Sunteți pe pagina 1din 3

CURRICULUM VITAE 1 ) PERSONAL DATA Name Birth Nationality Marital Status Languages Arabic English Home Address Telephone

Mobile phone E- Mail Adress 2 ) EDUCATION : : : : : : : : : : : : : : : : : : : : Ahmed Nader El Shinnawi Jan. 27th 1962 Egyptian Married " 3 children " Spoken Written Mother tonuge Mother tonuge Excellent Excellent Cairo area No.6. Naser City 28 Hossni Ahmed khalaf st. 00202 2727353 - 00202 2871593 0020 10 1021134 - 0020 10 3810672
a_nader1962@hotmail.com

B.Sc. Architecture Helwan University 1984

3 ) TRAINING COURSES

Construction Site Safety Project Planning & Control Techniques. Project Specification ,Bids And Contracts . Quality Control and Risk Managment. Participated in the following conference: AFTA 2001 Germany

( 40 hours) Jan. 1997 ( 20 hours) Jan. 2000 ( 20 hours) Jan. 2000 ( 50 hours) May 2000

4 ) MEMBERSHIP : Member of Egyptians Engineering Syndicate No 4266/7. 5 ) SKILLS : Professional In Using P.C. And The Following Softwares: 1)Operating Systems(Windows 2000 ,XP) 2)Spread Sheet ( Excel ) 3)Word Processing ( Win Word ) 6 ) BRIEF OF CAREER Jul.2000 - Til now Jul.98 - June. 2000 Oct.97 - June. 98 Aug.90 - Nov. 95 Oct. 87 - Aug. 90 Oct. 85 - Oct. 87 Oct. 84 - Oct. 85 7 ) CAREER DETAILS

: : : : : : : :

BONIAN CONTRACTING COMPANY S.A.E. AL Tysser for Trading & Contracting co. (My Own Company) ADMAK GENERAL CONTRACTING CO. (UAE - Abou Dhbi). NATIONAL CONSULTANTS (KSA) AL DAHMAN EST.RIYADH (KSA) CIVIL WORKS COMPANY. DAMMAM (KSA). HASSN MARZOUQ Al- OTAIBI (KSA)

Page 1 of 3

a)Company Period Title Duties

: : : :

Bonian Contracting Company S.E.A. Jul.2000 - Till now No Dig Construction Sector Manager. Responsible for managing the sector organization as follow: 1- The sector working as an individual small company specialized in executing all kind of pipes under land surface without digging. 2- The sector has got two 25 ton HDD machines. 3- The sector start working at year 1999 in Egypt. 4- The clients of this method are varied and they covers all kind of utilites work (Gas ,Tellecommunication, Ellectrical, Water supply & Sewege Work) 5- The sector annualy turn over is arround 8 M EP.

B)Company Period Title Duties

: AL Tysser for Trading & Contracting co. (My Own Company) : Jul.98 - June. 2000 : The Owner of The Company (an equal share) -High Standard Finishing of minestry of foreign affair new building. (Main contractor) -Devilopment of Masjid Amr Abn EL Aass (Old Cairo) (Main contractor) -High Standard Finishing of Egyptian Business-man Villa in Giza (Subcontractor) : : : : ADMAK GENERAL CONTRACTING CO. (ABU DHABI). Oct.97 - June. 98 Abu Dhabi (U.A.E.) Senior Site Engineer. Executing twin warer line D.I pipes 1200 mm From Umm Al Nar Treatment plant up to ABU Dahabi power station . Project Amount 240 Million Dhs. NATIONAL CONSULTANTS Aug.90 - Nov. 95 Project Manager. Abha ( K.S.A. ) Supervision of ABHA and KHAMIS MUSHAYT Water supply project in asser Region.

C)Company Period Location Title Duties

D)Establishment Period Title Location Duties

: : : : :

Abha water supply project (71 Million SR.) 1) 220 Km water network U.P.V.C. pipes, DI. pipes, C.C. pipes
and hedb pipes for house connection. 2) Ground reservoirs( 700 m3. 1500m3,3000m3). 3) W.S.D. ABHA BR. Billing building. 4) 4 No. pump station (supervision of construction works).
Page 2 of 3

5) 7000 No. house connection. 6)110 No. valve chambers. 7) 250 No. fire hydrant. KHAMIS mushat water supply project (42 Million SR.) 1) 127 Km water Network U P.V.C pipes, D.I, pipes, C.C. pipes and hadb pipes for house connection. 2) Ground reservoirs (5000m3 x 3). 3) 70 No. valve chamber. 4) 79 No. fire hydrant. E)Establishment Location Period Title Duties : : : : : AL DAHMAN EST.RIYADH Riyadh ( K.S.A. ) Oct. 87 - Aug. 90 Assistant project manager. Executing pipe network water supply Project in NIFA and surrounding villaaes (32 Million SR) 1)150 km water network U.P.V.C. pipes, R.T.R pipes, and hedb pipes for house connection. 2) 950 No. house connection. 3) 240 No. valve chamber. 4)150 No. fire hydrant. CIVIL WORKS COMPANY. DAMMAM. Oct. 85 - Oct. 87 Site engineer. 1) Executing W.S.D. Dammam BR. Building. 2) Executing of construction works Lift stations AL ANOOD area(NW) pump stations No.1 And 5(NE) 3) Executing sewer networks in Al mubarakiah area (NW). 4) Executing water network in Al- ANOOD and al mubarakiah area (NW)

F)Company Period Title Duties

: : : :

G)Company Period Titles Projects

: HASSN MARZOUQ Al- OTAIBI : Oct. 84 - Oct. 85 : Site engineer. 1) Supervision on construction of 2 RES towers 11 floors.(Opposite ministry of finance). 2)Desing and execution of a resident villa, Two floors, Al naseem Area.

Page 3 of 3

S-ar putea să vă placă și