Sunteți pe pagina 1din 43

Francis Gregory Library

DC Public Library
3660 Alabama Ave, SE

Adjaye Associates
Wiencek + Associates

Community  Meeting
May 6, 2009
Design Process
DCPL Program
Community Input
Agencies Review

1
Adjaye Associates
Current

Summer
2011

2
Adjaye Associates
3
Adjaye Associates
4
Adjaye Associates
Children

Teen

Building Services

Adult

Program Adjacencies

5
Adjaye Associates
6
Adjaye Associates
7
Adjaye Associates
Site
Neighborhood
Property Constraints

8
Adjaye Associates
Washington D.C.

Northwest Northeast
Southwest Southeast

9
Adjaye Associates
Pe
nn
sy
lva
n ia
Av
en
Fort Davis Park ue
,

,S
E
nu e
e
a Av
b am
Ala
Be
er
sE
lem
en
ta
ry
Sc
ho
ol

36
th
Pl

38th Street, SE
37th Street, SE
ac
e,
S E

10
Existing Site
Southeast Corner
SE
37 Street,

ue
ven
aA
bam
11 Ala
th

Adjaye Associates
Existing Site
Southeast Corner
SE
37 Street,

ue
ven
aA
bam
12 Ala
th

Adjaye Associates
Fort Davis Park

ry
nta
e
lem ol
E o
ers Sch
Be
E
ue ,S
en
a Av
l abam
A

Site Plan
13 North

Adjaye Associates
Fort Davis Park Alabama Avenue, SE

North South

Beers Elementary School Fort Davis Park

South Capitol Terrace

West East

Site Sections
14
Adjaye Associates
Neighborhood

15
Adjaye Associates
Precedents
16
Adjaye Associates
17
Adjaye Associates
18
Adjaye Associates
19
Adjaye Associates
20
Adjaye Associates
21
Adjaye Associates
22
Adjaye Associates
2

3
1 Alabama Avenue, SE
2 Fort Davis Park
3 Property Line
4 Existing Playground
5 Bioretention Pond
4
6 37TH Street

5 5

Site Plan
23 6
North
Adjaye Associates
6 1 Entry
7 2 Book Drop
3 Circulation Desk
13
10 8 4 Circulation Workroom
4 12 12 5 Adult: New Browsing
11 9 6 Teen Services
3
7 Adult Stacks / Reading
5
8 Study Room
9 Conference Room
1 2 10 Staff Storage
11 Elevator
12 Stair
13 Information Desk

Preliminary First Floor Plan

24 North
Adjaye Associates
1 Children’s Stack / Reading
9 2 Children’s Program Storage
10
4 3 Children’s Restroom
4 Conference Room
7
5 Meeting Room
1
6 Meeting Room Pre-Function
3 7 Meeting Room Storage
8 2 8 Restroom
6 9 Closet / Roof Access
11
12 10 Open to Below
11 Elevator
5 12 Information Desk

Preliminary Second Floor Plan

25 North
Adjaye Associates
1 1 Staff Information
4 2 Staff Breakout
3
3 Staff Manager
2
4 Staff Restroom
9
6 5 Mechanical Room
6 Fire / Gas Room
8 7
7 Elevator Control
8 Elevator
5
9 Janitor Closet

Preliminary Basement Floor Plan

26 North
Adjaye Associates
Transverse Section
27
Adjaye Associates
Longitudinal Section
28
Adjaye Associates
“-Take advantage of the park setting by providing views to the park.”

Adult Program

29
Adjaye Associates
“Be sure to have separate areas for kids and teens.”

Teen Program

30
Adjaye Associates
Teen Program

31
Adjaye Associates
“The library is a safe place, especially for kids. The
library plays a central role in a thriving community.”

Elementary

Stacks/Reading First
Tables/ Five Years
Computers

Restroom Children’s
Program Room
Program
Storage
Information

Children’s Floor

32
Adjaye Associates
Children’s Program Room

33
Adjaye Associates
“Provide more attractive and more
abundant meeting space.”

Sink/Cabinets

Storage

Meeting Room
Accommodates ~100people

Other Break-out Rooms:


Conference Room
Large Study Room
4 Study Rooms

34
Adjaye Associates
Meeting Room-Possible Configurations

35
Adjaye Associates
Outdoor Seating

Perspective Vignettes
36
Adjaye Associates
Outdoor Seating at Rear

Perspective Vignettes
37
Adjaye Associates
South Elevation

38
Adjaye Associates
North Elevation
39
Adjaye Associates
East Elevation

40
Adjaye Associates
West Elevation

41
Adjaye Associates
Perspective

42
Adjaye Associates

S-ar putea să vă placă și