InspectionandTestPlanforCentrifugalPump
ActivityBy No. 1 InspectionandTestPlan PreInspectionMeeting ReferenceDocument Spec. AcceptanceCriteria Spec. BeforeManufacturing 2 3 4 5 6 7 DWG,Design, CalculationDocument WPS&PQR WelderQualification Certificates NDTprocedure NDEPersonnel Certificates PWHTProcedure (ifneeded) CentrifugalPumpImpeller Dynamic BalanceTestProcedure 9 CentrifugalPump PerformanceTest Procedure CentrifugalPump MechanicalRunningTest (ifspecified) CasingHydroStaticTest Procedure API610 ASME ASME ASME ASME API610/ASME API610 ASMEIX ASMEIX ASMEV,VIII,IX ASMEV API610/ASME DWG, Calculationbook WeldingBook Certificates Procedures Certificates Procedure H H H H H H R R R R R R A A A A VerifyingDocument Manuf. MOM H TPI H Client H Remark

API610

API610

Procedure

API610

API610

Procedure

10

API610

API610

Procedure

12

API610/ASMEVIII

ASMEVIII/API610

Procedure

www.inspectionforindustry.com
13 PaintingProcedure Spec. Spec. Materials 14 15 16 MaterialCertificates MaterialIdentification Visual,Dimensionand MarkingControl ASMEII/ASTM ASMEII/ASTM ASMEII/ASTM ASMEII/ASTM ASMEII/ASTM ASMEII/ASTM DuringFabrication CasingVisualInspection fordamage CasingDimensionalCheck toDrawingRequirements CasingVisualExamination ofWeldedonConnections CasingConfirmationof SatisfactoryNDE CasingHydrostaticTesting 22 17 18 19 ImpellerVisualand DimensionalInspection ImpellerConfirmation ofSatisfactoryNDE ImpellerDynamic BalanceTest CentrifugalPump Assemblyinspection API610 DWG/API610 API610 DWG/API610 Report Report H H W W OriginalMaterial Certificates Report Report H H H R W W Procedure H R A

ASME/API610

ASME/API610

Report

ASME/API610

ASME/API610

Report

Procedure/API610 DWG/API610 ASME/API610 Procedure/API610 DWG/API610

Procedure/API610 DWG/API610 ASME/API610 Procedure/API610 DWG/API610

Report Report Report Report Report

H H H H H

H W W H SW

www.inspectionforindustry.com
20 WearRingClearances Control CentrifugalPump PerformanceTest(If specified) CentrifugalPump NPSHTest CentrifugalMechanical RunningTesting(If specified) CentrifugalPumpStrip DownInspection(If specified) DWG/API610 DWG/API610 Report H W

21

Procedure/API610

Procedure/API610

Report

23

Procedure/API610

Procedure/API610

Report

30

Procedure/API610

Procedure/API610

Report

31

Procedure/API610

Procedure/API610 FinalInspection

Report

33 34 35 36

FinalVisual& DimensionalCheck SurfacePreparationand Painting CheckofNamePlate CheckofFinalBook

DWG/Spec. Procedure DWG

DWG Procedure DWG Spec. Documentation

Report Report DWG/P.O

H H H H

H W H R

Submitted by

37 38 39

InspectionReports NCR ReviewFinalDataReport

Spec./DWG Spec./DWG Spec./DWG

Spec./DWG Spec./DWG Spec./DWG PreShipmentInspection

Report Report

H H H

R R R

www.inspectionforindustry.com
40 41 42 43 PreservationandPacking Marking LoadingInspection ShippingDocument Control Spec. Spec. Spec. Procedure Spec. Spec. Spec. Spec. Report Report Report PackingList H H H H H H H H

auxiliaryequipmentsuchaslubeoilsystem,filter,strainer,piping,steelstructureandetc.arenotincludedtothisITP Abbreviations: H:HoldPoint=HoldontheproductiontillTPIInspectorperformsinspectionandsupervisetherequiredtest W:WitnessPoint=ManufactureshallnotifyclientandTPIInspectorbutthereisnoholdontheproduction; ClientcanwaivethisinspectionbasedonhisdiscretionandinformsTPIInspectoraccordingly. R:DocumentReview=ReviewmeansReviewdocument,whichincludesofmaterialtestcertificates,WPS,PQR,NDTProceduresandetc. A:Approval SW:SpotWitness=foritemswithspotwitnessmanufactureshallnotifyTPIinspectorasfulfillingthemonitoring; ForexampleonerandomvisitforwholeUTtestsoroneortwovisitsforwholesurfacepreparationworksforpainting. MOM:MinuteofMeeting P.O:PurchaseOrder