SCAFFOLD ERECTION POTENTIAL HAZARD HAZARDS CONTROL RESPONSIBLE PARTY Inspect issue and control use of PPE/ Explain daily 1. Hold daily total safety task instruction meeting Lack of PPE work activity Site Supervisor Anchor point for safety harness and wearing safety harness, Belt and Tool Holders/ Cordon off the area 2. Dewatering of concrete chamber Worker falling, Trip,Tools falling by hard barricade Site Supervisor Safety harness anchored, Belt and Tool Holders/ Provide lookout and emergency safety ladder/ Trip, Falls. Unsafe handling, Check oxygen inside chamber/Cordon off the area 3. Established pipe hole on concrete wall Tools falling by hard barricade Site Supervisor Safety harness anchored, Belt and Tool Holders/ Provide lookout and emergency safety ladder/ Trip, Falls. Unsafe handling, Check oxygen inside chamber/Cordon off the area 4. Hole drilling on concrete wall Tools falling by hard barricade Site Supervisor Safety harness anchored, Belt and Tool Holders/ Provide lookout and emergency safety ladder/ Trip, Falls. Unsafe handling, Check oxygen inside chamber/Cordon off the area 5. Pipe fitting on cocnrete wall opening Tools falling by hard barricade Site Supervisor Safety harness anchored, Belt and Tool Holders/ Provide lookout and emergency safety ladder/ 6. Install form works, concrete grouting and Trip, Falls. Unsafe handling, Check oxygen inside chamber/Cordon off the area remove form works Tools falling by hard barricade Site Supervisor REVISION: 1 Concrete Batching Plant Requirements Description unit Qty 1) Design Mix 20N/mm2 or 3000 psi ( 28 days ) ea 1 2) Design Mix 28N/mm2 or 3500 psi ( 28 days ) ea 1 3) Test Certificate a. Cement ea 1 b. Sand ea 1 c. Gravel stone ea 1 d. Water ea 1 e. Admixture ea 1 4) Batching plant calibration certificate ea 1 5) Testing equipment calibration certificate ea 1 6) Concrete cylinder sample a. 3000 psi ( 28 days ) ea 3 b. 3500 psi ( 28 days ) ea 3
Note: All of the above, need to be submitted today to CTJV