I.
Site description
NRL: 465.00 maSL Crest elevation: 468.00 maSL Water volume : 5.80 mil mc Installed flow : 90 mc/s Dikes length : 3.80 km
Ostrovul Mic hydropower development, first of the Rul Mare Aval scheme, is situated at about 20 km from Haeg town.
The development is composed of a weir dam, a hydroelectric power plant and the perimeter dams.
The main purposes of the development are: the production of electrical energy, the regulation of the Raul Mare River and irrigation.
Seepage problems since commission (1986) Concentrated springs Large wet areas Piping phenomena Seepage flow : 140 l/s
To analyze the efficiency of the proposed solution regarding the seepage flow, the spring level, the critical gradient and the influence of the proposed length of the cutoff wall.
Boundary conditions (for both models): Upstream: Downstream: lake water level equal to the normal retention level (465.00 maSL) 1 m water level in the downstream channel (449.00 maSL) potential spring area on the downstream slope.
170 160 150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0 0 25 50 75 100 125 150 175 200 225 250 275 300 325 350 375 400 425 450 475 500 525 550 575 600 625
Distante (Y)
Distante (X)
Main causes the deteriorated slabs on the lower part of the concrete face the damaged joint between the concrete face and the cutoff wall
1. Perfect execution flow: 0,037 l/s m spring el. in the channel i < icritical
110 120 130 140 150
480
460
Cote
455
450
445
440
46 4
435
0 45
454
462
460
458
452
456
430
425 0 10 20 30 40 50 60 70 80 90 100
Distante orizontale
2. Lack of embedding (0,50 m) flow: 0,419 l/s m spring el. in the channel i < icritical
480
475
470
460
Cote
455
450
445
440
435
430
Distante orizontale
475
470
3. Presence of a window (0,50 m) flow: 0,494 l/s m spring el. 0.50 m above the berm
460
Cote
455
450
445
440
464
452
435
430
i < icritical
130 140 150
450
454
462
460
458
456
Distante orizontale
1. Perfect execution
Distante (Y)
Distante (X)
170 160 150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0 0 25 50 75 100 125 150 175 200 225 250 275 300 325 350 375 400 425 450 475 500 525 550 575 600 625
2. Presence of a window
Distante (Y)
Distante (X)
170 160 150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0 0 25 50 75 100 125 150 175 200 225 250 275 300 325 350 375 400 425 450 475 500 525 550 575 600 625
Distante (Y)
Distante (X)
Conclusions
The seepage phenomenon through the dikes of the Ostrovul Mic Lake is a continuous and intensity increasing process followed by the fine material picking up. This is the cause of the restricted water level operating mode since the commissioning of the development. The seepage analysis was based on two 2D finite elements models using Geostudio software. The calibration was realized using the emergence rate of the downstream parameter depression curve. To determine its value in situ, infrared image technique was used. The proposed solution for the sealing of the left side dike crest cutoff wall was analyzed in both the situation when the execution was perfect and the situation in which some defects may appear in its body. As a result of the mathematical modeling, this solution offers a complete seepage control, even if the execution of the cutoff wall is not perfect.