INPUT DATA SHEET

Project : TK9764 - I/C No. 10


Bridge : AT STA. 0+100 - LEFT & RIGHT
Date :
11/10/2013

WH

WB WC

WA

WW

Deisgned : C. Malek
Checked : G. Marj
Approved : G. Marj
EB

LS

BT
CR

C4

WT
WS

P1- P11

HB

EB

TH
C3

WAW *

CR
Xi

C6

P1

P11

HG

CC

C3

S7

HS
C1

S6

C1

S1

S5
S2

* Shall be = WA
if wing wall is
needed or = 0

HT

C2
BX BW BC

WD

HF

C5

C5
BF

LF

GEOMETRY

DECK REACTIONS (kN)


Vertical Reactions

Lateral loads (kN)

BF=

8.00

(m)

BT=

3.20

(m)

EB=

0.50

(m)

WC=

0.50

(m)

WB=

0.30

(m)

WA=

3.50

(m)

WD=

0.00

(m)

BC=

1.30

(m)

BW=

0.00

(m)

BX=

0.00

(m)

HS=

10.50

(m)

HF=

1.50

(m)

HB=

1.90

(m)

HG=

0.00

(m)

HT=

0.60

(m)

LS=

25.00

(m)

Soil data

CR=

0.30

(m)

g=

18.00 kN/m

f'c =

25000 kN/m

CC=

7.00

(m)

f=

35.00 degree

LF=

25.00

(m)

Ka =

0.271

fy =
gm =

420000 kN/m
3
17.00 kN/m

WAW=

0.00

(m)

m=

TH=

0.00

(m)

Surch. =

WS=

3.00

(m)

i=

0.00 degree

WH=

0.75

(m)

b=

0.00 degree

WT=

0.30

(m)

d=

0.00 degree

WW=

3.00

(m)

A=

0.40 Acc. Coeff.

Kh =

0.20 = A/2

(KN)

#####
#####
#####
#####
0.00
652.50
#####
#####
#####
0.00
0.00
0.00
0.00

Prestress

LL

Xi (m)

a-Longitudinal

261.00

0.00

140.00

P2 =

261.00

0.00

140.00

-7.50 H(brak.)

63.00

P3 =

261.00

0.00

140.00

-5.00 H(E.Q.)

321.81

P4 =

261.00

0.00

140.00

-2.50

P5 =

261.00

0.00

140.00

0.00 b-Transversal

P6 =

261.00

0.00

140.00

2.50 b-

P7 =

261.00

0.00

140.00

5.00 H(E.Q.)

P8 =

261.00

0.00

140.00

7.50

P9 =

-10.00 a-

261.00

0.00

140.00

10.00

P10 =

0.00

0.00

0.00

0.00

P11 =

0.00

0.00

0.00

0.00

P12 =

0.00

0.00

0.00

0.00

2349.00

0.00

1260.00
Materials

Kv=

187188545.xls.ms_office - Rev. 2.0

DL

P1 =

0.50 base fric.


11.00 kN/m

364.97

##
##
##
##
##
0
##
##
##
##
0
0
0
0

Horizontal Load factors


Braking
Earthquake

5
13.7

% of L.L.
% of Mass

0.00

q=

11.31 degree

Y=
KAE =

2.205
0.396

1 / 16

11/10/2013

TK9764 - I/C No. 10


OUTPUT DATA SHEET

Static Pressures

Dynamic Pressures

E14
E21

E15
E23
EP2

EP1

EP3

E24

E22
E16

es2

E17
E18
es1

Arm. Moment

1 - Own weight
C1 =
C2 =
C3 =
C4 =
C5 =
C6 =
C7 =
C8 =
Total

6987.50
0.00
0.00
356.25
7500.00
28.50
0.00
84.38
14956.6

(kN)

71.25
0.00
1397.50
0.00
1500.00
16.88
0.00
598.50
2709.00
0.00
0.00
16.88
6310.00

(m)

(kN.m)

3.85

26901.88

(kN)

(kN)

3.85

0.00

(kN)

4.35

1549.69

(kN)

4.00

30000.00

(kN)

3.70

105.45

(kN)

0.00

0.00

(kN)

5.70

480.94

Arm.

2 - Soil Loads
S1 =
S2 =
S5 =
S6 =
S7 =
Total

16537.50
864.00
0.00
0.00
0.00
17401.50

Moment

(m)

(kN.m)

(kN)

6.25

103359.38

(kN)

1.60

1382.40

(kN)

(kN)

(kN)

104741.8

(kN)

59037.95

(kN)

3- Abut. Dynamic forces


E14 =
E15 =
E16 =
E17 =
E18 =
E19 =
E20 =
E21 =
E22 =
E23 =
E24 =
E25 =
Total

es3

Arm. Moment
(m)

(kN.m)

(kN)

11.05

787.31

(kN)

(kN)

5.80

8105.50

(kN)

(kN)

0.75

1125.00

(kN)

11.63

196.17

(kN)

10.87

0.00

(kN)

11.05

6613.43

(kN)

5.80

15712.20

(kN)

6.52

0.00

(kN)

5.80

0.00

(kN)

10.95

184.78

(kN)

187188545.xls.ms_office - Rev. 2.0

Arm.

Moment

(m)

(kN.m)

(kN/m2)

(kN/m2)

(kN)

4.00

35120.31

(kN)

6.00

5365.60

(kN)

35120.31

(kN)

5365.60

4 - Static Earth pressure


Ka =
es1 =
es2 =
EP1 =
EP2 =
Total (under construction)
Total (surcharge)

0.271
58.53
2.98
8780.08
894.27
8780.08
894.27

32724.39

2 / 16

11/10/2013

TK9764 - I/C No. 10

Longitu. Transver.
5 - Deck Reactions
D.L.
L.L.
Brack

2349.00
1260.00
63.00

Arm. Moment Moment


(m)

(kN.m)

(kN.m)

(kN)

3.70

8691.30

0.00

(kN)

3.70

4662.00

0.00

(kN)

8.60

Bearings (R+S+T) Reaction


R+S+T

0.00

(kN)

7- Earthquake reaction

Arm. Moment

E.Q.

10.10

321.81

(kN)

962.50

0.271
26.91
4036.90
4036.90

(kN/m2)
(kN)
(kN)

Arm.

Moment

(m)

(kN.m)

7.20

29065.70

29065.70

Moment
(kN.m)
0.00
g=
q=
Y=

(kN.m)

3250.31

18.00
11.310
2.205

kN/m
degree

Arm. Moment

8 - Surcharge
L.L.

(m)

Ka =
es3 =
EP3 =
Total

Arm.
(m)
10.10

6-Soil Dynamic Pressures

(kN)

(m)

(kN.m)

6.25

6015.63

KAE =
Kdyn. =

0.396
0.125

9- Bill Of Quantities
Concrete

595.44

(m3)

187188545.xls.ms_office - Rev. 2.0

3 / 16

11/10/2013

TK9764 - I/C No. 10


CHECKING FOR STABILITY
A- CHECKING DURING CONSTRUCTION

Group I ( D.L. + EP. + Surch.)


1 - Check for sliding
1-

2 - Check for overturning


2-

Total Vertical load

N = 33320.63

(kN)

Overturning Moment

Mo = 40485.91

(kN.m)

Total Lateral load

F=

(kN)

Stabilising Moment

Ms = 169795.4

(kN.m)

Factor of safety

F.O.S. =

9674.34
1.72

Factor of safety

F.O.S. =

4.19

Group I ( D.L. + EP. )


1 - Check for sliding
1-

2 - Check for overturning


2-

Total Vertical load

N = 32358.13

(kN)

Overturning Moment

Mo = 35120.31

(kN.m)

Total Lateral load

F=

(kN)

Stabilising Moment

Ms = 163779.7

(kN.m)

Factor of safety

F.O.S. =

8780.08
1.84

Factor of safety

F.O.S. =

4.66

B- CHECKING AT SERVICE LOADING

Group I ( D.L. + L.L.+ EP. + Surch.)


1 - Check for sliding
1-

2 - Check for overturning


2-

Total Vertical load

N = 36929.63

(kN)

Overturning Moment

Mo = 40485.91 (kN.m)

Total Lateral load

F=

(kN)

Stabilising Moment

Ms = 183148.7 (kN.m)

Factor of safety

F.O.S. =

187188545.xls.ms_office - Rev. 2.0

9737.34
1.90

Factor of safety

4 / 16

F.O.S. =

4.52

11/10/2013

TK9764 - I/C No. 10

3 - Check for stresses

q3

Mnet =
N=
X=
ecc. =

142663
36929.6
3.863
0.14

(kN.m)
(kN)

LF

(m)

q2

(m)

BF

Mfinal longitudinal = 5055.76

(kN.m)

Mfinal transversal =
0.00
Total bearing pressures
q1 =
203.61 (kN/m2)
q2 =
203.61 (kN/m2)
q3 =
165.69 (kN/m2)
2
q4 =
165.69 (kN/m )

(kN.m)

qmax =

203.61 (kN/m2)

q4

q1

Area of base
Inertia longitudinal
Inertia transversal
Y longitudinal
Y transversal

200.0
1066.7
10416.7
4.00
12.50

Corresponding to a net bearing pressure of

qaverage/net = 3/4 qmax/net + 1/4 qmin/net =

187188545.xls.ms_office - Rev. 2.0

5 / 16

(m2)
(m4)
(m4)
(m)
(m)

165.81 (kN/m2)

156.33 (kN/m2)

11/10/2013

TK9764 - I/C No. 10


CHECKING FOR STABILITY
C- CHECKING DURING EARTHQUAKE

Group VII ( D.L. + EP. + E.Q.)

Stresses 133%

1 - Check for sliding


1-

2 - Check for overturning


2-

Total Vertical load

N = 34707.13

(kN)

Overturning Moment

Mo = 100160.7

(kN.m)

Total Lateral load

F = 19448.79

(kN)

Stabilising Moment

Ms = 172471.0

(kN.m)

Factor of safety

F.O.S. =

0.89

Factor of safety

F.O.S. =

1.72

3 - Check for stresses

Mnet =
N=

72310
34707.1

(kN.m)

q3

(kN)

LF

X=
ecc. =

2.083
1.917

(m)

q2

(m)

BF

Mfinal longitudinal =66518.19

(kN.m)

Mfinal transversal = 3686.18


Total bearing pressures
q1 =
427.40 (kN/m2)
q2 =
418.56 (kN/m2)
q3 =
-80.33 (kN/m2)
2
q4 =
-71.48 (kN/m )

(kN.m)

qmax =

427.40 (kN/m2)

q4

Area of base
Inertia longitudinal
Inertia transversal
Y longitudinal
Y transversal

200.0
1066.7
10416.7
4.00
12.50

Corresponding to a net bearing pressure of

qaverage/net = 3/4 qmax/net + 1/4 qmin/net =

187188545.xls.ms_office - Rev. 2.0

6 / 16

(m2)
(m4)
(m4)
(m)
(m)

283.56 (kN/m2)

183.13 (kN/m2)

11/10/2013

TK9764 - I/C No. 10


PILE DATA SHEET
A- PILE REACTIONS

1 - Piles & Pile Cap Data


No.
Row
d
p
s
Piles
1
10
1.000 1.250
2.50
2
6
3.500 2.500
5.00
3
10
7.000 1.250
2.50
Xcog = 3.88 m
3 rows
26
Pile Diameter =
Pile Capacity =

n1

n2

Ymax

S x2

4.0
4.5
11.250 83.2
2.0
2.5
12.500
0.9
4.0
4.5
11.250 97.1
0.0
0.0
Ycog = 12.50 m
181.15
1000
1500

S y2
515.6
437.5
515.6
0.0
0.0
1468.8

mm
KN

PILE REACTIONS (UNFACTORED WORKING LOADS)


Pile1
Pile2
Pile3
Pile4 Pile5
Pile6
(KN)

Allowable
increase in
capacity

Shear
long.
(KN)

1422

1422

100

375

1436

1499

133

748

12

GROUP

(KN)

(KN)

(KN)

(KN)

(KN)

1433

1433

1407

1407

VII

2359

2302

288

232

Shear
tran.
(KN)

B- DESIGN LOADS

PILE REACTIONS (FACTORED ULTIMATE LOADS)


Pile1
Pile2
Pile3
Pile4 Pile5
Pile6
GROUP

(KN)

(KN)

(KN)

(KN)

(KN)

(KN)

Allowable
increase in
capacity

Shear
long.
(KN)

Shear
tran.
(KN)

2202

2202

1618

1618

1958

1958

100

651

VII

1773

1731

217

174

1080

1127

133

562

Moments

1 - Pile Cap Analysis


Row
1
2
3
3 rows

No.
Piles
10
6
10
0
0
26

d
1
3.5
7
0
0

GI
1.25
2.5
1.25
0
0
Toe
Heel

187188545.xls.ms_office - Rev. 2.0

G VII

Shear
GI

G VII

1937.4 1541.9 880.62 700.85


-470 -264.8
470
264.83
1617.9 195.4 647.1
78.1

1937.4 1541.9 880.62 700.85


1147.9 -69.48 1117.1 342.97

7 / 16

11/10/2013

TK9764 - I/C No. 10

Transversa

Pile 3

d1

Pile 6

Pile 1

p1

p3

p2

s1

s3

d2

d1

s2

d3

d2

D
d3
Pile 5

Longitudinal
Pile 4

187188545.xls.ms_office - Rev. 2.0

8 / 16

Pile 2

11/10/2013

TK9764 - I/C No. 10


DESIGN FOR MOMENT

1 - Stem
1(per meter)
A=
Yt =
Ig =

Stem
Mu =
d=
fr =
Mcr =
1.2 Mcr =
m=
Rn =
r=
a=

KN.m

As =

cm2

m
Mpa
KN.m
KN.m

Mpa
%
cm

1.30
0.65
0.183

(m2)
(m)
(m4)

GROUP I

GROUP VII

1994.3
1.17
3.1
885.1
1062.2 1.2 Mcr < Mu, OK
19.76
1.61872
0.401
9.28
0.33

2807.7
1.17
3.1
885.1
1062.2 1.2 Mcr < Mu, OK
19.76
2.27896
0.575
13.30
0.33

46.96

67.31

2 - Toe
2(per meter)
A=
Yt =
Ig =

1.50
0.75
0.281

(m2)
(m)
(m4)

2
2

Toe

GROUP I

Mu =
d=
fr =
Mcr =
1.2 Mcr =
m=
Rn =
r=
a=

KN.m

As =

cm2

m
Mpa
KN.m
KN.m

Mpa
%
cm

1438.2
1.35
3.1
1178.4
1414.1 1.2 Mcr < Mu, OK
19.76
0.8768
0.213
5.69
27
28.79

187188545.xls.ms_office - Rev. 2.0

GROUP VII

1157.9
1.35
3.1
1178.4
1414.1 Redesign elastic
19.76
0.70591
0.171 use rmin = 0.18%
4.56
27
23.08

9 / 16

Asmin = 27 cm2

11/10/2013

TK9764 - I/C No. 10

3 - Heel
3(per meter)
A=
Yt =
Ig =

1.50
0.75
0.281

(m2)
(m)
(m4)

Heel
Mu =
d=
fr =
Mcr =
1.2 Mcr =
m=
Rn =
r=
a=
As =

KN.m
m
Mpa
KN.m
KN.m

Mpa
%
cm

cm2

GROUP I

GROUP VII

656
1.35
3.1
1178.4
1414.1 Redesign elastic
19.76
0.39972
0.096 use rmin = 0.18%
2.56
27
12.97 Asmin = 27 cm2

1457
1.35
3.1
1178.4
1414.1 1.2 Mcr < Mu, OK
19.76
0.88815
0.216
5.77
29.17

Summary of Reinforcement 1/2


Foundation
POZ
No.

cm2 / m

As

01
02
03
04
05
06
07
08
09
10
11
12
13
14

28.79
29.17
27.00
27.00
27.00
5.33
5.33
5.33
19.50
53.33
13.98
3 No

CAP
DIAM.

ARALIK ARALIK
SPAC.
SPAC.

mm

Cm

Cm

20

10.91
10.77
18.18
18.18
18.18
28.86
37.70
37.70
16.11
15.08
35.10
-

15

20
25
25
25
14
16
16
20
32
25
20

187188545.xls.ms_office - Rev. 2.0

15
15
15
15
25
25
25
15
15
15
100

ADET
No.
Unacceptable Spac.
Unacceptable Spac.
Spac. OK
Spac. OK
Spac. OK
Spac. OK
Spac. OK
Spac. OK
Spac. OK
Spac. OK
Spac. OK
Spac. OK

10 / 16

11/10/2013

TK9764 - I/C No. 10

Summary of Reinforcement 2/2


wall
POZ
No.

cm2 / m

As

18
27
23
24
25
26

#REF!
#REF!
#REF!
#REF!
-

CAP
DIAM.

ARALIK ARALIK
SPAC.
SPAC.

mm

Cm

Cm

16
14
16
14
16
16

#REF!
#REF!
#REF!
#REF!
-

15
15
15
15
20

ADET
No.
#REF!
#REF!
#REF!
#REF!
-

Wall min horiz/face


BackWall min horiz
Back Wall min vert
Bracket long steel
Bracket Main steel
Bracket Dowel bars

13
11
04

12
05,06 & 07

03
08, 09&10
14

05,06 & 07

187188545.xls.ms_office - Rev. 2.0

01

11 / 16

02

11/10/2013

TK9764 - I/C No. 10


DESIGN FOR MOMENT

1 - Stem
1(per meter)
A=
Yt =
Ig =

Stem
Mu =
d=
fr =
Mcr =
1.2 Mcr =
m=
Rn =
r=
a=

KN.m

As =

cm2

m
Mpa
KN.m
KN.m

Mpa
%
cm

1.30
0.65
0.183

(m2)
(m)
(m4)

GROUP I

GROUP VII

1994.3
1.17
3.1
885.1
1062.2 1.2 Mcr < Mu, OK
19.76
1.61872
0.401
9.28
0.33

2807.7
1.17
3.1
885.1
1062.2 1.2 Mcr < Mu, OK
19.76
2.27896
0.575
13.30
0.33

46.96

67.31

2 - Toe
2(per meter)
A=
Yt =
Ig =

1.50
0.75
0.281

(m2)
(m)
(m4)

2
2

Toe
Mu =
d=
fr =
Mcr =
1.2 Mcr =
m=
Rn =
r=
a=

KN.m

As =

cm2

m
Mpa
KN.m
KN.m

Mpa
%
cm

GROUP I

GROUP VII

1228.4
1.35
3.1
1178.4
1414.1 Redesign elastic
19.76
0.7489
0.182
4.84
27

-795.3
1.35
3.1
1178.4
1414.1 Redesign elastic
19.76
-0.4849
-0.114 use rmin = 0.18%
-3.05
27

24.51

187188545.xls.ms_office - Rev. 2.0

-15.41

12 / 16

Asmin = 27 cm2

11/10/2013

TK9764 - I/C No. 10

3 - Heel
3(per meter)
A=
Yt =
Ig =

1.50
0.75
0.281

(m2)
(m)
(m4)

Heel
Mu =
d=
fr =
Mcr =
1.2 Mcr =
m=
Rn =
r=
a=
As =

KN.m
m
Mpa
KN.m
KN.m

Mpa
%
cm

cm2

GROUP I

GROUP VII

811
1.35
3.1
1178.4
1414.1 Redesign elastic
19.76
0.4945
0.119 use rmin = 0.18%
3.18
27
16.08 Asmin = 27 cm2

1387
1.35
3.1
1178.4
1414.1 Redesign elastic
19.76
0.84579
0.206
5.48
27.75

Summary of Reinforcement 1/2


Foundation
POZ
No.

cm2 / m

As

01
02
03
04
05
06
07
08
09
10
11
12
13
14

27.00
27.75
27.00
27.00
27.00
5.33
5.33
5.33
19.50
53.33
13.98
3 No

CAP
DIAM.

ARALIK ARALIK
SPAC.
SPAC.

mm

Cm

Cm

25

18.18
17.69
18.18
18.18
18.18
28.86
37.70
37.70
16.11
15.08
35.10
-

15

25
25
25
25
14
16
16
20
32
25
20

187188545.xls.ms_office - Rev. 2.0

15
15
15
15
25
25
25
15
15
15
100

ADET
No.
Spac. OK
Spac. OK
Spac. OK
Spac. OK
Spac. OK
Spac. OK
Spac. OK
Spac. OK
Spac. OK
Spac. OK
Spac. OK
Spac. OK

13 / 16

11/10/2013

TK9764 - I/C No. 10

Summary of Reinforcement 2/2


wall
POZ
No.

cm2 / m

As

18
27
23
24
25
26

#REF!
#REF!
#REF!
#REF!
-

CAP
DIAM.

ARALIK ARALIK
SPAC.
SPAC.

mm

Cm

Cm

16
14
16
14
16
16

#REF!
#REF!
#REF!
#REF!
-

15
15
15
15
20

ADET
No.
#REF!
#REF!
#REF!
#REF!
-

Wall min horiz/face


BackWall min horiz
Back Wall min vert
Bracket long steel
Bracket Main steel
Bracket Dowel bars

13
11
04

12
05,06 & 07

03
08, 09&10
14

05,06 & 07

187188545.xls.ms_office - Rev. 2.0

01

14 / 16

02

11/10/2013

TK9764 - I/C No. 10


DESIGN FOR SHEAR

1 - Stem
1(per meter)
Stem
Vu =
d=
vu =
vc =

GROUP I

Mpa

527.8
1.17
0.45
0.83

Mpa

0.71

KN/m
m
Mpa

f vc =

GROUP VII

597.8
1.17
0.51
0.83
vc > vu, OK

0.71

vc > vu, OK

2 - Toe
2(per meter)
Toe
Vu =
d=
vu =
vc =

GROUP I

Mpa

724.6
1.35
0.54
0.83

Mpa

0.71

KN/m
m
Mpa

f vc =

GROUP VII

580.9
1.35
0.43
0.83
vc > vu, OK

0.71

vc > vu, OK

3 - Heel
3(per meter)
#####
Heel
Vu =
d=
vu =
vc =

GROUP I

Mpa

-14.1
1.35
-0.01
0.83

Mpa

0.71

KN/m

f vc =

m
Mpa

GROUP VII

408.8
1.35
0.30
0.83
vc > vu, OK

0.71

vc > vu, OK

4 - Check for Punching


4(per meter)
b0 =
d=
Corner Pile
Pmax =
Vn =
f Vn =

KN
KN
KN

4.10
1.35

(m)
(m)

GROUP I

2202
8847
7520 Vn > Pmax, OK

187188545.xls.ms_office - Rev. 2.0

GROUP VII

1773
8847
7520 Vn > Pmax, OK

15 / 16

11/10/2013

TK9764 - I/C No. 10


DESIGN FOR SHEAR

1 - Stem
1(per meter)
Stem
Vu =
d=
vu =
vc =

GROUP I

Mpa

527.8
1.17
0.45
0.83

Mpa

0.71

KN/m
m
Mpa

f vc =

GROUP VII

597.8
1.17
0.51
0.83
vc > vu, OK

0.71

vc > vu, OK

2 - Toe
2(per meter)
Toe
Vu =
d=
vu =
vc =
f vc =

GROUP I

Mpa

468.2
1.35
0.35
0.83

Mpa

0.71

KN/m
m
Mpa

GROUP VII

-209.8
1.35
-0.16
0.83
vc > vu, OK

0.71

vc > vu, OK

3 - Heel
3(per meter)
#####
Heel
Vu =
d=
vu =
vc =
f vc =

GROUP I

Mpa

284.7
1.35
0.21
0.83

Mpa

0.71

KN/m
m
Mpa

GROUP VII

487.0
1.35
0.36
0.83
vc > vu, OK

187188545.xls.ms_office - Rev. 1.0

0.71

vc > vu, OK

16 / 16

11/10/2013

S-ar putea să vă placă și