Documente Academic
Documente Profesional
Documente Cultură
Unit Time Status Frequency Load Reactive Power Generator Current Power factor Fuel Fuel flow N. Gas I/L Pre. Spread Ambient Temp. Comp. Dish. Pre. Comp. Dish. Temp. Atom. Comp. Pressure Exhaust Temp. Atom Air Temp. Lube Oil Temp. MOP Dish. Pre. AHOP/MHOP Dish. Pr. Lube Oil Hdr. Pressure Brg. Temp (Max) Brg. Vib. (Max.) Gen.Wndg Temp(Max) I/L Air DP-Turbine I/l Air DP- Gen
AL GHAIL POWER PLANT SHIFT REPORT GTG 1 A-Shift B-Shift 16.00 B-Shift Auto
A-Shift 08.00 ISOCH 50.0 25.44 10.52 1491 0.92 NG 1.79 23.6 21 22.84 9.77 387 9.5 407 70 55 6.0 75 1.8 92 7.09 68 56 21
GTG 2 B-Shift 16.00 ISOCH 50.0 24.4 11.25 1498 0.92 NG 1.85 23.6 23 27.95 9.68 392 9.5 428 71.5 56 6.0 75 1.8 92 7.18 72 54.7 21.2
C-Shift 24.00 ISOCH 50.0 25.77 9.37 1367 0.94 NG 1.82 23.57 22 25 9.77 389 9.5 411 70 55 6.0 75 1.8 91 7.27 67 55.67 20.97
Hrs 08.00 DROOP/ISOCH HZ MW MVAR Amp PF NG/HSD Kg/Sec. Kg/Cm2 C C Kg/Cm2 C Kg/Cm2 C C C Bar Bar Bar C mm/sec C mmwc mmwc Fire Fighting System A-Shift A/M Auto A/M A/M
Tank Level Open. Closing 37 37 80 80 63 67 63 67
Unit % % % %
Receipt & Consumption Op. Stock Receipt Cl.Stock 35420 0 35420 96000 0 96000 1562 1474 0 0 1562 1474
Consmp 0 0 0 0
HIGHLIGHTS: Starting of the day, GTG1 on standby with Cool Down ON mode and GTG2 operating on Isochronous mode with 26.3 MW / 10.5 MVAR Simultaneous max. Load at AGP LLC was 60.62MW at 14:20Hrs. Heat rate of AGP LLC was 13151.87btu/kWh. GTG 1, fuel nozzles no. 4, 5 and 6 dismantling, Inspection and Assembly job was taken up by mechanical maintenance along with Instrument maintenance.why it was taken up, what was finding? In GTG1 & 2, Accessory Compartment, Load gear Compartment and Turbine Compartment general lighting maintenance done by Electrical maintenance. Replaced faulty lighting fixtures how many 2 or 200?. Preventive Maintenance of 11KV Spare Feeder breaker and panel (Panel No.20) taken up by Electrical maintenance. No abnormalities found. Emergency Diesel Generator Set trial taken. No abnormalities were noticed during the trial run. At 16:06Hrs, GTG1 started after completion of fuel nozzles cleaning job. Can you put this sentence immediately after At 16:39Hrs GTG1 Auto synchronized with GTG2 and slowly loaded up to 27MW. At 27MW, GTG 1 exhaust temperature spread was 700C what is permissible, how can you give a feeling that 700C is high or low?. So load transferred from GTG1 back to GTG2. GTG1 shut down taken at 18:35Hrs. Does story end here? What is your next action?? Total power generation during last 24 hrs was 556.75MWH Total Power Export to Al Hamra during last 24 hrs was 289.4MWH Total Power Import at Al Hamra during last 24 hrs was 283.2MWH
Max Load (MW) 26.83 30.57 28.54 Min Load (MW) 18.58 20.84 5.93
Time (Hrs) 00.36 14.20 15:35 Time (Hrs) 5.07 13.03 17:52
Exhaust Temp C 420 471 449 Exhaust Temp C 367 392 341
PERMIT ISSUED Sr. no 1. Permit Type Cold / Hot / Electrical Safety / Electrical Safety / Mechanical Job Description Issued by Name / Dept Suresh / Operation Suresh / Operation Cancelled by Name / Dept. Suresh / Operation Suresh / Operation Received by / Status Name / Dept. / Progr. Naresh / Electrical/ work completed Abhishek / Mechanical /work completed.
2.
Preventive Maintenance of 11KV Spare Feeder breaker and panel (Panel No.20) Dismantling , Inspection and Assembly of Fuel Nozzles 4,5 and 6 of Gas Turnine-1
3.
Cold / Electrical
Suresh / Operation