Sunteți pe pagina 1din 2

Crown Home Consultants

SECTION 15189 WATER TREATMENT AND CHEMICAL CLEANING SYSTEM PART 1 - GENERAL 1.1 GENERAL A. B. C. 1.2 Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification Sections, apply to work of this Section. General Requirements for HVAC Work, Section 15501, applies to work of this Section. The requirements of this Section apply to equipment specified elsewhere in the specification.

DESCRIPTION A. General: Provide chemical cleaning and a water treatment program for the following systems: 1. B. Chilled, Secondary and Hot Water Closed Systems

All necessary mechanical equipment, cleaning chemicals, treatment chemicals, and services shall be furnished by a single water treatment consulting firm for undivided responsibility. The water treatment supplier shall receive written notice prior to temporary or permanent startup of any system requiring chemical treatment or cleaning chemicals. All chemical water treatment system make-up water piping shall conform to all Code requirements. One year contract should be bid as an alternate.

1.3

SUBMITTALS A. The water cleaning supplier shall forward within 90 days from job acceptance, the following for approval: 1. 2. 3. 4. 5. 6. 7. System Installation drawings and diagrams. Product Information sheets on each component, device, pump, controller, valve, etc., being supplied in the system. Analysis of Raw Water supplying each system. Product information sheet on all chemical products being supplied for each system including cleaning chemicals. Recommended feed rate on each chemical product. Analysis of blow down water from each system requiring blow down. Recommended operating conditions for each system including cycles of concentration, chemical test limits and limits of water treatment system set points.

PART 2 - PRODUCTS
Cleopatra Plaza Tower (Nasr City) Specifications 15189/1 Rev.0 March.2012

Crown Home Consultants

2.1 2.2

Water Treatment and Chemical Cleaning System shall be Olin Water Services Corp. or other acceptable. CHEMICAL CLEANING A. All water systems indicated shall be thoroughly flushed out with the approved cleaning chemicals to remove pipe dope, slushing compounds, cutting oils, and other loose extraneous materials. The cleaning chemicals shall be added by the mechanical trade. The chemical supplier shall instruct as to the proper feed rates, shall check that the cleaning solution is actually in each system, shall instruct the contractor as to when to flush the system and shall check each system following flushing to insure all cleaning chemicals have been removed from each system. The mechanical trades shall block open all modulating valves, zone valves and all other system restrictions. If building pumps are not available, this trade shall provide portable pumps to circulate water for cleaning purposes. Chemical used for cleaning of systems shall comply with the recommendations of the manufacturers of the major components in the system. A certificate of cleaning shall be provided by the cleaning chemical supplier to the Owner. Following system flushing, upon initial fill, the approved chemicals which provide a protective coating are to be added to prevent oxidation of the piping system.

B. C. D.

PART 3 - EXECUTION 3.1 INSTALLATION A. 3.2 Install in accordance with approved system drawings and diagrams.

FIELD QUALITY CONTROL A. B. Instruction and training of maintenance personnel in the operation of system installed. Perform all field test procedures and issue all reports of such tests.

END OF SECTION 15189

Cleopatra Plaza Tower (Nasr City) Specifications

15189/2

Rev.0 March.2012

S-ar putea să vă placă și