Sunteți pe pagina 1din 16

ZINC 17/12/06 1:16 pm Page 3

WORLD ZINC REPORT

Galvanized for action


As world demand for zinc grows, particularly in Asia, zinc inventories are expected to hit
critically low levels in the second quarter of 2007, equal to two days of consumption.
A high price forecast is expected to cause a shift in market attitudes since zinc has exceed-
ed the $4,000/t price barrier. Sally Higgins investigates whether the supply-demand
deficit will continue to widen, examines some projects and considers relevant technologies

A
s a result of low stockpiles, the zinc steeply in 2005, demand in the USA is Canada, India, Kazakhstan and Portugal. An
price forecast for 2007 has risen expected to rise by 7% in 2006 but to expected increase in global refined zinc
from $1.48 to $2.06/lb according to remain flat in 2007. Similarly in Europe, it is metal output of 4.9% in 2007 will primarily
Scotia Capital’s recently updated zinc anticipated that demand will rise by 3.4% in be driven by expansions in China where an
outlook. The International Zinc and Lead 2006 but remain unchanged in 2007. increase of 10% is forecast.
Study Group expects global demand for It is predicted that world zinc mine output Additional production resulting from the
refined zinc metal to increase by 2.6% to will increase by 7.3% to 11.12 Mt in 2007, commissioning of Hindustan Zinc’s new
11.35 Mt in 2007. Chinese demand is influenced by a number of mine openings, 170,000 t/y capacity Chanderiya refinery in
forecast to rise by 4.7% in 2006 and 6.9% re-opening and expansions. Production is 2005 caused an increase in Indian output of
in 2007, at which time it will account for expected to rise in a number of countries, 44% in 2006. Significant rises are also
30% of total world zinc usage. After falling most notably Australia, China, Bolivia, anticipated in Kazakhstan and South Korea.

McArthur River Mining plans to convert from


underground to open pit at the McArthur River mine.

14 International Mining JANUARY 2007


Document1 2/1/07 2:34 pm Page 1
ZINC 17/12/06 1:16 pm Page 4

WORLD ZINC REPORT

A new world leader

A
s IM went to press, on December 11, Umicore and Zinifex announced that they had signed a Memorandum ofUnderstanding (MOU)
with the objective of combining their respective zinc smelting and alloying businesses, leading to the creation of "the world’s pre-emi-
nent zinc metal producer with operations on four continents.”
The Zinifex assets to be contributed are the Hobart (Australia), Port Pirie (Australia), Clarksville (USA) and Budel (Netherlands) smelting and
alloying operations as well as its shareholdings in Australian Refined Alloys (Australia) and Genesis Alloys (China). The Umicore assets to be con-
tributed are the Balen (Belgium), Overpelt (Belgium), Auby (France) and GM Metal (France) smelting and alloying operations as well as its share-
holdings in Padaeng Industry (Thailand) , Galva 45 (France), Umicore Yunnan Zinc Alloys (China) and Föhl China (China). Combined, these enti-
ties produce some 1.2 Mt/y of zinc and zinc alloys. The jointly owned company is to be incorporated in Belgium, have its global headquarters
in London and have regional support centres in Melbourne (Australia) and Balen (Belgium).
Greg Gailey, CEO, commented that this gives Zinifex’s "refining and smelting business the opportunity to flourish as part of a stronger more
diversified global enterprise while at the same time enabling us to focus more clearly on our ambitions to vigorously grow our mining business.”
The two companies are committed to working together to complete final due diligence and structuring discussions over the next few months
with a view to signing a binding Business Combination and Sales Agreement (BCSA) by the end of the first quarter of calendar 2007. Subject
to required presentation to the works councils in Europe and the receipt of necessary regulatory and shareholder approvals, the new venture is
targeted to come into existence in the third quarter of calendar 2007.

The increased availability of concentrates in expected shortfall of 2.38 Mt. He said that 27 months and that it would worsen to
2006 and 2007, combined with rapidly China would remain the driver for higher 907 t/d this year.
expanding smelter capacity, is expected to zinc production globally. Almost half of all demand for zinc is for
result in a decrease in Chinese net imports “If China increases consumption by an galvanizing steel to prevent it from rusting.
of refined zinc both this year and next. average 345,000 t/y to 4.8 Mt total by The largest consumer and producer of steel
Exports from the CIS are expected to rise as 2010, and the rest of the world increases is currently China, owing mainly to expanding
production in the region is expanded. consumption by a modest 2%, total world infrastructure. China accounts for 25% of
Industry experts predict that demand for production within three years must reach 13 world zinc demand, which is one of the
zinc will exceed supply until at least 2010. Mt,” Forrester said. He continued that stocks contributing factors to the increase in the
Anders Haker, Chief Financial Officer of and output would be at critical levels by price of zinc from $1,380/t in 2005 to
Lundin Mining, commented at Metal early in 2008. $4,000/t in 2006.
Bulletin’s zinc seminar, “China and India are “The decline has been evident over recent When compared to other base metals, zinc
at a very early stage of development, and I years with London Metals Exchange stocks of has a relatively low level of supply from scrap
assume these two economies will follow the 780,000 t in April 2004 dwindling 606,500 t due to the difficulty in salvaging zinc layers
same pattern as consumption of zinc in the in just 27 months to 173,500 t by just a few from steel. Out of a total supply of 10.5 Mt,
US.” Haker forecasts that India’s zinc weeks ago.” He said it represented an only 500,000 t of zinc are from scrap recovery.
consumption will increase considerably from average daily decrease of 728 t/d over the National Australia Bank (NAB) has indicated
comparatively low levels of about 0.5 kg per that speculative pressures will remain in
person. US per capita consumption is 3.5 kg 2007 and prices could continue to rise.
and South Korea’s is 8.8 kg. By 2010 it is The feasibility study was completed in May 2006 Whilst speculative demand has strengthened,
estimated that China will consume 2-4 Mt for the Wolverine project. Currently, a review and supply has not changed much due to the
and India will consume 1 Mt. The disparity optimization study is underway and Yukon Zinc is long lead-time in getting new projects up
between supply and demand is illustrated by on a path to advance the Wolverine project to and running. Supply increases are forecast
Haker’s forecasted supply increase from construction in 2007 and production in 2008. for 2007, although metal prices will remain
2006 to 2009 of 1.8 Mt, clearly high as the supply response
insufficient to close the gap. continues to be impacted by
Mount Burgess Mining higher costs of machinery, raw
believes that world zinc output materials and labour. NAB
would have to grow by 22% suggests that the fundamentals
on this year's production for zinc are the most favourable
estimate of 10.6 Mt to meet of all the metals as demand
expected demand by 2010. continues to exceed supply.
Speaking at an African- Canaccord Adams notes that
focused mining conference in zinc oxide ores were the
Perth on September 7, primary source of zinc prior to
Chairperson Nigel Forrester the development of the flotation
said that new mine start-ups, and smelting processes for sulphide
production upgrades and mine ores. With the modern development
closures would have to fill the of SX-EW technology and the

16 International Mining JANUARY 2007


TECNICAS REUNIDAS J07 17/12/06 10:05 am Page 1
ZINC 17/12/06 1:17 pm Page 5

WORLD ZINC REPORT

Terramin Australia operates the Angas


Zinc: mine production (Mt) zinc project, 2 km outside the small town of
Strathalbyn, 60 km from Adelaide, South
2002 2003 2004 2005 Jan-Aug 2005 Jan-Aug 2006 Australia. The orebody outcrops under a
Europe 0.90 1.01 1.00 1.04 0.69 0.71 limestone quarry in a rural zone containing
Africa 0.24 0.26 0.35 0.41 0.28 0.27 two waste landfill dumps and effluent
America 3.76 3.74 3.57 3.52 2.40 2.27 treatment ponds. Current zinc resources in
Asia 2.55 3.06 3.51 3.81 2.48 2.70 three shoots are 3.04 Mt. Mining reserves
Oceania 1.44 1.45 1.30 1.33 0.89 0.87 are currently 2.2 Mt. Feasibility studies and a
World 8.89 9.52 9.73 10.11 6.73 6.82 financial model for a 400,000 t/y under-
Source: International Lead and Zinc Study Group ground operation were completed in July
2006. Production is on track to start in
modernization of the Walz technology for of ore, which represents an improvement of 2007, producing 30,000 t of zinc and
treatment of zinc oxides, commercial interest more than 40% over the feed rate achieved 10,000 t of lead, with significant gold and
is expanding for non-sulphide zinc deposits. in the first nine months of 2006. silver credits.
The interest is largely the same as that for The Lady Loretta zinc project, a joint Xstrata Zinc’s wholly-owned, McArthur
acid leachable copper deposits. Recovery venture between Xstrata and Scarborough River Mining (MRM), has had approval for
using SX-EW requires lower energy, ideally Minerals, in northwest Queensland, is it’s A$110 million development to convert
the process is environmentally simple, and currently the subject of a preliminary feasibility from underground to open pit operations at
generating a final saleable zinc product cuts study into a proposed 1 Mt/y mine and the McArthur River mine located 900 km
out the costs associated with transportation concentrator. Xstrata has substantial zinc southeast of Darwin, Northern Territory. The
of concentrates and smelter charges. These mining and processing operations 150 km to approved open pit development will enable
positives are contrasted by a few negatives the south of Lady Loretta at Mount Isa. The MRM to continue to access one of the
including a process that typically recovers a total resources have been reported as 13.6 world’s largest known deposits of zinc and
single metal versus multi metal recovery Mt grading 17% Zn, 5.9% Pb and 97 g/t lead. It will increase annual ore throughput
using flotation followed by pyrometallurgy. Ag. from 1.6 to 1.8 Mt to maintain current levels
Up front capital for zinc oxide operations Jabiru Metals says it “is well on the way of concentrate production of around
can be above average. One of the best to becoming Australia’s next zinc and copper 320,000 t/y, and extend the life of mine by
examples of a modern, successful zinc oxide producer with the Jaguar project construction 25 years.
operation is Anglo American’s Skorpion mine on track to begin concentrate production in MRM exports feed to smelters in Poland,
in Namibia. In September 2000, Anglo made the June quarter 2007.” Refurbishment of Romania, Japan and China, producing 70%
a production decision on Skorpion. Based on Cadjebut and Black Cat plants is nearing of the world’s zinc-lead bulk concentrate.
capital requirements of $454 million the completion and detailed engineering is MRM opened in 1995 and in August 2005,
operation now yields just about 150,000 t/y complete. Jaguar lies northwest of Leonora, MRM announced its intention to convert the
of zinc at cash costs below $0.25/lb. This Western Australia. Current reserves are stat- mine from an underground to an open-pit
makes it one of the lowest cost zinc ed as 1.6 Mt at 3.1% Cu, 11.7% Zn, 0.72% operation to enable production to continue.
operations on the planet. Pb and 120g/t Ag. Since April 2006, MRM’s production has

Australian expansion
Xstrata Zinc has successfully completed the Wolfden Resources’ High Lake property in
first stage of the project to upgrade and Nunavut, Canada, includes two open pit
expand the Mount Isa zinc concentrator. This mines, one underground mine and a mill.
first stage of the project comprised increasing
the operating reliability of the old plant
through the installation of a new crushing
circuit and ore feed system, an enhanced
maintenance programme with special
emphasis on the heavy medium plant and
the recent commissioning of a new zinc
filter plant. This project also included a low
cost expansion of throughput capacity by an
additional 1.5 Mt/y of ore through the
installation of a parallel second hand milling
and flotation circuit acquired at a nominal
cost. The combined effect of the increased
operating reliability of the old plant plus the
new parallel circuit will increase the nominal
feed capacity of the concentrator to 6.5 Mt/y

18 International Mining JANUARY 2007


SANDVIK JAN 07 2/1/07 2:38 pm Page 1
ZINC 17/12/06 1:17 pm Page 6

WORLD ZINC REPORT

been generated by an approved test pit as Zinc: metal production (Mt)


underground operations have now ceased.
MRM has a measured and indicated ore
resource of greater than 120 Mt, equating 2002 2003 2004 2005 Jan-Aug 2005 Jan-Aug 2006
to over 85 years of production at current Europe 2.90 2.74 2.72 2.56 1.73 1.70
levels. Africa 0.15 0.20 0.26 0.27 0.18 0.19
Perilya has formally approved the development America 1.90 1.93 1.99 1.88 1.26 1.22
of the Potosi mine, located 2 km from Asia 4.19 4.45 4.91 5.06 3.31 3.63
Broken Hill in New South Wales. The Oceania 0.57 0.55 0.47 0.46 0.30 0.29
development of an exploration decline from World 9.71 9.87 10.35 10.23 6.78 7.02
the base of the Potosi open pit to initially Source: International Lead and Zinc Study Group
access some 194,000 t of high grade ore
from Potosi North is expected to commence an additional 4 years with the conversion of shares of ScoZinc from HudBay Minerals.
in the March quarter 2007, with first ore inferred resources into mining reserves. ScoZinc’s principal assets are a modern mill
delivery expected in the September quarter The mining licence for the Wolverine facility (the Scotia mine) and zinc-lead
of 2007. deposit, 195 km northwest of Watson Lake deposits located at Gay’s River, Nova Scotia.
Capitalizing on existing infrastructure and and 135 km southeast of the Ross River, was The company has completed a positive
a highly experienced mining workforce at granted at the beginning of December 2006 feasibility study and is obtaining the
Broken Hill, the project has very competitive and provides for the development of a necessary regulatory approvals and financing
fundamentals and is expected to increase 1,500 t/d underground mine. The company to make the transition to a producer in 2007.
zinc production from Broken Hill by about hopes for a production decision by early The ScoZinc acquisition is the cornerstone of
10,000 t in the first year and by 35,000 t in 2007. Ores will be processed by standard the Scotia project, which also incorporates
subsequent years. The resource is open in a flotation processes to produce silver and some 7,800 newly staked mineral claims
number of directions and there is good gold-bearing zinc, copper and lead covering 126,000 ha prospective for zinc.
potential to add further resources with the concentrates to be sold primarily to metal The Getty zinc-lead deposit, a westerly
planned drill programme. The company is markets in Asia. extension of the Scotia deposit, is located
targeting an ultimate resource for the The measured and indicated resource 700 m to the east. Based on a 1.5% Zn
project of at least 4 Mt at grades of 10-12% estimate is 4.46 Mt grading 12.14% Zn, equivalent cut-off grade, resources at the
Zn, 3-5% Pb and 40-50 g/t Ag. 354.8 g/t Ag, 1.16% Cu, 1.69 g/t Au and Getty deposit were estimated at 4.5 Mt at
1.58% Pb. Inferred resources are 1.69 Mt an average grade of 1.9% Zn and 1.3% Pb.
Canadian developments containing 12.16% Zn, 385.4 g/t silver, The Getty deposit resources are in addition
Yukon Zinc recently completed a feasibility 1.23% Cu, 1.71 g/t Au and 1.74% Pb. The to the 5.24 Mt of measured and indicated
study on its Wolverine project in south-central diluted proven and probable mining reserves resources grading 4.1% Zn and 2% Pb and
Yukon. The study demonstrates an estimated based on the measured and indicated 1.8 Mt of inferred resources grading 3.1%
production in the first three years of 33,342 t/y resources total 5.2 Mt grading 9.71% Zn, Zn and 1.1% Pb at the Scotia mine.
of zinc, 3,577 t/y of copper, 3,399 t/y of 0.93% Cu, 1.26% Pb, 284 g/t Ag and 1.37 Scotia currently has a reserve sufficient for
lead, 3.8 Moz/y of silver and 16,043 oz/y of g/t Au. five years of open pit production at 700,000
gold in the concentrates. A mine life of ten In July 2006 Acadian Gold completed the t/y and two and a half years of underground
years is predicted, which could be extended acquisition of 100% of the outstanding production at 472,500 t/y. Future work
programmes will be designed to bring the
Getty deposit into NI 43-101 compliance
and ascertain development potential.
Wolfden Resources has submitted regulatory
applications for the construction and operation
of a base metal mine and mill at its 100%
owned High Lake property in Nunavut. The
High Lake project includes two open pit
mines, three underground mining areas and
a mill to process up to 4,000 t/d. It will also
include a tailings management facility.
The Amaqqut group of projects, several of
which rank amongst the highest-grade
undeveloped copper-zinc deposits in the
world, according to Wolfden, include the

Canadian Zinc’s Prairie Creek includes a partially


developed underground mine with a 1,000 t/d
mill.

20 International Mining JANUARY 2007


Document1 2/1/07 2:37 pm Page 1
ZINC 17/12/06 1:19 pm Page 7

WORLD ZINC REPORT

Zinc: metal consumption (Mt) project could be viable. This plan was to
construct roads and tunnels to connect the
2002 2003 2004 2005 Jan-Aug 2005 Jan-Aug 2006 old plant site and ship-loading facility with
Europe 2.75 2.79 2.82 2.68 1.78 1.88 the new satellite discoveries (Ark, Glacier,
Africa 0.19 0.17 0.19 0.20 0.14 0.13 and others yet to be drilled) and to re-establish
America 2.02 1.95 2.12 1.90 1.27 1.34 access to the former mine. A&R intends to
Asia 4.15 4.66 5.24 5.60 3.60 3.77 establish a pre-treatment plant in order to
Oceania 0.27 0.27 0.26 0.26 0.18 0.18 upgrade the known high-grade Black Angel
World 9.38 9.84 10.65 10.63 6.96 7.30 mineralization. It would then be possible to
Source: International Lead and Zinc Study Group export pre-concentrated mineral to an existing
mill, or to re-establish a mill on site dependant
Izok and High Lake deposits. Izok hosts an containing roughly 55.5% Zn. At full on the size of the mineral reserves and the
indicated resource of 14.4 Mt at grades of production in 2008, the mine is expected to relative economics of the options. It is of
2.52% Cu, 1.28% Pb and 12.94% Zn, with produce some 60,000 t of zinc metal in great benefit to the overall project economics
71 g/t Ag. High Lake has an indicated concentrate and up to 40% of the Balmat that a good part of the new resources at the
resource of 17.25 Mt grading 2.25% Cu, mine annual concentrate production, over Glacier and Ark zones can be mined by open
0.31% Pb, 3.35% Zn and 69.7 g/t Ag. the life of the mine, may be swapped for pit methods. Fuller details of the project were
Canadian Zinc’s Prairie Creek mine in the Xstrata concentrate and treated at HudBay’s published in IM Project News, December 10.
Northwest Territories reopened in May 2006. zinc plant in Manitoba.
The Prairie Creek project includes a Angus and Ross (A&R) has received the South American assets
partially developed underground mine with Wardell Armstrong International (WAI) Production has started at Pan American
an existing 1,000 t/d mill and related resource report following four months of Silver’s 55%-owned San Vicente silver-zinc
infrastructure and equipment. The property drilling this summer at its Black Angel prospect mine in the Potosí department of the
hosts a major mineral deposit containing a in Greenland. The drilling programme Bolivian Andes. More than 20 bonanza type
historically estimated resource of 3.6 Mt established at least 1.9 Mt of additional silver-zinc veins are known to occur over an
(measured and indicated) grading 11.8% Zn, mineral resources around the Black Angel area of 1.5 km on surface and extend to at
9.7% Pb, 0.3% Cu and 141.5 g/t Ag and mine. This additional mineral resource does least 200 m in depth. Feasibility analysis and
8.3 Mt (inferred) grading 12.8% Zn, 10.5% not include the 1.57 Mt of proven and engineering is continuing on a plan to
Pb, 0.5% Cu and 169.2 g/t Ag. probable reserves of an average combined expand mine production and build a new
Full commercial production is expected in Zn/Pb grade of 21.6% that remain in the mill on the property.
mid-2007 at Breakwater Resources’ Langlois mine, as disclosed in WAI’s November 2005 Commercial production has begun at
mine in northwestern Quebec. A feasibility prefeasibility report. Fortuna Silver Mine's Caylloma silver-zinc-
study to reopen the mine, including a The Directors of A&R are considering a lead mine in southern Peru. Ore is currently
technical solution for the ore pass problem, number of options to re-open the mine.
was completed by SRK Consulting. The They say that, subject to the availability of
project economics were reviewed again by project finance, it now seems likely that the The mill at Caylloma has a capacity of 700 t/d,
Breakwater late in 2005, concluding that, original A&R mining plan to develop the which Fortuna aims to achieve in May 2007.
based on a life-of-mine average price for
zinc of $0.53/lb, a copper price of $1.05/lb,
a silver price of $6.59/oz and an exchange
rate of US$0.80 per C$1.00 the project had
an internal rate of return of 16.6% based
on mining and milling the proven and
probable mineral reserves of 3.3 Mt at head
grades of 10.8% Zn, 0.8% Cu, 0.1 g/t Au
and 52.1 g/t Ag.
In 2005 HudBay initiated the re-opening
of its wholly-owned Balmat mine and
concentrator after completion of a feasibility
study. The mine’s concentrate production
will be treated at the Canadian Electrolytic
Zinc (CEZ) refinery near Montreal, some 158 km
from the mine. Balmat includes a 1,000 m
deep shaft, underground excavations to
access the ore zones, extensive mining
equipment and a 5,000 t/d ore concentrator.
Recovery of zinc to concentrate is expected
to be about 96%, producing a concentrate

22 International Mining JANUARY 2007


ITT FLYGT J 07 17/12/06 12:04 pm Page 1

WWWDOWELLSTUBBSCOM

7KHQHZIRUFHLQGHZDWHULQJ²
XQEHDWDEOHLQWRXJKHQYLURQPHQWV
7KHVHULHVIURP,77)O\JWLVHQJLQHHUHGWR
ZLWKVWDQGWKHKDUVKHVWHQYLURQPHQWV%\UDGLFDOO\
UHGXFLQJFRPSRQHQWZHDUDQGWKHQHHGIRUPDLQ
WHQDQFHWKHVHSXPSVRIIHUWKHORZHVWSRVVLEOHFRVW
RIRZQHUVKLSDQGNHHS\RXURSHUDWLRQVPRYLQJ
7KHSDWHQWHG'XUD6SLQŒK\GUDXOLFV\VWHPDQG
KLJKFKURPHLPSHOOHUERRVWZHDUUHVLVWDQFHZKLOH
DVSHFLDOO\GHVLJQHG6SLQ2XWŒV\VWHPGUDVWLFDOO\
UHGXFHVFORJJLQJDQGVHDOZHDU6WDLQOHVVVWHHO
VWUDLQHUVDQGUXEEHUVKRFNDEVRUEHUVRIIHUKLJK
FRUURVLRQDQGLPSDFWUHVLVWDQFH
)RUPRUHLQIRUPDWLRQJRWRZZZIO\JWFRP
ZINC 17/12/06 1:21 pm Page 8

WORLD ZINC REPORT

Cost savings filter through Metso supplies the complete system:


◆ Slurry thickener with automatic discharge

B
oliden’s Tara Mines in Ireland is the biggest zinc producer in ◆ Feed slurry buffer tank
Europe and the sixth largest zinc mine in the world. It became ◆ Flow and density meters for filter feed
part of Boliden Group on January 1, 2004. It is a high cost pro- ◆ Slurry feed pump and cloth wash water pump and tank
ducer so over the past three years the new management has been find- ◆ Compressed air system
ing ways to cut costs. ◆ Product weighing system for production monitoring
One very successful change has been in the concentrator where ◆ Filter cloth damage detector
Tara was struggling with two different filter systems which were ◆ Process controller for complete automatic operation
costing too much in both energy and maintenance time. ◆ Service platform
The solution has been two new Metso Minerals VPA pressure The Pressure Filter is the heart of the system and is available in two
filters in the zinc circuit. These two are of the size VPA 1530-60, basic versions VPA and VPC.VPA means Vertical Plate Airblow and
which have 60 chambers with a 1.5 m chamber frame size with 30 designates the filter with compressed air dewatering of the filter
mm deep chambers. Concentrate slurry is pumped from the zinc cake. VPC means Vertical Plate Compression and is the unit with
thickener to a surge tank and thence to the Metso filters. Thomas high pressure membrane dewatering of the filter cake.
Sundqvist, Mill Manager at Tara, explained that in Sweden, Boliden’s
mines had good experience with these filters, and in fact had helped
developed the system. Each unit goes through five cycles an hour,
for a total throughput of 90 t.
These units were installed in August 2006. Calculating for the sav-
ings in fuel, maintenance labour and downtime, Tara expects to pay
for them in less than two years. The lead circuit still uses a vacuum
filter, but that is to be replaced this year by two more Metso
Minerals’ VP pressure filters.
These VP pressure filters bring together high performance and a
high degree of automation at low cost. They feature:
◆ Light weight construction, with machined polypro-pylene filter
chambers
◆ Compact design with pulling hydraulic cylinders for a reduced
footprint
◆ A one-minute filter cloth change operation
◆ Available in several pressure ratings for differ-ent applications
◆ Few moving parts for low maintenance and high availability.
The operating pressure
Cloth Wash Spray Bars
Filter Cloth Support of VPA units is usually
Fixed Head
Upper Rails 7-10 bar and they are
the standard machine
for dewatering mineral
concentrates.
Membranes are inflated
with compressed air.
Cycle time can often be
as short as 6 minutes.

Load Cells
Moving Head

Filter Cake Discharge Chute

Parallel Hydraulic Cylinders

being processed at a rate of 500 t/d. An beginning of November 2006. also in the midst of a 33,500 m
increase in mill throughput to 700 t/d is Apogee Minerals has begun planning and diamond drilling programme to delineate
expected in May 2007. Fortuna made its implementing operational improvements at potential mineral resources at its Bolivian
first shipment of silver-lead and zinc the 100% owned La Solucion mine located silver-lead-zinc projects where exploration
concentrates from Caylloma at the 17 km from Bolivia’s capital city, La Paz. It is programmes in the first half of 2006 located

24 International Mining JANUARY 2007


TEREX J06 17/12/06 9:04 am Page 1

Powerful and productive

NEW TA35 and TA40 – Building on technology


• New Design = improved operator comfort
• High power and payload = increased productivity and return on invested capital
• Oil cooled disc brakes on all axles = reduced ownership costs and increased service intervals
• Dual transmission and engine retardation = increased safety and control

Terex Construction
TEL: +44 (0) 1698 732 121
FAX: +44 (0) 1698 503 200
www.terex.com
sales@terex.co.uk
Copyright Terex Corporation 2006 · Terex is a registered trademark of Terex Corporation in the United States of America and many other countries
ZINC 17/12/06 1:22 pm Page 9

WORLD ZINC REPORT

significant high grade silver, lead, zinc and The mineral resources in Tamboraque are 225,000 t of payable zinc and 82,000 t of
locally, gold mineralization. 652,818 t of measured and indicated payable lead. It has a projected 16 year
La Solucion has been producing for the resources averaging 0.209 oz/t Au, 6.46 oz/t mine life.
past 14 years with an ore processing capacity Ag, 3.18% Pb, 3.85% Zn and 0.44% Cu.
of 120 t/d and an existing flotation mill that These resource estimates are from the More from Mexico
produces zinc and lead concentrates. Constancia and Wellington veins. In addi- Constructora Necaxa has been selected as
Apogee says the production facility is in tion, the total inferred resources, including the contractor to complete the underground
good operating condition. However, the all other mineralized veins, was estimated to access decline to the G-9 deposit at Farallon
mine has received little capital investment in be 3.9 Mt averaging 0.170 oz/t Au, 8.40 Resources’ Campo Morado property in
the past 10 years. The previous operators oz/t Ag, 2.56% Pb, 3.12% Zn and 0.35% Guerrero State. Site preparation began in
focused on zinc and have used antiquated Cu. August. The decline development is part of a
non-mechanized mining methods, while The development of Apex Silver Mines’ larger programme, encompassing under-
mine planning and grade control have been San Cristobal silver-zinc-lead project in ground and surface drilling, engineering,
non-existent, and safety practices poor. southwestern Bolivia is almost complete. With infrastructure and environmental studies.
There has been virtually no exploration in major structural foundation and equipment The objective is to advance G-9 through the
the past ten years prior to Apogee beginning fully installed, the primary crusher should be feasibility stage toward production. Access
its diamond drilling in 2005. As a result, both in position to receive ore in January 2007. to the G-9 deposit and the drill stations for
mining efficiency and ore grades realized in The conveyor structure and idlers are in underground infill drilling will require the
production have suffered. Very recent production place for the 1.5 km overland conveyor. excavation of a 4.5 by 4.5 m exploration
under previous ownership has averaged over With the imminent installation of the conveyor decline some 1,400 m in length.
2,300 t/month of ore and grades have belt and the requisite electronic equipment, An exploration decline of this size could
averaged 49 g/t Ag, 4.5% Zn, and 1.3% Pb. it should be fully operational by 2007. In subsequently accommodate production of
Recently, Apogee intersected additional September 2006 Sumitomo earned a 35% 1,500 t/d. The ability to use this decline in any
significant, very high grade silver-zinc-lead interest in San Cristobal. future mine development would significantly
mineralization on the Hampaturi vein south Mining activities are advancing to provide expedite the start of production. Preliminary
extension, adjacent to La Solucion. Vice ore feed by the time the concentrator is fully studies indicate 1,500 t/d to be an appropriate
President of Exploration, Doug Currie, operational. Two new CAT 789 200 t production rate for G-9’s current inferred
stated, “These further positive results solidify haulage trucks are in service and some 15.1 resource base of 5.6 Mt at 2.8 g/t Au, 186
our view that the vein systems at La Mt of material have been moved. Eight g/t Ag, 1.3% Cu, 1% Pb and 7.3% Zn at a
Solucion host the potential to define a more 200 t trucks, two PC 4000 Komatsu zinc cutoff grade of 2% Zn.
significant silver-zinc resource.” shovels and a CAT 994 loader are scheduled Dia Bras Exploration registered a record
Cia Minera San Juan (CMSJ), the wholly- for delivery in late 2006 and early 2007. The 9,113 t in September, to close the third
owned subsidiary of Gold Hawk Resources, project remains on schedule to commence quarter of 2006 with 23,588 t processed
has received a formal resolution from the operations in the third quarter of 2007. and $7.2 million in concentrate production
Peruvian Ministry of Energy and Mines, In the first five years of operation, value at its Bolivar mine pilot-mining
lifting the ‘stop work order’ on the based on the designed 40,000 t/d ore programme in Chihuahua State. Recoveries
Tamboraque concentrator, which was issued throughput, San Cristobal is expected to at the Malpaso mill averaged 91.96% for
in November 2002 to the previous owner. produce about 16.9 Moz of payable silver, zinc and 85.96% for copper resulting in a
This is a very significant step in the process production of 3,504 t of zinc concentrate
of re-starting production at the Tamboraque Apogee Minerals has begun planning and and 1,497 t of copper concentrate during
mine in Huarochiri Province, in Peru’s Central implementing operation improvements at the third quarter. Direct operating costs for
Andes. It is now expected that the mill will La Solucion. the quarter, including shipping of
start-up in February 2007 and concentrate, amounted to $2.7
be in full production at 600 t/d million.
in April 2007. Baja Mining has completed the
Tamboraque has been exploited first 20,000 m of the current
almost continuously from +38,000 m in-fill drill programme
colonial times. In addition to the at its El Boleo copper-cobalt-
conventional treatment of silver- manganese-zinc project located
lead-zinc ores, advances in near Santa Rosalia, Baja
bioxidation of sulphide ores California Sur. This will meet the
allowed the owners to expand requirements for completion of
production to 600 t/d from 200 the definitive feasibility study
t/d and treat refractory gold (DFS) scheduled for completion in
minerals contained in arsenopyrite. the fourth quarter of 2006. The
The concentrator produces lead, samples from this drill
zinc, pyrite and arsenopyrite programme are being assayed on
concentrates. an expedited basis.

26 International Mining JANUARY 2007


Document1 2/1/07 2:41 pm Page 1

Unearthing the right solution


Fluent in the international language of mining
Our engineers have one overriding aim: to develop, refine and implement
the innovative systems that improve safety at the same time as increasing pro-
ductivity and cost efficiency. Day in and day out, they delve deeper to discover
more about the problems Minova customers face and the products needed to
overcome them.

Our ability to integrate local knowledge with global resources allows us to call
upon the very best people almost anywhere in the world where their expertise
is most needed. Wherever they go, they speak the same language as their cus-
tomers – the international language of mining. It’s this fluency gained over
three decades that allows us to go further by challenging convention and
uncovering the very best solutions.

• Roof bolting • Ventilation seals • Injection resins


• Membranes • Backfill • Roadway support

Contact +44 1608 649 355 or visit our website


www.minovainternational.com

Operations in: • UK • Slovakia Minova International Ltd.


• Australia • Ukraine • Spain
• Czech Republic • USA • South Africa
26 Fleetwood House
• Germany • Poland • Switzerland Cromwell Business Park
• India • Russia • People’s Republic of China Chipping Norton
Oxon OX7 5SR
Solutions from Materials Technology England
ZINC 18/12/06 11:10 am Page 10

WORLD ZINC REPORT

The ZINCEX SX process produces the highest quality electrolyte


Maturity of ZINCEX™ SX reported all over the world, Díaz explains. “It shows the lowest con-
centration of every impurity compared with existing information of

G
ustavo Díaz, Research & Development Division Director of electrolytes coming from conventional process.” Magnesium report-
Técnicas Reunidas, Spain reoports that “after three years of ed at several g/litre is at the mg/litre level in ZINCEX. Furthermore
developing studies, engineering and construction; the verti- ZINCEX electrolyte is gypsum-, chlorine- and fluorine-free. As a con-
cally integrated Skorpion Zinc mine and refinery has been smoothly sequence this electrolyte is the most suitable to get the highest per-
producing SHG zinc since the first of May 2003. Técnicas Reunidas formance from the EW process.
(TR) proprietary modified ZINCEX™ process is the core technology The technology can be applied to peculiar sulphide ores containing
used in the refinery. Ramping up took about one year and a half.” high levels of manganese or other impurities. Once the zinc is dis-
The Skorpion plant is currently feeding the market with a steady solved by pressure leaching, atmospheric oxidative leaching, bio-
150,000 t/y of SHG zinc. From the technical point of view, he says, leaching, etc then ZINCEX SX purifies and concentrates for feed to
“three years of successful operation of the Skorpion plant is the con- the zinc EW tank house.
firmation of the strong maturity reached by ZINCEX solvent extraction In the same way, marginal but valuable materials such as low grade
technology. A conceptual process diagram is depicted in the figure, concentrates, old and fresh tailings, and ROM can be treated using
which can be applied to any impure raw material thanks to the ultra- heap leaching, bioleaching, etc to produce a solution containing zinc
purification ability of the solvent extraction circuit; which separates Finally secondary materials such as, for instance, electric arc fur-
the dirty leaching upstream unit from the nace dust, any sort of fumes, and impure
extremely sensitive to impurities electrowin- zinc oxide concentrates (Waelz type) can
ning unit.” be also treated in the same way by any
The process has demonstrated its capaci- process which leads to an impure solution
ty to get rid of all the impurities: chlorides containing zinc; to which the same SX
and fluorides, alkaline metals such calcium approach applies.
and magnesium, and the standard heavy As a result of these works TR now has
metals such as cobalt, nickel, copper and the know-how to apply ZINCEX SX tech-
cadmium, which impair EW performance. nology to PLSs deriving from a variety of
SX has proven its reliability and robustness upstream processes and raw materials. A
as well as it flexibility to cope with wide wide range of zinc concentrations from 5
oscillations in Pregnant Liquor Solution (PLS) to 150 g/litre in the feed solution can be
concentrations. managed by customized process design
There are several mining projects under and proper selection of operating condi-
development which have considered tions.
ZINCEX SX as core technology to treat oxide Díaz concludes that “a very promising
materials of the same family of Skorpion future has been opened by the combina-
ore. Mineralogy is based on silicated, carbonated, oxidized and tion of Skorpion’s successful project and the ZINCEX technology
hydrated materials such as sauconite, willemite, hemimorphite, breakthrough.”
smithsonite, zincite, hydrozincite, etc. Those ores are unable to be
treated by the conventional roasting-leaching-EW process due to low Skorpion plant view
grade, silica, solid-liquid separation and impurity problems.
In Mexico there are two projects under development. These are
Sierra Mojada in which ZINCEX SX has been implemented to produce
150,000 t/y of SHG zinc from a concentrated oxide ore and Terrazas
in which 75,000 t/y of SHG zinc will be produced from a PLS coming
from heap leaching and a copper SX plant.
In Iran there are two projects as well. The first is Zanjan zinc refin-
ery, which is fed with oxide ore from Angouran mine to produce
100,000 t/y zinc. The second is Mehdiabad mine and zinc refinery for
a capacity in the range of 300,000 t/y zinc of which a quarter will
come from oxide and three quarters from sulphide ores. It is note-
worthy in that ZINCEX will be used for zinc recovery and purification
of the PLS from the sulphide zinc concentrate leaching line.
There are some more projects worldwide that are considering this
technology. Spain, Brazil, Turkey, Peru and India each host one at least.

The measured and indicated resource is least 20 years producing up to 50,000 t/y Exploring Africa
223.8 Mt at 1.63% Cu equivalent and an copper cathode, 1,850 t/y cobalt cathode, Kumba Resources has asked the DRC to
inferred resource of 310.3 Mt at 1.47% Cu 23,000 t/y zinc sulphate and possibly guarantee its property rights before the
equivalent. The projected mine life is at 100,000 t/y manganese carbonate. company restarts its Kipushi lead-zinc-silver

28 International Mining JANUARY 2007


Document1 2/1/07 2:48 pm Page 1

Performance... Know-How... Reliability

Sedimentation
Thickeners
Deep Cone® Paste Thickeners
E-Cat® Thickeners
Clarifiers

Filtration
Drum Filters
Horizontal Belt Filters
Disc Filters
Filter Presses

Flotation
World’s Largest Flotation Cell (257m3)
Wemco® 1+1® Flotation Cells
Wemco® SmartCell™ Flotation Cells
Dorr-Oliver® Flotation Cells

Dorr-Oliver Eimco combines the longest experience in the global market for supplying liquid/solid
separation equipment and process technology. We have one of the world’s largest installed bases
of original equipment, operating under well-known trademarks (Eimco®, Wemco®, Dorr-Oliver®,
and Shriver®) that have long been synonymous with know-how, reliability and performance.

A GL&V Company

To find out more, please visit us online @ www.glv.com

S-ar putea să vă placă și