C10-TL-223B C10-TL-222B C14-TL-202C C14-TL-204C C14-TL-207C C14-TL-049C C14-TL-099A C14-TL-097A C14-TL-093A C14-TL-091A CABLE C14-TL-089 C14-TL-087 C14-TL-085 C14-TL-083 C14-TL-082 C14-C-1109

Cable: C10BJF1077
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 185 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691590

Service: HP LEAD 12 TO AUX. STEAM DRAIN MOV


Routed Length (m): Allowance (m): Total Length (m): 165 9 174 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 11.2.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LBA-46-AA-006 Compartment: End Length(m): 15 Description: C12 HP DRN POT MOV North: 1703.65 Equip Location: Zone: East: 2211.16 Elevation: 14.02 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-691590

Routing Information: Remarks: Route: CABLE C10-TL-012C C10-TL-009C C10-TL-008C C10-TL-035C C10-TL-066D C10-TL-068D C10-TL-070D C10-TL-102D C10-TL-109C C10-TL-107C C10-TL-164C C10-TL-201C C12-TL-520C C12-TL-519C C12-TL-518C C12-TL-517 C12-TL-201 C12-TL-102 C12-TL-203 C12-TL-101 C12-TL-110 C12-TL-111 C12-TL-112 C12-TL-113 C12-C-1127

Page 151 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
3C X 95 SQ.MM, 0.6/1kV
Pull Length(m): 177 No. of Cables: 1 Type Code: 30956 End Length(m): 5 Elevation: Schematic: ED-691548

Cable: C10BJF1078
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Service: LP RECIRC PUMP-2


Routed Length (m): Allowance (m): Total Length (m): 181 9 190 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691548 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 3.6 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LCA-93-AP-001 Compartment: Description: CPH RECIRCULATION PUMP-B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685564

Routing Information: Remarks: Route: CABLE C10-TL-012B C10-TL-009B C10-TL-008B C10-TL-035B C10-TL-066C C10-TL-068C C10-TL-070C C10-TL-102C C10-TL-109B C10-TL-107B C10-TL-164B C10-TL-201B C12-TL-520B C12-TL-519B C12-TL-518B C12-TL-516B C12-TL-515B C12-TL-513 C12-TL-510B C12-TL-508 C12-TL-509 C12-TL-116 C12-TL-115 2CL-A13

Cable: C10BJF1079
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

3C X 95 SQ.MM, 0.6/1kV
Pull Length(m): 218 No. of Cables: 1 Type Code: 30956 End Length(m): 5 Elevation: Schematic: ED-691548

Service: LP RECIRC PUMP-2


Routed Length (m): Allowance (m): Total Length (m): 175 9 184 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691548 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 3.6 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LCA-93-AP-001 Compartment: Description: CPH RECIRCULATION PUMP-B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685564

Routing Information: Remarks: Route: CABLE C10-TL-012C C10-TL-009C C10-TL-008C C10-TL-035C C10-TL-066D C10-TL-068D C10-TL-070D C10-TL-102D C10-TL-109C C10-TL-107C C10-TL-164C C10-TL-201C C12-TL-520C C12-TL-519C C12-TL-518C C12-TL-517 C12-TL-201 C12-TL-102 C12-TL-203 C12-TL-101 C12-TL-110 C12-TL-111 C12-TL-112 C12-TL-113 C12-TL-114 2CL-A13

Cable: C10BJF1080
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

3C X 50 SQ.MM, 0.6/1kV
Pull Length(m): 201 No. of Cables: 1 Type Code: 30506 End Length(m): 5 Elevation: Schematic: ED-691591

Service: SAMPLING SYSTEM CHILLER-1


Routed Length (m): Allowance (m): Total Length (m): 202 10 212 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691591 20

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 4.3.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C10-QUL-49-AC-004 Description: CHILLER UNIT # 1 Equip Location: Zone: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-012B C10-TL-009B C10-TL-008B C10-TL-035B C10-TL-066C C10-TL-068C C10-TL-070C C10-TL-102C C10-TL-109B C10-TL-107B C10-TL-164B C10-TL-201B C12-TL-520B C12-TL-519B C12-TL-518B C12-TL-516B C12-TL-515B C12-TL-513 C12-TL-510B C12-TL-508 C12-TL-509 C12-TL-116 C12-TL-115 C12-TL-114 C12-TL-113 C12-TL-112 C12-C-1135

Page 152 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
3C X 50 SQ.MM, 0.6/1kV
Pull Length(m): 208 No. of Cables: 1 Type Code: 30506 End Length(m): 5 Elevation: Schematic: ED-691592

Cable: C10BJF1081
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Service: SAMPLING SYSTEM CHILLER-2


Routed Length (m): Allowance (m): Total Length (m): 202 10 212 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691592 20

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 4.4.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C10-QUL-49-AC-005 Description: CHILLER UNIT # 2 Equip Location: Zone: Location Dwg: EA-685564

Routing Information: Remarks: Route: CABLE C10-TL-012B C10-TL-009B C10-TL-008B C10-TL-035B C10-TL-066C C10-TL-068C C10-TL-070C C10-TL-102C C10-TL-109B C10-TL-107B C10-TL-164B C10-TL-201B C12-TL-520B C12-TL-519B C12-TL-518B C12-TL-516B C12-TL-515B C12-TL-513 C12-TL-510B C12-TL-508 C12-TL-509 C12-TL-116 C12-TL-115 C12-TL-114 C12-TL-113 C12-TL-112 C12-C-1136

Cable: C10BJF1082
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 00

Description:

3C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): No. of Cables: 1 Type Code: 30156 End Length(m): 5 Elevation: Schematic: ED-691547

Service: LP RECIRC PUMP-1


Routed Length (m): Allowance (m): Total Length (m): 178 9 187 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691547 15

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 3.5 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LCA-92-AP-001 Compartment: Description: CPH RECIRCULATION PUMP-A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685564

Routing Information: Remarks: Route: CABLE C10-TL-012C C10-TL-009C C10-TL-008C C10-TL-035C C10-TL-066D C10-TL-068D C10-TL-070D C10-TL-102D C10-TL-109C C10-TL-107C C10-TL-164C C10-TL-201C C12-TL-520C C12-TL-519C C12-TL-518C C12-TL-517 C12-TL-201 C12-TL-102 C12-TL-203 C12-TL-101 C12-TL-110 C12-TL-111 C12-TL-112 C12-TL-113 2CL-A08

Cable: C10BJF1083
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 00

Description:

3C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): No. of Cables: 1 Type Code: 30156 End Length(m): 5 Elevation: Schematic: ED-691548

Service: LP RECIRC PUMP-2


Routed Length (m): Allowance (m): Total Length (m): 181 9 190 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691548 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 3.6 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LCA-93-AP-001 Compartment: Description: CPH RECIRCULATION PUMP-B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685564

Routing Information: Remarks: Route: CABLE C10-TL-012B C10-TL-009B C10-TL-008B C10-TL-035B C10-TL-066C C10-TL-068C C10-TL-070C C10-TL-102C C10-TL-109B C10-TL-107B C10-TL-164B C10-TL-201B C12-TL-520B C12-TL-519B C12-TL-518B C12-TL-516B C12-TL-515B C12-TL-513 C12-TL-510B C12-TL-508 C12-TL-509 C12-TL-116 C12-TL-115 2CL-A13

Page 153 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
3C X 50 SQ.MM, 0.6/1kV
Pull Length(m): 171 No. of Cables: 1 Type Code: 30506 End Length(m): 5 Elevation: Schematic: ED-691593

Cable: C10BJF1084
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Service: 127V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 179 9 188 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691593 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 7.1.3 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LBA-90-AA-191 Compartment: Description: ELECTRICAL RELIEF VALVE North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-012C C10-TL-009C C10-TL-008C C10-TL-035C C10-TL-066D C10-TL-068D C10-TL-070D C10-TL-102D C10-TL-109C C10-TL-107C C10-TL-164C C10-TL-201C C12-TL-520C C12-TL-519C C12-TL-518C C12-TL-517 C12-TL-201 C12-TL-221 C12-TL-223 2CL-C48 P-05 2CL-C45

Cable: C10BJF1085
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

3C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 87 No. of Cables: 1 Type Code: 30156 End Length(m): 5 Elevation: Schematic: ED-691593

Service: 127V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 59 5 64 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691593 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 7.1.3 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-CPB-66-GH-011 Compartment: Description: B1H2T CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-032A C10-TL-031A C10-TL-030A C10-TL-029A C10-TL-041 C10-TL-017A C10-TL-018A C10-TL-020A C10-TL-021 C10-TL-048 C10-TL-118 C10-TL-122 C10-TL-125 C10-TL-128 CABLE

Cable: C10BJF1086
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

3C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 89 No. of Cables: 1 Type Code: 30156 End Length(m): 5 Elevation: Schematic: ED-691593

Service: 127V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 59 5 64 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691593 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 7.1.3 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-CPB-66-GH-013 Compartment: Description: B1H2T I/O CABINET-1_TMR North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-032A C10-TL-031A C10-TL-030A C10-TL-029A C10-TL-041 C10-TL-017A C10-TL-018A C10-TL-020A C10-TL-021 C10-TL-048 C10-TL-118 C10-TL-122 C10-TL-125 C10-TL-128 CABLE

Page 154 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
3C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 73 No. of Cables: 1 Type Code: 30156 End Length(m): 5 Elevation: Schematic: ED-691593

Cable: C10BJF1087
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Service: 127V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 65 5 70 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691593 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 7.1.3 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-CPB-66-GH-001 Compartment: Description: B1H2 CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-032A C10-TL-031A C10-TL-030A C10-TL-029A C10-TL-041 C10-TL-017A C10-TL-018A C10-TL-020A C10-TL-021 C10-TL-048 C10-TL-118 C10-TL-122 C10-TL-125 C10-TL-128 C10-TL-131 CABLE

Cable: C10BJF1088
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

3C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 92 No. of Cables: 1 Type Code: 30026 End Length(m): 5 Elevation: Schematic: ED-691593

Service: 127V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 65 5 70 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691593 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 7.1.3 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-CPB-66-GH-002 Compartment: Description: B1H2 I/O CABINET-1_TMR North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-032A C10-TL-031A C10-TL-030A C10-TL-029A C10-TL-041 C10-TL-017A C10-TL-018A C10-TL-020A C10-TL-021 C10-TL-048 C10-TL-118 C10-TL-122 C10-TL-125 C10-TL-128 C10-TL-131 CABLE

Cable: C10BJF1089
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

3C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 90 No. of Cables: 1 Type Code: 30026 End Length(m): 5 Elevation: Schematic: ED-691593

Service: 127V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 65 5 70 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691593 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 7.1.3 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-CPB-66-GH-003 Compartment: Description: B1H2 I/O CABINET-2_SIMP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-032A C10-TL-031A C10-TL-030A C10-TL-029A C10-TL-041 C10-TL-017A C10-TL-018A C10-TL-020A C10-TL-021 C10-TL-048 C10-TL-118 C10-TL-122 C10-TL-125 C10-TL-128 C10-TL-131 CABLE

Page 155 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
3C X 2.5 SQ.MM, 0.6/1kV
Pull Length(m): 92 No. of Cables: 1 Type Code: 30026 End Length(m): 5 Elevation: Schematic: ED-691593

Cable: C10BJF1090
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Service: 127V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 65 5 70 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691593 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 7.1.3 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-CPB-66-GH-004 Compartment: Description: B1H2 I/O CABINET-3_SIMP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-032A C10-TL-031A C10-TL-030A C10-TL-029A C10-TL-041 C10-TL-017A C10-TL-018A C10-TL-020A C10-TL-021 C10-TL-048 C10-TL-118 C10-TL-122 C10-TL-125 C10-TL-128 C10-TL-131 CABLE

Cable: C10BJF1091
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 00

Description:

3C X 25 SQ.MM, 0.6/1kV
Pull Length(m): 260 No. of Cables: 1 Type Code: 30256 End Length(m): 5 Elevation: Schematic: ED-691593

Service: 127V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 164 9 173 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691593 20

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 7.1.3 North: Wiring Dwg: East:

Cable To End: Equipment No: C10-QUM-49-GH-001 Description: BLK-1 SWAS PNL Equip Location: Zone: Location Dwg: EA-685564

Routing Information: Remarks: Route: CABLE C10-TL-012C C10-TL-009C C10-TL-008C C10-TL-035C C10-TL-066D C10-TL-068D C10-TL-070D C10-TL-102D C10-TL-109C C10-TL-107C C10-TL-164C C10-TL-201C C12-TL-520C C12-TL-519C C12-TL-518C C12-TL-517 C12-TL-201 C12-TL-102 C12-TL-203 C12-TL-101 C12-TL-110 C12-TL-111 C12-TL-112 C12-C-1212

Cable: C10BJF1092
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 00

Description:

3C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 75 No. of Cables: 1 Type Code: 30156 End Length(m): 10 Elevation: Schematic: ED-691593

Service: 127V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 60 5 65 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691593 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 7.1.3 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-CPB-66-GH-012 Compartment: Description: B1H2T I/O CABINET-2_TMR North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-128 C10-TL-125 C10-TL-122 C10-TL-118 C10-TL-048 C10-TL-021 CABLE C10-TL-020D C10-TL-018D C10-TL-016A C10-TL-004B C10-TL-013B C10-TL-012D CABLE

Page 156 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 03 Description:
4C X 6 SQ.MM, 0.6/1kV
Pull Length(m): 187 No. of Cables: 1 Type Code: 40066 End Length(m): 5 Elevation: Schematic: ED-693927

Cable: C10BJF1093
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Service: HRSG HP STEAM BYPASS ISOLATION MOV


Routed Length (m): Allowance (m): Total Length (m): 178 9 187 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693927 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 7.1.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LBA-25-AA-002 Description: C12 HP BYP ISO MOV Equip Location: Zone: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-012B C10-TL-009B C10-TL-008B C10-TL-035B C10-TL-066C C10-TL-068C C10-TL-070C C10-TL-102C C10-TL-109B C10-TL-107B C10-TL-164B C10-TL-201B C12-TL-520B C12-TL-519B C12-TL-518B C12-TL-516B C12-TL-515B C12-TL-513 C12-TL-510B C12-TL-508 C12-TL-509 C12-TL-116 C12-TL-117 C12-C-1134

Cable: C10BJF1094
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 191 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-693926

Service: HP SH1 INTLET DRAIN MOV


Routed Length (m): Allowance (m): Total Length (m): 185 9 194 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693926 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 11.8.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-HAH-91-AA-001 Compartment: Description: HP SH1 INLET DRAIN MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-012B C10-TL-009B C10-TL-008B C10-TL-035B C10-TL-066C C10-TL-068C C10-TL-070C C10-TL-102C C10-TL-109B C10-TL-107B C10-TL-164B C10-TL-201B C12-TL-520B C12-TL-519B C12-TL-518B C12-TL-516B C12-TL-515B C12-TL-513 C12-TL-510B C12-TL-508 C12-TL-509 C12-TL-116 C12-TL-117 C12-TL-118 2CL-B67

Cable: C10BJF1095
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 172 No. of Cables: 1 Type Code: 40026 End Length(m): 5 Elevation: Schematic: ED-693925

Service: HRSG LP STEAM BYPASS ISOLATION MOV


Routed Length (m): Allowance (m): Total Length (m): 163 9 172 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 11.7.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LBD-26-AA-001 Compartment: End Length(m): 10 Description: C12 LP BYP IN ISO MOV North: 1775.70 Equip Location: Zone: East: 2338.40 Elevation: 13.80 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-693925

Routing Information: Remarks: Route: CABLE C10-TL-038B C10-TL-029B C10-TL-015B C10-TL-003B C10-TL-002B C10-TL-024B C10-TL-023B C10-TL-223B C10-TL-222B C14-TL-202C C14-TL-204C C14-TL-207C C14-TL-049C C14-TL-099A C14-TL-097A C14-TL-093A C14-TL-091A CABLE C14-TL-089 C14-TL-087 C14-TL-086 C14-C-1111

Page 157 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 172 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-693924

Cable: C10BJF1096
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Service: HRSG#2 LP STEAM DRAIN LINE MOV 5


Routed Length (m): Allowance (m): Total Length (m): 174 9 183 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 11.7.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LBD-46-AA-005 Compartment: End Length(m): 15 Description: C12 LP DRN POT/COND MOV North: 1782.00 Equip Location: Zone: East: 2336.00 Elevation: 13.00 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-693924

Routing Information: Remarks: Route: CABLE C10-TL-038B C10-TL-029B C10-TL-015B C10-TL-003B C10-TL-002B C10-TL-024B C10-TL-023B C10-TL-223B C10-TL-222B C14-TL-202C C14-TL-204C C14-TL-207C C14-TL-049C C14-TL-099A C14-TL-097A C14-TL-093A C14-TL-091A CABLE C14-TL-089 C14-TL-087 C14-TL-085 C14-TL-083 C14-C-1110

Cable: C10BJF1097
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 195 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691594

Service: HP HEADER TO BYPASS VALVE DRAIN MOV


Routed Length (m): Allowance (m): Total Length (m): 172 9 181 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 11.8.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C10-LBA-46-AA-007 Compartment: End Length(m): 15 Description: C10 HP DRN POT MOV North: 1711.90 Equip Location: Zone: East: 2225.20 Elevation: 10.20 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-691594

Routing Information: Remarks: Route: CABLE C10-TL-012C C10-TL-009C C10-TL-008C C10-TL-035C C10-TL-066D C10-TL-068D C10-TL-070D C10-TL-102D C10-TL-109C C10-TL-107C C10-TL-164C C10-TL-201C C12-TL-520C C12-TL-519C C12-TL-518C C12-TL-517 C12-TL-201 C12-TL-102 C12-TL-203 C12-TL-101 C12-TL-110 C12-TL-111 C12-TL-112 C12-TL-113 C12-TL-114 C12-C-1128

Cable: C10BJF1098
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 185 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691595

Service: HP STEAM DRAIN MOVs


Routed Length (m): Allowance (m): Total Length (m): 172 9 181 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 4.5.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LBA-46-AA-009 Compartment: End Length(m): 15 Description: C12 HP STM LOW POINT DRN MOV North: 1712.50 Equip Location: Zone: East: 2225.20 Elevation: 11.00 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-691595

Routing Information: Remarks: Route: CABLE C10-TL-012C C10-TL-009C C10-TL-008C C10-TL-035C C10-TL-066D C10-TL-068D C10-TL-070D C10-TL-102D C10-TL-109C C10-TL-107C C10-TL-164C C10-TL-201C C12-TL-520C C12-TL-519C C12-TL-518C C12-TL-517 C12-TL-201 C12-TL-102 C12-TL-203 C12-TL-101 C12-TL-110 C12-TL-111 C12-TL-112 C12-TL-113 C12-TL-114 C12-C-1129

Page 158 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 173 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691596

Cable: C10BJF1099
Seg Code: L System: BJF Startup Code:
Cable From End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Service: HRSG REHEATER DRAIN MOV-CRH SYSTEM


Routed Length (m): Allowance (m): Total Length (m): 170 9 179 Option 1: Option 2: Option 3: Compartment: North: 1720.70 Wiring Dwg: Shield: N Ground: Jacket: PVC End Length(m): 20

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 7.1.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C12-LBC-46-AA-001 Description: C12 CR DRN MOV Equip Location: Zone: Location Dwg: EA-681101

East: 2225.80 Elevation: 9.20 Schematic: ED-691596

Routing Information: Remarks: Route: CABLE C10-TL-012C C10-TL-009C C10-TL-008C C10-TL-035C C10-TL-066D C10-TL-068D C10-TL-070D C10-TL-102D C10-TL-109C C10-TL-107C C10-TL-164C C10-TL-201C C12-TL-520C C12-TL-519C C12-TL-518C C12-TL-517 C12-TL-201 C12-TL-102 C12-TL-203 C12-TL-101 C12-TL-110 C12-TL-111 C12-TL-112 C12-TL-113 C12-C-1130

Cable: C10BJG1001
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

4C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 226 No. of Cables: 1 Type Code: 40026 End Length(m): 5 Elevation: Schematic: ED-691093

Service: HRSG BFP - LUBE OIL PUMP 1 UNIT-1


Routed Length (m): Allowance (m): Total Length (m): 212 10 222 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691093 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 1.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LAB-45-AP-012 Compartment: Description: BLK#1 HRSG#1 BFP-A OIL PUMP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-031B C10-TL-032B C10-TL-033B C10-TL-036B C10-TL-065A C10-TL-101A C10-TL-103B C10-TL-104B C10-TL-105B C10-TL-166B C10-TL-204B C11-TL-321B C11-TL-520B C11-TL-519B C11-TL-518B C11-TL-517B C11-TL-515B C11-TL-514B C11-TL-513B C11-TL-512B C11-TL-511B C11-D001-01 C11-EMH-001 C11-EC-010

Cable: C10BJG1002
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

4C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 224 No. of Cables: 1 Type Code: 40026 End Length(m): 5 Elevation: Schematic: ED-691094

Service: HRSG BFP - LUBE OIL PUMP 2 UNIT-1


Routed Length (m): Allowance (m): Total Length (m): 215 11 226 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691094 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 1.3 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LAB-45-AP-022 Compartment: Description: BLK#1 HRSG#1 BFP-B OIL PUMP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-031B C10-TL-032B C10-TL-033B C10-TL-036B C10-TL-065A C10-TL-101A C10-TL-103B C10-TL-104B C10-TL-105B C10-TL-166B C10-TL-204B C11-TL-321B C11-TL-520B C11-TL-519B C11-TL-518B C11-TL-517B C11-TL-515B C11-TL-514B C11-TL-513B C11-TL-512B C11-TL-511B C11-D001-01 C11-EMH-001 C11-EC-007

Page 159 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
4C X 2.5 SQ.MM, 0.6/1kV
Pull Length(m): 232 No. of Cables: 1 Type Code: 40026 End Length(m): 5 Elevation: Schematic: ED-691095

Cable: C10BJG1003
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Service: HRSG BFP - LUBE OIL PUMP 3 UNIT-1


Routed Length (m): Allowance (m): Total Length (m): 218 11 229 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691095 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 1.4 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LAB-45-AP-032 Compartment: Description: BLK#1 HRSG#1 BFP-C OIL PUMP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-031B C10-TL-032B C10-TL-033B C10-TL-036B C10-TL-065A C10-TL-101A C10-TL-103B C10-TL-104B C10-TL-105B C10-TL-166B C10-TL-204B C11-TL-321B C11-TL-520B C11-TL-519B C11-TL-518B C11-TL-517B C11-TL-515B C11-TL-514B C11-TL-513B C11-TL-512B C11-TL-511B C11-D001-01 C11-EMH-001 C11-EC-004

Cable: C10BJG1004
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 225 No. of Cables: 1 Type Code: 40026 End Length(m): 5 Elevation: Schematic: ED-691096

Service: HRSG BFP HP DISCHARGE MOV 1 UNIT-1


Routed Length (m): Allowance (m): Total Length (m): 205 10 215 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 3.1.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LAB-45-AA-001 Compartment: End Length(m): 10 Description: C11 FW/FWP-A DIS ISO MOV North: 1658.70 Equip Location: Zone: East: 2222.30 Elevation: 13.30 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-691096

Routing Information: Remarks: Route: CABLE C10-TL-031A C10-TL-032A C10-TL-033A C10-TL-036A C10-TL-066A C10-TL-068A C10-TL-070A C10-TL-102A C10-TL-103A C10-TL-104A C10-TL-105A C10-TL-166A C10-TL-204A C11-TL-521A C11-TL-520A C11-TL-519A C11-TL-518A C11-TL-517A C11-TL-515A C11-TL-514A C11-TL-513A C11-TL-510A C11-TL-507 C11-TL-505 C11-C-1201

Cable: C10BJG1005
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 03

Description:

4C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 210 No. of Cables: 1 Type Code: 40026 End Length(m): 5 Elevation: Schematic: ED-691097

Service: HRSG BFP HP DISCHARGE MOV 2 UNIT-1


Routed Length (m): Allowance (m): Total Length (m): 205 10 215 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 3.1.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LAB-45-AA-005 Compartment: End Length(m): 10 Description: C11 FW/FWP-B DIS ISO MOV North: 1658.80 Equip Location: Zone: East: 2218.30 Elevation: 13.30 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-691097

Routing Information: Remarks: Route: CABLE C10-TL-031A C10-TL-032A C10-TL-033A C10-TL-036A C10-TL-066A C10-TL-068A C10-TL-070A C10-TL-102A C10-TL-103A C10-TL-104A C10-TL-105A C10-TL-166A C10-TL-204A C11-TL-521A C11-TL-520A C11-TL-519A C11-TL-518A C11-TL-517A C11-TL-515A C11-TL-514A C11-TL-513A C11-TL-510A C11-TL-507 C11-TL-505 C11-C-1202

Page 160 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 03 Description:
4C X 2.5 SQ.MM, 0.6/1kV
Pull Length(m): 215 No. of Cables: 1 Type Code: 40026 End Length(m): 5 Elevation: Schematic: ED-691098

Cable: C10BJG1006
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Service: HRSG BFP HP DISCHARGE MOV 3 UNIT-1


Routed Length (m): Allowance (m): Total Length (m): 209 10 219 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 3.2.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LAB-45-AA-009 Compartment: End Length(m): 10 Description: C11 FW/FWP-C DIS ISO MOV North: 1658.80 Equip Location: Zone: East: 2214.30 Elevation: 13.30 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-691098

Routing Information: Remarks: Route: CABLE C10-TL-031A C10-TL-032A C10-TL-033A C10-TL-036A C10-TL-066A C10-TL-068A C10-TL-070A C10-TL-102A C10-TL-103A C10-TL-104A C10-TL-105A C10-TL-166A C10-TL-204A C11-TL-521A C11-TL-520A C11-TL-519A C11-TL-518A C11-TL-517A C11-TL-515A C11-TL-514A C11-TL-513A C11-TL-510A C11-TL-507 C11-TL-505 C11-TL-503 C11-C-1205

Cable: C10BJG1007
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 03

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 215 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691099

Service: HRSG BFP HP DISCHARGE MOV EQUALIZING MOV 1 - UNIT-1


Routed Length (m): Allowance (m): Total Length (m): 198 10 208 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691099 6

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 3.2.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LAB-45-AA-012 Compartment: Description: VALVE C11LABAA012 MOTOR OPERATOR North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-031A C10-TL-032A C10-TL-033A C10-TL-036A C10-TL-066A C10-TL-068A C10-TL-070A C10-TL-102A C10-TL-103A C10-TL-104A C10-TL-105A C10-TL-166A C10-TL-204A C11-TL-521A C11-TL-520A C11-TL-519A C11-TL-518A C11-TL-517A C11-TL-515A C11-TL-514A C11-TL-513A C11-TL-510A C11-TL-507 C11-C-1001

Cable: C10BJG1008
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 03

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 229 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691100

Service: HRSG BFP HP DISCHARGE MOV EQUALIZING MOV 2 - UNIT-2


Routed Length (m): Allowance (m): Total Length (m): 201 10 211 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691100 6

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 3.3.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LAB-45-AA-013 Compartment: Description: VALVE C11LABAA013 MOTOR OPERATOR North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-031A C10-TL-032A C10-TL-033A C10-TL-036A C10-TL-066A C10-TL-068A C10-TL-070A C10-TL-102A C10-TL-103A C10-TL-104A C10-TL-105A C10-TL-166A C10-TL-204A C11-TL-521A C11-TL-520A C11-TL-519A C11-TL-518A C11-TL-517A C11-TL-515A C11-TL-514A C11-TL-513A C11-TL-510A C11-TL-507 C11-TL-505 C11-C-1002

Page 161 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 03 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 217 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691101

Cable: C10BJG1009
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Service: HRSG BFP HP DISCHARGE MOV EQUALIZING MOV 3 - UNIT-3


Routed Length (m): Allowance (m): Total Length (m): 205 10 215 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691101 6

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 3.3.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LAB-45-AA-014 Compartment: Description: VALVE C11LABAA014 MOTOR OPERATOR North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-031A C10-TL-032A C10-TL-033A C10-TL-036A C10-TL-066A C10-TL-068A C10-TL-070A C10-TL-102A C10-TL-103A C10-TL-104A C10-TL-105A C10-TL-166A C10-TL-204A C11-TL-521A C11-TL-520A C11-TL-519A C11-TL-518A C11-TL-517A C11-TL-515A C11-TL-514A C11-TL-513A C11-TL-510A C11-TL-507 C11-TL-505 C11-TL-503 C11-C-1003

Cable: C10BJG1010
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 03

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 211 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691102

Service: HRSG BFP IP DISCHARGE MOV 1 UNIT-1


Routed Length (m): Allowance (m): Total Length (m): 201 10 211 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 3.4.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LAB-45-AA-003 Compartment: End Length(m): 6 Description: C11 FW//FWP-A IP DIS ISO MOV North: 1660.70 Equip Location: Zone: East: 2220.00 Elevation: 13.30 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-691102

Routing Information: Remarks: Route: CABLE C10-TL-031A C10-TL-032A C10-TL-033A C10-TL-036A C10-TL-066A C10-TL-068A C10-TL-070A C10-TL-102A C10-TL-103A C10-TL-104A C10-TL-105A C10-TL-166A C10-TL-204A C11-TL-521A C11-TL-520A C11-TL-519A C11-TL-518A C11-TL-517A C11-TL-515A C11-TL-514A C11-TL-513A C11-TL-510A C11-TL-507 C11-TL-505 C11-C-1004

Cable: C10BJG1011
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 03

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 225 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691103

Service: HRSG BFP IP DISCHARGE MOV 2 UNIT-1


Routed Length (m): Allowance (m): Total Length (m): 205 10 215 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 3.4.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LAB-45-AA-007 Compartment: End Length(m): 6 Description: C11 FW//FWP-B IP DIS ISO MOV North: 1660.70 Equip Location: Zone: East: 2216.10 Elevation: 13.30 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-691103

Routing Information: Remarks: Route: CABLE C10-TL-031A C10-TL-032A C10-TL-033A C10-TL-036A C10-TL-066A C10-TL-068A C10-TL-070A C10-TL-102A C10-TL-103A C10-TL-104A C10-TL-105A C10-TL-166A C10-TL-204A C11-TL-521A C11-TL-520A C11-TL-519A C11-TL-518A C11-TL-517A C11-TL-515A C11-TL-514A C11-TL-513A C11-TL-510A C11-TL-507 C11-TL-505 C11-TL-503 C11-C-1005

Page 162 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 03 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 229 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691104

Cable: C10BJG1012
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Service: HRSG BFP IP DISCHARGE MOV 3 UNIT-1


Routed Length (m): Allowance (m): Total Length (m): 209 10 219 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 3.5.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LAB-45-AA-011 Compartment: End Length(m): 6 Description: C11 FW//FWP-C IP DIS ISO MOV North: 1660.70 Equip Location: Zone: East: 2212.10 Elevation: 13.30 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-691104

Routing Information: Remarks: Route: CABLE C10-TL-031A C10-TL-032A C10-TL-033A C10-TL-036A C10-TL-066A C10-TL-068A C10-TL-070A C10-TL-102A C10-TL-103A C10-TL-104A C10-TL-105A C10-TL-166A C10-TL-204A C11-TL-521A C11-TL-520A C11-TL-519A C11-TL-518A C11-TL-517A C11-TL-515A C11-TL-514A C11-TL-513A C11-TL-510A C11-TL-507 C11-TL-505 C11-TL-503 C11-TL-501 C11-C-1006

Cable: C10BJG1013
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 03

Description:

4C X 10 SQ.MM, 0.6/1kV
Pull Length(m): 168 No. of Cables: 1 Type Code: 40106 End Length(m): 5 Elevation: Schematic: ED-691105

Service: HP HYDRAULIC PUMP LCP UNIT-1


Routed Length (m): Allowance (m): Total Length (m): 233 11 244 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691105 15

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 9.1.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LBA-25-GH-001 Compartment: Description: BLK-1 HRSG-1 # HP BYP HSU PANEL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-031C C10-TL-032C C10-TL-033C C10-TL-036C C10-TL-065B C10-TL-101B C10-TL-103C C10-TL-104C C10-TL-105C C10-TL-166C C10-TL-204C C11-TL-321C C11-TL-520C C11-TL-519C C11-TL-518C C11-TL-517C C11-TL-516 C11-TL-201 C11-TL-102 C11-TL-203 C11-TL-101 C11-TL-110 C11-TL-111 C11-TL-112 C11-TL-113 C11-TL-114 C11-TL-115 C11-TL-117 C11-C-1101

Cable: C10BJG1014
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 03

Description:

4C X 10 SQ.MM, 0.6/1kV
Pull Length(m): 127 No. of Cables: 1 Type Code: 40106 End Length(m): 5 Elevation: Schematic: ED-691106

Service: HRH HYDRAULIC PUMP LCP UNIT-1


Routed Length (m): Allowance (m): Total Length (m): 105 6 111 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691106 15

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 9.1.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LBB-29-GH-001 Compartment: Description: BLK-1 HRSG-1 # IP BYP HSU PANEL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-031D C10-TL-014C C10-TL-013B C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-020D C10-TL-022C C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-C-1103

Page 163 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
4C X 10 SQ.MM, 0.6/1kV
Pull Length(m): 172 No. of Cables: 1 Type Code: 40106 End Length(m): 5 Elevation: Schematic: ED-691107

Cable: C10BJG1015
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Service: LP HYDRAULIC PUMP LCP UNIT-1


Routed Length (m): Allowance (m): Total Length (m): 163 9 172 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691107 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 9.2.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LBD-26-GH-001 Compartment: Description: BLK-1 HRSG-1 # LP BYP HSU PANEL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-038B C10-TL-029B C10-TL-015B C10-TL-003B C10-TL-002B C10-TL-024B C10-TL-023B C10-TL-223B C10-TL-222B C14-TL-202C C14-TL-204C C14-TL-207C C14-TL-049C C14-TL-099A C14-TL-097A C14-TL-093A C14-TL-091A CABLE C14-TL-089 C14-TL-087 C14-TL-086 C14-C-1102

Cable: C10BJG1016
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 03

Description:

4C X 10 SQ.MM, 0.6/1kV
Pull Length(m): 218 No. of Cables: 1 Type Code: 40106 End Length(m): 5 Elevation: Schematic: ED-691108

Service: MCC OF CHEMICAL FEED SYSTEM FOR HRSG 1


Routed Length (m): Allowance (m): Total Length (m): 201 10 211 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691108 6

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 9.2.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-QCC-39-GW-001 Compartment: Description: CHEMICAL FEED SYSTEM MCC FOR HRSG #1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-031A C10-TL-032A C10-TL-033A C10-TL-036A C10-TL-066A C10-TL-068A C10-TL-070A C10-TL-102A C10-TL-103A C10-TL-104A C10-TL-105A C10-TL-166A C10-TL-204A C11-TL-521A C11-TL-520A C11-TL-519A C11-TL-518A C11-TL-517A C11-TL-515A C11-TL-514A C11-TL-513A C11-TL-510A C11-TL-512A C11-C-1102

Cable: C10BJG1017
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 03

Description:

4C X 25 SQ.MM, 0.6/1kV
Pull Length(m): 138 No. of Cables: 1 Type Code: 40256 End Length(m): 5 Elevation: Schematic: ED-691109

Service: HRSG REHEATER TO IP TURBINE MOV UNIT-1


Routed Length (m): Allowance (m): Total Length (m): 138 8 146 Option 1: Option 2: Option 3: Compartment: North: 1775.20 Wiring Dwg: Shield: N Ground: Jacket: PVC End Length(m): 7

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 3.7.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LBB-29-AA-001 Description: C11 HR MOV Equip Location: Zone: Location Dwg: EA-681111

East: 2317.70 Elevation: 10.20 Schematic: ED-691109

Routing Information: Remarks: Route: CABLE C10-TL-031D C10-TL-014C C10-TL-013B C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-020D C10-TL-022C C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-211 C14-TL-212 C14-TL-043 C14-C-1104

Page 164 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 03 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 169 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691110

Cable: C10BJG1018
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Service: HRSG REHEATER TO IP TURBINE MOV (EQUALIZING VALVE)-UNIT-1


Routed Length (m): Allowance (m): Total Length (m): 138 8 146 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691110 7

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 3.8.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LBB-29-AA-008 Description: C11 HR EQUAL. MOV Equip Location: Zone: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-031D C10-TL-014C C10-TL-013B C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-020D C10-TL-022C C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-211 C14-TL-212 C14-TL-043 C14-C-1105

Cable: C10BJG1019
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 144 No. of Cables: 1 Type Code: 40156 End Length(m): 8 Elevation: Schematic: ED-691111

Service: HRSG REHEATER DRAIN MOV 1 UNIT-1


Routed Length (m): Allowance (m): Total Length (m): 142 8 150 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 3.8.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LBB-46-AA-004 Compartment: End Length(m): 10 Description: C11 HR DRN POT/CST 004 MOV North: 1774.80 Equip Location: Zone: East: 2306.60 Elevation: 8.30 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-691111

Routing Information: Remarks: Route: CABLE C10-TL-031D C10-TL-032D C10-TL-033D C10-TL-036D C10-TL-064D C10-TL-063D C10-TL-060D C10-TL-059D C10-TL-043D C10-TL-044C C10-TL-053C C10-TL-051B C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C11-C-1303

Cable: C10BJG1020
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 158 No. of Cables: 1 Type Code: 40156 End Length(m): 8 Elevation: Schematic: ED-691112

Service: HRSG REHEATER DRAIN MOV 2 UNIT-1


Routed Length (m): Allowance (m): Total Length (m): 145 8 153 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 3.5.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LBB-46-AA-007 Compartment: End Length(m): 10 Description: C11 HR DRN POT/CST 007 MOV North: 1774.60 Equip Location: Zone: East: 2310.90 Elevation: 8.30 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-691112

Routing Information: Remarks: Route: CABLE C10-TL-031D C10-TL-032D C10-TL-033D C10-TL-036D C10-TL-064D C10-TL-063D C10-TL-060D C10-TL-059D C10-TL-043D C10-TL-044C C10-TL-053C C10-TL-051B C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-210 C11-C-1304

Page 165 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 168 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691113

Cable: C10BJG1021
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Service: HRSG REHEATER DRAIN MOV 3 UNIT-1


Routed Length (m): Allowance (m): Total Length (m): 162 9 171 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 3.6.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LBB-46-AA-009 Compartment: End Length(m): 13 Description: C11 HR DRN POT/COND MOV North: 1718.90 Equip Location: Zone: East: 2225.80 Elevation: 9.20 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-691113

Routing Information: Remarks: Route: CABLE C10-TL-031D C10-TL-032D C10-TL-011C CABLE C10-TL-009C C10-TL-008C C10-TL-035C C10-TL-066D C10-TL-068D C10-TL-070D C10-TL-102D C10-TL-109C C10-TL-107C C10-TL-164C C10-TL-201C C12-TL-520C C12-TL-519C C12-TL-518C C12-TL-517 C12-TL-201 C12-TL-102 C12-TL-203 C12-TL-101 C12-TL-110 C12-TL-111 C12-TL-112 C12-TL-113 C12-C-1001

Cable: C10BJG1022
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 172 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691114

Service: HRSG REHEATER DRAIN MOV 4 UNIT-1


Routed Length (m): Allowance (m): Total Length (m): 162 9 171 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 4.1.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LBB-46-AA-010 Compartment: End Length(m): 13 Description: C11 HR DRN POT/COND MOV North: 1720.00 Equip Location: Zone: East: 2225.80 Elevation: 9.20 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-691114

Routing Information: Remarks: Route: CABLE C10-TL-031D C10-TL-032D C10-TL-011C CABLE C10-TL-009C C10-TL-008C C10-TL-035C C10-TL-066D C10-TL-068D C10-TL-070D C10-TL-102D C10-TL-109C C10-TL-107C C10-TL-164C C10-TL-201C C12-TL-520C C12-TL-519C C12-TL-518C C12-TL-517 C12-TL-201 C12-TL-102 C12-TL-203 C12-TL-101 C12-TL-110 C12-TL-111 C12-TL-112 C12-TL-113 C12-C-1001

Cable: C10BJG1023
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 200 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691115

Service: HRSG HP STEAM DRAIN LINE MOV 1 UNIT-1


Routed Length (m): Allowance (m): Total Length (m): 191 10 201 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 4.1.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LBA-46-AA-007 Compartment: End Length(m): 7 Description: C11 HP DRN POT MOV North: 1717.80 Equip Location: Zone: East: 2225.20 Elevation: 10.20 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-691115

Routing Information: Remarks: Route: CABLE C10-TL-031B C10-TL-032B C10-TL-011B C10-TL-009B C10-TL-008B C10-TL-035B C10-TL-066C C10-TL-068C C10-TL-070C C10-TL-102C C10-TL-109B C10-TL-107B C10-TL-164B C10-TL-201B C12-TL-520B C12-TL-519B C12-TL-518B C12-TL-516B C12-TL-515B C12-TL-513 C12-TL-510B C12-TL-508 C12-TL-509 C12-TL-116 C12-TL-115 C12-TL-114 C12-TL-113 C12-TL-112 C12-C-1101

Page 166 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 200 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691116

Cable: C10BJG1024
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Service: HRSG HP STEAM DRAIN LINE MOV 2 UNIT-1


Routed Length (m): Allowance (m): Total Length (m): 193 10 203 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 4.2.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LBA-46-AA-008 Compartment: End Length(m): 9 Description: C11 HP DRN POT MOV North: 1716.30 Equip Location: Zone: East: 2223.80 Elevation: 10.40 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-691116

Routing Information: Remarks: Route: CABLE C10-TL-031B C10-TL-032B C10-TL-011B C10-TL-009B C10-TL-008B C10-TL-035B C10-TL-066C C10-TL-068C C10-TL-070C C10-TL-102C C10-TL-109B C10-TL-107B C10-TL-164B C10-TL-201B C12-TL-520B C12-TL-519B C12-TL-518B C12-TL-516B C12-TL-515B C12-TL-513 C12-TL-510B C12-TL-508 C12-TL-509 C12-TL-116 C12-TL-115 C12-TL-114 C12-TL-113 C12-TL-112 C12-C-1102

Cable: C10BJG1025
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 136 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691117

Service: HRSG HP STEAM DRAIN LINE MOV 3 UNIT-1


Routed Length (m): Allowance (m): Total Length (m): 127 7 134 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 4.2.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LBA-46-AA-005 Compartment: End Length(m): 5 Description: C11 HP DRN POT MOV North: 1779.40 Equip Location: Zone: East: 2305.20 Elevation: 10.30 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-691117

Routing Information: Remarks: Route: CABLE C10-TL-031D C10-TL-014C C10-TL-013B C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-020D C10-TL-022C C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-211 C11-C-1103

Cable: C10BJG1026
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 216 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691118

Service: HRSG HP BYPASS SPRAY WATER LINE ISOLATION MOV


Routed Length (m): Allowance (m): Total Length (m): 209 10 219 Option 1: Option 2: Option 3: Compartment: North: 1661.50 Wiring Dwg: Shield: N Ground: Jacket: PVC End Length(m): 6

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 4.3.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LAB-25-AA-002 Description: C11 IP FW SPLY MOV Equip Location: Zone: Location Dwg: EA-681101

East: 2213.30 Elevation: 12.80 Schematic: ED-691118

Routing Information: Remarks: Route: CABLE C10-TL-031A C10-TL-032A C10-TL-033A C10-TL-036A C10-TL-066A C10-TL-068A C10-TL-070A C10-TL-102A C10-TL-103A C10-TL-104A C10-TL-105A C10-TL-166A C10-TL-204A C11-TL-521A C11-TL-520A C11-TL-519A C11-TL-518A C11-TL-517A C11-TL-515A C11-TL-514A C11-TL-513A C11-TL-510A C11-TL-507 C11-TL-505 C11-TL-503 C11-TL-501 C11-C-1104

Page 167 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 165 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691119

Cable: C10BJG1027
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Service: HRSG#1 LP STEAM DRAIN LINE MOV 1


Routed Length (m): Allowance (m): Total Length (m): 144 8 152 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 4.3.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LBD-46-AA-010 Compartment: End Length(m): 10 Description: C11 LP DRN POT/CST MOV North: 1781.00 Equip Location: Zone: East: 2311.00 Elevation: 9.70 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-691119

Routing Information: Remarks: Route: CABLE C10-TL-031D C10-TL-014C C10-TL-013B C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-020D C10-TL-022C C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-210 C14-TL-211 C14-TL-212 C14-TL-043 C14-C-1201

Cable: C10BJG1028
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 183 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691120

Service: HRSG#1 LP STEAM DRAIN LINE MOV 2


Routed Length (m): Allowance (m): Total Length (m): 179 9 188 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 4.4.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LBD-46-AA-011 Compartment: End Length(m): 10 Description: C11 LP DRN POT/CST MOV North: 1718.90 Equip Location: Zone: East: 2218.00 Elevation: 8.80 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-691120

Routing Information: Remarks: Route: CABLE C10-TL-032B C10-TL-011B C10-TL-009B C10-TL-008B C10-TL-035B C10-TL-066C C10-TL-068C C10-TL-070C C10-TL-102C C10-TL-109B C10-TL-107B C10-TL-164B C10-TL-201B C12-TL-520B C12-TL-519B C12-TL-518B C12-TL-516B C12-TL-515B C12-TL-513 C12-TL-510B C12-TL-508 C12-TL-509 C12-TL-116 C12-TL-115 C12-TL-114 C12-C-1203

Cable: C10BJG1029
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 183 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691121

Service: HRSG#1 LP STEAM DRAIN LINE MOV 3


Routed Length (m): Allowance (m): Total Length (m): 179 9 188 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691121 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 4.4.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LBD-46-AA-012 Compartment: Description: C11 LP DRN POT/CST MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-032B C10-TL-011B C10-TL-009B C10-TL-008B C10-TL-035B C10-TL-066C C10-TL-068C C10-TL-070C C10-TL-102C C10-TL-109B C10-TL-107B C10-TL-164B C10-TL-201B C12-TL-520B C12-TL-519B C12-TL-518B C12-TL-516B C12-TL-515B C12-TL-513 C12-TL-510B C12-TL-508 C12-TL-509 C12-TL-116 C12-TL-115 C12-TL-114 C12-C-1202

Page 168 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 183 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691122

Cable: C10BJG1030
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Service: HRSG#1 LP STEAM DRAIN LINE MOV 4


Routed Length (m): Allowance (m): Total Length (m): 179 9 188 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 4.5.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LBD-46-AA-013 Compartment: End Length(m): 10 Description: C13 LP DRN POT/CST MOV North: 1661.61 Equip Location: Zone: East: 2211.29 Elevation: 13.69 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-691122

Routing Information: Remarks: Route: CABLE C10-TL-032B C10-TL-011B C10-TL-009B C10-TL-008B C10-TL-035B C10-TL-066C C10-TL-068C C10-TL-070C C10-TL-102C C10-TL-109B C10-TL-107B C10-TL-164B C10-TL-201B C12-TL-520B C12-TL-519B C12-TL-518B C12-TL-516B C12-TL-515B C12-TL-513 C12-TL-510B C12-TL-508 C12-TL-509 C12-TL-116 C12-TL-115 C12-TL-114 C12-C-1201

Cable: C10BJG1031
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 10 SQ.MM, 0.6/1kV
Pull Length(m): 227 No. of Cables: 1 Type Code: 40106 End Length(m): 5 Elevation: Schematic: ED-691123

Service: BOILER FEED WATER PUMP HOIST UNIT-1


Routed Length (m): Allowance (m): Total Length (m): 205 10 215 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691123 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 4.5.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-SML-45-BZ-001 Compartment: Description: BFP SHELTER HOIST UNIT#11 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-031A C10-TL-032A C10-TL-033A C10-TL-036A C10-TL-066A C10-TL-068A C10-TL-070A C10-TL-102A C10-TL-103A C10-TL-104A C10-TL-105A C10-TL-166A C10-TL-204A C11-TL-521A C11-TL-520A C11-TL-519A C11-TL-518A C11-TL-517A C11-TL-515A C11-TL-514A C11-TL-513A C11-TL-510A C11-TL-507 C11-TL-505 C11-C-1203

Cable: C10BJG1032
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 35 SQ.MM, 0.6/1kV
Pull Length(m): 238 No. of Cables: 1 Type Code: 40356 End Length(m): 5 Elevation: Schematic: ED-691124

Service: GUILLOTINE DAMPER SEAL AIR FAN LCP


Routed Length (m): Allowance (m): Total Length (m): 253 12 265 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691124 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 9.3.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-MBR-90-GH-004 Compartment: Description: GUILIOTINE DAMPER SEAL AIR FAN LCP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685564

Routing Information: Remarks: Route: CABLE C10-TL-031C C10-TL-032C C10-TL-033C C10-TL-036C C10-TL-065B C10-TL-101B C10-TL-103C C10-TL-104C C10-TL-105C C10-TL-166C C10-TL-204C C11-TL-321C C11-TL-520C C11-TL-519C C11-TL-518C C11-TL-517C C11-TL-516 C11-TL-201 C11-TL-102 C11-TL-203 C11-TL-204 C11-TL-205 C11-TL-206 C11-TL-207 C11-TL-208 C11-TL-209 C11-TL-210 C11-TL-211 C11-TL-213 1CL-A26

Page 169 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 231 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691125

Cable: C10BJG1033
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Service: STACK DAMPER


Routed Length (m): Allowance (m): Total Length (m): 220 11 231 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691125 27

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 4.6.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-HNE-90-AA-001 Description: STACK DAMPER Equip Location: Zone: Location Dwg: EA-685564

Routing Information: Remarks: Route: CABLE C10-TL-031C C10-TL-032C C10-TL-033C C10-TL-036C C10-TL-065B C10-TL-101B C10-TL-103C C10-TL-104C C10-TL-105C C10-TL-166C C10-TL-204C C11-TL-321C C11-TL-520C C11-TL-519C C11-TL-518C C11-TL-517C C11-TL-516 C11-TL-201 C11-TL-102 C11-TL-203 C11-TL-101 C11-TL-301 C11-TL-302 C11-TL-311 C11-TL-322 C11-C-1204

Cable: C10BJG1034
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

3C X 95 SQ.MM, 0.6/1kV
Pull Length(m): 252 No. of Cables: 1 Type Code: 30956 End Length(m): 8 Elevation: Schematic: ED-691126

Service: LP RECIRC PUMP-1


Routed Length (m): Allowance (m): Total Length (m): 217 11 228 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691126 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 1.5 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LCA-92-AP-001 Compartment: Description: CPH RECIRCULATION PUMP-A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685564

Routing Information: Remarks: Route: CABLE C10-TL-033C C10-TL-036C C10-TL-065B C10-TL-101B C10-TL-103C C10-TL-104C C10-TL-105C C10-TL-166C C10-TL-204C C11-TL-321C C11-TL-520C C11-TL-519C C11-TL-518C C11-TL-517C C11-TL-516 C11-TL-201 C11-TL-102 C11-TL-203 C11-TL-101 C11-TL-110 C11-TL-111 C11-TL-112 C11-TL-113 C11-TL-114 1CL-A08

Cable: C10BJG1035
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

3C X 95 SQ.MM, 0.6/1kV
Pull Length(m): 248 No. of Cables: 1 Type Code: 30956 End Length(m): 8 Elevation: Schematic: ED-691126

Service: LP RECIRC PUMP-1


Routed Length (m): Allowance (m): Total Length (m): 217 11 228 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691126 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 1.5 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LCA-92-AP-001 Compartment: Description: CPH RECIRCULATION PUMP-A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685564

Routing Information: Remarks: Route: CABLE C10-TL-033C C10-TL-036C C10-TL-065B C10-TL-101B C10-TL-103C C10-TL-104C C10-TL-105C C10-TL-166C C10-TL-204C C11-TL-321C C11-TL-520C C11-TL-519C C11-TL-518C C11-TL-517C C11-TL-516 C11-TL-201 C11-TL-102 C11-TL-203 C11-TL-101 C11-TL-110 C11-TL-111 C11-TL-112 C11-TL-113 C11-TL-114 1CL-A08

Page 170 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
4C X 6 SQ.MM, 0.6/1kV
Pull Length(m): 230 No. of Cables: 1 Type Code: 40066 End Length(m): 5 Elevation: Schematic: ED-691128

Cable: C10BJG1036
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Service: HOIST-A
Routed Length (m): Allowance (m): Total Length (m): 214 10 224 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691128 15

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 4.7.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-HNE-94-AZ-051 Description: HOIST A Equip Location: Zone: Location Dwg: EA-685564

Routing Information: Remarks: Route: CABLE C10-TL-031C C10-TL-032C C10-TL-033C C10-TL-036C C10-TL-065B C10-TL-101B C10-TL-103C C10-TL-104C C10-TL-105C C10-TL-166C C10-TL-204C C11-TL-321C C11-TL-520C C11-TL-519C C11-TL-518C C11-TL-517C C11-TL-516 C11-TL-201 C11-TL-102 C11-TL-203 C11-TL-101 C11-TL-301 C11-TL-302 C11-TL-311 C11-TL-322 1CL-D67

Cable: C10BJG1037
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 6 SQ.MM, 0.6/1kV
Pull Length(m): 226 No. of Cables: 1 Type Code: 40066 End Length(m): 5 Elevation: Schematic: ED-691129

Service: HOIST-B
Routed Length (m): Allowance (m): Total Length (m): 218 11 229 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691129 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 4.7.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-HNE-95-AZ-051 Description: HOIST B Equip Location: Zone: Location Dwg: EA-685564

Routing Information: Remarks: Route: CABLE C10-TL-031C C10-TL-032C C10-TL-033C C10-TL-036C C10-TL-065B C10-TL-101B C10-TL-103C C10-TL-104C C10-TL-105C C10-TL-166C C10-TL-204C C11-TL-321C C11-TL-520C C11-TL-519C C11-TL-518C C11-TL-517C C11-TL-516 C11-TL-201 C11-TL-102 C11-TL-203 C11-TL-101 C11-TL-301 C11-TL-302 C11-TL-311 C11-TL-312 C11-TL-314 1CL-D68

Cable: C10BJG1038
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 70 SQ.MM, 0.6/1kV
Pull Length(m): 254 No. of Cables: 1 Type Code: 40706 End Length(m): 5 Elevation: Schematic: ED-691130

Service: HRSG WELDING RECEPTACLE


Routed Length (m): Allowance (m): Total Length (m): 252 12 264 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691130 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 4.8.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-BLH-LP-01 Compartment: Description: HRSG WELDING RECEPTACLE North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-031B C10-TL-032B C10-TL-033B C10-TL-036B C10-TL-065A C10-TL-101A C10-TL-103B C10-TL-104B C10-TL-105B C10-TL-166B C10-TL-204B C11-TL-321B C11-TL-520B C11-TL-519B C11-TL-518B C11-TL-517B C11-TL-515B C11-TL-514B C11-TL-513B C11-TL-510B C11-TL-508 C11-TL-509 C11-TL-116 C11-TL-115 C11-TL-114 C11-TL-113 C11-TL-112 C11-TL-111 C11-TL-110 C11-TL-101 C11-TL-203 1CL-C60

Page 171 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 03 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 230 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691131

Cable: C10BJG1039
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Service: HP DESH SPRAY WATER LINE STOP MOV


Routed Length (m): Allowance (m): Total Length (m): 207 10 217 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691131 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 4.8.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LAE-90-AA-001 Compartment: Description: HP DESH SPRAY WATER LINE STOP MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-031B C10-TL-032B C10-TL-033B C10-TL-036B C10-TL-065A C10-TL-101A C10-TL-103B C10-TL-104B C10-TL-105B C10-TL-166B C10-TL-204B C11-TL-321B C11-TL-520B C11-TL-519B C11-TL-518B C11-TL-517B C11-TL-515B C11-TL-514B C11-TL-513B C11-TL-510B C11-TL-508 C11-TL-509 C11-TL-116 1CL-B60

Cable: C10BJG1040
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 234 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691132

Service: HP DESH SPRAY TCV BYPASS MOV


Routed Length (m): Allowance (m): Total Length (m): 224 11 235 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691132 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 4.6.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LAE-90-AA-002 Compartment: Description: HP DESH SPRAY TCV BYPASS MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-031B C10-TL-032B C10-TL-033B C10-TL-036B C10-TL-065A C10-TL-101A C10-TL-103B C10-TL-104B C10-TL-105B C10-TL-166B C10-TL-204B C11-TL-321B C11-TL-520B C11-TL-519B C11-TL-518B C11-TL-517B C11-TL-515B C11-TL-514B C11-TL-513B C11-TL-510B C11-TL-508 C11-TL-509 C11-TL-116 C11-TL-117 C11-TL-118 1CL-B70

Cable: C10BJG1041
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): 242 No. of Cables: 1 Type Code: 40046 End Length(m): 5 Elevation: Schematic: ED-691133

Service: COLD REHEATER STEAM STOP MOV


Routed Length (m): Allowance (m): Total Length (m): 218 11 229 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691133 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 8.8.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LBC-90-AA-001 Compartment: Description: COLD REHEATER STEAM STOP MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-031B C10-TL-032B C10-TL-033B C10-TL-036B C10-TL-065A C10-TL-101A C10-TL-103B C10-TL-104B C10-TL-105B C10-TL-166B C10-TL-204B C11-TL-321B C11-TL-520B C11-TL-519B C11-TL-518B C11-TL-517B C11-TL-515B C11-TL-514B C11-TL-513B C11-TL-510B C11-TL-508 C11-TL-509 C11-TL-116 C11-TL-115 1CL-B49

Page 172 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 214 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691134

Cable: C10BJG1042
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Service: COLD REHEATER STEAM DRAIN MOV


Routed Length (m): Allowance (m): Total Length (m): 215 11 226 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691134 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 5.1.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LBC-90-AA-002 Compartment: Description: COLD REHEATER STEAM DRAIN MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-031B C10-TL-032B C10-TL-033B C10-TL-036B C10-TL-065A C10-TL-101A C10-TL-103B C10-TL-104B C10-TL-105B C10-TL-166B C10-TL-204B C11-TL-321B C11-TL-520B C11-TL-519B C11-TL-518B C11-TL-517B C11-TL-515B C11-TL-514B C11-TL-513B C11-TL-510B C11-TL-508 C11-TL-509 C11-TL-116 C11-TL-115 1CL-A18

Cable: C10BJG1043
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 250 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691135

Service: IP DRUM LEVEL CV STOP


Routed Length (m): Allowance (m): Total Length (m): 235 11 246 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691135 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 5.1.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-HAC-94-AA-001 Compartment: Description: IP DRUM LEVEL CV STOP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-031C C10-TL-032C C10-TL-033C C10-TL-036C C10-TL-065B C10-TL-101B C10-TL-103C C10-TL-104C C10-TL-105C C10-TL-166C C10-TL-204C C11-TL-321C C11-TL-520C C11-TL-519C C11-TL-518C C11-TL-517C C11-TL-516 C11-TL-201 C11-TL-102 C11-TL-203 C11-TL-101 C11-TL-301 C11-TL-302 C11-TL-311 C11-TL-312 C11-TL-314 C11-TL-316 C11-TL-317 1CL-D38

Cable: C10BJG1044
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 255 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691136

Service: DEAERATOR VENT STOP MOV


Routed Length (m): Allowance (m): Total Length (m): 236 11 247 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691136 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 5.2.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-HAD-97-AA-001 Compartment: Description: DEAERATOR VENT STOP MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-031C C10-TL-032C C10-TL-033C C10-TL-036C C10-TL-065B C10-TL-101B C10-TL-103C C10-TL-104C C10-TL-105C C10-TL-166C C10-TL-204C C11-TL-321C C11-TL-520C C11-TL-519C C11-TL-518C C11-TL-517C C11-TL-516 C11-TL-201 C11-TL-102 C11-TL-203 C11-TL-101 C11-TL-301 C11-TL-302 C11-TL-311 C11-TL-312 C11-TL-314 C11-TL-316 1CL-D26

Page 173 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 230 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691137

Cable: C10BJG1045
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Service: HOT REHEAT STEAM DRAIN MOV


Routed Length (m): Allowance (m): Total Length (m): 219 11 230 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691137 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 5.2.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-HAJ-90-AA-001 Compartment: Description: HOT REHEAT STEAM DRAIN MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-031B C10-TL-032B C10-TL-033B C10-TL-036B C10-TL-065A C10-TL-101A C10-TL-103B C10-TL-104B C10-TL-105B C10-TL-166B C10-TL-204B C11-TL-321B C11-TL-520B C11-TL-519B C11-TL-518B C11-TL-517B C11-TL-515B C11-TL-514B C11-TL-513B C11-TL-510B C11-TL-508 C11-TL-509 C11-TL-116 C11-TL-115 C11-TL-114 1CL-B32

Cable: C10BJG1046
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 230 No. of Cables: 1 Type Code: 40026 End Length(m): 5 Elevation: Schematic: ED-691138

Service: LP DRUM PEGGING STEAM STOP MOV


Routed Length (m): Allowance (m): Total Length (m): 230 11 241 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691138 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 5.3.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LBA-96-AA-001 Compartment: Description: LP DRUM PEGGING STEAM STOP MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-031C C10-TL-032C C10-TL-033C C10-TL-036C C10-TL-065B C10-TL-101B C10-TL-103C C10-TL-104C C10-TL-105C C10-TL-166C C10-TL-204C C11-TL-321C C11-TL-520C C11-TL-519C C11-TL-518C C11-TL-517C C11-TL-516 C11-TL-201 C11-TL-102 C11-TL-203 C11-TL-101 C11-TL-301 C11-TL-302 C11-TL-311 C11-TL-312 C11-TL-314 C11-TL-316 1CL-D18

Cable: C10BJG1047
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): 199 No. of Cables: 1 Type Code: 40046 End Length(m): 5 Elevation: Schematic: ED-691139

Service: HOT REHEAT STEAM VENT MOV


Routed Length (m): Allowance (m): Total Length (m): 187 9 196 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691139 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 5.3.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LBB-90-AA-001 Compartment: Description: HOT REHEAT STEAM VENT MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-031C C10-TL-032C C10-TL-033C C10-TL-036C C10-TL-065B C10-TL-101B C10-TL-103C C10-TL-104C C10-TL-105C C10-TL-166C C10-TL-204C C11-TL-321C C11-TL-520C C11-TL-519C C11-TL-518C C11-TL-517C C11-TL-516 C11-TL-201 C11-TL-102 C11-TL-203 C11-TL-101 C11-TL-301 1CL-C06

Page 174 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 263 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691140

Cable: C10BJG1048
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Service: HP DRUM CONTINUOUS B/D MOV


Routed Length (m): Allowance (m): Total Length (m): 251 12 263 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691140 20

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 5.4.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-HAD-91-AA-002 Compartment: Description: HP DRUM CONTINUOUS B/D MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-031C C10-TL-032C C10-TL-033C C10-TL-036C C10-TL-065B C10-TL-101B C10-TL-103C C10-TL-104C C10-TL-105C C10-TL-166C C10-TL-204C C11-TL-321C C11-TL-520C C11-TL-519C C11-TL-518C C11-TL-517C C11-TL-516 C11-TL-201 C11-TL-102 C11-TL-203 C11-TL-101 C11-TL-301 C11-TL-302 C11-TL-311 C11-TL-322 C11-TL-323 1CL-D60 P-08 1CL-D57

Cable: C10BJG1049
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 233 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691141

Service: HP DRUM INTMIT B/D MOV


Routed Length (m): Allowance (m): Total Length (m): 232 11 243 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691141 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 5.4.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-HAD-91-AA-001 Compartment: Description: HP DRUM INTMIT B/D MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-031B C10-TL-032B C10-TL-033B C10-TL-036B C10-TL-065A C10-TL-101A C10-TL-103B C10-TL-104B C10-TL-105B C10-TL-166B C10-TL-204B C11-TL-321B C11-TL-520B C11-TL-519B C11-TL-518B C11-TL-517B C11-TL-515B C11-TL-514B C11-TL-513B C11-TL-510B C11-TL-508 C11-TL-509 C11-TL-116 C11-TL-117 C11-TL-118 C11-TL-119 1CL-B83

Cable: C10BJG1050
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 03

Description:

4C X 10 SQ.MM, 0.6/1kV
Pull Length(m): 270 No. of Cables: 1 Type Code: 40106 End Length(m): 5 Elevation: Schematic: ED-691142

Service: HP DRUM LEVEL CV(100%) STOP MOV


Routed Length (m): Allowance (m): Total Length (m): 251 12 263 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691142 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 5.5.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-HAC-90-AA-001 Compartment: Description: HP DRUM LEVEL CV(100%) STOP MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-031C C10-TL-032C C10-TL-033C C10-TL-036C C10-TL-065B C10-TL-101B C10-TL-103C C10-TL-104C C10-TL-105C C10-TL-166C C10-TL-204C C11-TL-321C C11-TL-520C C11-TL-519C C11-TL-518C C11-TL-517C C11-TL-516 C11-TL-201 C11-TL-102 C11-TL-203 C11-TL-101 C11-TL-301 C11-TL-302 C11-TL-311 C11-TL-322 C11-TL-323 1CL-D60 P-08 1CL-D54

Page 175 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 03 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 246 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691143

Cable: C10BJG1051
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Service: HP DRUM LEVEL CV(30%) STOP MOV


Routed Length (m): Allowance (m): Total Length (m): 252 12 264 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691143 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 5.5.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-HAC-90-AA-002 Compartment: Description: HP DRUM LEVEL CV(30%) STOP MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-031C C10-TL-032C C10-TL-033C C10-TL-036C C10-TL-065B C10-TL-101B C10-TL-103C C10-TL-104C C10-TL-105C C10-TL-166C C10-TL-204C C11-TL-321C C11-TL-520C C11-TL-519C C11-TL-518C C11-TL-517C C11-TL-516 C11-TL-201 C11-TL-102 C11-TL-203 C11-TL-101 C11-TL-301 C11-TL-302 C11-TL-311 C11-TL-322 C11-TL-323 1CL-D60 P-08 1CL-D55

Cable: C10BJG1052
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 212 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691144

Service: HP DESH DRAIN MOV


Routed Length (m): Allowance (m): Total Length (m): 207 10 217 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691144 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 5.6.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-HAH-90-AA-001 Compartment: Description: HP DESH DRAIN MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-031B C10-TL-032B C10-TL-033B C10-TL-036B C10-TL-065A C10-TL-101A C10-TL-103B C10-TL-104B C10-TL-105B C10-TL-166B C10-TL-204B C11-TL-321B C11-TL-520B C11-TL-519B C11-TL-518B C11-TL-517B C11-TL-515B C11-TL-514B C11-TL-513B C11-TL-510B C11-TL-508 C11-TL-509 C11-TL-116 1CL-B53

Cable: C10BJG1053
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 253 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691145

Service: HP SH3 OUTLET DRAIN MOV


Routed Length (m): Allowance (m): Total Length (m): 237 11 248 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691145 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 5.6.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LBA-90-AA-001 Compartment: Description: HP SH3 OUTLET DRAIN MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-031B C10-TL-032B C10-TL-033B C10-TL-036B C10-TL-065A C10-TL-101A C10-TL-103B C10-TL-104B C10-TL-105B C10-TL-166B C10-TL-204B C11-TL-321B C11-TL-520B C11-TL-519B C11-TL-518B C11-TL-517B C11-TL-515B C11-TL-514B C11-TL-513B C11-TL-510B C11-TL-508 C11-TL-509 C11-TL-116 C11-TL-117 C11-TL-118 C11-TL-119 C11-TL-120 1CL-B94

Page 176 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
4C X 6 SQ.MM, 0.6/1kV
Pull Length(m): 225 No. of Cables: 1 Type Code: 40066 End Length(m): 5 Elevation: Schematic: ED-691146

Cable: C10BJG1054
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Service: HP FEED WATER STOP MOV


Routed Length (m): Allowance (m): Total Length (m): 207 10 217 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691146 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 5.7.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LAB-90-AA-001 Compartment: Description: HP FEED WATER STOP MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-031B C10-TL-032B C10-TL-033B C10-TL-036B C10-TL-065A C10-TL-101A C10-TL-103B C10-TL-104B C10-TL-105B C10-TL-166B C10-TL-204B C11-TL-321B C11-TL-520B C11-TL-519B C11-TL-518B C11-TL-517B C11-TL-515B C11-TL-514B C11-TL-513B C11-TL-510B C11-TL-508 C11-TL-509 C11-TL-116 1CL-B56

Cable: C10BJG1055
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 224 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691147

Service: HP FEED WATER STOP BYPASS MOV


Routed Length (m): Allowance (m): Total Length (m): 207 10 217 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691147 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 5.7.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LAB-90-AA-002 Compartment: Description: HP FEED WATER STOP BYPASS MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-031B C10-TL-032B C10-TL-033B C10-TL-036B C10-TL-065A C10-TL-101A C10-TL-103B C10-TL-104B C10-TL-105B C10-TL-166B C10-TL-204B C11-TL-321B C11-TL-520B C11-TL-519B C11-TL-518B C11-TL-517B C11-TL-515B C11-TL-514B C11-TL-513B C11-TL-510B C11-TL-508 C11-TL-509 C11-TL-116 1CL-B98

Cable: C10BJG1056
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 204 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691148

Service: HP STEAM DRAIN MOV


Routed Length (m): Allowance (m): Total Length (m): 216 11 227 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691148 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 5.8.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LBA-90-AA-005 Compartment: Description: HP STEAM DRAIN MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-031C C10-TL-032C C10-TL-033C C10-TL-036C C10-TL-065B C10-TL-101B C10-TL-103C C10-TL-104C C10-TL-105C C10-TL-166C C10-TL-204C C11-TL-321C C11-TL-520C C11-TL-519C C11-TL-518C C11-TL-517C C11-TL-516 C11-TL-201 C11-TL-221 C11-TL-223 1CL-C48 P-05 1CL-C63

Page 177 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
4C X 6 SQ.MM, 0.6/1kV
Pull Length(m): 215 No. of Cables: 1 Type Code: 40066 End Length(m): 5 Elevation: Schematic: ED-691149

Cable: C10BJG1057
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Service: HP STEAM STOP MOV


Routed Length (m): Allowance (m): Total Length (m): 195 10 205 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691149 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 5.8.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LBA-90-AA-003 Compartment: Description: HP STEAM STOP MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-031C C10-TL-032C C10-TL-033C C10-TL-036C C10-TL-065B C10-TL-101B C10-TL-103C C10-TL-104C C10-TL-105C C10-TL-166C C10-TL-204C C11-TL-321C C11-TL-520C C11-TL-519C C11-TL-518C C11-TL-517C C11-TL-516 C11-TL-201 C11-TL-221 C11-TL-223 1CL-C44

Cable: C10BJG1058
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 231 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691150

Service: HP STEAM VENT MOV


Routed Length (m): Allowance (m): Total Length (m): 248 12 260 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691150 20

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 3.6.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LBA-90-AA-002 Compartment: Description: HP STEAM VENT MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-031C C10-TL-032C C10-TL-033C C10-TL-036C C10-TL-065B C10-TL-101B C10-TL-103C C10-TL-104C C10-TL-105C C10-TL-166C C10-TL-204C C11-TL-321C C11-TL-520C C11-TL-519C C11-TL-518C C11-TL-517C C11-TL-516 C11-TL-201 C11-TL-102 C11-TL-203 C11-TL-101 C11-TL-301 C11-TL-302 C11-TL-311 C11-TL-322 C11-TL-323 1CL-D60 P-08 1CL-D59

Cable: C10BJG1059
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 236 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691151

Service: IP DRUM CONT. B/D MOV


Routed Length (m): Allowance (m): Total Length (m): 233 11 244 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691151 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 3.7.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-HAD-95-AA-002 Compartment: Description: IP DRUM CONT. B/D MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-031C C10-TL-032C C10-TL-033C C10-TL-036C C10-TL-065B C10-TL-101B C10-TL-103C C10-TL-104C C10-TL-105C C10-TL-166C C10-TL-204C C11-TL-321C C11-TL-520C C11-TL-519C C11-TL-518C C11-TL-517C C11-TL-516 C11-TL-201 C11-TL-102 C11-TL-203 C11-TL-101 C11-TL-301 C11-TL-302 C11-TL-311 C11-TL-312 C11-TL-314 C11-TL-316 C11-TL-317 1CL-D30

Page 178 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 238 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691152

Cable: C10BJG1060
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Service: IP DRUM INTMIT B/D MOV


Routed Length (m): Allowance (m): Total Length (m): 230 11 241 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691152 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 7.1.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-HAD-95-AA-001 Compartment: Description: IP DRUM INTMIT B/D MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-031B C10-TL-032B C10-TL-033B C10-TL-036B C10-TL-065A C10-TL-101A C10-TL-103B C10-TL-104B C10-TL-105B C10-TL-166B C10-TL-204B C11-TL-321B C11-TL-520B C11-TL-519B C11-TL-518B C11-TL-517B C11-TL-515B C11-TL-514B C11-TL-513B C11-TL-510B C11-TL-508 C11-TL-509 C11-TL-116 C11-TL-117 C11-TL-118 C11-TL-119 1CL-B80

Cable: C10BJG1061
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 225 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691153

Service: IP FEED WATER STOP MOV


Routed Length (m): Allowance (m): Total Length (m): 215 11 226 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691153 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 7.1.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LAB-94-AA-001 Compartment: Description: IP FEED WATER STOP MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-031B C10-TL-032B C10-TL-033B C10-TL-036B C10-TL-065A C10-TL-101A C10-TL-103B C10-TL-104B C10-TL-105B C10-TL-166B C10-TL-204B C11-TL-321B C11-TL-520B C11-TL-519B C11-TL-518B C11-TL-517B C11-TL-515B C11-TL-514B C11-TL-513B C11-TL-510B C11-TL-508 C11-TL-509 C11-TL-116 C11-TL-117 1CL-B63

Cable: C10BJG1062
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 03

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 251 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691154

Service: IP FEED WATER STOP BYPASS MOV


Routed Length (m): Allowance (m): Total Length (m): 235 11 246 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691154 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 7.2.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LAB-94-AA-002 Compartment: Description: IP FEED WATER STOP BYPASS MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-031B C10-TL-032B C10-TL-033B C10-TL-036B C10-TL-065A C10-TL-101A C10-TL-103B C10-TL-104B C10-TL-105B C10-TL-166B C10-TL-204B C11-TL-321B C11-TL-520B C11-TL-519B C11-TL-518B C11-TL-517B C11-TL-515B C11-TL-514B C11-TL-513B C11-TL-510B C11-TL-508 C11-TL-509 C11-TL-116 C11-TL-117 1CL-D44

Page 179 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 233 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691155

Cable: C10BJG1063
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Service: IP STEAM DRAIN MOV


Routed Length (m): Allowance (m): Total Length (m): 212 10 222 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691155 2

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 7.2.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LBA-95-AA-003 Compartment: Description: IP STEAM DRAIN MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-031B C10-TL-032B C10-TL-033B C10-TL-036B C10-TL-065A C10-TL-101A C10-TL-103B C10-TL-104B C10-TL-105B C10-TL-166B C10-TL-204B C11-TL-321B C11-TL-520B C11-TL-519B C11-TL-518B C11-TL-517B C11-TL-515B C11-TL-514B C11-TL-513B C11-TL-510B C11-TL-508 C11-TL-509 C11-TL-116 C11-TL-115 1CL-B45

Cable: C10BJG1064
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 182 No. of Cables: 1 Type Code: 40026 End Length(m): 5 Elevation: Schematic: ED-691156

Service: IP STEAM STOP MOV


Routed Length (m): Allowance (m): Total Length (m): 177 9 186 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691156 2

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 7.3.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LBA-95-AA-002 Description: IP STEAM STOP MOV Equip Location: Zone: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-031C C10-TL-032C C10-TL-033C C10-TL-036C C10-TL-065B C10-TL-101B C10-TL-103C C10-TL-104C C10-TL-105C C10-TL-166C C10-TL-204C C11-TL-321C C11-TL-520C C11-TL-519C C11-TL-518C C11-TL-517C C11-TL-516 C11-TL-201 C11-TL-221 C11-TL-223 1CL-C29

Cable: C10BJG1065
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 177 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691157

Service: IP STEAM VENT MOV


Routed Length (m): Allowance (m): Total Length (m): 165 9 174 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691157 3

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 7.3.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LBA-95-AA-001 Description: IP STEAM VENT MOV Equip Location: Zone: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-031C C10-TL-032C C10-TL-033C C10-TL-036C C10-TL-065B C10-TL-101B C10-TL-103C C10-TL-104C C10-TL-105C C10-TL-166C C10-TL-204C C11-TL-321C C11-TL-520C C11-TL-519C C11-TL-518C C11-TL-517C C11-TL-516 C11-TL-201 1CL-C22

Page 180 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 235 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691158

Cable: C10BJG1066
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Service: LP DRUM INTMIT B/D MOV


Routed Length (m): Allowance (m): Total Length (m): 226 11 237 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691158 1

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 7.4.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-HAD-98-AA-001 Compartment: Description: LP DRUM INTMIT B/D MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-031B C10-TL-032B C10-TL-033B C10-TL-036B C10-TL-065A C10-TL-101A C10-TL-103B C10-TL-104B C10-TL-105B C10-TL-166B C10-TL-204B C11-TL-321B C11-TL-520B C11-TL-519B C11-TL-518B C11-TL-517B C11-TL-515B C11-TL-514B C11-TL-513B C11-TL-510B C11-TL-508 C11-TL-509 C11-TL-116 C11-TL-117 C11-TL-118 C11-TL-119 1CL-B78

Cable: C10BJG1067
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 271 No. of Cables: 1 Type Code: 40026 End Length(m): 5 Elevation: Schematic: ED-691159

Service: LP FEED WATER STOP MOV


Routed Length (m): Allowance (m): Total Length (m): 233 11 244 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691159 2

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 7.4.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LCA-91-AA-001 Compartment: Description: LP FEED WATER STOP MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-031C C10-TL-032C C10-TL-033C C10-TL-036C C10-TL-065B C10-TL-101B C10-TL-103C C10-TL-104C C10-TL-105C C10-TL-166C C10-TL-204C C11-TL-321C C11-TL-520C C11-TL-519C C11-TL-518C C11-TL-517C C11-TL-516 C11-TL-201 C11-TL-102 C11-TL-203 C11-TL-101 C11-TL-301 C11-TL-302 C11-TL-311 C11-TL-312 C11-TL-314 C11-TL-316 1CL-D23

Cable: C10BJG1068
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 234 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691160

Service: LP STEAM DRAIN MOV


Routed Length (m): Allowance (m): Total Length (m): 220 11 231 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691160 1

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 7.5.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LBD-90-AA-004 Compartment: Description: LP STEAM DRAIN MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-031B C10-TL-032B C10-TL-033B C10-TL-036B C10-TL-065A C10-TL-101A C10-TL-103B C10-TL-104B C10-TL-105B C10-TL-166B C10-TL-204B C11-TL-321B C11-TL-520B C11-TL-519B C11-TL-518B C11-TL-517B C11-TL-515B C11-TL-514B C11-TL-513B C11-TL-510B C11-TL-508 C11-TL-509 C11-TL-116 C11-TL-117 C11-TL-118 1CL-B65

Page 181 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
4C X 2.5 SQ.MM, 0.6/1kV
Pull Length(m): 188 No. of Cables: 1 Type Code: 40026 End Length(m): 5 Elevation: Schematic: ED-691161

Cable: C10BJG1069
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Service: LP STEAM STOP MOV


Routed Length (m): Allowance (m): Total Length (m): 182 9 191 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 7.5.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LBD-90-AA-002 Compartment: End Length(m): 15 Description: C11 LP STEAM LINE MOV FROM HRSG North: 1777.50 Equip Location: Zone: East: 2340.60 Elevation: 16.30 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-691161

Routing Information: Remarks: Route: CABLE C10-TL-038B C10-TL-029B C10-TL-015B C10-TL-003B C10-TL-002B C10-TL-024B C10-TL-023B C10-TL-223B C10-TL-222B C14-TL-202C C14-TL-204C C14-TL-207C C14-TL-049C C14-TL-099A C14-TL-097A C14-TL-093A C14-TL-091A CABLE C14-TL-089 C14-TL-087 C14-TL-085 C14-TL-083 C14-TL-082 C14-C-1101

Cable: C10BJG1070
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 234 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691162

Service: LP STEAM VENT MOV


Routed Length (m): Allowance (m): Total Length (m): 223 11 234 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691162 2

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 7.6.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LBD-90-AA-001 Compartment: Description: HRSG LP STEAM VENT MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-031C C10-TL-032C C10-TL-033C C10-TL-036C C10-TL-065B C10-TL-101B C10-TL-103C C10-TL-104C C10-TL-105C C10-TL-166C C10-TL-204C C11-TL-321C C11-TL-520C C11-TL-519C C11-TL-518C C11-TL-517C C11-TL-516 C11-TL-201 C11-TL-221 C11-TL-223 1CL-C48 P-05 1CL-C46

Cable: C10BJG1071
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 03

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 259 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691163

Service: RH DESUPERHEATER SPRAY WATER STOP MOV


Routed Length (m): Allowance (m): Total Length (m): 267 12 279 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691163 2

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 7.6.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LAF-90-AA-001 Compartment: Description: RH DESUPERHEATER SPRAY WATER STOP MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-031B C10-TL-032B C10-TL-033B C10-TL-036B C10-TL-065A C10-TL-101A C10-TL-103B C10-TL-104B C10-TL-105B C10-TL-166B C10-TL-204B C11-TL-321B C11-TL-520B C11-TL-519B C11-TL-518B C11-TL-517B C11-TL-515B C11-TL-514B C11-TL-513B C11-TL-510B C11-TL-508 C11-TL-509 C11-TL-116 C11-TL-115 C11-TL-114 C11-TL-113 C11-TL-112 1CL-B25 P-03 1CL-B21

Page 182 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 03 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 256 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691164

Cable: C10BJG1072
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Service: RH DESH SPRAY WATER CV BYPASS STOP MOV


Routed Length (m): Allowance (m): Total Length (m): 265 12 277 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691164 2

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 7.7.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LAF-90-AA-002 Compartment: Description: RH DESH SPRAY WATER CV BYPASS STOP MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-031B C10-TL-032B C10-TL-033B C10-TL-036B C10-TL-065A C10-TL-101A C10-TL-103B C10-TL-104B C10-TL-105B C10-TL-166B C10-TL-204B C11-TL-321B C11-TL-520B C11-TL-519B C11-TL-518B C11-TL-517B C11-TL-515B C11-TL-514B C11-TL-513B C11-TL-510B C11-TL-508 C11-TL-509 C11-TL-116 C11-TL-115 C11-TL-114 C11-TL-113 C11-TL-112 1CL-B25 P-03 1CL-B20

Cable: C10BJG1073
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 274 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691165

Service: RH2 OUTLET STEAM DRAIN MOV


Routed Length (m): Allowance (m): Total Length (m): 259 12 271 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691165 2

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 7.7.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LBB-90-AA-002 Compartment: Description: RH2 OUTLET STEAM DRAIN MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-031B C10-TL-032B C10-TL-033B C10-TL-036B C10-TL-065A C10-TL-101A C10-TL-103B C10-TL-104B C10-TL-105B C10-TL-166B C10-TL-204B C11-TL-321B C11-TL-520B C11-TL-519B C11-TL-518B C11-TL-517B C11-TL-515B C11-TL-514B C11-TL-513B C11-TL-510B C11-TL-508 C11-TL-509 C11-TL-116 C11-TL-115 C11-TL-114 C11-TL-113 C11-TL-112 1CL-B04

Cable: C10BJG1074
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 193 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691166

Service: CONDENSATE FEED WATER STOP MOV


Routed Length (m): Allowance (m): Total Length (m): 175 9 184 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691166 1

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 7.8.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LCA-90-AA-001 Compartment: Description: CONDENSATE FEED WATER STOP MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-031C C10-TL-032C C10-TL-033C C10-TL-036C C10-TL-065B C10-TL-101B C10-TL-103C C10-TL-104C C10-TL-105C C10-TL-166C C10-TL-204C C11-TL-321C C11-TL-520C C11-TL-519C C11-TL-518C C11-TL-517C C11-TL-516 C11-TL-201 C11-TL-102 C11-TL-203 1CL-C10

Page 183 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 216 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691167

Cable: C10BJG1075
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Service: HP STEAM BYPASS MOV UNIT-1


Routed Length (m): Allowance (m): Total Length (m): 216 11 227 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691167 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 7.8.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LBA-90-AA-004 Compartment: Description: HP STEAM BYPASS MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-031C C10-TL-032C C10-TL-033C C10-TL-036C C10-TL-065B C10-TL-101B C10-TL-103C C10-TL-104C C10-TL-105C C10-TL-166C C10-TL-204C C11-TL-321C C11-TL-520C C11-TL-519C C11-TL-518C C11-TL-517C C11-TL-516 C11-TL-201 C11-TL-221 C11-TL-223 1CL-C48 P-05 1CL-C43

Cable: C10BJG1076
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 209 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691168

Service: LP STEAM STOP BYPASS MOV UNIT-1


Routed Length (m): Allowance (m): Total Length (m): 186 9 195 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691168 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 8.8.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LBD-90-AA-003 Compartment: Description: INTERGRAL BYPASS MOV OF C11-LBD-90-AA-002 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-032C C10-TL-037C C10-TL-063C C10-TL-060C C10-TL-059C C10-TL-043C C10-TL-042C C10-TL-017C C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-097B C14-TL-093B C14-TL-091B C14-TL-089 C14-TL-087 C14-TL-085 C14-TL-083 C14-TL-082 C14-C-1101

Cable: C10BJG1077
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 188 No. of Cables: 1 Type Code: 40156 End Length(m): 8 Elevation: Schematic: ED-691169

Service: HP LEAD 11 TO AUX. STEAM DRAIN MOV


Routed Length (m): Allowance (m): Total Length (m): 183 9 192 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 8.7.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LBA-46-AA-006 Compartment: End Length(m): 9 Description: C11 HP DRN POT MOV North: 1662.65 Equip Location: Zone: East: 2211.16 Elevation: 14.02 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-691169

Routing Information: Remarks: Route: CABLE C10-TL-031B C10-TL-032B C10-TL-011B C10-TL-009B C10-TL-008B C10-TL-035B C10-TL-066C C10-TL-068C C10-TL-070C C10-TL-102C C10-TL-109B C10-TL-107B C10-TL-164B C10-TL-201B C12-TL-520B C12-TL-519B C12-TL-518B C12-TL-516B C12-TL-515B C12-TL-513 C12-TL-510B C12-TL-508 C12-TL-509 C12-TL-116 C12-TL-115 C12-TL-114 C12-C-1306

Page 184 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
3C X 95 SQ.MM, 0.6/1kV
Pull Length(m): 258 No. of Cables: 1 Type Code: 30956 End Length(m): 8 Elevation: Schematic: ED-691127

Cable: C10BJG1078
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Service: LP RECIRC PUMP-2


Routed Length (m): Allowance (m): Total Length (m): 217 11 228 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691127 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 1.6 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LCA-93-AP-001 Compartment: Description: CPH RECIRCULATION PUMP-B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685564

Routing Information: Remarks: Route: CABLE C10-TL-033C C10-TL-036C C10-TL-065B C10-TL-101B C10-TL-103C C10-TL-104C C10-TL-105C C10-TL-166C C10-TL-204C C11-TL-321C C11-TL-520C C11-TL-519C C11-TL-518C C11-TL-517C C11-TL-516 C11-TL-201 C11-TL-102 C11-TL-203 C11-TL-101 C11-TL-110 C11-TL-111 C11-TL-112 C11-TL-113 C11-TL-114 1CL-A13

Cable: C10BJG1079
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

3C X 95 SQ.MM, 0.6/1kV
Pull Length(m): 258 No. of Cables: 1 Type Code: 30956 End Length(m): 8 Elevation: Schematic: ED-691127

Service: LP RECIRC PUMP-2


Routed Length (m): Allowance (m): Total Length (m): 217 11 228 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691127 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 1.6 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LCA-93-AP-001 Compartment: Description: CPH RECIRCULATION PUMP-B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685564

Routing Information: Remarks: Route: CABLE C10-TL-033C C10-TL-036C C10-TL-065B C10-TL-101B C10-TL-103C C10-TL-104C C10-TL-105C C10-TL-166C C10-TL-204C C11-TL-321C C11-TL-520C C11-TL-519C C11-TL-518C C11-TL-517C C11-TL-516 C11-TL-201 C11-TL-102 C11-TL-203 C11-TL-101 C11-TL-110 C11-TL-111 C11-TL-112 C11-TL-113 C11-TL-114 1CL-A13

Cable: C10BJG1080
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 00

Description:

3C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): No. of Cables: 1 Type Code: 30156 End Length(m): 8 Elevation: Schematic: ED-691126

Service: LP RECIRC PUMP-1


Routed Length (m): Allowance (m): Total Length (m): 217 11 228 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691126 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 1.5 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LCA-92-AP-001 Compartment: Description: CPH RECIRCULATION PUMP-A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685564

Routing Information: Remarks: Route: CABLE C10-TL-033C C10-TL-036C C10-TL-065B C10-TL-101B C10-TL-103C C10-TL-104C C10-TL-105C C10-TL-166C C10-TL-204C C11-TL-321C C11-TL-520C C11-TL-519C C11-TL-518C C11-TL-517C C11-TL-516 C11-TL-201 C11-TL-102 C11-TL-203 C11-TL-101 C11-TL-110 C11-TL-111 C11-TL-112 C11-TL-113 C11-TL-114 1CL-A08

Page 185 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
3C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 30156 End Length(m): 8 Elevation: Schematic: ED-691127

Cable: C10BJG1081
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Service: LP RECIRC PUMP-2


Routed Length (m): Allowance (m): Total Length (m): 217 11 228 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691127 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 1.6 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LCA-93-AP-001 Compartment: Description: CPH RECIRCULATION PUMP-B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685564

Routing Information: Remarks: Route: CABLE C10-TL-033C C10-TL-036C C10-TL-065B C10-TL-101B C10-TL-103C C10-TL-104C C10-TL-105C C10-TL-166C C10-TL-204C C11-TL-321C C11-TL-520C C11-TL-519C C11-TL-518C C11-TL-517C C11-TL-516 C11-TL-201 C11-TL-102 C11-TL-203 C11-TL-101 C11-TL-110 C11-TL-111 C11-TL-112 C11-TL-113 C11-TL-114 1CL-A13

Cable: C10BJG1086
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

3C X 50 SQ.MM, 0.6/1kV
Pull Length(m): 212 No. of Cables: 1 Type Code: 30506 End Length(m): 5 Elevation: Schematic: ED-691170

Service: 127V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 224 11 235 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691170 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 7.1.3 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LBA-90-AA-191 Compartment: Description: ELECTRICAL RELIEF VALVE North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-031C C10-TL-032C C10-TL-033C C10-TL-036C C10-TL-065B C10-TL-101B C10-TL-103C C10-TL-104C C10-TL-105C C10-TL-166C C10-TL-204C C11-TL-321C C11-TL-520C C11-TL-519C C11-TL-518C C11-TL-517C C11-TL-516 C11-TL-201 C11-TL-221 C11-TL-223 1CL-C48 P-05 1CL-C45

Cable: C10BJG1087
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

3C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 65 No. of Cables: 1 Type Code: 30156 End Length(m): 6 Elevation: Schematic: ED-691170

Service: 127V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 53 4 57 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691170 11

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 7.1.3 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-CPB-66-GH-011 Compartment: Description: B1H1T CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-032D C10-TL-031D C10-TL-014C C10-TL-013B C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-019 C10-TL-045 C10-TL-046 C10-TL-120 C10-TL-123 CABLE

Page 186 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
3C X 2.5 SQ.MM, 0.6/1kV
Pull Length(m): 66 No. of Cables: 1 Type Code: 30026 End Length(m): 6 Elevation: Schematic: ED-691170

Cable: C10BJG1088
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Service: 127V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 59 5 64 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691170 20

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 7.1.3 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-CPB-66-GH-013 Compartment: Description: B1H1T I/O CABINET-1_TMR North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-032D C10-TL-031D C10-TL-014C C10-TL-013B C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-020D CABLE C10-TL-021 C10-TL-048 C10-TL-118 C10-TL-122 CABLE

Cable: C10BJG1089
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

3C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 65 No. of Cables: 1 Type Code: 30156 End Length(m): 6 Elevation: Schematic: ED-691170

Service: 127V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 50 4 54 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691170 8

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 7.1.3 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-CPB-66-GH-012 Compartment: Description: B1H1T I/O CABINET-2_TMR North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-032D C10-TL-031D C10-TL-014C C10-TL-013B C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-019 C10-TL-045 C10-TL-046 C10-TL-120 C10-TL-123 CABLE

Cable: C10BJG1090
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

3C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 65 No. of Cables: 1 Type Code: 30156 End Length(m): 6 Elevation: Schematic: ED-691170

Service: 127V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 54 4 58 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691170 12

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 7.1.3 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-CPB-66-GH-001 Compartment: Description: B1H1 CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-032D C10-TL-031D C10-TL-014C C10-TL-013B C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-019 C10-TL-045 C10-TL-046 C10-TL-120 C10-TL-123 CABLE

Page 187 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
3C X 2.5 SQ.MM, 0.6/1kV
Pull Length(m): 73 No. of Cables: 1 Type Code: 30026 End Length(m): 6 Elevation: Schematic: ED-691170

Cable: C10BJG1091
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Service: 127V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 53 4 57 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691170 11

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 7.1.3 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-CPB-66-GH-002 Compartment: Description: B1H1 I/O CABINET-1_TMR North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-032D C10-TL-031D C10-TL-014C C10-TL-013B C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-019 C10-TL-045 C10-TL-046 C10-TL-120 C10-TL-123 CABLE

Cable: C10BJG1092
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

3C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 71 No. of Cables: 1 Type Code: 30026 End Length(m): 6 Elevation: Schematic: ED-691170

Service: 127V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 50 4 54 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691170 8

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 7.1.3 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-CPB-66-GH-003 Compartment: Description: B1H1 I/O CABINET-2_SIMP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-032D C10-TL-031D C10-TL-014C C10-TL-013B C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-019 C10-TL-045 C10-TL-046 C10-TL-120 C10-TL-123 CABLE

Cable: C10BJG1093
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

3C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 69 No. of Cables: 1 Type Code: 30026 End Length(m): 6 Elevation: Schematic: ED-691170

Service: 127V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 46 4 50 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691170 4

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 7.1.3 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-CPB-66-GH-004 Compartment: Description: B1H1 I/O CABINET-3_SIMP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-032D C10-TL-031D C10-TL-014C C10-TL-013B C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-019 C10-TL-045 C10-TL-046 C10-TL-120 C10-TL-123 CABLE

Page 188 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 200 No. of Cables: 1 Type Code: 40156 End Length(m): 8 Elevation: Schematic: ED-691171

Cable: C10BJG1094
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Service: HRSG HP STEAM DRAIN LINE MOV 4


Routed Length (m): Allowance (m): Total Length (m): 184 9 193 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 9.5.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LBA-46-AA-009 Compartment: End Length(m): 10 Description: C11 HP STM LOW POINT DRN MOV North: 1714.00 Equip Location: Zone: East: 2225.20 Elevation: 9.70 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-691171

Routing Information: Remarks: Route: CABLE C10-TL-031B C10-TL-032B C10-TL-011B C10-TL-009B C10-TL-008B C10-TL-035B C10-TL-066C C10-TL-068C C10-TL-070C C10-TL-102C C10-TL-109B C10-TL-107B C10-TL-164B C10-TL-201B C12-TL-520B C12-TL-519B C12-TL-518B C12-TL-516B C12-TL-515B C12-TL-513 C12-TL-510B C12-TL-508 C12-TL-509 C12-TL-116 C12-TL-115 C12-TL-114 C12-C-1306

Cable: C10BJG1095
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 182 No. of Cables: 1 Type Code: 40156 End Length(m): 8 Elevation: Schematic: ED-691172

Service: HRSG REHEATER DRAIN MOV-CRH SYSTEM


Routed Length (m): Allowance (m): Total Length (m): 190 10 200 Option 1: Option 2: Option 3: Compartment: North: 1720.20 Wiring Dwg: Shield: N Ground: Jacket: PVC End Length(m): 9

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 9.6.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LBC-46-AA-001 Description: C11 CR DRN MOV Equip Location: Zone: Location Dwg: EA-681101

East: 2222.90 Elevation: 10.50 Schematic: ED-691172

Routing Information: Remarks: Route: CABLE C10-TL-031B C10-TL-032B C10-TL-011B C10-TL-009B C10-TL-008B C10-TL-035B C10-TL-066C C10-TL-068C C10-TL-070C C10-TL-102C C10-TL-109B C10-TL-107B C10-TL-164B C10-TL-201B C12-TL-520B C12-TL-519B C12-TL-518B C12-TL-516B C12-TL-515B C12-TL-513 C12-TL-510B C12-TL-508 C12-TL-509 C12-TL-116 C12-TL-115 C12-TL-114 C12-TL-113 C12-C-1307

Cable: C10BJG1096
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 201 No. of Cables: 1 Type Code: 40156 End Length(m): 8 Elevation: Schematic: ED-691173

Service: HRSG#1 LP STEAM DRAIN LINE MOV 5


Routed Length (m): Allowance (m): Total Length (m): 172 9 181 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 8.1.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LBD-46-AA-005 Compartment: End Length(m): 10 Description: C11 LP DRN POT/COND MOV North: 1781.58 Equip Location: Zone: East: 2333.84 Elevation: 12.95 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-691173

Routing Information: Remarks: Route: CABLE C10-TL-038B C10-TL-029B C10-TL-015B C10-TL-003B C10-TL-002B C10-TL-024B C10-TL-023B C10-TL-223B C10-TL-222B C14-TL-202C C14-TL-204C C14-TL-207C C14-TL-049C C14-TL-099A C14-TL-097A C14-TL-093A C14-TL-091A CABLE C14-TL-089 C14-TL-087 C14-TL-085 C14-TL-083 C14-C-1301

Page 189 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
4C X 2.5 SQ.MM, 0.6/1kV
Pull Length(m): 180 No. of Cables: 1 Type Code: 40026 End Length(m): 5 Elevation: Schematic: ED-691174

Cable: C10BJG1097
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Service: HRSG LP STEAM BYPASS ISOLATION MOV


Routed Length (m): Allowance (m): Total Length (m): 171 9 180 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 9.4.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LBD-26-AA-001 Compartment: End Length(m): 10 Description: C11 LP BYP IN ISO MOV North: 1775.70 Equip Location: Zone: East: 2339.60 Elevation: 13.80 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-691174

Routing Information: Remarks: Route: CABLE C10-TL-032C C10-TL-037C C10-TL-063C C10-TL-060C C10-TL-059C C10-TL-043C C10-TL-042C C10-TL-017C C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-097B C14-TL-093B C14-TL-091B CABLE C14-TL-089 C14-TL-087 C14-TL-086 C14-C-1202

Cable: C10BJG1098
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 234 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691175

Service: HP SH1 INTLET DRAIN MOV


Routed Length (m): Allowance (m): Total Length (m): 223 11 234 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691175 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 9.5.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-HAH-91-AA-001 Compartment: Description: HP SH1 INLET DRAIN MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-031B C10-TL-032B C10-TL-033B C10-TL-036B C10-TL-065A C10-TL-101A C10-TL-103B C10-TL-104B C10-TL-105B C10-TL-166B C10-TL-204B C11-TL-321B C11-TL-520B C11-TL-519B C11-TL-518B C11-TL-517B C11-TL-515B C11-TL-514B C11-TL-513B C11-TL-510B C11-TL-508 C11-TL-509 C11-TL-116 C11-TL-117 C11-TL-118 1CL-B67

Cable: C10BJG1099
Seg Code: L System: BJG Startup Code:
Cable From End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

4C X 6 SQ.MM, 0.6/1kV
Pull Length(m): 230 No. of Cables: 1 Type Code: 40066 End Length(m): 8 Elevation: Schematic: ED-693923

Service: HRSG HP STEAM BYPASS ISOLATION MOV


Routed Length (m): Allowance (m): Total Length (m): 217 11 228 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693923 8

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 9.6.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C11-LBA-25-AA-002 Description: C11 HP BYP ISO MOV Equip Location: Zone: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-031B C10-TL-032B C10-TL-033B C10-TL-036B C10-TL-065A C10-TL-101A C10-TL-103B C10-TL-104B C10-TL-105B C10-TL-166B C10-TL-204B C11-TL-321B C11-TL-520B C11-TL-519B C11-TL-518B C11-TL-517B C11-TL-515B C11-TL-514B C11-TL-513B C11-TL-510B C11-TL-508 C11-TL-509 C11-TL-116 C11-TL-117 C11-C-1305

Page 190 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
4C X 2.5 SQ.MM, 0.6/1kV
Pull Length(m): 113 No. of Cables: 1 Type Code: 40026 End Length(m): 5 Elevation: Schematic: ED-691943

Cable: C10BJH1001
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Service: HRSG BFP - LUBE OIL PUMP - 3A


Routed Length (m): Allowance (m): Total Length (m): 114 7 121 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691943 1

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 1.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LAB-45-AP-012 Compartment: Description: BLK#1 HRSG#3 BFP-A OIL PUMP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-005B C10-TL-006B C10-TL-007B C10-TL-035E C10-TL-066F C10-TL-068F C10-TL-070F C10-TL-102F C10-TL-108B C10-TL-106B C10-TL-163B C10-TL-202B C13-TL-515B C13-TL-513 C13-TL-512B C13-TL-511B C13-D001-01 C13-EMH-001 C13-EC-010

Cable: C10BJH1002
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 113 No. of Cables: 1 Type Code: 40026 End Length(m): 5 Elevation: Schematic: ED-691944

Service: HRSG BFP - LUBE OIL PUMP - 3B


Routed Length (m): Allowance (m): Total Length (m): 117 7 124 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691944 1

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 1.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LAB-45-AP-022 Compartment: Description: BLK#1 HRSG#3 BFP-B OIL PUMP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-005B C10-TL-006B C10-TL-007B C10-TL-035E C10-TL-066F C10-TL-068F C10-TL-070F C10-TL-102F C10-TL-108B C10-TL-106B C10-TL-163B C10-TL-202B C13-TL-515B C13-TL-513 C13-TL-512B C13-TL-511B C13-D001-01 C13-EMH-001 C13-EC-007

Cable: C10BJH1003
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 119 No. of Cables: 1 Type Code: 40026 End Length(m): 5 Elevation: Schematic: ED-691945

Service: HRSG BFP - LUBE OIL PUMP - 3C


Routed Length (m): Allowance (m): Total Length (m): 120 7 127 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691945 1

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 1.3 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LAB-45-AP-032 Compartment: Description: BLK#1 HRSG#3 BFP-C OIL PUMP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-005B C10-TL-006B C10-TL-007B C10-TL-035E C10-TL-066F C10-TL-068F C10-TL-070F C10-TL-102F C10-TL-108B C10-TL-106B C10-TL-163B C10-TL-202B C13-TL-515B C13-TL-513 C13-TL-512B C13-TL-511B C13-D001-01 C13-EMH-001 C13-EC-004

Page 191 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
4C X 2.5 SQ.MM, 0.6/1kV
Pull Length(m): 94 No. of Cables: 1 Type Code: 40026 End Length(m): 5 Elevation: Schematic: ED-691934

Cable: C10BJH1004
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Service: HRSG BFP- HP DISCHARGE MOV - 3A


Routed Length (m): Allowance (m): Total Length (m): 95 6 101 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 3.1.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LAB-45-AA-001 Compartment: End Length(m): 10 Description: C13 FW/FWP-A DIS ISO MOV North: 1740.70 Equip Location: Zone: East: 2222.30 Elevation: 13.30 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-691934

Routing Information: Remarks: Route: CABLE C10-TL-005A C10-TL-006A C10-TL-007A C10-TL-035D C10-TL-066E C10-TL-068E C10-TL-070E C10-TL-102E C10-TL-108A C10-TL-106A C10-TL-163A C10-TL-202A C13-TL-515A C13-TL-514 C13-TL-510A C13-TL-507 C13-C-1212

Cable: C10BJH1005
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 03

Description:

4C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 97 No. of Cables: 1 Type Code: 40026 End Length(m): 5 Elevation: Schematic: ED-691935

Service: HRSG BFP- HP DISCHARGE MOV - 3B


Routed Length (m): Allowance (m): Total Length (m): 98 6 104 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 3.1.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LAB-45-AA-005 Compartment: End Length(m): 10 Description: C13 FW/FWP-B DIS ISO MOV North: 1740.80 Equip Location: Zone: East: 2218.30 Elevation: 13.30 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-691935

Routing Information: Remarks: Route: CABLE C10-TL-005A C10-TL-006A C10-TL-007A C10-TL-035D C10-TL-066E C10-TL-068E C10-TL-070E C10-TL-102E C10-TL-108A C10-TL-106A C10-TL-163A C10-TL-202A C13-TL-515A C13-TL-514 C13-TL-510A C13-TL-507 C13-TL-505 C13-C-1213

Cable: C10BJH1006
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 115 No. of Cables: 1 Type Code: 40026 End Length(m): 5 Elevation: Schematic: ED-691936

Service: HRSG BFP- HP DISCHARGE MOV - 3C


Routed Length (m): Allowance (m): Total Length (m): 98 6 104 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 3.2.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LAB-45-AA-009 Compartment: End Length(m): 6 Description: C13 FW/FWP-C DIS ISO MOV North: 1740.80 Equip Location: Zone: East: 2214.30 Elevation: 13.30 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-691936

Routing Information: Remarks: Route: CABLE C10-TL-005A C10-TL-006A C10-TL-007A C10-TL-035D C10-TL-066E C10-TL-068E C10-TL-070E C10-TL-102E C10-TL-108A C10-TL-106A C10-TL-163A C10-TL-202A C13-TL-515A C13-TL-514 C13-TL-510A C13-TL-507 C13-TL-505 C13-TL-503 C13-C-1214

Page 192 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 100 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691937

Cable: C10BJH1007
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Service: HRSG BFP - HP DISCHARGE MOV EQUALIZING MOV- 3A


Routed Length (m): Allowance (m): Total Length (m): 91 6 97 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691937 6

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 3.2.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LAB-45-AA-012 Compartment: Description: RESERVED; MOV INTEGRAL VALVE; SEE VENDOR DWG. North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-005A C10-TL-006A C10-TL-007A C10-TL-035D C10-TL-066E C10-TL-068E C10-TL-070E C10-TL-102E C10-TL-108A C10-TL-106A C10-TL-163A C10-TL-202A C13-TL-515A C13-TL-514 C13-TL-510A C13-TL-507 C13-C-1215

Cable: C10BJH1008
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 96 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691938

Service: HRSG BFP - HP DISCHARGE MOV EQUALIZING MOV- 3B


Routed Length (m): Allowance (m): Total Length (m): 94 6 100 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691938 6

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 3.3.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LAB-45-AA-013 Compartment: Description: RESERVED; MOV INTEGRAL VALVE; SEE VENDOR DWG. North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-005A C10-TL-006A C10-TL-007A C10-TL-035D C10-TL-066E C10-TL-068E C10-TL-070E C10-TL-102E C10-TL-108A C10-TL-106A C10-TL-163A C10-TL-202A C13-TL-515A C13-TL-514 C13-TL-510A C13-TL-507 C13-TL-505 C13-C-1202

Cable: C10BJH1009
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 110 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691939

Service: HRSG BFP - HP DISCHARGE MOV EQUALIZING MOV- 3C


Routed Length (m): Allowance (m): Total Length (m): 98 6 104 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691939 6

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 3.3.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LAB-45-AA-014 Compartment: Description: RESERVED; MOV INTEGRAL VALVE; SEE VENDOR DWG. North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-005A C10-TL-006A C10-TL-007A C10-TL-035D C10-TL-066E C10-TL-068E C10-TL-070E C10-TL-102E C10-TL-108A C10-TL-106A C10-TL-163A C10-TL-202A C13-TL-515A C13-TL-514 C13-TL-510A C13-TL-507 C13-TL-505 C13-TL-503 C13-C-1203

Page 193 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 03 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 111 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691940

Cable: C10BJH1010
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Service: HRSG BFP - IP DISCHARGE MOV - 3A


Routed Length (m): Allowance (m): Total Length (m): 94 6 100 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691940 6

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 3.4.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LAB-45-AA-003 Compartment: Description: C13 FW//FWP-A IP DIS ISO MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-005A C10-TL-006A C10-TL-007A C10-TL-035D C10-TL-066E C10-TL-068E C10-TL-070E C10-TL-102E C10-TL-108A C10-TL-106A C10-TL-163A C10-TL-202A C13-TL-515A C13-TL-514 C13-TL-510A C13-TL-507 C13-TL-505 C13-C-1204

Cable: C10BJH1011
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 109 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691941

Service: HRSG BFP - IP DISCHARGE MOV - 3B


Routed Length (m): Allowance (m): Total Length (m): 98 6 104 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691941 6

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 3.4.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LAB-45-AA-007 Compartment: Description: C13 FW//FWP-B IP DIS ISO MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-005A C10-TL-006A C10-TL-007A C10-TL-035D C10-TL-066E C10-TL-068E C10-TL-070E C10-TL-102E C10-TL-108A C10-TL-106A C10-TL-163A C10-TL-202A C13-TL-515A C13-TL-514 C13-TL-510A C13-TL-507 C13-TL-505 C13-TL-503 C13-C-1216

Cable: C10BJH1012
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 109 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691942

Service: HRSG BFP - IP DISCHARGE MOV - 3C


Routed Length (m): Allowance (m): Total Length (m): 102 6 108 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 3.5.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LAB-45-AA-011 Compartment: End Length(m): 6 Description: C12 FW//FWP-C IP DIS ISO MOV North: 1742.70 Equip Location: Zone: East: 2212.10 Elevation: 13.30 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-691942

Routing Information: Remarks: Route: CABLE C10-TL-005A C10-TL-006A C10-TL-007A C10-TL-035D C10-TL-066E C10-TL-068E C10-TL-070E C10-TL-102E C10-TL-108A C10-TL-106A C10-TL-163A C10-TL-202A C13-TL-515A C13-TL-514 C13-TL-510A C13-TL-507 C13-TL-505 C13-TL-503 C13-TL-501 C13-C-1205

Page 194 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 03 Description:
4C X 10 SQ.MM, 0.6/1kV
Pull Length(m): 185 No. of Cables: 1 Type Code: 40106 End Length(m): 5 Elevation: Schematic: ED-691946

Cable: C10BJH1013
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Service: HP HYDRAULIC PUMP LCP-UNIT-3


Routed Length (m): Allowance (m): Total Length (m): 177 9 186 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691946 17

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 9.1.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LBA-25-GH-001 Compartment: Description: BLK-1 HRSG-3 # HP BYP HSU PANEL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-005C C10-TL-004A C10-TL-015C C10-TL-028A C10-TL-027A C10-TL-026A C10-TL-025B C10-TL-219B C10-TL-218B C10-TL-216 C10-TL-214 C10-TL-211 C13-TL-518 C13-TL-517 C13-TL-516 C13-TL-201 C13-TL-102 C13-TL-203 C13-TL-101 C13-TL-110 C13-TL-111 C13-TL-112 C13-TL-113 C13-TL-114 C13-TL-115 C13-TL-117 C13-C-1206

Cable: C10BJH1014
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 10 SQ.MM, 0.6/1kV
Pull Length(m): 110 No. of Cables: 1 Type Code: 40106 End Length(m): 5 Elevation: Schematic: ED-691947

Service: HRH HYDRAULIC PUMP LCP-UNIT3


Routed Length (m): Allowance (m): Total Length (m): 112 7 119 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691947 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 9.1.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LBB-29-GH-001 Compartment: Description: BLK-1 HRSG-3 # IP BYP HSU PANEL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-005D C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-020D C10-TL-022C C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C13-C-1207

Cable: C10BJH1015
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 10 SQ.MM, 0.6/1kV
Pull Length(m): 166 No. of Cables: 1 Type Code: 40106 End Length(m): 5 Elevation: Schematic: ED-691948

Service: LP HYDRAULIC PUMP FOR LCP-UNIT3


Routed Length (m): Allowance (m): Total Length (m): 158 8 166 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691948 7

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 9.2.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LBD-26-GH-001 Compartment: Description: BLK-1 HRSG-3 # LP BYP HSU PANEL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-005C C10-TL-004A CABLE C10-TL-003B C10-TL-002B C10-TL-024B C10-TL-023B C10-TL-223B C10-TL-222B C14-TL-202C C14-TL-204C C14-TL-207C C14-TL-049C C14-TL-099A C14-TL-097A C14-TL-093A C14-TL-091A CABLE C14-TL-089 C14-TL-087 C14-TL-085 C14-TL-086 C14-C-1211

Page 195 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
4C X 10 SQ.MM, 0.6/1kV
Pull Length(m): 117 No. of Cables: 1 Type Code: 40106 End Length(m): 5 Elevation: Schematic: ED-691949

Cable: C10BJH1016
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Service: FEED TO MCC OF CHEMICAL FEED SYSTEM FOR HRSG #3


Routed Length (m): Allowance (m): Total Length (m): 104 6 110 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691949 25

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 9.2.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-QCC-39-GW-001 Compartment: Description: CHEMICAL FEED SYSTEM MCC FOR HRSG #3 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-005A C10-TL-006A C10-TL-007A C10-TL-035D C10-TL-066E C10-TL-068E C10-TL-070E C10-TL-102E C10-TL-108A C10-TL-106A C10-TL-163A C10-TL-202A C13-TL-515A C13-TL-514 C13-TL-512A C13-C-1208

Cable: C10BJH1017
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 03

Description:

4C X 25 SQ.MM, 0.6/1kV
Pull Length(m): 181 No. of Cables: 1 Type Code: 40256 End Length(m): 5 Elevation: Schematic: ED-691950

Service: HRSG REHEATER TO IP TURBINE MOV-UNIT3


Routed Length (m): Allowance (m): Total Length (m): 134 7 141 Option 1: Option 2: Option 3: Compartment: North: 1779.50 Wiring Dwg: Shield: N Ground: Jacket: PVC End Length(m): 7

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 3.7.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LBB-29-AA-001 Description: C13 HR MOV Equip Location: Zone: Location Dwg: EA-681111

East: 2317.70 Elevation: 10.20 Schematic: ED-691950

Routing Information: Remarks: Route: CABLE C10-TL-005D C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-020D C10-TL-022C C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-211 C14-TL-212 C14-TL-043 C14-C-1203

Cable: C10BJH1018
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 03

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 171 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691951

Service: HRSG REHEATER TO IP TURBINE MOV (EQUALIZING VALVE)-UNIT3


Routed Length (m): Allowance (m): Total Length (m): 134 7 141 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691951 7

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 3.8.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LBB-29-AA-008 Description: C13 HR EQUAL. MOV Equip Location: Zone: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-005D C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-020D C10-TL-022C C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-211 C14-TL-212 C14-TL-043 C14-C-1204

Page 196 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 137 No. of Cables: 1 Type Code: 40156 End Length(m): 8 Elevation: Schematic: ED-691952

Cable: C10BJH1019
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Service: HRSG REHEATER DRAIN MOV-3A


Routed Length (m): Allowance (m): Total Length (m): 122 7 129 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 3.8.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LBB-46-AA-004 Compartment: End Length(m): 10 Description: C13 HR DRN POT/CST 004 MOV North: 1775.40 Equip Location: Zone: East: 2306.60 Elevation: 8.20 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-691952

Routing Information: Remarks: Route: CABLE C10-TL-005D C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-020D C10-TL-022C C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-C-1205

Cable: C10BJH1020
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 147 No. of Cables: 1 Type Code: 40156 End Length(m): 8 Elevation: Schematic: ED-691953

Service: HRSG REHEATER DRAIN MOV-3B


Routed Length (m): Allowance (m): Total Length (m): 125 7 132 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 8.1.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LBB-46-AA-007 Compartment: End Length(m): 10 Description: C13 HR DRN POT/CST 007 MOV North: 1775.70 Equip Location: Zone: East: 2310.90 Elevation: 8.20 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-691953

Routing Information: Remarks: Route: CABLE C10-TL-005D C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-020D C10-TL-022C C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-210 C14-C-1206

Cable: C10BJH1024
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 130 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691955

Service: HRSG HP STEAM DRAIN LINE MOV-3B


Routed Length (m): Allowance (m): Total Length (m): 123 7 130 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 5.1.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LBA-46-AA-001 Compartment: End Length(m): 5 Description: C13 HP DRN POT MOV North: 1780.00 Equip Location: Zone: East: 2305.20 Elevation: 10.40 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-691955

Routing Information: Remarks: Route: CABLE C10-TL-005D C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-020D C10-TL-022C C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-211 C14-C-1212

Page 197 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 130 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691954

Cable: C10BJH1025
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Service: HRSG HP STEAM DRAIN LINE MOV-3A


Routed Length (m): Allowance (m): Total Length (m): 123 7 130 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 9.5.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LBA-46-AA-005 Compartment: End Length(m): 5 Description: C13 HP DRN POT MOV North: 1781.20 Equip Location: Zone: East: 2305.20 Elevation: 8.10 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-691954

Routing Information: Remarks: Route: CABLE C10-TL-005D C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-020D C10-TL-022C C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-211 C14-C-1207

Cable: C10BJH1026
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 115 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691957

Service: HRSG HP BYPASS SPRAY WATER LINE ISOLATION MOV-UNIT3


Routed Length (m): Allowance (m): Total Length (m): 102 6 108 Option 1: Option 2: Option 3: Compartment: North: 1743.50 Wiring Dwg: Shield: N Ground: Jacket: PVC End Length(m): 6

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 5.1.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LAB-25-AA-002 Description: C13 IP FW SPLY MOV Equip Location: Zone: Location Dwg: EA-681101

East: 2213.30 Elevation: 12.80 Schematic: ED-691957

Routing Information: Remarks: Route: CABLE C10-TL-005A C10-TL-006A C10-TL-007A C10-TL-035D C10-TL-066E C10-TL-068E C10-TL-070E C10-TL-102E C10-TL-108A C10-TL-106A C10-TL-163A C10-TL-202A C13-TL-515A C13-TL-514 C13-TL-510A C13-TL-507 C13-TL-505 C13-TL-503 C13-TL-501 C13-C-1211

Cable: C10BJH1027
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 186 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691958

Service: HRSG#3 LP STEAM DRAIN LINE MOV 1


Routed Length (m): Allowance (m): Total Length (m): 156 8 164 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 5.2.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LBD-46-AA-005 Compartment: End Length(m): 5 Description: C13 LP DRN POT/COND MOV North: 1780.80 Equip Location: Zone: East: 2336.50 Elevation: 13.00 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-691958

Routing Information: Remarks: Route: CABLE C10-TL-005D C10-TL-004B C10-TL-016A CABLE C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-097B C14-TL-093B C14-TL-091B C14-TL-089 C14-TL-087 C14-TL-085 C14-TL-083 C14-C-1210

Page 198 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 150 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691959

Cable: C10BJH1028
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Service: HRSG#3 LP STEAM DRAIN LINE MOV 2


Routed Length (m): Allowance (m): Total Length (m): 140 8 148 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 5.2.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LBD-46-AA-006 Compartment: End Length(m): 10 Description: C13 LP DRN POT/CST MOV North: 1781.70 Equip Location: Zone: East: 2311.00 Elevation: 9.70 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-691959

Routing Information: Remarks: Route: CABLE C10-TL-005D C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-020D C10-TL-022C C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-210 C14-TL-211 C14-TL-212 C14-TL-043 C14-C-1209

Cable: C10BJH1029
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 148 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691956

Service: HRSG#3 LP STEAM DRAIN LINE MOV 3


Routed Length (m): Allowance (m): Total Length (m): 140 8 148 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 5.3.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LBD-46-AA-010 Compartment: End Length(m): 10 Description: C13 LP DRN POT/CST MOV North: 1781.70 Equip Location: Zone: East: 2308.70 Elevation: 8.20 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-691956

Routing Information: Remarks: Route: CABLE C10-TL-005D C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-020D C10-TL-022C C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-210 C14-TL-211 C14-TL-212 C14-TL-043 C14-C-1208

Cable: C10BJH1030
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 182 No. of Cables: 1 Type Code: 40156 End Length(m): 8 Elevation: Schematic: ED-692008

Service: HRSG#3 LP STEAM DRAIN LINE MOV-4


Routed Length (m): Allowance (m): Total Length (m): 182 9 191 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 8.1.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LBD-46-AA-012 Compartment: End Length(m): 8 Description: C11 LP DRN POT/CST MOV North: 1743.61 Equip Location: Zone: East: 2211.29 Elevation: 13.69 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-692008

Routing Information: Remarks: Route: CABLE C10-TL-005B C10-TL-010B C10-TL-009B C10-TL-008B C10-TL-035B C10-TL-066C C10-TL-068C C10-TL-070C C10-TL-102C C10-TL-109B C10-TL-107B C10-TL-164B C10-TL-201B C12-TL-520B C12-TL-519B C12-TL-518B C12-TL-516B C12-TL-515B C12-TL-513 C12-TL-510B C12-TL-508 C12-TL-509 C12-TL-116 C12-TL-115 C12-TL-114 C12-C-1302

Page 199 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
4C X 10 SQ.MM, 0.6/1kV
Pull Length(m): 122 No. of Cables: 1 Type Code: 40106 End Length(m): 5 Elevation: Schematic: ED-691960

Cable: C10BJH1031
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Service: BOILER FEED WATER PUMP HOIST - UNIT-3


Routed Length (m): Allowance (m): Total Length (m): 98 6 104 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691960 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 5.3.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-SML-45-BZ-001 Compartment: Description: BFP SHELTER HOIST UNIT#13 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-005A C10-TL-006A C10-TL-007A C10-TL-035D C10-TL-066E C10-TL-068E C10-TL-070E C10-TL-102E C10-TL-108A C10-TL-106A C10-TL-163A C10-TL-202A C13-TL-515A C13-TL-514 C13-TL-510A C13-TL-507 C13-TL-505 C13-C-1210

Cable: C10BJH1032
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 35 SQ.MM, 0.6/1kV
Pull Length(m): 205 No. of Cables: 1 Type Code: 40356 End Length(m): 5 Elevation: Schematic: ED-691961

Service: GUILLOTINE DAMPER SEAL AIR FAN LCP


Routed Length (m): Allowance (m): Total Length (m): 195 10 205 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691961 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 9.3.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-MBR-90-GH-004 Compartment: Description: GUILIOTINE DAMPER SEAL AIR FAN LCP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685564

Routing Information: Remarks: Route: CABLE C10-TL-005C C10-TL-004A C10-TL-015C C10-TL-028A C10-TL-027A C10-TL-026A C10-TL-025B C10-TL-219B C10-TL-218B C10-TL-216 C10-TL-214 C10-TL-211 C13-TL-518 C13-TL-517 C13-TL-516 C13-TL-201 C13-TL-102 C13-TL-203 C13-TL-204 C13-TL-205 C13-TL-206 C13-TL-207 C13-TL-208 C13-TL-209 C13-TL-210 C13-TL-211 C13-TL-213 3CL-A26

Cable: C10BJH1033
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 179 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691962

Service: STACK DAMPER


Routed Length (m): Allowance (m): Total Length (m): 161 8 169 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691962 27

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 5.4.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-HNE-90-AA-001 Description: STACK DAMPER Equip Location: Zone: Location Dwg: EA-685564

Routing Information: Remarks: Route: CABLE C10-TL-005C C10-TL-004A C10-TL-015C C10-TL-028A C10-TL-027A C10-TL-026A C10-TL-025B C10-TL-219B C10-TL-218B C10-TL-216 C10-TL-214 C10-TL-211 C13-TL-518 C13-TL-517 C13-TL-516 C13-TL-201 C13-TL-102 C13-TL-203 C13-TL-101 C13-TL-301 C13-TL-302 C13-TL-311 C13-TL-322 C13-C-1209

Page 200 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
3C X 95 SQ.MM, 0.6/1kV
Pull Length(m): 154 No. of Cables: 1 Type Code: 30956 End Length(m): 5 Elevation: Schematic: ED-691963

Cable: C10BJH1034
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Service: LP RECIRC PUMP-1


Routed Length (m): Allowance (m): Total Length (m): 127 7 134 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691963 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 1.5 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LCA-92-AP-001 Compartment: Description: CPH RECIRCULATION PUMP-A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685564

Routing Information: Remarks: Route: CABLE C10-TL-005B C10-TL-006B C10-TL-007B C10-TL-035E C10-TL-066F C10-TL-068F C10-TL-070F C10-TL-102F C10-TL-108B C10-TL-106B C10-TL-163B C10-TL-202B C13-TL-515B C13-TL-513 C13-TL-510B C13-TL-508 C13-TL-509 C13-TL-116 C13-TL-115 C13-TL-114 3CL-A08

Cable: C10BJH1035
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

3C X 95 SQ.MM, 0.6/1kV
Pull Length(m): 146 No. of Cables: 1 Type Code: 30956 End Length(m): 5 Elevation: Schematic: ED-691963

Service: LP RECIRC PUMP-1


Routed Length (m): Allowance (m): Total Length (m): 127 7 134 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691963 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 1.5 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LCA-92-AP-001 Compartment: Description: CPH RECIRCULATION PUMP-A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685564

Routing Information: Remarks: Route: CABLE C10-TL-005B C10-TL-006B C10-TL-007B C10-TL-035E C10-TL-066F C10-TL-068F C10-TL-070F C10-TL-102F C10-TL-108B C10-TL-106B C10-TL-163B C10-TL-202B C13-TL-515B C13-TL-513 C13-TL-510B C13-TL-508 C13-TL-509 C13-TL-116 C13-TL-115 C13-TL-114 3CL-A08

Cable: C10BJH1036
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 6 SQ.MM, 0.6/1kV
Pull Length(m): 152 No. of Cables: 1 Type Code: 40066 End Length(m): 5 Elevation: Schematic: ED-691965

Service: HOIST-A
Routed Length (m): Allowance (m): Total Length (m): 155 8 163 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691965 15

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 5.5.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-HNE-94-AZ-051 Description: HOIST A Equip Location: Zone: Location Dwg: EA-685564

Routing Information: Remarks: Route: CABLE C10-TL-005C C10-TL-004A C10-TL-015C C10-TL-028A C10-TL-027A C10-TL-026A C10-TL-025B C10-TL-219B C10-TL-218B C10-TL-216 C10-TL-214 C10-TL-211 C13-TL-518 C13-TL-517 C13-TL-516 C13-TL-201 C13-TL-102 C13-TL-203 C13-TL-101 C13-TL-301 C13-TL-302 C13-TL-311 C13-TL-322 3CL-D67

Page 201 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
4C X 6 SQ.MM, 0.6/1kV
Pull Length(m): 148 No. of Cables: 1 Type Code: 40066 End Length(m): 5 Elevation: Schematic: ED-691966

Cable: C10BJH1037
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Service: HOIST-B
Routed Length (m): Allowance (m): Total Length (m): 158 8 166 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691966 15

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 5.5.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-HNE-95-AZ-051 Description: HOIST B Equip Location: Zone: Location Dwg: EA-685564

Routing Information: Remarks: Route: CABLE C10-TL-005C C10-TL-004A C10-TL-015C C10-TL-028A C10-TL-027A C10-TL-026A C10-TL-025B C10-TL-219B C10-TL-218B C10-TL-216 C10-TL-214 C10-TL-211 C13-TL-518 C13-TL-517 C13-TL-516 C13-TL-201 C13-TL-102 C13-TL-203 C13-TL-101 C13-TL-301 C13-TL-302 C13-TL-311 C13-TL-322 3CL-D68

Cable: C10BJH1038
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 70 SQ.MM, 0.6/1kV
Pull Length(m): 149 No. of Cables: 1 Type Code: 40706 End Length(m): 5 Elevation: Schematic: ED-691967

Service: HRSG WELDING RECEPTACLE


Routed Length (m): Allowance (m): Total Length (m): 129 7 136 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691967 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 5.6.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-BLH-LP-01 Compartment: Description: HRSG WELDING RECEPTACLE North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-006B C10-TL-007B C10-TL-035E C10-TL-066F C10-TL-068F C10-TL-070F C10-TL-102F C10-TL-108B C10-TL-106B C10-TL-163B C10-TL-202B C13-TL-515B C13-TL-513 C13-TL-510B C13-TL-508 C13-TL-509 C13-TL-116 C13-TL-117 C13-TL-118 C13-TL-119 3CL-A24

Cable: C10BJH1039
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 120 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691968

Service: HP DESH SPRAY WATER LINE STOP MOV


Routed Length (m): Allowance (m): Total Length (m): 119 7 126 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691968 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 5.6.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LAE-90-AA-001 Compartment: Description: HP DESH SPRAY WATER LINE STOP MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-005B C10-TL-006B C10-TL-007B C10-TL-035E C10-TL-066F C10-TL-068F C10-TL-070F C10-TL-102F C10-TL-108B C10-TL-106B C10-TL-163B C10-TL-202B C13-TL-515B C13-TL-513 C13-TL-510B C13-TL-508 C13-TL-509 C13-TL-116 3CL-D60

Page 202 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 133 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691969

Cable: C10BJH1040
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Service: HP DESH SPRAY TCV BYPASS MOV


Routed Length (m): Allowance (m): Total Length (m): 126 7 133 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691969 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 5.7.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LAE-90-AA-002 Compartment: Description: HP DESH SPRAY TCV BYPASS MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-005B C10-TL-006B C10-TL-007B C10-TL-035E C10-TL-066F C10-TL-068F C10-TL-070F C10-TL-102F C10-TL-108B C10-TL-106B C10-TL-163B C10-TL-202B C13-TL-515B C13-TL-513 C13-TL-510B C13-TL-508 C13-TL-509 C13-TL-116 C13-TL-117 C13-TL-118 3CL-B70

Cable: C10BJH1041
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): 124 No. of Cables: 1 Type Code: 40046 End Length(m): 5 Elevation: Schematic: ED-691970

Service: COLD REHEATER STEAM STOP MOV


Routed Length (m): Allowance (m): Total Length (m): 117 7 124 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691970 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 5.7.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LBC-90-AA-001 Compartment: Description: COLD REHEATER STEAM STOP MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-005B C10-TL-006B C10-TL-007B C10-TL-035E C10-TL-066F C10-TL-068F C10-TL-070F C10-TL-102F C10-TL-108B C10-TL-106B C10-TL-163B C10-TL-202B C13-TL-515B C13-TL-513 C13-TL-510B C13-TL-508 C13-TL-509 C13-TL-116 3CL-B49

Cable: C10BJH1042
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 123 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691971

Service: COLD REHEATER STEAM DRAIN MOV


Routed Length (m): Allowance (m): Total Length (m): 117 7 124 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691971 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 5.8.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LBC-90-AA-002 Compartment: Description: COLD REHEATER STEAM DRAIN MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-005B C10-TL-006B C10-TL-007B C10-TL-035E C10-TL-066F C10-TL-068F C10-TL-070F C10-TL-102F C10-TL-108B C10-TL-106B C10-TL-163B C10-TL-202B C13-TL-515B C13-TL-513 C13-TL-510B C13-TL-508 C13-TL-509 C13-TL-116 C13-TL-115 3CL-A18

Page 203 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 175 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691972

Cable: C10BJH1043
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Service: IP DRUM LEVEL CV STOP


Routed Length (m): Allowance (m): Total Length (m): 191 10 201 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691972 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 5.8.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-HAC-94-AA-001 Compartment: Description: IP DRUM LEVEL CV STOP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-005C C10-TL-004A C10-TL-015C C10-TL-028A C10-TL-027A C10-TL-026A C10-TL-025B C10-TL-219B C10-TL-218B C10-TL-216 C10-TL-214 C10-TL-211 C13-TL-518 C13-TL-517 C13-TL-516 C13-TL-201 C13-TL-102 C13-TL-203 C13-TL-101 C13-TL-301 C13-TL-302 C13-TL-311 C13-TL-312 C13-TL-314 C13-TL-316 C13-TL-317 3CL-D38

Cable: C10BJH1044
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 179 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691973

Service: DEAERATOR VENT STOP MOV


Routed Length (m): Allowance (m): Total Length (m): 177 9 186 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691973 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 8.5.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-HAD-97-AA-001 Compartment: Description: DEAERATOR VENT STOP MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-005C C10-TL-004A C10-TL-015C C10-TL-028A C10-TL-027A C10-TL-026A C10-TL-025B C10-TL-219B C10-TL-218B C10-TL-216 C10-TL-214 C10-TL-211 C13-TL-518 C13-TL-517 C13-TL-516 C13-TL-201 C13-TL-102 C13-TL-203 C13-TL-101 C13-TL-301 C13-TL-302 C13-TL-311 C13-TL-312 C13-TL-314 C13-TL-316 3CL-D26

Cable: C10BJH1045
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 139 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691974

Service: HOT REHEAT STEAM DRAIN MOV


Routed Length (m): Allowance (m): Total Length (m): 121 7 128 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691974 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 8.5.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-HAJ-90-AA-001 Compartment: Description: HOT REHEAT STEAM DRAIN MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-005B C10-TL-006B C10-TL-007B C10-TL-035E C10-TL-066F C10-TL-068F C10-TL-070F C10-TL-102F C10-TL-108B C10-TL-106B C10-TL-163B C10-TL-202B C13-TL-515B C13-TL-513 C13-TL-510B C13-TL-508 C13-TL-509 C13-TL-116 C13-TL-115 C13-TL-114 3CL-B32

Page 204 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
4C X 2.5 SQ.MM, 0.6/1kV
Pull Length(m): 190 No. of Cables: 1 Type Code: 40026 End Length(m): 5 Elevation: Schematic: ED-691975

Cable: C10BJH1046
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Service: LP DRUM PEGGING STEAM STOP MOV


Routed Length (m): Allowance (m): Total Length (m): 171 9 180 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691975 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 6.1.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LBA-96-AA-001 Compartment: Description: LP DRUM PEGGING STEAM STOP MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-005C C10-TL-004A C10-TL-015C C10-TL-028A C10-TL-027A C10-TL-026A C10-TL-025B C10-TL-219B C10-TL-218B C10-TL-216 C10-TL-214 C10-TL-211 C13-TL-518 C13-TL-517 C13-TL-516 C13-TL-201 C13-TL-102 C13-TL-203 C13-TL-101 C13-TL-301 C13-TL-302 C13-TL-311 C13-TL-312 C13-TL-314 C13-TL-316 3CL-D18

Cable: C10BJH1047
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): 139 No. of Cables: 1 Type Code: 40046 End Length(m): 5 Elevation: Schematic: ED-691976

Service: HOT REHEAT STEAM VENT MOV


Routed Length (m): Allowance (m): Total Length (m): 129 7 136 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691976 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 6.1.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LBB-90-AA-001 Compartment: Description: HOT REHEAT STEAM VENT MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-005C C10-TL-004A C10-TL-015C C10-TL-028A C10-TL-027A C10-TL-026A C10-TL-025B C10-TL-219B C10-TL-218B C10-TL-216 C10-TL-214 C10-TL-211 C13-TL-518 C13-TL-517 C13-TL-516 C13-TL-201 C13-TL-102 C13-TL-203 C13-TL-101 C13-TL-301 3CL-C06

Cable: C10BJH1048
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 174 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691977

Service: HP DRUM CONTINUOUS B/D MOV


Routed Length (m): Allowance (m): Total Length (m): 192 10 202 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691977 20

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 6.2.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-HAD-91-AA-002 Compartment: Description: HP DRUM CONTINUOUS B/D MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-005C C10-TL-004A C10-TL-015C C10-TL-028A C10-TL-027A C10-TL-026A C10-TL-025B C10-TL-219B C10-TL-218B C10-TL-216 C10-TL-214 C10-TL-211 C13-TL-518 C13-TL-517 C13-TL-516 C13-TL-201 C13-TL-102 C13-TL-203 C13-TL-101 C13-TL-301 C13-TL-302 C13-TL-311 C13-TL-322 C13-TL-323 3CL-D60 P-08 3CL-D57

Page 205 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 140 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691978

Cable: C10BJH1049
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Service: HP DRUM INTMIT B/D MOV


Routed Length (m): Allowance (m): Total Length (m): 130 7 137 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691978 1

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 6.2.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-HAD-91-AA-001 Compartment: Description: HP DRUM INTMIT B/D MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-005B C10-TL-006B C10-TL-007B C10-TL-035E C10-TL-066F C10-TL-068F C10-TL-070F C10-TL-102F C10-TL-108B C10-TL-106B C10-TL-163B C10-TL-202B C13-TL-515B C13-TL-513 C13-TL-510B C13-TL-508 C13-TL-509 C13-TL-116 C13-TL-117 C13-TL-118 C13-TL-119 3CL-B83

Cable: C10BJH1050
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 10 SQ.MM, 0.6/1kV
Pull Length(m): 217 No. of Cables: 1 Type Code: 40106 End Length(m): 5 Elevation: Schematic: ED-691979

Service: HP DRUM LEVEL CV(100%) STOP MOV


Routed Length (m): Allowance (m): Total Length (m): 207 10 217 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691979 20

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 6.3.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-HAC-90-AA-001 Compartment: Description: HP DRUM LEVEL CV(100%) STOP MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-005C C10-TL-004A C10-TL-015C C10-TL-028A C10-TL-027A C10-TL-026A C10-TL-025B C10-TL-219B C10-TL-218B C10-TL-216 C10-TL-214 C10-TL-211 C13-TL-518 C13-TL-517 C13-TL-516 C13-TL-201 C13-TL-102 C13-TL-203 C13-TL-101 C13-TL-301 C13-TL-302 C13-TL-311 C13-TL-322 C13-TL-323 3CL-D60 P-08 3CL-D54

Cable: C10BJH1051
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 190 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691980

Service: HP DRUM LEVEL CV(30%) STOP MOV


Routed Length (m): Allowance (m): Total Length (m): 208 10 218 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691980 20

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 6.3.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-HAC-90-AA-002 Compartment: Description: HP DRUM LEVEL CV(30%) STOP MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-005C C10-TL-004A C10-TL-015C C10-TL-028A C10-TL-027A C10-TL-026A C10-TL-025B C10-TL-219B C10-TL-218B C10-TL-216 C10-TL-214 C10-TL-211 C13-TL-518 C13-TL-517 C13-TL-516 C13-TL-201 C13-TL-102 C13-TL-203 C13-TL-101 C13-TL-301 C13-TL-302 C13-TL-311 C13-TL-322 C13-TL-323 3CL-D60 P-08 3CL-D55

Page 206 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 123 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691981

Cable: C10BJH1052
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Service: HP DESH DRAIN MOV


Routed Length (m): Allowance (m): Total Length (m): 109 7 116 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691981 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 6.4.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-HAH-90-AA-001 Compartment: Description: HP DESH DRAIN MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-005B C10-TL-006B C10-TL-007B C10-TL-035E C10-TL-066F C10-TL-068F C10-TL-070F C10-TL-102F C10-TL-108B C10-TL-106B C10-TL-163B C10-TL-202B C13-TL-515B C13-TL-513 C13-TL-510B C13-TL-508 C13-TL-509 C13-TL-116 3CL-B53

Cable: C10BJH1053
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 157 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691982

Service: HP SH3 OUTLET DRAIN MOV


Routed Length (m): Allowance (m): Total Length (m): 134 7 141 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691982 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 6.4.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LBA-90-AA-001 Compartment: Description: HP SH3 OUTLET DRAIN MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-005B C10-TL-006B C10-TL-007B C10-TL-035E C10-TL-066F C10-TL-068F C10-TL-070F C10-TL-102F C10-TL-108B C10-TL-106B C10-TL-163B C10-TL-202B C13-TL-515B C13-TL-513 C13-TL-510B C13-TL-508 C13-TL-509 C13-TL-116 C13-TL-117 C13-TL-118 C13-TL-119 3CL-B94

Cable: C10BJH1054
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 6 SQ.MM, 0.6/1kV
Pull Length(m): 130 No. of Cables: 1 Type Code: 40066 End Length(m): 5 Elevation: Schematic: ED-691983

Service: HP FEED WATER STOP MOV


Routed Length (m): Allowance (m): Total Length (m): 113 7 120 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691983 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 6.5.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LAB-90-AA-001 Compartment: Description: HP FEED WATER STOP MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-005B C10-TL-006B C10-TL-007B C10-TL-035E C10-TL-066F C10-TL-068F C10-TL-070F C10-TL-102F C10-TL-108B C10-TL-106B C10-TL-163B C10-TL-202B C13-TL-515B C13-TL-513 C13-TL-510B C13-TL-508 C13-TL-509 3CL-B56

Page 207 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 127 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691984

Cable: C10BJH1055
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Service: HP FEED WATER STOP BYPASS MOV


Routed Length (m): Allowance (m): Total Length (m): 113 7 120 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691984 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 6.5.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LAB-90-AA-002 Compartment: Description: HP FEED WATER STOP BYPASS MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-005B C10-TL-006B C10-TL-007B C10-TL-035E C10-TL-066F C10-TL-068F C10-TL-070F C10-TL-102F C10-TL-108B C10-TL-106B C10-TL-163B C10-TL-202B C13-TL-515B C13-TL-513 C13-TL-510B C13-TL-508 C13-TL-509 3CL-B98

Cable: C10BJH1056
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 162 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691985

Service: HP STEAM DRAIN MOV


Routed Length (m): Allowance (m): Total Length (m): 163 9 172 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691985 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 6.6.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LBA-90-AA-005 Compartment: Description: HP STEAM DRAIN MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-005C C10-TL-004A C10-TL-015C C10-TL-028A C10-TL-027A C10-TL-026A C10-TL-025B C10-TL-219B C10-TL-218B C10-TL-216 C10-TL-214 C10-TL-211 C13-TL-518 C13-TL-517 C13-TL-516 C13-TL-201 C13-TL-221 C13-TL-223 3CL-C48 P-05 3CL-C63

Cable: C10BJH1057
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 6 SQ.MM, 0.6/1kV
Pull Length(m): 138 No. of Cables: 1 Type Code: 40066 End Length(m): 5 Elevation: Schematic: ED-691986

Service: HP STEAM STOP MOV


Routed Length (m): Allowance (m): Total Length (m): 142 8 150 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691986 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 6.6.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LBA-90-AA-003 Compartment: Description: HP STEAM STOP MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-005C C10-TL-004A C10-TL-015C C10-TL-028A C10-TL-027A C10-TL-026A C10-TL-025B C10-TL-219B C10-TL-218B C10-TL-216 C10-TL-214 C10-TL-211 C13-TL-518 C13-TL-517 C13-TL-516 C13-TL-201 C13-TL-221 C13-TL-223 3CL-C44

Page 208 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 175 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691987

Cable: C10BJH1058
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Service: HP STEAM VENT MOV


Routed Length (m): Allowance (m): Total Length (m): 189 10 199 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691987 20

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 6.7.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LBA-90-AA-002 Compartment: Description: HP STEAM VENT MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-005C C10-TL-004A C10-TL-015C C10-TL-028A C10-TL-027A C10-TL-026A C10-TL-025B C10-TL-219B C10-TL-218B C10-TL-216 C10-TL-214 C10-TL-211 C13-TL-518 C13-TL-517 C13-TL-516 C13-TL-201 C13-TL-102 C13-TL-203 C13-TL-101 C13-TL-301 C13-TL-302 C13-TL-311 C13-TL-322 C13-TL-323 3CL-D60 P-08 3CL-D59

Cable: C10BJH1059
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 172 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691988

Service: IP DRUM CONT. B/D MOV


Routed Length (m): Allowance (m): Total Length (m): 189 10 199 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691988 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 6.7.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-HAD-95-AA-002 Compartment: Description: IP DRUM CONT. B/D MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-005C C10-TL-004A C10-TL-015C C10-TL-028A C10-TL-027A C10-TL-026A C10-TL-025B C10-TL-219B C10-TL-218B C10-TL-216 C10-TL-214 C10-TL-211 C13-TL-518 C13-TL-517 C13-TL-516 C13-TL-201 C13-TL-102 C13-TL-203 C13-TL-101 C13-TL-301 C13-TL-302 C13-TL-311 C13-TL-312 C13-TL-314 C13-TL-316 C13-TL-317 3CL-D30

Cable: C10BJH1060
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 137 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691989

Service: IP DRUM INTMIT B/D MOV


Routed Length (m): Allowance (m): Total Length (m): 132 7 139 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691989 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 6.8.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-HAD-95-AA-001 Compartment: Description: IP DRUM INTMIT B/D MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-005B C10-TL-006B C10-TL-007B C10-TL-035E C10-TL-066F C10-TL-068F C10-TL-070F C10-TL-102F C10-TL-108B C10-TL-106B C10-TL-163B C10-TL-202B C13-TL-515B C13-TL-513 C13-TL-510B C13-TL-508 C13-TL-509 C13-TL-116 C13-TL-117 C13-TL-118 C13-TL-119 3CL-B80

Page 209 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 132 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691990

Cable: C10BJH1061
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Service: IP FEED WATER STOP MOV


Routed Length (m): Allowance (m): Total Length (m): 117 7 124 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691990 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 6.8.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LAB-94-AA-001 Compartment: Description: IP FEED WATER STOP MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-005B C10-TL-006B C10-TL-007B C10-TL-035E C10-TL-066F C10-TL-068F C10-TL-070F C10-TL-102F C10-TL-108B C10-TL-106B C10-TL-163B C10-TL-202B C13-TL-515B C13-TL-513 C13-TL-510B C13-TL-508 C13-TL-509 C13-TL-116 C13-TL-117 3CL-B63

Cable: C10BJH1062
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 223 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691991

Service: IP FEED WATER STOP BYPASS MOV


Routed Length (m): Allowance (m): Total Length (m): 117 7 124 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691991 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 8.4.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LAB-94-AA-002 Compartment: Description: IP FEED WATER STOP BYPASS MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-005B C10-TL-006B C10-TL-007B C10-TL-035E C10-TL-066F C10-TL-068F C10-TL-070F C10-TL-102F C10-TL-108B C10-TL-106B C10-TL-163B C10-TL-202B C13-TL-515B C13-TL-513 C13-TL-510B C13-TL-508 C13-TL-509 C13-TL-116 C13-TL-117 3CL-B63

Cable: C10BJH1063
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 123 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691992

Service: IP STEAM DRAIN MOV


Routed Length (m): Allowance (m): Total Length (m): 114 7 121 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691992 2

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 8.4.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LBA-95-AA-003 Compartment: Description: IP STEAM DRAIN MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-005B C10-TL-006B C10-TL-007B C10-TL-035E C10-TL-066F C10-TL-068F C10-TL-070F C10-TL-102F C10-TL-108B C10-TL-106B C10-TL-163B C10-TL-202B C13-TL-515B C13-TL-513 C13-TL-510B C13-TL-508 C13-TL-509 C13-TL-116 C13-TL-115 3CL-B45

Page 210 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
4C X 2.5 SQ.MM, 0.6/1kV
Pull Length(m): 126 No. of Cables: 1 Type Code: 40026 End Length(m): 5 Elevation: Schematic: ED-691993

Cable: C10BJH1064
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Service: IP STEAM STOP MOV


Routed Length (m): Allowance (m): Total Length (m): 119 7 126 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691993 2

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 7.1.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LBA-95-AA-002 Description: IP STEAM STOP MOV Equip Location: Zone: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-005C C10-TL-004A C10-TL-015C C10-TL-028A C10-TL-027A C10-TL-026A C10-TL-025B C10-TL-219B C10-TL-218B C10-TL-216 C10-TL-214 C10-TL-211 C13-TL-518 C13-TL-517 C13-TL-516 C13-TL-201 C13-TL-221 C13-TL-223 3CL-C29

Cable: C10BJH1065
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 120 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691994

Service: IP STEAM VENT MOV


Routed Length (m): Allowance (m): Total Length (m): 107 6 113 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691994 3

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 7.1.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LBA-95-AA-001 Description: IP STEAM VENT MOV Equip Location: Zone: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-005C C10-TL-004A C10-TL-015C C10-TL-028A C10-TL-027A C10-TL-026A C10-TL-025B C10-TL-219B C10-TL-218B C10-TL-216 C10-TL-214 C10-TL-211 C13-TL-518 C13-TL-517 C13-TL-516 C13-TL-201 3CL-C22

Cable: C10BJH1066
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 127 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691995

Service: LP DRUM INTMIT B/D MOV


Routed Length (m): Allowance (m): Total Length (m): 128 7 135 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691995 1

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 7.2.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-HAD-98-AA-001 Compartment: Description: LP DRUM INTMIT B/D MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-005B C10-TL-006B C10-TL-007B C10-TL-035E C10-TL-066F C10-TL-068F C10-TL-070F C10-TL-102F C10-TL-108B C10-TL-106B C10-TL-163B C10-TL-202B C13-TL-515B C13-TL-513 C13-TL-510B C13-TL-508 C13-TL-509 C13-TL-116 C13-TL-117 C13-TL-118 C13-TL-119 3CL-B78

Page 211 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
4C X 2.5 SQ.MM, 0.6/1kV
Pull Length(m): 189 No. of Cables: 1 Type Code: 40026 End Length(m): 5 Elevation: Schematic: ED-691996

Cable: C10BJH1067
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Service: LP FEED WATER STOP MOV


Routed Length (m): Allowance (m): Total Length (m): 174 9 183 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691996 2

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 7.2.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LCA-91-AA-001 Compartment: Description: LP FEED WATER STOP MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-005C C10-TL-004A C10-TL-015C C10-TL-028A C10-TL-027A C10-TL-026A C10-TL-025B C10-TL-219B C10-TL-218B C10-TL-216 C10-TL-214 C10-TL-211 C13-TL-518 C13-TL-517 C13-TL-516 C13-TL-201 C13-TL-102 C13-TL-203 C13-TL-101 C13-TL-301 C13-TL-302 C13-TL-311 C13-TL-312 C13-TL-314 C13-TL-316 3CL-D23

Cable: C10BJH1068
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 128 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691997

Service: LP STEAM DRAIN MOV


Routed Length (m): Allowance (m): Total Length (m): 122 7 129 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691997 1

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 7.3.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LBD-90-AA-004 Compartment: Description: LP STEAM DRAIN MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-005B C10-TL-006B C10-TL-007B C10-TL-035E C10-TL-066F C10-TL-068F C10-TL-070F C10-TL-102F C10-TL-108B C10-TL-106B C10-TL-163B C10-TL-202B C13-TL-515B C13-TL-513 C13-TL-510B C13-TL-508 C13-TL-509 C13-TL-116 C13-TL-117 C13-TL-118 3CL-B65

Cable: C10BJH1069
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 179 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-691998

Service: LP STEAM STOP MOV


Routed Length (m): Allowance (m): Total Length (m): 170 9 179 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 7.3.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LBD-90-AA-002 Compartment: End Length(m): 5 Description: C13 LP STEAM LINE MOV FROM HRSG North: 1779.63 Equip Location: Zone: East: 2340.58 Elevation: 16.30 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-691998

Routing Information: Remarks: Route: CABLE C10-TL-005D C10-TL-004B C10-TL-016A CABLE C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-097B C14-TL-093B C14-TL-091B C14-TL-089 C14-TL-087 C14-TL-085 C14-TL-083 C14-TL-082 C14-C-1303

Page 212 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 184 No. of Cables: 1 Type Code: 40156 End Length(m): 8 Elevation: Schematic: ED-691999

Cable: C10BJH1070
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Service: LP STEAM VENT MOV


Routed Length (m): Allowance (m): Total Length (m): 168 9 177 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691999 2

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 7.4.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LBD-90-AA-001 Compartment: Description: HRSG LP STEAM VENT MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-005C C10-TL-004A C10-TL-015C C10-TL-028A C10-TL-027A C10-TL-026A C10-TL-025B C10-TL-219B C10-TL-218B C10-TL-216 C10-TL-214 C10-TL-211 C13-TL-518 C13-TL-517 C13-TL-516 C13-TL-201 C13-TL-221 C13-TL-223 3CL-C48 P-05 3CL-C46

Cable: C10BJH1071
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 156 No. of Cables: 1 Type Code: 40156 End Length(m): 8 Elevation: Schematic: ED-692000

Service: RH DESUPERHEATER SPRAY WATER STOP MOV


Routed Length (m): Allowance (m): Total Length (m): 131 7 138 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692000 2

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 7.4.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LAF-90-AA-001 Compartment: Description: RH DESUPERHEATER SPRAY WATER STOP MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-005B C10-TL-006B C10-TL-007B C10-TL-035E C10-TL-066F C10-TL-068F C10-TL-070F C10-TL-102F C10-TL-108B C10-TL-106B C10-TL-163B C10-TL-202B C13-TL-515B C13-TL-513 C13-TL-510B C13-TL-508 C13-TL-509 C13-TL-116 C13-TL-115 C13-TL-114 C13-TL-113 P-03 3CL-B21

Cable: C10BJH1072
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 153 No. of Cables: 1 Type Code: 40156 End Length(m): 8 Elevation: Schematic: ED-692001

Service: RH DESH SPRAY WATER CV BYPASS STOP MOV


Routed Length (m): Allowance (m): Total Length (m): 135 8 143 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692001 2

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 7.5.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LAF-90-AA-002 Compartment: Description: RH DESH SPRAY WATER CV BYPASS STOP MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-005B C10-TL-006B C10-TL-007B C10-TL-035E C10-TL-066F C10-TL-068F C10-TL-070F C10-TL-102F C10-TL-108B C10-TL-106B C10-TL-163B C10-TL-202B C13-TL-515B C13-TL-513 C13-TL-510B C13-TL-508 C13-TL-509 C13-TL-116 C13-TL-115 C13-TL-114 C13-TL-113 C13-TL-112 P-03 3CL-B20

Page 213 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 161 No. of Cables: 1 Type Code: 40156 End Length(m): 8 Elevation: Schematic: ED-692002

Cable: C10BJH1073
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Service: RH2 OUTLET STEAM DRAIN MOV


Routed Length (m): Allowance (m): Total Length (m): 164 9 173 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692002 2

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 7.5.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LBB-90-AA-002 Compartment: Description: RH2 OUTLET STEAM DRAIN MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-005B C10-TL-006B C10-TL-007B C10-TL-035E C10-TL-066F C10-TL-068F C10-TL-070F C10-TL-102F C10-TL-108B C10-TL-106B C10-TL-163B C10-TL-202B C13-TL-515B C13-TL-513 C13-TL-510B C13-TL-508 C13-TL-509 C13-TL-116 C13-TL-115 C13-TL-114 C13-TL-113 C13-TL-112 3CL-B04

Cable: C10BJH1074
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 03

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 130 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-692003

Service: CONDENSATE FEED WATER STOP MOV


Routed Length (m): Allowance (m): Total Length (m): 124 7 131 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692003 8

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 7.6.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LCA-90-AA-001 Compartment: Description: CONDENSATE FEED WATER STOP MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-005C C10-TL-004A C10-TL-015C C10-TL-028A C10-TL-027A C10-TL-026A C10-TL-025B C10-TL-219B C10-TL-218B C10-TL-216 C10-TL-214 C10-TL-211 C13-TL-518 C13-TL-517 C13-TL-516 C13-TL-201 C13-TL-102 C13-TL-203 3CL-C10

Cable: C10BJH1075
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 03

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 157 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-692004

Service: HP STEAM BYPASS MOV


Routed Length (m): Allowance (m): Total Length (m): 136 8 144 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692004 8

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 7.6.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LBA-90-AA-004 Compartment: Description: HP STEAM BYPASS MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-005C C10-TL-004A C10-TL-015C C10-TL-028A C10-TL-027A C10-TL-026A C10-TL-025B C10-TL-219B C10-TL-218B C10-TL-216 C10-TL-214 C10-TL-211 C13-TL-518 C13-TL-517 C13-TL-516 C13-TL-201 C13-TL-221 C13-TL-223 P-05 3CL-C43

Page 214 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 03 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 179 No. of Cables: 1 Type Code: 40156 End Length(m): 5 Elevation: Schematic: ED-692005

Cable: C10BJH1076
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Service: LP STEAM STOP BYPASS MOV


Routed Length (m): Allowance (m): Total Length (m): 170 9 179 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 7.7.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LBD-90-AA-003 Compartment: End Length(m): 5 Description: INTERGRAL BYPASS MOV OF C13-LBD-90-AA-002 North: 1781.69 Equip Location: Zone: East: 2309.89 Elevation: 9.53 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-692005

Routing Information: Remarks: Route: CABLE C10-TL-005D C10-TL-004B C10-TL-016A CABLE C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-097B C14-TL-093B C14-TL-091B C14-TL-089 C14-TL-087 C14-TL-085 C14-TL-083 C14-TL-082 C14-C-1303

Cable: C10BJH1077
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 188 No. of Cables: 1 Type Code: 40156 End Length(m): 8 Elevation: Schematic: ED-692006

Service: HP LEAD 13 TO AUX. STEAM DRAIN MOV


Routed Length (m): Allowance (m): Total Length (m): 180 9 189 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 9.5.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LBA-46-AA-006 Compartment: End Length(m): 12 Description: C13 HP DRN POT MOV North: 1744.65 Equip Location: Zone: East: 2211.16 Elevation: 14.02 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-692006

Routing Information: Remarks: Route: CABLE C10-TL-005B C10-TL-010B C10-TL-009B C10-TL-008B C10-TL-035B C10-TL-066C C10-TL-068C C10-TL-070C C10-TL-102C C10-TL-109B C10-TL-107B C10-TL-164B C10-TL-201B C12-TL-520B C12-TL-519B C12-TL-518B C12-TL-516B C12-TL-515B C12-TL-513 C12-TL-510B C12-TL-508 C12-TL-509 C12-TL-116 C12-TL-115 C12-C-1301

Cable: C10BJH1078
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

3C X 95 SQ.MM, 0.6/1kV
Pull Length(m): 119 No. of Cables: 1 Type Code: 30956 End Length(m): 5 Elevation: Schematic: ED-691964

Service: LP RECIRC PUMP-2


Routed Length (m): Allowance (m): Total Length (m): 121 7 128 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691964 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 1.6 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LCA-93-AP-001 Compartment: Description: CPH RECIRCULATION PUMP-B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685564

Routing Information: Remarks: Route: CABLE C10-TL-005B C10-TL-006B C10-TL-007B C10-TL-035E C10-TL-066F C10-TL-068F C10-TL-070F C10-TL-102F C10-TL-108B C10-TL-106B C10-TL-163B C10-TL-202B C13-TL-515B C13-TL-513 C13-TL-510B C13-TL-508 C13-TL-509 C13-TL-116 C13-TL-115 3CL-A13

Page 215 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
3C X 95 SQ.MM, 0.6/1kV
Pull Length(m): 119 No. of Cables: 1 Type Code: 30956 End Length(m): 5 Elevation: Schematic: ED-691964

Cable: C10BJH1079
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Service: LP RECIRC PUMP-2


Routed Length (m): Allowance (m): Total Length (m): 121 7 128 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691964 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 1.6 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LCA-93-AP-001 Compartment: Description: CPH RECIRCULATION PUMP-B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685564

Routing Information: Remarks: Route: CABLE C10-TL-005B C10-TL-006B C10-TL-007B C10-TL-035E C10-TL-066F C10-TL-068F C10-TL-070F C10-TL-102F C10-TL-108B C10-TL-106B C10-TL-163B C10-TL-202B C13-TL-515B C13-TL-513 C13-TL-510B C13-TL-508 C13-TL-509 C13-TL-116 C13-TL-115 3CL-A13

Cable: C10BJH1080
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 00

Description:

3C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): No. of Cables: 1 Type Code: 30156 End Length(m): 5 Elevation: Schematic: ED-691963

Service: LP RECIRC PUMP-1


Routed Length (m): Allowance (m): Total Length (m): 127 7 134 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691963 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 1.5 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LCA-92-AP-001 Compartment: Description: CPH RECIRCULATION PUMP-A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685564

Routing Information: Remarks: Route: CABLE C10-TL-005B C10-TL-006B C10-TL-007B C10-TL-035E C10-TL-066F C10-TL-068F C10-TL-070F C10-TL-102F C10-TL-108B C10-TL-106B C10-TL-163B C10-TL-202B C13-TL-515B C13-TL-513 C13-TL-510B C13-TL-508 C13-TL-509 C13-TL-116 C13-TL-115 C13-TL-114 3CL-A08

Cable: C10BJH1081
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 00

Description:

3C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): No. of Cables: 1 Type Code: 30156 End Length(m): 5 Elevation: Schematic: ED-691964

Service: LP RECIRC PUMP-2


Routed Length (m): Allowance (m): Total Length (m): 121 7 128 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-691964 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 1.6 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LCA-93-AP-001 Compartment: Description: CPH RECIRCULATION PUMP-B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685564

Routing Information: Remarks: Route: CABLE C10-TL-005B C10-TL-006B C10-TL-007B C10-TL-035E C10-TL-066F C10-TL-068F C10-TL-070F C10-TL-102F C10-TL-108B C10-TL-106B C10-TL-163B C10-TL-202B C13-TL-515B C13-TL-513 C13-TL-510B C13-TL-508 C13-TL-509 C13-TL-116 C13-TL-115 3CL-A13

Page 216 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
3C X 50 SQ.MM, 0.6/1kV
Pull Length(m): 175 No. of Cables: 1 Type Code: 30506 End Length(m): 8 Elevation: Schematic: ED-692007

Cable: C10BJH1086
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Service: 127V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 166 9 175 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692007 2

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 4.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LBA-90-AA-191 Compartment: Description: ELECTRICAL RELIEF VALVE North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-005C C10-TL-004A C10-TL-015C C10-TL-028A C10-TL-027A C10-TL-026A C10-TL-025B C10-TL-219B C10-TL-218B C10-TL-216 C10-TL-214 C10-TL-211 C13-TL-518 C13-TL-517 C13-TL-516 C13-TL-201 C13-TL-221 C13-TL-223 3CL-C48 P-05 3CL-C45

Cable: C10BJH1087
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

3C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 70 No. of Cables: 1 Type Code: 30156 End Length(m): 8 Elevation: Schematic: ED-692007

Service: 127V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 63 5 68 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692007 13

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 4.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-CPB-66-GH-011 Compartment: Description: B1H3T CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-005D C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-020D C10-TL-019 C10-TL-045 C10-TL-046 C10-TL-120 C10-TL-123 C10-TL-126 C10-TL-129 CABLE

Cable: C10BJH1089
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

3C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 82 No. of Cables: 1 Type Code: 30026 End Length(m): 8 Elevation: Schematic: ED-692007

Service: 127V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 62 5 67 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692007 12

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 4.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-CPB-66-GH-013 Compartment: Description: B1H3T I/O CABINET-1_TMR North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-005D C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-020D C10-TL-019 C10-TL-045 C10-TL-046 C10-TL-120 C10-TL-123 C10-TL-126 C10-TL-129 CABLE

Page 217 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
3C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 93 No. of Cables: 1 Type Code: 30156 End Length(m): 8 Elevation: Schematic: ED-692007

Cable: C10BJH1090
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Service: 127V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 65 5 70 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692007 15

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 4.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-CPB-66-GH-001 Compartment: Description: B1H3 CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-005D C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-020D C10-TL-019 C10-TL-045 C10-TL-046 C10-TL-120 C10-TL-123 C10-TL-126 C10-TL-129 CABLE

Cable: C10BJH1091
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

3C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 93 No. of Cables: 1 Type Code: 30026 End Length(m): 8 Elevation: Schematic: ED-692007

Service: 127V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 64 5 69 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692007 14

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 4.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-CPB-66-GH-002 Compartment: Description: B1H3 I/O CABINET-1_TMR North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-005D C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-020D C10-TL-019 C10-TL-045 C10-TL-046 C10-TL-120 C10-TL-123 C10-TL-126 C10-TL-129 CABLE

Cable: C10BJH1092
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

3C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 90 No. of Cables: 1 Type Code: 30026 End Length(m): 8 Elevation: Schematic: ED-692007

Service: 127V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 63 5 68 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692007 13

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 4.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-CPB-66-GH-003 Compartment: Description: B1H3 I/O CABINET-2_SIMP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-005D C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-020D C10-TL-019 C10-TL-045 C10-TL-046 C10-TL-120 C10-TL-123 C10-TL-126 C10-TL-129 CABLE

Page 218 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
3C X 2.5 SQ.MM, 0.6/1kV
Pull Length(m): 88 No. of Cables: 1 Type Code: 30026 End Length(m): 8 Elevation: Schematic: ED-692007

Cable: C10BJH1093
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Service: 127V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 62 5 67 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692007 12

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 4.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-CPB-66-GH-004 Compartment: Description: B1H3 I/O CABINET-3_SIMP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-005D C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-020D C10-TL-019 C10-TL-045 C10-TL-046 C10-TL-120 C10-TL-123 C10-TL-126 C10-TL-129 CABLE

Cable: C10BJH1094
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 191 No. of Cables: 1 Type Code: 40156 End Length(m): 8 Elevation: Schematic: ED-692009

Service: HP HEADER TO BYPASS VALVE DRAIN MOV


Routed Length (m): Allowance (m): Total Length (m): 186 9 195 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 8.2.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C10-LBA-46-AA-008 Compartment: End Length(m): 12 Description: C10 HP DRN POT MOV North: 1715.00 Equip Location: Zone: East: 2225.10 Elevation: 10.10 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-692009

Routing Information: Remarks: Route: CABLE C10-TL-005B C10-TL-010B C10-TL-009B C10-TL-008B C10-TL-035B C10-TL-066C C10-TL-068C C10-TL-070C C10-TL-102C C10-TL-109B C10-TL-107B C10-TL-164B C10-TL-201B C12-TL-520B C12-TL-519B C12-TL-518B C12-TL-516B C12-TL-515B C12-TL-513 C12-TL-510B C12-TL-508 C12-TL-509 C12-TL-116 C12-TL-115 C12-TL-114 C12-C-1303

Cable: C10BJH1095
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 185 No. of Cables: 1 Type Code: 40156 End Length(m): 8 Elevation: Schematic: ED-692010

Service: HRSG HP STEAM DRAIN LINE MOV-3


Routed Length (m): Allowance (m): Total Length (m): 186 9 195 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 8.2.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LBA-46-AA-007 Compartment: End Length(m): 12 Description: C13 HP STM LOW POINT DRN MOV North: 1718.30 Equip Location: Zone: East: 2223.90 Elevation: 10.40 Wiring Dwg: Location Dwg: EA-681101 Schematic: ED-692010

Routing Information: Remarks: Route: CABLE C10-TL-005B C10-TL-010B C10-TL-009B C10-TL-008B C10-TL-035B C10-TL-066C C10-TL-068C C10-TL-070C C10-TL-102C C10-TL-109B C10-TL-107B C10-TL-164B C10-TL-201B C12-TL-520B C12-TL-519B C12-TL-518B C12-TL-516B C12-TL-515B C12-TL-513 C12-TL-510B C12-TL-508 C12-TL-509 C12-TL-116 C12-TL-115 C12-TL-114 C12-C-1304

Page 219 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 195 No. of Cables: 1 Type Code: 40156 End Length(m): 8 Elevation: Schematic: ED-692011

Cable: C10BJH1096
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Service: HRSG REHEATER DRAIN MOV - CRH SYSTEM


Routed Length (m): Allowance (m): Total Length (m): 186 9 195 Option 1: Option 2: Option 3: Compartment: North: 1720.30 Wiring Dwg: Shield: N Ground: Jacket: PVC End Length(m): 12

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 8.3.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LBC-46-AA-001 Description: C13 CR DRN MOV Equip Location: Zone: Location Dwg: EA-681101

East: 2222.20 Elevation: 10.60 Schematic: ED-692011

Routing Information: Remarks: Route: CABLE C10-TL-005B C10-TL-010B C10-TL-009B C10-TL-008B C10-TL-035B C10-TL-066C C10-TL-068C C10-TL-070C C10-TL-102C C10-TL-109B C10-TL-107B C10-TL-164B C10-TL-201B C12-TL-520B C12-TL-519B C12-TL-518B C12-TL-516B C12-TL-515B C12-TL-513 C12-TL-510B C12-TL-508 C12-TL-509 C12-TL-116 C12-TL-115 C12-TL-114 C12-C-1305

Cable: C10BJH1097
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 00

Description:

3C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 65 No. of Cables: 1 Type Code: 30026 End Length(m): 8 Elevation: Schematic: ED-692007

Service: 127V DISTRIBUTION PANEL


Routed Length (m): Allowance (m): Total Length (m): 62 5 67 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692007 12

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 4.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-CPB-66-GH-012 Compartment: Description: B1H3T I/O CABINET-2_TMR North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-005D C10-TL-004B C10-TL-016A C10-TL-018D C10-TL-020D C10-TL-019 C10-TL-045 C10-TL-046 C10-TL-120 C10-TL-123 C10-TL-126 C10-TL-129 CABLE

Cable: C10BJH1098
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

4C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 179 No. of Cables: 1 Type Code: 40026 End Length(m): 8 Elevation: Schematic: ED-692012

Service: HRSG LP STEAM BYPASS ISOLATION MOV


Routed Length (m): Allowance (m): Total Length (m): 170 9 179 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 8.3.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LBD-26-AA-001 Compartment: End Length(m): 8 Description: C13 LP BYP IN ISO MOV North: 1775.70 Equip Location: Zone: East: 2337.30 Elevation: 13.80 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-692012

Routing Information: Remarks: Route: CABLE C10-TL-005C C10-TL-004A C10-TL-015C C10-TL-028A C10-TL-027A C10-TL-026A C10-TL-022B C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-097B C14-TL-093B C14-TL-091B C14-TL-089 C14-TL-087 C14-TL-086 C14-C-1304

Page 220 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 123 No. of Cables: 1 Type Code: 40156 End Length(m): 8 Elevation: Schematic: ED-692013

Cable: C10BJH1099
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Service: HP SH1 INTLET DRAIN MOV


Routed Length (m): Allowance (m): Total Length (m): 125 7 132 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692013 2

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 8.6.1 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-HAH-91-AA-001 Compartment: Description: HP SH1 INLET DRAIN MOV North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-005B C10-TL-006B C10-TL-007B C10-TL-035E C10-TL-066F C10-TL-068F C10-TL-070F C10-TL-102F C10-TL-108B C10-TL-106B C10-TL-163B C10-TL-202B C13-TL-515B C13-TL-513 C13-TL-510B C13-TL-508 C13-TL-509 C13-TL-116 C13-TL-117 C13-TL-118 3CL-B67

Cable: C10BJH1100
Seg Code: L System: BJH Startup Code:
Cable From End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

4C X 6 SQ.MM, 0.6/1kV
Pull Length(m): 135 No. of Cables: 1 Type Code: 40066 End Length(m): 8 Elevation: Schematic: ED-692014

Service: HRSG HP STEAM BYPASS ISOLATION MOV


Routed Length (m): Allowance (m): Total Length (m): 119 7 126 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692014 8

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: 8.6.2 North: Wiring Dwg: East:

Cable To End: Equipment No: C13-LBA-25-AA-002 Description: C13 HP BYP ISO MOV Equip Location: Zone: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-005B C10-TL-006B C10-TL-007B C10-TL-035E C10-TL-066F C10-TL-068F C10-TL-070F C10-TL-102F C10-TL-108B C10-TL-106B C10-TL-163B C10-TL-202B C13-TL-515B C13-TL-513 C13-TL-510B C13-TL-508 C13-TL-509 C13-TL-116 C13-TL-117 C13-C-1301

Cable: C10BRA1001
Seg Code: L System: BRA Startup Code:

Rev: 01

Description:

2C X 300 SQ.MM, 0.6/1kV


Pull Length(m): 28 No. of Cables: 1 Type Code: 23006 End Length(m): 13 Elevation: Schematic: ED-692776

Service: 120V AC BLOCK-1 UPSDB-1 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 30 4 34 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692776 8

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BTU01 Compartment: Description: 120V AC UPS-1A BATTERY FOR BLK-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BTZ01 Compartment: Description: BATTERY MNTRG PNL (BLK-1 UPS-1A) North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: C10-C-1001 C10-TL-020F C10-TL-018F C10-TL-016C C10-TL-015E CABLE

Cable: C10BRA1002
Seg Code: L System: BRA Startup Code:

Rev: 01

Description:

2C X 300 SQ.MM, 0.6/1kV


Pull Length(m): 28 No. of Cables: 1 Type Code: 23006 End Length(m): 13 Elevation: Schematic: ED-692776

Service: 120V AC BLOCK-1 UPSDB-1 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 30 4 34 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692776 8

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BTU01 Compartment: Description: 120V AC UPS-1A BATTERY FOR BLK-1 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BTZ01 Compartment: Description: BATTERY MNTRG PNL (BLK-1 UPS-1A) North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: C10-C-1002 C10-TL-020F C10-TL-018F C10-TL-016C C10-TL-015E CABLE

Page 221 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
2C X 300 SQ.MM, 0.6/1kV
Pull Length(m): 28 No. of Cables: 1 Type Code: 23006 End Length(m): 13 Elevation: Schematic: ED-692776

Cable: C10BRA1003
Seg Code: L System: BRA Startup Code:

Service: 120V AC BLOCK-1 UPSDB-1 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 30 4 34 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692776 8

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BTU01 Compartment: Description: 120V AC UPS-1A BATTERY FOR BLK-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BTZ01 Compartment: Description: BATTERY MNTRG PNL (BLK-1 UPS-1A) North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: C10-C-1003 C10-TL-020F C10-TL-018F C10-TL-016C C10-TL-015E CABLE

Cable: C10BRA1004
Seg Code: L System: BRA Startup Code:

Rev: 01

Description:

2C X 300 SQ.MM, 0.6/1kV


Pull Length(m): 29 No. of Cables: 1 Type Code: 23006 End Length(m): 4 Elevation: Schematic: ED-692776

Service: 120V AC BLOCK-1 UPSDB-1 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 22 3 25 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692776 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BTZ01 Compartment: Description: BATTERY MNTRG PNL (BLK-1 UPS-1A) Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BRU01 Compartment: Description: 120V AC BLK-1 UPS-1A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-028C C10-TL-027C C10-TL-047A CABLE C10-TL-117 C10-TL-121 CABLE

Cable: C10BRA1005
Seg Code: L System: BRA Startup Code:

Rev: 01

Description:

2C X 300 SQ.MM, 0.6/1kV


Pull Length(m): 29 No. of Cables: 1 Type Code: 23006 End Length(m): 4 Elevation: Schematic: ED-692776

Service: 120V AC BLOCK-1 UPSDB-1 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 22 3 25 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692776 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BTZ01 Compartment: Description: BATTERY MNTRG PNL (BLK-1 UPS-1A) Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BRU01 Compartment: Description: 120V AC BLK-1 UPS-1A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-028C C10-TL-027C C10-TL-047A CABLE C10-TL-117 C10-TL-121 CABLE

Cable: C10BRA1006
Seg Code: L System: BRA Startup Code:

Rev: 01

Description:

2C X 300 SQ.MM, 0.6/1kV


Pull Length(m): 29 No. of Cables: 1 Type Code: 23006 End Length(m): 4 Elevation: Schematic: ED-692776

Service: 120V AC BLOCK-1 UPSDB-1 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 22 3 25 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692776 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BTZ01 Compartment: Description: BATTERY MNTRG PNL (BLK-1 UPS-1A) Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BRU01 Compartment: Description: 120V AC BLK-1 UPS-1A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-028C C10-TL-027C C10-TL-047A CABLE C10-TL-117 C10-TL-121 CABLE

Page 222 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
2C X 300 SQ.MM, 0.6/1kV
Pull Length(m): 28 No. of Cables: 1 Type Code: 23006 End Length(m): 13 Elevation: Schematic: ED-692776

Cable: C10BRA1007
Seg Code: L System: BRA Startup Code:

Service: 120V AC BLOCK-1 UPSDB-1 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 30 4 34 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692776 8

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BTU02 Compartment: Description: 120V AC UPS-1B BATTERY FOR BLK-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BTZ02 Compartment: Description: BATTERY MNTRG PNL (BLK-1 UPS-1B) North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: C10-C-1004 C10-TL-020F C10-TL-018F C10-TL-016C C10-TL-015E CABLE

Cable: C10BRA1008
Seg Code: L System: BRA Startup Code:

Rev: 01

Description:

2C X 300 SQ.MM, 0.6/1kV


Pull Length(m): 28 No. of Cables: 1 Type Code: 23006 End Length(m): 13 Elevation: Schematic: ED-692776

Service: 120V AC BLOCK-1 UPSDB-1 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 30 4 34 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692776 8

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BTU02 Compartment: Description: 120V AC UPS-1B BATTERY FOR BLK-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BTZ02 Compartment: Description: BATTERY MNTRG PNL (BLK-1 UPS-1B) North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: C10-C-1005 C10-TL-020F C10-TL-018F C10-TL-016C C10-TL-015E CABLE

Cable: C10BRA1009
Seg Code: L System: BRA Startup Code:

Rev: 01

Description:

2C X 300 SQ.MM, 0.6/1kV


Pull Length(m): 28 No. of Cables: 1 Type Code: 23006 End Length(m): 13 Elevation: Schematic: ED-692776

Service: 120V AC BLOCK-1 UPSDB-1 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 30 4 34 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692776 8

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BTU02 Compartment: Description: 120V AC UPS-1B BATTERY FOR BLK-1 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BTZ02 Compartment: Description: BATTERY MNTRG PNL (BLK-1 UPS-1B) North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: C10-C-1006 C10-TL-020F C10-TL-018F C10-TL-016C C10-TL-015E CABLE

Cable: C10BRA1010
Seg Code: L System: BRA Startup Code:

Rev: 01

Description:

2C X 300 SQ.MM, 0.6/1kV


Pull Length(m): 30 No. of Cables: 1 Type Code: 23006 End Length(m): 4 Elevation: Schematic: ED-692776

Service: 120V AC BLOCK-1 UPSDB-1 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 22 3 25 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692776 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BTZ02 Compartment: Description: BATTERY MNTRG PNL (BLK-1 UPS-1B) Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BRU02 Compartment: Description: 120V AC BLK-1 UPS-1B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-028C C10-TL-027C C10-TL-047A CABLE C10-TL-117 C10-TL-121 CABLE

Page 223 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
2C X 300 SQ.MM, 0.6/1kV
Pull Length(m): 30 No. of Cables: 1 Type Code: 23006 End Length(m): 4 Elevation: Schematic: ED-692776

Cable: C10BRA1011
Seg Code: L System: BRA Startup Code:

Service: 120V AC BLOCK-1 UPSDB-1 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 22 3 25 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692776 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BTZ02 Compartment: Description: BATTERY MNTRG PNL (BLK-1 UPS-1B) Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BRU02 Compartment: Description: 120V AC BLK-1 UPS-1B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-028C C10-TL-027C C10-TL-047A CABLE C10-TL-117 C10-TL-121 CABLE

Cable: C10BRA1012
Seg Code: L System: BRA Startup Code:

Rev: 01

Description:

2C X 300 SQ.MM, 0.6/1kV


Pull Length(m): 30 No. of Cables: 1 Type Code: 23006 End Length(m): 4 Elevation: Schematic: ED-692776

Service: 120V AC BLOCK-1 UPSDB-1 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 22 3 25 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692776 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BTZ02 Compartment: Description: BATTERY MNTRG PNL (BLK-1 UPS-1B) Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BRU02 Compartment: Description: 120V AC BLK-1 UPS-1B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-028C C10-TL-027C C10-TL-047A CABLE C10-TL-117 C10-TL-121 CABLE

Cable: C10BRA1013
Seg Code: L System: BRA Startup Code:

Rev: 02

Description:

2C X 95 SQ.MM, 0.6/1kV
Pull Length(m): 240 No. of Cables: 1 Type Code: 20956 End Length(m): 20 Elevation: Schematic: ED-692776

Service: 120V AC BLOCK-1 UPSDB-1 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 222 11 233 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692776 14

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRA Compartment: Description: 120V AC BLK-1 UPSDB-1 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C11-QCC-39-GH-001 Compartment: Description: CHEMICAL FEED SYSTEM HRSG#1 CONTROL PANEL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: C10-C-1025 C10-TL-018B C10-TL-017B C10-TL-042B C10-TL-043B C10-TL-059B C10-TL-060B C10-TL-063B C10-TL-064B CABLE C10-TL-066A C10-TL-068A C10-TL-070A C10-TL-102A C10-TL-103A C10-TL-104A C10-TL-105A C10-TL-166A C10-TL-204A C11-TL-521A C11-TL-520A C11-TL-519A C11-TL-518A C11-TL-517A C11-TL-515A C11-TL-514A C11-TL-513A C11-TL-512A C11-C-1206

Page 224 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
2C X 95 SQ.MM, 0.6/1kV
Pull Length(m): 240 No. of Cables: 1 Type Code: 20956 End Length(m): 20 Elevation: Schematic: ED-692776

Cable: C10BRA1014
Seg Code: L System: BRA Startup Code:

Service: 120V AC BLOCK-1 UPSDB-1 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 222 11 233 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692776 14

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRA Compartment: Description: 120V AC BLK-1 UPSDB-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C11-QCC-39-GH-001 Compartment: Description: CHEMICAL FEED SYSTEM HRSG#1 CONTROL PANEL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: C10-C-1025 C10-TL-018B C10-TL-017B C10-TL-042B C10-TL-043B C10-TL-059B C10-TL-060B C10-TL-063B C10-TL-064B CABLE C10-TL-066A C10-TL-068A C10-TL-070A C10-TL-102A C10-TL-103A C10-TL-104A C10-TL-105A C10-TL-166A C10-TL-204A C11-TL-521A C11-TL-520A C11-TL-519A C11-TL-518A C11-TL-517A C11-TL-515A C11-TL-514A C11-TL-513A C11-TL-512A C11-C-1206

Cable: C10BRA1015
Seg Code: L System: BRA Startup Code:

Rev: 01

Description:

2C X 95 SQ.MM, 0.6/1kV
Pull Length(m): 200 No. of Cables: 1 Type Code: 20956 End Length(m): 14 Elevation: Schematic: ED-692776

Service: 120V AC BLOCK-1 UPSDB-1 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 185 9 194 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692776 14

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRA Compartment: Description: 120V AC BLK-1 UPSDB-1 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C12-QCC-39-GH-001 Compartment: Description: CHEMICAL FEED SYSTEM HRSG#2 CONTROL PANEL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: C10-C-1025 C10-TL-018A C10-TL-017A C10-TL-041 C10-TL-029A C10-TL-030A C10-TL-031A C10-TL-032A C10-TL-011A C10-TL-009A C10-TL-008A C10-TL-035A C10-TL-066B C10-TL-068B C10-TL-070B C10-TL-102B C10-TL-109A C10-TL-107A C10-TL-164A C10-TL-201A C12-TL-520A C12-TL-519A C12-TL-518A C12-TL-516A C12-TL-515A C12-TL-514 C12-TL-512A C12-C-1204

Cable: C10BRA1016
Seg Code: L System: BRA Startup Code:

Rev: 02

Description:

2C X 95 SQ.MM, 0.6/1kV
Pull Length(m): 200 No. of Cables: 1 Type Code: 20956 End Length(m): 14 Elevation: Schematic: ED-692776

Service: 120V AC BLOCK-1 UPSDB-1 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 185 9 194 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692776 14

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRA Compartment: Description: 120V AC BLK-1 UPSDB-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C12-QCC-39-GH-001 Compartment: Description: CHEMICAL FEED SYSTEM HRSG#2 CONTROL PANEL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: C10-C-1025 C10-TL-018A C10-TL-017A C10-TL-041 C10-TL-029A C10-TL-030A C10-TL-031A C10-TL-032A C10-TL-011A C10-TL-009A C10-TL-008A C10-TL-035A C10-TL-066B C10-TL-068B C10-TL-070B C10-TL-102B C10-TL-109A C10-TL-107A C10-TL-164A C10-TL-201A C12-TL-520A C12-TL-519A C12-TL-518A C12-TL-516A C12-TL-515A C12-TL-514 C12-TL-512A C12-C-1204

Page 225 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
2C X 95 SQ.MM, 0.6/1kV
Pull Length(m): 130 No. of Cables: 1 Type Code: 20956 End Length(m): 5 Elevation: Schematic: ED-692776

Cable: C10BRA1017
Seg Code: L System: BRA Startup Code:

Service: 120V AC BLOCK-1 UPSDB-1 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 114 7 121 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692776 14

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRA Compartment: Description: 120V AC BLK-1 UPSDB-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C13-QCC-39-GH-001 Compartment: Description: CHEMICAL FEED SYSTEM HRSG#3 CONTROL PANEL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: C10-C-1025 C10-TL-018A C10-TL-017A C10-TL-041 C10-TL-029A C10-TL-030A C10-TL-031A C10-TL-032A C10-TL-011A C10-TL-010A C10-TL-006A C10-TL-007A C10-TL-035D C10-TL-066E C10-TL-068E C10-TL-070E C10-TL-102E C10-TL-108A C10-TL-106A C10-TL-163A C10-TL-202A C13-TL-515A C13-TL-514 C13-TL-512A C13-C-1218

Cable: C10BRA1018
Seg Code: L System: BRA Startup Code:

Rev: 02

Description:

2C X 95 SQ.MM, 0.6/1kV
Pull Length(m): 130 No. of Cables: 1 Type Code: 20956 End Length(m): 5 Elevation: Schematic: ED-692776

Service: 120V AC BLOCK-1 UPSDB-1 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 114 7 121 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692776 14

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRA Compartment: Description: 120V AC BLK-1 UPSDB-1 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C13-QCC-39-GH-001 Compartment: Description: CHEMICAL FEED SYSTEM HRSG#3 CONTROL PANEL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: C10-C-1025 C10-TL-018A C10-TL-017A C10-TL-041 C10-TL-029A C10-TL-030A C10-TL-031A C10-TL-032A C10-TL-011A C10-TL-010A C10-TL-006A C10-TL-007A C10-TL-035D C10-TL-066E C10-TL-068E C10-TL-070E C10-TL-102E C10-TL-108A C10-TL-106A C10-TL-163A C10-TL-202A C13-TL-515A C13-TL-514 C13-TL-512A C13-C-1218

Cable: C10BRA1019
Seg Code: L System: BRA Startup Code:

Rev: 03

Description:

2C X 35 SQ.MM, 0.6/1kV
Pull Length(m): 283 No. of Cables: 1 Type Code: 20356 End Length(m): 10 Elevation: Schematic: ED-692776

Service: 120V AC BLOCK-1 UPSDB-1 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 238 11 249 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692776 15

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRA Compartment: Description: 120V AC BLK-1 UPSDB-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C11-LBA-25-GH-001 Compartment: Description: BLK-1 HRSG-1 # HP BYP HSU PANEL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: C10-C-1025 C10-TL-018A C10-TL-017A C10-TL-042A C10-TL-043A C10-TL-059A C10-TL-060A C10-TL-063A C10-TL-064A CABLE C10-TL-065B C10-TL-101B C10-TL-103C C10-TL-104C C10-TL-105C C10-TL-166C C10-TL-204C C11-TL-321C C11-TL-520C C11-TL-519C C11-TL-518C C11-TL-517C C11-TL-516 C11-TL-201 C11-TL-102 C11-TL-203 C11-TL-101 C11-TL-110 C11-TL-111 C11-TL-112 C11-TL-113 C11-TL-114 C11-TL-115 C11-TL-117 C11-C-1208

Page 226 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 04 Description:
2C X 35 SQ.MM, 0.6/1kV
Pull Length(m): 275 No. of Cables: 1 Type Code: 20356 End Length(m): 10 Elevation: Schematic: ED-692776

Cable: C10BRA1020
Seg Code: L System: BRA Startup Code:

Service: 120V AC BLOCK-1 UPSDB-1 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 238 11 249 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692776 15

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRA Compartment: Description: 120V AC BLK-1 UPSDB-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C11-LBA-25-GH-001 Compartment: Description: BLK-1 HRSG-1 # HP BYP HSU PANEL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: CABLE NOT REQUIRED AS PER LATEST MSD Route: C10-C-1025 C10-TL-018A C10-TL-017A C10-TL-042A C10-TL-043A C10-TL-059A C10-TL-060A C10-TL-063A C10-TL-064A CABLE C10-TL-065B C10-TL-101B C10-TL-103C C10-TL-104C C10-TL-105C C10-TL-166C C10-TL-204C C11-TL-321C C11-TL-520C C11-TL-519C C11-TL-518C C11-TL-517C C11-TL-516 C11-TL-201 C11-TL-102 C11-TL-203 C11-TL-101 C11-TL-110 C11-TL-111 C11-TL-112 C11-TL-113 C11-TL-114 C11-TL-115 C11-TL-117 C11-C-1208

Cable: C10BRA1021
Seg Code: L System: BRA Startup Code:

Rev: 03

Description:

2C X 35 SQ.MM, 0.6/1kV
Pull Length(m): 216 No. of Cables: 1 Type Code: 20356 End Length(m): 15 Elevation: Schematic: ED-692776

Service: 120V AC BLOCK-1 UPSDB-1 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 206 10 216 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692776 15

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRA Compartment: Description: 120V AC BLK-1 UPSDB-1 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C12-LBA-25-GH-001 Compartment: Description: BLK-1 HRSG-2 # HP BYP HSU PANEL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: C10-C-1025 C10-TL-018D C10-TL-016A C10-TL-004B C10-TL-013B CABLE C10-TL-012B C10-TL-009B C10-TL-008B C10-TL-035B C10-TL-066C C10-TL-068C C10-TL-070C C10-TL-102C C10-TL-109B C10-TL-107B C10-TL-164B C10-TL-201B C12-TL-520B C12-TL-519B C12-TL-518B C12-TL-516B C12-TL-515B C12-TL-513 C12-TL-510B C12-TL-508 C12-TL-509 C12-TL-116 C12-TL-117 C12-C-1206

Cable: C10BRA1022
Seg Code: L System: BRA Startup Code:

Rev: 04

Description:

2C X 35 SQ.MM, 0.6/1kV
Pull Length(m): 226 No. of Cables: 1 Type Code: 20356 End Length(m): 5 Elevation: Schematic: ED-692776

Service: 120V AC BLOCK-1 UPSDB-1 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 210 10 220 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692776 15

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRA Compartment: Description: 120V AC BLK-1 UPSDB-1 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C12-LBA-25-GH-001 Compartment: Description: BLK-1 HRSG-2 # HP BYP HSU PANEL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: CABLE NOT REQUIRED AS PER LATEST MSD Route: CABLE C10-TL-120 C10-TL-046 C10-TL-045 C10-TL-019 C10-TL-018D C10-TL-016A C10-TL-004B C10-TL-013B CABLE C10-TL-012B C10-TL-009B C10-TL-008B C10-TL-035B C10-TL-066C C10-TL-068C C10-TL-070C C10-TL-102C C10-TL-109B C10-TL-107B C10-TL-164B C10-TL-201B C12-TL-520B C12-TL-519B C12-TL-518B C12-TL-516B C12-TL-515B C12-TL-513 C12-TL-510B C12-TL-508 C12-TL-509 C12-TL-116 C12-TL-117 C12-C-1206

Page 227 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 03 Description:
2C X 25 SQ.MM, 0.6/1kV
Pull Length(m): 180 No. of Cables: 1 Type Code: 20256 End Length(m): 5 Elevation: Schematic: ED-692776

Cable: C10BRA1023
Seg Code: L System: BRA Startup Code:

Service: 120V AC BLOCK-1 UPSDB-1 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 171 9 180 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692776 15

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRA Compartment: Description: 120V AC BLK-1 UPSDB-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C13-LBA-25-GH-001 Compartment: Description: BLK-1 HRSG-3 # HP BYP HSU PANEL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-125 C10-TL-122 C10-TL-118 C10-TL-048 CABLE C10-TL-026A C10-TL-025B C10-TL-219B C10-TL-218B C10-TL-216 C10-TL-214 C10-TL-211 C13-TL-518 C13-TL-517 C13-TL-516 C13-TL-201 C13-TL-102 C13-TL-203 C13-TL-101 C13-TL-110 C13-TL-111 C13-TL-112 C13-TL-113 C13-TL-114 C13-TL-115 C13-TL-117 C13-C-1220

Cable: C10BRA1024
Seg Code: L System: BRA Startup Code:

Rev: 04

Description:

2C X 25 SQ.MM, 0.6/1kV
Pull Length(m): 180 No. of Cables: 1 Type Code: 20256 End Length(m): 5 Elevation: Schematic: ED-692776

Service: 120V AC BLOCK-1 UPSDB-1 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 171 9 180 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692776 15

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRA Compartment: Description: 120V AC BLK-1 UPSDB-1 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C13-LBA-25-GH-001 Compartment: Description: BLK-1 HRSG-3 # HP BYP HSU PANEL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: CABLE NOT REQUIRED AS PER LATEST MSD Route: CABLE C10-TL-125 C10-TL-122 C10-TL-118 C10-TL-048 CABLE C10-TL-026A C10-TL-025B C10-TL-219B C10-TL-218B C10-TL-216 C10-TL-214 C10-TL-211 C13-TL-518 C13-TL-517 C13-TL-516 C13-TL-201 C13-TL-102 C13-TL-203 C13-TL-101 C13-TL-110 C13-TL-111 C13-TL-112 C13-TL-113 C13-TL-114 C13-TL-115 C13-TL-117 C13-C-1220

Cable: C10BRA1025
Seg Code: L System: BRA Startup Code:

Rev: 03

Description:

2C X 35 SQ.MM, 0.6/1kV
Pull Length(m): 125 No. of Cables: 1 Type Code: 20356 End Length(m): 5 Elevation: Schematic: ED-692776

Service: 120V AC BLOCK-1 UPSDB-1 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 115 7 122 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692776 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRA Compartment: Description: 120V AC BLK-1 UPSDB-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C11-LBB-29-GH-001 Compartment: Description: BLK-1 HRSG-1 # IP BYP HSU PANEL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: C10-C-1026 C10-TL-123 C10-TL-120 C10-TL-046 C10-TL-045 C10-TL-019 C10-TL-020D C10-TL-022C C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-C-1260

Page 228 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 03 Description:
2C X 35 SQ.MM, 0.6/1kV
Pull Length(m): 125 No. of Cables: 1 Type Code: 20356 End Length(m): 5 Elevation: Schematic: ED-692776

Cable: C10BRA1026
Seg Code: L System: BRA Startup Code:

Service: 120V AC BLOCK-1 UPSDB-1 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 115 7 122 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692776 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRA Compartment: Description: 120V AC BLK-1 UPSDB-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C11-LBB-29-GH-001 Compartment: Description: BLK-1 HRSG-1 # IP BYP HSU PANEL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: CABLE NOT REQUIRED AS PER LATEST MSD Route: C10-C-1026 C10-TL-123 C10-TL-120 C10-TL-046 C10-TL-045 C10-TL-019 C10-TL-020D C10-TL-022C C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-C-1260

Cable: C10BRA1027
Seg Code: L System: BRA Startup Code:

Rev: 03

Description:

2C X 35 SQ.MM, 0.6/1kV
Pull Length(m): 125 No. of Cables: 1 Type Code: 20356 End Length(m): 5 Elevation: Schematic: ED-692776

Service: 120V AC BLOCK-1 UPSDB-1 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 115 7 122 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692776 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRA Compartment: Description: 120V AC BLK-1 UPSDB-1 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C12-LBB-29-GH-001 Compartment: Description: BLK-1 HRSG-2 # IP BYP HSU PANEL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: C10-C-1026 C10-TL-123 C10-TL-120 C10-TL-046 C10-TL-045 C10-TL-019 C10-TL-020D C10-TL-022C C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-C-1261

Cable: C10BRA1028
Seg Code: L System: BRA Startup Code:

Rev: 04

Description:

2C X 35 SQ.MM, 0.6/1kV
Pull Length(m): 129 No. of Cables: 1 Type Code: 20356 End Length(m): 5 Elevation: Schematic: ED-692776

Service: 120V AC BLOCK-1 UPSDB-1 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 115 7 122 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692776 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRA Compartment: Description: 120V AC BLK-1 UPSDB-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C12-LBB-29-GH-001 Compartment: Description: BLK-1 HRSG-2 # IP BYP HSU PANEL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: CABLE NOT REQUIRED AS PER LATEST MSD Route: C10-C-1026 C10-TL-123 C10-TL-120 C10-TL-046 C10-TL-045 C10-TL-019 C10-TL-020D C10-TL-022C C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-C-1261

Page 229 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 03 Description:
2C X 25 SQ.MM, 0.6/1kV
Pull Length(m): 125 No. of Cables: 1 Type Code: 20256 End Length(m): 5 Elevation: Schematic: ED-692776

Cable: C10BRA1029
Seg Code: L System: BRA Startup Code:

Service: 120V AC BLOCK-1 UPSDB-1 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 115 7 122 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692776 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRA Compartment: Description: 120V AC BLK-1 UPSDB-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C13-LBB-29-GH-001 Compartment: Description: BLK-1 HRSG-3 # IP BYP HSU PANEL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: C10-C-1026 C10-TL-123 C10-TL-120 C10-TL-046 C10-TL-045 C10-TL-019 C10-TL-020D C10-TL-022C C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-C-1262

Cable: C10BRA1030
Seg Code: L System: BRA Startup Code:

Rev: 04

Description:

2C X 25 SQ.MM, 0.6/1kV
Pull Length(m): 125 No. of Cables: 1 Type Code: 20256 End Length(m): 5 Elevation: Schematic: ED-692776

Service: 120V AC BLOCK-1 UPSDB-1 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 115 7 122 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692776 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRA Compartment: Description: 120V AC BLK-1 UPSDB-1 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C13-LBB-29-GH-001 Compartment: Description: BLK-1 HRSG-3 # IP BYP HSU PANEL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: CABLE NOT REQUIRED AS PER LATEST MSD Route: C10-C-1026 C10-TL-123 C10-TL-120 C10-TL-046 C10-TL-045 C10-TL-019 C10-TL-020D C10-TL-022C C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-C-1262

Cable: C10BRA1031
Seg Code: L System: BRA Startup Code:

Rev: 02

Description:

2C X 35 SQ.MM, 0.6/1kV
Pull Length(m): 180 No. of Cables: 1 Type Code: 20356 End Length(m): 18 Elevation: Schematic: ED-692776

Service: 120V AC BLOCK-1 UPSDB-1 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 163 9 172 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692776 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRA Compartment: Description: 120V AC BLK-1 UPSDB-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C11-LBD-26-GH-001 Compartment: Description: BLK-1 HRSG-1 # LP BYP HSU PANEL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: C10-C-1026 C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-097B C14-TL-093B C14-TL-091B C14-TL-089 C14-TL-087 C14-TL-086 C14-C-1263

Page 230 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 03 Description:
2C X 35 SQ.MM, 0.6/1kV
Pull Length(m): 176 No. of Cables: 1 Type Code: 20356 End Length(m): 18 Elevation: Schematic: ED-692776

Cable: C10BRA1032
Seg Code: L System: BRA Startup Code:

Service: 120V AC BLOCK-1 UPSDB-1 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 163 9 172 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692776 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRA Compartment: Description: 120V AC BLK-1 UPSDB-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C11-LBD-26-GH-001 Compartment: Description: BLK-1 HRSG-1 # LP BYP HSU PANEL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: CABLE NOT REQUIRED AS PER LATEST MSD Route: C10-C-1026 C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-097B C14-TL-093B C14-TL-091B C14-TL-089 C14-TL-087 C14-TL-086 C14-C-1263

Cable: C10BRA1033
Seg Code: L System: BRA Startup Code:

Rev: 02

Description:

2C X 35 SQ.MM, 0.6/1kV
Pull Length(m): 174 No. of Cables: 1 Type Code: 20356 End Length(m): 18 Elevation: Schematic: ED-692776

Service: 120V AC BLOCK-1 UPSDB-1 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 159 8 167 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692776 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRA Compartment: Description: 120V AC BLK-1 UPSDB-1 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C12-LBD-26-GH-001 Compartment: Description: BLK-1 HRSG-2 # LP BYP HSU PANEL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: C10-C-1026 C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-097B C14-TL-093B C14-TL-091B C14-TL-089 C14-TL-087 C14-TL-086 C14-C-1264

Cable: C10BRA1034
Seg Code: L System: BRA Startup Code:

Rev: 03

Description:

2C X 35 SQ.MM, 0.6/1kV
Pull Length(m): 170 No. of Cables: 1 Type Code: 20356 End Length(m): 18 Elevation: Schematic: ED-692776

Service: 120V AC BLOCK-1 UPSDB-1 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 159 8 167 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692776 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRA Compartment: Description: 120V AC BLK-1 UPSDB-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C12-LBD-26-GH-001 Compartment: Description: BLK-1 HRSG-2 # LP BYP HSU PANEL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: CABLE NOT REQUIRED AS PER LATEST MSD Route: C10-C-1026 C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-097B C14-TL-093B C14-TL-091B C14-TL-089 C14-TL-087 C14-TL-086 C14-C-1264

Page 231 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
2C X 35 SQ.MM, 0.6/1kV
Pull Length(m): 175 No. of Cables: 1 Type Code: 20356 End Length(m): 18 Elevation: Schematic: ED-692776

Cable: C10BRA1035
Seg Code: L System: BRA Startup Code:

Service: 120V AC BLOCK-1 UPSDB-1 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 159 8 167 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692776 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRA Compartment: Description: 120V AC BLK-1 UPSDB-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C13-LBD-26-GH-001 Compartment: Description: BLK-1 HRSG-3 # LP BYP HSU PANEL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: C10-C-1026 C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-097B C14-TL-093B C14-TL-091B C14-TL-089 C14-TL-087 C14-TL-086 C14-C-1265

Cable: C10BRA1036
Seg Code: L System: BRA Startup Code:

Rev: 03

Description:

2C X 35 SQ.MM, 0.6/1kV
Pull Length(m): 175 No. of Cables: 1 Type Code: 20356 End Length(m): 18 Elevation: Schematic: ED-692776

Service: 120V AC BLOCK-1 UPSDB-1 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 159 8 167 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692776 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRA Compartment: Description: 120V AC BLK-1 UPSDB-1 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C13-LBD-26-GH-001 Compartment: Description: BLK-1 HRSG-3 # LP BYP HSU PANEL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: CABLE NOT REQUIRED AS PER LATEST MSD Route: C10-C-1026 C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-097B C14-TL-093B C14-TL-091B C14-TL-089 C14-TL-087 C14-TL-086 C14-C-1265

Cable: C10BRA1037
Seg Code: L System: BRA Startup Code:

Rev: 02

Description:

2C X 10 SQ.MM, 0.6/1kV
Pull Length(m): 255 No. of Cables: 1 Type Code: 20106 End Length(m): 5 Elevation: Schematic: ED-692776

Service: 120V AC BLOCK-1 UPSDB-1 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 262 12 274 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692776 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRA Compartment: Description: 120V AC BLK-1 UPSDB-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-CPC-77-GH-001 Description: BLK-1 IA/ SA PLC PNL Equip Location: Zone: Location Dwg: EA-681141

Routing Information: Remarks: Route: CABLE C10-TL-120 C10-TL-046 C10-TL-045 C10-TL-019 CABLE C10-TL-018A C10-TL-017A C10-TL-041 C10-TL-029A C10-TL-030A C10-TL-031A C10-TL-032A C10-TL-011A C10-TL-009A C10-TL-008A C10-TL-035A C10-TL-066B C10-TL-068B C10-TL-070B C10-TL-102B C10-TL-109A C10-TL-107A C10-TL-164A C10-TL-201A C12-TL-520A C12-TL-519A C12-TL-518A C12-TL-516A C12-TL-515A C12-TL-514 C12-TL-512A C12-TL-511A CABLE C12-D001-07 C12-EMH-001 C10-D030-06 C10-EMH-012 C10-D031-06 C10-EMH-013 C10-D029-06 C10-EMH-011 C10-D026-06 C10-TL-201 CABLE

Page 232 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
2C X 10 SQ.MM, 0.6/1kV
Pull Length(m): 254 No. of Cables: 1 Type Code: 20106 End Length(m): 5 Elevation: Schematic: ED-692776

Cable: C10BRA1038
Seg Code: L System: BRA Startup Code:

Service: 120V AC BLOCK-1 UPSDB-1 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 267 12 279 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692776 15

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRA Compartment: Description: 120V AC BLK-1 UPSDB-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-CPC-77-GH-001 Description: BLK-1 IA/ SA PLC PNL Equip Location: Zone: Location Dwg: EA-681141

Routing Information: Remarks: Route: CABLE C10-TL-120 C10-TL-046 C10-TL-045 C10-TL-019 CABLE C10-TL-018A C10-TL-017A C10-TL-041 C10-TL-029A C10-TL-030A C10-TL-031A C10-TL-032A C10-TL-011A C10-TL-009A C10-TL-008A C10-TL-035A C10-TL-066B C10-TL-068B C10-TL-070B C10-TL-102B C10-TL-109A C10-TL-107A C10-TL-164A C10-TL-201A C12-TL-520A C12-TL-519A C12-TL-518A C12-TL-516A C12-TL-515A C12-TL-514 C12-TL-512A C12-TL-511A CABLE C12-D001-07 C12-EMH-001 C10-D030-06 C10-EMH-012 C10-D031-06 C10-EMH-013 C10-D029-06 C10-EMH-011 C10-D026-06 C10-TL-201 CABLE

Cable: C10BRA1039
Seg Code: L System: BRA Startup Code:

Rev: 02

Description:

2C X 10 SQ.MM, 0.6/1kV
Pull Length(m): 265 No. of Cables: 1 Type Code: 20106 End Length(m): 15 Elevation: Schematic: ED-692776

Service: 120V AC BLOCK-1 UPSDB-1 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 267 12 279 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692776 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRA Compartment: Description: 120V AC BLK-1 UPSDB-1 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-CYE-63-GH-003 Compartment: Description: BLK-1 IA/ SA COMP BLDG LFAP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681141

Routing Information: Remarks: Route: CABLE C10-TL-120 C10-TL-046 C10-TL-045 C10-TL-019 CABLE C10-TL-018A C10-TL-017A C10-TL-041 C10-TL-029A C10-TL-030A C10-TL-031A C10-TL-032A C10-TL-011A C10-TL-009A C10-TL-008A C10-TL-035A C10-TL-066B C10-TL-068B C10-TL-070B C10-TL-102B C10-TL-109A C10-TL-107A C10-TL-164A C10-TL-201A C12-TL-520A C12-TL-519A C12-TL-518A C12-TL-516A C12-TL-515A C12-TL-514 C12-TL-512A C12-TL-511A CABLE C12-D001-07 C12-EMH-001 C10-D030-06 C10-EMH-012 C10-D031-06 C10-EMH-013 C10-D029-06 C10-EMH-011 C10-D026-06 C10-TL-201 CABLE

Cable: C10BRA1040
Seg Code: L System: BRA Startup Code:

Rev: 03

Description:

2C X 10 SQ.MM, 0.6/1kV
Pull Length(m): 260 No. of Cables: 1 Type Code: 20106 End Length(m): 15 Elevation: Schematic: ED-692776

Service: 120V AC BLOCK-1 UPSDB-1 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 271 13 284 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692776 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRA Compartment: Description: 120V AC BLK-1 UPSDB-1 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-CYE-63-GH-003 Compartment: Description: BLK-1 IA/ SA COMP BLDG LFAP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681141

Routing Information: Remarks: CABLE NOT REQUIRED AS PER LATEST MSD Route: CABLE C10-TL-122 C10-TL-118 C10-TL-048 C10-TL-021 C10-TL-020A C10-TL-018A C10-TL-017A C10-TL-041 C10-TL-029A C10-TL-030A C10-TL-031A C10-TL-032A C10-TL-011A C10-TL-009A C10-TL-008A C10-TL-035A C10-TL-066B C10-TL-068B C10-TL-070B C10-TL-102B C10-TL-109A C10-TL-107A C10-TL-164A C10-TL-201A C12-TL-520A C12-TL-519A C12-TL-518A C12-TL-516A C12-TL-515A C12-TL-514 C12-TL-512A C12-TL-511A CABLE C12-D001-07 C12-EMH-001 C10-D030-06 C10-EMH-012 C10-D031-06 C10-EMH-013 C10-D029-06 C10-EMH-011 C10-D026-06 C10-TL-201 CABLE

Page 233 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
2C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 88 No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-692776

Cable: C10BRA1041
Seg Code: L System: BRA Startup Code:

Service: 120V AC BLOCK-1 UPSDB-1 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 25 3 28 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692776 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRA Compartment: Description: 120V AC BLK-1 UPSDB-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-CYE-63-GH-002 Compartment: Description: BLK-1 MV/ LV BLDG LFAP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-123 C10-TL-126 C10-TL-129 C10-TL-132 CABLE

Cable: C10BRA1042
Seg Code: L System: BRA Startup Code:

Rev: 03

Description:

2C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 88 No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-692776

Service: 120V AC BLOCK-1 UPSDB-1 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 25 3 28 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692776 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRA Compartment: Description: 120V AC BLK-1 UPSDB-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-CYE-63-GH-002 Compartment: Description: BLK-1 MV/ LV BLDG LFAP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: CABLE NOT REQUIRED AS PER LATEST MSD Route: CABLE C10-TL-123 C10-TL-126 C10-TL-129 C10-TL-132 CABLE

Cable: C10BRA1045
Seg Code: L System: BRA Startup Code:

Rev: 02

Description:

2C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 20 No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-692776

Service: 120V AC BLOCK-1 UPSDB-1 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 10 2 12 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692776 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRA Compartment: Description: 120V AC BLK-1 UPSDB-1 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE

Cable To End: Equipment No: C10-CYE-63-GH-202 Compartment: Description: BLK-1 MV/ LV BLDG FIRE SYSTEM BPS-1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BRA1046
Seg Code: L System: BRA Startup Code:

Rev: 03

Description:

2C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 20 No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-692776

Service: 120V AC BLOCK-1 UPSDB-1 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 10 2 12 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692776 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRA Compartment: Description: 120V AC BLK-1 UPSDB-1 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: CABLE NOT REQUIRED AS PER LATEST MSD Route: CABLE

Cable To End: Equipment No: C10-CYE-63-GH-202 Compartment: Description: BLK-1 MV/ LV BLDG FIRE SYSTEM BPS-1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Page 234 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
3C X 150 SQ.MM, 0.6/1kV
Pull Length(m): 261 No. of Cables: 1 Type Code: 31506 End Length(m): 15 Elevation: Schematic: ED-692776

Cable: C10BRA1047
Seg Code: L System: BRA Startup Code:

Service: 120V AC BLOCK-1 UPSDB-1 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 249 12 261 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692776 30

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRA Compartment: Description: 120V AC BLK-1 UPSDB-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-QUM-49-GH-001 Description: BLK-1 SWAS PNL Equip Location: Zone: Location Dwg: EA-685564

Routing Information: Remarks: Route: CABLE C10-TL-120 C10-TL-046 C10-TL-045 C10-TL-019 C10-TL-018D C10-TL-016A C10-TL-004B C10-TL-013B CABLE C10-TL-012B C10-TL-009B C10-TL-008B C10-TL-035B C10-TL-066C C10-TL-068C C10-TL-070C C10-TL-102C C10-TL-109B C10-TL-107B C10-TL-164B C10-TL-201B C12-TL-520B C12-TL-519B C12-TL-518B C12-TL-516B C12-TL-515B C12-TL-513 C12-TL-510B C12-TL-508 C12-TL-509 C12-TL-116 C12-TL-115 C12-TL-114 C12-TL-113 C12-TL-112 C12-C-1212

Cable: C10BRA1048
Seg Code: L System: BRA Startup Code:

Rev: 02

Description:

3C X 150 SQ.MM, 0.6/1kV


Pull Length(m): 261 No. of Cables: 1 Type Code: 31506 End Length(m): 15 Elevation: Schematic: ED-692776

Service: 120V AC BLOCK-1 UPSDB-1 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 249 12 261 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692776 30

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRA Compartment: Description: 120V AC BLK-1 UPSDB-1 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-QUM-49-GH-001 Description: BLK-1 SWAS PNL Equip Location: Zone: Location Dwg: EA-685564

Routing Information: Remarks: Route: CABLE C10-TL-120 C10-TL-046 C10-TL-045 C10-TL-019 C10-TL-018D C10-TL-016A C10-TL-004B C10-TL-013B CABLE C10-TL-012B C10-TL-009B C10-TL-008B C10-TL-035B C10-TL-066C C10-TL-068C C10-TL-070C C10-TL-102C C10-TL-109B C10-TL-107B C10-TL-164B C10-TL-201B C12-TL-520B C12-TL-519B C12-TL-518B C12-TL-516B C12-TL-515B C12-TL-513 C12-TL-510B C12-TL-508 C12-TL-509 C12-TL-116 C12-TL-115 C12-TL-114 C12-TL-113 C12-TL-112 C12-C-1212

Cable: C10BRA1049
Seg Code: L System: BRA Startup Code:

Rev: 02

Description:

3C X 240 SQ.MM, 0.6/1kV


Pull Length(m): 162 No. of Cables: 1 Type Code: 32406 End Length(m): 12 Elevation: Schematic: ED-692776

Service: 120V AC BLOCK-1 UPSDB-1 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 152 8 160 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692776 15

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRA Compartment: Description: 120V AC BLK-1 UPSDB-1 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BRI Compartment: Description: 120V AC STG UPS-1 SUB-DB North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-125 C10-TL-122 C10-TL-118 C10-TL-048 C10-TL-021 CABLE C10-TL-023B C10-TL-223B C10-TL-222B C14-TL-202C C14-TL-204C C14-TL-207C C14-TL-049C C14-TL-050C C14-TL-052B C14-TL-053B C14-TL-054B C14-TL-055B C14-TL-065B CABLE

Page 235 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
3C X 240 SQ.MM, 0.6/1kV
Pull Length(m): 162 No. of Cables: 1 Type Code: 32406 End Length(m): 12 Elevation: Schematic: ED-692776

Cable: C10BRA1050
Seg Code: L System: BRA Startup Code:

Service: 120V AC BLOCK-1 UPSDB-1 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 152 8 160 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692776 15

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRA Compartment: Description: 120V AC BLK-1 UPSDB-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BRI Compartment: Description: 120V AC STG UPS-1 SUB-DB North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-125 C10-TL-122 C10-TL-118 C10-TL-048 C10-TL-021 CABLE C10-TL-023B C10-TL-223B C10-TL-222B C14-TL-202C C14-TL-204C C14-TL-207C C14-TL-049C C14-TL-050C C14-TL-052B C14-TL-053B C14-TL-054B C14-TL-055B C14-TL-065B CABLE

Cable: C10BRA1051
Seg Code: L System: BRA Startup Code:

Rev: 00

Description:

2C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): No. of Cables: 1 Type Code: 20156 End Length(m): 15 Elevation: Schematic: ED-692776

Service: 120V AC BLOCK-1 UPSDB-1 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 272 13 285 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692776 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRA Compartment: Description: 120V AC BLK-1 UPSDB-1 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C11-MBR-10-GH-001 Compartment: Description: DIVERTER DAMPER LCP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-123 C10-TL-120 C10-TL-046 C10-TL-045 C10-TL-019 CABLE C10-TL-018B C10-TL-017B C10-TL-042B C10-TL-043B C10-TL-059B C10-TL-060B C10-TL-063B CABLE C10-TL-065B C10-TL-101B C10-TL-103C C10-TL-104C C10-TL-105C C10-TL-166C C10-TL-204C C11-TL-321C C11-TL-520C C11-TL-519C C11-TL-518C C11-TL-517C C11-TL-516 C11-TL-201 C11-TL-102 C11-TL-203 C11-TL-204 C11-TL-205 C11-TL-206 C11-TL-207 C11-TL-208 C11-TL-209 C11-TL-210 C11-TL-211 C11-TL-213 1CL-A27

Cable: C10BRA1052
Seg Code: L System: BRA Startup Code:

Rev: 00

Description:

2C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): No. of Cables: 1 Type Code: 20156 End Length(m): 15 Elevation: Schematic: ED-692776

Service: 120V AC BLOCK-1 UPSDB-1 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 272 13 285 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692776 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRA Compartment: Description: 120V AC BLK-1 UPSDB-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C11-MBR-10-GH-001 Compartment: Description: DIVERTER DAMPER LCP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-123 C10-TL-120 C10-TL-046 C10-TL-045 C10-TL-019 CABLE C10-TL-018B C10-TL-017B C10-TL-042B C10-TL-043B C10-TL-059B C10-TL-060B C10-TL-063B CABLE C10-TL-065B C10-TL-101B C10-TL-103C C10-TL-104C C10-TL-105C C10-TL-166C C10-TL-204C C11-TL-321C C11-TL-520C C11-TL-519C C11-TL-518C C11-TL-517C C11-TL-516 C11-TL-201 C11-TL-102 C11-TL-203 C11-TL-204 C11-TL-205 C11-TL-206 C11-TL-207 C11-TL-208 C11-TL-209 C11-TL-210 C11-TL-211 C11-TL-213 1CL-A27

Page 236 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
2C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 20156 End Length(m): 15 Elevation: Schematic: ED-692776

Cable: C10BRA1053
Seg Code: L System: BRA Startup Code:

Service: 120V AC BLOCK-1 UPSDB-1 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 247 12 259 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692776 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRA Compartment: Description: 120V AC BLK-1 UPSDB-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C12-MBR-10-GH-001 Compartment: Description: DIVERTER DAMPER LCP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-123 C10-TL-120 C10-TL-046 C10-TL-045 C10-TL-019 C10-TL-018D C10-TL-016A C10-TL-004B C10-TL-013B CABLE C10-TL-012C C10-TL-009C C10-TL-008C C10-TL-035C C10-TL-066D C10-TL-068D C10-TL-070D C10-TL-102D C10-TL-109C C10-TL-107C C10-TL-164C C10-TL-201C C12-TL-520C C12-TL-519C C12-TL-518C C12-TL-517 C12-TL-201 C12-TL-102 C12-TL-203 C12-TL-204 C12-TL-205 C12-TL-206 C12-TL-207 C12-TL-208 C12-TL-209 C12-TL-210 C12-TL-211 C12-TL-213 2CL-A27

Cable: C10BRA1054
Seg Code: L System: BRA Startup Code:

Rev: 00

Description:

2C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): No. of Cables: 1 Type Code: 20156 End Length(m): 15 Elevation: Schematic: ED-692776

Service: 120V AC BLOCK-1 UPSDB-1 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 247 12 259 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692776 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRA Compartment: Description: 120V AC BLK-1 UPSDB-1 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C12-MBR-10-GH-001 Compartment: Description: DIVERTER DAMPER LCP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-123 C10-TL-120 C10-TL-046 C10-TL-045 C10-TL-019 C10-TL-018D C10-TL-016A C10-TL-004B C10-TL-013B CABLE C10-TL-012C C10-TL-009C C10-TL-008C C10-TL-035C C10-TL-066D C10-TL-068D C10-TL-070D C10-TL-102D C10-TL-109C C10-TL-107C C10-TL-164C C10-TL-201C C12-TL-520C C12-TL-519C C12-TL-518C C12-TL-517 C12-TL-201 C12-TL-102 C12-TL-203 C12-TL-204 C12-TL-205 C12-TL-206 C12-TL-207 C12-TL-208 C12-TL-209 C12-TL-210 C12-TL-211 C12-TL-213 2CL-A27

Cable: C10BRA1055
Seg Code: L System: BRA Startup Code:

Rev: 00

Description:

2C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): No. of Cables: 1 Type Code: 20156 End Length(m): 15 Elevation: Schematic: ED-692776

Service: 120V AC BLOCK-1 UPSDB-1 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 209 10 219 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692776 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRA Compartment: Description: 120V AC BLK-1 UPSDB-1 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C13-MBR-10-GH-001 Compartment: Description: DIVERTER DAMPER LCP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-123 C10-TL-120 C10-TL-046 C10-TL-045 C10-TL-019 CABLE C10-TL-018C C10-TL-020C C10-TL-022B C10-TL-026A C10-TL-025B C10-TL-219B C10-TL-218B C10-TL-216 C10-TL-214 C10-TL-211 C13-TL-518 C13-TL-517 C13-TL-516 C13-TL-201 C13-TL-102 C13-TL-203 C13-TL-204 C13-TL-205 C13-TL-206 C13-TL-207 C13-TL-208 C13-TL-209 C13-TL-210 C13-TL-211 C13-TL-213 3CL-A27

Page 237 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
2C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 20156 End Length(m): 15 Elevation: Schematic: ED-692776

Cable: C10BRA1056
Seg Code: L System: BRA Startup Code:

Service: 120V AC BLOCK-1 UPSDB-1 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 209 10 219 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692776 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRA Compartment: Description: 120V AC BLK-1 UPSDB-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C13-MBR-10-GH-001 Compartment: Description: DIVERTER DAMPER LCP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685856

Routing Information: Remarks: Route: CABLE C10-TL-123 C10-TL-120 C10-TL-046 C10-TL-045 C10-TL-019 CABLE C10-TL-018C C10-TL-020C C10-TL-022B C10-TL-026A C10-TL-025B C10-TL-219B C10-TL-218B C10-TL-216 C10-TL-214 C10-TL-211 C13-TL-518 C13-TL-517 C13-TL-516 C13-TL-201 C13-TL-102 C13-TL-203 C13-TL-204 C13-TL-205 C13-TL-206 C13-TL-207 C13-TL-208 C13-TL-209 C13-TL-210 C13-TL-211 C13-TL-213 3CL-A27

Cable: C10BRA1057
Seg Code: L System: BRA Startup Code:

Rev: 00

Description:

2C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): No. of Cables: 1 Type Code: 20156 End Length(m): 0 Elevation: Schematic: ED-692776

Service: 120V AC BLOCK-1 UPSDB-1 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 10 2 12 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692776 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRA Compartment: Description: 120V AC BLK-1 UPSDB-1 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: FIELD ROUTED

Cable To End: Equipment No: C10-CYE-63-GH-204 Compartment: Description: BLK-1 MV/ LV BLDG FIRE SYSTEM BPS-2 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BRC1001
Seg Code: L System: BRC Startup Code:

Rev: 01

Description:

2C X 300 SQ.MM, 0.6/1kV


Pull Length(m): 29 No. of Cables: 1 Type Code: 23006 End Length(m): 12 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 27 3 30 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 6

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BTU03 Compartment: Description: 120V AC UPS-2A BATTERY FOR BLK-1 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BTZ03 Compartment: Description: BATTERY MNTRG PNL (BLK-1 UPS-2A) North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: C10-C-1007 C10-TL-020E C10-TL-018E C10-TL-016B C10-TL-015D CABLE

Page 238 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
2C X 300 SQ.MM, 0.6/1kV
Pull Length(m): 29 No. of Cables: 1 Type Code: 23006 End Length(m): 12 Elevation: Schematic: ED-692777

Cable: C10BRC1002
Seg Code: L System: BRC Startup Code:

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 27 3 30 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 6

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BTU03 Compartment: Description: 120V AC UPS-2A BATTERY FOR BLK-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BTZ03 Compartment: Description: BATTERY MNTRG PNL (BLK-1 UPS-2A) North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: C10-C-1008 C10-TL-020E C10-TL-018E C10-TL-016B C10-TL-015D CABLE

Cable: C10BRC1003
Seg Code: L System: BRC Startup Code:

Rev: 01

Description:

2C X 300 SQ.MM, 0.6/1kV


Pull Length(m): 29 No. of Cables: 1 Type Code: 23006 End Length(m): 12 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 27 3 30 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 6

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BTU03 Compartment: Description: 120V AC UPS-2A BATTERY FOR BLK-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BTZ03 Compartment: Description: BATTERY MNTRG PNL (BLK-1 UPS-2A) North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: C10-C-1009 C10-TL-020E C10-TL-018E C10-TL-016B C10-TL-015D CABLE

Cable: C10BRC1004
Seg Code: L System: BRC Startup Code:

Rev: 01

Description:

2C X 300 SQ.MM, 0.6/1kV


Pull Length(m): 36 No. of Cables: 1 Type Code: 23006 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 35 4 39 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BTZ03 Compartment: Description: BATTERY MNTRG PNL (BLK-1 UPS-2A) Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BRU03 Compartment: Description: 120V AC BLK-1 UPS-2A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-028B C10-TL-027B C10-TL-047 C10-TL-117 C10-TL-121 C10-TL-124 C10-TL-127 CABLE

Cable: C10BRC1005
Seg Code: L System: BRC Startup Code:

Rev: 01

Description:

2C X 300 SQ.MM, 0.6/1kV


Pull Length(m): 36 No. of Cables: 1 Type Code: 23006 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 35 4 39 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BTZ03 Compartment: Description: BATTERY MNTRG PNL (BLK-1 UPS-2A) Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BRU03 Compartment: Description: 120V AC BLK-1 UPS-2A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-028B C10-TL-027B C10-TL-047 C10-TL-117 C10-TL-121 C10-TL-124 C10-TL-127 CABLE

Page 239 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
2C X 300 SQ.MM, 0.6/1kV
Pull Length(m): 36 No. of Cables: 1 Type Code: 23006 End Length(m): 5 Elevation: Schematic: ED-692777

Cable: C10BRC1006
Seg Code: L System: BRC Startup Code:

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 35 4 39 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BTZ03 Compartment: Description: BATTERY MNTRG PNL (BLK-1 UPS-2A) Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BRU03 Compartment: Description: 120V AC BLK-1 UPS-2A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-028B C10-TL-027B C10-TL-047 C10-TL-117 C10-TL-121 C10-TL-124 C10-TL-127 CABLE

Cable: C10BRC1007
Seg Code: L System: BRC Startup Code:

Rev: 01

Description:

2C X 300 SQ.MM, 0.6/1kV


Pull Length(m): 29 No. of Cables: 1 Type Code: 23006 End Length(m): 12 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 27 3 30 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 6

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BTU04 Compartment: Description: 120V AC UPS-2B BATTERY FOR BLK-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BTZ04 Compartment: Description: BATTERY MNTRG PNL (BLK-1 UPS-2B) North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: C10-C-1010 C10-TL-020E C10-TL-018E C10-TL-016B C10-TL-015D CABLE

Cable: C10BRC1008
Seg Code: L System: BRC Startup Code:

Rev: 01

Description:

2C X 300 SQ.MM, 0.6/1kV


Pull Length(m): 29 No. of Cables: 1 Type Code: 23006 End Length(m): 12 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 27 3 30 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 6

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BTU04 Compartment: Description: 120V AC UPS-2B BATTERY FOR BLK-1 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BTZ04 Compartment: Description: BATTERY MNTRG PNL (BLK-1 UPS-2B) North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: C10-C-1011 C10-TL-020E C10-TL-018E C10-TL-016B C10-TL-015D CABLE

Cable: C10BRC1009
Seg Code: L System: BRC Startup Code:

Rev: 01

Description:

2C X 300 SQ.MM, 0.6/1kV


Pull Length(m): 29 No. of Cables: 1 Type Code: 23006 End Length(m): 12 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 27 3 30 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 6

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BTU04 Compartment: Description: 120V AC UPS-2B BATTERY FOR BLK-1 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BTZ04 Compartment: Description: BATTERY MNTRG PNL (BLK-1 UPS-2B) North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: C10-C-1012 C10-TL-020E C10-TL-018E C10-TL-016B C10-TL-015D CABLE

Page 240 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
2C X 300 SQ.MM, 0.6/1kV
Pull Length(m): 36 No. of Cables: 1 Type Code: 23006 End Length(m): 5 Elevation: Schematic: ED-692777

Cable: C10BRC1010
Seg Code: L System: BRC Startup Code:

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 35 4 39 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BTZ04 Compartment: Description: BATTERY MNTRG PNL (BLK-1 UPS-2B) Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BRU04 Compartment: Description: 120V AC BLK-1 UPS-2B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-028B C10-TL-027B C10-TL-047 C10-TL-117 C10-TL-121 C10-TL-124 C10-TL-127 CABLE

Cable: C10BRC1011
Seg Code: L System: BRC Startup Code:

Rev: 01

Description:

2C X 300 SQ.MM, 0.6/1kV


Pull Length(m): 36 No. of Cables: 1 Type Code: 23006 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 35 4 39 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BTZ04 Compartment: Description: BATTERY MNTRG PNL (BLK-1 UPS-2B) Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BRU04 Compartment: Description: 120V AC BLK-1 UPS-2B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-028B C10-TL-027B C10-TL-047 C10-TL-117 C10-TL-121 C10-TL-124 C10-TL-127 CABLE

Cable: C10BRC1012
Seg Code: L System: BRC Startup Code:

Rev: 01

Description:

2C X 300 SQ.MM, 0.6/1kV


Pull Length(m): 36 No. of Cables: 1 Type Code: 23006 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 35 4 39 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BTZ04 Compartment: Description: BATTERY MNTRG PNL (BLK-1 UPS-2B) Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BRU04 Compartment: Description: 120V AC BLK-1 UPS-2B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-028B C10-TL-027B C10-TL-047 C10-TL-117 C10-TL-121 C10-TL-124 C10-TL-127 CABLE

Page 241 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
2C X 2.5 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 20026 End Length(m): 7 Elevation: Schematic: ED-692777

Cable: C10BRC1013
Seg Code: L System: BRC Startup Code:

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 289 13 302 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 50

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C11HNE90CQ005 Compartment: Description: HRSG-11 STACK OPACITY MONITOR North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685564

Routing Information: Remarks: Route: CABLE C10-TL-131 C10-TL-128 C10-TL-125 C10-TL-122 C10-TL-118 C10-TL-048 C10-TL-021 C10-TL-020A C10-TL-018A C10-TL-017A C10-TL-041 C10-TL-029A C10-TL-030A CABLE C10-TL-031C C10-TL-032C C10-TL-033C C10-TL-036C C10-TL-065B C10-TL-101B C10-TL-103C C10-TL-104C C10-TL-105C C10-TL-166C C10-TL-204C C11-TL-321C C11-TL-520C C11-TL-519C C11-TL-518C C11-TL-517C C11-TL-516 C11-TL-201 C11-TL-102 C11-TL-203 C11-TL-101 C11-TL-301 C11-TL-302 C11-TL-311 C11-TL-322 FIELD ROUTED

Cable: C10BRC1015
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 25 SQ.MM, 0.6/1kV
Pull Length(m): 351 No. of Cables: 1 Type Code: 20256 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 250 12 262 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 15

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BRF Compartment: Description: 120V AC HRSG-1 RDLI UPS SUB-DB North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-129 C10-TL-126 C10-TL-123 C10-TL-120 C10-TL-046 C10-TL-045 C10-TL-019 CABLE C10-TL-018A C10-TL-017A C10-TL-041 C10-TL-029A C10-TL-030A C10-TL-031A C10-TL-032A C10-TL-033A C10-TL-036A C10-TL-066A C10-TL-068A C10-TL-070A C10-TL-102A C10-TL-103A C10-TL-104A C10-TL-105A C10-TL-166A C10-TL-204A C11-TL-521A C11-TL-520A C11-TL-519A C11-TL-518A C11-TL-517A C11-TL-515A C11-TL-514A C11-TL-513A C11-TL-510A C11-TL-512A C11-C-1209

Cable: C10BRC1016
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 25 SQ.MM, 0.6/1kV
Pull Length(m): 297 No. of Cables: 1 Type Code: 20256 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 250 12 262 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 15

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BRF Compartment: Description: 120V AC HRSG-1 RDLI UPS SUB-DB North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-129 C10-TL-126 C10-TL-123 C10-TL-120 C10-TL-046 C10-TL-045 C10-TL-019 CABLE C10-TL-018A C10-TL-017A C10-TL-041 C10-TL-029A C10-TL-030A C10-TL-031A C10-TL-032A C10-TL-033A C10-TL-036A C10-TL-066A C10-TL-068A C10-TL-070A C10-TL-102A C10-TL-103A C10-TL-104A C10-TL-105A C10-TL-166A C10-TL-204A C11-TL-521A C11-TL-520A C11-TL-519A C11-TL-518A C11-TL-517A C11-TL-515A C11-TL-514A C11-TL-513A C11-TL-510A C11-TL-512A C11-C-1209

Page 242 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
2C X 25 SQ.MM, 0.6/1kV
Pull Length(m): 251 No. of Cables: 1 Type Code: 20256 End Length(m): 5 Elevation: Schematic: ED-692777

Cable: C10BRC1017
Seg Code: L System: BRC Startup Code:

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 202 10 212 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BRG Compartment: Description: 120V AC HRSG-2 RDLI UPS SUB-DB North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-128 C10-TL-125 C10-TL-122 C10-TL-118 C10-TL-048 C10-TL-021 C10-TL-020A C10-TL-018A C10-TL-017A C10-TL-041 C10-TL-029A C10-TL-030A C10-TL-031A C10-TL-032A C10-TL-011A C10-TL-010A C10-TL-009A C10-TL-008A C10-TL-035A C10-TL-066B C10-TL-068B C10-TL-070B C10-TL-102B C10-TL-109A C10-TL-107A C10-TL-164A C10-TL-201A C12-TL-520A C12-TL-519A C12-TL-518A C12-TL-516A C12-TL-515A C12-TL-514 C12-TL-510A C12-TL-512A C12-C-1310

Cable: C10BRC1018
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 25 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 20256 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 202 10 212 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BRG Compartment: Description: 120V AC HRSG-2 RDLI UPS SUB-DB North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-128 C10-TL-125 C10-TL-122 C10-TL-118 C10-TL-048 C10-TL-021 C10-TL-020A C10-TL-018A C10-TL-017A C10-TL-041 C10-TL-029A C10-TL-030A C10-TL-031A C10-TL-032A C10-TL-011A C10-TL-010A C10-TL-009A C10-TL-008A C10-TL-035A C10-TL-066B C10-TL-068B C10-TL-070B C10-TL-102B C10-TL-109A C10-TL-107A C10-TL-164A C10-TL-201A C12-TL-520A C12-TL-519A C12-TL-518A C12-TL-516A C12-TL-515A C12-TL-514 C12-TL-510A C12-TL-512A C12-C-1310

Cable: C10BRC1019
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 16 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 20166 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 123 7 130 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 1

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BRH Compartment: Description: 120V AC HRSG-3 RDLI UPS SUB-DB North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C30-TL-129 C30-TL-126 C30-TL-123 C30-TL-120 C30-TL-046 C30-TL-045 C30-TL-019 C30-TL-018D C30-TL-016A C30-TL-004B CABLE C10-TL-005B C10-TL-006B C10-TL-007B C10-TL-035E C10-TL-066F C10-TL-068F C10-TL-070F C10-TL-102F C10-TL-108B C10-TL-106B C10-TL-163B C10-TL-202B C13-TL-515B C13-TL-513 C13-TL-512B C13-C-1303

Page 243 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
2C X 16 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 20166 End Length(m): 5 Elevation: Schematic: ED-692777

Cable: C10BRC1020
Seg Code: L System: BRC Startup Code:

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 123 7 130 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 1

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BRH Compartment: Description: 120V AC HRSG-3 RDLI UPS SUB-DB North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C30-TL-129 C30-TL-126 C30-TL-123 C30-TL-120 C30-TL-046 C30-TL-045 C30-TL-019 C30-TL-018D C30-TL-016A C30-TL-004B CABLE C10-TL-005B C10-TL-006B C10-TL-007B C10-TL-035E C10-TL-066F C10-TL-068F C10-TL-070F C10-TL-102F C10-TL-108B C10-TL-106B C10-TL-163B C10-TL-202B C13-TL-515B C13-TL-513 C13-TL-512B C13-C-1303

Cable: C10BRC1021
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 6 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 20066 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 18 3 21 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 7

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 C10-TL-126 CABLE

Cable To End: Equipment No: C10-CRC-61-GW-100 Compartment: Description: DGP-MV/LV-1 (ELECTRICAL ROOM(2FL)) North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BRC1022
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 6 SQ.MM, 0.6/1kV
Pull Length(m): 295 No. of Cables: 1 Type Code: 20066 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 278 13 291 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 7

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-CRL-61-GW-100 Compartment: Description: DGP-COMPRESSED AIR BLDG-1 (CONTROL ROOM) North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681141

Routing Information: Remarks: Route: CABLE C10-TL-128 C10-TL-125 C10-TL-122 C10-TL-118 C10-TL-048 C10-TL-021 C10-TL-020A C10-TL-018A C10-TL-017A C10-TL-041 C10-TL-029A C10-TL-030A C10-TL-031A C10-TL-032A C10-TL-011A C10-TL-010A C10-TL-009A C10-TL-008A C10-TL-035A C10-TL-066B C10-TL-068B C10-TL-070B C10-TL-102B C10-TL-109A C10-TL-107A C10-TL-164A C10-TL-201A C12-TL-520A C12-TL-519A C12-TL-518A C12-TL-516A C12-TL-515A C12-TL-514 C12-TL-512A C12-TL-511A C12-D001-03 C12-EMH-001 C10-D030-02 C10-EMH-012 C10-D031-02 C10-EMH-013 C10-D029-02 C10-EMH-011 C10-D026-02 CABLE C10-TL-201 C10-TL-202 CABLE

Page 244 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
2C X 2.5 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 20026 End Length(m): 7 Elevation: Schematic: ED-692777

Cable: C10BRC1023
Seg Code: L System: BRC Startup Code:

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 246 12 258 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 50

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C12HNE90CQ005 Compartment: Description: HRSG-12 STACK OPACITY MONITOR North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685564

Routing Information: Remarks: Route: CABLE C10-TL-131 C10-TL-128 C10-TL-125 C10-TL-122 C10-TL-118 C10-TL-048 C10-TL-021 C10-TL-020A C10-TL-018A C10-TL-017A C10-TL-041 C10-TL-029A CABLE C10-TL-030C C10-TL-014B C10-TL-012C C10-TL-009C C10-TL-008C C10-TL-035C C10-TL-066D C10-TL-068D C10-TL-070D C10-TL-102D C10-TL-109C C10-TL-107C C10-TL-164C C10-TL-201C C12-TL-520C C12-TL-519C C12-TL-518C C12-TL-517 C12-TL-201 C12-TL-102 C12-TL-203 C12-TL-101 C12-TL-301 C12-TL-302 C12-TL-311 C12-TL-322 FIELD ROUTED

Cable: C10BRC1024
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): No. of Cables: 1 Type Code: 20026 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 189 10 199 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 50

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C13HNE90CQ005 Compartment: Description: HRSG-13 STACK OPACITY MONITOR North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-685564

Routing Information: Remarks: Route: CABLE C10-TL-130 C10-TL-127 C10-TL-124 C10-TL-121 C10-TL-117 C10-TL-047 C10-TL-026B CABLE C10-TL-025B C10-TL-219B C10-TL-218B C10-TL-216 C10-TL-214 C10-TL-211 C13-TL-518 C13-TL-517 C13-TL-516 C13-TL-201 C13-TL-102 C13-TL-203 C13-TL-101 C13-TL-301 C13-TL-302 C13-TL-311 C13-TL-322 FIELD ROUTED

Cable: C10BRC1027
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 18 No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 18 3 21 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 7

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 C10-TL-126 CABLE

Cable To End: Equipment No: C11-CPB-66-GH-001 Compartment: Description: B1H1 CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Page 245 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
2C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 18 No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-692777

Cable: C10BRC1028
Seg Code: L System: BRC Startup Code:

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 18 3 21 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 7

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 C10-TL-126 CABLE

Cable To End: Equipment No: C11-CPB-66-GH-001 Compartment: Description: B1H1 CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BRC1029
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 16 No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 17 3 20 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 12

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 CABLE

Cable To End: Equipment No: C12-CPB-66-GH-001 Compartment: Description: B1H2 CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BRC1030
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 16 No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 17 3 20 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 12

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 CABLE

Cable To End: Equipment No: C12-CPB-66-GH-001 Compartment: Description: B1H2 CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BRC1031
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 26 No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 22 3 25 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 12

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 C10-TL-132 CABLE

Cable To End: Equipment No: C13-CPB-66-GH-001 Compartment: Description: B1H3 CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Page 246 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
2C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 26 No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-692777

Cable: C10BRC1032
Seg Code: L System: BRC Startup Code:

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 22 3 25 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 12

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 C10-TL-132 CABLE

Cable To End: Equipment No: C13-CPB-66-GH-001 Compartment: Description: B1H3 CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BRC1033
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 23 No. of Cables: 1 Type Code: 20026 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 19 3 22 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 8

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 C10-TL-126 CABLE

Cable To End: Equipment No: C11-CPB-66-GH-002 Compartment: Description: B1H1 I/O CABINET-1_TMR North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BRC1034
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 23 No. of Cables: 1 Type Code: 20026 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 19 3 22 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 8

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 C10-TL-126 CABLE

Cable To End: Equipment No: C11-CPB-66-GH-002 Compartment: Description: B1H1 I/O CABINET-1_TMR North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BRC1035
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 25 No. of Cables: 1 Type Code: 20026 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 20 3 23 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 9

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 C10-TL-126 CABLE

Cable To End: Equipment No: C11-CPB-66-GH-003 Compartment: Description: B1H1 I/O CABINET-2_SIMP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Page 247 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
2C X 2.5 SQ.MM, 0.6/1kV
Pull Length(m): 25 No. of Cables: 1 Type Code: 20026 End Length(m): 5 Elevation: Schematic: ED-692777

Cable: C10BRC1036
Seg Code: L System: BRC Startup Code:

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 20 3 23 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 9

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 C10-TL-126 CABLE

Cable To End: Equipment No: C11-CPB-66-GH-003 Compartment: Description: B1H1 I/O CABINET-2_SIMP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BRC1037
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 26 No. of Cables: 1 Type Code: 20026 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 22 3 25 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 7

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 C10-TL-126 C10-TL-123 CABLE

Cable To End: Equipment No: C11-CPB-66-GH-004 Compartment: Description: B1H1 I/O CABINET-3_SIMP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BRC1038
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 26 No. of Cables: 1 Type Code: 20026 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 22 3 25 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 7

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 C10-TL-126 C10-TL-123 CABLE

Cable To End: Equipment No: C11-CPB-66-GH-004 Compartment: Description: B1H1 I/O CABINET-3_SIMP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BRC1039
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 20 No. of Cables: 1 Type Code: 20026 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 15 3 18 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 CABLE

Cable To End: Equipment No: C12-CPB-66-GH-002 Compartment: Description: B1H2 I/O CABINET-1_TMR North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Page 248 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
2C X 2.5 SQ.MM, 0.6/1kV
Pull Length(m): 20 No. of Cables: 1 Type Code: 20026 End Length(m): 5 Elevation: Schematic: ED-692777

Cable: C10BRC1040
Seg Code: L System: BRC Startup Code:

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 15 3 18 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 CABLE

Cable To End: Equipment No: C12-CPB-66-GH-002 Compartment: Description: B1H2 I/O CABINET-1_TMR North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BRC1041
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 20 No. of Cables: 1 Type Code: 20026 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 14 3 17 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 9

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 CABLE

Cable To End: Equipment No: C12-CPB-66-GH-003 Compartment: Description: B1H2 I/O CABINET-2_SIMP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BRC1042
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 20 No. of Cables: 1 Type Code: 20026 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 14 3 17 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 9

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 CABLE

Cable To End: Equipment No: C12-CPB-66-GH-003 Compartment: Description: B1H2 I/O CABINET-2_SIMP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BRC1043
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 17 No. of Cables: 1 Type Code: 20026 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 12 2 14 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 7

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 CABLE

Cable To End: Equipment No: C12-CPB-66-GH-004 Compartment: Description: B1H2 I/O CABINET-3_SIMP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Page 249 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
2C X 2.5 SQ.MM, 0.6/1kV
Pull Length(m): 17 No. of Cables: 1 Type Code: 20026 End Length(m): 5 Elevation: Schematic: ED-692777

Cable: C10BRC1044
Seg Code: L System: BRC Startup Code:

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 12 2 14 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 7

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 CABLE

Cable To End: Equipment No: C12-CPB-66-GH-004 Compartment: Description: B1H2 I/O CABINET-3_SIMP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BRC1045
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 27 No. of Cables: 1 Type Code: 20026 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 22 3 25 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 12

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 C10-TL-132 CABLE

Cable To End: Equipment No: C13-CPB-66-GH-002 Compartment: Description: B1H3 I/O CABINET-1_TMR North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BRC1046
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 27 No. of Cables: 1 Type Code: 20026 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 22 3 25 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 12

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 C10-TL-132 CABLE

Cable To End: Equipment No: C13-CPB-66-GH-002 Compartment: Description: B1H3 I/O CABINET-1_TMR North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BRC1047
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 25 No. of Cables: 1 Type Code: 20026 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 22 3 25 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 12

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 C10-TL-132 CABLE

Cable To End: Equipment No: C13-CPB-66-GH-003 Compartment: Description: B1H3 I/O CABINET-2_SIMP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Page 250 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
2C X 2.5 SQ.MM, 0.6/1kV
Pull Length(m): 25 No. of Cables: 1 Type Code: 20026 End Length(m): 5 Elevation: Schematic: ED-692777

Cable: C10BRC1048
Seg Code: L System: BRC Startup Code:

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 22 3 25 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 12

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 C10-TL-132 CABLE

Cable To End: Equipment No: C13-CPB-66-GH-003 Compartment: Description: B1H3 I/O CABINET-2_SIMP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BRC1049
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 32 No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 27 3 30 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 12

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 C10-TL-126 C10-TL-123 CABLE

Cable To End: Equipment No: C11-CPB-66-GH-011 Compartment: Description: B1H1T CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BRC1050
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 32 No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 27 3 30 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 12

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 C10-TL-126 C10-TL-123 CABLE

Cable To End: Equipment No: C11-CPB-66-GH-011 Compartment: Description: B1H1T CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BRC1051
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 22 No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 17 3 20 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 12

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 CABLE

Cable To End: Equipment No: C12-CPB-66-GH-011 Compartment: Description: B1H2T CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Page 251 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
2C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 22 No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-692777

Cable: C10BRC1052
Seg Code: L System: BRC Startup Code:

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 17 3 20 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 12

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 CABLE

Cable To End: Equipment No: C12-CPB-66-GH-011 Compartment: Description: B1H2T CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BRC1053
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 18 No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 17 3 20 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 12

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 CABLE

Cable To End: Equipment No: C13-CPB-66-GH-011 Compartment: Description: B1H3T CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BRC1054
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 18 No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 17 3 20 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 12

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 CABLE

Cable To End: Equipment No: C13-CPB-66-GH-011 Compartment: Description: B1H3T CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BRC1055
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 30 No. of Cables: 1 Type Code: 20026 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 26 3 29 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 11

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 C10-TL-126 C10-TL-123 CABLE

Cable To End: Equipment No: C11-CPB-66-GH-013 Compartment: Description: B1H1T I/O CABINET-1_TMR North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Page 252 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
2C X 2.5 SQ.MM, 0.6/1kV
Pull Length(m): 30 No. of Cables: 1 Type Code: 20026 End Length(m): 5 Elevation: Schematic: ED-692777

Cable: C10BRC1056
Seg Code: L System: BRC Startup Code:

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 26 3 29 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 11

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 C10-TL-126 C10-TL-123 CABLE

Cable To End: Equipment No: C11-CPB-66-GH-013 Compartment: Description: B1H1T I/O CABINET-1_TMR North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BRC1057
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 20 No. of Cables: 1 Type Code: 20026 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 16 3 19 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 11

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 CABLE

Cable To End: Equipment No: C12-CPB-66-GH-013 Compartment: Description: B1H2T I/O CABINET-1_TMR North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BRC1058
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 20 No. of Cables: 1 Type Code: 20026 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 16 3 19 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 11

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 CABLE

Cable To End: Equipment No: C12-CPB-66-GH-013 Compartment: Description: B1H2T I/O CABINET-1_TMR North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BRC1059
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 22 No. of Cables: 1 Type Code: 20026 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 15 3 18 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 CABLE

Cable To End: Equipment No: C13-CPB-66-GH-013 Compartment: Description: B1H3T I/O CABINET-1_TMR North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Page 253 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
2C X 2.5 SQ.MM, 0.6/1kV
Pull Length(m): 22 No. of Cables: 1 Type Code: 20026 End Length(m): 5 Elevation: Schematic: ED-692777

Cable: C10BRC1060
Seg Code: L System: BRC Startup Code:

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 15 3 18 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 CABLE

Cable To End: Equipment No: C13-CPB-66-GH-013 Compartment: Description: B1H3T I/O CABINET-1_TMR North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BRC1061
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 15 No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 11 2 13 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 6

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 CABLE

Cable To End: Equipment No: C10-CPB-66-GH-021 Compartment: Description: B1BT CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BRC1062
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 15 No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 11 2 13 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 6

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 CABLE

Cable To End: Equipment No: C10-CPB-66-GH-021 Compartment: Description: B1BT CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BRC1063
Seg Code: L System: BRC Startup Code:

Rev: 01

Description:

2C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 18 No. of Cables: 1 Type Code: 20026 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 12 2 14 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 7

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 CABLE

Cable To End: Equipment No: C10-CPB-66-GH-022 Compartment: Description: B1BT I/O CABINET-1_TMR North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Page 254 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
2C X 2.5 SQ.MM, 0.6/1kV
Pull Length(m): 18 No. of Cables: 1 Type Code: 20026 End Length(m): 5 Elevation: Schematic: ED-692777

Cable: C10BRC1064
Seg Code: L System: BRC Startup Code:

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 12 2 14 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 7

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 CABLE

Cable To End: Equipment No: C10-CPB-66-GH-022 Compartment: Description: B1BT I/O CABINET-1_TMR North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BRC1065
Seg Code: L System: BRC Startup Code:

Rev: 01

Description:

2C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 20 No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 14 3 17 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 9

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 CABLE

Cable To End: Equipment No: C10-CPB-66-GH-023 Compartment: Description: B1BT I/O CABINET-2_TMR North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BRC1066
Seg Code: L System: BRC Startup Code:

Rev: 01

Description:

2C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 20 No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 14 3 17 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 9

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 CABLE

Cable To End: Equipment No: C10-CPB-66-GH-023 Compartment: Description: B1BT I/O CABINET-2_TMR North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BRC1067
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 20 No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 20 3 23 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 C10-TL-132 CABLE

Cable To End: Equipment No: C10-CPB-66-GH-024 Compartment: Description: B1BT I/O CABINET-3_SIMP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Page 255 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
2C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 20 No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-692777

Cable: C10BRC1068
Seg Code: L System: BRC Startup Code:

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 20 3 23 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 C10-TL-132 CABLE

Cable To End: Equipment No: C10-CPB-66-GH-024 Compartment: Description: B1BT I/O CABINET-3_SIMP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BRC1069
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 28 No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 22 3 25 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 11

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 C10-TL-126 CABLE

Cable To End: Equipment No: C10-CPB-66-GH-011 Compartment: Description: B1E CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BRC1070
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 28 No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 22 3 25 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 11

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 C10-TL-126 CABLE

Cable To End: Equipment No: C10-CPB-66-GH-011 Compartment: Description: B1E CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BRC1071
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 27 No. of Cables: 1 Type Code: 20026 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 22 3 25 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 11

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 C10-TL-126 CABLE

Cable To End: Equipment No: C10-CPB-66-GH-012 Compartment: Description: B1E I/O CABINET-1_SIMP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Page 256 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
2C X 2.5 SQ.MM, 0.6/1kV
Pull Length(m): 27 No. of Cables: 1 Type Code: 20026 End Length(m): 5 Elevation: Schematic: ED-692777

Cable: C10BRC1072
Seg Code: L System: BRC Startup Code:

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 22 3 25 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 11

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 C10-TL-126 CABLE

Cable To End: Equipment No: C10-CPB-66-GH-012 Compartment: Description: B1E I/O CABINET-1_SIMP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BRC1073
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 26 No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 23 3 26 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 12

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 C10-TL-126 CABLE

Cable To End: Equipment No: C10-CPB-66-GH-013 Compartment: Description: B1E I/O CABINET-2_SIMP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BRC1074
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 26 No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 23 3 26 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 12

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 C10-TL-126 CABLE

Cable To End: Equipment No: C10-CPB-66-GH-013 Compartment: Description: B1E I/O CABINET-2_SIMP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BRC1075
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 33 No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 29 4 33 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 14

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 C10-TL-126 C10-TL-123 CABLE

Cable To End: Equipment No: C10-CPB-66-GH-001 Compartment: Description: B1C CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Page 257 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
2C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 33 No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-692777

Cable: C10BRC1076
Seg Code: L System: BRC Startup Code:

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 29 4 33 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 14

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 C10-TL-126 C10-TL-123 CABLE

Cable To End: Equipment No: C10-CPB-66-GH-001 Compartment: Description: B1C CONTROLLER CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BRC1077
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 4 SQ.MM, 0.6/1kV
Pull Length(m): 36 No. of Cables: 1 Type Code: 20046 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 28 3 31 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 13

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 C10-TL-126 C10-TL-123 CABLE

Cable To End: Equipment No: C10-CPB-66-GH-002 Compartment: Description: B1C I/O CABINET-1_TMR North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BRC1078
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 4 SQ.MM, 0.6/1kV
Pull Length(m): 36 No. of Cables: 1 Type Code: 20046 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 28 3 31 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 13

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 C10-TL-126 C10-TL-123 CABLE

Cable To End: Equipment No: C10-CPB-66-GH-002 Compartment: Description: B1C I/O CABINET-1_TMR North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BRC1079
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 32 No. of Cables: 1 Type Code: 20026 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 27 3 30 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 12

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 C10-TL-126 C10-TL-123 CABLE

Cable To End: Equipment No: C10-CPB-66-GH-003 Compartment: Description: B1C I/O CABINET-2_TMR North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Page 258 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
2C X 2.5 SQ.MM, 0.6/1kV
Pull Length(m): 32 No. of Cables: 1 Type Code: 20026 End Length(m): 5 Elevation: Schematic: ED-692777

Cable: C10BRC1080
Seg Code: L System: BRC Startup Code:

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 27 3 30 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 12

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 C10-TL-126 C10-TL-123 CABLE

Cable To End: Equipment No: C10-CPB-66-GH-003 Compartment: Description: B1C I/O CABINET-2_TMR North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BRC1081
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 4 SQ.MM, 0.6/1kV
Pull Length(m): 32 No. of Cables: 1 Type Code: 20046 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 25 3 28 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 C10-TL-126 C10-TL-123 CABLE

Cable To End: Equipment No: C10-CPB-66-GH-004 Compartment: Description: B1C I/O CABINET-3_SIMP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BRC1082
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 4 SQ.MM, 0.6/1kV
Pull Length(m): 32 No. of Cables: 1 Type Code: 20046 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 25 3 28 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 C10-TL-126 C10-TL-123 CABLE

Cable To End: Equipment No: C10-CPB-66-GH-004 Compartment: Description: B1C I/O CABINET-3_SIMP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BRC1083
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 4 SQ.MM, 0.6/1kV
Pull Length(m): 36 No. of Cables: 1 Type Code: 20046 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 27 3 30 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 12

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 C10-TL-126 C10-TL-123 CABLE

Cable To End: Equipment No: C10-CPB-66-GH-005 Compartment: Description: B1C I/O CABINET-4_SIMP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Page 259 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
2C X 4 SQ.MM, 0.6/1kV
Pull Length(m): 36 No. of Cables: 1 Type Code: 20046 End Length(m): 5 Elevation: Schematic: ED-692777

Cable: C10BRC1084
Seg Code: L System: BRC Startup Code:

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 27 3 30 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 12

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 C10-TL-126 C10-TL-123 CABLE

Cable To End: Equipment No: C10-CPB-66-GH-005 Compartment: Description: B1C I/O CABINET-4_SIMP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BRC1085
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 25 No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 18 3 21 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 13

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 CABLE

Cable To End: Equipment No: C10-CPB-66-GN-001 Compartment: Description: B1C NETWORK CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BRC1086
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 25 No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 18 3 21 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 13

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 CABLE

Cable To End: Equipment No: C10-CPB-66-GN-001 Compartment: Description: B1C NETWORK CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Page 260 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
2C X 2.5 SQ.MM, 0.6/1kV
Pull Length(m): 30 No. of Cables: 1 Type Code: 20026 End Length(m): 5 Elevation: Schematic: ED-692777

Cable: C10BRC1087
Seg Code: L System: BRC Startup Code:

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 297 14 311 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-QFB-31-CM-001 Compartment: Description: BLK-1 IA DRYR-A AFT-FLTR DEW POINT North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-680571

Routing Information: Remarks: Route: CABLE C10-TL-128 C10-TL-125 C10-TL-122 C10-TL-118 C10-TL-048 C10-TL-021 C10-TL-020A C10-TL-018A C10-TL-017A C10-TL-041 C10-TL-029A C10-TL-030A C10-TL-031A C10-TL-032A C10-TL-011A C10-TL-009A C10-TL-008A C10-TL-035A C10-TL-066B C10-TL-068B C10-TL-070B C10-TL-102B C10-TL-109A C10-TL-107A C10-TL-164A C10-TL-201A C12-TL-520A C12-TL-519A C12-TL-518A C12-TL-516A C12-TL-515A C12-TL-514 C12-TL-512A C12-TL-511A C12-D001-04 C12-EMH-001 C10-D030-04 C10-EMH-012 C10-D031-04 C10-EMH-013 C10-D029-04 C10-EMH-011 C10-D026-04 CABLE C10-TL-201 CABLE C10-D027-04 FIELD ROUTED

Cable: C10BRC1089
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 22 No. of Cables: 1 Type Code: 20026 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 297 14 311 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-QFB-31-CM-002 Compartment: Description: BLK-1 IA DRYR-B AFT-FLTR DEW POINT North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-680571

Routing Information: Remarks: Route: CABLE C10-TL-128 C10-TL-125 C10-TL-122 C10-TL-118 C10-TL-048 C10-TL-021 C10-TL-020A C10-TL-018A C10-TL-017A C10-TL-041 C10-TL-029A C10-TL-030A C10-TL-031A C10-TL-032A C10-TL-011A C10-TL-009A C10-TL-008A C10-TL-035A C10-TL-066B C10-TL-068B C10-TL-070B C10-TL-102B C10-TL-109A C10-TL-107A C10-TL-164A C10-TL-201A C12-TL-520A C12-TL-519A C12-TL-518A C12-TL-516A C12-TL-515A C12-TL-514 C12-TL-512A C12-TL-511A C12-D001-04 C12-EMH-001 C10-D030-04 C10-EMH-012 C10-D031-04 C10-EMH-013 C10-D029-04 C10-EMH-011 C10-D026-04 CABLE C10-TL-201 CABLE C10-D027-04 FIELD ROUTED

Cable: C10BRC1090
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 22 No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 25 3 28 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-131 C10-TL-128 C10-TL-125 CABLE

Cable To End: Equipment No: C11-CPB-66-GH-012 Compartment: Description: B1H1T I/O CABINET-2_TMR North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Page 261 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
2C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 25 No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-692777

Cable: C10BRC1091
Seg Code: L System: BRC Startup Code:

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 25 3 28 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-131 C10-TL-128 C10-TL-125 CABLE

Cable To End: Equipment No: C11-CPB-66-GH-012 Compartment: Description: B1H1T I/O CABINET-2_TMR North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BRC1092
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 25 No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 15 3 18 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-131 CABLE

Cable To End: Equipment No: C12-CPB-66-GH-012 Compartment: Description: B1H2T I/O CABINET-2_TMR North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BRC1093
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 15 3 18 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-131 CABLE

Cable To End: Equipment No: C12-CPB-66-GH-012 Compartment: Description: B1H2T I/O CABINET-2_TMR North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BRC1094
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 15 3 18 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-131 CABLE

Cable To End: Equipment No: C13-CPB-66-GH-012 Compartment: Description: B1H3T I/O CABINET-2_TMR North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Page 262 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
2C X 4 SQ.MM, 0.6/1kV
Pull Length(m): 25 No. of Cables: 1 Type Code: 20046 End Length(m): 5 Elevation: Schematic: ED-692777

Cable: C10BRC1095
Seg Code: L System: BRC Startup Code:

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 20 3 23 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 C10-TL-132 CABLE

Cable To End: Equipment No: C10-CFA-77-GH-001 Description: BLOCK-1 CMS-01 Equip Location: Zone: Location Dwg: EA-681121

Cable: C10BRC1096
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 15 3 18 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-131 CABLE

Cable To End: Equipment No: C13-CPB-66-GH-012 Compartment: Description: B1H3T I/O CABINET-2_TMR North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BRC1097
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 4 SQ.MM, 0.6/1kV
Pull Length(m): 25 No. of Cables: 1 Type Code: 20046 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 21 3 24 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 11

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 C10-TL-132 CABLE

Cable To End: Equipment No: C10-CFA-77-GH-002 Description: BLOCK-1 CMS-02 Equip Location: Zone: Location Dwg: EA-681121

Cable: C10BRC1099
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 4 SQ.MM, 0.6/1kV
Pull Length(m): 25 No. of Cables: 1 Type Code: 20046 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 22 3 25 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 12

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 C10-TL-132 CABLE

Cable To End: Equipment No: C10-CFA-77-GH-003 Description: BLOCK-1 CMS-03 Equip Location: Zone: Location Dwg: EA-681121

Page 263 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
3C X 150 SQ.MM, 0.6/1kV
Pull Length(m): 150 No. of Cables: 1 Type Code: 31506 End Length(m): 12 Elevation: Schematic: ED-692777

Cable: C10BRC1101
Seg Code: L System: BRC Startup Code:

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 156 8 164 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 15

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BRE Compartment: Description: 120V AC STG UPS-2 SUB-DB North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-128 C10-TL-125 C10-TL-122 C10-TL-118 C10-TL-048 C10-TL-021 CABLE C10-TL-023B C10-TL-223B C10-TL-222B C14-TL-202C C14-TL-204C C14-TL-207C C14-TL-049C C14-TL-050C C14-TL-052B C14-TL-053B C14-TL-054B C14-TL-055B C14-TL-065B CABLE

Cable: C10BRC1102
Seg Code: L System: BRC Startup Code:

Rev: 01

Description:

3C X 150 SQ.MM, 0.6/1kV


Pull Length(m): 150 No. of Cables: 1 Type Code: 31506 End Length(m): 12 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 156 8 164 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 15

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BRE Compartment: Description: 120V AC STG UPS-2 SUB-DB North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-128 C10-TL-125 C10-TL-122 C10-TL-118 C10-TL-048 C10-TL-021 CABLE C10-TL-023B C10-TL-223B C10-TL-222B C14-TL-202C C14-TL-204C C14-TL-207C C14-TL-049C C14-TL-050C C14-TL-052B C14-TL-053B C14-TL-054B C14-TL-055B C14-TL-065B CABLE

Cable: C10BRC1103
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 290 No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 259 12 271 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C11-LAB-45-GH-001 Compartment: Description: BLOCK-1 HRSG-1 BFP-1 JB North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-129 C10-TL-126 C10-TL-123 C10-TL-120 C10-TL-046 C10-TL-045 C10-TL-019 CABLE C10-TL-018A C10-TL-017A C10-TL-041 C10-TL-029A C10-TL-030A C10-TL-031A C10-TL-032A C10-TL-033A C10-TL-036A C10-TL-066A C10-TL-068A C10-TL-070A C10-TL-102A C10-TL-103A C10-TL-104A C10-TL-105A C10-TL-166A C10-TL-204A C11-TL-521A C11-TL-520A C11-TL-519A C11-TL-518A C11-TL-517A C11-TL-515A C11-TL-514A C11-TL-513A C11-TL-512A C11-TL-511A C11-D001-04 C11-EMH-001 C11-EC-010

Page 264 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
2C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 290 No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-692777

Cable: C10BRC1105
Seg Code: L System: BRC Startup Code:

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 262 12 274 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C11-LAB-45-GH-002 Compartment: Description: BLOCK-1 HRSG-1 BFP-2 JB North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-129 C10-TL-126 C10-TL-123 C10-TL-120 C10-TL-046 C10-TL-045 C10-TL-019 CABLE C10-TL-018A C10-TL-017A C10-TL-041 C10-TL-029A C10-TL-030A C10-TL-031A C10-TL-032A C10-TL-033A C10-TL-036A C10-TL-066A C10-TL-068A C10-TL-070A C10-TL-102A C10-TL-103A C10-TL-104A C10-TL-105A C10-TL-166A C10-TL-204A C11-TL-521A C11-TL-520A C11-TL-519A C11-TL-518A C11-TL-517A C11-TL-515A C11-TL-514A C11-TL-513A C11-TL-512A C11-TL-511A C11-D001-04 C11-EMH-001 C11-EC-007

Cable: C10BRC1107
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 295 No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 265 12 277 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C11-LAB-45-GH-003 Compartment: Description: BLOCK-1 HRSG-1 BFP-3 JB North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-129 C10-TL-126 C10-TL-123 C10-TL-120 C10-TL-046 C10-TL-045 C10-TL-019 CABLE C10-TL-018A C10-TL-017A C10-TL-041 C10-TL-029A C10-TL-030A C10-TL-031A C10-TL-032A C10-TL-033A C10-TL-036A C10-TL-066A C10-TL-068A C10-TL-070A C10-TL-102A C10-TL-103A C10-TL-104A C10-TL-105A C10-TL-166A C10-TL-204A C11-TL-521A C11-TL-520A C11-TL-519A C11-TL-518A C11-TL-517A C11-TL-515A C11-TL-514A C11-TL-513A C11-TL-512A C11-TL-511A C11-D001-04 C11-EMH-001 C11-EC-004

Cable: C10BRC1109
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 225 No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 213 10 223 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C12-LAB-45-GH-001 Compartment: Description: BLOCK-1 HRSG-2 BFP-1 JB North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-130 C10-TL-127 C10-TL-124 C10-TL-121 C10-TL-117 C10-TL-047 CABLE C10-TL-027A C10-TL-028A C10-TL-015C C10-TL-004A C10-TL-005C CABLE C10-TL-010B C10-TL-009B C10-TL-008B C10-TL-035B C10-TL-066C C10-TL-068C C10-TL-070C C10-TL-102C C10-TL-109B C10-TL-107B C10-TL-164B C10-TL-201B C12-TL-520B C12-TL-519B C12-TL-518B C12-TL-516B C12-TL-515B C12-TL-513 C12-TL-512B C12-TL-511B C12-D001-04 C12-EMH-001 C12-EC-010

Page 265 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
2C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 230 No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-692777

Cable: C10BRC1111
Seg Code: L System: BRC Startup Code:

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 223 11 234 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C12-LAB-45-GH-002 Compartment: Description: BLOCK-1 HRSG-2 BFP-2 JB North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-128 C10-TL-125 C10-TL-122 C10-TL-118 C10-TL-048 C10-TL-021 C10-TL-020A C10-TL-018A C10-TL-017A C10-TL-041 C10-TL-029A C10-TL-030A C10-TL-031A C10-TL-032A C10-TL-011A C10-TL-010A C10-TL-009A C10-TL-008A C10-TL-035A C10-TL-066B C10-TL-068B C10-TL-070B C10-TL-102B C10-TL-109A C10-TL-107A C10-TL-164A C10-TL-201A C12-TL-520A C12-TL-519A C12-TL-518A C12-TL-516A C12-TL-515A C12-TL-514 C12-TL-512A C12-TL-511A C12-D001-03 C12-EMH-001 C12-EC-007

Cable: C10BRC1113
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 233 No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 226 11 237 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C12-LAB-45-GH-003 Compartment: Description: BLOCK-1 HRSG-2 BFP-3 JB North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-128 C10-TL-125 C10-TL-122 C10-TL-118 C10-TL-048 C10-TL-021 C10-TL-020A C10-TL-018A C10-TL-017A C10-TL-041 C10-TL-029A C10-TL-030A C10-TL-031A C10-TL-032A C10-TL-011A C10-TL-010A C10-TL-009A C10-TL-008A C10-TL-035A C10-TL-066B C10-TL-068B C10-TL-070B C10-TL-102B C10-TL-109A C10-TL-107A C10-TL-164A C10-TL-201A C12-TL-520A C12-TL-519A C12-TL-518A C12-TL-516A C12-TL-515A C12-TL-514 C12-TL-512A C12-TL-511A C12-D001-03 C12-EMH-001 C12-EC-004

Cable: C10BRC1115
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 160 No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 154 8 162 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C13-LAB-45-GH-001 Compartment: Description: BLOCK-1 HRSG-3 BFP-1 JB North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-129 C10-TL-126 C10-TL-123 C10-TL-120 C10-TL-046 C10-TL-045 C10-TL-019 C10-TL-018D C10-TL-016A C10-TL-004B CABLE C10-TL-005B C10-TL-006B C10-TL-007B C10-TL-035E C10-TL-066F C10-TL-068F C10-TL-070F C10-TL-102F C10-TL-108B C10-TL-106B C10-TL-163B C10-TL-202B C13-TL-515B C13-TL-513 C13-TL-512B C13-TL-511B C33-D001-01 C33-EMH-001 C33-EC-010

Page 266 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
2C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 165 No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-692777

Cable: C10BRC1117
Seg Code: L System: BRC Startup Code:

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 152 8 160 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C13-LAB-45-GH-002 Compartment: Description: BLOCK-1 HRSG-3 BFP-2 JB North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-129 C10-TL-126 C10-TL-123 C10-TL-120 C10-TL-046 C10-TL-045 C10-TL-019 C10-TL-018D C10-TL-016A C10-TL-004B CABLE C10-TL-005B C10-TL-006B C10-TL-007B C10-TL-035E C10-TL-066F C10-TL-068F C10-TL-070F C10-TL-102F C10-TL-108B C10-TL-106B C10-TL-163B C10-TL-202B C13-TL-515B C13-TL-513 C13-TL-512B C13-TL-511B C33-D001-01 C13-EC-007

Cable: C10BRC1119
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 170 No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 155 8 163 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C13-LAB-45-GH-003 Compartment: Description: BLOCK-1 HRSG-3 BFP-3 JB North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-129 C10-TL-126 C10-TL-123 C10-TL-120 C10-TL-046 C10-TL-045 C10-TL-019 C10-TL-018D C10-TL-016A C10-TL-004B CABLE C10-TL-005B C10-TL-006B C10-TL-007B C10-TL-035E C10-TL-066F C10-TL-068F C10-TL-070F C10-TL-102F C10-TL-108B C10-TL-106B C10-TL-163B C10-TL-202B C13-TL-515B C13-TL-513 C13-TL-512B C13-TL-511B C33-D001-01 C13-EC-004

Cable: C10BRC1121
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 4 SQ.MM, 0.6/1kV
Pull Length(m): 95 No. of Cables: 1 Type Code: 20046 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 75 5 80 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10CMA01 Compartment: Description: 4.16KV UNIT SWGR DATA RETRIEVAL PANEL (BLK-1) North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-129 C10-TL-126 C10-TL-123 C10-TL-120 C10-TL-046 C10-TL-045 C10-TL-019 C10-TL-018D C10-TL-016A C10-TL-004B C10-TL-013B C10-TL-014C C10-TL-031D C10-TL-038C C10-TL-063D C10-TL-062 CABLE

Page 267 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
2C X 4 SQ.MM, 0.6/1kV
Pull Length(m): 95 No. of Cables: 1 Type Code: 20046 End Length(m): 5 Elevation: Schematic: ED-692777

Cable: C10BRC1122
Seg Code: L System: BRC Startup Code:

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 75 5 80 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10CMA01 Compartment: Description: 4.16KV UNIT SWGR DATA RETRIEVAL PANEL (BLK-1) North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: CABLE NOT REQUIRED AS PER LATEST MSD Route: CABLE C10-TL-129 C10-TL-126 C10-TL-123 C10-TL-120 C10-TL-046 C10-TL-045 C10-TL-019 C10-TL-018D C10-TL-016A C10-TL-004B C10-TL-013B C10-TL-014C C10-TL-031D C10-TL-038C C10-TL-063D C10-TL-062 CABLE

Cable: C10BRC1123
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 22 No. of Cables: 1 Type Code: 20026 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 17 3 20 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 12

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 CABLE

Cable To End: Equipment No: C13-CPB-66-GH-004 Compartment: Description: B1H3 I/O CABINET-3_SIMP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BRC1124
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 22 No. of Cables: 1 Type Code: 20026 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 17 3 20 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 12

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 CABLE

Cable To End: Equipment No: C13-CPB-66-GH-004 Compartment: Description: B1H3 I/O CABINET-3_SIMP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BRC1125
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 4 SQ.MM, 0.6/1kV
Pull Length(m): 25 No. of Cables: 1 Type Code: 20046 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 20 3 23 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 C10-TL-132 CABLE

Cable To End: Equipment No: C10-CFA-77-GH-001 Description: BLOCK-1 CMS-01 Equip Location: Zone: Location Dwg: EA-681121

Page 268 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
2C X 4 SQ.MM, 0.6/1kV
Pull Length(m): 25 No. of Cables: 1 Type Code: 20046 End Length(m): 5 Elevation: Schematic: ED-692777

Cable: C10BRC1126
Seg Code: L System: BRC Startup Code:

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 21 3 24 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 11

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 C10-TL-132 CABLE

Cable To End: Equipment No: C10-CFA-77-GH-002 Description: BLOCK-1 CMS-02 Equip Location: Zone: Location Dwg: EA-681121

Cable: C10BRC1127
Seg Code: L System: BRC Startup Code:

Rev: 00

Description:

2C X 4 SQ.MM, 0.6/1kV
Pull Length(m): 25 No. of Cables: 1 Type Code: 20046 End Length(m): 5 Elevation: Schematic: ED-692777

Service: 120V AC BLOCK-1 UPSDB-2 FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 22 3 25 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692777 12

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRC Compartment: Description: 120V AC BLK-1 UPSDB-2 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: CABLE C10-TL-129 C10-TL-132 CABLE

Cable To End: Equipment No: C10-CFA-77-GH-003 Description: BLOCK-1 CMS-03 Equip Location: Zone: Location Dwg: EA-681121

Cable: C10BRE1001
Seg Code: L System: BRE Startup Code:

Rev: 00

Description:

2C X 4 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 20046 End Length(m): 5 Elevation: Schematic: ED-692850

Service: 120 V STG UPS-2 SUB DB


Routed Length (m): Allowance (m): Total Length (m): 16 3 19 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692850 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRE Compartment: Description: 120V AC STG UPS-2 SUB-DB Equip Location: Zone: North: East: Location Dwg: EA-681111 Wiring Dwg: Routing Information: Remarks: Route: CABLE C14-TL-065A C14-TL-055A C14-TL-054A CABLE

Cable To End: Equipment No: C10-CJJ-66-GK-101 Compartment: Description: BLOCK-1 STG HMI OPERATOR WORKSTATION North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681131

Cable: C10BRE1002
Seg Code: L System: BRE Startup Code:

Rev: 00

Description:

2C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-692850

Service: 120 V STG UPS-2 SUB DB


Routed Length (m): Allowance (m): Total Length (m): 20 3 23 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692850 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRE Compartment: Description: 120V AC STG UPS-2 SUB-DB Equip Location: Zone: North: East: Location Dwg: EA-681111 Wiring Dwg:

Cable To End: Equipment No: C10SW61 Compartment: Description: NETWORK SW61 IN ST1 ELEC ROOM North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C14-TL-065A C14-TL-055A C14-TL-054A C14-TL-053A CABLE

Page 269 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
2C X 10 SQ.MM, 0.6/1kV
Pull Length(m): 23 No. of Cables: 1 Type Code: 20106 End Length(m): 5 Elevation: Schematic: ED-692850

Cable: C10BRE1003
Seg Code: L System: BRE Startup Code:

Service: 120 V STG UPS-2 SUB DB


Routed Length (m): Allowance (m): Total Length (m): 23 3 26 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692850 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRE Compartment: Description: 120V AC STG UPS-2 SUB-DB Equip Location: Zone: East: North: Location Dwg: EA-681111 Wiring Dwg: Routing Information: Remarks: Route: CABLE C14-TL-065B C14-TL-063 C14-TL-061B CABLE

Cable To End: Equipment No: C10-CFA-77-GH-004 Compartment: Description: BLOCK-1 CMS-01 STG North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Cable: C10BRE1004
Seg Code: L System: BRE Startup Code:

Rev: 00

Description:

2C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-692850

Service: 120 V STG UPS-2 SUB DB


Routed Length (m): Allowance (m): Total Length (m): 20 3 23 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692850 7

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRE Compartment: Description: 120V AC STG UPS-2 SUB-DB Equip Location: Zone: East: North: Location Dwg: EA-681111 Wiring Dwg: Routing Information: Remarks: Route: CABLE C14-TL-065B C14-TL-063 C14-TL-061B CABLE

Cable To End: Equipment No: C10-CFA-77-GN-201 Description: SW32 Equip Location: Zone: Location Dwg: EA-681131

Cable: C10BRE1005
Seg Code: L System: BRE Startup Code:

Rev: 00

Description:

2C X 10 SQ.MM, 0.6/1kV
Pull Length(m): 27 No. of Cables: 1 Type Code: 20106 End Length(m): 5 Elevation: Schematic: ED-692850

Service: 120 V STG UPS-2 SUB DB


Routed Length (m): Allowance (m): Total Length (m): 25 3 28 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692850 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRE Compartment: Description: 120V AC STG UPS-2 SUB-DB Equip Location: Zone: North: East: Location Dwg: EA-681111 Wiring Dwg:

Cable To End: Equipment No: C10-CJJ-25-GH-001 Compartment: Description: B1 MARK VIE STG CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C14-TL-065A C14-TL-055A C14-TL-054A C14-TL-053A CABLE

Cable: C10BRE1006
Seg Code: L System: BRE Startup Code:

Rev: 00

Description:

2C X 10 SQ.MM, 0.6/1kV
Pull Length(m): 27 No. of Cables: 1 Type Code: 20106 End Length(m): 5 Elevation: Schematic: ED-692850

Service: 120 V STG UPS-2 SUB DB


Routed Length (m): Allowance (m): Total Length (m): 25 3 28 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692850 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRE Compartment: Description: 120V AC STG UPS-2 SUB-DB Equip Location: Zone: North: East: Location Dwg: EA-681111 Wiring Dwg:

Cable To End: Equipment No: C10-CJJ-25-GH-001 Compartment: Description: B1 MARK VIE STG CABINET North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C14-TL-065A C14-TL-055A C14-TL-054A C14-TL-053A CABLE

Page 270 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
2C X 16 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 20166 End Length(m): 5 Elevation: Schematic: ED-692850

Cable: C10BRE1007
Seg Code: L System: BRE Startup Code:

Service: 120 V STG UPS-2 SUB DB


Routed Length (m): Allowance (m): Total Length (m): 56 5 61 Option 1: H2 SYSTEM CABINET Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692850 8

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRE Compartment: Description: 120V AC STG UPS-2 SUB-DB Equip Location: Zone: East: North: Location Dwg: EA-681111 Wiring Dwg:

Cable To End: Equipment No: C10DHCP Compartment: Description: BLK-1 STG HYDROGEN CONTROL PANEL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C14-TL-065B C14-TL-063 C14-TL-064 C14-TL-066 C14-TL-071 C14-TL-073 C14-TL-078 FIELD ROUTED

Cable: C10BRE1008
Seg Code: L System: BRE Startup Code:

Rev: 00

Description:

2C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-692850

Service: 120 V STG UPS-2 SUB DB


Routed Length (m): Allowance (m): Total Length (m): 20 3 23 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692850 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRE Compartment: Description: 120V AC STG UPS-2 SUB-DB Equip Location: Zone: East: North: Location Dwg: EA-681111 Wiring Dwg:

Cable To End: Equipment No: C10SW62 Compartment: Description: NETWORK SW62 IN ST1 ELEC ROOM North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C14-TL-065A C14-TL-055A C14-TL-054A C14-TL-053A CABLE

Cable: C10BRE1011
Seg Code: L System: BRE Startup Code:

Rev: 00

Description:

2C X 10 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 20106 End Length(m): 5 Elevation: Schematic: ED-692850

Service: 120 V STG UPS-2 SUB DB


Routed Length (m): Allowance (m): Total Length (m): 20 3 23 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692850 7

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRE Compartment: Description: 120V AC STG UPS-2 SUB-DB Equip Location: Zone: North: East: Location Dwg: EA-681111 Wiring Dwg: Routing Information: Remarks: Route: CABLE C14-TL-065B C14-TL-063 C14-TL-061B CABLE

Cable To End: Equipment No: C10-CRB-61-GW-100 Compartment: Description: DGP-STG-1 (ELECTRICAL ROOM) North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Cable: C10BRE1012
Seg Code: L System: BRE Startup Code:

Rev: 00

Description:

2C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): 95 No. of Cables: 1 Type Code: 20026 End Length(m): 5 Elevation: Schematic: ED-692850

Service: 120 V STG UPS-2 SUB DB


Routed Length (m): Allowance (m): Total Length (m): 84 6 90 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692850 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRE Compartment: Description: 120V AC STG UPS-2 SUB-DB Equip Location: Zone: North: East: Location Dwg: EA-681111 Wiring Dwg:

Cable To End: Equipment No: C00-QCK-39-GH-003 Compartment: Description: CHLORINE ANALYZER LOCAL PANEL BLK-1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C14-TL-065A C14-TL-003 CABLE C14-TL-008B C14-TL-009A C14-TL-011A C14-TL-023 C14-TL-024 C14-TL-026 C14-TL-030B C14-TL-031 C14-TL-032 C14-TL-035 C14-C-1047

Page 271 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
2C X 2.5 SQ.MM, 0.6/1kV
Pull Length(m): 95 No. of Cables: 1 Type Code: 20026 End Length(m): 5 Elevation: Schematic: ED-692850

Cable: C10BRE1013
Seg Code: L System: BRE Startup Code:

Service: 120 V STG UPS-2 SUB DB


Routed Length (m): Allowance (m): Total Length (m): 84 6 90 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692850 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRE Compartment: Description: 120V AC STG UPS-2 SUB-DB Equip Location: Zone: East: North: Location Dwg: EA-681111 Wiring Dwg:

Cable To End: Equipment No: C00-QCK-39-GH-003 Compartment: Description: CHLORINE ANALYZER LOCAL PANEL BLK-1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C14-TL-065A C14-TL-003 CABLE C14-TL-008B C14-TL-009A C14-TL-011A C14-TL-023 C14-TL-024 C14-TL-026 C14-TL-030B C14-TL-031 C14-TL-032 C14-TL-035 C14-C-1047

Cable: C10BRE1015
Seg Code: L System: BRE Startup Code:

Rev: 00

Description:

2C X 10 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 20106 End Length(m): 5 Elevation: Schematic: ED-692850

Service: 120 V STG UPS-2 SUB DB


Routed Length (m): Allowance (m): Total Length (m): 18 3 21 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692850 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRE Compartment: Description: 120V AC STG UPS-2 SUB-DB Equip Location: Zone: North: East: Location Dwg: EA-681111 Wiring Dwg: Routing Information: Remarks: Route: CABLE C14-TL-065A C14-TL-056A C14-TL-058A CABLE

Cable To End: Equipment No: C101017 Compartment: Description: EX2100 PNL FOR BLK-1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Cable: C10BRE1016
Seg Code: L System: BRE Startup Code:

Rev: 00

Description:

2C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-692850

Service: 120 V STG UPS-2 SUB DB


Routed Length (m): Allowance (m): Total Length (m): 98 6 104 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRE Compartment: Description: 120V AC STG UPS-2 SUB-DB Equip Location: Zone: North: East: Location Dwg: EA-681111 Wiring Dwg:

Cable To End: Equipment No: C10-GCK-46-CF-070 Compartment: End Length(m): 5 Description: BLK-1 COND MKUP FL North: 1754.13 Equip Location: Zone: East: 2347.94 Elevation: 5.50 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-692850

Routing Information: Remarks: Route: CABLE C14-TL-065A C14-TL-056A C14-TL-058A C14-TL-060A C14-TL-061A C14-TL-001 C14-TL-006A C14-TL-008B C14-TL-009A C14-TL-011A C14-TL-023 C14-TL-024 C14-TL-026 C14-TL-030B C14-TL-031 C14-TL-033 C14-TL-034 CABLE

Cable: C10BRE1018
Seg Code: L System: BRE Startup Code:

Rev: 00

Description:

2C X 10 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 20106 End Length(m): 5 Elevation: Schematic: ED-692850

Service: 120 V STG UPS-2 SUB DB


Routed Length (m): Allowance (m): Total Length (m): 23 3 26 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692850 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRE Compartment: Description: 120V AC STG UPS-2 SUB-DB Equip Location: Zone: North: East: Location Dwg: EA-681111 Wiring Dwg: Routing Information: Remarks: Route: CABLE C14-TL-065B C14-TL-063 C14-TL-061B CABLE

Cable To End: Equipment No: C10-CFA-77-GH-004 Compartment: Description: BLOCK-1 CMS-01 STG North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Page 272 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
2C X 25 SQ.MM, 0.6/1kV
Pull Length(m): 97 No. of Cables: 1 Type Code: 20256 End Length(m): 5 Elevation: Schematic: ED-692849

Cable: C10BRI1001
Seg Code: L System: BRI Startup Code:

Service: 120 V STG UPS-1 SUB DB


Routed Length (m): Allowance (m): Total Length (m): 91 6 97 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692849 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRI Compartment: Description: 120V AC STG UPS-1 SUB-DB Equip Location: Zone: East: North: Location Dwg: EA-681111 Wiring Dwg:

Cable To End: Equipment No: C10-PAB-55-GH-010 Compartment: Description: BLK-1 DBRS FLTR CNTL PNL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C14-TL-065B C14-TL-063 C14-TL-064 C14-TL-067 C14-TL-098 C14-TL-048 C14-TL-047 C14-TL-045 C14-TL-044 C14-TL-038 C14-C-1307

Cable: C10BRI1002
Seg Code: L System: BRI Startup Code:

Rev: 00

Description:

2C X 25 SQ.MM, 0.6/1kV
Pull Length(m): 97 No. of Cables: 1 Type Code: 20256 End Length(m): 5 Elevation: Schematic: ED-692849

Service: 120 V STG UPS-1 SUB DB


Routed Length (m): Allowance (m): Total Length (m): 91 6 97 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692849 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRI Compartment: Description: 120V AC STG UPS-1 SUB-DB Equip Location: Zone: East: North: Location Dwg: EA-681111 Wiring Dwg:

Cable To End: Equipment No: C10-PAB-55-GH-010 Compartment: Description: BLK-1 DBRS FLTR CNTL PNL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C14-TL-065B C14-TL-063 C14-TL-064 C14-TL-067 C14-TL-098 C14-TL-048 C14-TL-047 C14-TL-045 C14-TL-044 C14-TL-038 C14-C-1307

Cable: C10BRI1005
Seg Code: L System: BRI Startup Code:

Rev: 01

Description:

2C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 15 No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-692849

Service: 120 V STG UPS-1 SUB DB


Routed Length (m): Allowance (m): Total Length (m): 13 3 16 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692849 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRI Compartment: Description: 120V AC STG UPS-1 SUB-DB Equip Location: Zone: North: East: Location Dwg: EA-681111 Wiring Dwg: Routing Information: Remarks: Route: CABLE C14-TL-065B C14-TL-063 CABLE

Cable To End: Equipment No: C10-CYE-63-GH-001 Compartment: Description: BLK-1 STG ELEC BLDG LFAP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Cable: C10BRI1006
Seg Code: L System: BRI Startup Code:

Rev: 02

Description:

2C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 15 No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-692849

Service: 120 V STG UPS-1 SUB DB


Routed Length (m): Allowance (m): Total Length (m): 13 3 16 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692849 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRI Compartment: Description: 120V AC STG UPS-1 SUB-DB Equip Location: Zone: North: East: Location Dwg: EA-681111 Wiring Dwg: Routing Information: Remarks: CABLE NOT REQUIRED AS PER LATEST MSD Route: CABLE C14-TL-065B C14-TL-063 CABLE

Cable To End: Equipment No: C10-CYE-63-GH-001 Compartment: Description: BLK-1 STG ELEC BLDG LFAP North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Page 273 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
2C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-692849

Cable: C10BRI1007
Seg Code: L System: BRI Startup Code:

Service: 120 V STG UPS-1 SUB DB


Routed Length (m): Allowance (m): Total Length (m): 13 3 16 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692849 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRI Compartment: Description: 120V AC STG UPS-1 SUB-DB Equip Location: Zone: East: North: Location Dwg: EA-681111 Wiring Dwg: Routing Information: Remarks: Route: CABLE C14-TL-065B C14-TL-063 CABLE

Cable To End: Equipment No: C10-CYE-63-GH-201 Compartment: Description: BLK-1 STG ELEC BLDG FIRE SYSTEM BPS North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Cable: C10BRI1009
Seg Code: L System: BRI Startup Code:

Rev: 00

Description:

2C X 35 SQ.MM, 0.6/1kV
Pull Length(m): 95 No. of Cables: 1 Type Code: 20356 End Length(m): 5 Elevation: Schematic: ED-692849

Service: 120 V STG UPS-1 SUB DB


Routed Length (m): Allowance (m): Total Length (m): 107 6 113 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692849 20

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRI Compartment: Description: 120V AC STG UPS-1 SUB-DB Equip Location: Zone: East: North: Location Dwg: EA-681111 Wiring Dwg:

Cable To End: Equipment No: C10-PGP-56-GH-001 Compartment: Description: BLK-1 H/EX OLTCS CNTL PNL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C14-TL-065A C14-TL-003 C14-TL-008A CABLE C14-TL-009A C14-TL-011A CABLE C14-TL-012 C14-TL-013 C14-TL-019 C14-TL-018 C14-TL-017 C14-TL-016 C14-C-1009

Cable: C10BRI1010
Seg Code: L System: BRI Startup Code:

Rev: 00

Description:

2C X 35 SQ.MM, 0.6/1kV
Pull Length(m): 95 No. of Cables: 1 Type Code: 20356 End Length(m): 5 Elevation: Schematic: ED-692849

Service: 120 V STG UPS-1 SUB DB


Routed Length (m): Allowance (m): Total Length (m): 107 6 113 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692849 20

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRI Compartment: Description: 120V AC STG UPS-1 SUB-DB Equip Location: Zone: North: East: Location Dwg: EA-681111 Wiring Dwg:

Cable To End: Equipment No: C10-PGP-56-GH-001 Compartment: Description: BLK-1 H/EX OLTCS CNTL PNL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C14-TL-065A C14-TL-003 C14-TL-008A CABLE C14-TL-009A C14-TL-011A CABLE C14-TL-012 C14-TL-013 C14-TL-019 C14-TL-018 C14-TL-017 C14-TL-016 C14-C-1009

Cable: C10BRI1011
Seg Code: L System: BRI Startup Code:

Rev: 00

Description:

2C X 35 SQ.MM, 0.6/1kV
Pull Length(m): 95 No. of Cables: 1 Type Code: 20356 End Length(m): 5 Elevation: Schematic: ED-692849

Service: 120 V STG UPS-1 SUB DB


Routed Length (m): Allowance (m): Total Length (m): 91 6 97 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692849 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRI Compartment: Description: 120V AC STG UPS-1 SUB-DB Equip Location: Zone: North: East: Location Dwg: EA-681111 Wiring Dwg:

Cable To End: Equipment No: C10-PAH-55-GH-001 Compartment: Description: BLK-1 COND OLTCS PNL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C14-TL-065B C14-TL-063 C14-TL-064 C14-TL-067 C14-TL-098 C14-TL-048 C14-TL-047 C14-TL-045 C14-TL-044 C14-TL-038 C14-C-1308

Page 274 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
2C X 35 SQ.MM, 0.6/1kV
Pull Length(m): 95 No. of Cables: 1 Type Code: 20356 End Length(m): 5 Elevation: Schematic: ED-692849

Cable: C10BRI1012
Seg Code: L System: BRI Startup Code:

Service: 120 V STG UPS-1 SUB DB


Routed Length (m): Allowance (m): Total Length (m): 91 6 97 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-692849 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BRI Compartment: Description: 120V AC STG UPS-1 SUB-DB Equip Location: Zone: East: North: Location Dwg: EA-681111 Wiring Dwg:

Cable To End: Equipment No: C10-PAH-55-GH-001 Compartment: Description: BLK-1 COND OLTCS PNL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C14-TL-065B C14-TL-063 C14-TL-064 C14-TL-067 C14-TL-098 C14-TL-048 C14-TL-047 C14-TL-045 C14-TL-044 C14-TL-038 C14-C-1308

Cable: C10BUA1001
Seg Code: L System: BUA Startup Code:

Rev: 01

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 30 No. of Cables: 1 Type Code: 16306 End Length(m): 10 Elevation: Schematic: ED-693900

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 28 3 31 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 10

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BTA01 Compartment: Description: 125V DC DCDB BATTERY FOR BLK-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: C10-C-1101 C10-TL-026B C10-TL-027B C10-TL-028B CABLE

Cable To End: Equipment No: C10BVY01 Compartment: Description: BATTERY MNTRG PNL (BLK-1 DCDB) North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BUA1002
Seg Code: L System: BUA Startup Code:

Rev: 01

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 30 No. of Cables: 1 Type Code: 16306 End Length(m): 10 Elevation: Schematic: ED-693900

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 28 3 31 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 10

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BTA01 Compartment: Description: 125V DC DCDB BATTERY FOR BLK-1 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: C10-C-1102 C10-TL-026B C10-TL-027B C10-TL-028B CABLE

Cable To End: Equipment No: C10BVY01 Compartment: Description: BATTERY MNTRG PNL (BLK-1 DCDB) North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BUA1003
Seg Code: L System: BUA Startup Code:

Rev: 01

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 30 No. of Cables: 1 Type Code: 16306 End Length(m): 10 Elevation: Schematic: ED-693900

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 28 3 31 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 10

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BTA01 Compartment: Description: 125V DC DCDB BATTERY FOR BLK-1 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: C10-C-1103 C10-TL-026B C10-TL-027B C10-TL-028B CABLE

Cable To End: Equipment No: C10BVY01 Compartment: Description: BATTERY MNTRG PNL (BLK-1 DCDB) North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Page 275 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
1C X 630 SQ.MM, 0.6/1kV
Pull Length(m): 30 No. of Cables: 1 Type Code: 16306 End Length(m): 10 Elevation: Schematic: ED-693900

Cable: C10BUA1004
Seg Code: L System: BUA Startup Code:

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 28 3 31 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 10

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BTA01 Compartment: Description: 125V DC DCDB BATTERY FOR BLK-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: C10-C-1104 C10-TL-026B C10-TL-027B C10-TL-028B CABLE

Cable To End: Equipment No: C10BVY01 Compartment: Description: BATTERY MNTRG PNL (BLK-1 DCDB) North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BUA1005
Seg Code: L System: BUA Startup Code:

Rev: 01

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 30 No. of Cables: 1 Type Code: 16306 End Length(m): 10 Elevation: Schematic: ED-693900

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 28 3 31 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 10

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BTA01 Compartment: Description: 125V DC DCDB BATTERY FOR BLK-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: C10-C-1105 C10-TL-026B C10-TL-027B C10-TL-028B CABLE

Cable To End: Equipment No: C10BVY01 Compartment: Description: BATTERY MNTRG PNL (BLK-1 DCDB) North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BUA1006
Seg Code: L System: BUA Startup Code:

Rev: 01

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 30 No. of Cables: 1 Type Code: 16306 End Length(m): 10 Elevation: Schematic: ED-693900

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 28 3 31 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 10

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BTA01 Compartment: Description: 125V DC DCDB BATTERY FOR BLK-1 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: C10-C-1101 C10-TL-026B C10-TL-027B C10-TL-028B CABLE

Cable To End: Equipment No: C10BVY01 Compartment: Description: BATTERY MNTRG PNL (BLK-1 DCDB) North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BUA1007
Seg Code: L System: BUA Startup Code:

Rev: 01

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 30 No. of Cables: 1 Type Code: 16306 End Length(m): 10 Elevation: Schematic: ED-693900

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 28 3 31 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 10

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BTA01 Compartment: Description: 125V DC DCDB BATTERY FOR BLK-1 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: C10-C-1102 C10-TL-026B C10-TL-027B C10-TL-028B CABLE

Cable To End: Equipment No: C10BVY01 Compartment: Description: BATTERY MNTRG PNL (BLK-1 DCDB) North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Page 276 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
1C X 630 SQ.MM, 0.6/1kV
Pull Length(m): 30 No. of Cables: 1 Type Code: 16306 End Length(m): 10 Elevation: Schematic: ED-693900

Cable: C10BUA1008
Seg Code: L System: BUA Startup Code:

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 28 3 31 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 10

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BTA01 Compartment: Description: 125V DC DCDB BATTERY FOR BLK-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: C10-C-1103 C10-TL-026B C10-TL-027B C10-TL-028B CABLE

Cable To End: Equipment No: C10BVY01 Compartment: Description: BATTERY MNTRG PNL (BLK-1 DCDB) North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BUA1009
Seg Code: L System: BUA Startup Code:

Rev: 01

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 30 No. of Cables: 1 Type Code: 16306 End Length(m): 10 Elevation: Schematic: ED-693900

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 28 3 31 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 10

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BTA01 Compartment: Description: 125V DC DCDB BATTERY FOR BLK-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: C10-C-1104 C10-TL-026B C10-TL-027B C10-TL-028B CABLE

Cable To End: Equipment No: C10BVY01 Compartment: Description: BATTERY MNTRG PNL (BLK-1 DCDB) North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BUA1010
Seg Code: L System: BUA Startup Code:

Rev: 01

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 30 No. of Cables: 1 Type Code: 16306 End Length(m): 10 Elevation: Schematic: ED-693900

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 28 3 31 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 10

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BTA01 Compartment: Description: 125V DC DCDB BATTERY FOR BLK-1 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg: Routing Information: Remarks: Route: C10-C-1105 C10-TL-026B C10-TL-027B C10-TL-028B CABLE

Cable To End: Equipment No: C10BVY01 Compartment: Description: BATTERY MNTRG PNL (BLK-1 DCDB) North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Cable: C10BUA1011
Seg Code: L System: BUA Startup Code:

Rev: 01

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 28 No. of Cables: 1 Type Code: 16306 End Length(m): 10 Elevation: Schematic: ED-693900

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 30 4 34 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 10

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BVY01 Compartment: Description: BATTERY MNTRG PNL (BLK-1 DCDB) Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BUA Description: 125V DC BLK-1 DCDB Equip Location: Zone: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-040 C10-TL-043E C10-TL-044D C10-TL-053D CABLE

Page 277 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
1C X 630 SQ.MM, 0.6/1kV
Pull Length(m): 28 No. of Cables: 1 Type Code: 16306 End Length(m): 10 Elevation: Schematic: ED-693900

Cable: C10BUA1012
Seg Code: L System: BUA Startup Code:

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 30 4 34 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 10

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BVY01 Compartment: Description: BATTERY MNTRG PNL (BLK-1 DCDB) Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BUA Description: 125V DC BLK-1 DCDB Equip Location: Zone: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-040 C10-TL-043E C10-TL-044D C10-TL-053D CABLE

Cable: C10BUA1013
Seg Code: L System: BUA Startup Code:

Rev: 01

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 28 No. of Cables: 1 Type Code: 16306 End Length(m): 10 Elevation: Schematic: ED-693900

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 30 4 34 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 10

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BVY01 Compartment: Description: BATTERY MNTRG PNL (BLK-1 DCDB) Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BUA Description: 125V DC BLK-1 DCDB Equip Location: Zone: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-040 C10-TL-043E C10-TL-044D C10-TL-053D CABLE

Cable: C10BUA1014
Seg Code: L System: BUA Startup Code:

Rev: 01

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 28 No. of Cables: 1 Type Code: 16306 End Length(m): 10 Elevation: Schematic: ED-693900

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 30 4 34 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 10

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BVY01 Compartment: Description: BATTERY MNTRG PNL (BLK-1 DCDB) Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BUA Description: 125V DC BLK-1 DCDB Equip Location: Zone: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-040 C10-TL-043E C10-TL-044D C10-TL-053D CABLE

Cable: C10BUA1015
Seg Code: L System: BUA Startup Code:

Rev: 01

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 28 No. of Cables: 1 Type Code: 16306 End Length(m): 10 Elevation: Schematic: ED-693900

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 30 4 34 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 10

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BVY01 Compartment: Description: BATTERY MNTRG PNL (BLK-1 DCDB) Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BUA Description: 125V DC BLK-1 DCDB Equip Location: Zone: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-040 C10-TL-043E C10-TL-044D C10-TL-053D CABLE

Page 278 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
1C X 630 SQ.MM, 0.6/1kV
Pull Length(m): 28 No. of Cables: 1 Type Code: 16306 End Length(m): 10 Elevation: Schematic: ED-693900

Cable: C10BUA1016
Seg Code: L System: BUA Startup Code:

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 30 4 34 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 10

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BVY01 Compartment: Description: BATTERY MNTRG PNL (BLK-1 DCDB) Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BUA Description: 125V DC BLK-1 DCDB Equip Location: Zone: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-040 C10-TL-043E C10-TL-044D C10-TL-053D CABLE

Cable: C10BUA1017
Seg Code: L System: BUA Startup Code:

Rev: 01

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 28 No. of Cables: 1 Type Code: 16306 End Length(m): 10 Elevation: Schematic: ED-693900

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 30 4 34 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 10

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BVY01 Compartment: Description: BATTERY MNTRG PNL (BLK-1 DCDB) Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BUA Description: 125V DC BLK-1 DCDB Equip Location: Zone: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-040 C10-TL-043E C10-TL-044D C10-TL-053D CABLE

Cable: C10BUA1018
Seg Code: L System: BUA Startup Code:

Rev: 01

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 28 No. of Cables: 1 Type Code: 16306 End Length(m): 10 Elevation: Schematic: ED-693900

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 30 4 34 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 10

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BVY01 Compartment: Description: BATTERY MNTRG PNL (BLK-1 DCDB) Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BUA Description: 125V DC BLK-1 DCDB Equip Location: Zone: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-040 C10-TL-043E C10-TL-044D C10-TL-053D CABLE

Cable: C10BUA1019
Seg Code: L System: BUA Startup Code:

Rev: 01

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 28 No. of Cables: 1 Type Code: 16306 End Length(m): 10 Elevation: Schematic: ED-693900

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 30 4 34 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 10

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BVY01 Compartment: Description: BATTERY MNTRG PNL (BLK-1 DCDB) Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BUA Description: 125V DC BLK-1 DCDB Equip Location: Zone: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-040 C10-TL-043E C10-TL-044D C10-TL-053D CABLE

Page 279 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
1C X 630 SQ.MM, 0.6/1kV
Pull Length(m): 28 No. of Cables: 1 Type Code: 16306 End Length(m): 10 Elevation: Schematic: ED-693900

Cable: C10BUA1020
Seg Code: L System: BUA Startup Code:

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 30 4 34 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 10

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BVY01 Compartment: Description: BATTERY MNTRG PNL (BLK-1 DCDB) Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10BUA Description: 125V DC BLK-1 DCDB Equip Location: Zone: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-040 C10-TL-043E C10-TL-044D C10-TL-053D CABLE

Cable: C10BUA1021
Seg Code: L System: BUA Startup Code:
Cable From End: Equipment No: C10BUA Description: 125V DC BLK-1 DCDB Equip Location: Zone: Location Dwg: EA-681121

Rev: 00

Description:

2C X 50 SQ.MM, 0.6/1kV
Pull Length(m): 165 No. of Cables: 1 Type Code: 20506 End Length(m): 5

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 148 8 156 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: East:

Elevation: Schematic: ED-693900

Cable To End: Equipment No: C10BAC01 Compartment: Description: GENERATOR CIRCUIT BRKR (GCB) BLK-1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-053B C10-TL-044B CABLE C10-TL-042C C10-TL-017C C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-098 C14-TL-067 C14-TL-066 C14-TL-070 C14-C-1115

Cable: C10BUA1022
Seg Code: L System: BUA Startup Code:
Cable From End: Equipment No: C10BUA Description: 125V DC BLK-1 DCDB Equip Location: Zone: Location Dwg: EA-681121

Rev: 00

Description:

2C X 16 SQ.MM, 0.6/1kV
Pull Length(m): 165 No. of Cables: 1 Type Code: 20166 End Length(m): 5

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 148 8 156 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: East:

Elevation: Schematic: ED-693900

Cable To End: Equipment No: C10BAC01 Compartment: Description: GENERATOR CIRCUIT BRKR (GCB) BLK-1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-053B C10-TL-044B CABLE C10-TL-042C C10-TL-017C C10-TL-018C C10-TL-020C C10-TL-023C C10-TL-223C C10-TL-222C C14-TL-202D C14-TL-204D C14-TL-207D C14-TL-049D C14-TL-099B C14-TL-098 C14-TL-067 C14-TL-066 C14-TL-070 C14-C-1115

Page 280 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
2C X 16 SQ.MM, 0.6/1kV
Pull Length(m): 170 No. of Cables: 1 Type Code: 20166 End Length(m): 5 East: Elevation: Schematic: ED-693900

Cable: C10BUA1023
Seg Code: L System: BUA Startup Code:
Cable From End: Equipment No: C10BUA Description: 125V DC BLK-1 DCDB Equip Location: Zone: Location Dwg: EA-681121

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 157 8 165 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg:

Cable To End: Equipment No: C10BAT01 Compartment: End Length(m): 6 Description: GENERATOR STEP-UP XFMR FOR BLK-1 North: 1733.00 Equip Location: Zone: East: 2292.20 Elevation: 4.10 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-693900

Routing Information: Remarks: Route: CABLE C10-TL-053B C10-TL-051A C10-TL-022A C10-TL-024B C10-TL-001B C10-TL-226B C10-TL-225B C14-TL-201B C14-TL-203B C14-TL-205B C10-EMH-007 C10-D065-10 C10-EMH-006 C10-D064-05 CABLE

Cable: C10BUA1024
Seg Code: L System: BUA Startup Code:
Cable From End: Equipment No: C10BUA Description: 125V DC BLK-1 DCDB Equip Location: Zone: Location Dwg: EA-681121

Rev: 00

Description:

2C X 6 SQ.MM, 0.6/1kV
Pull Length(m): 31 No. of Cables: 1 Type Code: 20066 End Length(m): 10

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 31 4 35 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 8

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: East:

Elevation: Schematic: ED-693900

Cable To End: Equipment No: C10CHA01 Compartment: Description: UAT PROTECTION PNL-1 (BLK-1) North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-057 C10-TL-058D C10-TL-062 CABLE

Cable: C10BUA1025
Seg Code: L System: BUA Startup Code:
Cable From End: Equipment No: C10BUA Description: 125V DC BLK-1 DCDB Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

2C X 25 SQ.MM, 0.6/1kV
Pull Length(m): 37 No. of Cables: 1 Type Code: 20256 End Length(m): 5

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 30 4 34 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 7

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: East:

Elevation: Schematic: ED-693900

Cable To End: Equipment No: C10BBE Compartment: Description: 4.16KV UNIT SWBD BUS A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-053C C10-TL-052 C10-TL-056 C10-TL-082 C10-TL-080 C10-TL-076 C10-TL-074 CABLE

Cable: C10BUA1026
Seg Code: L System: BUA Startup Code:
Cable From End: Equipment No: C10BUA Description: 125V DC BLK-1 DCDB Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

2C X 16 SQ.MM, 0.6/1kV
Pull Length(m): 37 No. of Cables: 1 Type Code: 20166 End Length(m): 5

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 30 4 34 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 7

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: East:

Elevation: Schematic: ED-693900

Cable To End: Equipment No: C10BBE Compartment: Description: 4.16KV UNIT SWBD BUS A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-053C C10-TL-052 C10-TL-056 C10-TL-082 C10-TL-080 C10-TL-076 C10-TL-074 CABLE

Page 281 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
2C X 10 SQ.MM, 0.6/1kV
Pull Length(m): 20 No. of Cables: 1 Type Code: 20106 End Length(m): 5 East: Elevation: Schematic: ED-693900

Cable: C10BUA1027
Seg Code: L System: BUA Startup Code:
Cable From End: Equipment No: C10BUA Description: 125V DC BLK-1 DCDB Equip Location: Zone: Location Dwg: EA-681121

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 16 3 19 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 7

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg:

Cable To End: Equipment No: C10BFA Compartment: Description: 480V UNIT SWBD BUS A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-053C C10-TL-052 C10-TL-055D CABLE

Cable: C10BUA1028
Seg Code: L System: BUA Startup Code:
Cable From End: Equipment No: C10BUA Description: 125V DC BLK-1 DCDB Equip Location: Zone: Location Dwg: EA-681121

Rev: 00

Description:

2C X 10 SQ.MM, 0.6/1kV
Pull Length(m): 30 No. of Cables: 1 Type Code: 20106 End Length(m): 5

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 24 3 27 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: East:

Elevation: Schematic: ED-693900

Cable To End: Equipment No: C10BJE Compartment: Description: BLK-1 STEAM TURBINE MAIN MCC North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-053B C10-TL-044B C10-TL-043B C10-TL-059B C10-TL-060B CABLE

Cable: C10BUA1029
Seg Code: L System: BUA Startup Code:
Cable From End: Equipment No: C10BUA Description: 125V DC BLK-1 DCDB Equip Location: Zone: Location Dwg: EA-681121

Rev: 00

Description:

2C X 10 SQ.MM, 0.6/1kV
Pull Length(m): 30 No. of Cables: 1 Type Code: 20106 End Length(m): 5

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 24 3 27 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: East:

Elevation: Schematic: ED-693900

Cable To End: Equipment No: C10BJE Compartment: Description: BLK-1 STEAM TURBINE MAIN MCC North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-053B C10-TL-044B C10-TL-043B C10-TL-059B C10-TL-060B CABLE

Cable: C10BUA1030
Seg Code: L System: BUA Startup Code:
Cable From End: Equipment No: C10BUA Description: 125V DC BLK-1 DCDB Equip Location: Zone: Location Dwg: EA-681121

Rev: 00

Description:

2C X 10 SQ.MM, 0.6/1kV
Pull Length(m): 42 No. of Cables: 1 Type Code: 20106 End Length(m): 5

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 36 4 40 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: East:

Elevation: Schematic: ED-693900

Cable To End: Equipment No: C10BJC Compartment: Description: BLK-1 / INST AIR MCC-A North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-053B C10-TL-044B C10-TL-043B C10-TL-059B C10-TL-060B C10-TL-063B C10-TL-037B C10-TL-011B C10-TL-009B CABLE

Page 282 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
2C X 10 SQ.MM, 0.6/1kV
Pull Length(m): 44 No. of Cables: 1 Type Code: 20106 End Length(m): 5 East: Elevation: Schematic: ED-693900

Cable: C10BUA1031
Seg Code: L System: BUA Startup Code:
Cable From End: Equipment No: C10BUA Description: 125V DC BLK-1 DCDB Equip Location: Zone: Location Dwg: EA-681121

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 38 4 42 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg:

Cable To End: Equipment No: C10BJD Compartment: Description: BLK-1 / INST AIR MCC-B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-053B C10-TL-044B C10-TL-043B C10-TL-059B C10-TL-060B C10-TL-063B C10-TL-037B C10-TL-011B C10-TL-010B C10-TL-006B CABLE

Cable: C10BUA1032
Seg Code: L System: BUA Startup Code:
Cable From End: Equipment No: C10BUA Description: 125V DC BLK-1 DCDB Equip Location: Zone: Location Dwg: EA-681121

Rev: 00

Description:

2C X 10 SQ.MM, 0.6/1kV
Pull Length(m): 33 No. of Cables: 1 Type Code: 20106 End Length(m): 10

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 31 4 35 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 8

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: East:

Elevation: Schematic: ED-693900

Cable To End: Equipment No: C10BJA Compartment: Description: BLK-1 ESSENTIAL MCC North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-053A C10-TL-044A C10-TL-043A C10-TL-059A C10-TL-039A CABLE

Cable: C10BUA1033
Seg Code: L System: BUA Startup Code:
Cable From End: Equipment No: C10BUA Description: 125V DC BLK-1 DCDB Equip Location: Zone: Location Dwg: EA-681121

Rev: 00

Description:

2C X 10 SQ.MM, 0.6/1kV
Pull Length(m): 33 No. of Cables: 1 Type Code: 20106 End Length(m): 5

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 23 3 26 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: East:

Elevation: Schematic: ED-693900

Cable To End: Equipment No: C10BJA Compartment: Description: BLK-1 ESSENTIAL MCC North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-053A C10-TL-044A C10-TL-043A C10-TL-059A C10-TL-039A CABLE

Cable: C10BUA1034
Seg Code: L System: BUA Startup Code:
Cable From End: Equipment No: C10BUA Description: 125V DC BLK-1 DCDB Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

2C X 25 SQ.MM, 0.6/1kV
Pull Length(m): 26 No. of Cables: 1 Type Code: 20256 End Length(m): 5

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 22 3 25 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: East:

Elevation: Schematic: ED-693900

Cable To End: Equipment No: C10BVD01 Compartment: End Length(m): 10 Description: EMERGENCY LIGHTIN PANEL FOR MV / LV BLDG. (SWGR. ROOM) (BLK-1) North: Equip Location: Zone: East: Elevation: Wiring Dwg: Location Dwg: EA-681121 Schematic: ED-693900

Routing Information: Remarks: Route: CABLE C10-TL-053B C10-TL-044B C10-TL-042B CABLE

Page 283 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
2C X 50 SQ.MM, 0.6/1kV
Pull Length(m): 175 No. of Cables: 1 Type Code: 20506 End Length(m): 7 East: Elevation: Schematic: ED-693900

Cable: C10BUA1035
Seg Code: L System: BUA Startup Code:
Cable From End: Equipment No: C10BUA Description: 125V DC BLK-1 DCDB Equip Location: Zone: Location Dwg: EA-681121

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 168 9 177 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg:

Cable To End: Equipment No: C11 BVA-LP01 Compartment: Description: EMERGENCY LIGHTING FOR HRSG-1 AREA North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-052 C10-TL-056 C10-TL-082 C10-TL-080 C10-TL-076 C10-TL-074 C10-TL-071 C10-TL-101B C10-TL-103C C10-TL-104C C10-TL-105C C10-TL-166C C10-TL-204C C11-TL-321C C11-TL-520C C11-TL-519C C11-TL-518C C11-TL-517C C11-TL-516 C11-TL-201 C11-TL-102 C11-C-1105

Cable: C10BUA1036
Seg Code: L System: BUA Startup Code:
Cable From End: Equipment No: C10BUA Description: 125V DC BLK-1 DCDB Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

2C X 35 SQ.MM, 0.6/1kV
Pull Length(m): 161 No. of Cables: 1 Type Code: 20356 End Length(m): 10

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 153 8 161 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: East:

Elevation: Schematic: ED-693900

Cable To End: Equipment No: C12 BVA-LP01 Compartment: Description: EMERGENCY LIGHTING FOR HRSG-2 AREA North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-055C C10-TL-058C C10-TL-061C C10-TL-039C C10-TL-030C C10-TL-014B C10-TL-012C C10-TL-009C C10-TL-008C C10-TL-035C C10-TL-066D C10-TL-068D C10-TL-070D C10-TL-102D C10-TL-109C C10-TL-107C C10-TL-164C C10-TL-201C C12-TL-520C C12-TL-519C C12-TL-518C C12-TL-517 C12-TL-201 C12-TL-102 C12-C-1138

Cable: C10BUA1037
Seg Code: L System: BUA Startup Code:
Cable From End: Equipment No: C10BUA Description: 125V DC BLK-1 DCDB Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

2C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 35 No. of Cables: 1 Type Code: 20156 End Length(m): 7

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 29 4 33 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 7

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: East:

Elevation: Schematic: ED-693900

Cable To End: Equipment No: C10CHD01 Compartment: Description: UNIT 4.16KV SWBD (BLK-1) HSBT PANEL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-044C C10-TL-057 C10-TL-058D C10-TL-062 CABLE

Page 284 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
2C X 10 SQ.MM, 0.6/1kV
Pull Length(m): 170 No. of Cables: 1 Type Code: 20106 End Length(m): 5 East: Elevation: Schematic: ED-693900

Cable: C10BUA1038
Seg Code: L System: BUA Startup Code:
Cable From End: Equipment No: C10BUA Description: 125V DC BLK-1 DCDB Equip Location: Zone: Location Dwg: EA-681121

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 154 8 162 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg:

Cable To End: Equipment No: C10BBT01 Compartment: Description: UNIT AUXILIARY XFMR (UAT) BLK-1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-053B C10-TL-051A C10-TL-022A C10-TL-024B C10-TL-001B C10-TL-226B C10-TL-225B C14-TL-201B C14-TL-203B C14-TL-205B C10-EMH-007 C10-D065-18 C10-EMH-006 C10-D064-18 CABLE

Cable: C10BUA1039
Seg Code: L System: BUA Startup Code:
Cable From End: Equipment No: C10BUA Description: 125V DC BLK-1 DCDB Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

2C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 34 No. of Cables: 1 Type Code: 20156 End Length(m): 7

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 29 4 33 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 7

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: East:

Elevation: Schematic: ED-693900

Cable To End: Equipment No: C10CHA03 Description: UAT AVR PNL (BLK-1) Equip Location: Zone: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-044C C10-TL-057 C10-TL-058D C10-TL-062 CABLE

Cable: C10BUA1040
Seg Code: L System: BUA Startup Code:
Cable From End: Equipment No: C10BUA Description: 125V DC BLK-1 DCDB Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

2C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 34 No. of Cables: 1 Type Code: 20156 End Length(m): 7

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 29 4 33 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 7

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: East:

Elevation: Schematic: ED-693900

Cable To End: Equipment No: C10CHA02 Compartment: Description: UAT PROTECTION PNL-2 (BLK-1) North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-044C C10-TL-057 C10-TL-058D C10-TL-062 CABLE

Cable: C10BUA1041
Seg Code: L System: BUA Startup Code:
Cable From End: Equipment No: C10BUA Description: 125V DC BLK-1 DCDB Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

2C X 25 SQ.MM, 0.6/1kV
Pull Length(m): 27 No. of Cables: 1 Type Code: 20256 End Length(m): 10

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 24 3 27 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 7

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: East:

Elevation: Schematic: ED-693900

Cable To End: Equipment No: C10BBF Compartment: Description: 4.16KV UNIT SWBD BUS B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-057 C10-TL-055D C10-TL-056 CABLE

Page 285 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
2C X 16 SQ.MM, 0.6/1kV
Pull Length(m): 27 No. of Cables: 1 Type Code: 20166 End Length(m): 10 East: Elevation: Schematic: ED-693900

Cable: C10BUA1042
Seg Code: L System: BUA Startup Code:
Cable From End: Equipment No: C10BUA Description: 125V DC BLK-1 DCDB Equip Location: Zone: Location Dwg: EA-681121

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 24 3 27 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 7

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg:

Cable To End: Equipment No: C10BBF Compartment: Description: 4.16KV UNIT SWBD BUS B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-057 C10-TL-055D C10-TL-056 CABLE

Cable: C10BUA1043
Seg Code: L System: BUA Startup Code:
Cable From End: Equipment No: C10BUA Description: 125V DC BLK-1 DCDB Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

2C X 10 SQ.MM, 0.6/1kV
Pull Length(m): 20 No. of Cables: 1 Type Code: 20106 End Length(m): 10

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 22 3 25 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: East:

Elevation: Schematic: ED-693900

Cable To End: Equipment No: C10BFB Compartment: Description: 480V UNIT SWBD BUS B North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-057 C10-TL-058D CABLE

Cable: C10BUA1044
Seg Code: L System: BUA Startup Code:
Cable From End: Equipment No: C10BUA Description: 125V DC BLK-1 DCDB Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

2C X 10 SQ.MM, 0.6/1kV
Pull Length(m): 40 No. of Cables: 1 Type Code: 20106 End Length(m): 10

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 36 4 40 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: East:

Elevation: Schematic: ED-693900

Cable To End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-044C C10-TL-043D C10-TL-059D C10-TL-060D C10-TL-038C CABLE

Cable: C10BUA1045
Seg Code: L System: BUA Startup Code:
Cable From End: Equipment No: C10BUA Description: 125V DC BLK-1 DCDB Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

2C X 10 SQ.MM, 0.6/1kV
Pull Length(m): 40 No. of Cables: 1 Type Code: 20106 End Length(m): 10

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 36 4 40 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: East:

Elevation: Schematic: ED-693900

Cable To End: Equipment No: C10BJG Description: HRSG MCC-1 Equip Location: Zone: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-044C C10-TL-043D C10-TL-059D C10-TL-060D C10-TL-038C CABLE

Page 286 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
2C X 10 SQ.MM, 0.6/1kV
Pull Length(m): 37 No. of Cables: 1 Type Code: 20106 End Length(m): 5 East: Elevation: Schematic: ED-693900

Cable: C10BUA1046
Seg Code: L System: BUA Startup Code:
Cable From End: Equipment No: C10BUA Description: 125V DC BLK-1 DCDB Equip Location: Zone: Location Dwg: EA-681121

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 31 4 35 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg:

Cable To End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-053A C10-TL-044A C10-TL-043A C10-TL-059A C10-TL-039A C10-TL-038A CABLE

Cable: C10BUA1047
Seg Code: L System: BUA Startup Code:
Cable From End: Equipment No: C10BUA Description: 125V DC BLK-1 DCDB Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

2C X 10 SQ.MM, 0.6/1kV
Pull Length(m): 37 No. of Cables: 1 Type Code: 20106 End Length(m): 5

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 31 4 35 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: East:

Elevation: Schematic: ED-693900

Cable To End: Equipment No: C10BJF Description: HRSG MCC-2 Equip Location: Zone: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-053A C10-TL-044A C10-TL-043A C10-TL-059A C10-TL-039A C10-TL-038A CABLE

Cable: C10BUA1048
Seg Code: L System: BUA Startup Code:
Cable From End: Equipment No: C10BUA Description: 125V DC BLK-1 DCDB Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

2C X 10 SQ.MM, 0.6/1kV
Pull Length(m): 44 No. of Cables: 1 Type Code: 20106 End Length(m): 7

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 37 4 41 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: East:

Elevation: Schematic: ED-693900

Cable To End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-055B C10-TL-058B C10-TL-061B C10-TL-039B C10-TL-030B C10-TL-014A C10-TL-013A C10-TL-005B CABLE

Cable: C10BUA1049
Seg Code: L System: BUA Startup Code:
Cable From End: Equipment No: C10BUA Description: 125V DC BLK-1 DCDB Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

2C X 10 SQ.MM, 0.6/1kV
Pull Length(m): 44 No. of Cables: 1 Type Code: 20106 End Length(m): 7

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 37 4 41 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: East:

Elevation: Schematic: ED-693900

Cable To End: Equipment No: C10BJH Description: HRSG MCC-3 Equip Location: Zone: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-055B C10-TL-058B C10-TL-061B C10-TL-039B C10-TL-030B C10-TL-014A C10-TL-013A C10-TL-005B CABLE

Page 287 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
2C X 35 SQ.MM, 0.6/1kV
Pull Length(m): 105 No. of Cables: 1 Type Code: 20356 End Length(m): 10 East: Elevation: Schematic: ED-693900

Cable: C10BUA1050
Seg Code: L System: BUA Startup Code:
Cable From End: Equipment No: C10BUA Description: 125V DC BLK-1 DCDB Equip Location: Zone: Location Dwg: EA-681121

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 99 6 105 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg:

Cable To End: Equipment No: C13 BVA-LP01 Compartment: Description: EMERGENCY LIGHTING FOR HRSG-3 AREA North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681101

Routing Information: Remarks: Route: CABLE C10-TL-052 C10-TL-051B CABLE C10-TL-025B C10-TL-219B C10-TL-218B C10-TL-216 C10-TL-214 C10-TL-211 C13-TL-518 C13-TL-517 C13-TL-516 C13-TL-201 C13-TL-102 C13-C-1101

Cable: C10BUA1051
Seg Code: L System: BUA Startup Code:
Cable From End: Equipment No: C10BUA Description: 125V DC BLK-1 DCDB Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

2C X 300 SQ.MM, 0.6/1kV


Pull Length(m): 125 No. of Cables: 1 Type Code: 23006 End Length(m): 5

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 119 7 126 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: East:

Elevation: Schematic: ED-693900

Cable To End: Equipment No: C10BUB Compartment: Description: 125V DC STG DC SUB-DB North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-053B C10-TL-051A C10-TL-025A C10-TL-219A C10-TL-218A C10-TL-217A C10-TL-221A C14-TL-202B C14-TL-204B C14-TL-207B C14-TL-049B C14-TL-050B C14-TL-052A C14-TL-059A C14-TL-060A C14-TL-061A CABLE

Cable: C10BUA1052
Seg Code: L System: BUA Startup Code:
Cable From End: Equipment No: C10BUA Description: 125V DC BLK-1 DCDB Equip Location: Zone: Location Dwg: EA-681121

Rev: 02

Description:

2C X 300 SQ.MM, 0.6/1kV


Pull Length(m): 125 No. of Cables: 1 Type Code: 23006 End Length(m): 5

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 119 7 126 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 5

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: East:

Elevation: Schematic: ED-693900

Cable To End: Equipment No: C10BUB Compartment: Description: 125V DC STG DC SUB-DB North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-053B C10-TL-051A C10-TL-025A C10-TL-219A C10-TL-218A C10-TL-217A C10-TL-221A C14-TL-202B C14-TL-204B C14-TL-207B C14-TL-049B C14-TL-050B C14-TL-052A C14-TL-059A C14-TL-060A C14-TL-061A CABLE

Page 288 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
1C X 630 SQ.MM, 0.6/1kV
Pull Length(m): 18 No. of Cables: 1 Type Code: 16306 End Length(m): 12 East: Elevation: Schematic: ED-693900

Cable: C10BUA1053
Seg Code: L System: BUA Startup Code:
Cable From End: Equipment No: C10BUA Description: 125V DC BLK-1 DCDB Equip Location: Zone: Location Dwg: EA-681121 Routing Information: Remarks: Route: C10-C-1106

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 13 3 16 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg:

Cable To End: Equipment No: C1072ESOP Compartment: End Length(m): 0 Description: DC MOTOR STARTER FOR EMERGENCY SEAL OIL PUMP BLOCK-1 North: Equip Location: Zone: East: Elevation: Wiring Dwg: Location Dwg: EA-681121 Schematic: ED-693900

Cable: C10BUA1054
Seg Code: L System: BUA Startup Code:
Cable From End: Equipment No: C10BUA Description: 125V DC BLK-1 DCDB Equip Location: Zone: Location Dwg: EA-681121 Routing Information: Remarks: Route: C10-C-1107

Rev: 01

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 16 No. of Cables: 1 Type Code: 16306 End Length(m): 12

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 13 3 16 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: East:

Elevation: Schematic: ED-693900

Cable To End: Equipment No: C1072ESOP Compartment: End Length(m): 0 Description: DC MOTOR STARTER FOR EMERGENCY SEAL OIL PUMP BLOCK-1 North: Equip Location: Zone: East: Elevation: Wiring Dwg: Location Dwg: EA-681121 Schematic: ED-693900

Cable: C10BUA1055
Seg Code: L System: BUA Startup Code:
Cable From End: Equipment No: C10BUA Description: 125V DC BLK-1 DCDB Equip Location: Zone: Location Dwg: EA-681121 Routing Information: Remarks: Route: C10-C-1108

Rev: 01

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 16 No. of Cables: 1 Type Code: 16306 End Length(m): 12

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 13 3 16 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: East:

Elevation: Schematic: ED-693900

Cable To End: Equipment No: C1072ESOP Compartment: End Length(m): 0 Description: DC MOTOR STARTER FOR EMERGENCY SEAL OIL PUMP BLOCK-1 North: Equip Location: Zone: East: Elevation: Wiring Dwg: Location Dwg: EA-681121 Schematic: ED-693900

Cable: C10BUA1056
Seg Code: L System: BUA Startup Code:
Cable From End: Equipment No: C10BUA Description: 125V DC BLK-1 DCDB Equip Location: Zone: Location Dwg: EA-681121 Routing Information: Remarks: Route: C10-C-1109

Rev: 01

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 18 No. of Cables: 1 Type Code: 16306 End Length(m): 12

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 13 3 16 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: East:

Elevation: Schematic: ED-693900

Cable To End: Equipment No: C1072ESOP Compartment: End Length(m): 0 Description: DC MOTOR STARTER FOR EMERGENCY SEAL OIL PUMP BLOCK-1 North: Equip Location: Zone: East: Elevation: Wiring Dwg: Location Dwg: EA-681121 Schematic: ED-693900

Page 289 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
1C X 630 SQ.MM, 0.6/1kV
Pull Length(m): 18 No. of Cables: 1 Type Code: 16306 End Length(m): 7 East: Elevation: Schematic: ED-693900

Cable: C10BUA1057
Seg Code: L System: BUA Startup Code:
Cable From End: Equipment No: C10BUA Description: 125V DC BLK-1 DCDB Equip Location: Zone: Location Dwg: EA-681121

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 19 3 22 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 7

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg:

Cable To End: Equipment No: C1072EBOP Compartment: Description: DC MOTOR STARTER FOR EBPM BLOCK-1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-044A C10-TL-042A C10-TL-041 CABLE

Cable: C10BUA1058
Seg Code: L System: BUA Startup Code:
Cable From End: Equipment No: C10BUA Description: 125V DC BLK-1 DCDB Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 18 No. of Cables: 1 Type Code: 16306 End Length(m): 7

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 19 3 22 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 7

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: East:

Elevation: Schematic: ED-693900

Cable To End: Equipment No: C1072EBOP Compartment: Description: DC MOTOR STARTER FOR EBPM BLOCK-1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-044A C10-TL-042A C10-TL-041 CABLE

Cable: C10BUA1059
Seg Code: L System: BUA Startup Code:
Cable From End: Equipment No: C10BUA Description: 125V DC BLK-1 DCDB Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 18 No. of Cables: 1 Type Code: 16306 End Length(m): 7 Elevation: Schematic: ED-693900

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 19 3 22 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 7

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No: Compartment: AUTO1059 North: Wiring Dwg: East:

Cable To End: Equipment No: C1072EBOP Compartment: Description: DC MOTOR STARTER FOR EBPM BLOCK-1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-044A C10-TL-042A C10-TL-041 CABLE

Cable: C10BUA1060
Seg Code: L System: BUA Startup Code:
Cable From End: Equipment No: C10BUA Description: 125V DC BLK-1 DCDB Equip Location: Zone: Location Dwg: EA-681121

Rev: 01

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 18 No. of Cables: 1 Type Code: 16306 End Length(m): 7

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 19 3 22 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 7

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: East:

Elevation: Schematic: ED-693900

Cable To End: Equipment No: C1072EBOP Compartment: Description: DC MOTOR STARTER FOR EBPM BLOCK-1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-044A C10-TL-042A C10-TL-041 CABLE

Page 290 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
2C X 2.5 SQ.MM, 0.6/1kV
Pull Length(m): 37 No. of Cables: 1 Type Code: 20026 End Length(m): 7 East: Elevation: Schematic: ED-693900

Cable: C10BUA1061
Seg Code: L System: BUA Startup Code:
Cable From End: Equipment No: C10BUA Description: 125V DC BLK-1 DCDB Equip Location: Zone: Location Dwg: EA-681121

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 29 4 33 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 7

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg:

Cable To End: Equipment No: C10CEJ01 Compartment: Description: 4.16KV UNIT SWGR FAULT RECORDER PANEL-1 (BLK-1) North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681121

Routing Information: Remarks: Route: CABLE C10-TL-044C C10-TL-057 C10-TL-058D C10-TL-062 CABLE

Cable: C10BUA1063
Seg Code: L System: BUA Startup Code:

Rev: 02

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 175 No. of Cables: 1 Type Code: 16306

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 181 9 190 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 10

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C1072ESOP Compartment: End Length(m): 5 Description: DC MOTOR STARTER FOR EMERGENCY SEAL OIL PUMP BLOCK-1 Equip Location: Zone: East: Elevation: North: Location Dwg: EA-681121 Wiring Dwg: Schematic: ED-693900

Cable To End: Equipment No: C10ESPM Compartment: Description: EMERGENCY SEAL OIL PUMP MOTOR (BLK-1) North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-053B C10-TL-051A C10-TL-025A C10-TL-219A C10-TL-218A C10-TL-217A C10-TL-221A C14-TL-202B C14-TL-204B C14-TL-207B C14-TL-049B C14-TL-050B C14-TL-052A C14-TL-059A C14-TL-060A C14-TL-061A C14-TL-001 C14-TL-006A C14-TL-008B C14-TL-009A C14-TL-011A C14-TL-023 C14-TL-028 C14-TL-027A C14-C-1116

Cable: C10BUA1064
Seg Code: L System: BUA Startup Code:

Rev: 02

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 177 No. of Cables: 1 Type Code: 16306

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 181 9 190 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 10

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C1072ESOP Compartment: End Length(m): 5 Description: DC MOTOR STARTER FOR EMERGENCY SEAL OIL PUMP BLOCK-1 Equip Location: Zone: North: East: Elevation: Location Dwg: EA-681121 Wiring Dwg: Schematic: ED-693900

Cable To End: Equipment No: C10ESPM Compartment: Description: EMERGENCY SEAL OIL PUMP MOTOR (BLK-1) North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-053B C10-TL-051A C10-TL-025A C10-TL-219A C10-TL-218A C10-TL-217A C10-TL-221A C14-TL-202B C14-TL-204B C14-TL-207B C14-TL-049B C14-TL-050B C14-TL-052A C14-TL-059A C14-TL-060A C14-TL-061A C14-TL-001 C14-TL-006A C14-TL-008B C14-TL-009A C14-TL-011A C14-TL-023 C14-TL-028 C14-TL-027A C14-C-1116

Page 291 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
1C X 630 SQ.MM, 0.6/1kV
Pull Length(m): 176 No. of Cables: 1 Type Code: 16306

Cable: C10BUA1065
Seg Code: L System: BUA Startup Code:

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 181 9 190 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 10

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C1072ESOP Compartment: End Length(m): 5 Description: DC MOTOR STARTER FOR EMERGENCY SEAL OIL PUMP BLOCK-1 Equip Location: Zone: East: Elevation: North: Location Dwg: EA-681121 Wiring Dwg: Schematic: ED-693900

Cable To End: Equipment No: C10ESPM Compartment: Description: EMERGENCY SEAL OIL PUMP MOTOR (BLK-1) North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-053B C10-TL-051A C10-TL-025A C10-TL-219A C10-TL-218A C10-TL-217A C10-TL-221A C14-TL-202B C14-TL-204B C14-TL-207B C14-TL-049B C14-TL-050B C14-TL-052A C14-TL-059A C14-TL-060A C14-TL-061A C14-TL-001 C14-TL-006A C14-TL-008B C14-TL-009A C14-TL-011A C14-TL-023 C14-TL-028 C14-TL-027A C14-C-1117

Cable: C10BUA1066
Seg Code: L System: BUA Startup Code:

Rev: 02

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 177 No. of Cables: 1 Type Code: 16306

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 181 9 190 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 10

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C1072ESOP Compartment: End Length(m): 5 Description: DC MOTOR STARTER FOR EMERGENCY SEAL OIL PUMP BLOCK-1 Equip Location: Zone: North: East: Elevation: Location Dwg: EA-681121 Wiring Dwg: Schematic: ED-693900

Cable To End: Equipment No: C10ESPM Compartment: Description: EMERGENCY SEAL OIL PUMP MOTOR (BLK-1) North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-053B C10-TL-051A C10-TL-025A C10-TL-219A C10-TL-218A C10-TL-217A C10-TL-221A C14-TL-202B C14-TL-204B C14-TL-207B C14-TL-049B C14-TL-050B C14-TL-052A C14-TL-059A C14-TL-060A C14-TL-061A C14-TL-001 C14-TL-006A C14-TL-008B C14-TL-009A C14-TL-011A C14-TL-023 C14-TL-028 C14-TL-027A C14-C-1117

Cable: C10BUA1067
Seg Code: L System: BUA Startup Code:

Rev: 02

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 183 No. of Cables: 1 Type Code: 16306 End Length(m): 5 Elevation: Schematic: ED-693900

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 181 9 190 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 10

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C1072EBOP Compartment: Description: DC MOTOR STARTER FOR EBPM BLOCK-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10EBPM Compartment: Description: EMERGENCY BEARING OIL PUMP MOTOR (BLK-1) North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-053B C10-TL-051A C10-TL-025A C10-TL-219A C10-TL-218A C10-TL-217A C10-TL-221A C14-TL-202B C14-TL-204B C14-TL-207B C14-TL-049B C14-TL-050B C14-TL-052A C14-TL-059A C14-TL-060A C14-TL-061A C14-TL-001 C14-TL-006A C14-TL-008B C14-TL-009A C14-TL-011A C14-TL-023 C14-TL-028 C14-TL-027A C14-C-1118

Page 292 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
1C X 630 SQ.MM, 0.6/1kV
Pull Length(m): 183 No. of Cables: 1 Type Code: 16306 End Length(m): 5 Elevation: Schematic: ED-693900

Cable: C10BUA1068
Seg Code: L System: BUA Startup Code:

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 181 9 190 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 10

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C1072EBOP Compartment: Description: DC MOTOR STARTER FOR EBPM BLOCK-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10EBPM Compartment: Description: EMERGENCY BEARING OIL PUMP MOTOR (BLK-1) North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-053B C10-TL-051A C10-TL-025A C10-TL-219A C10-TL-218A C10-TL-217A C10-TL-221A C14-TL-202B C14-TL-204B C14-TL-207B C14-TL-049B C14-TL-050B C14-TL-052A C14-TL-059A C14-TL-060A C14-TL-061A C14-TL-001 C14-TL-006A C14-TL-008B C14-TL-009A C14-TL-011A C14-TL-023 C14-TL-028 C14-TL-027A C14-C-1118

Cable: C10BUA1069
Seg Code: L System: BUA Startup Code:

Rev: 02

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 185 No. of Cables: 1 Type Code: 16306 End Length(m): 5 Elevation: Schematic: ED-693900

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 181 9 190 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 10

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C1072EBOP Compartment: AUTO1059 Description: DC MOTOR STARTER FOR EBPM BLOCK-1 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10EBPM Compartment: Description: EMERGENCY BEARING OIL PUMP MOTOR (BLK-1) North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-053B C10-TL-051A C10-TL-025A C10-TL-219A C10-TL-218A C10-TL-217A C10-TL-221A C14-TL-202B C14-TL-204B C14-TL-207B C14-TL-049B C14-TL-050B C14-TL-052A C14-TL-059A C14-TL-060A C14-TL-061A C14-TL-001 C14-TL-006A C14-TL-008B C14-TL-009A C14-TL-011A C14-TL-023 C14-TL-028 C14-TL-027A C14-C-1119

Cable: C10BUA1070
Seg Code: L System: BUA Startup Code:

Rev: 02

Description:

1C X 630 SQ.MM, 0.6/1kV


Pull Length(m): 184 No. of Cables: 1 Type Code: 16306 End Length(m): 5 Elevation: Schematic: ED-693900

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 181 9 190 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 10

Furnish Spec: QC-1020 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C1072EBOP Compartment: Description: DC MOTOR STARTER FOR EBPM BLOCK-1 Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10EBPM Compartment: Description: EMERGENCY BEARING OIL PUMP MOTOR (BLK-1) North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-053B C10-TL-051A C10-TL-025A C10-TL-219A C10-TL-218A C10-TL-217A C10-TL-221A C14-TL-202B C14-TL-204B C14-TL-207B C14-TL-049B C14-TL-050B C14-TL-052A C14-TL-059A C14-TL-060A C14-TL-061A C14-TL-001 C14-TL-006A C14-TL-008B C14-TL-009A C14-TL-011A C14-TL-023 C14-TL-028 C14-TL-027A C14-C-1119

Page 293 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
2C X 4 SQ.MM, 0.6/1kV
Pull Length(m): 200 No. of Cables: 1 Type Code: 20046

Cable: C10BUA1071
Seg Code: L System: BUA Startup Code:

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 181 9 190 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C1072ESOP Compartment: End Length(m): 5 Description: DC MOTOR STARTER FOR EMERGENCY SEAL OIL PUMP BLOCK-1 Equip Location: Zone: East: Elevation: North: Location Dwg: EA-681121 Wiring Dwg: Schematic: ED-693900

Cable To End: Equipment No: C10ESPM Compartment: Description: EMERGENCY SEAL OIL PUMP MOTOR (BLK-1) North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-053B C10-TL-051A C10-TL-025A C10-TL-219A C10-TL-218A C10-TL-217A C10-TL-221A C14-TL-202B C14-TL-204B C14-TL-207B C14-TL-049B C14-TL-050B C14-TL-052A C14-TL-059A C14-TL-060A C14-TL-061A C14-TL-001 C14-TL-006A C14-TL-008B C14-TL-009A C14-TL-011A C14-TL-023 C14-TL-028 C14-TL-027A C14-C-1117

Cable: C10BUA1072
Seg Code: L System: BUA Startup Code:

Rev: 02

Description:

2C X 4 SQ.MM, 0.6/1kV
Pull Length(m): 200 No. of Cables: 1 Type Code: 20046 End Length(m): 5 Elevation: Schematic: ED-693900

Service: 125V DC BLOCK-1 DCDB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 181 9 190 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693900 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C1072EBOP Compartment: Description: DC MOTOR STARTER FOR EBPM BLOCK-1 Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10EBPM Compartment: Description: EMERGENCY BEARING OIL PUMP MOTOR (BLK-1) North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C10-TL-053B C10-TL-051A C10-TL-025A C10-TL-219A C10-TL-218A C10-TL-217A C10-TL-221A C14-TL-202B C14-TL-204B C14-TL-207B C14-TL-049B C14-TL-050B C14-TL-052A C14-TL-059A C14-TL-060A C14-TL-061A C14-TL-001 C14-TL-006A C14-TL-008B C14-TL-009A C14-TL-011A C14-TL-023 C14-TL-028 C14-TL-027A C14-C-1119

Cable: C10BUB1001
Seg Code: L System: BUB Startup Code:

Rev: 02

Description:

2C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 25 No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-693901

Service: 125V DC STG BLDG DC SUB DB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 18 3 21 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693901 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BUB Compartment: Description: 125V DC STG DC SUB-DB Equip Location: Zone: East: North: Location Dwg: EA-681111 Wiring Dwg:

Cable To End: Equipment No: C100102 Compartment: Description: GENERATOR CONT & PROT PNL BLK-1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C14-TL-061A C14-TL-060A C14-TL-059A C14-TL-052A CABLE

Page 294 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
2C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 25 No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-693901

Cable: C10BUB1002
Seg Code: L System: BUB Startup Code:

Service: 125V DC STG BLDG DC SUB DB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 18 3 21 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693901 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BUB Compartment: Description: 125V DC STG DC SUB-DB Equip Location: Zone: East: North: Location Dwg: EA-681111 Wiring Dwg:

Cable To End: Equipment No: C100102 Compartment: Description: GENERATOR CONT & PROT PNL BLK-1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C14-TL-061A C14-TL-060A C14-TL-059A C14-TL-052A CABLE

Cable: C10BUB1003
Seg Code: L System: BUB Startup Code:

Rev: 02

Description:

2C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 25 No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-693901

Service: 125V DC STG BLDG DC SUB DB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 18 3 21 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693901 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BUB Compartment: Description: 125V DC STG DC SUB-DB Equip Location: Zone: East: North: Location Dwg: EA-681111 Wiring Dwg:

Cable To End: Equipment No: C100102 Compartment: Description: GENERATOR CONT & PROT PNL BLK-1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C14-TL-061A C14-TL-060A C14-TL-059A C14-TL-052A CABLE

Cable: C10BUB1004
Seg Code: L System: BUB Startup Code:

Rev: 02

Description:

2C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 25 No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-693901

Service: 125V DC STG BLDG DC SUB DB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 18 3 21 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693901 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BUB Compartment: Description: 125V DC STG DC SUB-DB Equip Location: Zone: North: East: Location Dwg: EA-681111 Wiring Dwg:

Cable To End: Equipment No: C100102 Compartment: Description: GENERATOR CONT & PROT PNL BLK-1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C14-TL-061A C14-TL-060A C14-TL-059A C14-TL-052A CABLE

Cable: C10BUB1005
Seg Code: L System: BUB Startup Code:

Rev: 02

Description:

2C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 25 No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-693901

Service: 125V DC STG BLDG DC SUB DB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 18 3 21 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693901 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BUB Compartment: Description: 125V DC STG DC SUB-DB Equip Location: Zone: North: East: Location Dwg: EA-681111 Wiring Dwg:

Cable To End: Equipment No: C100102 Compartment: Description: GENERATOR CONT & PROT PNL BLK-1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C14-TL-061A C14-TL-060A C14-TL-059A C14-TL-052A CABLE

Page 295 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
2C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 25 No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-693901

Cable: C10BUB1006
Seg Code: L System: BUB Startup Code:

Service: 125V DC STG BLDG DC SUB DB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 18 3 21 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693901 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BUB Compartment: Description: 125V DC STG DC SUB-DB Equip Location: Zone: East: North: Location Dwg: EA-681111 Wiring Dwg:

Cable To End: Equipment No: C100102 Compartment: Description: GENERATOR CONT & PROT PNL BLK-1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C14-TL-061A C14-TL-060A C14-TL-059A C14-TL-052A CABLE

Cable: C10BUB1007
Seg Code: L System: BUB Startup Code:

Rev: 02

Description:

2C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 90 No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-693901

Service: 125V DC STG BLDG DC SUB DB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 81 5 86 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693901 15

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BUB Compartment: Description: 125V DC STG DC SUB-DB Equip Location: Zone: East: North: Location Dwg: EA-681111 Wiring Dwg:

Cable To End: Equipment No: C1041AC Compartment: Description: EXCITATION TRANSFORMER SECONDARY BREAKER North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C14-TL-061A C14-TL-060A C14-TL-058A C14-TL-056A C14-TL-065A C14-TL-003 C14-TL-008A C14-TL-004 C14-EC-001

Cable: C10BUB1008
Seg Code: L System: BUB Startup Code:

Rev: 02

Description:

2C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 30 No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-693901

Service: 125V DC STG BLDG DC SUB DB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 23 3 26 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693901 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BUB Compartment: Description: 125V DC STG DC SUB-DB Equip Location: Zone: North: East: Location Dwg: EA-681111 Wiring Dwg:

Cable To End: Equipment No: C10CHB02 Compartment: Description: STG#1 INTERFACE PANEL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C14-TL-061A C14-TL-060A C14-TL-058A C14-TL-056A CABLE

Cable: C10BUB1009
Seg Code: L System: BUB Startup Code:

Rev: 02

Description:

2C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): 30 No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-693901

Service: 125V DC STG BLDG DC SUB DB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 23 3 26 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693901 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BUB Compartment: Description: 125V DC STG DC SUB-DB Equip Location: Zone: North: East: Location Dwg: EA-681111 Wiring Dwg:

Cable To End: Equipment No: C10CHB02 Compartment: Description: STG#1 INTERFACE PANEL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C14-TL-061A C14-TL-060A C14-TL-058A C14-TL-056A CABLE

Page 296 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
2C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): 30 No. of Cables: 1 Type Code: 20156 End Length(m): 5 Elevation: Schematic: ED-693901

Cable: C10BUB1010
Seg Code: L System: BUB Startup Code:

Service: 125V DC STG BLDG DC SUB DB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 23 3 26 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693901 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BUB Compartment: Description: 125V DC STG DC SUB-DB Equip Location: Zone: East: North: Location Dwg: EA-681111 Wiring Dwg:

Cable To End: Equipment No: C10CHC01 Compartment: Description: GSU BLK-1 RTCC PNL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C14-TL-061A C14-TL-060A C14-TL-058A C14-TL-056A CABLE

Cable: C10BUB1011
Seg Code: L System: BUB Startup Code:

Rev: 02

Description:

2C X 4 SQ.MM, 0.6/1kV
Pull Length(m): 30 No. of Cables: 1 Type Code: 20046 End Length(m): 5 Elevation: Schematic: ED-693901

Service: 125V DC STG BLDG DC SUB DB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 23 3 26 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693901 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BUB Compartment: Description: 125V DC STG DC SUB-DB Equip Location: Zone: East: North: Location Dwg: EA-681111 Wiring Dwg:

Cable To End: Equipment No: C10CHB01 Compartment: Description: GSU#1 MECHANICAL PROTECTION PANEL North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C14-TL-061A C14-TL-060A C14-TL-058A C14-TL-056A CABLE

Cable: C10BUB1012
Seg Code: L System: BUB Startup Code:

Rev: 02

Description:

2C X 16 SQ.MM, 0.6/1kV
Pull Length(m): 26 No. of Cables: 1 Type Code: 20166 End Length(m): 5 Elevation: Schematic: ED-693901

Service: 125V DC STG BLDG DC SUB DB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 19 3 22 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693901 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BUB Compartment: Description: 125V DC STG DC SUB-DB Equip Location: Zone: North: East: Location Dwg: EA-681111 Wiring Dwg: Routing Information: Remarks: Route: CABLE C14-TL-061A C14-TL-060A C14-TL-058A CABLE

Cable To End: Equipment No: C101017 Compartment: Description: EX2100 PNL FOR BLK-1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Cable: C10BUB1013
Seg Code: L System: BUB Startup Code:

Rev: 02

Description:

2C X 4 SQ.MM, 0.6/1kV
Pull Length(m): 26 No. of Cables: 1 Type Code: 20046 End Length(m): 5 Elevation: Schematic: ED-693901

Service: 125V DC STG BLDG DC SUB DB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 19 3 22 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693901 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BUB Compartment: Description: 125V DC STG DC SUB-DB Equip Location: Zone: North: East: Location Dwg: EA-681111 Wiring Dwg: Routing Information: Remarks: Route: CABLE C14-TL-061A C14-TL-060A C14-TL-058A CABLE

Cable To End: Equipment No: C101017 Compartment: Description: EX2100 PNL FOR BLK-1 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Page 297 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 02 Description:
2C X 16 SQ.MM, 0.6/1kV
Pull Length(m): 90 No. of Cables: 1 Type Code: 20166 End Length(m): 5 Elevation: Schematic: ED-693901

Cable: C10BUB1014
Seg Code: L System: BUB Startup Code:

Service: 125V DC STG BLDG DC SUB DB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 81 5 86 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693901 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BUB Compartment: Description: 125V DC STG DC SUB-DB Equip Location: Zone: East: North: Location Dwg: EA-681111 Wiring Dwg:

Cable To End: Equipment No: C10JB21 Compartment: Description: JUNCTION BOX- JB/21 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C14-TL-061A C14-TL-001 C14-TL-006A C14-TL-008B C14-TL-009A C14-TL-011A C14-TL-023 C14-TL-024 C14-TL-026 C14-TL-030B C14-TL-031 C14-C-1113

Cable: C10BUB1015
Seg Code: L System: BUB Startup Code:

Rev: 02

Description:

2C X 6 SQ.MM, 0.6/1kV
Pull Length(m): 56 No. of Cables: 1 Type Code: 20066 End Length(m): 5 Elevation: Schematic: ED-693901

Service: 125V DC STG BLDG DC SUB DB FEEDERS


Routed Length (m): Allowance (m): Total Length (m): 47 4 51 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: ED-693901 15

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BUB Compartment: Description: 125V DC STG DC SUB-DB Equip Location: Zone: North: East: Location Dwg: EA-681111 Wiring Dwg:

Cable To End: Equipment No: C10BVD02 Compartment: Description: EMERGENCY LIGHTING FOR STG BLDG. North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681111

Routing Information: Remarks: Route: CABLE C14-TL-061B C14-TL-064 C14-TL-067 C14-TL-098 C14-TL-097B C14-C-1114

Cable: C10LCB1001
Seg Code: L System: LCB Startup Code:

Rev: 01

Description:

3C X 6 SQ.MM, 0.6/1kV
Pull Length(m): 160 No. of Cables: 1 Type Code: 30066 End Length(m): 8 Elevation: Schematic: ED-680937

Service: CONDENSATE PUMP-A


Routed Length (m): Allowance (m): Total Length (m): 148 8 156 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BBF Compartment: H23 Description: 4.16KV UNIT SWBD BUS B Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-LCB-46-AP-001 Compartment: HEATER End Length(m): 15 T/BOX Description: CONDENSATE EXTRACTION PUMP North: 1741.30 Equip Location: Zone: East: 2321.40 Elevation: 2.60 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-680937

Routing Information: Remarks: Route: CABLE C10-TL-080 C10-TL-082 C10-TL-056 CABLE C10-TL-051A CABLE C10-TL-222A C14-TL-202A C14-TL-204A C14-TL-207A C14-TL-049A C14-TL-050A C14-TL-051 C14-TL-002 C14-TL-006B C14-TL-007 C14-TL-010 C14-C-1286

Page 298 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
3C X 6 SQ.MM, 0.6/1kV
Pull Length(m): 180 No. of Cables: 1 Type Code: 30066 End Length(m): 8 Elevation: Schematic: ED-680938

Cable: C10LCB1004
Seg Code: L System: LCB Startup Code:

Service: CONDENSATE PUMP-B


Routed Length (m): Allowance (m): Total Length (m): 158 8 166 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BBE Compartment: H11 Description: 4.16KV UNIT SWBD BUS A Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-LCB-46-AP-002 Compartment: HEATER End Length(m): 15 T/BOX Description: CONDENSATE EXTRACTION PUMP North: 1743.80 Equip Location: Zone: East: 2321.40 Elevation: 2.60 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-680938

Routing Information: Remarks: Route: CABLE C10-TL-071 C10-TL-074 C10-TL-076 C10-TL-080 C10-TL-082 C10-TL-056 CABLE C10-TL-051A CABLE C10-TL-222A C14-TL-202A C14-TL-204A C14-TL-207A C14-TL-049A C14-TL-050A C14-TL-051 C14-TL-002 C14-TL-006B C14-TL-007 C14-TL-010 C14-C-1287

Cable: C10LCB1007
Seg Code: L System: LCB Startup Code:

Rev: 01

Description:

3C X 6 SQ.MM, 0.6/1kV
Pull Length(m): 160 No. of Cables: 1 Type Code: 30066 End Length(m): 8 Elevation: Schematic: ED-680939

Service: CONDENSATE PUMP-C


Routed Length (m): Allowance (m): Total Length (m): 148 8 156 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BBF Compartment: H24 Description: 4.16KV UNIT SWBD BUS B Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-LCB-46-AP-003 Compartment: HEATER End Length(m): 15 T/BOX Description: CONDENSATE EXTRACTION PUMP North: 1746.30 Equip Location: Zone: East: 2321.40 Elevation: 2.60 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-680939

Routing Information: Remarks: Route: CABLE C10-TL-080 C10-TL-082 C10-TL-056 CABLE C10-TL-051A CABLE C10-TL-222A C14-TL-202A C14-TL-204A C14-TL-207A C14-TL-049A C14-TL-050A C14-TL-051 C14-TL-002 C14-TL-006B C14-TL-007 C14-TL-010 C14-C-1288

Cable: C10PAA1001
Seg Code: L System: PAA Startup Code:

Rev: 00

Description:

4C X 16 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40166 End Length(m): 5 Elevation: Schematic:

Service: 480V POWER FOR DRUM SCREEN MOTOR 11


Routed Length (m): Allowance (m): Total Length (m): 213 10 223 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C00BJK Compartment: Description: DRUM SCREEN MCC-A Equip Location: Zone: East: North: Location Dwg: EA-681133 Wiring Dwg: DOC EE-02850

Cable To End: Equipment No: C10-PAA-55-AT-001 Compartment: Description: DRUM SCREEN MOTOR 11 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681133

Routing Information: Remarks: QC-1048, BEAUDREY Route: CABLE C00-TL-165B C00-TL-166B C00-TL-167B C00-TL-168B C00-TL-169B C00-TL-170B C00-TL-171B C00-TL-203B C00-TL-205B C00-TL-207B C00-TL-209B C00-TL-211B C00-TL-265 C00-TL-266 C00-TL-267 C00-TL-268 C00-EC-110 CABLE

Page 299 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
4C X 16 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40166 End Length(m): 5 Elevation: Schematic:

Cable: C10PAA1002
Seg Code: L System: PAA Startup Code:

Service: 480V POWER FOR DRUM SCREEN MOTOR 12


Routed Length (m): Allowance (m): Total Length (m): 223 11 234 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C00BJL Compartment: Description: DRUM SCREEN MCC-B Equip Location: Zone: East: North: Location Dwg: EA-681133 Wiring Dwg: DOC EE-02850

Cable To End: Equipment No: C10-PAA-55-AT-002 Compartment: Description: DRUM SCREEN MOTOR 12 North: Equip Location: Zone: East: Wiring Dwg: Location Dwg: EA-681133

Routing Information: Remarks: QC-1048, BEAUDREY Route: CABLE C00-TL-166B C00-TL-167B C00-TL-168B C00-TL-169B C00-TL-170B C00-TL-171B C00-TL-203B C00-TL-205B C00-TL-207B C00-TL-209B C00-TL-211B C00-TL-265 C00-TL-266 C00-TL-267 C00-TL-268 C00-TL-269 C00-EC-122 CABLE

Cable: C10PAA1003
Seg Code: L System: PAA Startup Code:
Cable From End: Equipment No: C00BJO Description: TRASH RAKE MCC-A Equip Location: Zone: Location Dwg: EA-681133

Rev: 00

Description:

4C X 6 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40066 End Length(m): 5 Elevation: Schematic:

Service: 480V POWER FOR CCRBS MOTOR 11


Routed Length (m): Allowance (m): Total Length (m): 248 12 260 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: East: Wiring Dwg: DOC EE-02850

Cable To End: Equipment No: C10-PAA-55-AT-003 Description: CCRBS MOTOR 11 Equip Location: Zone: Location Dwg: EA-681133

Routing Information: Remarks: QC-1048, BEAUDREY Route: CABLE C00-TL-162B C00-TL-163B C00-TL-164B C00-TL-165B C00-TL-166B C00-TL-167B C00-TL-168B C00-TL-169B C00-TL-170B C00-TL-171B C00-TL-203B C00-TL-205B C00-TL-207B C00-TL-209B C00-TL-211B C00-TL-265 C00-TL-278 C00-TL-279 C00-TL-280 C00-TL-281 C00-TL-282 C00-EC-115 CABLE

Cable: C10PAA1004
Seg Code: L System: PAA Startup Code:
Cable From End: Equipment No: C00BJP Description: TRASH RAKE MCC-B Equip Location: Zone: Location Dwg: EA-681133

Rev: 00

Description:

4C X 6 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40066 End Length(m): 5 Elevation: Schematic:

Service: 480V POWER FOR CCRBS MOTOR 12


Routed Length (m): Allowance (m): Total Length (m): 258 12 270 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: East: Wiring Dwg: DOC EE-02850

Cable To End: Equipment No: C10-PAA-55-AT-004 Description: CCRBS MOTOR 12 Equip Location: Zone: Location Dwg: EA-681133

Routing Information: Remarks: QC-1048, BEAUDREY Route: CABLE C00-TL-163B C00-TL-164B C00-TL-165B C00-TL-166B C00-TL-167B C00-TL-168B C00-TL-169B C00-TL-170B C00-TL-171B C00-TL-203B C00-TL-205B C00-TL-207B C00-TL-209B C00-TL-211B C00-TL-265 C00-TL-278 C00-TL-279 C00-TL-280 C00-TL-281 C00-TL-282 C00-TL-283 C00-EC-127 CABLE

Page 300 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
4C X 6 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40066 End Length(m): 12 Elevation: Schematic:

Cable: C10PAH1004
Seg Code: L System: PAH Startup Code:

Service: BALL RECIRCULATION PUMP


Routed Length (m): Allowance (m): Total Length (m): 39 4 43 Option 1: CTCS CABLES BLK-1 Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: 15

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10-PAH-55-GH-001 Compartment: Description: BLK-1 COND OLTCS PNL Equip Location: Zone: East: North: Location Dwg: EA-681111 Wiring Dwg: EE-01774 Routing Information: Remarks: QC-1074, CTCS Route: C14-C-1008 C14-TL-038 C14-TL-036 FIELD ROUTED

Cable To End: Equipment No: C10-PAH-55-AP-001 Compartment: Description: BALL RECIRCULATION PUMP-A North: Equip Location: Zone: East: Wiring Dwg: EE-01774 Location Dwg: EA-681111

Cable: C10PAH1005
Seg Code: L System: PAH Startup Code:

Rev: 00

Description:

4C X 6 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40066 End Length(m): 12 Elevation: Schematic:

Service: BALL RECIRCULATION PUMP


Routed Length (m): Allowance (m): Total Length (m): 39 4 43 Option 1: CTCS CABLES BLK-1 Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: 15

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10-PAH-55-GH-001 Compartment: Description: BLK-1 COND OLTCS PNL Equip Location: Zone: East: North: Location Dwg: EA-681111 Wiring Dwg: EE-01774 Routing Information: Remarks: QC-1074, CTCS Route: C14-C-1008 C14-TL-038 C14-TL-036 FIELD ROUTED

Cable To End: Equipment No: C10-PAH-55-AP-002 Compartment: Description: BALL RECIRCULATION PUMP-B North: Equip Location: Zone: East: Wiring Dwg: EE-01774 Location Dwg: EA-681111

Cable: C10PAH1006
Seg Code: L System: PAH Startup Code:

Rev: 00

Description:

4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40046 End Length(m): 12 Elevation: Schematic:

Service: BALL STRAINER ACTUATOR


Routed Length (m): Allowance (m): Total Length (m): 49 4 53 Option 1: CTCS CABLES BLK-1 Option 2: Option 3: Compartment: North: Wiring Dwg: EE-01774 East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: 15

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10-PAH-55-GH-001 Compartment: Description: BLK-1 COND OLTCS PNL Equip Location: Zone: North: East: Location Dwg: EA-681111 Wiring Dwg: EE-01774

Cable To End: Equipment No: C10-PAH-55-AA-051 Description: BALL STRAINER A-1 Equip Location: Zone: Location Dwg: EA-681111

Routing Information: Remarks: QC-1074, CTCS Route: C14-C-1008 C14-TL-038 C14-TL-036 C14-TL-033 FIELD ROUTED

Cable: C10PAH1007
Seg Code: L System: PAH Startup Code:

Rev: 00

Description:

4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40046 End Length(m): 12 Elevation: Schematic:

Service: BALL STRAINER ACTUATOR


Routed Length (m): Allowance (m): Total Length (m): 49 4 53 Option 1: CTCS CABLES BLK-1 Option 2: Option 3: Compartment: North: Wiring Dwg: EE-01774 East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: 15

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10-PAH-55-GH-001 Compartment: Description: BLK-1 COND OLTCS PNL Equip Location: Zone: North: East: Location Dwg: EA-681111 Wiring Dwg: EE-01774

Cable To End: Equipment No: C10-PAH-55-AA-052 Description: BALL STRAINER A-2 Equip Location: Zone: Location Dwg: EA-681111

Routing Information: Remarks: QC-1074, CTCS Route: C14-C-1008 C14-TL-038 C14-TL-036 C14-TL-033 FIELD ROUTED

Page 301 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40046 End Length(m): 12 Elevation: Schematic:

Cable: C10PAH1008
Seg Code: L System: PAH Startup Code:

Service: BALL STRAINER ACTUATOR


Routed Length (m): Allowance (m): Total Length (m): 39 4 43 Option 1: CTCS CABLES BLK-1 Option 2: Option 3: Compartment: North: Wiring Dwg: EE-01774 East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: 15

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10-PAH-55-GH-001 Compartment: Description: BLK-1 COND OLTCS PNL Equip Location: Zone: East: North: Location Dwg: EA-681111 Wiring Dwg: EE-01774 Routing Information: Remarks: QC-1074, CTCS Route: C14-C-1008 C14-TL-038 C14-TL-036 FIELD ROUTED

Cable To End: Equipment No: C10-PAH-55-AA-053 Description: BALL STRAINER B-1 Equip Location: Zone: Location Dwg: EA-681111

Cable: C10PAH1009
Seg Code: L System: PAH Startup Code:

Rev: 00

Description:

4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40046 End Length(m): 12 Elevation: Schematic:

Service: BALL STRAINER ACTUATOR


Routed Length (m): Allowance (m): Total Length (m): 39 4 43 Option 1: CTCS CABLES BLK-1 Option 2: Option 3: Compartment: North: Wiring Dwg: EE-01774 East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: 15

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10-PAH-55-GH-001 Compartment: Description: BLK-1 COND OLTCS PNL Equip Location: Zone: East: North: Location Dwg: EA-681111 Wiring Dwg: EE-01774 Routing Information: Remarks: QC-1074, CTCS Route: C14-C-1008 C14-TL-038 C14-TL-036 FIELD ROUTED

Cable To End: Equipment No: C10-PAH-55-AA-054 Description: BALL STRAINER B-2 Equip Location: Zone: Location Dwg: EA-681111

Cable: C10PAH1010
Seg Code: L System: PAH Startup Code:

Rev: 00

Description:

4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40046 End Length(m): 12 Elevation: Schematic:

Service: BALL COLLECTOR


Routed Length (m): Allowance (m): Total Length (m): 39 4 43 Option 1: CTCS CABLES BLK-1 Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: 15

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10-PAH-55-GH-001 Compartment: Description: BLK-1 COND OLTCS PNL Equip Location: Zone: North: East: Location Dwg: EA-681111 Wiring Dwg: EE-01774 Routing Information: Remarks: QC-1074, CTCS Route: C14-C-1008 C14-TL-038 C14-TL-036 FIELD ROUTED

Cable To End: Equipment No: C10-PAH-55-AA-001 Compartment: Description: BALL COLLECTOR MOV North: Equip Location: Zone: East: Wiring Dwg: EE-01774 Location Dwg: EA-681111

Page 302 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 01 Description:
3C X 16 SQ.MM, 0.6/1kV
Pull Length(m): 265 No. of Cables: 1 Type Code: 30166 End Length(m): 7 Elevation: Schematic: ED-680993

Cable: C10PGC1001
Seg Code: L System: PGC Startup Code:

Service: CLOSED COOLING WATER PUMP-1A


Routed Length (m): Allowance (m): Total Length (m): 254 12 266 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BBE Compartment: H5 Description: 4.16KV UNIT SWBD BUS A Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-PGC-36-AP-001 Compartment: HEATER End Length(m): 20 T/BOX Description: CLOSED COOLING WATER PUMP North: 1725.20 Equip Location: Zone: East: 2353.80 Elevation: 5.10 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-680993

Routing Information: Remarks: Route: CABLE C10-TL-069 C10-TL-071 C10-TL-074 C10-TL-076 C10-TL-080 C10-TL-082 C10-TL-056 C10-TL-052 CABLE C10-TL-051A C10-TL-022A CABLE C10-TL-023A C10-TL-223A C10-TL-222A C14-TL-202A C14-TL-204A C14-TL-207A C14-TL-049A C14-TL-050A C14-TL-051 C14-TL-002 C14-TL-006B C14-TL-008C C14-TL-009B C14-TL-011B C14-TL-012 C14-TL-013 C14-TL-019 C14-TL-018 C14-TL-017 C14-C-1289

Cable: C10PGC1004
Seg Code: L System: PGC Startup Code:

Rev: 01

Description:

3C X 16 SQ.MM, 0.6/1kV
Pull Length(m): 240 No. of Cables: 1 Type Code: 30166 End Length(m): 7 Elevation: Schematic: ED-680994

Service: CLOSED COOLING WATER PUMP-1B


Routed Length (m): Allowance (m): Total Length (m): 229 11 240 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BBF Compartment: H25 Description: 4.16KV UNIT SWBD BUS B Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C10-PGC-36-AP-002 Compartment: HEATER End Length(m): 20 T/BOX Description: CLOSED COOLING WATER PUMP North: 1725.20 Equip Location: Zone: East: 2349.80 Elevation: 5.10 Wiring Dwg: Location Dwg: EA-681111 Schematic: ED-680994

Routing Information: Remarks: Route: CABLE C10-TL-082 C10-TL-056 C10-TL-052 CABLE C10-TL-051A C10-TL-022A CABLE C10-TL-023A C10-TL-223A C10-TL-222A C14-TL-202A C14-TL-204A C14-TL-207A C14-TL-049A C14-TL-050A C14-TL-051 C14-TL-002 C14-TL-006B C14-TL-008C C14-TL-009B C14-TL-011B C14-TL-012 C14-TL-013 C14-TL-019 C14-TL-018 C14-C-1290

Cable: C10PGP1004
Seg Code: L System: PGP Startup Code:

Rev: 00

Description:

4C X 6 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40066 End Length(m): 10 Elevation: Schematic:

Service: BALL RECIRCULATION PUMP


Routed Length (m): Allowance (m): Total Length (m): 49 4 53 Option 1: CTCS CABLES BLK-1 Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: 18

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10-PGP-56-GH-001 Compartment: Description: BLK-1 H/EX OLTCS CNTL PNL Equip Location: Zone: East: North: Location Dwg: EA-681111 Wiring Dwg: EE-01776 Routing Information: Remarks: QC-1074, CTCS Route: C14-C-1009 C14-TL-016 C14-TL-017 FIELD ROUTED

Cable To End: Equipment No: C10-PGP-56-AP-901 Compartment: Description: BALL RECIRCULATION PUMP-A North: Equip Location: Zone: East: Wiring Dwg: EE-01776 Location Dwg: EA-681111

Page 303 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
4C X 6 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40066 End Length(m): 10 Elevation: Schematic:

Cable: C10PGP1005
Seg Code: L System: PGP Startup Code:

Service: BALL RECIRCULATION PUMP


Routed Length (m): Allowance (m): Total Length (m): 49 4 53 Option 1: CTCS CABLES BLK-1 Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: 18

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10-PGP-56-GH-001 Compartment: Description: BLK-1 H/EX OLTCS CNTL PNL Equip Location: Zone: East: North: Location Dwg: EA-681111 Wiring Dwg: EE-01776 Routing Information: Remarks: QC-1074, CTCS Route: C14-C-1009 C14-TL-016 C14-TL-017 FIELD ROUTED

Cable To End: Equipment No: C10-PGP-56-AP-902 Compartment: Description: BALL RECIRCULATION PUMP-B North: Equip Location: Zone: East: Wiring Dwg: EE-01776 Location Dwg: EA-681111

Cable: C10PGP1006
Seg Code: L System: PGP Startup Code:

Rev: 00

Description:

4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40046 End Length(m): 10 Elevation: Schematic:

Service: BALL STRAINER ACTUATOR


Routed Length (m): Allowance (m): Total Length (m): 53 4 57 Option 1: CTCS CABLES BLK-1 Option 2: Option 3: Compartment: North: Wiring Dwg: EE-01776 East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: 22

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10-PGP-56-GH-001 Compartment: Description: BLK-1 H/EX OLTCS CNTL PNL Equip Location: Zone: East: North: Location Dwg: EA-681111 Wiring Dwg: EE-01776 Routing Information: Remarks: QC-1074, CTCS Route: C14-C-1009 C14-TL-016 C14-TL-017 FIELD ROUTED

Cable To End: Equipment No: C10-PGP-56-AA-043 Description: BALL STRAINER A Equip Location: Zone: Location Dwg: EA-681111

Cable: C10PGP1007
Seg Code: L System: PGP Startup Code:

Rev: 00

Description:

4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40046 End Length(m): 10 Elevation: Schematic:

Service: BALL STRAINER ACTUATOR


Routed Length (m): Allowance (m): Total Length (m): 53 4 57 Option 1: CTCS CABLES BLK-1 Option 2: Option 3: Compartment: North: Wiring Dwg: EE-01776 East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: 22

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10-PGP-56-GH-001 Compartment: Description: BLK-1 H/EX OLTCS CNTL PNL Equip Location: Zone: North: East: Location Dwg: EA-681111 Wiring Dwg: EE-01776 Routing Information: Remarks: QC-1074, CTCS Route: C14-C-1009 C14-TL-016 C14-TL-017 FIELD ROUTED

Cable To End: Equipment No: C10-PGP-56-AA-042 Description: BALL STRAINER B Equip Location: Zone: Location Dwg: EA-681111

Cable: C10PGP1008
Seg Code: L System: PGP Startup Code:

Rev: 00

Description:

4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40046 End Length(m): 10 Elevation: Schematic:

Service: BALL COLLECTOR


Routed Length (m): Allowance (m): Total Length (m): 49 4 53 Option 1: CTCS CABLES BLK-1 Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: 18

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10-PGP-56-GH-001 Compartment: Description: BLK-1 H/EX OLTCS CNTL PNL Equip Location: Zone: North: East: Location Dwg: EA-681111 Wiring Dwg: EE-01776 Routing Information: Remarks: QC-1074, CTCS Route: C14-C-1009 C14-TL-016 C14-TL-017 FIELD ROUTED

Cable To End: Equipment No: C10-PGP-56-AA-041 Compartment: Description: BALL COLLECTOR MOV North: Equip Location: Zone: East: Wiring Dwg: EE-01776 Location Dwg: EA-681111

Page 304 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
4C X 1.5 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40156

Cable: C10QFA1001
Seg Code: L System: QFA Startup Code:

Service: AFTER-COOLER 1
Routed Length (m): Allowance (m): Total Length (m): 10 2 12 Option 1: Blk-1 IA/SA Cables Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10-QFA-31-AN-001 Compartment: End Length(m): 10 Description: INSTRUMENT AIR COMPRESSOR Equip Location: Zone: East: 2264.90 Elevation: 6.40 North: 1670.80 Location Dwg: EA-681141 Wiring Dwg: EA-690038 Schematic: Routing Information: Remarks: QC-1056, ATLAS COPCO Route: FIELD ROUTED

Cable To End: Equipment No: C10-QFA-31-AH-001 Compartment: End Length(m): 0 Description: INSTRUMENT AIR COMPRESSOR AFTERCOOLER North: 1669.80 Equip Location: Zone: East: 2263.80 Elevation: 5.00 Wiring Dwg: EA-690038 Location Dwg: EA-681141 Schematic:

Cable: C10QFA1002
Seg Code: L System: QFA Startup Code:

Rev: 00

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): No. of Cables: 1 Type Code: 40156

Service: AFTER-COOLER 2
Routed Length (m): Allowance (m): Total Length (m): 10 2 12 Option 1: Blk-1 IA/SA Cables Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10-QFA-31-AN-002 Compartment: End Length(m): 10 Description: INSTRUMENT AIR COMPRESSOR Equip Location: Zone: East: 2264.90 Elevation: 6.40 North: 1674.50 Location Dwg: EA-681141 Wiring Dwg: EA-690038 Schematic: Routing Information: Remarks: QC-1056, ATLAS COPCO Route: FIELD ROUTED

Cable To End: Equipment No: C10-QFA-31-AH-002 Compartment: End Length(m): 0 Description: INSTRUMENT AIR COMPRESSOR AFTERCOOLER North: 1673.20 Equip Location: Zone: East: 2263.80 Elevation: 5.00 Wiring Dwg: EA-690038 Location Dwg: EA-681141 Schematic:

Cable: C10QUM1001
Seg Code: L System: QUM Startup Code:

Rev: 00

Description:

3C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): No. of Cables: 1 Type Code: 30026 End Length(m): 20 Elevation: Schematic:

Service: HOTWELL SOL' V/V #1 CONTROL


Routed Length (m): Allowance (m): Total Length (m): 20 3 23 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: EA-685950 East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: 0

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C12-QUL-49-GB-003 Compartment: Description: HOTWELL SAMPLING SOV'S JUNCTION BOX Equip Location: Zone: North: East: Location Dwg: EA-685441 Wiring Dwg: EA-685950 Routing Information: Remarks: QC-1067(D) Route: FIELD ROUTED

Cable To End: Equipment No: C10-QUM-46-AA-051 Description: SOL V/V #1 Equip Location: Zone: Location Dwg: EA-685441

Cable: C10QUM1002
Seg Code: L System: QUM Startup Code:

Rev: 00

Description:

3C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): No. of Cables: 1 Type Code: 30026 End Length(m): 20 Elevation: Schematic:

Service: HOTWELL SOL' V/V #1 CONTROL


Routed Length (m): Allowance (m): Total Length (m): 20 3 23 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: EA-685950 East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: 0

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C12-QUL-49-GB-003 Compartment: Description: HOTWELL SAMPLING SOV'S JUNCTION BOX Equip Location: Zone: North: East: Location Dwg: EA-685441 Wiring Dwg: EA-685950 Routing Information: Remarks: QC-1067(D) Route: FIELD ROUTED

Cable To End: Equipment No: C10-QUM-46-AA-052 Description: SOL V/V #2 Equip Location: Zone: Location Dwg: EA-685441

Page 305 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
3C X 2.5 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 30026 End Length(m): 20 Elevation: Schematic:

Cable: C10QUM1003
Seg Code: L System: QUM Startup Code:

Service: HOTWELL SOL' V/V #1 CONTROL


Routed Length (m): Allowance (m): Total Length (m): 20 3 23 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: EA-685950 East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: 0

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C12-QUL-49-GB-003 Compartment: Description: HOTWELL SAMPLING SOV'S JUNCTION BOX Equip Location: Zone: East: North: Location Dwg: EA-685441 Wiring Dwg: EA-685950 Routing Information: Remarks: QC-1067(D) Route: FIELD ROUTED

Cable To End: Equipment No: C10-QUM-46-AA-053 Description: SOL V/V #3 Equip Location: Zone: Location Dwg: EA-685441

Cable: C10QUM1004
Seg Code: L System: QUM Startup Code:

Rev: 00

Description:

3C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): No. of Cables: 1 Type Code: 30026 End Length(m): 20 Elevation: Schematic:

Service: HOTWELL SOL' V/V #1 CONTROL


Routed Length (m): Allowance (m): Total Length (m): 20 3 23 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: EA-685950 East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: 0

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C12-QUL-49-GB-003 Compartment: Description: HOTWELL SAMPLING SOV'S JUNCTION BOX Equip Location: Zone: East: North: Location Dwg: EA-685441 Wiring Dwg: EA-685950 Routing Information: Remarks: QC-1067(D) Route: FIELD ROUTED

Cable To End: Equipment No: C10-QUM-46-AA-054 Description: SOL V/V #4 Equip Location: Zone: Location Dwg: EA-685441

Cable: C10QUM1005
Seg Code: L System: QUM Startup Code:

Rev: 00

Description:

3C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): No. of Cables: 1 Type Code: 30026 End Length(m): 20 Elevation: Schematic:

Service: HOTWELL SOL' V/V #1 CONTROL


Routed Length (m): Allowance (m): Total Length (m): 20 3 23 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: EA-685950 East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: 0

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C12-QUL-49-GB-003 Compartment: Description: HOTWELL SAMPLING SOV'S JUNCTION BOX Equip Location: Zone: North: East: Location Dwg: EA-685441 Wiring Dwg: EA-685950 Routing Information: Remarks: QC-1067(D) Route: FIELD ROUTED

Cable To End: Equipment No: C10-QUM-46-AA-055 Description: SOL V/V #5 Equip Location: Zone: Location Dwg: EA-685441

Cable: C10QUM1006
Seg Code: L System: QUM Startup Code:

Rev: 00

Description:

3C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): No. of Cables: 1 Type Code: 30026 End Length(m): 20 Elevation: Schematic:

Service: HOTWELL SOL' V/V #1 CONTROL


Routed Length (m): Allowance (m): Total Length (m): 20 3 23 Option 1: Option 2: Option 3: Compartment: North: Wiring Dwg: EA-685950 East: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: 0

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C12-QUL-49-GB-003 Compartment: Description: HOTWELL SAMPLING SOV'S JUNCTION BOX Equip Location: Zone: North: East: Location Dwg: EA-685441 Wiring Dwg: EA-685950 Routing Information: Remarks: QC-1067(D) Route: FIELD ROUTED

Cable To End: Equipment No: C10-QUM-46-AA-056 Description: SOL V/V #6 Equip Location: Zone: Location Dwg: EA-685441

Page 306 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
20C X 1.5 SQ.MM, 0.6/1kV

Cable: C10QUM1007
Seg Code: L System: QUM Startup Code:
Cable From End: Equipment No: C10-QUM-49-GH-001 Description: BLK-1 SWAS PNL Equip Location: Zone: Location Dwg: EA-685564

Service: HOTWELL SAMPLING SOV CONTROL SIGNAL


Routed Length (m): Allowance (m): Total Length (m): 289 13 302 Option 1: Option 2: Option 3: Shield: Y Ground: Jacket: PVC End Length(m): Elevation: Schematic: 10

Furnish Spec: QC-1022 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: EA-685950 East:

Pull Length(m): No. of Cables: 1 Type Code: 20C156 End Length(m): 20 Elevation: Schematic:

Cable To End: Equipment No: C12-QUL-49-GB-003 Compartment: Description: HOTWELL SAMPLING SOV'S JUNCTION BOX North: Equip Location: Zone: East: Wiring Dwg: EA-685950 Location Dwg: EA-685441

Routing Information: Remarks: QC-1067(D) Route: C12-C-1212 C12-TL-112 C12-TL-111 C12-TL-110 C12-TL-101 C12-TL-203 C12-TL-102 C12-TL-201 C12-TL-517 C12-TL-518C C12-TL-519C C12-TL-520C C10-TL-201C C10-TL-164C C10-TL-107C C10-TL-109C C10-TL-102D C10-TL-070D C10-TL-068D C10-TL-066D C10-TL-035C C10-TL-008C C10-TL-009C C10-TL-012C CABLE C10-TL-016A C10-TL-018D C10-TL-020D C10-TL-022C C10-TL-025C C10-TL-219C C10-TL-218C C10-TL-217B C10-TL-221B C14-TL-202E C14-TL-204E C14-TL-206 C14-TL-208 C14-TL-211 C14-TL-210 C14-TL-046 C14-TL-047 FIELD ROUTED

Cable: C10SCA1003
Seg Code: L System: SCA Startup Code:

Rev: 00

Description:

4C X 1.5 SQ.MM, 0.6/1kV


Pull Length(m): No. of Cables: 1 Type Code: 40156

Service: AFTER-COOLER 1
Routed Length (m): Allowance (m): Total Length (m): 10 2 12 Option 1: Blk-1 IA/SA Cables Option 2: Option 3: Shield: N Ground: Jacket: PVC

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10-SCA-32-AN-001 Compartment: End Length(m): 10 Description: SERVICE AIR COMPRESSOR Equip Location: Zone: North: 1677.90 East: 2264.90 Elevation: 6.40 Location Dwg: EA-681141 Wiring Dwg: EA-690038 Schematic: Routing Information: Remarks: QC-1056, ATLAS COPCO Route: FIELD ROUTED

Cable To End: Equipment No: C10-SCA-32-AH-001 Compartment: End Length(m): 0 Description: INST. AIR COMPRESSOR-1A COOLER North: 1676.70 Equip Location: Zone: East: 2263.80 Elevation: 5.00 Wiring Dwg: EA-690038 Location Dwg: EA-681141 Schematic:

Cable: C11LAC1001
Seg Code: L System: LAC Startup Code:

Rev: 00

Description:

3C X 6 SQ.MM, 0.6/1kV
Pull Length(m): 221 No. of Cables: 1 Type Code: 30066 End Length(m): 8 Elevation: Schematic: ED-680984

Service: BOILER FEED WATER PUMP-1A


Routed Length (m): Allowance (m): Total Length (m): 193 10 203 Option 1: Option 2: Option 3: Compartment: HEATER T/BOX North: 1657.70 Wiring Dwg: Shield: N Ground: Jacket: PVC End Length(m): 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BBE Compartment: H6 Description: 4.16KV UNIT SWBD BUS A Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C11-LAC-45-AP-001 Description: BFP PUMP Equip Location: Zone: Location Dwg: EA-681101

East: 2221.00 Elevation: 4.90 Schematic: ED-680984

Routing Information: Remarks: Route: CABLE C10-TL-070A C10-TL-102A C10-TL-103A C10-TL-104A C10-TL-105A C10-TL-166A C10-TL-204A C11-TL-521A C11-TL-520A C11-TL-519A C11-TL-518A C11-TL-517A C11-TL-515A C11-TL-514A C11-TL-513A C11-TL-512A C11-TL-511A C11-D001-01 C11-EMH-001 C11-EC-010 CABLE

Page 307 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
3C X 6 SQ.MM, 0.6/1kV
Pull Length(m): 211 No. of Cables: 1 Type Code: 30066 End Length(m): 8 Elevation: Schematic: ED-680985

Cable: C11LAC1004
Seg Code: L System: LAC Startup Code:

Service: BOILER FEED WATER PUMP-1B


Routed Length (m): Allowance (m): Total Length (m): 201 10 211 Option 1: Option 2: Option 3: Compartment: HEATER T/BOX North: 1657.70 Wiring Dwg: Shield: N Ground: Jacket: PVC End Length(m): 8

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BBF Compartment: H19 Description: 4.16KV UNIT SWBD BUS B Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C11-LAC-45-AP-002 Description: BFP PUMP Equip Location: Zone: Location Dwg: EA-681101

East: 2217.00 Elevation: 4.90 Schematic: ED-680985

Routing Information: Remarks: Route: CABLE C10-TL-076 C10-TL-074 C10-TL-071 CABLE C10-TL-101A C10-TL-103B C10-TL-104B C10-TL-105B C10-TL-166B C10-TL-204B C11-TL-321B C11-TL-520B C11-TL-519B C11-TL-518B C11-TL-517B C11-TL-515B C11-TL-514B C11-TL-513B C11-TL-512B C11-TL-511B C11-D001-01 C11-EMH-001 C11-EC-007 CABLE

Cable: C11LAC1007
Seg Code: L System: LAC Startup Code:

Rev: 00

Description:

3C X 6 SQ.MM, 0.6/1kV
Pull Length(m): 213 No. of Cables: 1 Type Code: 30066 End Length(m): 8 Elevation: Schematic: ED-680986

Service: BOILER FEED WATER PUMP-1C


Routed Length (m): Allowance (m): Total Length (m): 197 10 207 Option 1: Option 2: Option 3: Compartment: HEATER T/BOX North: 1657.70 Wiring Dwg: Shield: N Ground: Jacket: PVC End Length(m): 8

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BBE Compartment: H14 Description: 4.16KV UNIT SWBD BUS A Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C11-LAC-45-AP-003 Description: BFP PUMP Equip Location: Zone: Location Dwg: EA-681101

East: 2213.00 Elevation: 4.90 Schematic: ED-680986

Routing Information: Remarks: Route: CABLE C10-TL-071 CABLE C10-TL-101A C10-TL-103B C10-TL-104B C10-TL-105B C10-TL-166B C10-TL-204B C11-TL-321B C11-TL-520B C11-TL-519B C11-TL-518B C11-TL-517B C11-TL-515B C11-TL-514B C11-TL-513B C11-TL-512B C11-TL-511B C11-D001-01 C11-EMH-001 C11-EC-004 CABLE

Cable: C11QCC1001
Seg Code: L System: QCC Startup Code:
Cable From End: Equipment No: C11-QCE-39-GW-001 Description: MCC Equip Location: Zone: Location Dwg: EA-682933

Rev: 00

Description:

4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40046 End Length(m): 5

Service: OXYGEN SCAVENGER SOLUTION FEED PUMP "A"


Routed Length (m): Allowance (m): Total Length (m): 22 3 25 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: EA-685943 East:

Elevation: Schematic:

Cable To End: Equipment No: C11-QCC-39-AP-001 Compartment: Description: OXYGEN SCAVENGER TRANSFER PUMMP "B" North: Equip Location: Zone: East: Wiring Dwg: EA-685943 Location Dwg: EA-682933

Routing Information: Remarks: QC-1057, DOOSAN Route: CABLE C11-TL-601 C11-TL-602 C11-TL-603 C11-TL-604 C11-TL-605 C11-TL-606 C11-EC-853

Page 308 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
3C X 2.5 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 30026 End Length(m): 5 East: Elevation: Schematic:

Cable: C11QCC1002
Seg Code: L System: QCC Startup Code:
Cable From End: Equipment No: C11-QCE-39-GH-001 Description: LCP Equip Location: Zone: Location Dwg: EA-682933

Service: OXYGEN SCAVENGER SOLUTION FEED PUMP "A" AUTO STOROKE


Routed Length (m): Allowance (m): Total Length (m): 23 3 26 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC 6

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: EA-685943

Cable To End: Equipment No: C11-QCC-39-AP-001S Compartment: End Length(m): Description: OXYGEN SCAVENGER SOLUTION FEED PUMP "A" AUTO STOROKE North: Equip Location: Zone: East: Elevation: Wiring Dwg: EA-685943 Location Dwg: EA-682933 Schematic:

Routing Information: Remarks: QC-1057, DOOSAN Route: CABLE C11-TL-601 C11-TL-602 C11-TL-603 C11-TL-604 C11-TL-605 C11-TL-606 C11-EC-863

Cable: C11QCC1003
Seg Code: L System: QCC Startup Code:
Cable From End: Equipment No: C11-QCE-39-GW-001 Description: MCC Equip Location: Zone: Location Dwg: EA-682933

Rev: 00

Description:

4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40046 End Length(m): 5

Service: OXYGEN SCAVENGER TRANSFER PUMMP "B"


Routed Length (m): Allowance (m): Total Length (m): 24 3 27 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: 7

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: EA-685943 East:

Elevation: Schematic:

Cable To End: Equipment No: C11-QCC-39-AP-002 Compartment: Description: OXYGEN SCAVENGER TRANSFER PUMMP "B" North: Equip Location: Zone: East: Wiring Dwg: EA-685943 Location Dwg: EA-682933

Routing Information: Remarks: QC-1057, DOOSAN Route: CABLE C11-TL-601 C11-TL-602 C11-TL-603 C11-TL-604 C11-TL-605 C11-TL-606 C11-EC-854

Cable: C11QCC1004
Seg Code: L System: QCC Startup Code:
Cable From End: Equipment No: C11-QCE-39-GH-001 Description: LCP Equip Location: Zone: Location Dwg: EA-682933

Rev: 00

Description:

3C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): No. of Cables: 1 Type Code: 30026 End Length(m): 5

Service: OXYGEN SCAVENGER SOLUTION FEED PUMP "B" AUTO STOROKE


Routed Length (m): Allowance (m): Total Length (m): 24 3 27 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC 7

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: EA-685943 East:

Elevation: Schematic:

Cable To End: Equipment No: C11-QCC-39-AP-002S Compartment: End Length(m): Description: OXYGEN SCAVENGER SOLUTION FEED PUMP "B" AUTO STOROKE North: Equip Location: Zone: East: Elevation: Wiring Dwg: EA-685943 Location Dwg: EA-682933 Schematic:

Routing Information: Remarks: QC-1057, DOOSAN Route: CABLE C11-TL-601 C11-TL-602 C11-TL-603 C11-TL-604 C11-TL-605 C11-TL-606 C11-EC-866

Cable: C11QCC1005
Seg Code: L System: QCC Startup Code:
Cable From End: Equipment No: C11-QCE-39-GW-001 Description: MCC Equip Location: Zone: Location Dwg: EA-682933

Rev: 00

Description:

4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40046 End Length(m): 5

Service: OSYGEN SCAVENGER SOLUTION FEED TANK AGITATOR


Routed Length (m): Allowance (m): Total Length (m): 31 4 35 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: 8

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: EA-685943 East:

Elevation: Schematic:

Cable To End: Equipment No: C11-QCC-39-AM-001 Compartment: Description: OSYGEN SCAVENGER SOLUTION FEED TANK AGITATOR North: Equip Location: Zone: East: Wiring Dwg: EA-685943 Location Dwg: EA-682933

Routing Information: Remarks: QC-1057, DOOSAN Route: CABLE C11-TL-601 C11-TL-602 C11-TL-603 C11-TL-604 C11-TL-605 C11-TL-606 C11-EC-858

Page 309 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40046 End Length(m): 5 East: Elevation: Schematic:

Cable: C11QCD1001
Seg Code: L System: QCD Startup Code:
Cable From End: Equipment No: C11-QCE-39-GW-001 Description: MCC Equip Location: Zone: Location Dwg: EA-682933

Service: TRISODIUM PHOSPHATE SOLUTION FEED PUMP "A"


Routed Length (m): Allowance (m): Total Length (m): 21 3 24 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: EA-685943

Cable To End: Equipment No: C11-QCD-39-AP-001 Compartment: Description: TRISODIUM PHOSPHATE SOLUTION FEED PUMP "A" North: Equip Location: Zone: East: Wiring Dwg: EA-685943 Location Dwg: EA-682933

Routing Information: Remarks: QC-1057, DOOSAN Route: CABLE C11-TL-601 C11-TL-602 C11-TL-603 C11-TL-604 C11-TL-605 C11-EC-851

Cable: C11QCD1002
Seg Code: L System: QCD Startup Code:
Cable From End: Equipment No: C11-QCE-39-GW-001 Description: MCC Equip Location: Zone: Location Dwg: EA-682933

Rev: 00

Description:

4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40046 End Length(m): 5

Service: TRISODIUM PHOSPHATE SOLUTION FEED PUMP "B"


Routed Length (m): Allowance (m): Total Length (m): 21 3 24 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: EA-685943 East:

Elevation: Schematic:

Cable To End: Equipment No: C11-QCD-39-AP-002 Compartment: Description: TRISODIUM PHOSPHATE SOLUTION FEED PUMP "B" North: Equip Location: Zone: East: Wiring Dwg: EA-685943 Location Dwg: EA-682933

Routing Information: Remarks: QC-1057, DOOSAN Route: CABLE C11-TL-601 C11-TL-602 C11-TL-603 C11-TL-604 C11-TL-605 C11-EC-852

Cable: C11QCD1003
Seg Code: L System: QCD Startup Code:
Cable From End: Equipment No: C11-QCE-39-GW-001 Description: MCC Equip Location: Zone: Location Dwg: EA-682933

Rev: 00

Description:

4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40046 End Length(m): 5

Service: TRISODIUM PHOSPHATE SOLUTION FEED TANK AGITATOR


Routed Length (m): Allowance (m): Total Length (m): 27 3 30 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC 9

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: EA-685943 East:

Elevation: Schematic:

Cable To End: Equipment No: C11-QCD-39-AM-001 Compartment: End Length(m): Description: TRISODIUM PHOSPHATE SOLUTION FEED TANK AGITATOR North: Equip Location: Zone: East: Elevation: Wiring Dwg: EA-685943 Location Dwg: EA-682933 Schematic:

Routing Information: Remarks: QC-1057, DOOSAN Route: CABLE C11-TL-601 C11-TL-602 C11-TL-603 C11-TL-604 C11-EC-857

Cable: C11QCE1001
Seg Code: L System: QCE Startup Code:
Cable From End: Equipment No: C11-QCE-39-GW-001 Description: MCC Equip Location: Zone: Location Dwg: EA-682933

Rev: 00

Description:

4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40046 End Length(m): 5

Service: AMMONIA SOLUTION FEED PUMP "A"


Routed Length (m): Allowance (m): Total Length (m): 29 4 33 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: 6

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: EA-685943 East:

Elevation: Schematic:

Cable To End: Equipment No: C11-QCE-39-AP-001 Compartment: Description: AMMONIA SOLUTION FEED PUMP "A" North: Equip Location: Zone: East: Wiring Dwg: EA-685943 Location Dwg: EA-682933

Routing Information: Remarks: QC-1057, DOOSAN Route: CABLE C11-TL-601 C11-TL-602 C11-TL-603 C11-TL-604 C11-TL-605 C11-TL-606 C11-TL-607 C11-TL-608 C11-EC-855

Page 310 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
3C X 2.5 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 30026 End Length(m): 5 East: Elevation: Schematic:

Cable: C11QCE1002
Seg Code: L System: QCE Startup Code:
Cable From End: Equipment No: C11-QCE-39-GH-001 Description: LCP Equip Location: Zone: Location Dwg: EA-682933

Service: AMMONIA SOLUTION FEED PUMP "A" AUTO STOROKE


Routed Length (m): Allowance (m): Total Length (m): 32 4 36 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: 9

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: EA-685943

Cable To End: Equipment No: C11-QCE-39-AP-001S Compartment: Description: AMMONIA SOLUTION FEED PUMP "A" AUTO STOROKE North: Equip Location: Zone: East: Wiring Dwg: EA-685943 Location Dwg: EA-682933

Routing Information: Remarks: QC-1057, DOOSAN Route: CABLE C11-TL-601 C11-TL-602 C11-TL-603 C11-TL-604 C11-TL-605 C11-TL-606 C11-TL-607 C11-TL-608 C11-EC-873

Cable: C11QCE1003
Seg Code: L System: QCE Startup Code:
Cable From End: Equipment No: C11-QCE-39-GW-001 Description: MCC Equip Location: Zone: Location Dwg: EA-682933

Rev: 00

Description:

4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40046 End Length(m): 5

Service: AMMONIA SOLUTION FEED PUMP "B"


Routed Length (m): Allowance (m): Total Length (m): 28 3 31 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: EA-685943 East:

Elevation: Schematic:

Cable To End: Equipment No: C11-QCE-39-AP-002 Compartment: Description: AMMONIA SOLUTION FEED PUMP "B" North: Equip Location: Zone: East: Wiring Dwg: EA-685943 Location Dwg: EA-682933

Routing Information: Remarks: QC-1057, DOOSAN Route: CABLE C11-TL-601 C11-TL-602 C11-TL-603 C11-TL-604 C11-TL-605 C11-TL-606 C11-TL-607 C11-TL-608 C11-EC-856

Cable: C11QCE1004
Seg Code: L System: QCE Startup Code:
Cable From End: Equipment No: C11-QCE-39-GH-001 Description: LCP Equip Location: Zone: Location Dwg: EA-682933

Rev: 00

Description:

3C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): No. of Cables: 1 Type Code: 30026 End Length(m): 5

Service: AMMONIA SOLUTION FEED PUMP "B" AUTO STOROKE


Routed Length (m): Allowance (m): Total Length (m): 32 4 36 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: 9

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: EA-685943 East:

Elevation: Schematic:

Cable To End: Equipment No: C11-QCE-39-AP-002S Compartment: Description: AMMONIA SOLUTION FEED PUMP "B" AUTO STOROKE North: Equip Location: Zone: East: Wiring Dwg: EA-685943 Location Dwg: EA-682933

Routing Information: Remarks: QC-1057, DOOSAN Route: CABLE C11-TL-601 C11-TL-602 C11-TL-603 C11-TL-604 C11-TL-605 C11-TL-606 C11-TL-607 C11-TL-608 C11-EC-876

Cable: C11QCE1005
Seg Code: L System: QCE Startup Code:
Cable From End: Equipment No: C11-QCE-39-GW-001 Description: MCC Equip Location: Zone: Location Dwg: EA-682933

Rev: 00

Description:

4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40046 End Length(m): 5

Service: AMMONIA SOLUTION FEED TANK AGITATOR


Routed Length (m): Allowance (m): Total Length (m): 38 4 42 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: 9

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: EA-685943 East:

Elevation: Schematic:

Cable To End: Equipment No: C11-QCE-39-AM-001 Compartment: Description: AMMONIA SOLUTION FEED TANK AGITATOR North: Equip Location: Zone: East: Wiring Dwg: EA-685943 Location Dwg: EA-682933

Routing Information: Remarks: QC-1057, DOOSAN Route: CABLE C11-TL-601 C11-TL-602 C11-TL-603 C11-TL-604 C11-TL-605 C11-TL-606 C11-TL-607 C11-TL-608 C11-EC-859

Page 311 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
3C X 6 SQ.MM, 0.6/1kV
Pull Length(m): 170 No. of Cables: 1 Type Code: 30066 End Length(m): 16 Elevation: Schematic: ED-680987

Cable: C12LAC1001
Seg Code: L System: LAC Startup Code:

Service: BOILER FEED WATER PUMP-2A


Routed Length (m): Allowance (m): Total Length (m): 159 8 167 Option 1: Option 2: Option 3: Compartment: HEATER T/BOX North: 1698.70 Wiring Dwg: Shield: N Ground: Jacket: PVC End Length(m): 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BBF Compartment: H20 Description: 4.16KV UNIT SWBD BUS B Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C12-LAC-45-AP-001 Description: BFP PUMP Equip Location: Zone: Location Dwg: EA-681101

East: 2221.00 Elevation: 4.90 Schematic: ED-680987

Routing Information: Remarks: Route: CABLE C10-TL-076 C10-TL-074 C10-TL-071 CABLE C10-TL-102B C10-TL-109A C10-TL-107A C10-TL-164A C10-TL-201A C12-TL-520A C12-TL-519A C12-TL-518A C12-TL-516A C12-TL-515A C12-TL-514 C12-TL-512B C12-TL-511B C12-D001-01 C12-EMH-001 C12-EC-010 CABLE

Cable: C12LAC1004
Seg Code: L System: LAC Startup Code:

Rev: 00

Description:

3C X 6 SQ.MM, 0.6/1kV
Pull Length(m): 162 No. of Cables: 1 Type Code: 30066 End Length(m): 8 Elevation: Schematic: ED-680988

Service: BOILER FEED WATER PUMP-2B


Routed Length (m): Allowance (m): Total Length (m): 147 8 155 Option 1: Option 2: Option 3: Compartment: HEATER T/BOX North: 1698.70 Wiring Dwg: Shield: N Ground: Jacket: PVC End Length(m): 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BBE Compartment: H8 Description: 4.16KV UNIT SWBD BUS A Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C12-LAC-45-AP-002 Description: BFP PUMP Equip Location: Zone: Location Dwg: EA-681101

East: 2217.00 Elevation: 4.90 Schematic: ED-680988

Routing Information: Remarks: Route: CABLE C10-TL-102B C10-TL-109A C10-TL-107A C10-TL-164A C10-TL-201A C12-TL-520A C12-TL-519A C12-TL-518A C12-TL-516A C12-TL-515A C12-TL-514 C12-TL-512A C12-TL-511A C12-D001-01 C12-EMH-001 C12-EC-007 CABLE

Cable: C12LAC1007
Seg Code: L System: LAC Startup Code:

Rev: 00

Description:

3C X 6 SQ.MM, 0.6/1kV
Pull Length(m): 174 No. of Cables: 1 Type Code: 30066 End Length(m): 16 Elevation: Schematic: ED-680989

Service: BOILER FEED WATER PUMP-2C


Routed Length (m): Allowance (m): Total Length (m): 165 9 174 Option 1: Option 2: Option 3: Compartment: HEATER T/BOX North: 1698.70 Wiring Dwg: Shield: N Ground: Jacket: PVC End Length(m): 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BBF Compartment: H21 Description: 4.16KV UNIT SWBD BUS B Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C12-LAC-45-AP-003 Description: BFP PUMP Equip Location: Zone: Location Dwg: EA-681101

East: 2213.00 Elevation: 4.90 Schematic: ED-680989

Routing Information: Remarks: Route: CABLE C10-TL-076 C10-TL-074 C10-TL-071 CABLE C10-TL-102B C10-TL-109A C10-TL-107A C10-TL-164A C10-TL-201A C12-TL-520A C12-TL-519A C12-TL-518A C12-TL-516A C12-TL-515A C12-TL-514 C12-TL-512B C12-TL-511B C12-D001-01 C12-EMH-001 C12-EC-004 CABLE

Page 312 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40046 End Length(m): 5 East: Elevation: Schematic:

Cable: C12QCB1001
Seg Code: L System: QCB Startup Code:
Cable From End: Equipment No: C12-QCE-39-GW-001 Description: MCC Equip Location: Zone: Location Dwg: EA-682933

Service: CORROSION INHIBITOR SOLUTION PUMP "A"


Routed Length (m): Allowance (m): Total Length (m): 26 3 29 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: EA-685943

Cable To End: Equipment No: C12-QCB-39-AP-001 Compartment: Description: CORROSION INHIBITOR SOLUTION PUMP "A" North: Equip Location: Zone: East: Wiring Dwg: EA-685943 Location Dwg: EA-682933

Routing Information: Remarks: QC-1057, DOOSAN Route: CABLE C12-TL-601 C12-TL-602 C12-TL-603 C12-TL-604 C12-TL-605 C12-TL-606 C12-TL-607 C12-TL-608 C12-EC-851

Cable: C12QCB1002
Seg Code: L System: QCB Startup Code:
Cable From End: Equipment No: C12-QCE-39-GW-001 Description: MCC Equip Location: Zone: Location Dwg: EA-682933

Rev: 00

Description:

4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40046 End Length(m): 5

Service: CORROSION INHIBITOR SOLUTION PUMP "B"


Routed Length (m): Allowance (m): Total Length (m): 26 3 29 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: EA-685943 East:

Elevation: Schematic:

Cable To End: Equipment No: C12-QCB-39-AP-002 Compartment: Description: CORROSION INHIBITOR SOLUTION PUMP "B" North: Equip Location: Zone: East: Wiring Dwg: EA-685943 Location Dwg: EA-682933

Routing Information: Remarks: QC-1057, DOOSAN Route: CABLE C12-TL-601 C12-TL-602 C12-TL-603 C12-TL-604 C12-TL-605 C12-TL-606 C12-TL-607 C12-TL-608 C12-EC-852

Cable: C12QCC1001
Seg Code: L System: QCC Startup Code:
Cable From End: Equipment No: C12-QCE-39-GW-001 Description: MCC Equip Location: Zone: Location Dwg: EA-682933

Rev: 00

Description:

4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40046 End Length(m): 5

Service: OXYGEN SCAVENGER SOLUTION FEED PUMP "A"


Routed Length (m): Allowance (m): Total Length (m): 22 3 25 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: EA-685943 East:

Elevation: Schematic:

Cable To End: Equipment No: C12-QCC-39-AP-001 Compartment: Description: OXYGEN SCAVENGER SOLUTION FEED PUMP "A" North: Equip Location: Zone: East: Wiring Dwg: EA-685943 Location Dwg: EA-682933

Routing Information: Remarks: QC-1057, DOOSAN Route: CABLE C12-TL-601 C12-TL-602 C12-TL-603 C12-TL-604 C12-TL-605 C12-TL-606 C12-EC-855

Cable: C12QCC1002
Seg Code: L System: QCC Startup Code:
Cable From End: Equipment No: C12-QCE-39-GH-001 Description: LCP Equip Location: Zone: Location Dwg: EA-682933

Rev: 00

Description:

3C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): No. of Cables: 1 Type Code: 30026 End Length(m): 5

Service: OXYGEN SCAVENGER SOLUTION FEED PUMP "A" AUTO STOROKE


Routed Length (m): Allowance (m): Total Length (m): 22 3 25 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: EA-685943 East:

Elevation: Schematic:

Cable To End: Equipment No: C12-QCC-39-AP-001S Compartment: End Length(m): Description: OXYGEN SCAVENGER SOLUTION FEED PUMP "A" AUTO STOROKE North: Equip Location: Zone: East: Elevation: Wiring Dwg: EA-685943 Location Dwg: EA-682933 Schematic:

Routing Information: Remarks: QC-1057, DOOSAN Route: CABLE C12-TL-601 C12-TL-602 C12-TL-603 C12-TL-604 C12-TL-605 C12-TL-606 C12-EC-869

Page 313 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40046 End Length(m): 5 East: Elevation: Schematic:

Cable: C12QCC1003
Seg Code: L System: QCC Startup Code:
Cable From End: Equipment No: C12-QCE-39-GW-001 Description: MCC Equip Location: Zone: Location Dwg: EA-682933

Service: OXYGEN SCAVENGER SOLUTION FEED PUMP "B"


Routed Length (m): Allowance (m): Total Length (m): 22 3 25 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: EA-685943

Cable To End: Equipment No: C12-QCC-39-AP-002 Compartment: Description: OXYGEN SCAVENGER SOLUTION FEED PUMP "B" North: Equip Location: Zone: East: Wiring Dwg: EA-685943 Location Dwg: EA-682933

Routing Information: Remarks: QC-1057, DOOSAN Route: CABLE C12-TL-601 C12-TL-602 C12-TL-603 C12-TL-604 C12-TL-605 C12-TL-606 C12-EC-856

Cable: C12QCC1004
Seg Code: L System: QCC Startup Code:
Cable From End: Equipment No: C12-QCE-39-GH-001 Description: LCP Equip Location: Zone: Location Dwg: EA-682933

Rev: 00

Description:

3C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): No. of Cables: 1 Type Code: 30026 End Length(m): 5

Service: OXYGEN SCAVENGER SOLUTION FEED PUMP "B" AUTO STOROKE


Routed Length (m): Allowance (m): Total Length (m): 23 3 26 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC 6

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: EA-685943 East:

Elevation: Schematic:

Cable To End: Equipment No: C12-QCD-39-CF-001 Compartment: End Length(m): Description: TRISODIUM POSHATE SOLUTION FEED PUMP DISCHARGE FIT North: Equip Location: Zone: East: Elevation: Wiring Dwg: EA-685943 Location Dwg: EA-682933 Schematic:

Routing Information: Remarks: QC-1057, DOOSAN Route: CABLE C12-TL-601 C12-TL-602 C12-TL-603 C12-TL-604 C12-TL-605 C12-TL-606 C12-EC-874

Cable: C12QCC1005
Seg Code: L System: QCC Startup Code:
Cable From End: Equipment No: C12-QCE-39-GW-001 Description: MCC Equip Location: Zone: Location Dwg: EA-682933

Rev: 00

Description:

4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40046 End Length(m): 5

Service: OXYGEN SCAVENGER SOLUTION FEED TANK AGITATOR


Routed Length (m): Allowance (m): Total Length (m): 33 4 37 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: EA-685943 East:

Elevation: Schematic:

Cable To End: Equipment No: C12-QCC-39-AM-001 Compartment: Description: OXYGEN SCAVENGER SOLUTION FEED TANK AGITATOR North: Equip Location: Zone: East: Wiring Dwg: EA-685943 Location Dwg: EA-682933

Routing Information: Remarks: QC-1057, DOOSAN Route: CABLE C12-TL-601 C12-TL-602 C12-TL-603 C12-TL-604 C12-TL-605 C12-TL-606 C12-EC-860

Cable: C12QCD1001
Seg Code: L System: QCD Startup Code:
Cable From End: Equipment No: C12-QCE-39-GW-001 Description: MCC Equip Location: Zone: Location Dwg: EA-682933

Rev: 00

Description:

4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40046 End Length(m): 5

Service: TRISODIUM POSHATE SOLUTION FEED PUMP "A"


Routed Length (m): Allowance (m): Total Length (m): 25 3 28 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: EA-685943 East:

Elevation: Schematic:

Cable To End: Equipment No: C12-QCD-39-AP-001 Compartment: Description: TRISODIUM POSHATE SOLUTION FEED PUMP "A" North: Equip Location: Zone: East: Wiring Dwg: EA-685943 Location Dwg: EA-682933

Routing Information: Remarks: QC-1057, DOOSAN Route: CABLE C12-TL-601 C12-TL-602 C12-TL-603 C12-TL-604 C12-TL-605 C12-TL-606 C12-TL-607 C12-EC-853

Page 314 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40046 End Length(m): 5 East: Elevation: Schematic:

Cable: C12QCD1002
Seg Code: L System: QCD Startup Code:
Cable From End: Equipment No: C12-QCE-39-GW-001 Description: MCC Equip Location: Zone: Location Dwg: EA-682933

Service: TRISODIUM POSHATE SOLUTION FEED PUMP "B"


Routed Length (m): Allowance (m): Total Length (m): 25 3 28 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: EA-685943

Cable To End: Equipment No: C12-QCD-39-AP-002 Compartment: Description: TRISODIUM POSHATE SOLUTION FEED PUMP "B" North: Equip Location: Zone: East: Wiring Dwg: EA-685943 Location Dwg: EA-682933

Routing Information: Remarks: QC-1057, DOOSAN Route: CABLE C12-TL-601 C12-TL-602 C12-TL-603 C12-TL-604 C12-TL-605 C12-TL-606 C12-TL-607 C12-EC-854

Cable: C12QCD1003
Seg Code: L System: QCD Startup Code:
Cable From End: Equipment No: C12-QCE-39-GW-001 Description: MCC Equip Location: Zone: Location Dwg: EA-682933

Rev: 00

Description:

4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40046 End Length(m): 5

Service: TRISODIUM PHOSPHATE SOLUTION FEED TANK AGITATOR


Routed Length (m): Allowance (m): Total Length (m): 36 4 40 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: EA-685943 East:

Elevation: Schematic:

Cable To End: Equipment No: C12-QCD-39-AM-001 Compartment: End Length(m): Description: TRISODIUM PHOSPHATE SOLUTION FEED TANK AGITATOR North: Equip Location: Zone: East: Elevation: Wiring Dwg: EA-685943 Location Dwg: EA-682933 Schematic:

Routing Information: Remarks: QC-1057, DOOSAN Route: CABLE C12-TL-601 C12-TL-602 C12-TL-603 C12-TL-604 C12-TL-605 C12-TL-606 C12-TL-607 C12-EC-859

Cable: C12QCE1001
Seg Code: L System: QCE Startup Code:
Cable From End: Equipment No: C12-QCE-39-GW-001 Description: MCC Equip Location: Zone: Location Dwg: EA-682933

Rev: 00

Description:

4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40046 End Length(m): 5

Service: AMMONIA SOLUTION FEED PUMP "A"


Routed Length (m): Allowance (m): Total Length (m): 19 3 22 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: EA-685943 East:

Elevation: Schematic:

Cable To End: Equipment No: C12-QCE-39-AP-001 Compartment: Description: AMMONIA SOLUTION FEED PUMP "A" North: Equip Location: Zone: East: Wiring Dwg: EA-685943 Location Dwg: EA-682933

Routing Information: Remarks: QC-1057, DOOSAN Route: CABLE C12-TL-601 C12-TL-602 C12-TL-603 C12-TL-604 C12-TL-605 C12-EC-857

Cable: C12QCE1002
Seg Code: L System: QCE Startup Code:
Cable From End: Equipment No: C12-QCE-39-GH-001 Description: LCP Equip Location: Zone: Location Dwg: EA-682933

Rev: 00

Description:

3C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): No. of Cables: 1 Type Code: 30026 End Length(m): 5

Service: AMMONIA SOLUTION FEED PUMP "A" AUTO STOROKE


Routed Length (m): Allowance (m): Total Length (m): 19 3 22 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: EA-685943 East:

Elevation: Schematic:

Cable To End: Equipment No: C12-QCE-39-AP-001S Compartment: Description: AMMONIA SOLUTION FEED PUMP "A" AUTO STOROKE North: Equip Location: Zone: East: Wiring Dwg: EA-685943 Location Dwg: EA-682933

Routing Information: Remarks: QC-1057, DOOSAN Route: CABLE C12-TL-601 C12-TL-602 C12-TL-603 C12-TL-604 C12-TL-605 C12-EC-879

Page 315 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40046 End Length(m): 5 East: Elevation: Schematic:

Cable: C12QCE1003
Seg Code: L System: QCE Startup Code:
Cable From End: Equipment No: C12-QCE-39-GW-001 Description: MCC Equip Location: Zone: Location Dwg: EA-682933

Service: AMMONIA SOLUTION FEED PUMP "B"


Routed Length (m): Allowance (m): Total Length (m): 19 3 22 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: EA-685943

Cable To End: Equipment No: C12-QCE-39-AP-002 Compartment: Description: AMMONIA SOLUTION FEED PUMP "B" North: Equip Location: Zone: East: Wiring Dwg: EA-685943 Location Dwg: EA-682933

Routing Information: Remarks: QC-1057, DOOSAN Route: CABLE C12-TL-601 C12-TL-602 C12-TL-603 C12-TL-604 C12-TL-605 C12-EC-858

Cable: C12QCE1004
Seg Code: L System: QCE Startup Code:
Cable From End: Equipment No: C12-QCE-39-GH-001 Description: LCP Equip Location: Zone: Location Dwg: EA-682933

Rev: 00

Description:

3C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): No. of Cables: 1 Type Code: 30026 End Length(m): 5

Service: AMMONIA SOLUTION FEED PUMP "B" AUTO STOROKE


Routed Length (m): Allowance (m): Total Length (m): 19 3 22 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: EA-685943 East:

Elevation: Schematic:

Cable To End: Equipment No: C12-QCE-39-CF-002S Compartment: Description: AMMONIA SOLUTION FEED PUMP "B" AUTO STOROKE North: Equip Location: Zone: East: Wiring Dwg: EA-685943 Location Dwg: EA-682933

Routing Information: Remarks: QC-1057, DOOSAN Route: CABLE C12-TL-601 C12-TL-602 C12-TL-603 C12-TL-604 C12-TL-605 C12-EC-882

Cable: C12QCE1005
Seg Code: L System: QCE Startup Code:
Cable From End: Equipment No: C12-QCE-39-GW-001 Description: MCC Equip Location: Zone: Location Dwg: EA-682933

Rev: 00

Description:

4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40046 End Length(m): 5

Service: AMMONIA SOPUTION FEED TANK AGITATOR


Routed Length (m): Allowance (m): Total Length (m): 30 4 34 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: 10

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: EA-685943 East:

Elevation: Schematic:

Cable To End: Equipment No: C12-QCE-39-AM-001 Compartment: Description: AMMONIA SOPUTION FEED TANK AGITATOR North: Equip Location: Zone: East: Wiring Dwg: EA-685943 Location Dwg: EA-682933

Routing Information: Remarks: QC-1057, DOOSAN Route: CABLE C12-TL-601 C12-TL-602 C12-TL-603 C12-TL-604 C12-TL-605 C12-EC-861

Cable: C12QUL1001
Seg Code: L System: QUL Startup Code:

Rev: 00

Description:

3C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): No. of Cables: 1 Type Code: 30026 End Length(m): 0 Elevation: Schematic:

Service: PRECONDITIONING RACK LIGHTING


Routed Length (m): Allowance (m): Total Length (m): 20 3 23 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: 20

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C12-QUL-49-GB-002 Compartment: Description: ANALYSIS PANEL J/B #2 Equip Location: Zone: North: East: Location Dwg: EA-685441 Wiring Dwg: EA-685950 Routing Information: Remarks: QC-1067(D) Route: FIELD ROUTED

Cable To End: Equipment No: C12-QUL-49-GB-001 Compartment: Description: SAMPLE PRECONDITIONING RACK J/B #1 North: Equip Location: Zone: East: Wiring Dwg: EA-685950 Location Dwg: EA-685441

Page 316 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
3C X 6 SQ.MM, 0.6/1kV
Pull Length(m): 95 No. of Cables: 1 Type Code: 30066 End Length(m): 5 Elevation: Schematic: ED-680990

Cable: C13LAC1001
Seg Code: L System: LAC Startup Code:

Service: BOILER FEED WATER PUMP-3A


Routed Length (m): Allowance (m): Total Length (m): 81 5 86 Option 1: Option 2: Option 3: Compartment: HEATER T/BOX North: 1739.70 Wiring Dwg: Shield: N Ground: Jacket: PVC End Length(m): 8

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BBE Compartment: H9 Description: 4.16KV UNIT SWBD BUS A Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C13-LAC-45-AP-001 Description: BFP PUMP Equip Location: Zone: Location Dwg: EA-681101

East: 2221.00 Elevation: 4.90 Schematic: ED-680990

Routing Information: Remarks: Route: CABLE C13-EC-010 C13-EMH-001 C13-D001-01 C13-TL-511A C13-TL-512A C13-TL-514 C13-TL-515A C10-TL-202A C10-TL-163A C10-TL-106A C10-TL-108A C10-TL-102E C10-TL-070E CABLE

Cable: C13LAC1004
Seg Code: L System: LAC Startup Code:

Rev: 00

Description:

3C X 6 SQ.MM, 0.6/1kV
Pull Length(m): 110 No. of Cables: 1 Type Code: 30066 End Length(m): 15 Elevation: Schematic: ED-680991

Service: BOILER FEED WATER PUMP-3B


Routed Length (m): Allowance (m): Total Length (m): 96 6 102 Option 1: Option 2: Option 3: Compartment: HEATER T/BOX North: 1739.70 Wiring Dwg: Shield: N Ground: Jacket: PVC End Length(m): 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BBF Compartment: H22 Description: 4.16KV UNIT SWBD BUS B Equip Location: Zone: North: East: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C13-LAC-45-AP-002 Description: BFP PUMP Equip Location: Zone: Location Dwg: EA-681101

East: 2217.00 Elevation: 4.90 Schematic: ED-680991

Routing Information: Remarks: Route: CABLE C13-EC-007 C13-EMH-001 C13-D001-01 C13-TL-511A C13-TL-512A C13-TL-514 C13-TL-515A C10-TL-202A C10-TL-163A C10-TL-106A C10-TL-108A C10-TL-102E CABLE C10-TL-071 C10-TL-074 C10-TL-076 CABLE

Cable: C13LAC1007
Seg Code: L System: LAC Startup Code:

Rev: 00

Description:

3C X 6 SQ.MM, 0.6/1kV
Pull Length(m): 115 No. of Cables: 1 Type Code: 30066 End Length(m): 15 Elevation: Schematic: ED-680992

Service: BOILER FEED WATER PUMP-3C


Routed Length (m): Allowance (m): Total Length (m): 99 6 105 Option 1: Option 2: Option 3: Compartment: HEATER T/BOX North: 1739.70 Wiring Dwg: Shield: N Ground: Jacket: PVC End Length(m): 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No:

Cable From End: Equipment No: C10BBE Compartment: H10 Description: 4.16KV UNIT SWBD BUS A Equip Location: Zone: East: North: Location Dwg: EA-681121 Wiring Dwg:

Cable To End: Equipment No: C13-LAC-45-AP-003 Description: BFP PUMP Equip Location: Zone: Location Dwg: EA-681101

East: 2213.00 Elevation: 4.90 Schematic: ED-680992

Routing Information: Remarks: Route: CABLE C10-TL-076 C10-TL-074 C10-TL-071 CABLE C10-TL-102E C10-TL-108A C10-TL-106A C10-TL-163A C10-TL-202A C13-TL-515A C13-TL-514 C13-TL-512A C13-TL-511A C13-D001-01 C13-EMH-001 C13-EC-004

Page 317 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40046 End Length(m): 5 East: Elevation: Schematic:

Cable: C13QCC1001
Seg Code: L System: QCC Startup Code:
Cable From End: Equipment No: C13-QCE-39-GW-001 Description: MCC Equip Location: Zone: Location Dwg: EA-682933

Service: OXYGEN SCAVENGER SOLUTION FEED PUMP "A"


Routed Length (m): Allowance (m): Total Length (m): 22 3 25 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: EA-685943

Cable To End: Equipment No: C13-QCC-39-AP-001 Compartment: Description: OXYGEN SCAVENGER TRANSFER PUMMP "B" North: Equip Location: Zone: East: Wiring Dwg: EA-685943 Location Dwg: EA-682933

Routing Information: Remarks: QC-1057, DOOSAN Route: CABLE C13-TL-601 C13-TL-602 C13-TL-603 C13-TL-604 C13-TL-605 C13-TL-606 C13-EC-853

Cable: C13QCC1002
Seg Code: L System: QCC Startup Code:
Cable From End: Equipment No: C13-QCE-39-GH-001 Description: LCP Equip Location: Zone: Location Dwg: EA-682933

Rev: 00

Description:

3C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): No. of Cables: 1 Type Code: 30026 End Length(m): 5

Service: OXYGEN SCAVENGER SOLUTION FEED PUMP "A" AUTO STOROKE


Routed Length (m): Allowance (m): Total Length (m): 23 3 26 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC 6

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: EA-685943 East:

Elevation: Schematic:

Cable To End: Equipment No: C13-QCC-39-AP-001S Compartment: End Length(m): Description: OXYGEN SCAVENGER SOLUTION FEED PUMP "A" AUTO STOROKE North: Equip Location: Zone: East: Elevation: Wiring Dwg: EA-685943 Location Dwg: EA-682933 Schematic:

Routing Information: Remarks: QC-1057, DOOSAN Route: CABLE C13-TL-601 C13-TL-602 C13-TL-603 C13-TL-604 C13-TL-605 C13-TL-606 C13-EC-863

Cable: C13QCC1003
Seg Code: L System: QCC Startup Code:
Cable From End: Equipment No: C13-QCE-39-GW-001 Description: MCC Equip Location: Zone: Location Dwg: EA-682933

Rev: 00

Description:

4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40046 End Length(m): 5

Service: OXYGEN SCAVENGER TRANSFER PUMMP "B"


Routed Length (m): Allowance (m): Total Length (m): 24 3 27 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: 7

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: EA-685943 East:

Elevation: Schematic:

Cable To End: Equipment No: C13-QCC-39-AP-002 Compartment: Description: OXYGEN SCAVENGER TRANSFER PUMMP "B" North: Equip Location: Zone: East: Wiring Dwg: EA-685943 Location Dwg: EA-682933

Routing Information: Remarks: QC-1057, DOOSAN Route: CABLE C13-TL-601 C13-TL-602 C13-TL-603 C13-TL-604 C13-TL-605 C13-TL-606 C13-EC-854

Cable: C13QCC1004
Seg Code: L System: QCC Startup Code:
Cable From End: Equipment No: C13-QCE-39-GH-001 Description: LCP Equip Location: Zone: Location Dwg: EA-682933

Rev: 00

Description:

3C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): No. of Cables: 1 Type Code: 30026 End Length(m): 5

Service: OXYGEN SCAVENGER SOLUTION FEED PUMP "B" AUTO STOROKE


Routed Length (m): Allowance (m): Total Length (m): 24 3 27 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC 7

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: EA-685943 East:

Elevation: Schematic:

Cable To End: Equipment No: C13-QCC-39-AP-002S Compartment: End Length(m): Description: OXYGEN SCAVENGER SOLUTION FEED PUMP "B" AUTO STOROKE North: Equip Location: Zone: East: Elevation: Wiring Dwg: EA-685943 Location Dwg: EA-682933 Schematic:

Routing Information: Remarks: QC-1057, DOOSAN Route: CABLE C13-TL-601 C13-TL-602 C13-TL-603 C13-TL-604 C13-TL-605 C13-TL-606 C13-EC-866

Page 318 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40046 End Length(m): 5 East: Elevation: Schematic:

Cable: C13QCC1005
Seg Code: L System: QCC Startup Code:
Cable From End: Equipment No: C13-QCE-39-GW-001 Description: MCC Equip Location: Zone: Location Dwg: EA-682933

Service: OSYGEN SCAVENGER SOLUTION FEED TANK AGITATOR


Routed Length (m): Allowance (m): Total Length (m): 31 4 35 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: 8

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: EA-685943

Cable To End: Equipment No: C13-QCC-39-AM-001 Compartment: Description: OSYGEN SCAVENGER SOLUTION FEED TANK AGITATOR North: Equip Location: Zone: East: Wiring Dwg: EA-685943 Location Dwg: EA-682933

Routing Information: Remarks: QC-1057, DOOSAN Route: CABLE C13-TL-601 C13-TL-602 C13-TL-603 C13-TL-604 C13-TL-605 C13-TL-606 C13-EC-858

Cable: C13QCD1001
Seg Code: L System: QCD Startup Code:
Cable From End: Equipment No: C13-QCE-39-GW-001 Description: MCC Equip Location: Zone: Location Dwg: EA-682933

Rev: 00

Description:

4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40046 End Length(m): 5

Service: TRISODIUM PHOSPHATE SOLUTION FEED PUMP "A"


Routed Length (m): Allowance (m): Total Length (m): 21 3 24 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: EA-685943 East:

Elevation: Schematic:

Cable To End: Equipment No: C13-QCD-39-AP-001 Compartment: Description: TRISODIUM PHOSPHATE SOLUTION FEED PUMP "A" North: Equip Location: Zone: East: Wiring Dwg: EA-685943 Location Dwg: EA-682933

Routing Information: Remarks: QC-1057, DOOSAN Route: CABLE C13-TL-601 C13-TL-602 C13-TL-603 C13-TL-604 C13-TL-605 C13-EC-851

Cable: C13QCD1002
Seg Code: L System: QCD Startup Code:
Cable From End: Equipment No: C13-QCE-39-GW-001 Description: MCC Equip Location: Zone: Location Dwg: EA-682933

Rev: 00

Description:

4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40046 End Length(m): 5

Service: TRISODIUM PHOSPHATE SOLUTION FEED PUMP "B"


Routed Length (m): Allowance (m): Total Length (m): 21 3 24 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: EA-685943 East:

Elevation: Schematic:

Cable To End: Equipment No: C13-QCD-39-AP-002 Compartment: Description: TRISODIUM PHOSPHATE SOLUTION FEED PUMP "B" North: Equip Location: Zone: East: Wiring Dwg: EA-685943 Location Dwg: EA-682933

Routing Information: Remarks: QC-1057, DOOSAN Route: CABLE C13-TL-601 C13-TL-602 C13-TL-603 C13-TL-604 C13-TL-605 C13-EC-852

Cable: C13QCD1003
Seg Code: L System: QCD Startup Code:
Cable From End: Equipment No: C13-QCE-39-GW-001 Description: MCC Equip Location: Zone: Location Dwg: EA-682933

Rev: 00

Description:

4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40046 End Length(m): 5

Service: TRISODIUM PHOSPHATE SOLUTION FEED TANK AGITATOR


Routed Length (m): Allowance (m): Total Length (m): 27 3 30 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC 9

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: EA-685943 East:

Elevation: Schematic:

Cable To End: Equipment No: C13-QCD-39-AM-001 Compartment: End Length(m): Description: TRISODIUM PHOSPHATE SOLUTION FEED TANK AGITATOR North: Equip Location: Zone: East: Elevation: Wiring Dwg: EA-685943 Location Dwg: EA-682933 Schematic:

Routing Information: Remarks: QC-1057, DOOSAN Route: CABLE C13-TL-601 C13-TL-602 C13-TL-603 C13-TL-604 C13-EC-857

Page 319 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40046 End Length(m): 5 East: Elevation: Schematic:

Cable: C13QCE1001
Seg Code: L System: QCE Startup Code:
Cable From End: Equipment No: C13-QCE-39-GW-001 Description: MCC Equip Location: Zone: Location Dwg: EA-682933

Service: AMMONIA SOLUTION FEED PUMP "A"


Routed Length (m): Allowance (m): Total Length (m): 29 4 33 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: 6

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: EA-685943

Cable To End: Equipment No: C13-QCE-39-AP-001 Compartment: Description: AMMONIA SOLUTION FEED PUMP "A" North: Equip Location: Zone: East: Wiring Dwg: EA-685943 Location Dwg: EA-682933

Routing Information: Remarks: QC-1057, DOOSAN Route: CABLE C13-TL-601 C13-TL-602 C13-TL-603 C13-TL-604 C13-TL-605 C13-TL-606 C13-TL-607 C13-TL-608 C13-EC-855

Cable: C13QCE1002
Seg Code: L System: QCE Startup Code:
Cable From End: Equipment No: C13-QCE-39-GH-001 Description: LCP Equip Location: Zone: Location Dwg: EA-682933

Rev: 00

Description:

3C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): No. of Cables: 1 Type Code: 30026 End Length(m): 5

Service: AMMONIA SOLUTION FEED PUMP "A" AUTO STOROKE


Routed Length (m): Allowance (m): Total Length (m): 32 4 36 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: 9

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: EA-685943 East:

Elevation: Schematic:

Cable To End: Equipment No: C13-QCE-39-AP-001S Compartment: Description: AMMONIA SOLUTION FEED PUMP "A" AUTO STOROKE North: Equip Location: Zone: East: Wiring Dwg: EA-685943 Location Dwg: EA-682933

Routing Information: Remarks: QC-1057, DOOSAN Route: CABLE C13-TL-601 C13-TL-602 C13-TL-603 C13-TL-604 C13-TL-605 C13-TL-606 C13-TL-607 C13-TL-608 C13-EC-873

Cable: C13QCE1003
Seg Code: L System: QCE Startup Code:
Cable From End: Equipment No: C13-QCE-39-GW-001 Description: MCC Equip Location: Zone: Location Dwg: EA-682933

Rev: 00

Description:

4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40046 End Length(m): 5

Service: AMMONIA SOLUTION FEED PUMP "B"


Routed Length (m): Allowance (m): Total Length (m): 28 3 31 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: 5

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: EA-685943 East:

Elevation: Schematic:

Cable To End: Equipment No: C13-QCE-39-AP-002 Compartment: Description: AMMONIA SOLUTION FEED PUMP "B" North: Equip Location: Zone: East: Wiring Dwg: EA-685943 Location Dwg: EA-682933

Routing Information: Remarks: QC-1057, DOOSAN Route: CABLE C13-TL-601 C13-TL-602 C13-TL-603 C13-TL-604 C13-TL-605 C13-TL-606 C13-TL-607 C13-TL-608 C13-EC-856

Cable: C13QCE1004
Seg Code: L System: QCE Startup Code:
Cable From End: Equipment No: C13-QCE-39-GH-001 Description: LCP Equip Location: Zone: Location Dwg: EA-682933

Rev: 00

Description:

3C X 2.5 SQ.MM, 0.6/1kV


Pull Length(m): No. of Cables: 1 Type Code: 30026 End Length(m): 5

Service: AMMONIA SOLUTION FEED PUMP "B" AUTO STOROKE


Routed Length (m): Allowance (m): Total Length (m): 32 4 36 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: 9

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: EA-685943 East:

Elevation: Schematic:

Cable To End: Equipment No: C13-QCE-39-AP-002S Compartment: Description: AMMONIA SOLUTION FEED PUMP "B" AUTO STOROKE North: Equip Location: Zone: East: Wiring Dwg: EA-685943 Location Dwg: EA-682933

Routing Information: Remarks: QC-1057, DOOSAN Route: CABLE C13-TL-601 C13-TL-602 C13-TL-603 C13-TL-604 C13-TL-605 C13-TL-606 C13-TL-607 C13-TL-608 C13-EC-876

Page 320 of 321

PLADES Plant Design System

Sargent & Lundy LLC, Chicago, IL


txtReportTitle Block-1 LV

Qurayyah Combined Cycle 12620-001 Saudi Electricity Company

INTELAGEN - CMS (03.7.860 - 3.2) Run Date: 7/31/2012 2:05 pm


Rev: 00 Description:
4C X 4 SQ.MM, 0.6/1kV
Pull Length(m): No. of Cables: 1 Type Code: 40046 End Length(m): 5 East: Elevation: Schematic:

Cable: C13QCE1005
Seg Code: L System: QCE Startup Code:
Cable From End: Equipment No: C13-QCE-39-GW-001 Description: MCC Equip Location: Zone: Location Dwg: EA-682933

Service: AMMONIA SOLUTION FEED TANK AGITATOR


Routed Length (m): Allowance (m): Total Length (m): 38 4 42 Option 1: Option 2: Option 3: Shield: N Ground: Jacket: PVC End Length(m): Elevation: Schematic: 9

Furnish Spec: QC-1021 Installation Spec: BEMCO Budget Ref No: Compartment: North: Wiring Dwg: EA-685943

Cable To End: Equipment No: C13-QCE-39-AM-001 Compartment: Description: AMMONIA SOLUTION FEED TANK AGITATOR North: Equip Location: Zone: East: Wiring Dwg: EA-685943 Location Dwg: EA-682933

Routing Information: Remarks: QC-1057, DOOSAN Route: CABLE C13-TL-601 C13-TL-602 C13-TL-603 C13-TL-604 C13-TL-605 C13-TL-606 C13-TL-607 C13-TL-608 C13-EC-859

Total Cables:

1,058

Report Filter = ( CABLE_NUMBER Like 'C1%') AND CABLE_SEG_CODE = 'L' AND CABLE_STATUS = 'Released'