2.

6 Design of Open Channels


Open channels have uses in urban stormwater drainage urban sanitarysewer systems irrigation delivery systems In the next few lectures, well discuss the design procedure for 3 types of open channels: lined (nonerodable channels) are primarily used to maximize flow rates and minimize construction costs unlined (erodible channels) are the least expensive and what is commonly found in nature, but often experience unacceptable levels of sediment transport and erosion. grasslined are commonly used to transmit intermittent irrigation and stormwater flows and to control erosion

Open Channel Flow

1/27

2.5 Design of Channels

Open Channel Design Fundamentals There are many design considerations which are common to all 3 types of channels. This includes the determination of the best hydraulic section. The best hydraulic section will accommodate the design flow at a reasonable cost and limit erosion/deposition of sediment and other material. Trapezoidal Channel To determine the optimum channel size for a trapezoidal channel, we need to determine the optimum channel width and side slope (to minimize excavation costs) which will maximize the flowrate. First recall Mannings Equation,
1 2 Q = AR 3 S o n
2 1

Rearranging
3

A=

Qn So

2 5

Restating the above statement another way, we need to minimize A & P with respect to Q or
3

Qn So

Recall the area and wetted perimeter definitions for a trapezoidal cross section

combining these two equations

Open Channel Flow

2/27

2.5 Design of Channels

substituting into Mannings equation

The optimum perimeter/area is determined by differentiating with respect to y (while holding m constant).

Similarly, the optimum channel side slope is determined by differentiating with respect to m (while holding y constant).

Combing the optimum perimeter and optimum slope equations, we can determine the best hydraulic section for a trapezoid is

This solution assumes the channel slope can be set to any value. Often this is not possible, in which case use a known (or specified) m value to determine the optimum perimeter. Please note, for lined channels, the side slope is often specified as being less than 33.7o. The best hydraulic section for a variety of channels is given in the below table

Open Channel Flow

3/27

2.5 Design of Channels

Other considerations The previous derivations does not consider the following points: freeboard (distance between water surface and top of channel) whether or not its possible to excavate the optimum channel cost of lining access to site Minimal permissible velocity 0.60.9 m/s (23 ft/s) to prevent sedimentation 0.75 m/s (2.5 ft/s) to prevent vegetation growth Channel Slopes Longitudinal governed by topography (unless velocities are too low) Side Slopes a function of material

Open Channel Flow

4/27

2.5 Design of Channels

Other considerations (continued) Freeboard The freeboard is the vertical distance between the water surface and the top of the channel slope. Its basically a factor of safety to keep the channel from overflowing. For unlined channels, the freeboard is estimated with:
F = 0.55 Cy

where F is the freeboard in meters y is the design flow depth C is a coefficient

Generally, ASCE recommends a minimum freeboard of 30 cm. In sinuous channels, additional freeboard is need at he channel bends to account for the superelevation of the water surface. The superelevation in the vicinity of the bend is approximated with
V 2T h s= gr c

where V is the average velocity T is the top width of the channel rc is the bend radius

According to the USACE (1995) rc > 3T

Open Channel Flow

5/27

2.5 Design of Channels

Design of Lined Channels Lined (or rigidboundary channels) are used in the following situations: transmit flow at high velocities decrease seepage losses decrease maintenance and operation costs ensure channel stability The design procedure for lined channels is as follows: 1. Estimate the roughness coefficient, n, and the freeboard coefficient, C, for the desired channel lining and flowrate 2. Compute the normal depth of flow, yn, with Mannings equation
1 2 Q = AR 3 S o n
2 1

3. Verify that: minimum permissible velocities are being met

flow is subcritical, Fr < 0.8

maximum permissible velocities are being met V < 2.1 m/s unreinforced channel V < 5.5 m/s reinforced channels If necessary, choose new channel dimensions and recalculate yn to ensure above criteria are satisfied. 4. Calculate the required freeboard (including the additional freeboard at channel bends)

Open Channel Flow

6/27

2.5 Design of Channels

Open Channel Flow

7/27

2.5 Design of Channels

Example~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Design lined channel to carry 20 m3/s on a longitudinal slope of 0.0015. The lining of the channel is to be reinforced float finished concrete. Consider a) the best hydraulic section and b) a section with side slopes of 1.5:1 (H:V). Solution~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ a) given:

1. Estimate the roughness coefficient, n, and the freeboard coefficient, C, for the desired channel lining and flowrate

2. Compute the normal depth of flow, yn, with Mannings equation determine best hydraulic section:

1 2 Q = AR 3 S o n

b=2.4 m yn=2.09 m
Open Channel Flow 8/27 2.5 Design of Channels

3. Verify that: minimum permissible velocities are being met

V=2.6 m/s flow is subcritical, Fr<0.8 Fr = 0.66

maximum permissible velocities are being met V < 5.5 m/s reinforced channels 4. Calculate the required freeboard (including the additional freeboard at channel bends)

F=1.04 m

The total channel depth (including freeboard) is 3.13 m. The channel is to have a bottom width of 2.4 m and side slopes is .58:1 (H:V).

Open Channel Flow

9/27

2.5 Design of Channels

b)

Step 1. Estimate the roughness coefficient, n, and the freeboard coefficient, C, for the desired channel lining and flowrate

Step 2. Compute the normal depth of flow, yn, with Mannings equation determine the geometry given H:V=1.5:1

1 2 Q = AR 3 S o n

b=1.16 m yn=1.94 m

Open Channel Flow

10/27

2.5 Design of Channels

Step 3. Verify that: minimum permissible velocities are being met

V=2.53 m/s flow is subcritical, Fr<0.8

Fr = 0.76 maximum permissible velocities are being met V < 5.5 m/s reinforced channels Step 4. Calculate the required freeboard (including the additional freeboard at channel bends)

F=1.00 m

The total channel depth (including freeboard) is 2.94 m. The channel is to have a bottom width of 1.16 m and side slopes is 1.5:1 (H:V).

Open Channel Flow

11/27

2.5 Design of Channels

Design of Unlined Open Channels In the design of unlined channels, it is necessary to assure that sediment wont be eroded from or deposited on channel beds. To design new (or analyze existing), well need to approximate the stress applied to the channel walls by the fluid and the stress required to move the sediment particles. Stress applied by the flow The stress applied by the flow is not applied evenly to the channel sidewalls and bottom walls. For the two conditions it is defined with bottom side Stress required to move sediment The stress required to move particles on the bottom is a function of the immersed particle weight, the particle geometry, and the applied friction between particles.

Where

the critical stress required for sediment to move becomes

Open Channel Flow

12/27

2.5 Design of Channels

For particles on the side slope of the channel, the relationship with gravity is more complicated. The above expression is modified, so the critical stress to move particles on the channel sides becomes

where

The ratio of the critical shear stress on the side to the critical shear stress on the bottom is defined as the tractive force, K, with

Open Channel Flow

13/27

2.5 Design of Channels

Open Channel Flow

14/27

2.5 Design of Channels

Open Channel Flow

15/27

2.5 Design of Channels

Design of Unlined Channels (continued) 1. Estimate the roughness coefficient, n, based on the perimeter characteristics (attached table) of the channel, and select the freeboard coefficient, C, based on the design flowrate in the channel.

2. Estimate the angle of repose (attached figure 4.31)

3. Estimate the channel sinuousness and the tractive force correction factor (attached table 4.15)

4. Specify a side slope angle (attached table 4.13)

5. Estimate the tractive force

6. Estimate the permissible tractive force on the bottom and sides of the channel

Open Channel Flow

16/27

2.5 Design of Channels

7. Assume permissible shear stress on the channel sides is the limiting design factor, and determine the normal depth

8. Calculate the required bottom width, b, of the channel using Mannings equation

9. Compare the permissible tractive force on the bottom with the actual tractive force

10.Compare the permissible velocity and calculate the Froude number (verify that it is subcritical)

11. Estimate the required freeboard and super elevation if needed

Open Channel Flow

17/27

2.5 Design of Channels

Example~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Design a trapezoidal channel to carry 20 m3/s through a slightly sinuous channel on a slope of 0.0015. The channel is to be excavated in course alluvium with a 75percentile diameter of 2 cm (.8 in) and with particles on the perimeter of the channel moderately rounded. Solution~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Step 1. Estimate the roughness coefficient, n, and select the freeboard coefficient, C, based on the design flowrate in the channel.

Step 2. Estimate the angle of repose (attached figure 4.31)

Step 3. Estimate the channel sinuousness and the tractive force correction factor (attached table 4.15)

Step 4. Specify a side slope angle (attached table 4.13)

Step 5. Estimate the tractive force

Step 6. Estimate the permissible tractive force on the bottom and sides of the channel

Open Channel Flow

18/27

2.5 Design of Channels

Step 7. Determine the normal depth

Step 8. Calculate the required bottom width, b, of the channel using Mannings equation

Step 9. Compare the permissible tractive force on the bottom with the actual tractive force

Step 10. Verify permissible velocity and that flow is subcritical

Step 11. Estimate the required freeboard

The total depth of the channel to be excavated (including the freeboard) is 1.27. The channel is to have a bottom width of 24.2 and sides slopes of 2:1 (H:V).
Open Channel Flow 19/27 2.5 Design of Channels

Design of GrassLined Open Channels Grasslined are often used to transmit intermittent irrigation and storm water flows. They are often preferable to lined channels because they provide increased storage, low velocities, and aesthetic benefits. The additional design considerations for grass lined channels include: Channel Roughness The Mannings n value is a function of the velocity and channel geometry, in addition to the roughness provided by the grass.

Open Channel Flow

20/27

2.5 Design of Channels

The mannings n for the various retardances is given in the below figure.

Permissible Velocities There exists a variety of considerations for determining the maximum permissible velocities in a grasslined channel. Those include the table on the next page (table 4.18) and the below considerations from the soil conservation service

Vmax(m/s) 0.9 0.91.2 1.21.5 1.51.8 1.82.1

Conditions Sparse vegetive cover possible Vegetation to be established by seeding Dense sod (or temporarily diverted flow) Wellestablished sod Very special conditions ???

Open Channel Flow

21/27

2.5 Design of Channels

Channel Cross Sections In addition to the best hydraulic section and slope stability, grass lined channels may have to be designed to allow farm equipment to cross. Freeboard The freeboard on a grass lined channel is defined with

Open Channel Flow

22/27

2.5 Design of Channels

Design Procedure for grasslined channels This procedure must completed for BOTH upper and lower bound of retardance (ie. Mowed and unmowed conditions).

Stage I Lower Bound Retardance 1. Assume the value of the roughness coefficient and determine the value of VR

2. Select the maximum permissible velocity (attached table)

3. Using Mannings equation, compute new VR

4. Repeat until VR is converged

5. Determine A from design flow and maximum permissible velocity

6. Determine the channel proportions for the calculated values of R and A

Open Channel Flow

23/27

2.5 Design of Channels

Stage II Upper Bound retardance 1. Assume a depth of flow for the channel assumed in Stage I and compute A and R.

2. Compute the averaged velocity

3. Compute VR using the results of 1 & 2

4. determine n from the attached figure using the upper bound retardance

5. Use the n from step 4, R from step 1, compute V from the mannings equation

6. Repeat 1 5 until V has converged

7. Add the appropriate freeboard and check the Froude number

Open Channel Flow

24/27

2.5 Design of Channels

Example~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Design a triangular grasslined channel to handle intermittent flow of 0.7 m3/s. The channel is to be excavated in an easily erodible soil, on a longitudinal slope of 2%, and lined with Bermuda grass. During the early stages of channel development, the height of the grass will be maintained at about 4 cm (a retardance of E); during the latter stages of development, the Bermuda grass is expected to be at a height of about 30 cm (a retardance of B). Solution~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ given: Q=0.7m3/s So=0.02 Bermuda grass easily eroded soil Stage I: E retardance Stage II: B retardance

Stage I 1. 4. guess at n, determine VR determine Vmax from table compute R=VR/Vmax find new VR from Mannings eq repeat with adjusted n n VR (ft2/s) fig4.33 VR (m2/s) fig 4.33/10.76 R (m) VR/Vmax VR n 2 (m /s) =R5/3So1/2/n

Open Channel Flow

25/27

2.5 Design of Channels

VR (ft2/s) fig4.33

VR (m2/s) fig 4.33/10.76

R (m) VR/Vmax

VR n 2 (m /s) =R5/3So1/2/n

Find the Area (triangle)

Determine channel geometry from A and R

m=1.71 y=0.48 m note: youll get two solutions for m and have to choose the best

Stage II: 1. 4. guess at y, from stage I from stage I geometry compute A & R from known geometry compute the average velocity (=Q/A) compute VR determine n (fig 4.33) compute V from mannings equation

Open Channel Flow

26/27

2.5 Design of Channels

Y A R (m (m2) (m) VR/Vmax )

V VR (m/s (m2/s) ) =Q/ A

VR n V V 2 (ft /s) (m/s) VR*10.76 fig4.33 =R2/3So1/2/ n

Find the freeboard

F=0.3 Check for subcritical flow

Fr=0.38, subcritical, ok design The total depth of flow is 1.05 m. The triangular channel is to have side slopes of 1.7:1 (H:V).