Documente Academic
Documente Profesional
Documente Cultură
AL GIHAZ
Site:
SEC-WOA
Panel / Designation / Location no.:
Page 1 of 14
Project no.:
R08.1
P545
Designation :
87L/21/67N /79
1/5 A 100- 120 VAC 50/60 HZ
3. PRELIMINARY CHECKS Relay damaged? Rating information correct for installation? Case earth installed? External wiring checked against diagram? Test block connections checked? LCD front panel display Clock set to local time?
Witnessed by: SEC-WOA-CONSULTANT Name : ENG/ MAHMOUD HAMDI Signature & Date
AL GIHAZ
Site:
SEC-WOA
Panel / Designation / Location no.:
Page 2 of 14
Project no.:
R08.1
4. GENERAL CHECKS
Checking
Dry cell battery voltage (Remove battery isolation strip) Auxiliary voltage value on terminals M2 ( + ) and M1 ( - )
Results
Check if the frequency is set on required value Clock set-up, remove auxiliary supply for 30 seconds check date & time Trip relay LED operation check Alarm relay LED operation check Out of service relay LED operation check Healthy relay LED operation check
5. DISPLAY READINGS
Circuit Injected value Phases
VAN VBN VOLTAGE 57.73 VCN VAB VBC VCA IA CURRENT 1.0 A Phase A / 0 Phase B / -120 Phase C / 120 IB IC IN
Expected value
63.51 KV 63.51 KV 63.51 KV 110 KV 110 KV 110 KV 1200 1200 1200 0
Displayed value
PRIMARY SECANDRY
Witnessed by: SEC-WOA-CONSULTANT Name : ENG/ MAHMOUD HAMDI Signature & Date
AL GIHAZ
Site:
SEC-WOA
Panel / Designation / Location no.:
Page 3 of 14
Project no.:
R08.1
Lower slope test (Injected current < Is2) |diff| > ( k1.| bias| + s1)/2 = 0.25 A
Expected differential current for tripping (Amp) 0.25 A 0.25 A 0.25 A Actual Trip Time in m-sec at 2 x I Pickup
Witnessed by: SEC-WOA-CONSULTANT Name : ENG/ MAHMOUD HAMDI Signature & Date
AL GIHAZ
Site:
SEC-WOA
Panel / Designation / Location no.:
Page 4 of 14
Project no.:
R08.1
Upper slope test (Injected current > Is2) |diff| > (k2.| bias| - (k2 - k1). s2 + s1)/2=1.15A
Bias current injected in phase (Amps) A 3.0 B 3.0 3.0 X C Differential current injected in phase A B X C X Expected differential current for tripping (Amp) 1.15 A 1.15 A 1.15 A
7-Distance protection (21-1) AttachmentsResistive Zone Reach check (quadrilateral characteristics only
Item 1 Description Print out from FREJA attached Checked Ok
Impedance tolerance: +/- 5% for zone 1 and +/- 10 % for other zones.
PH-E (G): - Resistive reach: Rn (/Loop) = RGn ()/ (1+Kz). - Reactive reach: Xn (/Loop) = Zn () * sin (LG) - Compensation factor KZ = 1/3((Zo-Z1)/Z1). - Line impedance ZLG = RLG+J XLG = 1/3(2*ZLph +ZOL) PH-PH (PH): - Resistive reach: Rphn (/ph) = Rphn (/Loop) / 2. - Reactive reach: Xn () = Zn () * sin (Lph). - Line impedance ZLph = RLph+J XLph.
6.
Witnessed by: SEC-WOA-CONSULTANT Name : ENG/ MAHMOUD HAMDI Signature & Date
AL GIHAZ
Site:
SEC-WOA
Panel / Designation / Location no.:
Page 5 of 14
Project no.:
R08.1
6.2.3
I. Permissive Under Reach Scheme: Send logic: CS = ZM1 : Trip logic: Trip = ZM2 + CR : Trip logic: Trip = ZM2 w/o CR : II. Permissive Over Reach Scheme: Send logic: CS = ZM2 : Trip logic: Trip = ZM2 + CR : Trip logic: Trip = ZM2 w/o CR : :
IV.
R S T
45
OK OK OK
Start at ph voltage more than setting value and go down gradually and apply send signal each time and check at which value will come ECHO trip
Tested by: Name : Eng. Mohamed Shokry Signature & Date : Witnessed by: SEC-WOA-CONSULTANT Name : ENG/ MAHMOUD HAMDI Signature & Date Witnessed by: SEC-WOA-CSD Name : ENG/GAMAL HAMMAM Signature & Date :
AL GIHAZ
Site:
SEC-WOA
Panel / Designation / Location no.:
Page 6 of 14
Project no.:
R08.1 m sec
VI. Blocking 1 Scheme: Send logic: CS = ZM4 : 36 Trip logic: Trip = ZM2 w/o CR : 21 Trip logic: Trip = ZM2 with CR : 427 6.4 Distance protection Power Swing Blocking - PSB
Blocked zone for Power Swing Blocking
0.5 Sec.
6.4 Distance protection Switch On To Fault - SOFT 1-SOTF BY C.B CLOSING BI:SETTING:Zone concerned by sotf: Z1,Z2 Sotf pulse time set=500 ms Check sotf work with concerned zone Check sotf trip time at fault at Z1= 21 ms Z2= 28 ms Sotf pulse time measured = 498 ms
Configure BI. (set
(OK)
SEC SEC
nd
Inject first page normal current and voltage. 2 page inject zero current zero voltage and stop freja by contact (SOTF ACTIVE) the time till freja stop by contact will be the delay time
14.9
ms
Inject direct at page two any fault at zone concerned by SOTF stop injection by SOTF trip contact
NOTE:
When the line is healthy once it become dead so SOTF will be activated after this delay time while the line still dead The line identifications for line dead is setting at CB FAIL SETTING I< =80 m
Tested by: Name : Eng. Mohamed Shokry Signature & Date : Witnessed by: SEC-WOA-CONSULTANT Name : ENG/ MAHMOUD HAMDI Signature & Date Witnessed by: SEC-WOA-CSD Name : ENG/GAMAL HAMMAM Signature & Date :
AL GIHAZ
Site:
SEC-WOA
Panel / Designation / Location no.:
Page 7 of 14
Project no.:
R08.1
6.4
- CHECK THE FUSE FAIL BLOCKING BY I2> inhibit (simulate 3 phase voltage to get fuse Fail, for I2> Apply 3 Phase equal current (Ir A) with balanced angles and increase one phase to get I2 more than the setting Value it will inhibit fuse fail then decrease again phase till you get fuse fail - [I2> inhibit measured > = 99.59 mA]. -Check the relay trip unblocking during the internal fuse fail by any fault [ OK ]. Simulate 2 stages: - stage 1; inject 3 phase voltage to get fuse fail and zero current. - stage 2; inject the same voltage as in stage 1, inject 3 phase current to get a value grater than I2> inhibit.
6.2.5.2 Loss of all 3 phase voltages under load condition test(detect 3p):
Fixed Setting: a- for fuse fail pick up; V1=10 volts. b- for fuse fail reset; V1=30 volts. Pick up measurement voltage(v) 10.03 Reset measurement voltage(v) 30.05 ]
8.1.2.4 Check the blocking of the relay when the general block functions (VT MCB TRIP) is activated [
7.
Line Length:
Fault Type
80.0 Km
L: 79 degree.
Actual display (KM)
Fault Impedance Z ()
AL GIHAZ
Site:
SEC-WOA
Panel / Designation / Location no.:
Page 8 of 14
Project no.:
R08.1
8.1
A B C
-Apply 3 phase volts of rated value (57.73 volt) with balanced angles. -for the phase under test start reducing voltage till you get Vn more thane vpolarizing Apply 3 phase current with balanced angles for the phase under test start increasing current till you get pick-up; then decrease again till you get reset.
We will inject and change the voltage angle not current angle so the angle will be as added 180
3V
NOTE: -Apply balanced current at 3 phase for phase under testing up slowly till get In more than 3Io setting
Tested by: Name : Eng. Mohamed Shokry Signature & Date : Witnessed by: SEC-WOA-CONSULTANT Name : ENG/ MAHMOUD HAMDI Signature & Date Witnessed by: SEC-WOA-CSD Name : ENG/GAMAL HAMMAM Signature & Date :
AL GIHAZ
Site:
SEC-WOA
Panel / Designation / Location no.:
Page 9 of 14
Project no.:
R08.1
-Apply 3 phase volts of rated value (57.73 volt) with balanced angles. -for the phase under test start reducing voltage till you get pick-up; then increase again till you get reset.
8.4 III
90
m sec
Scheme: permissive over reach SEND: DEF STFW : 29.6 DEF AIDED TRIP : DEF STFW + CR: 120 DEF AIDED TRIP : DEF STFW w/o CR 1.53
m sec m sec SEC (trip with EF element. no trip with aid -2)
II.
THIS MEASURED VALUE INCLUDE DELAY TIME AND DEF PICK UP TIME
III
III
45
45.03
OK
Start at 3ph voltage more than setting value and go down gradually and apply send signal each time and check at which value will come ECHO/WI trip
III
79.2
41.3 118.1 1.53
m sec
m sec m sec
sec (trip with EF element no trip with aid-2)
Scheme: BLOCKING reach SEND: DEF STRV : DEF AIDED TRIP : DEF STFW W/O CR : DEF AIDED TRIP : DEF STFW + CR
Witnessed by: SEC-WOA-CONSULTANT Name : ENG/ MAHMOUD HAMDI Signature & Date
AL GIHAZ
Site:
SEC-WOA
Panel / Designation / Location no.:
Page 10 of 14
Project no.:
R08.1
6.
(Is > 1 A)
CURVE SI VI EI LTI
1) System check:-
CAL TIME @ 2 Times 5 Times 2 Times 5 Times 2 Times 5 Times 2 Times 5 Times
OPERATING TIME A 10.02 4.29 13.46 3.38 26.53 3.32 119 29.88 B 10.02 4.29 13.46 3.38 26.53 3.33 119 29.90 C 10.02 4.29 13.45 3.38 26.51 3.32 119 29.87
LIMIT(as per curve) 10.03+/-5% 4.28+/-5% 13.5+/-5% 3.375+/-5% 26.67+/-5% 3.333+/-5% 120+/-5% 30+/-5%
No 1 2 3 4 5 6 7
Item description Dead voltage Live voltage Under voltage Over voltage U diff CS1 angle CS1 freq
Measured values BB LINE 20.0 20.04 40.01 40.06 43.04 42.97 70.04 69.97 6.58 6.56 19.1 19.1 50 50
Remark
Witnessed by: SEC-WOA-CONSULTANT Name : ENG/ MAHMOUD HAMDI Signature & Date
AL GIHAZ
Site:
SEC-WOA
Panel / Designation / Location no.:
Page 11 of 14
Project no.:
R08.1
2) AUTO RECLOSER No 1 2 3 4 5 Item description Dead time 1 CB READY Reclaim time A/R inhibit time Check system time Setting values 3 Sec 5 Sec 30 Sec 7 Sec 2 Sec Measured values
3.1 5.1 30.1 7.1 2.08
Check that A/R block from Z2 , Z4 as we make in A/R setting Check that A/R NOT block from multi phase as we make in A/R setting Check that A/R WILL START FROM EXTERNAL BI AR START Check that A/R WILL BLOCK FROM EXTERNAL BI AR BLOCK
[ OK [ OK [ OK [ OK
] ] ] ]
1-Dead time :- start timer protection trip and stop with close command (auto close) BO 2-CB HEALTY : When AR finish dead time before giving close command go to chick CB healthy BI if not come will wait this time to chick it .if come before time finish will make close. if not come it will make lock out after this time -A-first way start timer trip BO and stop AR LOCK OUT BO and remove CB HEALTHY BI(time=dead time + CB healthy time -B-other way when AR start shot it make blocking until finish shot. if condition CB HEALTHY not come at end of dead time it will remove blocking through this time and return blocking again after this time finish So to measure this time we can start timer by AR BLOCK BO NC and stop by AR BLOCK BO NO THIS WILL measure CB HEALTHY time only and accurate 3-CHICK SYSTEM TIME:it will be measured same ways as CB HEALTHY TIME unless we will remove CHECK SYSTEM BI and will activate syncrocheck with 1st shot 4-AR inhibit time:this time coming after closing the C.B. through this time inhibit AR for this time. to measure it will make freja sequence first page will take freja BO to relay BI MANUAL CLOSE COMMAND will function it at relay (CLOSE CB) and but the time for page one as this inhibit time setting and stage two will make fault to start the AR and change stage one duration till get AR START so inhibit time will be the time of stage one at freja (CB.READY, SYNCROCHECK BI .must be available) 5-RECLAIM TIME:At last shot When A/R start reclaim time it make A/R LOCK OUT OR still making blocking during reclaim time To measure it take BO close command (auto close) to start timer .and take BO A/R BLOCK NC to stop timer
Witnessed by: SEC-WOA-CONSULTANT Name : ENG/ MAHMOUD HAMDI Signature & Date
AL GIHAZ
Site:
SEC-WOA
Panel / Designation / Location no.:
Page 12 of 14
Project no.:
R08.1
Terminal
E1 E2 E3 E4 E5 E6 E7 E8 E9 E10 E11 E12 E13 E14 E15 E16 C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 C11 C12 C13 C14 C15 C16 G1 G2 G3 G4 G5 G6 G7 G8 G9 G10 G11 G12 G13 G14 G15 G16
Circuit
Result OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK
Witnessed by: SEC-WOA-CONSULTANT Name : ENG/ MAHMOUD HAMDI Signature & Date
AL GIHAZ
Site:
SEC-WOA
Panel / Designation / Location no.:
Page 13 of 14
Project no.:
R08.1
Terminal
L1 L2 L3 L4 L5 L6 L7 L8 L9 L10 L11 L12 L13L14L15 L16L17L18 K1 K2 K3 K4 K5 K6 K7 K8 K9 K10 K11 K12 K13K14K15 K16K17K18 J1 J2 J3 J4 J5 J6 J7 J8 J9 J10 J11 J12 J13J14J15 J16J17J18 H1 H2 H3 H4 H5 H6 H7 H8 H9 H10 H11 H12
Contact
NO NO NO NO NO NO C/O C/O NO NO NO NO NO NO C/O C/O NO NO NO NO NO NO C/O C/O NO NO NO NO NO NO
Circuit
Result OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK
Witnessed by: SEC-WOA-CSD Name : ENG/GAMAL HAMMAM Signature & Date :
Witnessed by: SEC-WOA-CONSULTANT Name : ENG/ MAHMOUD HAMDI Signature & Date
AL GIHAZ
Site:
SEC-WOA
Panel / Designation / Location no.:
Page 14 of 14
Project no.:
R08.1 OK OK
Witnessed by: SEC-WOA-CONSULTANT Name : ENG/ MAHMOUD HAMDI Signature & Date