INTERCONNECTION SYSTEM :JOB SAFETY ANALYSIS FORM

SEQUENCE OF BASIC ACTIVITY STEPS/


SCAFFOLD ERECTION POTENTIAL HAZARD HAZARDS CONTROL RESPONSIBLE PARTY
Inspect issue and control use of PPE/ Explain daily
1. Hold daily total safety task instruction meeting Lack of PPE work activity Site Supervisor
Anchor point for safety harness and wearing safety
harness, Belt and Tool Holders/ Cordon off the area
2. Dewatering of concrete chamber Worker falling, Trip,Tools falling by hard barricade Site Supervisor
Safety harness anchored, Belt and Tool Holders/
Provide lookout and emergency safety ladder/
Trip, Falls. Unsafe handling, Check oxygen inside chamber/Cordon off the area
3. Established pipe hole on concrete wall Tools falling by hard barricade Site Supervisor
Safety harness anchored, Belt and Tool Holders/
Provide lookout and emergency safety ladder/
Trip, Falls. Unsafe handling, Check oxygen inside chamber/Cordon off the area
4. Hole drilling on concrete wall Tools falling by hard barricade Site Supervisor
Safety harness anchored, Belt and Tool Holders/
Provide lookout and emergency safety ladder/
Trip, Falls. Unsafe handling, Check oxygen inside chamber/Cordon off the area
5. Pipe fitting on cocnrete wall opening Tools falling by hard barricade Site Supervisor
Safety harness anchored, Belt and Tool Holders/
Provide lookout and emergency safety ladder/
6. Install form works, concrete grouting and Trip, Falls. Unsafe handling, Check oxygen inside chamber/Cordon off the area
remove form works Tools falling by hard barricade Site Supervisor
REVISION: 1
Concrete Batching Plant Requirements
Description unit Qty
1) Design Mix 20N/mm2 or 3000 psi ( 28 days ) ea 1
2) Design Mix 28N/mm2 or 3500 psi ( 28 days ) ea 1
3) Test Certificate
a. Cement ea 1
b. Sand ea 1
c. Gravel stone ea 1
d. Water ea 1
e. Admixture ea 1
4) Batching plant calibration certificate ea 1
5) Testing equipment calibration certificate ea 1
6) Concrete cylinder sample
a. 3000 psi ( 28 days ) ea 3
b. 3500 psi ( 28 days ) ea 3

Note: All of the above, need to be submitted today to CTJV


MANHOLES TABULATED DATA Width x 2 Width x 2
SURVEY ORDINATES Top wall Bottom slab Wall & slab Height ( outside-mtrs ( inside
Description Northing Easting finished elev finished elev. Thickness ( meters ) ) -mtrs )
Manholes # 1
Manholes # 2
Manholes # 3
Manholes # 4
Manholes # 5
Manholes # 6
Manholes # 7
Manholes # 8
Manholes # 9
Manholes # 10
Manholes # 11