Sunteți pe pagina 1din 18

Instructions

Title
Prestress Concrete SLS Check

NOTE
Although I have endeavoured to check this spreadsheet, I cannot gaurantee that it
contains no errors. I recommend that you complete your own design check of the
results prior to using this for detailed design.
Revision
Vision Revision
1.0
First version

Date
11/28/2011

Spreadsheet Limitations
1
2
3

Instructions
This spreadsheet is designed to Prestress Concrete SLS Check

Page 1

Made by

Instructions
1
2

Input the shaded cells only

Page 2

MAuNSELL | AECOM

Contract

Job ref.

Part of
structure

Calc.sheet No.

Drawing ref.

Calculated by

3.1

Checked by

60095653

Date

Material properties

1. Properties of Concrete:
Characteristic compressive cylinder strength of concrete at 28 days (f 'c):
For beam: f 'c.beam =

50.00 (Mpa)

f 'c.slab =

40.00 (Mpa)

For slab:

At transfer Strength of concrete fcp is:

0.80 f 'c

(To propose)

fcp = 0.8f 'c =

40.00 (Mpa)

Elasticity modulus

Ec.50 =

27400.00 (MPa)

Elasticity modulus

Ec.40 =

24000.00 (MPa)

2. Concrete stress limitation for prestressing:


(1). Allowable compressive stress (refer to BS5400 part4 clause 6.3.2.2):
At transfer: sc.transfer = 0.5 fcp =

20.00 (Mpa)

Serviceability stage: sc.serviceability.top = 0.40 f 'c.beam =

20.00 (Mpa)

sc.serviceability.bot = 0.40 f 'c.beam =

20.00 (Mpa)

(2). Allowable tensile stress (refer to BS5400 part4 clause 6.3.2.4):


At transfer: st.transfer =
class 1:
class 2:

-1.00 (Mpa)

Serviceability stage: st.serviceability.top =

0.00 (Mpa)

st.serviceability.bot =

0.00 (Mpa)

Serviceability stage: st.serviceability.top =

-3.20 (Mpa)

st.serviceability.bot =

-3.20 (Mpa)

3. Properties of Tendons :
For 7-wire super standard

fp = 1770.00 (Mpa)
fpy = 1504.50 (Mpa)
Ap =

Breaking load (kN) Pbreaking =


Elasticity modulus

(0.85fp)

150.00 (mm )
265.00 (kN)

Ep = 195000 (Mpa)
dp =

15.70 (mm)

Foe grade D500N deformed bars

fsy =

500.00 (Mpa)

Elasticity modulus

Es =

200000 (Mpa)

4. Properties of Reinforcement:

189888032.xls.ms_office:3.1STRENGHT

3 of 18

MAuNSELL | AECOM

Job ref.
Calc.sheet No.

Drawing ref.

Calculated by

3.2
1. Properties of Tendons:

Checked by

Date

Tendons design
Beam converse-section 2

fp =

1770.00 (Mpa)

fpy =

1504.50 (Mpa)

Ap =

150.00 (mm2)

Breaking load (kN) Pbreaking =

60095653

Contract
Part of
structure

modular ratio
(0.85fp)

Area of converse-section
A1=

265.00 (kN)

Jacking forces Pjack =

1.788 (m2)

A2=

2.195 (m2)

Sg2=

0.011 (m3)

first moment of tendons about the neutral axis of gross

0.75 Pbreaking = 198.75 (kN)


0.75 f p =
1327.50 (Mpa)

Jacking stress s jack =

Beam-slab conversion-section 2

7.117

n=

2. Allowable compressive & tensile stress for concrete:

cross-section Sg1=

0.008 (m )

distance from the barycenter of the conversion-section to


barycenter of the gross cross-section dh1=

0.004 (m)

dh2=

0.005 (m)

s c.transfer =

20.00 (Mpa)

barycenter of the converse-section

0.791 (m)

y2=

0.939 (m)

s t.transfer =

-1.00 (Mpa)

moment of inertia of converse-section I1=

0.328 (m4)

I2=

0.542 (m4)

y1=

3. Section properties:

dslab =
gross cross-section
Beam-slab conversion-section 2
2

Beam transform-section 2

Beam solid section 1

cross-section 2

0.20 (m)

solid section 1

Ae1=

0.964 (m2)

Abeam =

1.788 (m2)

1.766 (m2)

A0 =

2.195 (m2)

2.173 (m2)

Ae2=

1.371 (m2)

Ie1=

0.045 (m4)

Ibeam =

0.328 (m4)

0.326 (m4)

I0 =

0.542 (m4)

0.536 (m4)

Ie2=

0.106 (m4)

ye1=

0.384 (m)

ybeam =

0.791 (m)

0.796 (m)

y0 =

0.939 (m)

0.944 (m)

ye2=

0.520 (m)

de1=

0.750 (m)

dbeam =

1.500 (m)

1.500 (m)

d0 =

1.700 (m)

1.700 (m)

de2=

0.950 (m)

Z e1t=

0.122 (m3)

0.463 (m3)

0.462 (m3)

0.712 (m3)

0.710 (m3)

Z e2t=

0.246 (m3)

Z e1b=

Z beam.top =

-0.116 (m )

Z beam.bot =

-0.415 (m )

Beam converse-section 3

Z 0.top =

-0.409 (m )

A1=

1.106 (m )

A2=

1.525 (m )

0.005 (m3)

Sg2=

0.011 (m3)

distance from the barycenter of the conversion-section to


barycenter of the gross cross-section dh1=

0.005 (m)

dh2=

0.007 (m)

barycenter of the converse-section

0.680 (m)

y2=

0.930 (m)

0.216 (m4)

I2=

0.468 (m4)

y1=

moment of inertia of converse-section I1=

Beam converse-section 4

0.796 (m2)

Z e2b=

-0.204 (m3)

0.965 (m3)

Z e2.top1 =

0.460 (m3)

0.019 (m3)

barycenter of the converse-section

0.023 (m)

y1=

moment of inertia of converse-section I1=

gross cross-section
Beam-slab conversion-section 3
3
1.084 (m2)
4

A0 =

cross-section 3

1.525 (m2)
4

1.502 (m2)

Ibeam =

0.216 (m )

0.215 (m )

I0 =

0.468 (m )

0.463 (m4)

ybeam =

0.680 (m)

0.685 (m)

y0 =

0.930 (m)

0.937 (m)

dbeam =

1.500 (m)

1.500 (m)

d0 =

1.700 (m)

Z beam.top =

0.264 (m )

0.264 (m )

Z 0.top =

0.607 (m )

0.606 (m3)

Z beam.bot =

-0.318 (m3)

-0.314 (m3)

Z 0.bot =

-0.503 (m3)

-0.494 (m3)

Z 0.top1 =

0.820 (m3)

0.821 (m3)

gross cross-section
Beam-slab conversion-section 4
4

1.700 (m)

cross-section 4

Abeam =

0.796 (m2)

0.752 (m2)

A0 =

1.210 (m2)

1.166 (m2)

I0 =

0.416 (m4)

0.393 (m4)

1.210 (m2)

Ibeam =

0.176 (m4)

0.176 (m4)

ybeam =

0.670 (m)

0.693 (m)

y0 =

0.985 (m)

1.012 (m)

Sg2=

0.033 (m3)

dbeam =

1.500 (m)

1.500 (m)

d0 =

1.700 (m)

1.700 (m)

Z beam.top =

0.212 (m3)

0.219 (m3)

Z 0.top =

0.582 (m3)

0.571 (m3)

Z beam.bot =

-0.262 (m3)

-0.254 (m3)

Z 0.bot =

-0.422 (m3)

-0.388 (m3)

distance from the barycenter of the conversion-section to


barycenter of the gross cross-section dh1=

1.106 (m2)

A2=

first moment of tendons about the neutral axis of gross


cross-section Sg1=

-0.568 (m )

0.966 (m3)

Beam transform-section 4

Beam-slab conversion-section 4

Area of converse-section
A1=

-0.577 (m )

Abeam =

first moment of tendons about the neutral axis of gross


cross-section Sg1=

Z 0.bot =
Z 0.top1 =

Beam transform-section 3

Beam-slab conversion-section 3

Area of converse-section
2

dh2=

0.027 (m)

0.670 (m)

y2=

0.985 (m)

0.176 (m4)

I2=

0.416 (m4)

Z 0.top1 =

0.808 (m )

0.821 (m3)

4. Section properties accounting for tendons:


No. of strand at height of yi (mm)
NODE

189888032.xls.ms_office:3.2TENDOU DESIGN

60.00

110.00

160.00

210.00

260.00

500.00

1400.00

60.00

50.00

50.00

50.00

50.00

240.00

900.00

Sni

Sniyi

yp (mm)

ebeam.p
(m)

e0.p
(m)

Zbeam.p
(m3)

(m3)

(ybeam-yp)

(y0-yp)

Ibeam/ep.beam

I0/ep.0

Z0.p

24.00

10880.00

453.33

0.34

0.49

0.97

1.11

6.25

0.25

24.50

10922.50

445.82

0.35

0.49

0.95

1.10

6.25

0.25

24.50

10922.50

445.82

0.23

0.48

0.92

0.97

28.50

11325.00

397.37

0.27

0.59

0.64

0.71

15

42.00

12410.00

295.48

0.37

0.69

0.47

0.60

17

10.50

45.50

12695.00

279.01

0.39

0.71

0.45

0.59

17

13

48.00

12970.00

270.21

0.40

0.71

0.44

0.58

17

13

48.00

12970.00

270.21

0.40

0.71

0.44

0.58

17

13

48.00

12970.00

270.21

0.40

0.71

0.44

0.58

10

17

10.50

45.50

12695.00

279.01

0.39

0.71

0.45

0.59

11

15

42.00

12410.00

295.48

0.37

0.69

0.47

0.60

12

28.50

11325.00

397.37

0.27

0.59

0.64

0.71

13

6.25

0.25

24.50

10922.50

445.82

0.23

0.48

0.92

0.97

13

6.25

0.25

24.50

10922.50

445.82

0.35

0.49

0.95

1.10

14

24.00

10880.00

453.33

0.34

0.49

0.97

1.11

4 of 18

MAuNSELL | AECOM

60095653

Contract

Job ref.

Part of
structure

Calc.sheet No.

Drawing ref.

Calculated by

Checked by

Date

5. Stress of section due to tendons:


Assume effect prestress =
Tendons area
Ap (mm2)

Sni

NODE

70.00% Pjeck

Assume
effect
prestress

ebeam.p (m)

Stress due to DL1 at SLS (MPa)

Stress due to prestress (MPa)

Stress in cross
(MPa)

Allowable stress
(MPa)

CHECKING

24

3600.00

70%Pjack
(kN)
3339.00

0.34

-0.569

4.59

113.66

0.25

-0.27

-0.32

4.31

20.00

-1.00

OK !

25

3675.00

3408.56

0.35

-0.636

4.75

361.19

0.78

-0.87

0.14

3.88

20.00

-1.00

OK !

25

3675.00

3408.56

0.23

0.055

5.59

361.19

1.37

-1.14

1.42

4.46

20.00

-1.00

OK !

stop.P

sbot.P

stop.P

MDL1 (kNm)

sbot.P

stop.P

sbot.P

sc

st

29

4275.00

3965.06

0.27

-0.127

9.10

597.25

2.82

-2.28

2.69

6.83

20.00

-1.00

OK !

42

6300.00

5843.25

0.37

-3.001

15.69

1170.95

5.53

-4.47

2.53

11.22

20.00

-1.00

OK !

46

6825.00

6330.19

0.39

-3.743

17.39

1581.79

7.47

-6.03

3.73

11.36

20.00

-1.00

OK !

48

7200.00

6678.00

0.40

-4.227

18.57

1828.76

8.64

-6.98

4.41

11.60

20.00

-1.00

OK !

48

7200.00

6678.00

0.40

-4.227

18.57

1911.99

9.03

-7.29

4.81

11.28

20.00

-1.00

OK !

48

7200.00

6678.00

0.40

-4.227

18.57

1831.41

8.65

-6.99

4.43

11.59

20.00

-1.00

OK !

10

46

6825.00

6330.19

0.39

-3.743

17.39

1587.22

7.50

-6.05

3.76

11.34

20.00

-1.00

OK !

11

42

6300.00

5843.25

0.37

-3.001

15.69

1179.72

5.57

-4.50

2.57

11.19

20.00

-1.00

OK !

12

29

4275.00

3965.06

0.27

-0.127

9.10

608.17

2.87

-2.32

2.75

6.78

20.00

-1.00

OK !

13

25

3675.00

3408.56

0.23

0.055

5.59

374.81

1.42

-1.18

1.47

4.41

20.00

-1.00

OK !

13

25

3675.00

3408.56

0.35

-0.636

4.75

374.81

0.81

-0.90

0.17

3.84

20.00

-1.00

OK !

14

24

3600.00

3339.00

0.34

-0.569

4.59

116.71

0.25

-0.28

-0.32

4.31

20.00

-1.00

OK !

25.00
20.00

Allowable compressive stress

15.00

stress of beam top

10.00

stress of beam bottom

5.00

Allowable tensile stress

0.00
-5.00

189888032.xls.ms_office:3.2TENDOU DESIGN

10

11

12

13

14

15

5 of 18

MAuNSELL | AECOM

Contract

Job ref.

Part of
structure

Calc.sheet No.

Drawing ref.

Calculated by

Checked by

60095653

Date

Stress due to tendons at transfer:


P = 6678.00 (kN)

Prestressing force in tendons


Eccentricity of prestrssong fouce(P)

0.40 (m)

e=

Section modulus at top or bottom of section:


Z top =

0.21 (m3)

Z bottom =

-0.26 (m3)
0.80 (m2)

Ac=
Stress due to tendons:
beam top: s top.P =

P Pe
=
Ac Z top

Pe

beam bottom: s bot.P = Ac - Z =


bot

189888032.xls.ms_office:3.2TENDOU DESIGN

-4.23 (MPa)
18.57 (MPa)

6 of 18

MAuNSELL | AECOM

Contract

Job ref.

Part of structure

Calc.sheet No.

Drawing ref.

Calculations by

Checked by

60095653

Date

3.3 Calculation of prestress losses


1. Properties of Tendons:
Ep =

195000 (Mpa)

Ec =

27400.0 (Mpa)

fp =

1770.00 (Mpa)

fpy =

1504.50 (Mpa)

Ap =

150.00 (mm2)

Breaking load (kN) Pbreaking =

(0.85fp)

265.00 (kN)

Pjack =

198.75 (kN)

Jacking stress sjack =

1327.50 (Mpa)

2. Loss due to prestress tendons relaxation

considered the steam curing ,the relaxation loss take as 8% of initial prestress
R=

At serviceability stage

0.080

Rtransfer = 70%Rjack=

74.34 (Mpa)

Rserviceality = 30%Rjack=

31.86 (Mpa)

At transfer

3. Stress losses at transfer


(1) Anchorage seating Loss during anchoring
DL1 =

0.00 (mm)

(2) Loss due to prestress tendons relaxation


DsR.tranfer = Rtransfer =

74.34 (Mpa)

(3) Loss of elastic concrete


For section 8:

P=

9540.00 (kN)

Pinitial=

9004.75

ebeam.p =

0.40 (m)

Abeam =

0.80 (m2)
0.4394 (m3)

Zbeam.p =
c =

fcp =

(Mpa)
P 12.96
ebeam
.p

40.00 (Mpa)

Abeam2.4E+04 (Mpa)
Zbeam.p
=
c 539.95 (10 )
105.29=
= E e =
(Mpa)
E c.50.80%

Ec.50.80% =
ee
Dse.tranfer
(3) Total loss at transfer

m= 8.13

-6

For other section:

189888032.xls.ms_office:LOSS

Abeam

Zbeam.p

Dse
(MPa)

NODE

Sni

Pjack (kN)

Pe,tran (kN)

Pe,tran/P
%

24

4770.00

3600.00

267.62

4502.38

1.79

0.34

0.97

113.66

-0.12

3.86

160.95

31.39

4389.39

92.02

25

4869.38

3675.00

273.20

4596.18

1.79

0.34

0.95

361.19

-0.38

3.71

154.76

30.18

4485.27

92.11

25

4869.38

3675.00

273.20

4596.18

1.11

0.23

0.92

361.19

-0.39

4.75

198.00

38.61

4454.28

91.48

29

5664.38

4275.00

317.80

5346.57

0.80

0.27

0.64

597.25

-0.93

7.56

314.84

61.39

5084.12

89.76

42

8347.50

6300.00

468.34

7879.16

0.80

0.37

0.47

1170.95

-2.50

12.15

506.29

98.73

7257.18

86.94

46

9043.13

6825.00

507.37

8535.75

0.80

0.39

0.45

1581.79

-3.52

12.71

529.77

103.31

7830.70

86.59

48

9540.00

7200.00

535.25

9004.75

0.80

0.40

0.44

1828.76

-4.16

13.15

547.84

106.83

8235.58

86.33

48

9540.00

7200.00

535.25

9004.75

0.80

0.40

0.44

1911.99

-4.35

12.96

539.95

105.29

8246.67

86.44

48

9540.00

7200.00

535.25

9004.75

0.80

0.40

0.44

1831.41

-4.17

13.14

547.59

106.78

8235.94

86.33

10

46

9043.13

6825.00

507.37

8535.75

0.80

0.39

0.45

1587.22

-3.53

12.70

529.27

103.21

7831.37

86.60

11

42

8347.50

6300.00

468.34

7879.16

0.80

0.37

0.47

1179.72

-2.52

12.13

505.52

98.58

7258.13

86.95

12

29

5664.38

4275.00

317.80

5346.57

0.80

0.27

0.64

608.17

-0.94

7.54

314.13

61.26

5084.70

89.77

13

25

4869.38

3675.00

273.20

4596.18

1.11

0.23

0.92

374.81

-0.41

4.74

197.39

38.49

4454.72

91.48

13

25

4869.38

3675.00

273.20

4596.18

1.79

0.34

0.95

374.81

-0.39

3.70

154.16

30.06

4485.70

92.12

14

24

4770.00

3600.00

267.62

4502.38

1.79

0.34

0.97

116.71

-0.12

3.86

160.82

31.36

4389.48

92.02

tendon area

relaxation
loss

Pi

(m2)

ebeam.p (m)

(m3)

Moment
stress due
due to DL1
to DL1

c (MPa)

ee

(10-6)

7 of 18

MAuNSELL | AECOM

Contract

Job ref.

Part of structure

Calc.sheet No.

Drawing ref.

Calculations by

Checked by

60095653

Date

6. Stress losses at beam installation - 30 days


(1) Loss due to shrinkage of concrete (Say shrinkage loss at 30 days)
Cs=

3.00

K L=

250.00

figure 14

ue =

KC=

1.00

figure 11

th =

K e=

0.80

figure 15

Kj =

0.25

figure 13

0.75 (m2)

Ag =

7.81 (m)
192.62 (mm)
2 Ag
=
ue

Assume slab finished after 30 days, the shrinkage losses is:


Shrinkage strains at transfer

cs10-6 = Cs*KL*KC*Ke*Kj =

Loss due to shrinkage

Dss =

150.00

D cs E p =
29.25 (Mpa)

(at 30 days)

(2) Loss due to creep of concrete (Say creep loss on 30 days)


For section 8:

Sustained stress ci in the concrete at the level of the centroid of the tendons calculation:
P=

8246.67 (kN)

MDL1=

1912 (kN.m)

ebeam.p =

0.40 (m)

Zbeam.p =

0.44 (m3)

Abeam =

0.80 (m2)
7200.00 (mm2)

Ap =

Assume slab finished after 30 days, the shrinkage losses is:


cc = KL*Km*KC*Ke*Kj =
K L=

2.10

Km=

1.00

K e=
sci.beam =
creep strains cc.beam =
Loss due to creep

NODE

Pinitial (kN)

0.85
(Mpa)
P ebeam .13.51
p
+
=
220.03 (10 )
Abeam Zbeam.p
ci.beam
42.91 (Mpa)
cc
c.50
Z
Moment

Dsc.beam = Epcc.beam =

For other section:

Abeam (m2)

0.45

ebeam.p

(m)

-6

beam.p

(m3)

due to DL1

(at 30 days)

30 days
stress
due to
DL1

ci (MPa)
sci.beam.

cc = 0.45
ecc
(10-6)

Dsc
(MPa)

ecc.beam

Dsc.beam

4389.39

1.79

0.34

0.97

113.66

-0.12

3.87

62.96

12.28

4485.27

1.79

0.35

0.95

361.19

-0.38

3.76

61.24

11.94

4454.28

1.11

0.23

0.92

361.19

-0.39

4.77

77.61

15.13

5084.12

0.80

0.27

0.64

597.25

-0.93

7.61

123.94

24.17

7257.18

0.80

0.37

0.47

1170.95

-2.50

12.41

202.17

39.42

7830.70

0.80

0.39

0.45

1581.79

-3.52

13.13

213.83

41.70

8235.58

0.80

0.40

0.44

1828.76

-4.16

13.68

222.73

43.43

8246.67

0.80

0.40

0.44

1911.99

-4.35

13.51

220.03

42.91

8235.94

0.80

0.40

0.44

1831.41

-4.17

13.67

222.64

43.41

10

7831.37

0.80

0.39

0.45

1587.22

-3.53

13.12

213.66

41.66

11

7258.13

0.80

0.37

0.47

1179.72

-2.52

12.40

201.90

39.37

12

5084.70

0.80

0.27

0.64

608.17

-0.94

7.59

123.68

24.12

13

4454.72

1.11

0.23

0.92

374.81

-0.41

4.75

77.38

15.09

13

4485.70

1.79

0.35

0.95

374.81

-0.39

3.75

61.01

11.90

14

4389.48

1.79

0.34

0.97

116.71

-0.12

3.86

62.91

12.27

Dss.transfer

Dsc.transfer

(3) Total losses at 30 days(MPa):


For other section:
AT TRANSFER
NODE

189888032.xls.ms_office:LOSS

30 days

Effect prestress at 30 days


P30days/P

DsR.tranfer

Dse.transfer

74.34

31.39

105.73

29.25

12.28

147.25

4770.00

3600.00

4239.89

88.89

74.34

30.18

104.52

29.25

11.94

145.71

4869.38

3675.00

4333.90

89.00

74.34

38.61

112.95

29.25

15.13

157.34

4869.38

3675.00

4291.17

88.13

74.34

61.39

135.73

29.25

24.17

189.15

5664.38

4275.00

4855.75

85.72

74.34

98.73

173.07

29.25

39.42

241.74

8347.50

6300.00

6824.53

81.76

74.34

103.31

177.65

29.25

41.70

248.59

9043.13

6825.00

7346.48

81.24

74.34

106.83

181.17

29.25

43.43

253.85

9540.00

7200.00

7712.28

80.84

74.34

105.29

179.63

29.25

42.91

251.79

9540.00

7200.00

7727.14

81.00

74.34

106.78

181.12

29.25

43.41

253.78

9540.00

7200.00

7712.75

80.85

10

74.34

103.21

177.55

29.25

41.66

248.46

9043.13

6825.00

7347.38

81.25

11

74.34

98.58

172.92

29.25

39.37

241.54

8347.50

6300.00

6825.82

81.77

12

74.34

61.26

135.60

29.25

24.12

188.96

5664.38

4275.00

4856.56

85.74

13

74.34

38.49

112.83

29.25

15.09

157.17

4869.38

3675.00

4291.77

88.14

13

74.34

30.06

104.40

29.25

11.90

145.55

4869.38

3675.00

4334.49

89.02

14

74.34

31.36

105.70

29.25

12.27

147.22

4770.00

3600.00

4240.01

88.89

Pjeck (kN)

Ap (mm2)

P30days (kN)

8 of 18

MAuNSELL | AECOM

Contract

Job ref.

Part of structure

Calc.sheet No.

Drawing ref.

Calculations by

Checked by

60095653

Date

7. Stress losses at serviceability stage


(1) Loss due to prestress tendons relaxation
DsR.serviceability = Rserviceability =

31.86 (Mpa)

(2) Loss due to shrinkage of concrete (Say shrinkage loss at 30 years)


Cs=

3.00

Ag =

K L=

250.00

ue =

KC=

1.00

th =

K e=

0.52

Kj =

1.00

1.21 (m2)
5.65 (m)
428.18 (mm)
2 Ag
=
ue

Assume slab finished after 30 days, the shrinkage losses is:


Shrinkage strains at transfer

-6
cs10 = Cs*KL*KC*Ke*Kj =

Loss due to shrinkage

Dss =

390.00

D cs E p =
76.05 (Mpa)

(at 30 years)

Loss due to shrinkage from 30 days to 30 years is:


-6
e cs10 = e cs.30years - e cs.30days =

Loss due to shrinkage

240.00

Dss = Dss.30years - Dss.30days =

46.80 (Mpa)

(3) Loss due to creep of concrete (Say creep loss at 30 years)


cc = KL*Km*KC*Ke*Kj =
K L=

2.10

Km=

0.50

K e=

0.71

0.75

For section 8:
Sustained stress ci in the concrete at the level of the centroid of the tendons calculation:
Pe,transfe =

8246.67 (kN)

e0.p =

0.71 (m)

A0 =

1.21 (m2)

Z0.p =

0.58 (m4)

sci.0 =
MDL2,SDL=
sG =

16.95 (Mpa)

P100 days P100 days ep.0


+
=
A0
Z0.p
1181.19 (KN*m)
-6.38 (Mpa)

s=

10.57 (Mpa)

ci.0 287.54
56.07
=
Before finishing slab (30 days), the creep losses is: E
c
creep strains e cc.0 =

cc

Dsc.0 = Epecc.0 =

Loss due to creep

cc = KL*Km*KC*Ke*Kj =
Km=

1.00

Kj =

0.10

P100 days P100 days ep10.57


.0
+ 57.51=
A
Zci.0
0.p 11.21
Loss due to creep Ds = 0

=
cc
Loss due to creep from 30 days to 30 years is: E
c
sci.0 =

Epecc.0 =

e cc10 = e cc.30years - e cc.30days =


-6

Loss due to creep

(Mpa)

(at 30 years)

0.15

creep strains e cc.0 =


c.0

(10-6)

(Mpa)
(10-6)
(Mpa)

(at 30 days)

230.04

Dsc = Dss.30years - Dss.30days =

44.86 (Mpa)

For other section:


= 0.75

30 years
NODE

Pinitial (kN)

A0 (m2)

e0.p

(m)

Z0.p

(m3)

Mdl2,sdl

189888032.xls.ms_office:LOSS

ecc

ci (MPa)
sci.0

= 0.15

30 days

(10-6)

Dsc
(MPa)

ci (MPa)

ecc.0

Dsc.0

sci.0

ecc
(10-6)
ecc.0

From 30 days to 30 years

Dsc (MPa)
Dsc.0

ecc

(10-6)
ecc.0

Dsc
(MPa)
Dsc.0

4389.39

2.20

0.49

1.11

120.92

3.69

100.37

19.57

3.69

20.07

3.91

80.30

15.66

4485.27

2.20

0.49

1.10

472.63

3.25

88.43

17.24

3.25

17.69

3.45

70.74

13.79

4454.28

1.52

0.48

0.97

472.63

4.27

116.17

22.65

4.27

23.23

4.53

92.93

18.12

5084.12

1.21

0.59

0.71

604.54

6.64

180.76

35.25

6.64

36.15

7.05

144.61

28.20

7257.18

1.21

0.69

0.60

878.45

10.34

281.44

54.88

10.34

56.29

10.98

225.15

43.90

7830.70

1.21

0.71

0.59

1052.55

10.55

287.10

55.98

10.55

57.42

11.20

229.68

44.79

8235.58

1.21

0.71

0.58

1150.93

10.79

293.49

57.23

10.79

58.70

11.45

234.80

45.79

8246.67

1.21

0.71

0.58

1181.19

10.57

287.54

56.07

10.57

57.51

11.21

230.04

44.86

8235.94

1.21

0.71

0.58

1145.47

10.79

293.61

57.25

10.79

58.72

11.45

234.88

45.80

10

7831.37

1.21

0.71

0.59

1044.37

10.56

287.19

56.00

10.56

57.44

11.20

229.75

44.80

11

7258.13

1.21

0.69

0.60

873.40

10.34

281.21

54.84

10.34

56.24

10.97

224.97

43.87

12

5084.70

1.21

0.59

0.71

607.47

6.62

180.21

35.14

6.62

36.04

7.03

144.17

28.11

13

4454.72

1.52

0.48

0.97

491.49

4.24

115.25

22.47

4.24

23.05

4.49

92.20

17.98

13

4485.70

2.20

0.49

1.10

491.49

3.22

87.58

17.08

3.22

17.52

3.42

70.07

13.66

14

4389.48

2.20

0.49

1.11

122.94

3.68

100.24

19.55

3.68

20.05

3.91

80.19

15.64

9 of 18

MAuNSELL | AECOM

Contract

Job ref.

Part of structure

Calc.sheet No.

Drawing ref.

Calculations by

Checked by

60095653

Date

(4) Total losses at serviceability stage (MPa):


For section 8:

DsR.serviceability =

31.86 (Mpa)

Dss.serviseability =

46.80 (Mpa)

Dsc.serviceability =

44.86 (Mpa)

Total losses SDsserviceability

123.52 (Mpa)

For other section:


Total losses at serviceality stage (MPa)
NODE

DsR.serviceability

Dss.serviceability

Dsc.serviceability

Effect prestress at 30 years


S

P30days
(kN)

Ap (mm )

Pe (kN) (30
years)

Pe / Pjack

Pjack (kN)

sp (MPa)

70% fp

check

31.86

46.80

15.66

94.32

4239.89

3600.00

3900.34

4770.00

81.77

1083.43

1239.00

ok!

31.86

46.80

13.79

92.45

4333.90

3675.00

3994.12

4869.38

82.03

1086.84

1239.00

ok!

31.86

46.80

18.12

96.78

4291.17

3675.00

3935.49

4869.38

80.82

1070.88

1239.00

ok!

31.86

46.80

28.20

106.86

4855.75

4275.00

4398.93

5664.38

77.66

1028.99

1239.00

ok!

31.86

46.80

43.90

122.56

6824.53

6300.00

6052.37

8347.50

72.51

960.69

1239.00

ok!

31.86

46.80

44.79

123.45

7346.48

6825.00

6503.95

9043.13

71.92

952.96

1239.00

ok!

31.86

46.80

45.79

124.45

7712.28

7200.00

6816.27

9540.00

71.45

946.70

1239.00

ok!

31.86

46.80

44.86

123.52

7727.14

7200.00

6837.82

9540.00

71.68

949.70

1239.00

ok!

31.86

46.80

45.80

124.46

7712.75

7200.00

6816.62

9540.00

71.45

946.75

1239.00

ok!

10

31.86

46.80

44.80

123.46

7347.38

6825.00

6504.76

9043.13

71.93

953.08

1239.00

ok!

11

31.86

46.80

43.87

122.53

6825.82

6300.00

6053.89

8347.50

72.52

960.93

1239.00

ok!

12

31.86

46.80

28.11

106.77

4856.56

4275.00

4400.10

5664.38

77.68

1029.26

1239.00

ok!

13

31.86

46.80

17.98

96.64

4291.77

3675.00

3936.63

4869.38

80.84

1071.19

1239.00

ok!

13

31.86

46.80

13.66

92.32

4334.49

3675.00

3995.20

4869.38

82.05

1087.13

1239.00

ok!

14

31.86

46.80

15.64

94.30

4240.01

3600.00

3900.54

4770.00

81.77

1083.48

1239.00

ok!

Summary of strain at each stage:


At transfer

189888032.xls.ms_office:LOSS

At 30 days

Total strains

At serviseability stage (30d to 30y)

DeR.tranfer
10-6

Dee.transfer
10-6

Des.30days 10-6

Dec.30days
10-6

DeR.serviceability

Des.serviceability

Dec.serviceability

S eR.loss

S ee.loss

10-6

10-6

10-6

10-6

10-6

10-6

[1]

[2]

[3]

[4]

[5]

[6]

[7]

[8]=[1]+[5]

[9]=[2]

[10]=[3]+[6]

381.23

160.95

150.00

62.96

163.38

240.00

80.30

544.62

160.95

390.00

143.26

381.23

154.76

150.00

61.24

163.38

240.00

70.74

544.62

154.76

390.00

131.98

381.23

198.00

150.00

77.61

163.38

240.00

92.93

544.62

198.00

390.00

170.55

381.23

314.84

150.00

123.94

163.38

240.00

144.61

544.62

314.84

390.00

268.55

381.23

506.29

150.00

202.17

163.38

240.00

225.15

544.62

506.29

390.00

427.33

381.23

529.77

150.00

213.83

163.38

240.00

229.68

544.62

529.77

390.00

443.51

381.23

547.84

150.00

222.73

163.38

240.00

234.80

544.62

547.84

390.00

457.52

381.23

539.95

150.00

220.03

163.38

240.00

230.04

544.62

539.95

390.00

450.07

NODE

S es.loss

S ec.loss 10-6
[11]=[4]+[7]

381.23

547.59

150.00

222.64

163.38

240.00

234.88

544.62

547.59

390.00

457.52

10

381.23

529.27

150.00

213.66

163.38

240.00

229.75

544.62

529.27

390.00

443.41

11

381.23

505.52

150.00

201.90

163.38

240.00

224.97

544.62

505.52

390.00

426.87

12

381.23

314.13

150.00

123.68

163.38

240.00

144.17

544.62

314.13

390.00

267.85

13

381.23

197.39

150.00

77.38

163.38

240.00

92.20

544.62

197.39

390.00

169.58

13

381.23

154.16

150.00

61.01

163.38

240.00

70.07

544.62

154.16

390.00

131.08

14

381.23

160.82

150.00

62.91

163.38

240.00

80.19

544.62

160.82

390.00

143.10

10 of 18

MAuNSELL | AECOM

60095653

Contract

Job ref.

Part of
structure

Calc.sheet No.

Drawing ref.

Calculations by

Checked by

Date

3.4 Sections Stress due to Tendons


f 'c.beam =

50.00 (Mpa)

f 'c.slab =

40.00 (Mpa)

Pjack =

198.75 (kN)

BEAM SECTION
NODE
2

Abeam (m )

Zbeam.top

Zbeam.bot

(m3)

(m3)

[2]

[3]

[1]

AT TRANSFER

BEAM-SLAB SECTION
2

ebeam.p (m)

A0 (m )

[5]

[8]

Z0.top1

Z0.bot

(m3)

(m3)

[9]

[10]

e0.p (m)

P (kN)

[12]

[4]

AT SERVICEABILITY STAGE

stop.P

sbot.P

(N/m2)

(N/m2)

[6]=
[4]/[1][4][5]/[2]

[7]=
[4]/[1][4][5]/[3]

Pe (kN)

[11]

stop1.P

sbot.P

(N/m2)

(N/m2)

[13]=
[14]=
[11]/[8][11]/[8][11][12]/[9] [11][12]/[10]

1.79

0.46

-0.41

0.34

2.20

0.97

-0.58

0.49

4389.39

-0.75

6.03

3900.34

-0.19

5.07

1.79

0.46

-0.41

0.35

2.20

0.97

-0.58

0.49

4485.27

-0.84

6.25

3994.12

-0.22

5.24

1.11

0.26

-0.32

0.23

1.52

0.82

-0.50

0.48

4454.28

0.07

7.31

3935.49

0.26

6.36

0.80

0.21

-0.26

0.27

1.21

0.81

-0.42

0.59

5084.12

-0.16

11.67

4398.93

0.43

9.76

0.80

0.21

-0.26

0.37

1.21

0.81

-0.42

0.69

7257.18

-3.73

19.48

6052.37

-0.17

14.89

0.80

0.21

-0.26

0.39

1.21

0.81

-0.42

0.71

7830.70

-4.63

21.51

6503.95

-0.31

16.25

0.80

0.21

-0.26

0.40

1.21

0.81

-0.42

0.71

8235.58

-5.21

22.90

6816.27

-0.40

17.18

0.80

0.21

-0.26

0.40

1.21

0.81

-0.42

0.71

8246.67

-5.22

22.93

6837.82

-0.40

17.23

0.80

0.21

-0.26

0.40

1.21

0.81

-0.42

0.71

8235.94

-5.21

22.90

6816.62

-0.40

17.18

10

0.80

0.21

-0.26

0.39

1.21

0.81

-0.42

0.71

7831.37

-4.63

21.52

6504.76

-0.31

16.26

11

0.80

0.21

-0.26

0.37

1.21

0.81

-0.42

0.69

7258.13

-3.73

19.48

6053.89

-0.17

14.89

12

0.80

0.21

-0.26

0.27

1.21

0.81

-0.42

0.59

5084.70

-0.16

11.67

4400.10

0.43

9.76

13

1.11

0.26

-0.32

0.23

1.52

0.82

-0.50

0.48

4454.72

0.07

7.31

3936.63

0.26

6.37

13

1.79

0.46

-0.41

0.35

2.20

0.97

-0.58

0.49

4485.70

-0.84

6.25

3995.20

-0.22

5.24

14

1.79

0.46

-0.41

0.34

2.20

0.97

-0.58

0.49

4389.48

-0.75

6.03

3900.54

-0.19

5.07

Section modulus above top or bottom of section:


Ztop.1 = 0.21

(m3)

Zbottom = -0.26

(m )

Eccentricity of prestrssong fouce(P)

Ac= 0.80

(m2)

e = 0.40

(m)

Stress due to tendons at transfer:


Prestressing force in tendons

8246.67 (kN)

P=

Stress due to tendons:


P

Pe

beam top: stop1.P = Ac - Z top =

-5.22 (N/mm2)

P PPee
= Acc -- ZZ top ==
bot

22.93 (N/mm2)

beam bottom: sbot.P

Stress due to tendons at serviceality stage:


Prestressing force in tendons

6837.82 (kN)

P=

Stress due to tendons:


P

Pe

Pe

beam top: stop1.P = Ac - Z =


top
beam bottom: sbot.P = Ac - Z =
bot

189888032.xls.ms_office:P-STRESS

-0.40 (N/mm2)
17.23 (N/mm2)

11 of 18

MAuNSELL | AECOM

Contract

Job ref.

Part of
structure

Calc.sheet No.

Drawing ref.

Calculations by

Checked by

60095653

Date

3.5 Stress Checking


1. Stress checking at transfer:
fcp =

40.00 (Mpa)

sc.transfer =

20.00 (Mpa)

st.transfer =

-1.00 (Mpa)
STRESS DUE TO DL1

SRETSS DUE TO TENDON

NODE

Abeam

Zbeam.top

Zbeam.bot

(m )

stop.P

(m )

(m )

sbot.P

(N/mm2)

[3]

MOMENT
(kNm)
(N/mm2)

[4]

[5]

[6]

STRESS CHECKING AT TRANSFER

stop.DL1

sbot.DL1

stop

sbot

sc

st

(N/mm2)

(N/mm2)

(N/mm2)

(N/mm2)

(N/mm2)

(N/mm2)

[7]=[6]/[2]

[8]=[6]/[3]

[11]

[12]

[9]=[4]+[7] [10]=[5]+[8]

CHECKING

[1]

[2]

1.788

0.463

-0.415

-0.75

6.03

113.66

0.25

-0.27

-0.50

5.76

20.00

-1.00

OK !

[13]

1.788

0.463

-0.415

-0.84

6.25

361.19

0.78

-0.87

-0.06

5.37

20.00

-1.00

OK !

1.106

0.264

-0.318

0.07

7.31

361.19

1.37

-1.14

1.44

6.17

20.00

-1.00

OK !

0.796

0.212

-0.262

-0.16

11.67

597.25

2.82

-2.28

2.66

9.39

20.00

-1.00

OK !

0.796

0.212

-0.262

-3.73

19.48

1170.95

5.53

-4.47

1.81

15.02

20.00

-1.00

OK !

0.796

0.212

-0.262

-4.63

21.51

1581.79

7.47

-6.03

2.84

15.48

20.00

-1.00

OK !

0.796

0.212

-0.262

-5.21

22.90

1828.76

8.64

-6.98

3.43

15.93

20.00

-1.00

OK !

0.796

0.212

-0.262

-5.22

22.93

1911.99

9.03

-7.29

3.81

15.64

20.00

-1.00

OK !

0.796

0.212

-0.262

-5.21

22.90

1831.41

8.65

-6.99

3.44

15.92

20.00

-1.00

OK !

10

0.796

0.212

-0.262

-4.63

21.52

1587.22

7.50

-6.05

2.87

15.46

20.00

-1.00

OK !

11

0.796

0.212

-0.262

-3.73

19.48

1179.72

5.57

-4.50

1.85

14.98

20.00

-1.00

OK !

12

0.796

0.212

-0.262

-0.16

11.67

608.17

2.87

-2.32

2.71

9.35

20.00

-1.00

OK !

13

1.106

0.264

-0.318

0.07

7.31

374.81

1.42

-1.18

1.49

6.13

20.00

-1.00

OK !

13

1.788

0.463

-0.415

-0.84

6.25

374.81

0.81

-0.90

-0.03

5.34

20.00

-1.00

OK !

14

1.788

0.463

-0.415

-0.75

6.03

116.71

0.25

-0.28

-0.50

5.75

20.00

-1.00

OK !

25.00
20.00
STRESS OF BEAM TOP

15.00

STRESS OF BEAM BOTTOM

10.00

ALLOWABLE COMPRESSIVE STRESS

5.00

ALLOWABLE TRNSILE STRESS

0.00
1

10

11

12

13

14

15

-5.00

Moment due to selfweight of super T (DL1):


MDL1 = 1911.99 (kNm)
Section peculiarity:
Ztop =

0.21 (m3)

Zbottom =

-0.26 (m3)

Ac=

0.80 (m2)

Stress due to DL1:


M

DL1

=
beam top: stop.DL1 = Z
top

9.03 (N/mm2)

M DL1
=
=
Z bot

-7.29 (N/mm2)

beam bottom: sbot.DL1


Stress due to tendons:

beam top: stop.P =

-5.22 (N/mm2)

beam bottom: sbot.P =

22.93 (N/mm2)

Stress section top: stop = stop.DL1 + stop.P =

3.81 (N/mm2)

OK !

Stress section bpttom: sbot = sbot.DL1 + sbot.P =

15.64 (N/mm2)

OK !

189888032.xls.ms_office:At transfer

12 of 18

MAuNSELL | AECOM

Contract

Job ref.

Part of
structure

Calc.sheet No.

Drawing ref.

Calculations by

Checked by

60095653

Date

3.5 Stress Checking


2. Stress checking at serviceability stage:

NODE

f 'c.beam =

50.00 (Mpa)

f 'c.slab =

40.00 (Mpa)

s c.serviceability.top =

20.00 (Mpa)

s c.serviceability.bot =

20.00 (Mpa)

0.00 (Mpa)

s t.serviceability.bot =

0.00 (Mpa)

s t.serviceability.top =

Zbeam.top

(m3)

Zbeam.top

SRETSS DUE TO
TENDON (MPa)

Zbeam.bot

(m3)

(m3)

STRESS DUE TO DL1

stop1.P

sbot.P

MOMEN
T (kNm)

stop1.DL1
(MPa)

[4]

[5]

[6]

[7]=[6]/[2]

sbot.DL1
(MPa)

SRETSS DUE TO
TENDON + DL (MPa)

stop1.DL1

sbot.DL1

-0.27

0.06

4.79

0.78

-0.87

0.56

4.37

1.37

-1.14

1.63

2.82

-2.28

3.26

7.48

1170.95

5.53

-4.47

5.37

10.42

16.25

1581.79

7.47

-6.03

7.16

10.22

17.18

1828.76

8.64

-6.98

8.24

10.20

17.23

1911.99

9.03

-7.29

8.63

9.94

-0.40

17.18

1831.41

8.65

-6.99

8.25

10.19

-0.262

-0.31

16.26

1587.22

7.50

-6.05

7.19

10.20

0.212

-0.262

-0.17

14.89

1179.72

5.57

-4.50

5.41

10.39

0.212

-0.262

0.43

9.76

608.17

2.87

-2.32

3.31

7.44

0.264

-0.318

0.26

6.37

374.81

1.42

-1.18

1.68

5.19

13

0.463

-0.415

-0.22

5.24

374.81

0.81

-0.90

0.59

4.34

14

0.463

-0.415

-0.19

5.07

116.71

0.25

-0.28

0.07

4.78

[1]

[2]

[3]

0.463

-0.415

-0.19

5.07

113.66

0.25

0.463

-0.415

-0.22

5.24

361.19

0.264

-0.318

0.26

6.36

361.19

0.212

-0.262

0.43

9.76

597.25

0.212

-0.262

-0.17

14.89

0.212

-0.262

-0.31

0.212

-0.262

-0.40

0.212

-0.262

-0.40

0.212

-0.262

10

0.212

11
12
13

(N/m )
(N/m )
[8]=[6]/[3] =[4]+[7] =[4]+[8]

5.23

STRESS DUE TO OTHER LOADS (HB25)(MPa)


NODE

Z0.top

(m )

Z0.top1

Z0.bot

N(KN)

(m )

(m )

MOMENT (kNm)

STRESS DUE TO MAX.MOMENT

MAX.

MIN.

MAX.

MIN.

stop

stop1

[4]

[5]

[6]

[7]

[8]=[6]/[1]

[9]=[6]/[2]

sbot

STRESS DUE TO OTHER LOADS(HB45) (MPa)


N(KN)

STRESS DUE TO MIN.MONENT

stop

stop1

sbot

STRESS DUE TO
MAX.MOMENT

MOMENT (kNm)

MAX.

MIN.

MAX.

MIN.

[4]

[5]

[6]

[7]

stop

stop1

STRESS DUE TO LOADS + PRESTRESS (MPa)


STRESS DUE TO
MIN.MONENT

sbot

stop

stop1

stop.max
sbot

=
[1]

[2]

[3]

[10]=[6]/[3] [11]=[7]/[1] [12]=[7]/[2] [13]=[7]/[3]

[8]=[6]/[1] [9]=[6]/[2]

[10]=[6]/[ [11]=[7]/[1 [12]=[7]/[ [13]=[7]/[


3]
]
2]
3]

stop1.max

MAX([8],[11])

stop1.min
=

+MAX([9],[12]
+MIN([9],[12])
)

sbot.max

sbot.min

= +

= +

STRESS CHECKING AT
SERVICEABILITY STAGE

sc
(MPa)

st
(MPa)

CHECKIN
G

MAX([10],[13]) MIN([10],[13])

2.195

0.712

0.966

-0.577

0.000

0.000

294.52

85.31

0.41

0.30

-0.51

0.12

0.09

-0.15

0.000

0.000

475.27

50.42

0.67

0.49

-0.82

0.07

0.05

-0.09

0.67

0.55

0.15

4.70

4.28

20.00

0.00

OK !

2.195

0.712

0.966

-0.577

0.000

0.000

1138.22

335.77

1.60

1.18

-1.97

0.47

0.35

-0.58

0.000

0.000

1834.20

200.63

2.58

1.90

-3.18

0.28

0.21

-0.35

2.58

2.46

0.91

4.02

2.39

20.00

0.00

OK !

1.525

0.607

0.820

-0.503

0.000

0.000

1138.22

335.77

1.87

1.39

-2.26

0.55

0.41

-0.67

0.000

0.000

1834.20

200.63

3.02

2.24

-3.64

0.33

0.24

-0.40

3.02

3.87

2.04

4.83

2.97

20.00

0.00

OK !

1.210

0.582

0.808

-0.422

0.000

0.000

1534.05

509.65

2.64

1.90

-3.63

0.88

0.63

-1.21

0.000

0.000

2582.18

417.66

4.44

3.20

-6.12

0.72

0.52

-0.99

4.44

6.45

3.89

6.49

3.85

20.00

0.00

OK !

1.210

0.582

0.808

-0.422

0.000

0.000

2371.04

787.69

4.08

2.94

-5.62

1.35

0.98

-1.87

0.000

0.000

4141.62

742.13

7.12

5.13

-9.81

1.28

0.92

-1.76

7.12

10.49

6.34

8.67

4.81

20.00

0.00

OK !

1.210

0.582

0.808

-0.422

0.000

0.000

2920.62

930.67

5.02

3.62

-6.92

1.60

1.15

-2.20

0.000

0.000

5127.47

906.87

8.81

6.35

-12.15

1.56

1.12

-2.15

8.81

13.51

8.32

8.07

3.30

20.00

0.00

OK !

1.210

0.582

0.808

-0.422

0.000

0.000

3192.84

1026.51

5.49

3.95

-7.56

1.76

1.27

-2.43

0.000

0.000

5617.28

1014.43

9.66

6.95

-13.31

1.74

1.26

-2.40

9.66

15.20

9.51

7.80

2.64

20.00

0.00

OK !

1.210

0.582

0.808

-0.422

0.000

0.000

3240.17

1070.74

5.57

4.01

-7.68

1.84

1.33

-2.54

0.000

0.000

5713.63

1062.73

9.82

7.07

-13.53

1.83

1.32

-2.52

9.82

15.71

9.96

7.42

2.26

20.00

0.00

OK !

1.210

0.582

0.808

-0.422

0.000

0.000

3180.59

1019.39

5.47

3.94

-7.53

1.75

1.26

-2.41

0.000

0.000

5595.83

1007.38

9.62

6.93

-13.26

1.73

1.25

-2.39

9.62

15.18

9.52

7.81

2.66

20.00

0.00

OK !

10

1.210

0.582

0.808

-0.422

0.000

0.000

2902.33

919.44

4.99

3.59

-6.88

1.58

1.14

-2.18

0.000

0.000

5094.69

895.50

8.76

6.31

-12.07

1.54

1.11

-2.12

8.76

13.50

8.33

8.08

3.33

20.00

0.00

OK !

11

1.210

0.582

0.808

-0.422

0.000

0.000

2360.12

782.56

4.06

2.92

-5.59

1.35

0.97

-1.85

0.000

0.000

4121.10

735.56

7.08

5.10

-9.76

1.26

0.91

-1.74

7.08

10.51

6.38

8.65

4.80

20.00

0.00

OK !

12

1.210

0.582

0.808

-0.422

0.000

0.000

1551.63

509.93

2.67

1.92

-3.68

0.88

0.63

-1.21

0.000

0.000

2601.78

413.50

4.47

3.22

-6.16

0.71

0.51

-0.98

4.47

6.53

3.94

6.46

3.77

20.00

0.00

OK !

13

1.525

0.607

0.820

-0.503

0.000

0.017

1199.42

342.89

1.98

1.46

-2.38

0.56

0.42

-0.68

0.000

0.000

1916.31

195.09

3.16

2.34

-3.81

0.32

0.24

-0.39

3.16

4.02

2.10

4.80

2.80

20.00

0.00

OK !

13

2.195

0.712

0.966

-0.577

0.000

0.017

1199.42

342.89

1.68

1.24

-2.08

0.48

0.35

-0.59

0.000

0.000

1916.31

195.09

2.69

1.98

-3.32

0.27

0.20

-0.34

2.69

2.57

0.94

4.00

2.26

20.00

0.00

OK !

14

2.195

0.712

0.966

-0.577

0.000

0.000

305.04

86.90

0.43

0.32

-0.53

0.12

0.09

-0.15

0.000

0.000

487.64

49.37

0.68

0.50

-0.85

0.07

0.05

-0.09

0.68

0.57

0.16

4.70

4.26

20.00

0.00

OK !

25.00

ALLOWABLE COMPRESSIVE STRESS

20.00

MAX. STRESS OF SLAB TOP

15.00

MAX. STRESS OF BEAM TOP

10.00

MIN. STRESS OF BEAM TOP


5.00

MAX.STRESS OF BEAM BOTTOM

0.00
1

10

11

12

13

14

15

MIN STRESS OF BEAM BOTTOM


ALLOWABLE TRANSILE STRESS

Section modulus above top or bottom of section:

Ztop1 =

0.58 (m3)
0.81

Zbottom =

-0.42 (m3)

Ztop =

Moment due to loads(HB25):


3240.17 (kNm)

Mmax =
Stress due to loads moment:
s top.max =

M max
=
Z 0.top

5.57

(MPa)

s top1.max =

M max
=
Z 0. top 1

4.01

(MPa)

s bot.max =

M max
=
Z 0.bot

-7.68

(MPa)

Moment due to loads(HB45):


5713.63 (kNm)

Mmax =
Stress due to loads moment(HB45):
s top.max =

M max
=
Z 0.top

9.82

(MPa)

s top1.max =

M max
=
Z 0. top 1

7.07

(MPa)

-13.53

(MPa)

max
s bot.max = Z0.bot =

Stress due to tendons + DL1 at serviceability stage:


s top1.P+DL1 =

8.63 (MPa)

s bot.P+DL1 =

9.94 (MPa)

Stress due to tendons + all LOADS at serviceability stage:


Stress section top:
Stress section bpttom:

s top = stop.max

9.82 (MPa)

OK !

s top1 = stop1.max + stop1.P+DL1 =

15.71 (MPa)

OK !

s bot = sbot.max + sbot.P+DL1 =

2.26 (MPa)

OK !

189888032.xls.ms_office:SLS CHECK1

13 of 18

MAuNSELL | AECOM

60095653

Contract

Job ref.

Part of
structure

Calc.sheet No.

Drawing ref.

Calculations by

Checked by

Date

3.5 Stress Checking


3. Stress checking at serviceability stage (Consider thermal effects):

NODE

f 'c.beam =

50.00 (Mpa)

f 'c.slab =

40.00 (Mpa)

s c.serviceability.top =

20.00 (Mpa)

s c.serviceability.bot =

20.00 (Mpa)

s t.serviceability.top =

-3.20 (Mpa)

s t.serviceability.bot =

-3.20 (Mpa)

Zbeam.top

Zbeam.top1

Zbeam.bot

(m 3)

(m 3)

(m 3)

SRETSS DUE TO
TENDON (MPa)

STRESS DUE TO DL1

SRETSS DUE TO
TENDON + DL (MPa)

0.463

-0.415

-0.19

5.07

stop1.DL1 sbot.DL1
stop1.DL1 sbot.DL1
(MPa)
(MPa)
2
(N/m 2)
[7]=[6]/[2 [8]=[6]/[3 (N/m )
[6]
=[4]+[7] =[4]+[8]
]
]
113.66
0.25
-0.27
0.06
4.79

0.463

-0.415

-0.22

5.24

361.19

0.78

-0.87

0.56

0.264

-0.318

0.26

6.36

361.19

1.37

-1.14

1.63

0.212

-0.262

0.43

9.76

597.25

2.82

-2.28

3.26

7.48

0.212

-0.262

-0.17

14.89

1170.95

5.53

-4.47

5.37

10.42

0.212

-0.262

-0.31

16.25

1581.79

7.47

-6.03

7.16

10.22

10.20

[1]

[2]

stop1.P

sbot.P

[4]

[5]

[3]

MOMENT
(kNm)

4.37
5.23

0.212

-0.262

-0.40

17.18

1828.76

8.64

-6.98

8.24

0.21

-0.262

-0.40

17.23

1911.99

9.03

-7.29

8.63

9.94

0.212

-0.262

-0.40

17.18

1831.41

8.65

-6.99

8.25

10.19

10

0.212

-0.262

-0.31

16.26

1587.22

7.50

-6.05

7.19

10.20

11

0.212

-0.262

-0.17

14.89

1179.72

5.57

-4.50

5.41

10.39

12

0.212

-0.262

0.43

9.76

608.17

2.87

-2.32

3.31

7.44

13

0.264

-0.318

0.26

6.37

374.81

1.42

-1.18

1.68

5.19

13

0.463

-0.415

-0.22

5.24

374.81

0.81

-0.90

0.59

4.34

14

0.463

-0.415

-0.19

5.07

116.71

0.25

-0.28

0.07

4.78

STRESS DUE TO OTHER LOADS (MPa)


NODE

Z0.top

Z0.top1

Z0.bot

(m 3)

(m 3)

(m 3)

[1]

MOMENT (kNm)

STRESS DUE TO MAX.MOMENT

MAX.

MIN.

MAX.

MIN.

stop

stop1

[4]

[5]

[8]=[6]/[1]

[9]=[6]/[2]

STRESS DUE TO LOADS + PRESTRESS (MPa)


STRESS DUE TO MIN.MONENT

stop

stop1

stop.max

stop1.max

stop.min

sbot.max

sbot.min

sbot

=
=+MAX =+MIN([ =+MAX( =+
9],[12])
[10],[13])
MIN([10],[13])
[10]=[6]/[3] [11]=[7]/[1] [12]=[7]/[2] [13]=[7]/[3] MAX([8],[11]) ([9],[12])

STRESS CHECKING AT
SERVICEABILITY STAGE
sc
st
CHECKING
(MPa) (MPa)

[6]

[7]

2.195

0.71

0.97

-0.58

0.00

0.00

398.66

64.52

0.56

0.41

-0.69

0.09

0.07

-0.11

0.56

0.47

0.13

4.68

4.10

20.00

-3.20

OK !

2.195

0.71

0.97

-0.58

0.00

0.00

1540.32

251.77

2.16

1.59

-2.67

0.35

0.26

-0.44

2.16

2.15

0.82

3.93

1.70

20.00

-3.20

OK !

1.525

0.61

0.82

-0.50

0.00

0.00

1540.32

251.77

2.54

1.88

-3.06

0.41

0.31

-0.50

2.54

3.51

1.94

4.73

2.17

20.00

-3.20

OK !

1.210

0.58

0.81

-0.42

0.00

0.00

2130.73

419.79

3.66

2.64

-5.05

0.72

0.52

-0.99

3.66

5.89

3.78

6.49

2.43

20.00

-3.20

OK !

1.210

0.58

0.81

-0.42

0.00

0.00

3316.53

622.35

5.70

4.11

-7.86

1.07

0.77

-1.47

5.70

9.47

6.14

8.95

2.57

20.00

-3.20

OK !

1.210

0.58

0.81

-0.42

0.00

0.00

4071.45

678.18

7.00

5.04

-9.64

1.17

0.84

-1.61

7.00

12.20

8.00

8.61

0.58

20.00

-3.20

OK !

1.210

0.58

0.81

-0.42

0.00

0.00

4438.04

722.93

7.63

5.49

-10.51

1.24

0.90

-1.71

7.63

13.74

9.14

8.49

-0.31

20.00

-3.20

OK !

1.210

[3]

sbot

[2]

N(KN)

0.58

0.81

-0.42

0.00

0.00

4498.54

750.16

7.73

5.57

-10.66

1.29

0.93

-1.78

7.73

14.20

9.56

8.16

-0.72

20.00

-3.20

OK !

1.210

0.58

0.81

-0.42

0.00

0.00

4419.43

715.06

7.60

5.47

-10.47

1.23

0.89

-1.69

7.60

13.73

9.14

8.50

-0.28

20.00

-3.20

OK !

10

1.210

0.58

0.81

-0.42

0.00

0.00

4043.21

665.61

6.95

5.01

-9.58

1.14

0.82

-1.58

6.95

12.19

8.01

8.63

0.62

20.00

-3.20

OK !

11

1.210

0.58

0.81

-0.42

0.00

0.00

3298.99

615.78

5.67

4.08

-7.81

1.06

0.76

-1.46

5.67

9.49

6.17

8.93

2.58

20.00

-3.20

OK !

12

1.210

0.58

0.81

-0.42

0.00

0.00

2150.09

419.09

3.70

2.66

-5.09

0.72

0.52

-0.99

3.70

5.97

3.83

6.45

2.35

20.00

-3.20

OK !

13

1.525

0.61

0.82

-0.50

0.00

0.00

1614.66

256.13

2.66

1.97

-3.21

0.42

0.31

-0.51

2.66

3.65

1.99

4.68

1.98

20.00

-3.20

OK !

13

2.195

0.71

0.97

-0.58

0.00

0.00

1614.66

256.13

2.27

1.67

-2.80

0.36

0.27

-0.44

2.27

2.26

0.85

3.89

1.54

20.00

-3.20

OK !

14

2.195

0.71

0.97

-0.58

0.00

0.00

410.60

65.36

0.58

0.42

-0.71

0.09

0.07

-0.11

0.58

0.49

0.13

4.67

4.07

20.00

-3.20

OK !

25.00

ALLOWABLE COMPRESSIVE STRESS

20.00

MAX. STRESS OF SLAB TOP

15.00

MAX. STRESS OF BEAM TOP

10.00

MIN. STRESS OF BEAM TOP


MAX.STRESS OF BEAM BOTTOM

5.00

MIN STRESS OF BEAM BOTTOM

0.00
1

10

11

-5.00

12

13

14

15

ALLOWABLE TRANSILE STRESS

Section modulus above top or bottom of section:


0.58 (m 3)

Ztop =

0.81

Ztop1 =

-0.42 (m 3)

Zbottom =
Moment due to loads:

Mmax = 4498.54 (kNm)


Stress due to loads moment:
s top.max =

M max
=
Z 0.top

s top1.max =

M max
=
Z 0. top 1

max
s bot.max = Z 0.bot =

7.73 (MPa)
5.57 (MPa)
-10.66 (MPa)

Stress due to tendons + DL1 at serviceability stage:


s top1.P+DL1 =

8.63 (MPa)

s bot.P+DL1 =

9.94 (MPa)

Stress due to thermal effects:


s top.TL.max =

0.00 (MPa)

s top.TL.min =

0.00 (MPa)

s top1.TL.max =

0.00 (MPa)

s top1.TL.min =

0.00 (MPa)

s bot.TL.max =

0.00 (MPa)

s bot.TL.min =

0.00 (MPa)

Stress due to tendons + all LOADS at serviceability stage:


Stress section top:
Stress section bottom:

189888032.xls.ms_office:SLS CHECK 2

s top = stop1.max + stop1.TL =

7.73 (MPa)

OK !

s top1 = stop1.max + stop1.P+DL1 + stop1.TL =

14.20 (MPa)

OK !

s bot = stop1.max + sbot1.P+DL1 + sbot.TL =

-0.72 (MPa)

OK !

14 of 18

MAuNSELL | AECOM

Contract

Job ref.

Part of
structure

Calc.sheet No.

Drawing ref.

Calculations by

Checked by

60095653

Date

3.5 Stress Checking


2. Stress checking at serviceability stage:

NODE

f 'c.beam =

50.00 (Mpa)

f 'c.slab =

40.00 (Mpa)

s c.serviceability.top =

20.00 (Mpa)

s c.serviceability.bot =

20.00 (Mpa)

s t.serviceability.top =

-3.20 (Mpa)

s t.serviceability.bot =

-3.20 (Mpa)

Zbeam.top
A

(m 3)

Zbeam.top

SRETSS DUE TO
TENDON (MPa)

Zbeam.bot

(m 3)

(m 3)

sbot.P

[4]

[5]

stop1.DL1
(MPa)

stop1.DL1

sbot.DL1

RESIDUE TEMPERATURE STRESS (MPa)


(FROM LOAD ANALYSIS)
Positive
Negative

STRESS SUM DUE TO THERMAL EFFETS (MPa)

SRETSS DUE TO
TENDON + DL (MPa)

sbot.DL1
(MPa)

MAX.

MIN.

stop

stop1

sbot

stop

stop1

sbot

stop

stop1

sbot

stop

{1}

{2}

{3}

{4}

{5}

{6}

[a1]

[a2]

[a3]

[b1]

[b2]

[b3]

0.000

0.000

0.000

0.000

0.000

0.000

2.701

-0.284

0.965 -1.339

0.016

-1.716

4.37

0.000

0.000

0.000

0.000

0.000

0.000

2.701

-0.284

0.965 -1.339

0.016

-1.716

5.23

0.000

0.000

0.000

0.000

0.000

0.000

2.379

-0.574

0.884 -1.152

0.206

-1.507

7.48

0.000

0.000

0.000

0.000

0.000

0.000

2.265

-0.675

0.857 -1.068

0.296

-1.370

5.37

10.42

0.000

0.000

0.000

0.000

0.000

0.000

2.265

-0.675

0.857 -1.068

0.296

-1.370

-6.03

7.16

10.22

0.000

0.000

0.000

0.000

0.000

0.000

2.265

-0.675

0.857 -1.068

0.296

-1.370

8.64

-6.98

8.24

10.20

0.000

0.000

0.000

0.000

0.000

0.000

2.265

-0.675

0.857 -1.068

0.296

-1.370

1911.99

9.03

-7.29

8.63

9.94

0.00

0.00

0.00

0.00

0.00

0.00

2.265

-0.675

0.857 -1.068

0.296

-1.370

17.18

1831.41

8.65

-6.99

8.25

10.19

0.000

0.000

0.000

0.000

0.000

0.000

2.265

-0.675

0.857 -1.068

0.296

-1.370

-0.31

16.26

1587.22

7.50

-6.05

7.19

10.20

0.000

0.000

0.000

0.000

0.000

0.000

2.265

-0.675

0.857 -1.068

0.296

-1.370

-0.262

-0.17

14.89

1179.72

5.57

-4.50

5.41

10.39

0.000

0.000

0.000

0.000

0.000

0.000

2.265

-0.675

0.857 -1.068

0.296

-1.370

0.212

-0.262

0.43

9.76

608.17

2.87

-2.32

3.31

7.44

0.000

0.000

0.000

0.000

0.000

0.000

2.265

-0.675

0.857 -1.068

0.296

-1.370

0.264

-0.318

0.26

6.37

374.81

1.42

-1.18

1.68

5.19

0.000

0.000

0.000

0.000

0.000

0.000

2.379

-0.574

0.884 -1.152

0.206

-1.507

13

0.463

-0.415

-0.22

5.24

374.81

0.81

-0.90

0.59

4.34

0.000

0.000

0.000

0.000

0.000

0.000

2.701

-0.284

0.965 -1.339

14

0.463

-0.415

-0.19

5.07

116.71

0.25

-0.28

0.07

4.78

0.000

0.000

0.000

0.000
0.000
0.000
2.701
-0.284
STRESS DUE TO LOADS + PRESTRESS (MPa)

0.965 -1.339

Z0.top

Z0.top1

Z0.bot

(m 3)

(m 3)

(m 3)

[1]

stop1.P

STRESS DUE TO DL1


MOMEN
T (kNm)

(N/m 2)
(N/m 2)
[7]=[6]/[2] [8]=[6]/[3] =[4]+[7] =[4]+[8]

[2]

[3]

0.463

-0.415

-0.19

5.07

113.66

[6]

0.25

-0.27

0.06

4.79

0.463

-0.415

-0.22

5.24

361.19

0.78

-0.87

0.56

0.264

-0.318

0.26

6.36

361.19

1.37

-1.14

1.63

0.212

-0.262

0.43

9.76

597.25

2.82

-2.28

3.26

0.212

-0.262

-0.17

14.89

1170.95

5.53

-4.47

0.212

-0.262

-0.31

16.25

1581.79

7.47

0.212

-0.262

-0.40

17.18

1828.76

0.21

-0.26

-0.40

17.23

0.212

-0.262

-0.40

10

0.212

-0.262

11

0.212

12
13

STRESS DUE TO OTHER LOADS (MPa)


NODE

N(KN)
MAX.

[1]

[2]

[3]

MOMENT (kNm)
MIN.

[4]

MAX.

[5]

STRESS DUE TO MAX.MOMENT

stop

MIN.

[6]

[7]

stop1

[8]=[6]/[1]

[9]=[6]/[2]

sbot

STRESS DUE TO MIN.MONENT

stop

stop1

stop.max

stop1.max

sbot

[10]=[6]/[3] [11]=[7]/[1] [12]=[7]/[2] [13]=[7]/[3]

= MAX({1}
+[a1],{4} +[b1])+
MAX([8],[11])

stop1.min

sbot.max

sbot.min

st
(MPa)

0.016

CHECKING

+[a3],{6}+[b3])+
[b3])+MAX([10],
MIN([10],[13])
[13])

2.195

0.712

0.966

-0.577

0.000

0.000

392.54

70.64

0.55

0.41

-0.68

0.10

0.07

-0.12

3.25

0.48

-0.15

5.63

2.39

20.00

-3.20

OK !

2.195

0.712

0.966

-0.577

0.000

0.000

1515.76

276.33

2.13

1.57

-2.63

0.39

0.29

-0.48

4.83

2.14

0.56

4.85

0.02

20.00

-3.20

OK !

1.525

0.607

0.820

-0.503

0.000

0.000

1515.76

276.33

2.50

1.85

-3.01

0.46

0.34

-0.55

4.88

3.68

1.39

5.56

0.71

20.00

-3.20

OK !

1.210

0.582

0.808

-0.422

0.000

0.000

2091.59

458.93

3.60

2.59

-4.95

0.79

0.57

-1.09

5.86

6.14

3.15

7.25

1.16

20.00

-3.20

OK !

1.210

0.582

0.808

-0.422

0.000

0.000

3242.33

763.21

5.57

4.01

-7.68

1.31

0.94

-1.81

7.84

9.68

5.64

9.47

1.37

20.00

-3.20

OK !

1.210

0.582

0.808

-0.422

0.000

0.000

3972.16

917.87

6.83

4.92

-9.41

1.58

1.14

-2.17

9.09

12.38

7.62

8.90

-0.56

20.00

-3.20

OK !

1.210

0.582

0.808

-0.422

0.000

0.000

4323.69

1019.92

7.43

5.35

-10.24

1.75

1.26

-2.42

9.70

13.89

8.83

8.64

-1.41

20.00

-3.20

OK !

1.210

0.582

0.808

-0.422

0.000

0.000

4379.13

1066.12

7.53

5.42

-10.37

1.83

1.32

-2.53

9.79

14.35

9.28

8.27

-1.81

20.00

-3.20

OK !

1.210

0.582

0.808

-0.422

0.000

0.000

4304.97

1013.09

7.40

5.33

-10.20

1.74

1.25

-2.40

9.67

13.88

8.83

8.65

-1.38

20.00

-3.20

OK !

10

1.210

0.582

0.808

-0.422

0.000

0.000

3943.70

907.11

6.78

4.88

-9.34

1.56

1.12

-2.15

9.04

12.37

7.64

8.91

-0.51

20.00

-3.20

OK !

11

1.210

0.582

0.808

-0.422

0.000

0.000

3224.43

758.39

5.54

3.99

-7.64

1.30

0.94

-1.80

7.81

9.70

5.67

9.45

1.39

20.00

-3.20

OK !

12

1.210

0.582

0.808

-0.422

0.000

0.000

2110.51

458.68

3.63

2.61

-5.00

0.79

0.57

-1.09

5.89

6.22

3.20

7.21

1.07

20.00

-3.20

OK !

13

1.525

0.607

0.820

-0.503

0.000

0.000

1589.55

281.24

2.62

1.94

-3.16

0.46

0.34

-0.56

5.00

3.82

1.45

5.51

0.52

20.00

-3.20

OK !

13

2.195

0.712

0.966

-0.577

0.000

0.000

1589.55

281.24

2.23

1.65

-2.76

0.39

0.29

-0.49

4.93

2.25

0.60

4.81

-0.14

20.00

-3.20

OK !

14

2.195

0.712

0.966

-0.577

0.000

0.000

404.35

71.61

0.57

0.42

-0.70

0.10

0.07

-0.12

3.27

0.50

-0.14

5.62

2.37

20.00

-3.20

OK !

25.00

ALLOWABLE COMPRESSIVE STRESS

20.00

MAX. STRESS OF SLAB TOP

15.00

MAX. STRESS OF BEAM TOP

10.00

MIN. STRESS OF BEAM TOP


MAX.STRESS OF BEAM BOTTOM

5.00

MIN STRESS OF BEAM BOTTOM

0.00
1

10

11

-5.00

Section modulus above top or bottom of section:


Ztop =
Ztop1 =
Zbottom =

0.58 (m 3)
0.81
-0.42 (m 3)

Moment due to loads:


Mmax =

4379.13 (kNm)

Stress due to loads moment:


s top.max =
s top1.max =
s bot.max =

M max
M max =
Z
0.top
=
M
ax
Z 0m
. top 1 =
Z 0.bot
7.53

(MPa)

5.42

(MPa)

-10.37

(MPa)

Stress due to tendons + DL1 at serviceability stage:


s top1.P+DL1 =
s bot.P+DL1 =

8.63 (MPa)
9.94 (MPa)

Stress due to temperature effect at serviceability stage:


s top.temp =

2.27 (MPa)

s top1.temp =

0.30 (MPa)

s bot.temp =

-1.37 (MPa)

Stress due to tendons + all LOADS at serviceability stage:


Stress section top:
Stress section bpttom:

s top = stop.max+top.temp

9.79 (MPa)

OK !

s top1 = stop1.max + stop1.P+DL1+top1.temp =

14.35 (MPa)

OK !

s bot = sbot.max + sbot.P+DL1 + bot.temp=

-1.81 (MPa)

OK !

12

13

14

15

ALLOWABLE TRANSILE STRESS

sbot

0.016 -1.716

STRESS CHECKING AT
SERVICEABILITY STAGE

sc (MPa)
=+MIN({
=+MAX({
=+MAX({3 =+MIN({3}
2}+[a2],{5}+[b
2}+[a2],{5}+[b
}+ [a3],{6}+
2]
2])+MAX([9],[1
)+MIN([9],[12
2])
])

stop1

-1.716

MAuNSELL | AECOM

Contract

Job ref.

Part of
structure

Calc.sheet No.

Drawing ref.

Calculations by

Checked by

60095653

Date

Deflection of prestressed beam Design

Assume

"+ "sign means the deflection is downward(sag)


"- "sign means the deflection is upward(sag)

1.Material property
prestressed concrete density

pre.con =

DWS density sur.1 =

One tendon area

Ap=

Modulus of elasticity

Ep=

Tensile strength of tendon

fp=

24.50 (KN/m3)
22.60 (kN/m3)
150.00 (mm2)
195000 (Mpa)

1770 (Mpa)
Pj= 0.75fp X Ap X 10-3=

Jacking force(one tendon)

199.125

(KN)

2.Section properties
Beam length
Beam flange width

L=
bf=

Slab height

ts=

DWS height

td=

27.50 (m)
1.39 (m)
0.215 (m)
0.10 (m)

For beam section,


Area

Ab=

Moment of inertia
The distance between centroid axis to bottom

Ib=
yb=
ue.b=

0.7521 (m2)
0.1764 (m4)
0.6934 (m)
7.8100 (m)

For beam and slab composited section,


Area

Ac=

Moment of inertia
The distance between centroid axis to bottom

Ic=
yc=

1.1660 (mm2)
0.3925 (mm4)
1.0121 (m)

3.Tendon design
No. of strand at height of yi (mm)
NODE

60.00

110.00

160.00

210.00

260.00

500.00

1400.00

60.00

50.00

50.00

50.00

50.00

240.00

900.00

7.00

15

9.00

17

11

17

13

17

13

17

13

10

17

11

11

15

9.00

12

14

4.At transfer (say 7 days)


Minimum compresssive strength of concrete at transfer

fct=

40 (Mpa)
24000.00

Et=
R=

74.34 (Mpa)

Loss of elastic concrete e=

69.70 (Mpa)

Loss due to tendons relaxation

(Mpa)

The immediate loss of the tendon force:


Ploss.t= (R+e) X Ap X 10-3=
Pt=
Iefb = Ib =

Pj-Ploss.t=
0.1764

21.61 (KN)
177.520

(KN)

(mm )

E = Et = 24000.000 (Mpa)
P = Pt =

177.520

(KN)

Use chart multiplication method to calculate deflection

DEFLECTION

Page 16

MAuNSELL | AECOM

Contract

Job ref.

Part of
structure

Calc.sheet No.

Drawing ref.

Checked by

Date

No. of strand at height of yi (m)

yi
ni

Calculations by

60095653

0.060

0.110

0.160

0.210

0.260

0.500

1.400

(4,5)

(5,6)

15

(6,7)

17

11

(7,8)

17

13

(7,8)

17

13

(6,7)

17

11

(5,6)

15

(4,5)

(2,4)

Section

(2,4)

For section (2,4)


Value of the moment in M diagram
Area of the virtual M diagram

M1= P X ni ( yb - yi )=P[n1(yb-y1)+n2(yb-y2)+]=

1022.80 (KNm)
1.156 (m2)

A1= 1/2 X l1 X 1/2 X l1=

For other sections:


NODE

M i (KNm)

A i (m 2 )

Mi X Ai

(2,4)

1022.80

1.156

1181.969

(4,5)

1497.71

5.220

7818.070

(5,6)

2966.85

9.425

27962.547

(6,7)

3347.08

13.630

45620.667

(7,8)

3605.99

17.835

64312.828

(7,8)

3605.99

18

64312.828

(6,7)

3347.08

13.630

45620.667

(5,6)

2966.85

9.425

27962.547

(4,5)

1497.71

5.220

7818.070

(2,4)

1022.80

1.156

1181.969

293792.162

M i X A i

The short term deflection due to prestressing

fp=

fg1=

18.43 (KN/m)

Deflection due to prestressing and dead load of beam at tranfer is:


ftransfer=

(mm)

E I efb
4
(mm)
5 q g 32.41
1 L

qg1= pre.con X Ab=


Dflection due to dead load of beam

-69.40
M

E I

384
fp+fg1=

-36.98 (mm)

efb

5. 28 days
50 (Mpa)

fc28d=

27400.00 (Mpa)

E28d=
5.1 Prestress loss due to shrinkage from 0 to 28 days.
C s=
3.00

0.75 (m2)

Ag =

KL=

250.00

ue =

KC=

1.00

th =

Ke=

0.80

Kj =

0.25

7.81 (m)

2 A192.62
g
ue

The design shrinkage strain

1.cs28d= Cs*KL*KC*Ke*Kj =

150.00

Plossshrinkage28d= Ep X 1.cs28d X Ap X =

4.388 (KN)

5.2 Prestress loss due to shrinkage from 0 to 28 days.


Using the interpolation method, the creep strain coefficient can get as follow:
cc = KL*Km*KC*Ke*Kj =

0.45

KL=

2.10

Km=

1.00

Ke=

0.85

For the node 5:


s ci.beam =

creep strains ecc.28d =


Loss due to creep

Abeam

cc

Ds c.28d = Epecc.28d=

Plosscreep.28d= Ds c.28d X Ap=


For other nodes:

P13.51
e(Mpa)
beam . p

=
s Zci.beam
beam.p

E c.50
220.03 (10-6)
42.906 (Mpa)

(at 28 days)

6.436 (KN)

28 days

cc =

0.45

ebeam.p
(m)

Zbeam.p

Dsc.28d

(KN)

1.79

0.34

0.97

113.66

-0.12

3.87

62.96

12.28

1.84

5084.12

0.80

0.27

0.64

597.25

-0.93

7.61

123.94

24.17

3.63

7257.18

0.80

0.37

0.47

1170.95

-2.50

12.41

202.17

39.42

5.91

7830.70

0.80

0.39

0.45

1581.79

-3.52

13.13

213.83

41.70

6.25

8235.58

0.80

0.40

0.44

1828.76

-4.16

13.68

222.73

43.43

6.51

8246.67

0.80

0.40

0.44

1911.99

-4.35

13.51

220.03

42.91

6.44

8235.94

0.80

0.40

0.44

1831.41

-4.17

13.67

222.64

43.41

6.51

10

7831.37

0.80

0.39

0.45

1587.22

-3.53

13.12

213.66

41.66

6.25

11

7258.13

0.80

0.37

0.47

1179.72

-2.52

12.40

201.90

39.37

5.91

12

5084.70

0.80

0.27

0.64

608.17

-0.94

7.59

123.68

24.12

3.62

14

4389.48

1.79

0.34

0.97

116.71

-0.12

3.86

62.91

12.27

1.84

Pe,tran
(kN)

Abeam (m2)

4389.39

NODE

(m3)

Moment due stress due


to DL1
to DL1

ci (MPa)
sci.28d.

ecc
-6

(10 )
ecc.28d

Dsc

DEFLECTION

(MPa) Plosscreep.28d.i

Page 17

MAuNSELL | AECOM

Contract

Job ref.

Part of
structure

Calc.sheet No.

Drawing ref.

Calculations by

Checked by

60095653

Date

5.3 Use chart multiplication method to calculate deflection


Iefb=Ib=

0.1764 (m4)

E=E28d=

27400.00 (Mpa)

For section (0,1/8)


P28d1= Pt - Plossshrinkage.28d -( Plosscreep28d.1+Plosscreep28d.2)/2=

The prestress

170.40 (KN)

M1= P28d1 X ni ( yb - yi )=P[n1(yb-y1)+n2(yb-y2)+]=

Value of the moment in M diagram


Area of the virtual M diagram

981.77 (KNm)

1.156 (m2)

A1= 1/2 X l1 X 1/2 X l1=

For other sections:


NODE

P28di(KN) M i (KNm)

A i (m 2 )

Mi X Ai

(2,4)

170.40

981.77

1.156

(4,5)

168.36

1420.46

5.220

7414.79

(5,6)

167.05

2791.84

9.425

26313.08

(6,7)

166.79

3144.71

13.630

42862.45

(7,8)

166.62

3384.56

17.835

60363.56

(7,8)

166.62

3384.56

18

60363.56

(6,7)

166.79

3144.76

13.630

42863.10

(5,6)

167.05

2791.95

9.425

26314.10

(4,5)

168.37

1420.52

5.220

7415.14

(2,4)

170.40

981.79

1.156

1134.59

M i X A i

1134.56

276178.908

fpi=fp=
The short term deflection due to prestressing

fp.28d=

-69.40 (mm)

qg1= pre.con X Ab=


Dflection due to dead load of beam

fg1=

M-57.14i (mm)

18.43 (KN/m)

E I efb
(mm)
5 q g 128.39
L4

Dflection due to prestressing and dead load of beam at tranfer is:

384

E I

f28d= fp.28d+(fpi+fp.28d) X cc28d/2+fg1(1+cc28d)=

ef b

-44.31 (mm)

6.Short term deflection due to dead load of slab


qg2= pre.con X bf X ts =
Iefb=Ib=
E=E28d=
Dflection due to dead load of beam

fg2=

5 q
384

7.Short term deflection due to dead load of DWS

qg3= sur.1 X bf X td =
Iefb=Ic=
E=E28d=
Dflection due to dead load of beam

8.Total short term deflection at mid span based on 28 days

fg3=

7.32 (KN/m)

0.1764 (mm4)
27400.00 (Mpa)

L4

11.28 (mm)

g 2

E I
3.14 (KN/m)

efb

0.3925 (mm4)
27400.00 (Mpa)

5 q
384

fs= f28d+fg2+fg3=

L4

2.18 (mm)

g 3

E I
-30.86 (mm)

efb

DEFLECTION

Page 18

S-ar putea să vă placă și