Sunteți pe pagina 1din 8

2007 API Workshop Interim Hurricane Bulletins

A New Era for Fixed and Floating Structure Design and Assessment in the Gulf of Mexico
Patrick OConnor Chair: API SC2
July 17th (New Orleans); July 19th (Houston) - Extracts 2nd Oct. 2007

2007 API Workshop Interim Hurricane Bulletins July 17th (New Orleans); July 19th (Houston)

EVOLUTION OF API RP 2A New ERA


1950
48

1960
64

1970
Hilda Camille
69

1980
78

1990
Juan
84

2000
IvanKatrina/Rita
04 05

Andrew
92 93

1st Platform

Fixed Platforms

RP 2A 1st Ed.

RP 2A 9th Ed.

RP 2A RP 2A th 20 Ed. 21st Ed. Modern RP2A


07

Pre API RP

Early RP2A

NEW ERA
Bul 2INT-MET Bul 2INT-DG Bul 2INT-EX

87

95

98

01

06

RP 2T

RP 2FPS RP 2SK RP 2RD

Floating Platforms
TLP SPAR FPS

RP 95F RP 95J Bul 2TD

2007 API Workshop Interim Hurricane Bulletins July 17th (New Orleans); July 19th (Houston)

FUTURE API SC2 FOCUS Short-Term 2007:


Issue Interim API Guidance Bulletins


Existing Structures Bulletin 2INT EX Design of New Structures Bulletin 2INT DG New Metocean Information Bulletin 2INT MET

Issue API RP 95F (2nd Edition) Note also 2006 Documents: 1) API RP 95J (Jackups); 2) API Bulletin 2TD

2007 API Workshop Interim Hurricane Bulletins July 17th (New Orleans); July 19th (Houston)

SC2 - FORWARD FOCUS Long-Term: 2007/2008/2009

Update API RP 2A (New Design of Fixed Structures):


Metocean Data Extracted to Stand Alone API Document Reference New API RP 2SIM Define New Design Criteria

Update API RP 2SK, 2I, 2SM etc.


Update API RP FPS (Floating Production Systems) Update API 4F Specification for Drilling and Well Servicing Structures Link to API RP 2A Issue API RP 2SIM (Existing Fixed Structures)
2007 API Workshop Interim Hurricane Bulletins July 17th (New Orleans); July 19th (Houston)

API RP 2A (22nd Edition) Work On: 1. Extracting MET i.e. 2MET 2. Extracting SIM parts 3. Simplify Metocean Design Interpretation 4. Address Consequence Based Design, L1, L2 and L3 5. Address National Business Case Category, i.e. Major Hubs and
Critical Facilities

2007 API Workshop Interim Hurricane Bulletins July 17th (New Orleans); July 19th (Houston)

API RP 2SIM SIM Contents:


1. 2. 3. 4. 5. 6. 7. 8. Introduction Focus on explaining risk of A1, A2, A3 Categories. Definitions and Acronyms SIM Process In-Service Inspection Guidance given for a Risk Based Approach Damage Evaluation Assessment Process Assessment Criteria Grandfather Criteria (Section 17) & Future Criteria Risk Reduction and Mitigation Structural Loading Mitigation a) Reduce, b)
Raise Deck AND Operations Mitigation a) Relocate Safety/Operational Critical Equipment b) Reduce Congestion, c) Design for wave in deck.

9.

Decommissioning - Link SIM to Benefits of Early Decommissioning and/or Well P&A


2007 API Workshop Interim Hurricane Bulletins July 17th (New Orleans); July 19th (Houston)

SC2 CHALLENGES FROM THE CHAIR For H.E.A.T Simplify Metocean Criteria Research Funds Allocated 2007/2008 Provide Challenge/Peer Review for new Regional metocean Demonstrate Data/Observations/Assessment - linkages For SC2 Ensure API RP 2A 22nd Edition is Clear for Design & Construction Ensure New API RP 2SIM is Clear for Existing Facilities. Provide Guidance (via SIM) on Post Hurricane Inspection Priorities Provide Guidance on Monitoring & Metocean Data Collection Pipelines ??????? Offshore Industry Gap. For INDUSTRY Read & Understand New Bulletins Provide Feedback Do Not Abuse the Intent of Bulletins Participate
2007 API Workshop Interim Hurricane Bulletins July 17th (New Orleans); July 19th (Houston)

SC2 How Can You Help ?

Contact SC2 / HEAT members Constructive Feedback Actively Participate Positive Challenge Provide Data

2007 API Workshop Interim Hurricane Bulletins July 17th (New Orleans); July 19th (Houston)

S-ar putea să vă placă și