Sunteți pe pagina 1din 9

Method of Procedure MIP SBY2 Connectivity Test for Expansion Preparation

Date Version Prepared by

: Aug 28th, 2013 : 1.0 : ITDS

Statement of Confidentiality AQN jointly submits this document with the understanding that it will be held in the strictest confidence and will not be disclosed. No parts of this document should be duplicated or used for any purpose other than the evaluation of AQN- qualifications, without the prior written consent of AQN.

Excelcomindo

Classification: Confidential

AQN

MIP SBY2 Connectivity Test for Expansion Preparation Method of Procedure


Document Code: Version: Date:

1.0

Jul 25, 2013

Document History
Version Date Author(s) Description MOP initial version

Aug 28th, 2013

ITDS

Confidential

Page 1 of 6

MIP SBY2 Connectivity Test for Expansion Preparation Method of Procedure


Document Code: Version: Date:

1.0

Aug 28, 2013

Document Sign-Off
XL Signature:

Date:

AQN/Mobixell

Signature:

Date:

Confidential

Page 2 of 6

MIP SBY2 Connectivity Test for Expansion Preparation Method of Procedure


Document Code: Version: Date:

1.0

Aug 28, 2013

Table of Contents
1
1.1 1.2

INTRODUCTION ....................................................................................................... 4
REQUEST SUMMARY ..................................................................................................................... 4 CONTACT INFORMATION .............................................................................................................. 5

2
2.1 2.2 2.3

METHOD OF PROCEDURE ......................................................................................... 6


METHOD OF PROCEDURE AND CHECK LIST .................................................................................. 6 IMPACT ANALYSIS ......................................................................................................................... 7 FALL-BACK PROCEDURE AND CHECK LIST ..................................................................................... 7

Confidential

Page 3 of 6

MIP SBY2 Connectivity Test for Expansion Preparation Method of Procedure


Document Code: Version: Date:

1.0

Aug 28, 2013

1 INTRODUCTION
1.1 Request summary
Activity Request System to be Changed Date of Activity Change description XL MIP Routers MIP SBY2 site XX/XX/XXXX Time XX:XX XX:XX Test connectivity by dummy P2P to confirm physical condition of ports and cables.

End user impact

No end user impact.

Confidential

Page 4 of 13

MIP SBY2 Connectivity Test for Expansion Preparation Method of Procedure


Document Code: Version: Date:

1.0

Aug 28, 2013

1.2 Contact information


Contact Type AQN Support on Site XL Name / Location TBD TBD TBD Phone

Confidential

Page 5 of 13

MIP SBY2 Connectivity Test for Expansion Preparation Method of Procedure


Document Code: Version: Date:

1.0

Aug 28, 2013

2 METHOD OF PROCEDURE
2.1 Method of procedure and check list
# Description / notes Expected Duration Change Completion Verification Done By Status Status

1 2

Pre-sanity check Login to MCD SBY2 routers In privileged EXEC mode SBYRKO03-RO-MIP01> enable Do a : SBYRKO03-RO-MIP01# sh run Backup the running config either by doing a copy and paste to a text file or by FTP if allowed Confirm physical connection as below:

15 min 3 min

AQN DDI

3 4 5

3 min 5 min 10 min

DDI DDI HS IB SBY

Rack IT.C.15.05 SBYRKO03-RO-MIP01 Te1/4 <> PS-CESBRKO01 xe-4/2/2

In privileged EXEC mode Login to MIP router Assign a dummy P2P IP (e.g. 192.168.255.248/29) on the physical interface in MIP Router Te1/4 and CE Router 4/2/2.

5 min

DDI

7 8

Test ping If successful then physical link is confirm ok, activity done. Note: Follow up will be the expansion activity of SBY2 Router - PSCE

15 min

DDI

If not, then change the physical connection as below:

SBYRKO03-RO-MIP01 Te1/6

<>

PS-CESBRKO01 xe-5/2/2

10 min

HS IB SBY

Confidential

Page 6 of 13

MIP SBY2 Connectivity Test for Expansion Preparation Method of Procedure


Document Code: Version: Date:

1.0

Aug 28, 2013

Description / notes

Expected Duration

Change Completion Verification Done By Status Status

10

In privileged EXEC mode Login to MIP router Assign a dummy P2P IP (e.g. 192.168.255.248/29) on the physical interface in MIP Router Te1/4 and CE Router 4/2/2.

5 min

DDI

11 12

Test ping
If PING successful, then confirm there is port damage. Activity Done. Note: Follow up will be a TR vendor for damaged ports

15 min 5 min

DDI DDI

13

If PING is not successful then confirm physical cable is faulty and need to change. Activity Done. Note: Follow up will be a request to change cabling to cable vendor

5 min

DDI

14 15

Post-test activity Monitoring the whole system

24 hours AQN/MBX

2.2 Impact Analysis


# Description / notes Expected Change Completion Verification Duration Done By Status Status

There will no service outage.

2.3 Fall-back procedure and check list

Confidential

Page 7 of 13

MIP SBY2 Connectivity Test for Expansion Preparation Method of Procedure


Document Code: Version: Date:

1.0

Aug 28, 2013

# Description / notes

Expected Duration

Change Done By

Completion Status

Verification Status

1 2 3 4

Login to MCD CBT T1 routers In privileged EXEC mode Do a : cbt-c4900-1-t1# sh run In privileged EXEC mode Login to MIP router Remove all the Dummy P2P IP configuration and save it Do a sh run config To make sure configuration same with previous one Post-sanity check

3 min 3 min 0 min 10 min

DDI DDI DDI DDI

5 6

5 min 20 min

DDI AQN

.: END OF DOCUMENTATION :.

Confidential

Page 8 of 13