Sunteți pe pagina 1din 19

Valorizacin para pago de facturas

Proyecto:

REMODELACIN PLAZA VEA EL CORTIJO

Proveedor:

S&A CONSTRUCCION S.R.L

Objeto contratado

Moneda

N de O/C

S/. (NUEVOS SOLES)

Valorizaciones

Valorizacin N 001

Periodo

Monto valorizado

Construccin

94,886.70

En caso algun campo no sea de aplicacin indicar N/A

Nombre del Gerente / Jefe:

Firma:

Monto Aprobado
(Sin IGV)
844,820
Monto de retencin
de fondo de
garantia
4,744.33
0.00
0.00
0.00
0.00

VALORIZACIN N
EMPRESA EJECUTORA:
OBRA:
CONTRATO:
MONTO CONTRATADO:

SubPartidas

1
1
1
1
1
1
2
2
2
2

0
1
2
3
4
5
0
1
2
3

2
3

8
0

3
3
3

3
1
4

3
3
3
3
3
3
3
3

2
5
3
6
4
7
5
8

3
3
3
3
3
3
3
3
3

9
10
11
12
13
14
15
16
17

3
3
3

18
19
20

21

3
4
4
4

22
0
1
2

4
4
4
4
4

4
5
6
7
8

10

11

12

13

14

15

5
5
5
5
5
5
5

0
1
2
3
4
5
6

COSTO DIRECTO TOTAL


% AVANCE FSICO EJECUTADO
GASTOS GENERALES
UTILIDADES
DESCUENTOS
COSTO PARCIAL
DEDUCCION DE ADELANTO
TOTAL SIN IGV
IGV
TOTAL A FACTURAR
RETENCION POR FONDO DE GARANTIA
TOTAL A PAGAR

ORIZACIN N

RESA EJECUTORA:
A:
TRATO:
TO CONTRATADO:

DESCRIPCION

OBRAS PROVISIONALES
Limpieza final de obra
Movilizacion y desmovilizacion
Desmontaje de FCR encima de electro
Desmontaje de cobertura aislante trmica
Retiro de pintura y resane en columnas
OBRAS CIVILES
Corte y demolicion de losa cajoneada h=20cm
Demolicion de piso existente (retiro de porcelanato, terrazo y contrapiso)
Suministro e instalacion de cotrapiso (e= 5cm)
Suministro e instalacin de zocalos (marca y formato por definir, similar a celima)
0.30X0.30 en SSHH (h=2.10m)
Suministro e instalacin de Rodoplast 9mm.
Trincheras para caeria de frio alimentario ( largo promedio 1.11mx0.30m, incl
corte demolicion, solado, cama de arena y resane de piso )
Sardinel de concreto h=0.45m con dowell 3/8 @0.25m y acero de refuerzo horizontal de 3/8 para
sardinel en pescados.

Columnetas de drywall para ocultar tuberias negras de frio alimentario


INSTALACIONES SANITARIAS
Corte de losa de concreto existente (para IISS y frio alimentario incl. picado, cama
de arena, relleno, compactacion y resane con acabado similar al existente)
Corte de losa para generar canaletas medias caas para rejillas (acabado cemento
pulido)
Sistema de Desague
Salidas de desague de 2" en Sala de ventas
Salidas de desague de 3" para registro en piso
Salidas de desague de 4" para registro en piso

Tuberia de PVC - SAL de 2" para montante


Tuberia de PVC - SAL de 2" enterrada
Tuberia de PVC - SAL de 3" enterrada
Tuberia de PVC - SAL de 4" enterrada
Empalme a red existente de desague
Caja de registro de 24"x24" con tapa de concreto incluye sellado
Caja de registro de 36"x24" con tapa de concreto incluye sellado
Pruebas de estanqueidad sistema de desague incluye limpieza de red existente.
Sistema de agua Fria
Salida de agua fria sap 1/2" para lavatorios y mangueras de mantenimiento
Tuberia de distribucion de 1/2" pvc-sap enterrada
Tuberia de distribucion de 1 1/2" pvc-sap enterrada
Tuberia de distribucion de 1 1/2" pvc-sap adosada
Tuberia de distribucion de 1 1/4" pvc-sap enterrada
Conexin a red existente
Valvula esferica de bronce 1 1/2"
Valvula esferica de bronce 1/2"
Pruebas hidraulicas de sistema de agua fria, incluye limpieza de tuberias
Accesorios
Rejillas de Fe galvanizado 1.30X0.20m, incl. Angulo empotrado en piso y resane
de piso.
Instalacion de griferias para lavatorios, lavaderos incluye accesorios
Suministro de griferia para lavaderos tipo cuello de ganso
Suministro de trampa de grasa Helvex 18L, incl accesorios e instalacin, incluye
base metlica (con base doble capa zincromato + pintura esmalte de acabado)
Instalacin de lavadero de acero inoxidable de 1 y 2 pozas con escurridero
ACABADOS
Retiro de pintura y resane en paredes
Friso de drywall (segn detalle alcanzado de parante metalico @0.41 G20)
Estructura metlica + un (01)refuerzo de madera horizontal 4"x2" para sujecin de
friso publicitario
Fcr de drywall segn detalle con plenos de 1m, 1.5m
Pintura vencelatex blanco RAL por definir
Pintura vencelatex color y Ral por definir en losa
Pintura en columnas y vigas existentes
Zocalo de pintura esmalte h=1.50m RAL por definir
Sobre tabique de drywall con perfileria de 1 5/8" G20 @0.41m con plancha
sanitaria de 1/2" por una cara, acabado a partir de los 2.1 hacia arriba (lineal de
frio)
Tabique de drywall con perfileria de 3 5/8" G25 @0.61m con plancha regular de
3/8" a dos caras (cerramientos en sala de ventas)
Mochetas de drywall con plancha regular de 1/2"de 0.12m de ancho ( altura
variable 2.10m-2.40m )
Empaste de tabiques - sala de ventas

Suministro e instalacion de baldosa acustica de 2x4 ( incl, suspensin de perfiles


principales y secundarios, areas de tesoreria, arqueo, seguridad )
Refuerzos horizontales de madera de 4"x2"
Refuerzo metlico en tabiques en sala de ventas con tubo cuadrado de
3"X3"X3mm + arriostre horizontal de 3"X3"X3mm
OTROS
Seguridad y Salud (incluir examenes pre-ocupacionales)
Campamento de Obra
Topografia de obra (Estacion total y nivel)
Implementos de Seguridad
Resane de muros producto de los desmontajes
Paz social

TO DIRECTO TOTAL
VANCE FSICO EJECUTADO

TOS GENERALES
IDADES
CUENTOS
TO PARCIAL

UCCION DE ADELANTO
AL SIN IGV

AL A FACTURAR
ENCION POR FONDO DE GARANTIA
AL A PAGAR

VALORIZACIN DESAGREGADA ACUM


001
S&A CONSTRUCCION S.R.L.
PVS-EL CORTIJO
PAQUETE N 002 (ARQUITECTURA, OBRAS CIVILES E IISS)

S/. 996,887.65

Und

Contractual
Costo
Metrado
Unitario
S/.

glb
glb
glb
m2
glb

1.00
1.00
1.00
3,500.00
1.00

1,800.00
2,550.00
1,450.00
13.00
5,130.00

1,800.00
2,550.00
1,450.00
45,500.00
5,130.00

m2
m2
m2

1,560.00
3,138.75
3,138.75

45.00
17.00
24.00

70,200.00
53,358.75
75,330.00

m2

210.00

53.00

11,130.00

ml

100.00

9.00

900.00

und

14.00

550.00

7,700.00

ml

15.00

105.00

1,575.00

und

14.00

180.00

2,520.00

ml

398.84

95.00

37,889.80

ml

15.00

480.00

7,200.00

ptos
ptos
ptos

24.00
9.00
7.00

83.00
95.00
120.00

1,992.00
855.00
840.00

Avance Anterior
Costo Parcial S/.

Metrado

ml
ml
ml
ml
und
und
und
gbl

40.00
169.75
129.33
151.53
3.00
3.00
3.00
1.00

28.00
63.00
45.50
112.00
180.00
250.00
280.00
900.00

1,120.00
10,694.25
5,884.29
16,970.80
540.00
750.00
840.00
900.00

ptos
ml
ml
ml
ml
und
und
und
glb

9.00
33.15
63.61
93.20
21.74
2.00
3.00
9.00
1.00

55.00
25.00
65.00
75.00
75.00
150.00
150.00
55.00
500.00

495.00
828.75
4,134.78
6,990.00
1,630.13
300.00
450.00
495.00
500.00

ml
und
und

15.00
10.00
3.00

390.00
120.00
165.00

5,850.00
1,200.00
495.00

und

4.00

2,550.00

10,200.00

und

4.00

250.00

1,000.00

glb
ml

1.00
151.78

6,500.00
135.00

6,500.00
20,490.30

ml

151.78

125.00

18,972.50

m2
m2
m2
ml
m2

650.53
1,563.27
3,138.75
1,125.00
786.10

79.00
10.00
11.50
12.50
10.50

51,391.87
15,632.68
36,095.63
14,062.50
8,254.03

m2

220.00

73.00

16,060.00

m2

520.00

69.00

35,880.00

und

6.00

110.00

660.00

m2

3,886.73

4.50

17,490.29

m2

320.00

67.00

21,440.00

ml

480.00

10.00

4,800.00

Kg

1,920.00

12.50

24,000.00

glb
glb
mes
glb
glb
glb

1.00
1.00
2.00
1.00
1.00
1.00

14,000.00
3,500.00
6,000.00
2,200.00
3,010.00
21,000.00

14,000.00
3,500.00
12,000.00
2,200.00
3,010.00
21,000.00

S/. 747,628.35

7.50%
7.50%
-2.00%
S/.

56,072.13
56,072.13
(14,952.57)
S/. 844,820.04

0.00%
S/.

0.00
S/. 844,820.04

18.00%

152,067.61
S/. 996,887.65
42,241.00
S/. 954,646.65

5.00%
S/.

S/. 0.00
0.00%

ESAGREGADA ACUMULADA

FECHA DE PRESENTACION DE VALORIZACION :


N ORDEN DE TRABAJO:
FECHA DE INICIO DEL CONTRATO :
FECHA DE TERMINO DEL CONTRATO:

Avance Anterior
Monto de
%
Valorizacin
Ejecutado
Actual

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00

Avance Actual
Metrado

Monto de
% pto en obra
Valorizacin Total

1.00
0.30
636.48
0.10

0.00
2,550.00
435.00
8,274.24
513.00

0.00%
100.00%
30.00%
18.19%
10.00%

0.00
720.00
720.00

0.00
12,240.00
17,280.00

0.00%
22.94%
22.94%

0.00%

0.00

0.00%

0.00

0.00%

0.00

0.00%

0.00

0.00%

0.00

0.00%

0.00

0.00%

0.00

0.00%

0.00

0.00%

0.00

0.00%

0.00

0.00%

0.00

0.00%

0.00

0.00%

0.00

0.00%

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00

0.00%

0.00

0.00%

0.00

0.00%

0.00

0.00%

0.00
0.00

0.00%
0.00%

650.00
5,400.00

10.00%
26.35%

0.00

0.00%

0.00

0.00%

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
1,700.00
8,280.00
437.50
0.00

0.00%
10.87%
22.94%
3.11%
0.00%

0.00

0.00%

0.00

0.00%

0.00

0.00%

36.00

2,484.00

6.92%

0.00

0.00%

2.00

220.00

33.33%

0.00

0.00%

170.00

765.00

4.37%

0.10
40.00

170.00
720.00
35.00

0.00

0.00%

0.00

0.00%

0.00

0.00%

0.00

0.00%

0.00

0.00%

350.00

4,375.00

18.23%

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.29
1.00
0.29
0.43

4,060.00
3,500.00
1,740.00
946.00
0.00
5,250.00

29.00%
100.00%
14.50%
43.00%
0.00%
25.00%

S/. 0.00
0.00%

0.25

S/. 81,099.74
10.85%

0.00
0.00
0.00
S/. 0.00

6,082.48
6,082.48
(1,621.99)
S/. 94,886.70

0.00
S/. 0.00

0.00
S/. 94,886.70

0.00
S/. 0.00
0.00
S/. 0.00

17,079.61
S/. 111,966.30
S/.
4,744.33
S/. 107,221.97

DE VALORIZACION :

10/23/2013

RATO :
NTRATO:

7/22/2013
9/30/2013

Avance Acumulado
Metrado

Saldo por Ejecutar

Monto de
% Ejecutado
Valorizacin Total

Metrado

Monto de
Valorizacin Total

0.00
1.00
0.30
636.48
0.10

0.00
2,550.00
435.00
8,274.24
513.00

0.00%
100.00%
30.00%
18.19%
10.00%

1.00
0.00
0.70
2,863.52
0.90

1,800.00
0.00
1,015.00
37,225.76
4,617.00

0.00
720.00
720.00

0.00
12,240.00
17,280.00

0.00%
22.94%
22.94%

1,560.00
2,418.75
2,418.75

70,200.00
41,118.75
58,050.00

0.00

0.00

0.00%

210.00

11,130.00

0.00

0.00

0.00%

100.00

900.00

0.00

0.00

0.00%

14.00

7,700.00

0.00

0.00

0.00%

15.00

1,575.00

0.00

0.00

0.00%

14.00

2,520.00

0.00

0.00

0.00%

398.84

37,889.80

0.00

0.00

0.00%

15.00

7,200.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

24.00
9.00
7.00

1,992.00
855.00
840.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

40.00
169.75
129.33
151.53
3.00
3.00
3.00
1.00

1,120.00
10,694.25
5,884.29
16,970.80
540.00
750.00
840.00
900.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

9.00
33.15
63.61
93.20
21.74
2.00
3.00
9.00
1.00

495.00
828.75
4,134.78
6,990.00
1,630.13
300.00
450.00
495.00
500.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

15.00
10.00
3.00

5,850.00
1,200.00
495.00

0.00

0.00

0.00%

4.00

10,200.00

0.00

0.00

0.00%

4.00

1,000.00

0.10
40.00

650.00
5,400.00

10.00%
26.35%

0.90
111.78

5,850.00
15,090.30

0.00

0.00

0.00%

151.78

18,972.50

0.00
170.00
720.00
35.00
0.00

0.00
1,700.00
8,280.00
437.50
0.00

0.00%
10.87%
22.94%
3.11%
0.00%

650.53
1,393.27
2,418.75
1,090.00
786.10

51,391.87
13,932.68
27,815.63
13,625.00
8,254.03

0.00

0.00

0.00%

220.00

16,060.00

36.00

2,484.00

6.92%

484.00

33,396.00

2.00

220.00

33.33%

4.00

440.00

170.00

765.00

4.37%

3,716.73

16,725.29

0.00

0.00

0.00%

320.00

21,440.00

0.00

0.00

0.00%

480.00

4,800.00

350.00

4,375.00

18.23%

1,570.00

19,625.00

0.29
1.00
0.29
0.43
0.00
0.25

4,060.00
3,500.00
1,740.00
946.00
0.00
5,250.00

29.00%
100.00%
14.50%
43.00%
0.00%
25.00%

0.71
0.00
1.71
0.57
1.00
0.75

9,940.00
0.00
10,260.00
1,254.00
3,010.00
15,750.00

S/. 81,099.74
10.85%

S/. 666,528.59
89.15%

6,082.48
6,082.48
(1,621.99)
S/. 94,886.70

49,989.64
49,989.64
(13,330.57)
S/. 779,838.45

0.00
S/. 94,886.70

0.00
S/. 779,838.45

17,079.61
S/. 111,966.30
4,744.33
S/. 107,221.97

140,370.92
S/. 920,209.37
38,991.92
S/. 881,217.45

2013

2013
2013

do por Ejecutar
% Por Ejecutar

100.00%
0.00%
70.00%
81.81%
90.00%
100.00%
77.06%
77.06%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
90.00%
73.65%
100.00%
100.00%
89.13%
77.06%
96.89%
100.00%
100.00%
93.08%
66.67%
95.63%

S/. 666,528.59
89.15%

100.00%
100.00%
81.77%
71.00%
0.00%
85.50%
57.00%
100.00%
75.00%

S-ar putea să vă placă și