Mechanical works

Floor Basement Floor

Toachieve 15%

Zone1 Detailsofpendingworks InstalltionofExhaustFans Installationofexhaustairgrilles TypicalconnectionforCHWpipingforequipments InsulationforductedFCU InstallationofSupplyandReturnDiffusers FlushingofChilledWaterPipingSystem InsulationofSupplyDucts InstallationofFlexibleDucts InstallationofPlenumBoxes InstallationofRiserDuct InstallationofSupplyandReturnDiffusers

Zone2 Manpower Detailsofpendingworks required Toachieve 5 InstalltionofExhaustFans 15% 2 Installationofexhaustairgrilles 5 3 6 TypicalconnectionforCHWpipingforequipments InsulationforductedFCU InstallationofSupplyandReturnDiffusers FlushingofChilledWaterPipingSystem InstallationofSupplyandReturnDucts InsulationofSupplyDucts InstallationofFlexibleDucts InstallationofPlenumBoxes InstallationofRiserDuct InstallationofSupplyandReturnDiffusers Testingofductingsystem

Ground Floor

20%

20%

HVAC FirstFloor 25%

4 4 4 4

25%

Zone3 Manpower Detailsofpendingworks required Toachieve 5 InstalltionofExhaustFans 15% 2 Installationofexhaustairgrilles Testingofductingsystem 5 TypicalconnectionforCHWpipingforequipments 3 InsulationforductedFCU 30% 6 InstallationofSupplyandReturnDiffusers FlushingofChilledWaterPipingSystem Installationof3AHU's 4 InstallationofSupplyandReturnDucts 4 InsulationofSupplyDucts 4 InstallationofFlexibleDucts 30% 4 InstallationofPlenumBoxes 4 InstallationofRiserDuct 4 InstallationofSupplyandReturnDiffusers 3 Testingofductingsystem

Manpower required 5 2 3 5 3 6

4 4 4 4 4 4 3

RoofFloor

35%

InstallationofChiller&itscomponents InstallationCHWpumps InstallationofFAHU ConnectionforPackagedunits&otherequipments TOTALMANPOWERREQUIRED InstalltionofChannelGratings Installationofsubmersiblepumps&connections InstallationofManholecovers

6 4 4 10 61 2 4 2 10%

Basement Floor

10%

TOTALMANPOWERREQUIRED InstallationofGreaseInterceptors GRPtank&submerssibletankwithroomenclosureby LULU InstallationofwatersupplylineforGIroom

48 8 _ 2 10%

Plumbing

Ground Floor

20%

InstallationofSanitaryfixtures InstallationofWatersupplyfixture InstallationofWaterheaters InstallationofLPGsystemincludingtank,connecton Installationofmanholeforbypassconnectionwithgate valvesonbothlinesofbypass. InstallationofDieselPipingsystemforgeneratorroom withconnectiontodailytankofthegenerator

8 8 4 8 2 8

InstallationofSanitaryfixtures InstallationofWatersupplyfixture InstallationofWaterheaters 10%

8 8 4 10%

TOTALMANPOWERREQUIRED InstallationofceilingsuspendedGreaseInterceptorsfor 5restaurants RoomenclosurebyLULU InstalltionofChannelGratings Installationofsubmersiblepumps&connections Installationoftransferpumpwithtypicalconnection InstallationofManholecovers InstallationofwatersupplylineforGIroom InstallationofSanitaryfixtures InstallationofWatersupplyfixture InstallationofWaterheaters Installationofchannelgrating,scupperdrain&routingof loadingbaydrainagelineoutwards. Installationofwatersupplypipingembeddedinwall

51 3 2 3 3 2 2 8 8 4 4

6 8 8 4 4

FirstFloor Installationofwatersupplypumpswithtypical connections Installationofwatersupplylinewithhosebibfor equipment&services TOTALMANPOWERREQUIRED Paintingofpipes Installationofsprinklers Paintingofpipes Installationofsprinklers Paintingofpipes Installationofsprinklers TOTALMANPOWERREQUIRED Externalworks Externalstromdrainagesystem LPGsystem DieselFuelsupplysystem Manpower 12 8 6

30%

InstallationofSanitaryfixtures InstallationofWatersupplyfixture InstallationofWaterheaters

8 8 4

20%

InstallationofSanitaryfixtures InstallationofWatersupplyfixture InstallationofWaterheaters Installationofwatersupplypipingembeddedinwall

4 4 54 6 6 6 6 6 6 36 TOTALMANPOWERREQUIRED 10% Paintingofpipes Installationofsprinklers Paintingofpipes Installationofsprinklers Paintingofpipes Installationofsprinklers TOTALMANPOWERREQUIRED 50 6 6 6 6 6 6 36 TOTALMANPOWERREQUIRED Paintingofpipes Installationofsprinklers InstallationofFirepumpassemblywthconnections Paintingofpipes Installationofsprinklers InstallationofCleanagent&CO2system Paintingofpipes Installationofsprinklers InstallationofCleanagentsystem TOTALMANPOWERREQUIRED 69 6 6 3 6 6 6 6 6 6 51

RoofFloor

15%

Basement Floor Fire Fighting Ground Floor FirstFloor

10%

10%

10%

10%

10%

10%

10%

10%