Documente Academic
Documente Profesional
Documente Cultură
The MDH must be contacted for inspections, e.g., We have a lot more information that we expect to
on state-funded or licensed facilities. Please contact be updating and adding to the website as time
the PSR in your area of the state to request permits. If you have not done so, remember to
plumbing inspections or answer code or licensure bookmark our page and stop by periodically to see
questions. The following illustration shows the the changes!
inspection areas for each PSR and their phone
numbers: The plumbing engineering website address is:
http://www.health.state.mn.us/divs/eh/plumbing/
Exam Results
September 2002 Exam Results
Brad Jensen
Duluth Office
Exam Tested Passed
218/725-7731 Journeyman Plumber 109 32
Master Plumber 61 49
Gary Topp
Fergus Falls Office Water Conditioner Installer 14 9
218/739-1386 Water Conditioner Contractor 5 2
Chuck Olson
Metro Office March 2003 Exam Results
651/215-0856
Page 2
Exam Registration Review of Individual Sewage
Any person interested in taking the plumbing or
Treatment System Construction
water conditioning license exam must contact the Plans Ceases September 1
Department or visit our website for an application.
A completed application with a $50 nonrefundable The MDH Engineering Unit will no longer be able
fee must be postmarked no later than February 15, to provide review services for individual sewage
2004 to be considered for the March exam. The treatment systems (ISTS). In the past, the MDH
registration deadline for the Fall 2004 exam is provided reviews of systems proposed for many
August 15, 2004. licensed food, beverage, and lodging facilities and
manufactured home parks and campgrounds with
flow rates less than 10,000 gallons per day. Due to
Enforcement Actions a significant increase in program workload and
responsibility, staff will no longer be available to do
Please be reminded that all persons or companies these reviews.
contracting to do plumbing in Minnesota are
required to file a plumbing code compliance bond This change took place as of September 1, 2003.
annually with the State of Minnesota and register ISTS plans received after September 1 will be
the bond with the MDH. A number of companies returned to the responsible county or local unit of
listed on license examination applications and government.
apprentice registrations did not have the required
bond, which has resulted in the MDH issuing an Please note that this change will not affect review of
Administrative Penalty Order (APO) with monetary plumbing plans by the MDH. That is, plans and
penalties to those parties. specifications for plumbing systems for public and
commercial buildings and properties, manufactured
During 2002, the MDH took 64 enforcement actions home parks, and campgrounds should still be
that led to APO’s against persons and/or companies submitted to the MDH Engineering Unit for review
for violations of the Minnesota Plumbing Code. and approval prior to installation, except where the
APO’s can include monetary penalties. local administrative authority has established a
Enforcement actions may also lead to license plumbing plan review agreement with the MDH.
suspension or revocation. Examples of violations
This change also does not affect any plan review
include the following:
related to hospitals, nursing homes, or other MDH
• installing plumbing prior to plan approval;
licensed care facilities. Those plans should still be
• installing plumbing without the required submitted as required to the MDH Facility and
license or bond; Provider Compliance Section or other responsible
• allowing apprentices to perform plumbing on agency.
a jobsite without the required supervision; and
• attaching an unlicensed plumber’s name to
another plumber’s license, and then installing Plumbing Plan Submittals
plumbing in a city with a population greater
than 5000. In order to minimize delays in the plan review
Please remember it is the duty of the responsible process, please remember to include the following
master plumber or plumbing contractor to: ensure when submitting plumbing plans for review:
plans have been submitted and approved prior to • Utility site plan
installing any plumbing; verify that any person • Floor plan
performing plumbing is properly licensed or • Water and waste and vent riser diagrams
registered prior to performing plumbing onsite; • Fixture and pipe material specifications
provide the required immediate and personal
• Roof plan
supervision for apprentices performing plumbing;
• Signature
and properly file evidence of code compliance bond
Please visit our website for more information.
if contracting to do plumbing.
Page 3
Plumbing Plan Review Fee Schedule (see article on page 1)
System reviewed Fee Schedule
Water distribution and drain, (i) 25 or fewer drainage fixture units, $150;
waste, and vent systems, (ii) 26 to 50 drainage fixture units, $250;
including interceptors, (iii) 51 to 150 drainage fixture units, $350;
separators, or catch basins (iv) 151 to 249 drainage fixture units, $500;
(v) 250 or more drainage fixture units, $3 per drainage fixture unit to a maximum of
$4,000; and
(vi) $70 per interceptor, separator, or catch basin
Building sewer service only $150
Building water service only $150
Building water distribution $5 per supply fixture unit or $150, whichever is greater
system only, no drainage system
Storm drainage system a minimum fee of $150 or:
(i) $50 per drain opening, up to a maximum of $500; and
(ii) $70 per interceptor, separator, or catch basin
Manufactured home park or 1 to 25 sites, $300;
campground 26 to 50 sites, $350;
51 to 125 sites, $400;
more than 125 sites, $500
Accelerated review double the regular fee, one-half to be refunded if no response from the commissioner
within 15 business days
Revision to previously reviewed review of plans for which commissioner has issued two or more requests for additional
or incomplete plans information, per review, $100 or ten percent of the original fee, whichever is greater
Proposer-requested revision (i) with no increase in project scope, $50 or ten percent of original fee, whichever is
greater; and
(ii) with an increase in project scope, $50 plus the difference between the original project
fee and the revised project fee