Sunteți pe pagina 1din 0

JABATAN KERJA RAYA MALAYSIA

UNIT STANDARD ,PENGU.IIAN & MAKMAL


CAWANGAN ELEKTRIK
TECHNICAL INFORMATION ON STANDARD CABLE TRUNKINGS I CABLE
MANAGEMENT SYSTEM
A. COMPANY
1. Name of Company
2. Address
3. Telephone No
...............................................................
4. Faxs No
. ..............................................................
5 . S.T Registration No
. ................................................................
6. Validity Date of Registration : ...............................................................
7. SIRIM Test Report ............................................. -(If related)
8. SIRIM Test Certificate No :
..............................................
(If related)
9.
Other Accredicted Test Report/Certificate: ....................................................
B. PRODUCT SPECIFICATION
I. Brand's Name
................................................................
2. Model No
.............................................................
3. Approval Standard
. ................................................................
4. Country Of Origin
................................................................
4. I Full Type Test ReporVcertificate No.from:
i) SIRIM : ........................................
ii) Others : ........................................
Catatan Pejabat
Kandas
Catatan Pe'abat
k3
1 0 - Kandas 1
5.0 CABLE TRUNKING (METALLIC)
5.1 Comply with IEC 61084 q yes q NO 0
5.2 Fabricated from galvanished sheet steel and finished with 2 coats
of standard orange enamel q yes NO 0
5.3 Equipped with removable covers at suitable intervals
q Yes No 0
6.0 Shall have the following minimun wall thickness
Nomiilal Size(m11 x mrn) Minimun Wall Thickness(mm)
i) 50 x50 and below 1.0 yes q NO 0
ii) 75 x 50 to 100x100 1.2 Yes q No 0
iii) 150 x 50 to 300 x150 1.6 q yes q NO 0
iv) Above 300 x 150 2.0 O ~ e s ONO 0
If others from the above please specify.. . . . . . . . . . . . . . . . . . .. . . . ..
6.5 All truilking elbows,offsett & combinatioll elbow ,adaptors & tee shall have the same thickness as
the straight trunking q yes NO 0
6.6 Shall be maufactured by the same manufacturer Yes No 0
6.7 Shall be supported by fixing brackets i.e not be in contact with
wall or floor slabs yes NO 0
6.8 The brackets shall be installed at interval not greater 1500mm
for Vertical Run yes NO 0
6.9 The brackets shall be installed at interval not greater lOOOmm
For horizontal nin yes NO 0
7.0 The brackets shall be denlsted ,finished in a primer & coated with standard
orange enamel yes q NO 0
8.0 Whenever tnlilking passess through a floor or a fire resistance wall ,
fire resistance barrier shall be provided Yes No 0
Informative to be used together during installation:
8. 1 When conduit is tapped from the trunking ,suitable brass type smoother bushes shall be
fitted at all conduit termination . q Yes q No 0
... Information CPC For Site Installation:
9.0 A1 1 trunkings shall have either tinned copper tape of dimension not less than 25mm x 3
mrn as circuit protector conductor or
earth cable of approriate D y e s DNOO
10.0 Others (please specify)
11.0 Under Floor Trunking (i.e Raised Floor, Flushed Floor.. .etc)
i ) Please give details of the test report :
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
ii) The Dimensions - Please used Lampiran :
............... .............. 11 .I Comply to BS . . . . . . . . . . . . ., IEC , EN
Please specify
12.0 Cable trunking-uPVC(Cab1e trunking made of insulating material)
12.1 Comply to BS 4678:Part 4:1982 : OYe s ~ N O O
Others standard,please specify.. .............
Have an approval letter from Jabatan Bomba: q Yes q No 0
12.2 Comply to Clause 4 : Classification e.g
: Trunking for heavy mechanical stresses : OYe s ONOO
: Comply according to resistance against ingress of solid object:n Yes q No 0
. . . . . . . ........ 12.3 Dimension -Width.. . . . . x Height.. Thickness.. .(mm)
....................................................................................
Please specify !If needed arise please used additional paper-
12.4 Clause 9.3-
(i)
Impact Test Data - Heavy Duty (3.3 kg mass of hammer & impact Energy 10 J )-
12.5 Clause 10-Resistance to heat- Ball pressure test. q Yes q No 0
12.6 Clause 1 1-Resistance to burning.. ......... n ~ e s UNOO
12.7 Marking - code of marking e.g 425 plus additional marking code-/. .....
Please specify .
13.0 Others for uPVC trunking -(If there is a deviation from 12.0 & Please explain)-
......................................................................................
(Note : The above clauses to be tested is just an example of the important clauses that
malufacturers should be done but manufacturers also can do full type test .)

S-ar putea să vă placă și