Sunteți pe pagina 1din 9

Chevron Bangladesh Drilling Morning Report

Date: 10/29/2013

W
e

R
p
t
N
o
:

S
l
o
t
:
8

R
i

3
8
u
d
:
3
6
.
1
0

Hour

s: 12.00
Days Since Last DAFW / RI Case :
1,085 / 129

SBU Drilling Well Category : Drlg


Well Category 1

Depth End (MD) (mOTH): 4,031


TVD End (mOTH): 3,670.26
Fi
Original Spud
el
Date
d
Country
N
Bangladesh
a
m
e
B
ib
iy
a
n
a
Actual Start
Actual End Date
Date
Target Depth (MD)
7/1
(mOTH)
6/2
013
18:
00

Water Depth (m)


Original KB to Mud Line (m)

4
, Target
0 Depth
8
0 (TVD)
(mOTH)

AFE/WBS Number

3,7
21.
52

Total AFE Amount (Cost)

Safety
Check

Tour

Pre-Job Meeting

10/29/2013 00:00

Pre-Job Meeting

Night

10/29/2013 00:00

Pre-Job Meeting

Night

10/29/2013 00:00

Pre-Tour Safety Meeting

Night

10/29/2013 00:00

Pre-Job Meeting

Night

10/29/2013 00:00

Pre-Job Meeting

Night

10/29/2013 06:00

Pre-Job Meeting

Day

10/29/2013 06:00

Pre-Job Meeting

Day

10/29/2013 06:00

Pre-Job Meeting

Day

10/29/2013 06:00

Pre-Job Meeting

Day

10/29/2013 06:00

Pre-Job Meeting

Day

Night

Pre-Tour

10/29/2013 06:30

Pre-Job

10/29/2013 06:30

Pre-Job

10/29/2013 07:00

Pre-Job

10/29/2013 10:00

Pre-Job

10/29/2013 10:00

Pre-Job

10/29/2013 10:00

Pre-Job

10/29/2013 10:00

Pre-Job

10/29/2013 10:00

PTW Au

10/29/2013 11:00

Safety P

10/29/2013 11:30

Pre-Tour

Safety /
Environmental
Incidents
Incident
Cat.
Incident
Desc

D
ai
ly
O
p
er
at
io
n
s
R
e
p
or
t
St
ar
t
D
at
e

100632
Safety/Inspections
at
10/29/2013 00:00

10/29/2013 06:30

D
ai
Changing liner of mud pump
ly
RADAR, Ops, Tnt#09 & GEMS#02
Fi
Cellar entry @BYWP (PTW)
el
Gen. Forklift Ops @BYWP
Gen. Crane Lifting @BYWP
d
General Hotwork at workshop
E
Drill pipe inspection by Smith
st
Work on TDS/ Drawworks
T
Diesel Transfer @BYWP(PT
ot
Gen. Crane Lifting @BYWP

Replace lamp clean light

al
10/
(
29/
C
20
o
13
s
00:
t)
37
00
1,
Cum
87
7 Field
Est To
Date
(Cost)

No
safe
or
env
nme
al
incid
nt
Rep
End

Daily
Mud
Field
Est
(Cost)
Cum
Mud
Cost
to
13,
Date
165
(Cost)
,91
8911,39
0

10/29/201

3 12:00

Drilling Hours (hr)


Cum Rotating Hrs on

Casing

Operations Summary
Cont. TOH 5" DP & RTTS running tool. Pull wear bushing, R/U TRS 5.5"
handling equipment. RIH 16 jnt 5.5" tubing t/152.45m. P/U & M/U tubing
hanger assembly & landing jnt. RIH & land tubing hanger. Set tubing
hanger pack-off at 5000 psi. Test tubing hanger pack-off seal w/5000 psi.
N/D 13 5/8" BOP stack. Install tubing bonnet and temporary wellhead.
Pressure test bonnet seal carrier and wellhead @5000 psi.
Rig move from BY-18 to BY-19. Operations temporary suspended on BY-18.
Comments
Max Drill Gas
Avg Background Gas
Head Count
Required Matls next day
Halliburton batch mixer in customs.
CCTV: driller has camera for derrick,stabbing board,
mud pump. STP recorder non-operational.
Safety Observation Cards
Observation Typ
# Rpts
Com
60 Observed personnel was going to use
an extension pipe with chain tong.
Stopped him and reminded him to
operate within design then we used
two chain tong to do that job. Tenet #1
Harun Mia WDI Derrickman
D
a
il
y
C
o
n
t
a
c
t
s
D
e
w
a
y
n
e
C
o
l
e

Raymond Teale

1
4
8
.
0

ta

ct
Page 1/5

Report
Printed :
10/30/2013

Chevron Bangladesh Drilling Morning Report

Date: 10/29/2013

W
e

R
p
t
N
o
:

R
i

S
l
o
t
:
8

S
B
U
D
ri
ll
i
n
g
W
e
ll
C
a
t
e
g
o
r
y
:
D
rl
g
W
e
ll
C
a
t
e
g
o
r
y
1
Daily Contacts
Passagon Heamtanon
Randy Roberts
Palash Saha

3
8
H
o
u
r
s
:
1
2
.
0
0
Day
s
Sin
ce
Las
t
DA
FW
/ RI
Cas
e:
1,08
5 /
129

Miah Mohammed Fahad


Time Log
Start Time

End Time

Phase

00:00

01:30

PRODTBG, TBG

TOH

01:30

02:30

PRODTBG, TBG

02:30

03:30

03:30

04:30

04:30

07:00

07:00

12:00

Acti
vity

Dur
(hr)

Unsc
hed
Even

1.

Yes

WHDWB

1.

PRODTBG, TBG

TBGRUN

PRODTBG, TBG

TIH

1.
0
1.

PRODTBG, TBG

TBGLNDHGR

0
2.

BOPN/D

5.00

PRODTBG, TBG

UE
Time
(

UE
Ref
N

1.

13

Cont to TOH w/ 5'' DP & RTTS running tool


T/surface. Inspect & L/D running tool. Shift 15 stds 5''
fr. drillers side to off driller side for wt distribution to

Yes

1.

13

Pull wear bushing and M/U wash tool & wash


seating profile.

Yes

1.
0
1.

13

R/U TRS 5.5'' handling

13

RIH 16 joints 5.5'' tubing to

13

P/U & M/U tubing hanger assembly & landing joint.RIH


land tubing hanger visually check if tubing hanger
(ok). Line up to pump down choke line. Fill stack &
VBR's. Pressure up to 5000 psi & set tubing hanger
-off (pack off start setting at 3,000 psi).
hanger pack off seal with 5000 psi

Yes

0
2.

Yes

Nipple down 13 5/8" BOP stack and nipple up on


Skid rig forward.
Rig move from BY-18 to BY-19 at 12:00
****Operations Temporarily suspended on
Offline activities: Install Tubing bonnet and
wellhead. Pressure test bonnet seal carrier and
wellhead to 5000 psi. Install

Personnel
Company

Total
Headcount

Chevron

SSE

16

Weatherford

17

Rig Expat

Weatherford

45

Rig National

Weatherford

22

Shamolima Catering

Aker-Kvaerner

Wellhead Eng

Weatherford

LWD/MWD

Halliburton

Cementing

Weatherford

DD

MI Swaco

Mud Engineers

Weatherford

Gyrodata

Weatherford

TRS

Brandt - NOV

Solids Control

HAL - Wireline

Wireline

Weatherford

SLS

Weatherford

Ayun ent

Chevron

PetroBangla

Smith
International
Schlumberger

Inspection

Weatherford

Completion/Liner hands

Weatherford

Shafiq Brothers

Chevron

WWT

Slickline

Page 2/5

Report Printed :
10/30/2013

Chevron Bangladesh Drilling Morning Report

Well Name: Bibiyana-18


Slot: 8
Rig: WDI 801

Date: 10/29/2013

Total Time: 36.10


Time from Spud: 36.10

End Date:

SBU Drilling Well Category : Drlg Well Category 1

Rpt No: 38
Hours: 12.00

Days Since Last DAFW / RI Case :

1,085 / 129

Personnel
Compan
y

Weatherford

Total
Headcount

S
S

BanglaCat

Weatherford

Bangla Industrial

Chevron

Hunting Casing

Weatherford

11

Weatherford

NOV Tech
Cenelec

Chevron

HES

Weatherford

SPM

Weatherford

MD Totco Tech

Weatherford

LAMPRELL

Mud Checks
Date

Depth (MD) (mOTH)

10/29/2013 12:00

Depth (TVD) (mOTH)

4,031.0

Flow Line Temperature (C)

Fluid Density (lb/gal)

3,670.26
Gel 10 sec (lbf/100ft)

13.20
Vis 3rpm

Vis 6rpm

Filtration Sz (m)

High Gravity Solids (lb/bbl)

Gel 10 min (lbf/100ft)

294,674.
00
24.87

API Filtrate (cc/30min)

17
PV Calc (Pas)

71

Water Phase Salinity (mg/L)

725.0
Retort Solids (% by Volume) (%)

348,900

27.00
API Filter Cake (1/32")

ROC (Wet) (% by wt) (lb/lb)

Retort Water by Volume (%)

Retort NAF by Volume (%)

14.50

58.50

HTHP Filtrate (cc/30min)

80.1/19.9
Weather Conditions
Wave Ht (m)

YP Calc (lbf/100ft)

33.0

93
Electric Stability (V)

301.15
NaCl (mg/L)

Gel 30 min (lbf/100ft)


Funnel Viscosity (s/qt)

55

Corrected Solids (%)

Checked By

30.0

CaCl2 (mg/L)

49,500

NAF/Water Ratio

Active Pit

Vis 600rpm

9
Chlorides (mg/L)

Sample Source

NAF

22.0
Vis 300rpm

pH

Mud/Brine Type

HTHP Filter Cake (1/32")

2.4
Swell Ht (m)

Wave Dir ()

Wind Spd (knots)

Wind Dir

P Bar (mmHg)

Arrival Date

Depart Date

T High (C)

T Low (C)

Visibility (km)

Support Vessels
Vessel
Name

Vessel
Type

N
ot

Unscheduled Events
Refer
en ce
No.

13

Start Date

End Date

10/25/2013

10/29/2013

Event Type

NPT

Unsch Maj
Cat
EQP

Unsch Detail

Descript
ion
Trouble with liner hanger
set. Problem
with establish the circulation,
restricted on flow path.

CSG LN

Accountable
Party
Rig
Contractor

Mud Additive Amounts


Barite

De
s

10/29/2013

D
at

R
e

Consumed

Contractor

Weatherford
Casing &
Tubing
Running,
Liner
Hngrs/Whi
pst ocks
On
Loc

0.0

Base Oil Df1

10/29/2013

0.0

Ca Carb Fine

10/29/2013

0.0

Cacl2 / Nacl

10/29/2013

0.0

Caustic Soda

10/29/2013

0.0

Duo-Vis

10/29/2013

0.0

HRP

10/29/2013

0.0

Kwik Seal M
Lime

10/29/2013
10/29/2013

0.0
0.0

M-I Gel

10/29/2013

0.0

Mix 11F

10/29/2013

0.0

Nova Plus

10/29/2013

0.0

Novatec F

10/29/2013

0.0

Novatec S

10/29/2013

0.0

Pipelax-W

10/29/2013

0.0

Poly Plus

10/29/2013

0.0

Pot. Sulphate

10/29/2013

0.0

Page 3/5

Report Printed : 10/30/2013

Chevron Bangladesh Drilling Morning Report

Well Name: Bibiyana-18


Slot: 8
Rig: WDI 801

Date: 10/29/2013

Total Time: 36.10


Time from Spud: 36.10

End Date:

SBU Drilling Well Category : Drlg Well Category 1

Rpt No: 38
Hours: 12.00

Days Since Last DAFW / RI Case :

1,085 / 129

Mud Additive Amounts


De
s

Safe Surf W

10/29/2013

D
at

R
e

Consumed

On
Loc

0.0

Safecide

10/29/2013

0.0

Saraline

10/29/2013

0.0

Versamod

10/29/2013

0.0

Versatrol M

10/29/2013

0.0

VG Plus

10/29/2013

0.0

VG-69

10/29/2013

0.0

Job Supply Amounts


Supply Item
Des

Diesel

Recei
ved

at
10/29/2013

Consumed

Drill String/BHA
BHA #<stringno>, <des>
Bit Run

Drill Bit

Length (m)

Nozzles (1/32")

IADC Bit Dull

Cum On Loc

4,39
1.0
Bit Total Fluid Area (nozzles) (in)

String Length (m)

0.0

BHA ROP (m/hr)

Max Nominal OD (in)

String Components
Comment

String/BHA Components
Item
Des

Len
(m)

Mass/Len (lb/ft)

Drilling Parameters
Wellbore

Depth Start (MD)


(mOTH)

Cum Depth Drilled (mOTH)

TVD Start (mOTH)

Cum Drilling Time (hr)

Pick-Up String Weight (1000lbf)

Depth End (MD)


(mOTH)

Flow Rate (gpm)

TVD End (mOTH)

Weight on Bit (1000lbf)

Drill Time (hr)

On Bottom Drill Time


(hr)

RPM (rpm)

Interval ROP (m/hr)

Stand Pipe Pressure (psi)

Drill Str Wt (1000lbf)

Drilling Torque

Weight of String in Air (1000lbf)

Slack-Off String Weight (1000lbf)

Set Depth (MD) (mOTH)

Set Depth (TVD) (mOTH)

Run Date

Casing Strings
Casing Description
Comment

Casing Components
Top Depth
(MD)
(mOTH)

Btm Depth
(MD)
(mOTH)

Len
(m)

J
t

Item
Des

OD
(in)

ID
(in)

Tubing Strings
Tubing Description

Set Depth (MD) (mOTH)

Tubing

Run Date

199.21

10/29/20
13

Comment

Run 16 Jnts of 5 1/2" tubing


Tubing Components
Item
Des

Tubing Hanger
Pup Joint
5 1/2" Tubing

J
t

1
16

BOP Test
10/22/2013

Dat
e

Len
(m)

0.49
2.89
183.
31

OD
(in)

ID
(in)

9 5/8
5 1/2
5 1/2

Top (mOTH)

4.778
4.778
4.778

Btm (mOTH)

12.
52

13.
01

15.
90

199.
21

C
o
Perform full BOP test. Annular 250/3500 psi other test 250/5000
psi

Wellbores
Wellbore Name

Parent Wellbore

Original Hole
Directional Surveys

Original Hole

Description

Date

Actual Survey

7/18/20
13

Page 4/5

Report Printed : 10/30/2013

Chevron Bangladesh Drilling Morning Report

Well Name: Bibiyana-18


Slot: 8
Rig: WDI 801

Date: 10/29/2013

Total Time: 36.10


Time from Spud: 36.10

End Date:

SBU Drilling Well Category : Drlg Well Category 1

Rpt No: 38
Hours: 12.00

Days Since Last DAFW / RI Case :

1,085 / 129

Survey Data
Dat
e

MD (mOTH)

Incl
()

Azm
()

TVD (mOTH)

Page 5/5

VS
(m)

NS
(m)

EW
(m)

DLS (/30m)

Report Printed : 10/30/2013

S-ar putea să vă placă și