Bhel / PSWR / NAGPUR Monthly Maintenance Schedule for 8 T Escort Hydraulic Crane

Site : Month & Year

Format No. : PW:FEX:Crane:Maint:01

Sheet : 1 of 2

Sl. No. 1. 2. 3. 4. 5. 6. 7. 8. 9.

Description Check E.Oil level & Top up Check brake oil level & top up Check radiator water level Fule, hyd. Oil, level check & top up Check tyre inflation pre : Check tension of dynamo, water : pump & fan belt Battery Solution level Safety Devices are in order Clean air cleaner bowl & check air cleaner oil level

Periodicity 1 Daily Daily Daily Daily Daily Daily Daily Daily Daily Daily Daily 250 Hrs. 250 Hrs. 250 Hrs. 250 Hrs. 250 Hrs. 250 Hrs. 250 Hrs. 250 Hrs 250 Hrs. 250 Hrs. 250 Hrs. 2 3 4 5 6 7 8 9 10 11 12 13 14 15

DATE 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

10. Drain water from air receiving tank 11. Grease all grease nipple 12. Change E. oil 20 W/40 13. Change lub oil filters 14. Change fuel filter element 15. Engine tune up 16. Valve tappet clearance check 17. Check for any oil leak 18. Tighten all nuts & bolts 19. Check brush & bushes of dynamo & Self starter 20. Clean & tighten all electrical connection 21. Change hyd oil filter 22. Flush radiator

Bhel / PSWR / NAGPUR Monthly Maintenance Schedule for 8 T Escort Hydraulic Crane
Site : Month & Year

Format No. : PW:FEX:Crane:Maint:01

Sheet : 2 of 2

Sl. No.

Description

Periodicity 1 250 Hrs. 500 Hrs. 500 Hrs. 500 Hrs. 500 Hrs. 500 Hrs. 500 Hrs. 500 Hrs. 500 Hrs. 2 3 4 5 6 7 8 9 10 11 12 13 14 15

DATE 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

23. Adjust brake & clutch 250 24. Change hyd return line filter 25. Change hyd oil S.S-46 26. Change G.B. oil SAC. 90 27. Change wheel reduction gear oil 28. Change air cleaner filter 29. Adjust clutch & brake 30. Check for damages to hose 31. Clean & repack front wheel lub Bearings with fresh grease Initial of Engineer Incharge

Bhel / PSWR / NAGPUR


Site : Month & Year

Format No. : PW:FEX:Crane:Maint:02

Monthly Maintenance Schedule for 15/16 MT Coles Crane Model S1510


Sheet : 1 of 1

Sl. No. 1. 2. 3. 4. 5. 6. 7. 8. 9.

Description Check radiator water level Engine of level Fuel tank level Check brake fluid level Check battery lead & electrolite level Tyre air pressure Check oil level in air compressor Drain water from Air tank Grease all grease points

Periodicity 1 Daily Daily Daily Daily Daily Daily Daily Daily Daily Daily 200 Hrs. 200 Hrs. 200 Hrs. 200 Hrs. 200 Hrs. 200 Hrs. 200 Hrs. 200 Hrs. 200 Hrs. 200 Hrs. 2 3 4 5 6 7 8 9 10 11 12 13 14 15

DATE 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

10. Check tention of V belts 11. Change Engine oil 20 W/40 12. Change all filters 13. Change air compressor oil 14. Unloader valve felt cleaning 15. Air cleaner cleaning & oil changing 16. Apply cardium compound on wire ropes 17. Oil load movement ball joints 18. Check & adjust brake & clutches 19. Check & level reduction gear & gear box oil 20. Check & level wheel hub oil & differential Initial of Engineer Incharge

Bhel / PSWR / NAGPUR


Site : Month & Year

Format No. : PW:FEX:Crane:Maint:03

Monthly Maintenance Schedule for Voltas Omega tyre Mounted Crane Model 20/25
Sheet : 1 of 2

Sl. No. 1. 2. 3. 4. 5. 6. 7. 8. 9.

Description Check E.Oil level & Top up Check radiator water level Drain water in fuel tank Drain water in air tank Drain water in Hyd. Oil tank Check tyre air pressure Check for any leakage of oil + air Check for any nut & bolt loose Tight fan belt, Dynamo belt & water pump belt

Periodicity 1 Daily Daily Daily Daily Daily Daily Daily Daily Daily Daily Daily Daily Daily Daily Daily Daily Weekly Weekly Weekly Weekly 125 Hrs. 125 Hrs. 125 Hrs. 125 Hrs. 125 Hrs. 125 Hrs. 125 Hrs. 2 3 4 5 6 7 8 9 10 11 12 13 14 15

DATE 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

10. Check air tank pressure (Normal 8 Kg/Cm2 11. Check the performance of all safety devices 12. Check battery solution level 13. Check brake & clutch 14. Check fuel tank level 15. Check M/c oil level 16. Check Hyd. Oil tank level 17. Check oil level in torque convertor 18. Check differential oil level 19. Check wheel hub oil level 20. Grease all grease nipples 21. Change Engine Oil 20W/40 22. Change lube oil filter element 23. Change fuel filter element 24. Change hyd oil return line filter 25. Change compressor breather element 26. Clean air cleaner filter container 27. Check main winch oil level

Bhel / PSWR / NAGPUR


Site : Month & Year

Format No. : PW:FEX:Crane:Maint:03

Monthly Maintenance Schedule for Voltas Omega tyre Mounted Crane Model 20/25
Sheet : 2 of 2

Sl. No.

Description

Periodicity 1 125 Hrs 2 3 4 5 6 7 8 9 10 11 12 13 14 15

DATE 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

28. Clean & tighten all electrical connection & change carbon brush of dynamo & self motor 29. Change torque convertor oil 30. Change differential oil 31. Change wheel hub oil 32. Change hyd oil 33. Tighten all nut & bolt 34. Change air filter element 35. Engine tune up 36. Valve clearance setting 37. Check carbon brush & bushes of self starter and dynamo Initial of Engineer Incharge

500 Hrs. 500 Hrs. 500 Hrs. 500 Hrs. 500 Hrs. 500 Hrs. 500 Hrs. 500 Hrs. 500 Hrs.

Bhel / PSWR / NAGPUR


Site : Month & Year

Format No. : PW:FEX:Crane:Maint:04

Monthly Maintenance Schedule for 18 MT Tata 320 Crawler Crane


Sheet : 1 of 1

Sl. No. 1. 2. 3. 4. 5. 6. 7. 8. 9.

Description Engine oil checking Radiator water level checking Brake oil level checking Battery solution level checking Drain water from fuel tank Drain water from air tank Grease all greasing points Check brake and clutch efectiveness Check all safety devices working

Periodicity 1 Daily Daily Daily Daily Daily Daily Daily Daily Daily Daily Daily Daily Weekly Weekly Weekly Weekly Weekly 240 Hrs. 240 Hrs. 240 Hrs. 240 Hrs. 2 3 4 5 6 7 8 9 10 11 12 13 14 15

DATE 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

10. Check fuel level in tank 11. Check leakage for air, water & oil 12. Check tention of V belts 13. Clean air cleaner 14. Check & clean carbon brush of dynomo & self starter 15. Tighten all elect. Connection 16. Check oil level in gear box & chain case 17. Check oil level in propel chamber 18. Change engine oil. (240 Hrs) 19. Change all filter elements 20. Tighten propel chain & track chain 21. Apply cardium compound on wire ropes Initial of Engineer Incharge

Bhel / PSWR / NAGPUR


Site : Month & Year

Format No. : PW:FEX:Crane:Maint:05

Monthly Maintenance Schedule for Tata 75 MT 955/TFC-280 Crawler Crane


Sheet : 1 of 2

Sl. No. 1. 2. 3. 4. 5. 6. 7. 8. 9.

Description Check E. Oil level Check radiator water level Battery solution level Fuel tank level Brake oil tank level Drain water from fuel tank Drain water from air tank Check safety devices for healthyness Check tention of V belt

Periodicity 1 Daily Daily Daily Daily Daily Daily Daily Daily Daily Daily Daily 100 Hrs. 100 Hrs. 100 Hrs. 100 Hrs. 100 Hrs. 100 Hrs. 100 Hrs. 100 Hrs. 100 Hrs. 250 Hrs. 250 Hrs. 250 Hrs. 250 Hrs. 250 Hrs. 250 Hrs. 2 3 4 5 6 7 8 9 10 11 12 13 14 15

DATE 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

10. Check leak for air, oil & water 11. Grease all under carriage nipples 12. Check oil level in chain case 13. Check oil level in gear case 14. Check oil level in propel chamber 15. Check oil level in flower pot 16. Apply cardium compound on all open gears. 17. Grease all nipples of revolving frames 18. Fill up cam clutch with M. oil 19. Tighten & clean all electrical connections 20. Check track pad tightness 21. Engine oil changing 20W/40 22. Change oil filter element 23. Change fuel filter element 24. Change bypass filter element 25. Clean air cleaner filter element 26. Change corossion resistence element

Bhel / PSWR / NAGPUR


Site : Month & Year

Format No. : PW:FEX:Crane:Maint:05

Monthly Maintenance Schedule for Tata 75 MT955/TFC-280 Crawler Crane


Sheet : 2 of 2

Sl. No.

Description

Periodicity 1 250 Hrs. 2 3 4 5 6 7 8 9 10 11 12 13 14 15

DATE 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

27. Cleaning slip ring, check wear & tear of brush & bush of self motor and alternator 28. Check megenetorque and swing controller brush 29. Change oil of propel chamber gear case, chain case & flower pot. 30. Tighten bearing cap bolts of H.P. shaft Initial of Engineer Incharge

250 Hrs. 1000 Hrs. 250 Hrs.

Bhel / PSWR / NAGPUR


Site : Month & Year

Format No. : PW:FEX:Crane:Maint:06

Monthly Maintenance Schedule for 100 MT Tata Hitachi KH-500 HYD Crawler Crane
Sheet : 1 of 1

Sl. No. 1. 2. 3. 4. 5. 6. 7. 8. 9.

Description Check engine oil level & top up Check fuel level & drain water Fill radiator with treated water Drain water from air tank Start engine & note air pressure Check all safety device functions All grease nipple to be greased Check hyd oil level & top up Check leak for oil level & top up

Periodicity 1 Daily Daily Daily Daily Daily Daily Daily Daily Daily Daily Daily Daily Daily Daily Forthnight Forthnight Forthnight Monthly Monthly Monthly 2 3 4 5 6 7 8 9 10 11 12 13 14 15

DATE 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

10. Check battery solution level 11. Check V belt tention 12. Check all mounting bolts for tightness 13. Check brake & clutch for good functions 14. Check for proper track tention 15. Check oil filter for damage 16. Check & clean air cleaner element 17. Check elect. Connection and tighten 18. Change engine oil 20W/40 19. Change oil & diesel filters 20. Clean air breathers Initial of Engineer Incharge

Lubricants & Filter Replacement Period & Quantitly KH-500 Hyd. Crawler Crane 100 MT

Sl. No. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. Oil Fiter Element

Description Fuel Filter Element Hyd. Filter Element Engine Oil Hydraulic Oil Grease Air Cleaner Wire Rope Lub Pump Transmission Main Aux. Transmission Winch Gear Swing Transmission Propel Transmission Fuel Tank Radiator 1. No. 1. No. 1. No. 44 Ltrs. 600 Ltrs. 1 No. 1.5 Ltrs. 8.5 Ltrs. 6.0 Ltrs. 8.0 Ltrs.

Qty. 20 W 40 SS 46

Grade - do -

Period 240 Hrs. 500 Hrs. 140 Hrs. 2000 Hrs. 08 Working Hrs. 1000 Hrs. 500 Hrs. 250 Hrs. 1000 Hrs. - do - do - do -

Servo M.P. Servo Cot 110 SAE 90 - do - do - do - do HSD Pure Clean Water

18.0 Ltrs. 400.0 Ltrs 68.0 Ltrs

Bhel / PSWR / NAGPUR


Site : Month & Year

Format No. : PW:FEX:Crane:Maint:07

Monthly Maintenance Schedule for 100 MT Tata-1055 BLC Crawler Crane


Sheet : 1 of 2

Sl. No. 1. 2. 3. 4. 5. 6. 7. 8. 9.

Description Check E. Oil level Check radiator water level Battery solution level Fuel tank level Brake oil tank level Drain water from fuel tank Drain water from air tank Check safety devices for healthyness Check tention of V belt

Periodicity 1 Daily Daily Daily Daily Daily Daily Daily Daily Daily Daily Daily 100 Hrs. 100 Hrs. 100 Hrs. 100 Hrs. 100 Hrs. 100 Hrs. 100 Hrs. 100 Hrs. 100 Hrs. 250 Hrs. 250 Hrs. 250 Hrs. 250 Hrs. 250 Hrs. 250 Hrs. 2 3 4 5 6 7 8 9 10 11 12 13 14 15

DATE 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

10. Check leak for air, oil & water 11. Grease all under carriage nipples 12. Check oil level in chain case 13. Check oil level in gear case 14. Check oil level in propel chamber 15. Check oil level in flower pot 16. Apply cardium compound on all open gears. 17. Grease all nipples of revolving 18. Fill up cam clutch with M. Oil 19. Tighten & clean all electrical connections 20. Check track pad tightness 21. Engine oil changing 20W/40 22. Change oil filter element 23. Change fuel filter element 24. Change bypass filter element 25. Clean air cleaner filter element 26. Change corossion resistence element

Bhel / PSWR / NAGPUR Format No. : PW:FEX:Crane:Maint:07 Monthly Maintenance Schedule for 100 MT Tata-1055 BLC Crawler Crane
Site : Month & Year Sheet : 2 of 2

Sl. No.

Description

Periodicity 1 250 Hrs. 2 3 4 5 6 7 8 9 10 11 12 13 14 15

DATE 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

27. Cleaning slip ring, check wear & tear of brush & bush of self motor and alternator 28. Check magenetorque and swing Controller brush 29. Change oil of propel chamber gear case, chain case & flower pot 30. Tighten bearing cap bolts of H.P. shaft Initial of Engineer Incharge

250 Hrs. 1000 Hrs. 250 Hrs.

Bhel / PSWR / NAGPUR Format No. : PW:FEX:Crane:Maint:08 Monthly Maintenance Schedule for 180 MT Link Belt LS-248 H Crawler Crane
Site : Month & Year Sheet : 1 of 3

Sl. No. 1. 2. 3. 4. 5. 6. 7. 8. 9.

Description Take up idler greasing Tack rollers greasing Boom foot pins greasing Sheave bail greasing Live must foot pin greasing Bail sheave shaft greasing Check engine oil level Turntable gearteeth greasing Rediatorr water level check

Periodicity 1 Daily Daily Daily Daily Daily Daily Daily Daily Daily Daily Daily Daily Daily Daily Daily Daily Daily Daily Daily Daily Daily Daily 50 Hrs. 50 Hrs. 50 Hrs. 50 Hrs. 50 Hrs. 50 Hrs. 50 Hrs. 50 Hrs. 2 3 4 5 6 7 8 9 10 11 12 13 14 15

DATE 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

10. Hyd oil level check 11. Fuel level check 12. Alternator belt tension check 13. Safety belt healthyness check 14. Oil leakage check 15. Fuel leakage check 16. Remove water from fuel 17. Track shoe tightness check 18. Wedge pack tightness check 19. Inspect travel motor 20. Inspect jack cylinder 21. Check E. oil pressure 4 Kg/Cm2 22. Check E. oil pre warning lamp off 23. Outer travel planetory seal greasing 24. Rotating joints greasing 25. Back stop struts greasing 26. Bail hook greasing 27. Jib sheave + jib mast greasing 28. Deflector sheave greasing 29. Boom head sheave greasing 30. Auxilary lifting sheave greasing

Bhel / PSWR / NAGPUR Format No. : PW:FEX:Crane:Maint:08 Monthly Maintenance Schedule for 180 MT Link Belt LS-248 H Crawler Crane
Site : Month & Year Sheet : 2 of 3

Sl. No.

Description

Periodicity 1 50 Hrs. 50 Hrs. 50 Hrs. 50 Hrs. 50 Hrs. 50 Hrs. 50 Hrs. 50 Hrs. 50 Hrs. 50 Hrs. 50 Hrs. 250 Hrs. 250 Hrs. 250 Hrs. 250 Hrs. 250 Hrs. 250 Hrs. 250 Hrs. 250 Hrs. 250 Hrs. 250 Hrs. 250 Hrs. 250 Hrs. 250 Hrs. 250 Hrs. 2 3 4 5 6 7 8 9 10 11 12 13 14 15

DATE 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

31. Hook block & sheave greasing 32. Rear drum clutch apply lever 33. Front drum clutch apply lever greasing 34. Turntable bearing greasing 35. C.W.T. remover cylinder greasing 36. C.W.T. remover linkage greasing 37. R. drum clutch dead end pin oiling 38. F. drum clutch dead end pin oiling 39. Control valve linkage + rods oiling 40. Hyd. Pump drive gear case oiling 41. Inspect batteries and add electrolyte and cleaning terminals 42. Engine oil change 20W/40 43. Oil filter element change 44. Bypass oil filter element change 45. Outer travel planetory oiling 46. Travel reduction gear oiling 47. Park brake oiling 48. Swing speed reducer oiling 49. F. Drum planetory oiling 50. F. Drum gear case oiling 51. R. drum planetory oiling 52. R. Drum gear case oiling 53. Boom host planetory oiling 54. Boom host gear case oiling 55. Wire rope greasing

Bhel / PSWR / NAGPUR Format No. : PW:FEX:Crane:Maint:08 Monthly Maintenance Schedule for 180 MT Link Belt LS-248 H Crawler Crane
Site : Month & Year Sheet : 3 of 3

Sl. No.

Description

Periodicity 1 250 Hrs. 500 Hrs. 500 Hrs. 500 Hrs. 500 Hrs. 500 Hrs. 500 Hrs. 500 Hrs. 500 Hrs. 500 Hrs. 500 Hrs. 1000 Hrs. 1000 Hrs. 1000 Hrs. 1000 Hrs. 1000 Hrs. 1000 Hrs. 1000 Hrs. 1000 Hrs. 1000 Hrs. 1000 Hrs. 1000 Hrs. 1000 Hrs. 1000 Hrs. 2 3 4 5 6 7 8 9 10 11 12 13 14 15

DATE 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

56. Boom host bridle greasing 57. Fuel filter element change 58. Clean fuel tank strainer 59. Check injection nozzle 60. Coolent replacement 61. Radiator external face clean 62. Starter & alternator check & clean 63. Check wiring connection 64. H. pump driver gear case oiling 65. Change Hyd. Return line filter 66. Change Hyd. Pressure line filter 67. Priming pump strainer clean 68. Cooling system circuit clean 69. Outer travel planetry oil change 70. Travel reduction unil oil change 71. Park brake oil change 72. Upper Hyd. Res. Oil change 73. Swing speed reducer oil change 74. Front drum plane tory oil change 75. Front drum gear case oil change 76. Rear drum planetory oil change 77. Rear drum gear case oil change 78. Boom hoist planetory oil change 79. Boom hoist gear case oil change Initial of Engineer Incharge

PW:FEX:Crane:Maint:09

MONTHLY MAINTANENCE SCHEDULE FOR 250 MT FMC CRAWLER CRANE MODEL-LS718

Page : 1 of 3

Sl. No. 1. a. b. c. d. e. f. g. h. 1. 2. 3. 4. 5. 6. 7. 8. a. b. c. d. e.

Activity Check 2 top-up oil level Swing level gear case Boom hoist level gear case Chain case 2 Speed transmission Troque generator oil case Engine oil Hydraulic oil tank Oil reservior tank Deck gear case Inspect radiator level Check fuel tank level Check gas pr. In accumulator Inspect V belt tension Check & top up travel gear oil Inspect & coal open gears Grease following Inner tration shaft bush Idler Roller Outer Traction shaft bush Idler shaft bushing Drive Sprocket

Period 1 D D D D D D D D D D D D D D D D D D D D D D 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Date 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Lub Code M M M M T D B F M Water Diesel Nitrogen E M E A A A A A

Remarks

Replace every 500 hrs. - do - do - do Replace every 500 hrs. Replace every 500 hrs. Replace every 500 hrs. Replace every 500 hrs. Drain every 6

Replace every 500 hrs.

PW:FEX:Crane:Maint:09

MONTHLY MAINTANENCE SCHEDULE FOR 250 MT FMC CRAWLER CRANE MODEL-LS718


Page : 2 of 3

Sl. No. f. g. h. i. j. k. l. m. n. o. p. q. r. s. t. u. v. w. x. y. Upper Roller Lower Roller Shift coller

Activity

Period 1 D D D D D D D D D D D D D D D D D D D D 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Date 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Lub Code A A A A A A A A A A A A A A A A A A A A

Remarks

Inner bushing Outer Bearing Centre pin bearing 2 Speed Transmission 2-H drive bearing Reduction shaft bearing Master clutch Release Boom Hoist top Bearing Boom Hoist Shaft Bearing Real drum shaft bearing Swing horizontal shaft bearing Front shaft bearing Trawere Horizontal shaft bearing Swing lock pawl Boom Hoist vertical swing bearing Front break shaft bearing Redn. Break shift bearing

PW:FEX:Crane:Maint:09

MONTHLY MAINTANENCE SCHEDULE FOR 250 MT FMC CRAWLER CRANE MODEL-LS718


Page : 3 of 3

Sl. No. z.

Activity Rear break shaft bearing

Period 1 D D D D D D D W W W W 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Date 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Lub Code A A A A A A A E H W M Lube Code A General Grease B Hydraulic Oil D Engine Oil E Open Gear Oil F Break Fluid M Gear Oil T Automatic Transmission W Worm Gear Oil

Remarks

a1. Front break level bearing a2. Swing break level a3. Left drum draw bearing a4. Travel vertical shaft bearing a5. Swing drive shaft bearing a6. Outer traction 9. Inter gear of swing ball

10. Swing ball race 11. Checkup chain tension 12. Inspect bevel gear Initial of Engineer Incharge Period Code : D Daily W Weekly

MONTHLY MAINTANENCE SCHEDULE FOR 250 MT FMC CRAWLER CRANE MODEL-LS718

Sl. No. 1. 2. 3. 4. 5. 6. 7. 8. 9.

Description Engine oil level checking Radiator water level checking Battery acud level checking Tyre inflation pressure checking 145 PSI Engine oil pressure checking 2.5 Kg/cm2 in low idle Drain water from fuel tank Drain water from fuel tank Drain water from Hy. Oil tank Check system air pressure 120 PSI

Periodicity 1 Daily Daily Daily Daily Daily Daily Daily Daily Daily Daily Daily Daily Weekly 15 Days 15 Days 2 3 4 5 6 7 8 9 10 11 12 13 14 15

DATE 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

10. Check all safety devices are working 11. Check tension of V. belts 12. Grease all greasing points 13. Random check electrical connection 14. Check oil level in gear box centre joints & wheel hubs 15. Check oil level in swing braden swing funk, boom hoist drum rear drum front, Pump drive 16. Apply cardium compound on wire ropes 17. Check oil level in planatries, differendials, transmission & transfer case 18. Change oil in Quick disconnect pump 19. Change Engine oil & fileers 20. Check all nut & Bolts for looseness 21. Change hydraulic oil 22. Change all gear oils Initial of Engineer

15 Days 15 Days 15 Days 240 Hrs. 240 Hrs. 1000 Hrs. 1000 Hrs.