CHECKLIST FOR GROUP WATER SUPPLY SCHEMES Name of Scheme: Mardanpur Group Water Supply Scheme Name of Firm: SNC Lavalin Infrastructure Pvt. Ltd.
S. NO. 1 2 3 4 5 6 7 8 9 Executive summary Project at a glance i.e salient Features Details of villages Latitude- Longitudes of villages Name of panchayat, Block, Tehsil, Distric Name & Number of Vidhan Sabha, Lok Sabha Average Rainfall/ Actual rainfall of five years Population of villagesAs per census 2011 or District's decadal growth (c) (DDG) ATTRIBUTE YES or NO or VALUE YES YES YES YES YES VidhanSabha - Budhni, No. - 156 and Lok Sabha -Vidisha, No. - 29 YES As per Census 1971, 1981, 1991, 2001 YES (As per Census)

10 Code of villages 11 Estimation of population- how many models 12 Adopted method for future forecast 13 Water Demand in lpcd14 Domestic need 15 Institutions/ Industries/ Commerical demmand 16 Fire Fighting demand 17 NRW / UFW 18 Cattle Demand -'E' Existing local sources, if not than - demand 19 Desing Periods (year) 20 Intermediate 21 Ultimate 22 Source 23 Intake wall 24 Pump Houses 25 Electrical Motor and pumps 26 Water treatment plant 27 Raw and Clear water conveyance mains 28 Clear water reservoirs and overhead tanke 29 Distribution system 30 Other - mention 31 Proposed source - River /Dam or Barrage - Propsed or Existing 32 Dependability / Assessment check of source 33 Water quality checking report 34 Present status of water supply disussed

YES 4 Methods Decadal Growth Method

55 LPCD 15% of Domestic Need 5% Total Demand 20% Total Demand Included in Domestic Demand

10 year 20 year 30 year 30 year 20 year 10 year 10 year 20 year 20 year 20 year

River Narmada 100% (Previous flow) Attached YES YES

174765583.xlsx.ms_officeSheet2

1 of 7

SNC lavalin Infra Structure Pvt. Ltd.

Check List

CHECKLIST FOR GROUP WATER SUPPLY SCHEMES Name of Scheme: Mardanpur Group Water Supply Scheme Name of Firm: SNC Lavalin Infrastructure Pvt. Ltd.
S. NO. ATTRIBUTE YES or NO or VALUE YES YES Not Applicable

35 Present status of water supply disussed 36 Institutional setup discussed i.e VWSC 37 Gram panchayat willingness to contribute 5% of cost 38 Proposed scheme39 Source and its storage capacity or min . Flow 40 Intake wall-cum-Raw water pump house 41 Type and Number of raw water pumps 42 Electrical substation for Raw water pumpskv/ distance/ Transformer

River Narmada 9.54 Cumes YES Vertical Turbine Pumps 3 Nos. (2W + 1S) 11kv / 0.3km from proposed sub station at WTP / 2 transformers of 1600 KvA each for WTP & Intake Well DI K-7 / 500m dia. / 300m long 24.98 MLD PS, CF, RSF / Chlorimation YES 33 KV for WTP, clear water pumps & Intake Well / 2.9 Kms. / 2 transformers of 1600 KvA each for WTP & Intake Well DI K-9 / 400mm Dia. / 15000m (Salkanpur BPT) DI K-9 450mm / 26042m (Kanakaria BPT) DI K-9 300mm / 7250m (Bhesan BPT) YES 425KL RL 365.5M (Salkanpur) 438 KL RL 342.00M (Kankaria) 302KL RL 416.5M (Bhesan) YES DI K-7 / 150mm / 151709m DI K-7 / 200mm / 221397m DI K-7 / 250mm / 32717m DI K-7 / 300mm / 41562m DI K-7 / 400mm / 12060m DI K-9 / 150mm / 9669m DI K-9 / 200mm / 5705m DI K-9 / 250mm / 1240m DI K-9 / 300mm / 13554m DI K-9 / 400mm / 2160m

43 Raw water pumping main-DI (K9 or k7 )/ Dia / Length 44 Water treatment plant- capacity 45 Untis of WTP- PS/ RF/FM CF/ SSF or RSF / Chlorimation 46 Clear water sump - cum -pump house 47 Electrical substation for Clear water pumpskv/ distance/ Transformer

48 Clear water pumping main -DI (K9 or K7)/ Dia/Length

49 Break Pressure Tank-if Yes: capacity/RL of outlet

50 Clear water gravity main- if yes: DI (K9 or K7)/ Dia/Length

174765583.xlsx.ms_officeSheet2

2 of 7

SNC lavalin Infra Structure Pvt. Ltd.

Check List

CHECKLIST FOR GROUP WATER SUPPLY SCHEMES Name of Scheme: Mardanpur Group Water Supply Scheme Name of Firm: SNC Lavalin Infrastructure Pvt. Ltd.
S. NO. ATTRIBUTE YES or NO or VALUE 100 KL - 86 Nos. 120 KL - 1 No. 130 KL - 1 No. 150 KL - 6 Nos. 200 KL - 5 Nos. 230 KL - 1 No. 240 KL - 1 No. YES Muhai, Itwa Khurd, Ghutwa, Ladkui, Chakaldi, Harmau, Hathiahat, Pachore, Chittagaon, Nimnagaon, Chhapri & Nimota HDPE / 90mm dia - 271688m, 110mm dia 21786m, 140mm dia - 14507m, 160mm dia 467m, 200mm dia - 17366m NOT 12 7.00m YES - Liquid Chlorine YES

51 Overhead tanks- Capacity wise: No. of OHTs Existing OHT used or not, if yes name of village(s)

52 1. Distribution system- Pipe material/Lengths/ 2. Existing length used or not, if yes name of village(s) 3. peak Factor in the design 4. Min. Residual Head in the design

53 Chlorination- Liquid Chlorine/Bleaching/Sod. Hyprochlorite 54 SCADA 55 Others- Mention 56 Cost estimate in the schemeSOR: UADD/ PHE/ PWD/ MPVVCo. 57 Source 58 Intake wall-cum-Raw water pump house 59 Raw water pumping equipment 60 Electrical substation for Clear water pumps 61 Clear water pumping main 62 Overhead tanks 63 Distribution system 64 SCADA 65 Other - mention 66 O&M estimate - upto village OHT/ sump - cum - pump- house 67 O&M estimate -within village for each GP/ Village 68 Drawings69 Source 70 Intake wall -cum- Raw water pump house 71 Electrical substation for Raw water pumps 72 Plan& L- Section of Raw water pumping main 73 water treatment plant 74 Clear water sump - cum -pump house 75 Electrical substation for Clear water pump

YES

WRD UADD MKVVCL UADD UADD UADD Market Rate

986.74 Lakhs 47.54 Lakhs

YES YES YES (Combined) YES YES YES YES (Combined)

174765583.xlsx.ms_officeSheet2

3 of 7

SNC lavalin Infra Structure Pvt. Ltd.

Check List

CHECKLIST FOR GROUP WATER SUPPLY SCHEMES Name of Scheme: Mardanpur Group Water Supply Scheme Name of Firm: SNC Lavalin Infrastructure Pvt. Ltd.
S. NO. ATTRIBUTE YES or NO or VALUE YES YES YES YES YES YES

76 Plan& L- Section of Raw water pumping main 77 Break Pressure Tank 78 Plan& L- Section of Raw water gravity main 79 Overhed tanks 80 Distribution network drawings of all village 81 CPM/ PERT Chart

174765583.xlsx.ms_officeSheet2

4 of 7

SNC lavalin Infra Structure Pvt. Ltd.

CHECKLIST FOR GROUP WATER SUPPLY SCHEMES Name of Scheme: Mardanpur Group Water Supply Scheme Name of Firm: SNC Lavalin Infrastructure Pvt. Ltd. S. NO. 1 2 3 4 5 District Block No. of villages/habitation under proposed scheme(enclose drawing) Latitude- Longitudes of villages Population of proposed village/s/habitation Household Number on 2011 Description Details Sehore Rehti, Nadrullaganj, Budani 182 Villages + 2 Urban Town

Category Villages Urban Total Category Villages Urban Total

Nos.

Population

Household

Population of proposed village/s/habitation Household Number present (Year 2015)

Nos.

Population

Household

7 8 9 10 11 12

Proposed execution period(Years) Design village/s/Habitations house hold No after lag period (2015) Design village/s/Habitations house hold No after 10 year ( 2025) Design village/s/Habitations house hold No after 20 year ( 2035) Design village/s/Habitations house hold No after 30 year ( 2045) Total water demand for all purposes for village

3 Years For Villages For Urban town For Villages For Urban town For Villages For Urban town For Villages For Urban town Classification Immediately after After 10 years After 20 years After 30 years Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Villages MLD Villages MLD Total MLD

13 14

Proposed Water Supply Scheme i) Availability Three Phase Electric in Hours/day ii) GW/Surface iii) A) in case TW (Tube Well)

3 Years in the Project from 33kv station from Mardanpur Surface/Narmada River Not Applicable

7 8

Average Rainfall/ Actual rainfall of five years Population of villages-

YES As per Census 1971, 1981, 1991, 2001

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42

As per census 2011 (c) or District's decadal growth (DDG) Code of villages Estimation of population- how many models Adopted method for future forecast Water Demand in lpcdDomestic need Institutions/ Industries/ Commerical demmand Fire Fighting demand NRW / UFW Cattle Demand -'E' Existing local sources, if not than - demand Desing Periods (year) Intermediate Ultimate Source Intake wall Pump Houses Electrical Motor and pumps Water treatment plant Raw and Clear water conveyance mains Clear water reservoirs and overhead tanke Distribution system Other - mention Proposed source - River /Dam or Barrage - Propsed or Existing Dependability / Assessment check of source Water quality checking report Present status of water supply disussed Present status of water supply disussed Institutional setup discussed i.e VWSC Gram panchayat willingness to contribute 5% of cost Proposed schemeSource and its storage capacity or min . Flow Intake wall-cum-Raw water pump house Type and Number of raw water pumps Electrical substation for Raw water pumpskv/ distance/ Transformer Raw water pumping main-DI (K9 or k7 )/ Dia / Length Water treatment plant- capacity Untis of WTP- PS/ RF/FM CF/ SSF or RSF / Chlorimation Clear water sump - cum -pump house Electrical substation for Clear water pumpskv/ distance/ Transformer

YES (As per Census)

YES 4 Methods Decadal Growth Method 55 LPCD 15% of Domestic Need 5% Total Demand 20% Total Demand Included in Domestic Demand

10 year 20 year 30 year 30 year 20 year 10 year 10 year 20 year 20 year 20 year River Narmada 100% (Previous flow) Attached YES YES YES YES Not Applicable

River Narmada 9.54 Cumes YES Vertical Turbine Pumps 11kv / 0.3km from proposed sub station at WTP / 2 transformers of 1600 KvA each for WTP & Intake Well DI K-7 / 500m dia. / 300m long 24.98 MLD PS, CF, RSF / Chlorimation YES 33 KV for WTP, clear water pumps & Intake Well / 2.9 Kms. / 2 transformers of 1600 KvA each for WTP & Intake Well

43 44 45 46 47

48 49 50 51

52

53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81

Clear water pumping main -DI (K9 or K7)/ DI K-9 / 400mm Dia. / 15000m (Salkanpur BPT) Dia/Length DI K-9 450mm / 26042m (Kanakaria BPT) Break Pressure Tank-if Yes: capacity/RL YES of outlet 425KL RL 365.5M (Salkanpur) Clear water gravity main- if yes: DI (K9 or YES K7)/ Dia/Length DI K-7 / 150mm / 151709m Overhead tanks- Capacity wise: No. of 100 KL - 86 Nos. OHTs 120 KL - 1 No. Existing OHT used or not, if yes name of 130 KL - 1 No. village(s) 150 KL - 6 Nos. 1. Distribution system- Pipe HDPE / 90mm dia - 271688m, 110mm dia - 21786m, 140mm dia material/Lengths/ 14507m, 160mm dia - 467m, 200mm dia - 17366m 2. Existing length used or not, if yes NOT name of village(s) 12 3. peak Factor in the design 7.00m 4. Min. Residual Head in the design Chlorination- Liquid YES - Liquid Chlorine Chlorine/Bleaching/Sod. Hyprochlorite SCADA YES Others- Mention Cost estimate in the schemeYES SOR: UADD/ PHE/ PWD/ MPVVCo. Source Intake wall-cum-Raw water pump house WRD Raw water pumping equipment Electrical substation for Clear water pumps Clear water pumping main Overhead tanks Distribution system SCADA Other - mention O&M estimate - upto village OHT/ sump cum - pump- house O&M estimate -within village for each GP/ Village DrawingsSource Intake wall -cum- Raw water pump house Electrical substation for Raw water pumps Plan& L- Section of Raw water pumping main water treatment plant Clear water sump - cum -pump house Electrical substation for Clear water pump Plan& L- Section of Raw water pumping main Break Pressure Tank Plan& L- Section of Raw water gravity main Overhed tanks Distribution network drawings of all village CPM/ PERT Chart UADD MKVVCL UADD UADD UADD Market Rate 986.74 Lakhs 47.54 Lakhs

YES YES YES (Combined) YES YES YES YES (Combined) YES YES YES YES YES YES