Sunteți pe pagina 1din 133

Building Schedule of Rates (1) Labour (days) I ii iii (2) Materials v vi (3) Plant Etc.

ii iii
Fuel & Forge

I
Blast powder

ii

iii
Jump steel

iv

vii

viii

ix

No

Excavation & Earth work

Spe. SK

SK

Un SK

Fuse

Earth

Red 500 200x earth D.D.T. gauge 200 mm with coir powder polythen sods dust e

Tape

Steel

Kg 1 2 3 Remove top soil, 150mm deposit within site (100m2) Excavate over site, deposit spread out level. (3m3) Excavate for trench / pit in loose / soft soil, deposit spread out level. (3m3) Ditto - in ordinary soil. (3m3) Ditto - in land / dense soil. (3m3) Ditto - in mud / wet soil. (3m3) Ditto - in soft, disintegrated rock (not requiring blasting). (3m3) Ditto - in rock requiring blasting. (3m3) Benching in rock, but blasting prohibited (1m2) 1.10 1.60 11.00 1.75

Lm

Kg

m3

Nr

m3

Kg

m2

1.10 2.40 3.75 3.20 2.75 2.20 1.60 0.35 3.05 0.50
0.25 0.20

4 5 6 7 8 9

10 Backfill and compact in trench / pit with selected excavated earth. (m3) 11 Ditto - with imported earth. (3m3)

1.10 1.40 3.75

0.04

0.04

12 Fill under floors watering, compacting and leveling, in 75 mm layers with selected excavated earth. (3m3) 13 Ditto - with imported earth. (3m3)

2.20

0.04

2.20

3.75

0.04

Building Schedule of Rates

(1) Labour (days)

(2) Materials

(3) Plant Etc.

No

Excavation & Earth work

Building Schedule of Rates I ii iii I


Blast powder

ii

iii
Jump steel

iv

vi

vii

viii

ix

ii
Steel fuel & Forge

iii
Fuel & Forge

No

Excavation & Earth work

Spe. SK

SK

Un SK

Fuse

Earth

Red 500 200x earth D.D.T. gauge 200 mm with coir powder polythen sods dust e

Tape

Kg 1 Cutting turf sods, loading to and unloading from, laying and watering for 30 days(10 m2) Anti termite treatement to excavated foundated trenches and filling. (10m2) Polythene type 500 damp proof membrane on compacted fill, with 60 mm wide sealingtape. (10m2) 0.10 5.00

Lm

Kg

m3

Nr 263

m3 0.75

Kg

m2

m 0.40

0.50

7.30

0.20

12.00

25.00

(1) Labour (days) I ii iii

I
Cement

ii
Sand

iii
40 Metal

(2) Materials iv v vi
25 Metal 20 Metal

vii

viii

ix

I
Vibrator

(3) Plant Etc. ii iii


10/7 Mixer

No

Concrete Work

Spe. SK

SK

Un SK

Jute Mixed Hessian concrete

50 Kg 1 2 3 4 5 Mixing 1:3:6 (40) concrete (3m3) Grade 15 Mixing 1:2:4 (25) concrete (3m3) Grade 20 Mixing 1:2:4 (20) concrete (3m3) Grade Mixing 1:1 1/2 :3 (20) concrete (3m3) - Grade Mixing 1:1:2 (20) concrete (3m3) Grade 30 Placing - 50 mm screeds under foundation depth not exceeding 1.5m (10m2) 1.10 1.10 1.10 1.10 6.40 6.40 6.40 6.40 13.80

m3 1.60 1.80 1.50 1.30

m3 2.80

m3

m3

m2

m3

Day

Day 0.34

2.70 2.65 2.50

0.34 0.34 0.34

1.10

6.40

1.30

2.90

0.34

0.125

0.50

0.52

Building Schedule of Rates 7 8 Placing - 75 mm ditto Placing 150mm thick mass concrete ground floor slab (10m2) 0.125 0.50 0.75 1.25 0.80 1.50

Building Schedule of Rates 9 Placing 225x225 R.C.C. colomn on ground floor including curing. (1.25m3)

3.20

3.20

5.60

1.50

1.00

10 Placing 225x225 R.C.C. beam at first floor r including curing. (1.25m3)

3.20

4.25

5.60

1.50

1.00

Building Schedule of Rates 11 Placing 125 mm thick R.C.C. floor slab at first floor levelfloor including curing. (1.50m3)

3.20

4.25

2.80

1.65

1.00

(1) Labour (days) I ii iii

I
25 Tk Planks

ii
100x50 Timber

iii
50x50 Timber

iv

(2) Materials v vi
Wedges Etc Mould Oil

vii
16 dia 50 long Bolts

viii
Wire Nails

ix

(3) Plant Etc. ii iii

No

Form work

Spe. SK

SK

Un SK

50x25 Metal

50 Kg 1 Form work to floor 225x225 colomn in ground floor (140m2 contact area) Making mould per use (4 Nos) Assembling - per use 3 4 Dismantling, cleaning and repainting - per use Form work to under side of the first floor slab (20m2 contact area) Making panels (4 uses, including 20% repair cost) Assembling per use Dismantle and cleaning per use Form work to beams in ground floor (5m2 contact area) Making the mould per use.(4uses) Assembling Dismantling and cleaning

m3

m3

m3

m3

Nr

Kg

Day

Day

0.125

0.13

0.45

1.30

1.25

0.20

2 0.25 0.25 0.25 0.25 1.10 0.50 0.60

1.00

1.00

6.70

10.00

0.50

5 6 7

1.10 0.60

4.40 2.20

45.50

5.00

1.00

0.35 1.00 0.50

0.60 2.00 2.00

0.30 0.10

2.50 6.20

3.75 7.30

2.00

0.1% of timber 4.31

0.25 0.70

8 9

(1) Labour (days) i ii iii

ii

iii

iv

(2) Materials v vi

vii

viii

ix

(3) Plant Etc. ii iii

No

Reinforcement

Building Schedule of Rates

No

Reinforcement

Spe. SK

SK

Un SK

M.S for Steel

Binding wire

Spacers or Chairs

50 Kg 1 Mild steel / Tor steel reinforcement to lintols slab beams or columns bent to shape laid in position & tied with G.I. Wires (50Kg) 1.00 1.00 1.15

Kg

Kg

0.70

1.5% of 2(I)

(1) Labour ii iii

ii

iii

iv

(2) Materials v vi
Slacked lime

vii

viii

ix

(3) Plant Etc. ii iii

No

Brick work

Spe. SK

SK

Un SK

Brick

Sand

Cement

Wirecut Bricks

Acids

Water

Scaffoldi ng x% of (I)

Day 1 2 Brick work in 1:5 cement sand mtr in foundation.(3m3) -Ditto- in 1:8 cement , sand mortar in foundation.(3m3) -Ditto- in 1:5 cement , sand mortar in 112.5 mm thick walls in ground floor (10m2) -Ditto- 225 mm thick walls in ground floor (10m2) -Ditto- 337.5 mm thick walls in ground floor (10m2) -Ditto- in 1:8 cement and sand mortar in ground floor (10m2) Brick work (wire cut) in cement and sand mortar in 112 5 mm the walls in ground floor (10m2) -Ditto- 225 mm thick walls in ground floor (10m2)

Day 3.20 3.20

Day 4.30 4.30

1,000 1.60 1.60

m3 0.75 1.15

50 Kg 1,000 4.30 2.50

Ltr

50 Kg

Ltr

1.60

2.15

0.60

0.30

1.40

0.05

4 5 6

2.40 3.75 2.40

4.05 5.90 3.25

1.25 1.85 1.25

0.60 0.90 0.90

3.25 4.85 1.90

0.03

0.02

0.03

1.6

2.15

0.25

1.30

0.60

0.05

2.40

4.05

0.55

2.70

1.20

0.03

Building Schedule of Rates 9 -Ditto- 337.5 mm thick walls in ground floor (10m2) 4.05 5.90 0.90 4.85 1.80

0.02

Building Schedule of Rates Extra over for facing including raised 3 mm thick in cement and 10 sand 1:1 texture in ground floor (10m2) 11 175mm the floor paved in lime mortar 2:5 in ground floor (10m2)

5.40

3.75

0.05

0.55

0.45

1.25

2.50

0.40

0.35

1.30

200

Steps 338 x 150 mm in brick in cement and sand 1:5 12.5 mm 12 thick cement and sand 1 :2 rendering adusive necessary errors (3 m) Brick drains in cement and sand 1:5 225 mm wide 150-225 mm average depth including cement 13 rendering 12.5 mm thick 1:2 to exposed faces with 450 mm ramp including necessary errors. (3 m) 14 -Ditto- with out ramp (3 m )

0.50

0.50

0.12

0.14

0.50

1.27

1.27

0.14

0.14

0.81

1.02

1.27

0.11

0.12

0.71

(1) Labour (days) I ii iii

ii

iii

iv

(2) Materials v vi

vii

viii

ix

(3) Plant Etc. ii iii

No

Hollow Block Masonry

Spe. SK

SK

Blocks 400x Un SK 200x 200 mm

Sand

Blocks 400x Cement 200x 100 mm

Scaffoldi ng

1,000 1 200 mm thick hollow block work (400 x 200 x 200 ) in cement and sand mortar 1:5 in ground floor (caubes unfilled )(10m2) 100 mm thick -ditto- (400 x 200 x 100 mm ) 1.61 2.69 0.13

m3 0.18

50 Kg 1,000 0.81
0.03

1.08

2.15

0.09

0.43

0.13

0.03

(1) Labour (days) I ii iii

ii

iii

(2) Materials iv v vi

vii

viii

ix

(3) Plant Etc. ii iii

No

Random Rubble Masonry

Building Schedule of Rates

No

Random Rubble Masonry

Spe. SK

SK

Un SK

50x20 Rubble

Sand

Cement

m3

m3

50 Kg

Building Schedule of Rates Random rubble masonry in cement , sand mortar 1:5 in below FFL (350mm thick) (3m3) -Ditto in super structure(3m3)

4.24

6.35

3.90

0.90

5.30

4.77

7.41

3.90

0.90

5.30

(1) Labour (days) I ii iii

I
Fire Wood

ii

iii

(2) Materials iv v vi
Slacked Powder lime Pigment

vii

viii

ix

(3) Plant Etc. ii iii

No

Plstering

Spe. SK

SK

Un SK

Bitumen

Sand

Cement

Kg 1 19mm thick DPC in cement and sand 1:2 finished with 2 coats of hot bitumen blinded with sand (10m2) 16mm thick plasering to walls in lime and sand 2:5 including floating with lime putty (10 m2) -Ditto- cement and sand 1 :3 including cement floating (10 m2) 10mm thick plastering to sofft of slab cement and sand 1:3 including flating with lime putty (10m2) Ditto- to sides & soffit of beams (10m2) 16 mm thick walls in lime cement and sand 1:1:5 finished semirough with wooden float. (10m2) -Ditto- finish smooth with lime putty(10m2) 12mm thick rendering in cemnt and sand 1 : 3 finish smooth 1.34 2.69 4.90

Ltr 6.83

m3 0.34

50 Kg 50 Kg 2.42

Kg

1.08

1.88

0.21

1.40

1.08

1.61

0.18

1.51

2.69

2.69

0.15

0.86

0.17

2.15

2.15

0.15

0.86

0.17

1.08

1.34

0.21

0.86

0.43

7 8

1.61 1.08

1.61 1.61

0.21 0.15

0.86 0.15

0.65

Building Schedule of Rates 9 -Ditto cement and sand 1 :2 in floors finishes smooth (10 m2) 1.08 1.88 0.15 1.61

Building Schedule of Rates 19 mm thick rendering in cement 10 and sand 1:2 in floors finished smooth (10 m2) 11 -Ditto in cement and sand 1 :2 in floors finished smooth (10 m2)

1.34

2.42

0.24

1.88

1.34 1.34

2.42 2.42

0.24 0.24

2.42 2.41 2.43

19mm thick rendering in cement 12 and sand 1:2 in cloloured cement floors finished smooth (10 m2) 12.5 x 150 mm skirting in cement and sand 1:3 project or finished 13 with floating including forming grove (3m)

0.37

0.31

0.01

0.10

0.11

(1) Labour (days) I ii iii

I
150x 150 mm Glazed Tiles

ii

iii

(2) Materials iv v vi
300x white 300 mm Colour Cement Terra Pigment Tiles

vii
wax Polish

viii
Cotton waste

ix

(3) Plant Etc. ii iii

No

Glazed Tiles and Terrazzo Tiles

Spe. SK

SK

Un SK

Cement

Sand

Scaffoldi ng

Nr Glased tiles fixed to walls including bedding in cement mortar 1:2 & pointing in ground floor ( specils mesured separately)10 m2) Terrazzo floor tiles on 12.5 mm thick cement and sand 1:2 in ground floor (10m2)

50 Kg

m3

Kg

Nr

Kg

Kg

Kg

4.30

4.57

473

2.69

0.34

0.49

4.30

3.76

1.34

0.21

113

0.97

0.24

0.97

(1) Labour (days) I ii iii

I
200x 200 mm Pressed Tiles

ii

iii

(2) Materials iv v vi
Wax Polish Cotton waste

vii

viii

ix

(3) Plant Etc. ii iii

No

Pressed Tiles

Spe. SK

SK

Un SK

Cement

Sand

Coloured Pigment

Scaffoldi ng

Kg

50 Kg

m3

Kg

Kg

Kg

Building Schedule of Rates Pressed floor tiles bedded in 12.5 mm cement mortar 1:2 and pointing in neat cement in ground floor (10 m2)

4.30

4.84

254

1.34

0.21

0.12

0.12

0.97

(1) Labour (days) I ii iii

ii

iii

(2) Materials iv v

vi
Sand paper

vii

viii

I
Wire brush

(3) Plant Etc. iv ii iii


50 mm brush 75 mm Scaffoldi brush ng

No

Painting and Decoration

Spe. SK

SK

Primer Wood Anti Anti minaral Enamel Un SK Preserva corrosiv corrosiv terpentin Paint tive e e Paint e

Ltr 1 Prepare and apply one coats of preservative (oil type) to structural timber including touching up cut end ect. After fixing (10 m2) Prepare sufaces of steel trusses and apply two coatsof anti corrossive Apply one coat of anti - corrosive primer and two coats of enamal paint to mild steelon already shop primed and erected steel roof truss (10 m2) Prepare and apply two coats primer and finishing coat of enamal paint to mild steel (angle/flat) plates (10m2) Painting steel on new steeel work with 2 coats of anti corrosive paint (10m2) Painting new timber work with two coats of wood preservative. (10 m2) Prepare and painting wood work with primer two coats enamel paint (10m2) 0.81 0.54 2.95

Ltr

Ltr

Ltr

Ltr

Nr

Nr

Nr

Nr 1/10

1.61

1.61

2.42

0.16

1.00

1/8

2.69

1.08

0.22

0.22

1.43

1/5

3% of (I)

1.08

1.61

3.23

0.43

1.43

1.00

2/5

1.61

0.72

1/5

0.54

2.44

1/5

1.61

0.54

0.81

2.69

2.00

1/10

Building Schedule of Rates Prepare and apply one coats of preservative (oil type) to structural timber including touching up cut end ect. After fixing (10 m2) Preparea surfaces of steel truss and apply two coats of anti corrosive primer (10m2)

0.81

0.54

2.95

1/10

1.61

1.61

2.42

0.16

1.00

1/8

Apply one coat of anti - corrosive 10 primer two coats of anti corrosive primer (10 m2) Prepare and apply two caots primer and finishing caots of 11 enamal paint to mild steel ( angle/ flat) (10m2) Painting steel on new timber work 12 with 2 coats of anti corrosive paint (10m2) Painting new timber work with two 13 coats of wood preservative. (10 m2) Preparing and paing wood work 14 with primer two coats enamal paint (10m2)

2.69

1.08

0.22

0.22

1.43

1/5

3% of (I)

1.08

1.61

3.23

0.43

1.43

1.00

2/5

1.61

0.72

1/5

0.54 1.61 0.54

2.44 0.81 2.69 2.00

1/5 1/10

(1) Labour (days) I ii iii

I
Boiled lime

ii

iii
Yellow ochre

(2) Materials iv v

vi

vii

viii

ii

(3) Plant Etc. iv iii

No

Painting and Decoration

Spe. SK

SK

Un SK

Salt

Blue

Cement

150 mm 150 mm coir brush brush

Scaffoldi ng

50 Kg 1 2 White and coloured watshing two coats in single storey(100m2) -Ditto- in two sotored building (100m2) 2.42 3.23 2.42 3.23 0.54 0.54

Kg 0.97 0.97

Kg 0.24 0.24

g 61.00 61.00

Kg

Nr

Nr 1/3 1/3 3% of (I) 3% of (I)

Building Schedule of Rates 3 Cement washing to walls of single stored building 2 coats(100m2) 2.15 2.15 0.67 1.00 3% of (I)

Building Schedule of Rates

(1) Labour (days) I ii iii

ii

iii

(2) Materials iv v
Wax Polish Sand Papers

vi
Flannel cloth

vii

viii

I
Floor brush

ii

(3) Plant Etc. iv iii


150 mm Scaffoldi brush ng

No

Painting and Decoration

Spe. SK

SK

Un SK

Primer

Emulsio n Paint

Varnish

75 mm brush

Ltr 1 Prepare & apply one coat of alkali resistant primer and two coats of emulsion paint to walls (10m2) 1.34 0.97

Ltr 1.51

Ltr

Kg

Nr 2.00

Nr

Nr

Nr 1/10 3% of (I)

Painting walls with emulsion paint (2 coats) (10m2) Prepare & apply one coat alkali resistant primer and two coats of emulsion paint to soffit of slab(10m2) Varnish two coats with copal vaenish after sand paapering (10m2) Wax polish to timber in panels & floors(10m2)

0.81

1.51

1/10

3% of (I)

1.88

0.97

1.61

1/10

3% of (I)

0.54

0.54

1.94

1/3

0.40

0.37

7.00

0.50

1/10

(1) Labour (days) I ii iii

ii
50x 25 mm Reeper

iii
Roof Tiles

iv

(2) Materials v vi

vii

viii
Half round clay Tiles

ix
115 m long Ridges

(3) Plant Etc. ii iii

No

Roofing

Spe. SK

SK

Un SK

Timber

Wire nails 6'' long

Wire Asbesto Roofing nails 2'' s Screws long corrugat Washers ed sheet

Scaffoldi ng

m3

Lm

Nr

Kg

Kg

m2

Nr

Nr

Pair

Building Schedule of Rates Timber frame work for calicut pattern tile hip roof in sigle strore building consisting of wall plate beam ridge plate rafter ect. (preservative treatement to be mesured separately) 60m2

7.53

8.60

1.14

227

3.90

0.97

3% of (I)

Building Schedule of Rates Roof covering with calicut pattern clay tiles in single stored building (Timber frame work & ridge covering mesured separely)(60m2) Timber frame work for corrugated asbestos sheet roof in sigle stored building (60 m2) Roof covering with corrugated asbetose sheets in single stored building (Timber frame work & ridge covering mesured separely)(60m2) One layer half round clay tiles over corrugated asbetos roof covering (10m2) Asbestos close fittings ridging fixed complete with roofing screws or bolts (work) (4m) 0.25

3.23

3.23

807

3% of (I)

2.69

3.23

0.44

3% of (I)

1.00

2.15

41.95

78.00

3% of (I)

2.15

700

3% of (I) 3% of (I)

0.25

16.00

4.00

(1) Labour (days) I ii iii

I
Ridge Tiles

ii

iii

(2) Materials iv v vi
Slaked Colourin lime g Powder 25 mm Planks

vii
38 mm brass screws

viii

ix

(3) Plant Etc. ii iii

No

Roofing

Spe. SK

SK

Un SK

Cement

Sand

Scaffoldi ng

Nr 1 Ridging covering with calicut pattern ridge tiles bedded in cement lime mortar 1:1:4 (4m) 19x225 mm high valance board fixed with brass screws to ends of rafters (for tile roofing) (30m) 225 mm high barge board fixed with brass screws at 600mm centres to sides of rafters 0.27 0.27 10.00

50 Kg 0.37

m3 0.06

Kg 7.43

Kg 0.25

m2

Nr

2.95

2.95

7.20

70.00

5% of (I) 5% of (I)

2.95

2.95

7.20

50.00

(1) Labour (days)

(2) Materials

(3) Plant Etc.

Building Schedule of Rates I ii iii I ii iii iv v vi vii viii ix I ii iii

No

Roof plumbing

Building Schedule of Rates

No

Roof plumbing

Spe. SK

SK

Un SK

Wood G.I Preserva Cement Sheets tive

Slaked lime

Sand

Planks

38 mm wire Solderin nails g lead

Scaffoldi ng

m2 B,w,g. (1.2mm) glavanised iron sheet gutter 900mm girth overall once bent end caps not less than 225 mm with 25 mm tongued & grooved plank to slop and profile on timber members. B,w,g. (1.2mm) glavanised iron flashing mm girth overall 3 times bent with end not less than 150 mm lead soldered, and taked up to not less than 150 mm chase cut in wall & pointed in cement tar 1:2 lower end dress over roof ring not less than 300 mm wide (4.5 m).

Ltr

50 Kg 50 Kg

m3

m2

Kg

Kg

1.48

0.25

1.97

5.85

1.12

0.10

0.05

0.03

4.57

0.89

0.49

0.12

0.74

2.93

0.05

0.03

0.45

(1) Labour (days) I ii iii

I
Timber Class I

ii
50 mm wire nails

iii
Fibre/ Plastic Plugs

(2) Materials iv v vi

vii

viii

ix

I
50 mm brush

(3) Plant Etc. ii iii

No

Ceiling

Spe. SK

SK

Un SK

Cement

Sand

Ternap

Scaffoldi ng

m3 Timber frame work for 1.2 x 1.2 m flkat asbestos ceiling (shet mesured separately ) comprising of 100 x 50mm joints and 50 x 50 mm bearers in class 1 timber (20m 2)

Kg

Nr

50 Kg

m3

Ltr

2.75

0.55

1.65

0.25

0.50

29.00

0.25

0.06

1.67

1/4

3% of (I)

(1) Labour (days) I ii iii

ii

iii

(2) Materials iv v vi

vii

viii

ix

(3) Plant Etc. ii iii

No

Ceiling

Building Schedule of Rates


50x50 38x12 Flat mm mm Asbesto Halmilla Halmilla s sheets coveme beading nlding

No

Ceiling

Spe. SK

SK

Un SK

6 mm dout nails

38 mm brass screws

Scaffoldi ng

No

Ceiling
Building Schedule of Rates m2 Horizontal ceiling lining using 1.2 x 1.2 m flat asbestos cement sheets fixed with and including beading and cove mrnlding on timber frame work ( Timber frame work and painting mesured separately ) 20 m2 m m Kg Nr

1.66

2.21

21.54

20.19

42.06

0.13

106

3% of (I)

(1) Labour (days) I ii iii

I
100x 50mm timber joists

ii

iii

iv

(2) Materials v vi
38 mm brass screws 50x6 mm Timber strips

vii
19 mm Nails

viii

ix

(3) Plant Etc. ii iii

No

Ceiling

Spe. SK

SK

Un SK

150x38 mm Lunumid Cement ella Planks

Sand

Scaffoldi ng

m 19 mm thick tonged & grooved lunmuidella ceiling boards fixed horizontal on 100x50 mm class I timber joists at 600mm centres 38 mm brass nails (20m2)

m2

50 Kg

m3

Kg

Kg

4.42

1.10

7.73

39.15

22.05

0.03

0.13

4.42

3% of (I)

19 x 150 mm wide tonged & grooved lunmuidella ceiling boards fixed to undersides of rafters ( exsisting) with 38 mm brass nails including levlelling with timber strips whrerre necessary. (18 m2)

3.23

6.45

21.97

4.30

13.11

2.15

3% of (I)

(1) Labour (days) I ii iii

I
100x75 mm Timber

ii
Spear stone

iii
Fibre plastic plugs

(2) Materials iv v vi
16 mm 100 mm a.s. long dowels brass 100 mm Screws long 38 mm thick planks

vii

viii

ix

(3) Plant Etc. ii iii

No

Doors and Windows

Spe. SK

SK

Un SK

2025x 25 mm 825 mm thick plywood planks sash

Scaffoldi ng

m3

Nr

Nr

Nr

Nr

m2

m2

Nr

Building Schedule of Rates Door single hung 975x2100 mm high overall with frame having 31 mm thick sash and 94x69 mm timber frame (glazing iron mongery & painting measured separately) (2.10 m2) Door glazed & panelled double hung 1200 x2100 mm high overall with frame including 38 mm thickn sash & 94x69mm frame (glazing iron mongery & painting measured separately) (2.60 m2) Plywood door single hung 938x2088mm overall with frame having 31 mm thick sash and 94x69 mm frame ( iron mongery & painting measured separately) (2.02 m2) Door ledged, braced & battened single hung 750x1950 mm overall, with frame having 22 mm tongued & grooved planks and 94x69 mm frame( iron mongery & painting measured separately) (1.51m2) Window, glazed 2100x1200 mm high overall with frame comprising 3 Nr. Openable sashes and 94x69 mm frame and mullions(glasing, iron mongery and painting measured separately) (2.60)

5.00

1.50

0.04

2.00

6.00

6.00

2.00

1.30

0.47

6.00

2.00

0.05

2.00

6.00

6.00

2.00

1.49

0.65

0.75

0.25

0.63

0.05

2.00

6.00

6.00

2.25

0.25

1.25

0.05

2.00

6.00

6.00

2.00

1.95

36.00

6.00

0.50

3.00

0.09

4.00

4.00

0.86

(1) Labour (days) I ii iii

I
3 mm thick glass panes

ii
12x12 mm beading

iii
Brass panel pins

iv

(2) Materials v vi

vii

viii

ix

(3) Plant Etc. ii iii

No

Doors and Windows

Spe. SK

SK

Un SK

Scaffoldi ng

m3

Nr

Building Schedule of Rates 3 mm clear sheet glass panes exceeding 0.09 but not exceeding 0.38 m2 cut and fixed with timber beadings to doors and windows (consider sash 900x1200 mm high with 75x31 mm style & 4 Nos. glass panes) (0.84m2)

0.50

0.50

0.84

9.14

48.00

(1) Labour (days) I ii iii

I
20 mm pipes

ii
25 mm pipes

iii
32 mm pipes

(2) Materials iv v vi
20 mm clips & nails 25 mm clips & nails 32 mm clips & nails

vii
32 mm sockets

viii
Solvent cement

ix

(3) Plant Etc. ii iii

No

Plumbing (PVC)

Spe. SK

SK

Un SK

m 1 20mm diameter PVC Pipes fixed to walls (specils paid separely) (3 m) 25mm diameter PVC Pipes to walls (Specials paid separely) 32 mm diameter ditto-(30m) 0.13 0.13 3.90

Nr 3.00

Nr

Nr

Nr

Gms 2.00

2 3

0.13 0.5

0.13 0.50

3.90 32.00

3.00 35.00 8.00

3.00 32.00

(1) Labour (days) I ii iii

I
40 mm pipes

ii
40 mm sockets

iii
40 mm clips & nails

iv

(2) Materials v vi
50 mm sockets 50 mm clips & nails

vii

viii
Solvent cement

ix

(3) Plant Etc. ii iii

No

Plumbing (PVC)

Spe. SK

SK

Un SK

50 mm pipes

m 1 40 mm diameter PVC fixed to walls (sepecils paid separely)(30m) 50mm diameter PVC to walls ( sepecils paid separely)(30m) 0.75 0.75 32.00

Nr 8.00

Nr 35.00

Nr

Nr

Gms 48.00

0.75

0.75

32.00

8.00

35.00

64.00

Building Schedule of Rates

(1) Labour (days) I ii iii

ii

iii

iv

(2) Materials v vi

vii

viii

ix

(3) Plant Etc. ii iii

No

Plumbing (PVC)

Building Schedule of Rates

No

Plumbing (PVC)

Spe. SK

SK

Un SK

63 mm pipes

63 mm sockets

63 mm clips & nails

90 mm pipes

90 mm socket

90 mm clips & nails

Solvent cement

m 1 2 63mm diameter PVC to walls ( sepecils paid separely)(30m) 90mm diameter PVC to walls ( sepecils paid separely)(30m) Excavation for laying 20mm to 90 mm diameter PVC pipes in ground not less than 450 mm deep , back filling & compacting (30m) 0.75 1.00 0.75 1.00 32.00

Nr 8.00

Nr 35.00

Nr

Nr

Gms 112

32.00

8.00

35.00

200

2.22

(1) Labour (days) I ii iii

ii

iii

iv

(2) Materials v vi

vii
20 mm special

viii
Solvent cement

ix

(3) Plant Etc. ii iii

No

Plumbing (PVC)

Spe. SK

SK

Un SK

Cement

Sand

50 Kg Chasing bricks work for laying 20mm to 50 mm diameter PVC pipes and making good average depth 50mm (Pipes a& specials mesured separtaely) (30m) Ditto- for laying 50mm to 90 mm diameter PVC pipe sin ground floor & m.G average depth 75 mm ditto. 20mm dia special s elbow/ bends/ sockets (10specils) 0.25

m3

Nr

Gms

2.95

2.95

0.10

0.03

3.45

3.45

0.20

0.08

10.00

20.00

(1) Labour (days) I ii iii

ii

iii

iv

(2) Materials v vi

vii

viii

ix

(3) Plant Etc. ii iii

No

Plumbing (PVC)

Building Schedule of Rates

No

Plumbing (PVC)

Spe. SK

SK

Un SK

25 mm 32 mm 40 mm 50 mm 63 mm 75 mm 90 mm Solvent specials specials specials specials specials specials specials cement

No

Plumbing (PVC)
Building Schedule of Rates Nr Nr Nr Nr Nr Nr Nr Gms 30.00

25mm diameter PVC specils viz elbow/ bends/ sockets (10 nr specils) 32mm diameter - ditto- (10nr specials ) 40mm diameter - ditto- (10nr ) 50mm diameter - ditto- (10nr ) 63mm diameter - ditto- (10nr ) 75mm diameter - ditto- (10nr ) 90mm diameter - ditto- (10nr )

0.25

10.00

2 3 4 5 6 7

0.25 0.25 0.50 0.50 0.50 0.50

10.00 10.00 10.00 10.00 10.00 10.00

40.00 60.00 80.00 140 200 240

(1) Labour (days) I ii iii

ii

iii

(2) Materials iv v vi

vii

viii

ix
90 mm Tee

(3) Plant Etc. ii iii

No

Plumbing (PVC)

Spe. SK

SK

Un SK

20 mm 25 mm 32 mm 40 mm 50 mm 63 mm 75 mm Solvent specials specials specials specials specials specials specials cement

Nr 1 2 3 4 20mm diameter PVC specilss viz tee (10nr) 25mm diameter - ditto- (10nr specials ) 32mm diameter - ditto- (10nr specials ) 40mm diameter - ditto- (10nr ) 0.50 0.50 0.50 0.50 10.00

Nr

Nr

Nr

Nr

Nr

Nr

Gms 30.00

Nr

10.00 10.00 10.00

45.00 60.00 90.00

(1) Labour (days) I ii iii

ii

iii

iv

(2) Materials v vi

vii

viii

ix

(3) Plant Etc. ii iii

No

Plumbing (PVC)

Building Schedule of Rates

No

Plumbing (PVC)

Spe. SK

SK

Un SK

20 mm Tee

25 mm Tee

32 mm Tee

40 mm Tee

50 mm Tee

63 mm Tee

75 mm Tee

Solvent cement

90 mm Tee

Nr 1 2 3 4 50mm diameter - ditto- (10nr ) 63mm diameter - ditto- (10nr ) 75mm diameter - ditto- (10nr ) 90mm diameter - ditto- (10nr ) 1.00 1.00 1.50 1.50

Nr

Nr

Nr

Nr 10.00

Nr

Nr

Gms

Nr

10.00 10.00 360 10.00

(1) Labour (days) I ii iii

I
100 mm dia G.I pipes

ii

iii
Timber plugs 150x 150x 50

(2) Materials iv v vi
75 mm iron screws

vii
Fire wood

viii
Sundries in Cement & sand

ix

(3) Plant Etc. ii iii

No

Plumbing (PVC)

Spe. SK

SK

Un SK

Yarn

Cement

Lead

Scaffoldi ng

m 100 mm dia G.I . Soil/ vent pipe fixed vertically to walls jointed with cement caulking (special measured separately) (2m) 100 mm dia G.I . pipes fixed vertically to walls jointed with lead caulking (special measured separately) (2m)

50 Kg

m3

Nr

Kg

Kg

50 Kg 5% of (I)

0.25

0.25

2.20

0.16

1.00

2.00

1.00

0.25

0.25

2.20

0.16

1.00

2.00

2.97

0.07

10% of (I)

5% of (I)

(1) Labour (days) I ii iii

ii

iii
1:3:6 (40) concrete

(2) Materials iv v vi

vii

viii

ix

(3) Plant Etc. ii iii

No

External Drainage Pipes)

(EW
Spe. SK SK Un SK 100 mm Cement EV pipes

Yarn

No

External Drainage Pipes)

(EW Building Schedule of Rates Nr 50 Kg m3 Kg

Building Schedule of Rates 100mm diameter glazed eathwarepipes laid on 150mm thick bedding in cement concrete 1:3:6 (40mm ) including excavation average 600mm depth , back filling with selected excavatere materials and concrete haunching to joints(30m)

1.97

14.76

50.00

0.50

2.09

0.89

(1) Labour (days) I ii iii

ii

iii

iv

(2) Materials v vi

vii

viii
RCC cover slab

ix

(3) Plant Etc. ii iii

No

Manholes & Gulleys

Spe. SK

SK

Un SK

112 mm S.W. 112 mm Cement 100 mm Cement Brick gulley Excavati Brick renderin G.I. concrete work in 100mm on work g (1:2) Grating (1:5)

Scaffoldi ng

Nr 100mm diamerete stone gully with 150 x150 x 150mm gulley box including excavation , 100mm cement concrete 1:2:4 (20mm) base , and 1 :5 extended 150mm above top of guley box including making connection , 12mm cement and sand 1:2 renderign internally and exposed faces finished smoooth with neat cement floating and providing G.I grating on to pof gulley(1nr)

m3

m2

m3

m2

Nr

m2

Nr

0.50

0.50

1.00

0.11

0.51

0.02

0.09

1.00

Building Schedule of Rates Manhole 600 x 600mm internally with invertdepth not exceeding 600mm including excavation, backfilling 150 mm cement concrete 1:2:4 (20mm) base with 9 mm dia mild steel rods at 100 mm centres both ways, forming channels & benching in similar concrete, 112 mm walls in brick in cement 1:5, 12 mm thick cement & sand 1:2 rendering internally and exposed surfaces including channels, benching & 50 mm thick RCC removable cover slab 675x675mm in-let & out-let connection all complete to working order(1Nr)

1.50

2.50

0.99

0.20

8.64

10.18

1.00

(1) Labour (days) I ii iii

ii
20 mm tap

iii
Waste plug & chain

iv

(2) Materials v vi
38 mm brass screws

vii

viii

ix

(3) Plant Etc. ii iii

No

Sanitary Fittings

Spe. SK

SK

Wash basin Un SK with brackets

Wooden plug

Cement

Nr 550x400 mm glased fireclay wash basin with 20 mm diameter chromium plated pillar tap, waste plug , chromium plated waste chain and stay, including fixing wash basing on brackets.(water supply and waste water connection measured separately) (1Nr)

Nr

Nr

Nr

Nr

Kg

0.50

1.00

1.00

1.00

1.00

4.00

6.00

0.91

(1) Labour (days) I ii iii

ii

iii

(2) Materials iv v vi

vii

viii

ix

(3) Plant Etc. ii iii

No

Sanitary Fittings

Building Schedule of Rates


50mm thick 600x375 L iron Un SK Cement tapered x175 mm brackets wooden sink blocks Low 38 mm level brass suite screws complet e

No

Sanitary Fittings

Spe. SK

SK

20 mm stop cock

Sand

Nr

Nr

Kg

Nr

Nr

Nr

Nr

m3

Building Schedule of Rates

Sink 600x375x175 mm overall vitreous china with rubber plug and chromium plate and chain waste carried on iron brackets painted & fixed to walls.( water supply and waste water connection measured separately)(Nr)

0.50

0.50

1.00

2.00

0.91

2.00

8.00

(1) Labour (days) I ii iii

ii

iii

(2) Materials iv v vi
Low 38 mm level brass suite screws complet e

vii
20 mm stop cock

viii

ix

(3) Plant Etc. ii iii

No

Sanitary Fittings

Spe. SK

SK

Un SK

50mm thick Iron Cement tapered brackets wooden blocks

Sand

Nr Closet pedestal type with L/L flushing system, flush pipe double plastic seat cover, 20 mm dia stop cock, trap supplied & fixed complete to working order(1Nr)

Kg

Nr

Nr

Nr

Nr

m3

1.00

0.25

1.00

0.91

2.00

1.00

1.00

0.01

(1) Labour (days) I ii iii

ii

iii

(2) Materials iv v vi

vii

viii

ix

(3) Plant Etc. ii iii

No

Sanitary Fittings

Spe. SK

SK

Un SK

9 ltr G.I. Cistern with 40 mm Squattin flush g pan pipe with trap chain & over flow pipe

Clip

Wooden plug

38 mm brass screws

20 mm stop cock

Cement

Metal

Sand

Nr

Nr

Nr

Nr

Nr

Nr

Kg

m3

m3

Building Schedule of Rates Closet squatting type with trap including high level cistern fixed complete with flush pipe and 20 mm dia stop cock, all complete with working order

1.00

0.50

1.00

1.00

1.00

1.00

5.00

12.00

1.00

0.25

0.02

0.01

Building Schedule of Rates (1) Labour (days) I ii iii (2) Materials v vi


Wooden plug

ii
Urinals bowls

iii
9 Ltr Cistern

iv

vii
38 mm brass screws

viii

ix

(3) Plant Etc. ii iii

No

Sanitary Fittings

Spe. SK

SK

Un SK

Bidet

Rawl plug

Spreade r

Cement

Sand

Nr 1 Vitreous china bidet suite fixed complete to working order 4 No. Bowl type urinal with trap and 9 Litre capacity automatic flushing cistern and spreaders complete to working orders. (4Nr) 1.00 1.00 1

Nr

Nr

Nr

Nr

Nr

Kg

m3

1.00

0.25

1.00

4.00

1.00

8.00

1.00

4.00

4.00

1.81

0.01

Building Schedule of Rates

Building Schedule of Rates

Etc.
iv

Tools Etc.

0.04

0.04

0.04

0.04 0.04 0.04

0.07

0.04

0.04

Etc.

iv

Tools Etc.

0.04

0.02

Etc.
iv Tools Etc

0.03 0.03 0.03 0.03

0.03

0.05

0.05 0.05

0.03

0.03

0.03

Etc.
iv

Tools Etc

0.05

0.05 0.05

0.05

0.05 0.05

0.05

Etc.
iv

Tools Etc

0.05

Etc.
iv

Tools Etc Y% of (I)

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

Etc.
iv

Tools Etc

0.03

0.05

Etc.
iv

Tools Etc

0.30

0.03

Etc.
iv

Tools Etc

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

Etc.
iv

Tools Etc

0.03

0.03

Etc.
iv

Tools Etc

0.03

v
Tools Etc

v
Tools Etc

v
Tools Etc

Etc.
iv

Tools Etc

Etc.
iv

Tools Etc

0.03

0.03

0.03

Etc.

iv

Tools Etc

0.03

0.03

Etc.
iv

Tools Etc

0.03

Etc.
iv

Tools Etc

0.03

Etc.
iv

Tools Etc

0.03

0.03

Etc.
iv

Tools Etc

0.03

0.03

0.03

0.03

0.03

Etc.
iv

Tools Etc

0.03

Etc.
iv

Tools Etc

0.03

0.03 0.03

Etc.
iv

Tools Etc

0.03

0.03

Etc.
iv

Tools Etc

0.03 0.03

0.03

Etc.
iv

Tools Etc

0.03

0.03

0.03

Etc.
iv

Tools Etc

0.03

0.03 0.03 0.03 0.03 0.03 0.03

Etc.
iv

Tools Etc

0.03 0.03 0.03 0.03

Etc.
iv

Tools Etc

0.03 0.03 0.03 0.03

Etc.
iv

Tools Etc

0.03

0.03

Etc.
iv

Tools Etc

0.03

Etc.
iv

Tools Etc

0.03

0.03

Etc.
iv

Tools Etc

0.03

Etc.
iv

Tools Etc

0.03

Etc.
iv

Tools Etc

0.03

Etc.
iv

Tools Etc

0.03

Etc.
iv

Tools Etc

0.03

0.03

Prices
I Excavation & Earth work Labour (days) ii iii
SK Un SK

Materials I
Blast powder

ii
Fuse

iii
Jump steel

iv
Earth

Spe. SK

Price Rs.

Day Day Day 1200.00 900.00 600.00 Labour (days) I ii iii

Kg 12.00

Lm 18.00

Kg 55.00

m3 300.00 Materials

I
Cement

ii
Sand

iii
40 Metal

iv
25 Metal

Concrete Work

Spe. SK

SK

Un SK

Price Rs.

Day Day Day 1200.00 900.00 600.00 Labour (days) I ii iii

50 Kg 700.00

m3 7400.00

m3 3000.00

m3 3200.00 Materials

I
25 Tk Planks

ii
100x50 Timber

iii m3 30000.00

iv m3 2650.00 Materials

Form work

Spe. SK

SK

Un SK

50x50 Timber 50x25 Metal

Price Rs.

Day Day Day 1200.00 900.00 600.00 Labour (days) ii iii


SK Un SK

50 Kg 665.00

m3 55000.00

i Reinforcement

i
M.S for Steel

ii
Binding wire

iii
Spacers or Chairs

iv

Spe. SK

Price Rs.

Day Day Day 1200.00 900.00 600.00 Labour ii


SK

50 Kg 5150.00

Kg 170.00

Kg 65.00 Materials

I Brick Work
Spe. SK

iii
Un SK

I
Brick

ii
Sand

iii
Cement

iv
Wirecut Bricks

Price Rs.

Day Day Day 1200.00 900.00 600.00 Labour (days) ii iii


SK Un SK

1000.00 2000.00

m3 7400.00

50 Kg 700.00

1000.00 4500.00 Materials

I Hollow Block Masonry

I
Blocks 400x 200x 200 mm

ii
Sand

iii
Cement

iv
Blocks 400x 200x 100 mm

Spe. SK

Price Rs.

Day Day Day 1200.00 900.00 600.00 Labour (days) ii iii


SK Un SK

1000.00
18500.00

m3 7400.00

50 Kg 700.00

1000.00
14500.00

Materials I
50x20 Rubble

I Random Rubble Masonry

ii
Sand

iii
Cement

iv

Spe. SK

Price Rs.

Day Day Day 1200.00 900.00 600.00

m3 600.00

m3 7400.00

50 Kg 700.00

I Plstering

Labour (days) ii iii


SK Un SK

Materials I
Fire Wood

ii
Bitumen

iii
Sand

iv
Cement

Spe. SK

Price Rs.

Day Day Day 1200.00 900.00 600.00 Labour (days) ii iii


SK Un SK

Kg 15.00

Ltr 60.00

m3 7400.00

50 Kg 700.00 Materials

I Glazed Tiles and Terrazzo Tiles

I
150x 150 mm Glazed Tiles

ii
Cement

iii
Sand

iv
white Cement

Spe. SK

Price Rs.

Day Day Day 1200.00 900.00 600.00 Labour (days) I ii iii

Nr 15.00

50 Kg 700.00

m3 7400.00

Kg 20.00 Materials

I
200x 200 mm Pressed Tiles

ii
Cement

iii
Sand

iv
Wax Polish

Pressed Tiles

Spe. SK

SK

Un SK

Price Rs.

Day Day Day 1200.00 900.00 600.00 Labour (days) ii iii


SK Un SK

Kg 30.00

50 Kg 700.00

m3 7400.00

Kg 200.00 Materials

I Painting and Decoration

ii

iii
Primer minaral terpentine

iv
Enamel Paint

Spe. SK

Wood Anti corrosive Preservative

Price Rs.

Day Day Day 1200.00 900.00 600.00

Ltr 80.00

Ltr 250.00

Ltr 55.00

Ltr 218.00 Materials xvi


Flannel cloth

xi
Salt

xii
Yellow ochre

xiii
Blue

xiv
Cement

xv
Wax Polish

Painting and Decoration

Boiled lime

Price Rs.

50 Kg 400.00

Kg 10.00

Kg 65.00

g 20.00

Kg 700.00

Kg 200.00

45.00 Materials

xxii

Painting and Decoration

150 mm brush

Price Rs.

Nr 200.00 (1) Labour (days) I ii iii Materials I


Timber

ii
50x 25 mm Reeper

iii
Roof Tiles

iv
Wire nails 6'' long

Roofing

Spe. SK

SK

Un SK

Roofing Day Day Day 1200.00 900.00 600.00 m3 60000.00 Lm 60.00 Nr 18.00 Kg 400.00 Materials xvi
38 mm brass screws

Price Rs.

xi
Cement

xii
Sand

xiii
Slaked lime

xiv
Colouring Powder

xv
25 mm Planks

Roofing

Ridge Tiles

Price Rs.

Nr 35.00

50 Kg m3 700.00 7400.00

Kg 250.00

Kg 150.00

m2 1200.00

Nr 3.00 Materials

I Roof plumbing

Labour (days) ii iii


SK Un SK

I
G.I Sheets

ii
Wood Preservative

iii
Cement

iv
Slaked lime

Spe. SK

Price Rs.

Day Day Day 1200.00 900.00 600.00 Labour (days) I ii iii

m2 875.00

Ltr 80.00

50 Kg 700.00

50 Kg 250.00 Materials

I
Timber Class I

ii
50 mm wire nails

iii
Fibre/ Plastic Plugs

iv
Cement

Ceiling

Spe. SK

SK

Un SK

Price Rs.

Day Day Day 1200.00 900.00 600.00

m3 60000.00

Kg 400.00

Nr 60.00

50 Kg 700.00 Materials xvi

xi
38x12 mm Halmilla beading

xii

xiii

xiv

xv

Ceiling

50x50 mm Halmilla covemenl ding

6 mm 38 mm brass 50x6 mm 19 mm Nails 50 mm brush dout nails screws Timber strips

Price Rs.

m 250.00

m Kg 60.00 400.00

Nr 3.00

Kg 400.00

m 15.00

Nr 80.00 Materials

(1) Labour (days) I ii iii Doors and Windows


Spe. SK SK Un SK

I
100x75 mm Timber

ii
Spear stone

iii

iv

Fibre plastic 100 mm long plugs brass Screws

Price Rs.

Day Day Day 1200.00 900.00 600.00

m3 60000.00

Nr 250.00

Nr 60.00

Nr 4.50 Materials

xi

Doors and Windows

12x12 Brass mm panel pins beading

Price Rs.

m 60.00

Nr 80.00

(1) Labour (days) I ii iii Plumbing (PVC)


Spe. SK SK Un SK

Materials I m 40.00 ii m 35.00 iii m 30.00 iv


20 mm clips & nails 20 mm pipes 25 mm pipes 32 mm pipes

Price Rs.

Day Day Day 1200.00 900.00 600.00

Nr 6.00 Materials xvi


63 mm pipes

xi
40 mm sockets

xii
40 mm clips & nails

xiii
50 mm pipes

xiv
50 mm sockets

xv
50 mm clips & nails

Plumbing (PVC)

40 mm pipes

Price Rs.

m 40.00

Nr 30.00

Nr 6.00

m 45.00

Nr 40.00

Nr 6.00

m 75.00 Materials xxviii


63 mm specials

xxii

xxiii
20 mm special

xxiv
25 mm specials

xxv
32 mm specials

xxvi
40 mm specials

xxvii
50 mm specials

Plumbing (PVC)
Price Rs.

Sand

m3 7400.00

Nr 25.00

Nr 25.00

Nr 25.00

Nr 25.00

Nr 25.00

Nr 25.00 Materials xL
Yarn

xxxiv

xxxv
50 mm Tee

xxxvi
63 mm Tee

xxxvii
75 mm Tee

xxxviii
90 mm Tee

xxxix
100 mm dia G.I pipes

Plumbing (PVC)

40 mm Tee

Price Rs.

Nr 25.00

Nr 25.00

Nr 25.00

Nr 25.00

Nr 25.00

m 250.00

50 Kg 120.00 (2) Materials

External Drainage (EW Pipes) Price Rs.

(1) Labour (days) I ii iii


Spe. SK SK Un SK

I
100 mm EV pipes

ii
Cement

iii
1:3:6 (40) concrete

iv
Yarn

Day Day Day 1200.00 900.00 600.00 (1) Labour (days) I ii iii

Nr 100.00

50 Kg 700.00

m3 3800.00

Kg 120.00 (2) Materials

I
S.W. gulley 100mm

ii
Excavation

iii
112 mm Brick work

iv
Cement concrete

Manholes & Gulleys

Spe. SK

SK

Un SK

Price Rs.

Day Day Day 1200.00 900.00 600.00 (1) Labour (days) I ii iii

Nr 500.00

m3 200.00

m2 700.00

m3 5000.00 Materials

I
Wash basin with brackets

ii
20 mm tap

iii

iv

Sanitary Fittings

Spe. SK

SK

Un SK

Waste plug & Wooden plug chain

Price Rs.

1200.00 900.00 600.00

Nr 9000.00

Nr 115.00

Nr 50.00

Nr 15.00

xi

xii
50mm thick tapered wooden blocks

xiii

xiv
Low level suite complete

xv

Materials xvi

Sanitary Fittings

600x375x L iron 175 mm brackets sink

20 mm stop cock

Metal

Price Rs.

Nr Nr 3500 350.00

Nr 85.00

Nr 1500.00

Nr 650.00

m3 3200.00 Materials

xxii

xxiii

Sanitary Fittings
Price Rs.

Rawl plug Spreader

Nr 2.00 3500.00

Materials v

vi

vii
D.D.T. powder

viii
500 gauge polythene

ix
Tape

200x 200 mm Red earth sods with coir dust

Nr 75.00 Materials v
20 Metal

m3 350.00

Kg 40.00

m2 25.00

m 45.00

vi
Jute Hessian

vii
Mixed concrete

viii

ix

m3 3500.00 Materials v
Wedges Etc

m2 60.00

m3 6500.00

vi
Mould Oil

vii
16 dia 50 long Bolts

viii
Wire Nails

ix

m3 4500.00 Materials v

45.00

Nr 55.00

Kg 150.00

vi

vii

viii

ix

Materials v
Acids

vi
Slacked lime

vii

viii

ix

Ltr 25.00 Materials v

50 Kg 250.00

vi

vii

viii

ix

Materials v

vi

vii

viii

ix

Materials v
Slacked lime

vi
Powder Pigment

vii

viii

ix

50 Kg 250.00 Materials v
300x 300 mm Terra Tiles

Kg 200.00

vi
Colour Pigment

vii
wax Polish

viii
Cotton waste

ix

Nr 35.00 Materials v
Coloured Pigment

Kg 350.00

Kg 200.00

Kg 50.00

vi
Cotton waste

vii

viii

ix

Kg 350.00 Materials v
wire brush

Kg 50.00

vi
Sand paper

vii
Primer

viii
Emulsion Paint

ix
Varnish

Nr 175.00 Materials xvii

Nr 15.00

Ltr 160.00

Ltr 350.00

Ltr 400.00

xviii

xix

xx

xxi
Floor brush

Weathershiel 150 mm coir 50 mm brush 75 mm brush d paint brush

Nr Ltr 350.00 Materials

Nr 80.00 120.00

Nr 100.00 150.00

Materials v
Wire nails 2'' long

vi
Asbestos corrugated sheet

vii
Roofing Screws Washers

viii
Half round clay Tiles

ix
115 m long Ridges

Kg 400.00 Materials

m2 300.00

Nr 15.00

Nr 4.00

Pair 25000.00

Materials v
Sand

vi
Planks

vii
38 mm wire nails

viii
Soldering lead

ix

m3 7400.00 Materials v
Sand

m2 900.00

Kg 400.00

Kg 1200.00

vi
Ternap

vii
100x 50mm timber joists

viii

ix

150x38 mm Flat Asbestos Lunumidella sheets Planks

m3 7400.00 Materials

Ltr 85.00

m 200.00

m2 900.00

m2 350.00

Materials v
16 mm a.s. dowels 100 mm long

vi
38 mm thick planks

vii
25 mm thick planks

viii
2025x 825 mm plywood sash

ix
3 mm thick glass panes

Nr 175.00 Materials

m2 1400.00

m2 1500.00

Nr 2100.00

m2 700.00

Materials v
25 mm clips & nails

vi
32 mm clips & nails

vii
32 mm sockets

viii
Solvent cement

ix
Cement

Nr 6.00 Materials xvii


63 mm sockets

Nr 6.00

Nr 25.00

Gms 150.00

50 Kg 700.00

xviii
63 mm clips & nails

xix

xx

xxi
90 mm clips & nails

90 mm pipes 90 mm socket

Nr 55.00 Materials xxix


75 mm specials

Nr 10.00

m 85.00

Nr 65.00

Nr 15.00

xxx
90 mm specials

xxxi
20 mm Tee

xxxii
25 mm Tee

xxxiii
32 mm Tee

Nr 25.00 Materials xLi


Timber plugs 150x 150x 50

Nr 25.00

Nr 25.00

Nr 25.00

Nr 25.00

xLii
75 mm iron screws

xLiii
Lead

xLiv
Fire wood

xLv

m3 15.00 (2) Materials v

Nr 5.00

Kg 150.00

50 Kg 15.00

vi

vii

viii

ix

(2) Materials v
Cement rendering (1:2)

vi

vii

viii
RCC cover slab

ix

100 mm G.I. 112 mm Brick Grating work in (1:5)

m2 120.00 Materials v
38 mm brass screws

Nr 250.00

m2 700.00

Nr 200.00

vi
Cement

vii
Sand

viii
Squatting pan with trap

ix
Clip

Nr 3.00

Kg 14.00

m3 7400.00

Nr 4500.00

Nr 10.00

Materials xvii
9 ltr G.I. Cistern with 40 mm flush pipe chain & over flow pipe

xviii

xix

xx

xxi

Bidet

Urinals bowls 9 Ltr Cistern

Nr Nr 6500.00 15000.00 Materials

Nr 8500.00

Nr 1500.00

Basic Cost

No

Excavation & Earth work

Total Labour Cost

Material Cost

Plant cost

1 2 3 4 5 6 7 8 9

Remove top soil, 150mm deposit within site (100m2) Excavate over site, deposit spread out level. (3m3) Excavate for trench / pit in loose / soft soil, deposit spread out level. (3m3) Ditto - in ordinary soil. (3m3) Ditto - in land / dense soil. (3m3) Ditto - in mud / wet soil. (3m3) Ditto - in soft, disintegrated rock (not requiring blasting). (3m3) Ditto - in rock requiring blasting. (3m3)

6600.00 1050.00 660.00 1440.00 2250.00 1920.00 1650.00 2640.00 2880.00 660.00 840.00 1320.00 1320.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 86.60 0.00 0.00 281.25 0.00 1125.00

264.00 42.00 26.40 57.60 90.00 76.80 115.50 122.92 835.20 26.40 33.60 52.80 52.80

Benching in rock, but blasting prohibited (1m2) Backfill and compact in trench / pit with 10 selected excavated earth. (m3) 11 Ditto - with imported earth. (3m3) Fill under floors watering, compacting 12 and leveling, in 75 mm layers with selected excavated earth. (3m3) 13 Ditto - with imported earth. (3m3)

No

Excavation & Earth work

Total Labour Cost

Material Cost

Plant cost

Cutting turf sods, loading to and 1 unloading from, laying and watering for 30 days(10 m2) Anti termite treatement to excavated 2 foundated trenches and filling. (10m2)

3000.00 300.00

19987.50 292.00

1200.00 12.00

Polythene type 500 damp proof 3 membrane on compacted fill, with 60 mm wide sealingtape. (10m2)

210.00

1425.00

4.20

No

Concrete Work

Total Labour Cost

Material Cost

Plant cost

1 2 3 4 5 6

Mixing 1:3:6 (40) concrete (3m3) Grade 15 Mixing 1:2:4 (25) concrete (3m3) Grade 20 Mixing 1:2:4 (20) concrete (3m3) Grade Mixing 1:1 1/2 :3 (20) concrete (3m3) Grade Mixing 1:1:2 (20) concrete (3m3) Grade 30 Placing - 50 mm screeds under foundation depth not exceeding 1.5m (10m2)

4830.00 4830.00 4830.00 4830.00 4830.00 412.50 562.50 1200.00 4800.00 5430.00 5430.00

29900.00 21960.00 20375.00 18370.00 19770.00 3380.00 5200.00 9750.00 10086.00 10086.00 10893.00 .

1787.10 1787.10 1787.10 1787.10 1787.10 20.63 28.13 60.00 394.00 412.90 412.90

7 Placing - 75 mm ditto 8 9 10 Placing 150mm thick mass concrete ground floor slab (10m2) Placing 225x225 R.C.C. colomn on ground floor including curing. (1.25m3)

Placing 225x225 R.C.C. beam at first floor r including curing. (1.25m3) Placing 125 mm thick R.C.C. floor slab 11 at first floor levelfloor including curing. (1.50m3)

No

Form work

Total Labour Cost

Material Cost

Plant cost

Form work to floor 225x225 colomn in 1 ground floor (140m2 contact area) Making mould per use (4 Nos) 2 Assembling - per use 3 Dismantling, cleaning and repainting per use

187.50 375.00 375.00

42641.75 60555.50 0.00

9.38 18.75 18.75

Form work to under side of the first floor slab (20m2 contact area) 4 Making panels (4 uses, including 20% repair cost) 5 Assembling per use 6 Dismantle and cleaning per use Form work to beams in ground floor 7 (5m2 contact area) Making the mould per use.(4uses) 8 Assembling 9 Dismantling and cleaning

1500.00

554530.50

75.00

3630.00 1860.00 675.00 2100.00 1650.00

2502875.00 0.00 255787.00 560365.45 0.00

181.50 93.00 33.75 0.00 0.00

No

Reinforcement

Total Labour Cost

Material Cost

Plant cost

Mild steel / Tor steel reinforcement to lintols slab beams or columns bent to shape laid in position & tied with G.I. Wires (50Kg)

1800.00

6012.04

90.00

No

Brick work

Total Labour Cost

Material Cost

Plant cost

1 2 3 4 5 6 7 8

Brick work in 1:5 cement sand mtr in foundation.(3m3) -Ditto- in 1:8 cement , sand mortar in foundation.(3m3) -Ditto- in 1:5 cement , sand mortar in 112.5 mm thick walls in ground floor (10m2) -Ditto- 225 mm thick walls in ground floor (10m2) -Ditto- 337.5 mm thick walls in ground floor (10m2) -Ditto- in 1:8 cement and sand mortar in ground floor (10m2) Brick work (wire cut) in cement and sand mortar in 112 5 mm the walls in ground floor (10m2) -Ditto- 225 mm thick walls in ground floor (10m2)

5460.00 5460.00 2730.00 4590.00 6915.00 4110.00 2730.00 4590.00

11760.00 13460.00 4400.00 9215.00 13755.00 10490.00 5460.00 11360.00

9 10 11

12

13

14

-Ditto- 337.5 mm thick walls in ground floor (10m2) Extra over for facing including raised 3 mm thick in cement and sand 1:1 texture in ground floor (10m2) 175mm the floor paved in lime mortar 2:5 in ground floor (10m2) Steps 338 x 150 mm in brick in cement and sand 1:5 12.5 mm thick cement and sand 1 :2 rendering adusive necessary errors (3 m) Brick drains in cement and sand 1:5 225 mm wide 150-225 mm average depth including cement rendering 12.5 mm thick 1:2 to exposed faces with 450 mm ramp including necessary errors. (3 m) -Ditto- with out ramp (3 m )

7185.00 7110.00 2625.00

18155.00 766.25 3715.00

750.00

1626.00

1905.00

1883.00

1680.00

1605.00

No

Hollow Block Masonry

Total Labour Cost

Material Cost

Plant cost

200 mm thick hollow block work (400 x 200 x 200 ) in cement and sand mortar 1:5 in ground floor (caubes unfilled )(10m2) 100 mm thick -ditto- (400 x 200 x 100 mm )

3063.00

4304.00

2262.00

2852.00

No

Random Rubble Masonry

Total Labour Cost

Material Cost

Plant cost

1 2

Random rubble masonry in cement , sand mortar 1:5 in below FFL (350mm thick) (3m3) -Ditto in super structure(3m3)

6354.00 7308.00

12710.00 12710.00

No

Plstering

Total Labour Cost

Material Cost

Plant cost

2 3 4 5 6 7 8 9 10 11 12

19mm thick DPC in cement and sand 1:2 finished with 2 coats of hot bitumen blinded with sand (10m2) 16mm thick plasering to walls in lime and sand 2:5 including floating with lime putty (10 m2) -Ditto- cement and sand 1 :3 including cement floating (10 m2) 10mm thick plastering to sofft of slab cement and sand 1:3 including flating with lime putty (10m2) Ditto- to sides & soffit of beams (10m2) 16 mm thick walls in lime cement and sand 1:1:5 finished semirough with wooden float. (10m2) -Ditto- finish smooth with lime putty(10m2) 12mm thick rendering in cemnt and sand 1 : 3 finish smooth -Ditto cement and sand 1 :2 in floors finishes smooth (10 m2) 19 mm thick rendering in cement and sand 1:2 in floors finished smooth (10 m2) -Ditto in cement and sand 1 :2 in floors finished smooth (10 m2) 19mm thick rendering in cement and sand 1:2 in cloloured cement floors finished smooth (10 m2) 12.5 x 150 mm skirting in cement and sand 1:3 project or finished with floating including forming grove (3m)

2820.00

4693.30

84.60

2100.00 1938.00 4035.00 3225.00 1776.00 2415.00 1938.00 2100.00 2658.00 2658.00 2658.00

1904.00 2389.00 1754.50 1754.50 2263.50 2318.50 1215.00 2237.00 3092.00 3470.00 3949.00

63.00 58.14 121.05 96.75 53.28 72.45 58.14 63.00 79.74 79.74 79.74

13

519.00

166.00

15.57

No

Glazed Tiles and Terrazzo Tiles

Total Labour Cost

Material Cost

Plant cost

Glased tiles fixed to walls including bedding in cement mortar 1:2 & pointing in ground floor ( specils mesured separately)10 m2) Terrazzo floor tiles on 12.5 mm thick cement and sand 1:2 in ground floor (10m2)

7902.00

11503.80

237.06

7416.00

6883.00

222.48

No

Pressed Tiles

Total Labour Cost

Material Cost

Plant cost

No

Pressed Tiles

Total Labour Cost

Material Cost

Plant cost

Pressed floor tiles bedded in 12.5 mm cement mortar 1:2 and pointing in neat cement in ground floor (10 m2)

8064.00

10226.50

241.92

No

Painting and Decoration

Total Labour Cost

Material Cost

Plant cost

Prepare and apply one coats of preservative (oil type) to structural timber including touching up cut end ect. After fixing (10 m2) Prepare sufaces of steel trusses and apply two coatsof anti - corrossive Apply one coat of anti - corrosive primer and two coats of enamal paint to mild steelon already shop primed and erected steel roof truss (10 m2) Prepare and apply two coats primer and finishing coat of enamal paint to mild steel (angle/flat) plates (10m2) Painting steel on new steeel work with 2 coats of anti corrosive paint (10m2) Painting new timber work with two coats of wood preservative. (10 m2)

1296.00

236.00

12.00

2898.00

788.80

10.00

3876.00

378.84

16.00

2262.00

1317.89

32.00

1932.00

180.00

16.00

6 7

648.00 2256.00

195.20 660.97

16.00 8.00

Prepare and painting wood work with primer two coats enamel paint (10m2) Prepare and apply one coats of preservative (oil type) to structural 8 timber including touching up cut end ect. After fixing (10 m2) Preparea surfaces of steel truss and 9 apply two coats of anti - corrosive primer (10m2) Apply one coat of anti - corrosive primer 10 two coats of anti corrosive primer (10 m2) Prepare and apply two caots primer and 11 finishing caots of enamal paint to mild steel ( angle/ flat) (10m2)

1296.00

236.00

8.00

2898.00

788.80

10.00

3876.00

378.84

16.00

2262.00

1317.89

32.00

12

Painting steel on new timber work with 2 coats of anti corrosive paint (10m2) Painting new timber work with two coats of wood preservative. (10 m2) Preparing and paing wood work with primer two coats enamal paint (10m2)

1932.00

180.00

16.00

13 14

648.00 2256.00

195.20 660.97

16.00 8.00

No

Painting and Decoration

Total Labour Cost

Material Cost

Plant cost

1 2 3

White and coloured watshing two coats in single storey(100m2) -Ditto- in two sotored building (100m2) Cement washing to walls of single stored building 2 coats(100m2)

4356.00 5814.00 3870.00

1461.30 1461.30 569.00

33.33 33.33 0.00

No

Painting and Decoration

Total Labour Cost

Material Cost

Plant cost

1 2 3 4 5

Prepare & apply one coat of alkali resistant primer and two coats of emulsion paint to walls (10m2) Painting walls with emulsion paint (2 coats) (10m2) Prepare & apply one coat alkali resistant primer and two coats of emulsion paint to soffit of slab(10m2) Varnish two coats with copal vaenish after sand paapering (10m2) Wax polish to timber in panels & floors(10m2)

1608.00 972.00 2256.00 972.00 240.00

713.70 528.50 718.70 776.00 216.50

20.00 20.00 20.00 40.00 0.00

No

Roofing

Total Labour Cost

Material Cost

Plant cost

Timber frame work for calicut pattern tile hip roof in sigle strore building consisting of wall plate beam ridge plate rafter ect. (preservative treatement to be mesured separately) 60m2

14196.00

70575.00

Roof covering with calicut pattern clay tiles in single stored building (Timber frame work & ridge covering mesured separely)(60m2) Timber frame work for corrugated asbestos sheet roof in sigle stored building (60 m2) Roof covering with corrugated asbetose sheets in single stored building (Timber frame work & ridge covering mesured separely)(60m2) One layer half round clay tiles over corrugated asbetos roof covering (10m2) Asbestos close fittings ridging fixed complete with roofing screws or bolts (work) (4m)

5814.00

807.00

5166.00

26400.00

2490.00

13755.00

1290.00

2800.00

450.00

100240.00

No

Roofing

Total Labour Cost

Material Cost

Plant cost

Ridging covering with calicut pattern ridge tiles bedded in cement lime mortar 1:1:4 (4m) 19x225 mm high valance board fixed with brass screws to ends of rafters (for tile roofing) (30m) 225 mm high barge board fixed with brass screws at 600mm centres to sides of rafters

486.00

2948.00

14.58

5310.00

8850.00

159.30

5310.00

8790.00

159.30

No

Roof plumbing

Total Labour Cost

Material Cost

Plant cost

B,w,g. (1.2mm) glavanised iron sheet gutter 900mm girth overall once bent end caps not less than 225 mm with 25 mm tongued & grooved plank to slop and profile on timber members. B,w,g. (1.2mm) glavanised iron flashing mm girth overall 3 times bent with end not less than 150 mm lead soldered, and taked up to not less than 150 mm chase cut in wall & pointed in cement tar 1:2 lower end dress over roof ring not less than 300 mm wide (4.5 m).

3183.00

9981.85

95.49

1140.00

3360.75

34.20

No

Ceiling

Total Labour Cost

Material Cost

Plant cost

Timber frame work for 1.2 x 1.2 m flkat asbestos ceiling (shet mesured separately ) comprising of 100 x 50mm joints and 50 x 50 mm bearers in class 1 timber (20m 2)

4785.00

17700.95

163.55

No

Ceiling

Total Labour Cost

Material Cost

Plant cost

Horizontal ceiling lining using 1.2 x 1.2 m flat asbestos cement sheets fixed with and including beading and cove mrnlding on timber frame work ( Timber frame work and painting mesured separately ) 20 m2

3318.00

15480.10

99.54

No

Ceiling

Total Labour Cost

Material Cost

Plant cost

19 mm thick tonged & grooved lunmuidella ceiling boards fixed horizontal on 100x50 mm class I timber joists at 600mm centres 38 mm brass nails (20m2) 19 x 150 mm wide tonged & grooved lunmuidella ceiling boards fixed to undersides of rafters ( exsisting) with 38 mm brass nails including levlelling with timber strips whrerre necessary. (18 m2)

9943.10

28671.26

298.29

7746.00

1091.52

232.38

No

Doors and Windows

Total Labour Cost

Material Cost

Plant cost

No

Doors and Windows

Total Labour Cost

Material Cost

Plant cost

Door single hung 975x2100 mm high overall with frame having 31 mm thick sash and 94x69 mm timber frame (glazing iron mongery & painting measured separately) (2.10 m2) Door glazed & panelled double hung 1200 x2100 mm high overall with frame including 38 mm thickn sash & 94x69mm frame (glazing iron mongery & painting measured separately) (2.60 m2) Plywood door single hung 938x2088mm overall with frame having 31 mm thick sash and 94x69 mm frame ( iron mongery & painting measured separately) (2.02 m2) Door ledged, braced & battened single hung 750x1950 mm overall, with frame having 22 mm tongued & grooved planks and 94x69 mm frame( iron mongery & painting measured separately) (1.51m2) Window, glazed 2100x1200 mm high overall with frame comprising 3 Nr. Openable sashes and 94x69 mm frame and mullions(glasing, iron mongery and painting measured separately) (2.60)

6900.00

6162.00

207.00

8400.00

7298.00

252.00

1503.00

3887.00

45.09

3675.00

60967.00

110.25

9450.00

6948.00

283.50

No

Doors and Windows

Total Labour Cost

Material Cost

Plant cost

3 mm clear sheet glass panes exceeding 0.09 but not exceeding 0.38 m2 cut and fixed with timber beadings to doors and windows (consider sash 900x1200 mm high with 75x31 mm style & 4 Nos. glass panes) (0.84m2)

900.00

4976.40

27.00

No

Plumbing (PVC)

Total Labour Cost

Material Cost

Plant cost

No

Plumbing (PVC)

Total Labour Cost

Material Cost

Plant cost

1 2 3

20mm diameter PVC Pipes fixed to walls (specils paid separely) (3 m) 25mm diameter PVC Pipes to walls (Specials paid separely) 32 mm diameter ditto-(30m)

234.00 234.00 900.00

474.00 604.50 6170.00

7.02 7.02 27.00

No

Plumbing (PVC)

Total Labour Cost

Material Cost

Plant cost

1 2

40 mm diameter PVC fixed to walls (sepecils paid separely)(30m) 50mm diameter PVC to walls ( sepecils paid separely)(30m)

1350.00 1350.00

8930.00 11570.00

40.50 40.50

No

Plumbing (PVC)

Total Labour Cost

Material Cost

Plant cost

1 2

63mm diameter PVC to walls ( sepecils paid separely)(30m) 90mm diameter PVC to walls ( sepecils paid separely)(30m) Excavation for laying 20mm to 90 mm diameter PVC pipes in ground not less than 450 mm deep , back filling & compacting (30m)

1350.00 1800.00

19990.00 33765.00

40.50 54.00

1332.00

39.96

No

Plumbing (PVC)

Total Labour Cost

Material Cost

Plant cost

Chasing bricks work for laying 20mm to 50 mm diameter PVC pipes and making good average depth 50mm (Pipes a& specials mesured separtaely) (30m) Ditto- for laying 50mm to 90 mm diameter PVC pipe sin ground floor & m.G average depth 75 mm ditto. 20mm dia special s elbow/ bends/ sockets (10specils)

4425.00

922.10

132.75

2 3

5175.00 300.00

732.00 3250.00

155.25 9.00

No

Plumbing (PVC)

Total Labour Cost

Material Cost

Plant cost

No

Plumbing (PVC)

Total Labour Cost

Material Cost

Plant cost

1 2 3 4 5 6 7

25mm diameter PVC specils viz elbow/ bends/ sockets (10 nr specils) 32mm diameter - ditto- (10nr - specials ) 40mm diameter - ditto- (10nr ) 50mm diameter - ditto- (10nr ) 63mm diameter - ditto- (10nr ) 75mm diameter - ditto- (10nr ) 90mm diameter - ditto- (10nr )

300.00 300.00 300.00 600.00 600.00 600.00 600.00

4750.00 6250.00 9250.00 12250.00 21250.00 30250.00 36250.00

9.00 9.00 9.00 18.00 18.00 18.00 18.00

No

Plumbing (PVC)

Total Labour Cost

Material Cost

Plant cost

1 2 3 4

20mm diameter PVC specilss viz tee (10nr) 25mm diameter - ditto- (10nr - specials ) 32mm diameter - ditto- (10nr - specials ) 40mm diameter - ditto- (10nr )

600.00 600.00 600.00 600.00

4750.00 7000.00 9250.00 13750.00

18.00 18.00 18.00 18.00

No

Plumbing (PVC)

Total Labour Cost 1200.00 1200.00 1800.00 1800.00

Material Cost

Plant cost

1 2 3 4

50mm diameter - ditto- (10nr ) 63mm diameter - ditto- (10nr ) 75mm diameter - ditto- (10nr ) 90mm diameter - ditto- (10nr )

250.00 10.00 10.00 610.00

36.00 36.00 54.00 54.00

No

Plumbing (PVC)

Total Labour Cost

Material Cost

Plant cost

100 mm dia G.I . Soil/ vent pipe fixed vertically to walls jointed with cement caulking (special measured separately) (2m) 100 mm dia G.I . pipes fixed vertically to walls jointed with lead caulking (special measured separately) (2m)

450.00

1294.20

13.50

450.00

1085.75

13.50

No

External Drainage Pipes)

(EW

Total Labour Cost

Material Cost

Plant cost

100mm diameter glazed eathwarepipes laid on 150mm thick bedding in cement concrete 1:3:6 (40mm ) including excavation average 600mm depth , back filling with selected excavatere materials and concrete haunching to joints(30m)

11220.00

13398.80

336.60

No

Manholes & Gulleys

Total Labour Cost

Material Cost

Plant cost

100mm diamerete stone gully with 150 x150 x 150mm gulley box including excavation , 100mm cement concrete 1:2:4 (20mm) base , and 1 :5 extended 150mm above top of guley box including making connection , 12mm cement and sand 1:2 renderign internally and exposed faces finished smoooth with neat cement floating and providing G.I grating on to pof gulley(1nr)

750.00

1239.80

22.50

Manhole 600 x 600mm internally with invertdepth not exceeding 600mm including excavation, backfilling 150 mm cement concrete 1:2:4 (20mm) base with 9 mm dia mild steel rods at 100 mm centres both ways, forming channels & benching in similar concrete, 112 mm walls in brick in cement 1:5, 12 mm thick cement & sand 1:2 rendering internally and exposed surfaces including channels, benching & 50 mm thick RCC removable cover slab 675x675mm in-let & out-let connection all complete to working order(1Nr)

2850.00

9560.80

85.50

No

Sanitary Fittings

Total Labour Cost

Material Cost

Plant cost

550x400 mm glased fireclay wash basin with 20 mm diameter chromium plated pillar tap, waste plug , chromium plated waste chain and stay, including fixing wash basing on brackets.(water supply and waste water connection measured separately) (1Nr)

1050.00

9255.74

31.50

No

Sanitary Fittings

Total Labour Cost

Material Cost

Plant cost

Sink 600x375x175 mm overall vitreous china with rubber plug and chromium plate and chain waste carried on iron brackets painted & fixed to walls.( water supply and waste water connection measured separately)(Nr)

750.00

4406.74

22.50

No

Sanitary Fittings

Total Labour Cost

Material Cost

Plant cost

No

Sanitary Fittings

Total Labour Cost

Material Cost

Plant cost

Closet pedestal type with L/L flushing system, flush pipe double plastic seat cover, 20 mm dia stop cock, trap supplied & fixed complete to working order(1Nr)

2025.00

2242.74

60.75

No

Sanitary Fittings

Total Labour Cost

Material Cost

Plant cost

Closet squatting type with trap including high level cistern fixed complete with flush pipe and 20 mm dia stop cock, all complete with working order

2250.00

11912.50

67.50

No

Sanitary Fittings

Total Labour Cost Material Cost

Plant cost

Vitreous china bidet suite fixed complete to working order 4 No. Bowl type urinal with trap and 9 Litre capacity automatic flushing cistern and spreaders complete to working orders. (4Nr)

1800.00

15000.00

54.00

2025.00

39187.34

60.75

Cost

Basic Cost

O/ H

Profit

Selling Price

0.10 6864.00 1092.00 686.40 1497.60 2340.00 1996.80 1765.50 2849.52 3715.20 686.40 1154.85 1372.80 2497.80 686.40 109.20 68.64 149.76 234.00 199.68 176.55 284.95 371.52 68.64 115.49 137.28 249.78

0.12 823.68 131.04 82.37 179.71 280.80 239.62 211.86 341.94 445.82 82.37 138.58 164.74 299.74 8374.08 1332.24 837.41 1827.07 2854.80 2436.10 2153.91 3476.41 4532.54 837.41 1408.92 1674.82 3047.32

Basic Cost

O/ H

Profit

Selling Price

0.10 24187.50 604.00 2418.75 60.40

0.12 2902.50 72.48 29508.75 736.88

1639.20

163.92

196.70

1999.82

Basic Cost

O/ H

Profit

Selling Price

0.10 36517.10 28577.10 26992.10 24987.10 26387.10 3813.13 5790.63 11010.00 15280.00 15928.90 16735.90 3651.71 2857.71 2699.21 2498.71 2638.71 381.31 579.06 1101.00 1528.00 1592.89 1673.59

0.12 4382.05 3429.25 3239.05 2998.45 3166.45 457.58 694.88 1321.20 1833.60 1911.47 2008.31 44550.86 34864.06 32930.36 30484.26 32192.26 4652.01 7064.56 13432.20 18641.60 19433.26 20417.80

Basic Cost

O/ H

Profit

Selling Price

0.10 42838.63 60949.25 393.75 4283.86 6094.93 39.38

0.12 5140.64 7313.91 47.25 52263.12 74358.09 480.38

556105.50

55610.55

66732.66

678448.71

2506686.50 1953.00 256495.75 562465.45 1650.00

250668.65 195.30 25649.58 165.00 165.00

300802.38 234.36 30779.49 67495.85 198.00

3058157.53 2382.66 312924.82 630126.30 2013.00

Basic Cost

O/ H

Profit

Selling Price

7902.04

790.20

948.24

9640.49

Basic Cost

O/ H

Profit

Selling Price

0.10 17383.80 19083.80 7211.90 13942.70 20877.45 14723.30 8271.90 16087.70 1738.38 1908.38 721.19 1394.27 2087.75 1472.33 827.19 27966535.93

0.12 2086.06 2290.06 865.43 1673.12 2505.29 1766.80 992.63 1930.52 21208.24 23282.24 8798.52 17010.09 25470.49 17962.43 10091.72 27984554.15

25555.55 8089.55 6340.00

2555.56 808.96 634.00

3066.67 970.75 760.80

31177.77 9869.25 7734.80

2398.50

239.85

287.82

2926.17

3845.15

384.52

461.42

4691.08

3335.40

333.54

400.25

4069.19

Basic Cost

O/ H

Profit

Selling Price

0.10 7458.89 745.89

0.12 895.07 9099.85

5227.10

522.71

627.25

6377.06

Basic Cost

O/ H

Profit

Selling Price

0.10 20970.20 20237.24 2097.02 2023.72

0.12 2516.42 2428.47 4613.44 4452.19

Basic Cost

O/ H

Profit

Selling Price

0.10

0.12

7597.90

759.79

911.75

9269.44

4067.00 4385.14 5910.55 5076.25 4092.78 4805.95 3211.14 4400.00 5829.74 6207.74 6686.74

3090065.93 438.51 591.06 507.63 409.28 480.60 321.11 440.00 582.97 620.77 668.67

488.04 526.22 709.27 609.15 491.13 576.71 385.34 528.00 699.57 744.93 802.41

3094620.97 5349.87 7210.87 6193.03 4993.19 5863.26 3917.59 5368.00 7112.28 7573.44 8157.82

700.57

468452.94

84.07

469237.58

Basic Cost

O/ H 0.10

Profit 0.12 2357.14

Selling Price

19642.86

1964.29

23964.29

14521.48

1452.15

1742.58

17716.21

Basic Cost

O/ H

Profit

Selling Price

Basic Cost

O/ H

Profit

Selling Price

0.10 18532.42 1853.24

0.12 2223.89 4077.13

Basic Cost

O/ H

Profit

Selling Price

0.10 1544.00 154.40

0.12 185.28 1883.68

3696.80

369.68

443.62

4510.10

4270.84

427.08

512.50

5210.42

3611.89

361.19

433.43

4406.51

2128.00

212.80

255.36

2596.16

859.20 2924.97

85.92 292.50

103.10 351.00

1048.22 3568.46

1540.00

154.00

184.80

1878.80

3696.80

369.68

443.62

4510.10

4270.84

427.08

512.50

5210.42

3611.89

361.19

433.43

4406.51

2128.00

212.80

255.36

2596.16

859.20 2924.97

85.92 292.50

0.12 351.00

945.24 3568.46

Basic Cost

O/ H 0.10

Profit 0.12 702.08 877.04 532.68

Selling Price

5850.63 7308.63 4439.00

585.06 730.86 443.90

7137.77 8916.53 5415.58

Basic Cost

O/ H 0.10

Profit 0.12 281.00 182.46 359.36 214.56 54.78

Selling Price

2341.70 1520.50 2994.70 1788.00 456.50

234.17 152.05 299.47 178.80 45.65

2856.87 1855.01 3653.53 2181.36 556.93

Basic Cost

O/ H

Profit

Selling Price

0.10

0.12

84771.00

8477.10

10172.52

103420.62

6621.00

662.10

794.52

8077.62

31566.00

3156.60

3787.92

38510.52

16245.00

1624.50

1949.40

19818.90

4090.00

409.00

490.80

4989.80

100690.00

10069.00

12082.80

122841.80

Basic Cost

O/ H

Profit

Selling Price

0.10 3448.58 344.86

0.12 413.83 4207.27

14319.30

1431.93

1718.32

17469.55

14259.30

1425.93

1711.12

17396.35

Basic Cost

O/ H

Profit

Selling Price

0.10

0.12

13260.34

1326.03

1591.24

16177.61

4534.95

453.50

544.19

5532.64

Basic Cost

O/ H

Profit

Selling Price

0.10

0.12

22649.50

2264.95

2717.94

27632.39

Basic Cost

O/ H

Profit

Selling Price

0.10

0.12

18897.64

1889.76

2267.72

23055.12

Basic Cost

O/ H

Profit

Selling Price

0.10

0.12

38912.65

3891.27

4669.52

47473.44

9069.90

906.99

1088.39

11065.28

Basic Cost

O/ H

Profit

Selling Price

Basic Cost

O/ H

Profit

Selling Price

0.10

0.12

13269.00

1326.90

1592.28

16188.18

15950.00

1595.00

1914.00

19459.00

5435.09

543.51

652.21

6630.81

64752.25

6475.23

7770.27

78997.75

16681.50

1668.15

2001.78

20351.43

Basic Cost

O/ H

Profit

Selling Price

0.10

0.12

5903.40

590.34

708.41

7202.15

Basic Cost

O/ H

Profit

Selling Price

Basic Cost

O/ H

Profit

Selling Price

0.10 715.02 845.52 7097.00 71.50 84.55 709.70

0.12 85.80 101.46 851.64 872.32 1031.53 8658.34

Basic Cost

O/ H

Profit

Selling Price

0.10 10320.50 12960.50 1032.05 1296.05

0.12 1238.46 1555.26 12591.01 15811.81

Basic Cost

O/ H

Profit

Selling Price

0.10 21380.50 35619.00 2138.05 3561.90

0.12 2565.66 4274.28 26084.21 43455.18

1371.96

137.20

164.64

1673.79

Basic Cost

O/ H 0.10

Profit 0.12

Selling Price

5479.85

547.99

657.58

6685.42

6062.25 3559.00

606.23 355.90

727.47 427.08

7395.95 4341.98

Basic Cost

O/ H

Profit

Selling Price

Basic Cost

O/ H

Profit

Selling Price

0.10 5059.00 6559.00 9559.00 12868.00 21868.00 30868.00 36868.00 505.90 655.90 955.90 1286.80 2186.80 3086.80 3686.80

0.12 607.08 787.08 1147.08 1544.16 2624.16 3704.16 4424.16 6171.98 8001.98 11661.98 15698.96 26678.96 37658.96 44978.96

Basic Cost

O/ H

Profit

Selling Price

0.10 5368.00 7618.00 9868.00 14368.00 536.80 761.80 986.80 1436.80

0.12 644.16 914.16 1184.16 1724.16 6548.96 9293.96 12038.96 17528.96

Basic Cost

O/ H 0.10

Profit 0.12 178.32 149.52 223.68 295.68

Selling Price

1486.00 1246.00 1864.00 2464.00

148.60 124.60 186.40 246.40

1812.92 1520.12 2274.08 3006.08

Basic Cost

O/ H

Profit

Selling Price

0.10

0.12

1757.70

175.77

210.92

2144.39

1549.25

154.93

185.91

1890.09

Basic Cost

O/ H

Profit

Selling Price

0.10

0.12

24955.40

2495.54

2994.65

30445.59

Basic Cost

O/ H

Profit

Selling Price

0.10

0.12

2012.30

201.23

241.48

2455.01

12496.30

1249.63

1499.56

15245.49

Basic Cost

O/ H

Profit

Selling Price

0.10

0.12

10337.24

1033.72

1240.47

12611.43

Basic Cost

O/ H

Profit

Selling Price

0.10

0.12

5179.24

517.92

621.51

6318.67

Basic Cost

O/ H

Profit

Selling Price

Basic Cost

O/ H

Profit

Selling Price

0.10

0.12

4328.49

432.85

519.42

5280.76

Basic Cost

O/ H

Profit

Selling Price

0.10

0.12

14230.00

1423.00

1707.60

17360.60

Basic Cost

O/ H

Profit

Selling Price

0.10 16854.00 1685.40

0.12 2022.48 20561.88

41273.09

4127.31

4952.77

50353.17

Material , Labour and Plant Prices


Unit Spe Sk SK UnSK Brick Sand Cement Wirecut Brick Blocks 400x 200x 100 mm 50x20 Rubble Acid Slacked lime Block 400x 200x 100 mm Blast powder Fuse Jump steel Earth 200x 200 mm sods Red earth with coir dust D.D.T. powder 500 gauge polythene Tape 40 Metal 25 Metal 20 Metal Jute Hessian Mixed concrete 25 Tk Planks 100x50 Timber 50x50 Timber 50x25 Metal Wedges Etc Mould Oil 16 dia 50 long Bolts Wire Nails M.S for Steel (50Kg) Binding wire Spacers or Chairs 10/7 Mixer Fire Wood Bitumen Price 1200.00 900.00 600.00 2000.00 7400.00 700.00 4500.00 18500.00 600.00 25.00 250.00 14500.00 12.00 18.00 55.00 300.00 75.00 350.00 40.00 25.00 45.00 3000.00 3200.00 3500.00 60.00 6500.00 665.00 55000.00 30000.00 2650.00 4500.00 45.00 55.00 150.00 5150.00 170.00 65.00 250.00 15.00 60.00

Powder Pigment 150x 150 mm Glazed Tiles white Cement 300x 300 mm Terra Tiles Colour Pigment wax Polish Cotton waste 200x 200 mm Pressed Tiles Wood Preservative Anti corrosive Primer minaral terpentine Enamel Paint Sand paper Wire brush Primer Emulsion Paint Varnish Boiled lime Salt Yellow ochre Blue Flannel cloth Weather shield paint 50 mm brush 75 mm brush 150 mm coir brush Floor brush 150 mm brush Timber 50x 25 mm Reeper Roof Tiles Wire nails 6'' long Wire nails 2'' long Asbestos corrugated sheet Roofing Screws Washers Half round clay Tiles 115 m long Ridges(pair) Ridge Tiles Colouring Powder 25 mm Planks

200.00 15.00 20.00 35.00 350.00 200.00 50.00 30.00 80.00 250.00 55.00 218.00 15.00 175.00 160.00 350.00 400.00 400.00 10.00 65.00 20.00 45.00 350.00 80.00 120.00 100.00 150.00 200.00 60000.00 60.00 18.00 400.00 400.00 300.00 15.00 4.00 25000.00 35.00 150.00 1200.00

38 mm brass screws
G.I Sheets Planks 38 mm wire nails Soldering lead

875.00 900.00 400.00 1200.00 60000.00 60.00 85.00 350.00 200.00 900.00 250.00 60.00 400.00 400.00 15.00 60000.00 250.00 4.50 175.00 1400.00 1500.00 2100.00 700.00 60.00 80.00

Timber Class I Fibre/ Plastic Plugs Ternap Flat Asbestos sheets 100x 50mm timber joists 150x38 mm Lunumidella Planks

50x50 mm Halmilla covemenlding 38x12 mm Halmilla beading 6 mm dout nails 19 mm Nails 50x6 mm Timber strips

100x75 mm Timber Spear stone 100 mm long brass Screws 16 mm a.s. dowels 100 mm long 38 mm thick planks 25 mm thick planks 2025x 825 mm plywood sash 3 mm thick glass panes

12x12 mm beading Brass panel pins

abour and Plant Prices


Profit O/H Unit Vibrator( hour) Bidet Urinals bowls 9 Ltr Cistern Rawl plug Spreader Squatting pan with trap Iron brackets 50mm thick tapered wooden blocks 600x375x175 mm sink 9 ltr G.I. Cistern with 40 mm flush pipe chain & over flow pipe Clip Wash basin with brackets 20 mm tap Waste plug & chain Wooden plug 38 mm brass screws Low level suite complete L iron brackets 20 mm stop cock
20 mm pipes 25 mm pipes 32 mm pipes 20 mm clips & nails 25 mm clips & nails 32 mm clips & nails 32 mm sockets Solvent cement

0.12 0.10 Price 250.00 15000.00 8500.00 1500.00 2.00 3500.00 4500.00 350.00 85.00 3500.00 6500.00 10.00 9000.00 115.00 50.00 15.00 3.00 1500.00 350.00 650.00 40.00 35.00 30.00 6.00 6.00 6.00 25.00 150.00 40.00 30.00 6.00 45.00 40.00 6.00

40 mm pipes 40 mm sockets 40 mm clips & nails 50 mm pipes 50 mm sockets 50 mm clips & nails

63 mm pipes 63 mm sockets 63 mm clips & nails 90 mm pipes 90 mm socket 90 mm clips & nails

75.00 55.00 10.00 85.00 65.00 15.00

20 mm special 25 mm specials 32 mm specials 40 mm specials 50 mm specials 63 mm specials 75 mm specials 90 mm specials 20 mm Tee 25 mm Tee 32 mm Tee

25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 250.00 120.00 15.00 5.00 150.00 100.00 3800.00 500.00 200.00 700.00 5000.00 120.00 250.00 700.00 200.00

40 mm Tee 50 mm Tee 63 mm Tee 75 mm Tee 90 mm Tee 100 mm dia G.I pipes Yarn Timber plugs 150x 150x 50 75 mm iron screws Lead

100 mm EV pipes 1:3:6 (40) concrete

S.W. gulley 100mm Excavation 112 mm Brick work Cement concrete Cement rendering (1:2) 100 mm G.I. Grating 112 mm Brick work in (1:5) RCC cover slab

Sand

Sand

S-ar putea să vă placă și