Waste to Energy

Korea Engineering Consultants Corp.


WINDFLOWER BIO-ENERGY INC.

COMPANYS INTRODUCTION
COMPANY HISTORY CERTIFICATE PATENT & NEW TECHNOLOGY ORGANIZATION & ENGINEERING STAFF COMPANY LOCATION & BRANCH

04 05 06 07~08 09

ENVIRONMENT & PLANT ENG. DIV.


SCOPE OF SERVICE PROJECT EXPERIENCE

11 12~62

1 COMPANYS INTRODUCTION
COMPANY HISTORY CERTIFICATE PATENT & NEW TECHNOLOGY ORGANIZATION & ENGINEERING STAFF COMPANY LOCATION & BRANCH

COMPANY HISTORY
1963
ESTABLISHMENT OF KUKJE CONSULTANT CO

KOREA ENGINEERING CONSULTA CONSULTANTS CORP WINDFLOWER BIOBIO-ENERGY INCORPORATED

1989
REGISTERED CONSTRUCTION SUPERVISION FIRM

1966
CHANGED NAME TO KECC

1992
REGISTERED GENERAL SUPERVISION FIRM

1973
REGISTERED ENGINEERING FIRM

1994
PRIVATIZED TO HANJIN GROUP

1976
REGISTERED OVERSEAS ENGINEERING FIRM

1995
REGISTERED OVERSEAS CONSTRUCTION FIRM

1979
REGISTERED LAND SURVEY FIRM

2006
LAUNCH AS HANJIN HEAVY INDUSTRIES GROUP

1982
REGISTERED GENERAL CONSTRUCTION FIRM

2008
INAUGURATION OF CEO, MR LEE KANG ROG

1985
REGISTERED ENVIRONMENTAL ENGINEERING FIRM

2010
REGISTERED OVERSEAS CONSTRUCT CONTRACTOR

1987
NOMINATED EXCELENT ENGINEERING FIRM

2011
LISTED ON KOREA EXCHANGE

CERTIFICATE
REGISTERED ENGINEERING FIRM

KOREA ENGINEERING CONSULTA CONSULTANTS CORP WINDFLOWER BIOBIO-ENERGY INCORPORATED

REGISTERED FIRE FIGHTING ENGINEERING FIRM

REGISTERED POWER FACILITY ENGINEERING FIRM REGISTERED SUPERVISION ENGINEERING FIRM REGISTERED POWER FACILITY SUPERVISION FIRM REGISTERED WATER TREATMENT FIRM REGISTERED LABORATORY REGISTERED ENVIRONMENT ASSESSMENT FIRM REGISTERED NOISE & VIBRATION TREAT FIRM REGISTERED WASTE WATER TREATMENT FIRM REGISTERED FLUE GAS TREATMENT FIRM REGISTERED SOFTWARE FIRM CERTIFIED QUALITY SYSTEM REGISTERED TRAFFIC ASSESSMENT FIRM REGISTERED ARCHITECTS FIRM REGISTERED POPULATION ASSESSMENT FIRM

PATENT & NEW TECHNOLOGY

KOREA ENGINEERING CONSULTA CONSULTANTS CORP WINDFLOWER BIOBIO-ENERGY INCORPORATED

1. FLUIDIZED MELTING STOKER FIRING SYSTEM 2. MULTI STAGED LOW EMISSON ROTARY KILN 3. HORIZONTAL EJECTED LOW EMISSION SYSTEM

PATENT

4. CENTRIFUGAL EJECTED FLUE GAS TREATMENT 5. FLAT MOVING HEAT DRYER 6. WASTE SEPARATING SYSTEM 7. BIO REACTOR SYSTEM

TOTAL
135

1. WASTE SEPARATING SYSTEM 2. BIO REACTOR SYSTEM

TOTAL
18

3. AEROBIC WASTE WATER PROCESS WITH RECYCLED SLUDGE 4. ANAEROBIC WASTE WATER PROCESS

NEW TECHLOGY

ORGANIZATION ORGANIZATION & & ENGINEERING ENGINEERING STAFF STAFF

KOREA ENGINEERING CONSULTA CONSULTANTS CORP WINDFLOWER BIOBIO-ENERGY INCORPORATED

ORGANIZATION

CHAIRMAN PRESIDENT
TECHNICAL COMMITTEE

MANAGEMENT DIVISION PLANNING DEPT PERSONNEL DEPT FINANCING DEPT

ENVIRONMENT&PLANT ENG. DIVISION ENVIRONMENT PLANNING DEPT ENVIRONMENT. DEPT MECHENICAL ENG. DEPT ELECTRICAL ENG. DEPT TURNKEY DESIGN DEPT

WATER TREATMENT ENG. DIVISION WATER TREATMENT ENG. DEPT WATER RESOURCE ENG. DEPT INSTITUTE OF ENGINEERING

LAND&URBAN ENG. DIVISION URBAN PLANNING DEPT URBAN DEVELOPMENT DEPT LANDSCAPE ARCHTECT DEPT GEO INFORMATION DEPT ARCHTECTURAL ENG. DEPT

CONST SUPERVISION DIVISION CONST SUPERVISION DEPT FIELD SUPERVISION DEPT

ROAD ENG. DIVISION ROAD ENG. DEPT TRANSPORTATION ENG. DEPT STRUCTURAL ENG. DEPT GEO TECHNICAL DEPT SOC TEAM

ORGANIZATION ORGANIZATION & & ENGINEERING ENGINEERING STAFF STAFF

KOREA ENGINEERING CONSULTA CONSULTANTS CORP WINDFLOWER BIOBIO-ENERGY INCORPORATED

STATUS OF ENGINEERING STAFF

DATA

ROAD CIVIL GEO

WATER TREAT

WATER LAND TRANS ENVIRO CONSTR ARCHTE MECHN ELECT LAND TOTAL RESOUR -CT -ICAL -RIC SCAPE -PORT NMENT UCTION -CE

PROFESSIONAL ENGINEER SPECIAL ENGINEER SPECIAL ENGINEER ENGINEER ASSISTANT ENGINEER TOTAL

42

24

18

21

18

24

48

24

56

12

72

36

131

526

10

15

17

13

13

12

14

11

11

23

12

31

186

22

19

21

11

17

10

12

13

24

163

14

13

22

32

10

13

14

13

12

14

17

16

194

16

15

21

24

15

13

16

15

22

175

104

86

99

101

73

56

92

62

97

37

137

76

224

1244

COMPANY LOCATION & BRANCH

KOREA ENGINEERING CONSULTA CONSULTANTS CORP WINDFLOWER BIOBIO-ENERGY INCORPORATED

HEAD OFFICE
EAST SEOUL TURMINAL BUILDING 7FL 546-1 GUI-DONG KWANGJIN-GU, SEOUL, KOREA TEL : +82 2 2049 5292 FAX : +82 2 2049 5112

SUWON OFFICE
ADVANCED INSTITUTES OF CONVERGENCE TECHNOLOGY A-12F BUILDING 864-1 IUI-DONG YEONGTONG-GU, SUWON, KOREA TEL : +82 31 888 9883 FAX : +82 31 888 9899

ENVIRONMENT & PLANT ENGINEERING DIVISION


SCOPE OF SERVICE PROJECT EXPERIENCE

SCOPE OF SERVICE
ENVIRONMENT ENGINEERING

KOREA ENGINEERING CONSULTA CONSULTANTS CORP WINDFLOWER BIOBIO-ENERGY INCORPORATED

WASTE TO ENERGY ENGINEERING

RECYCLING PLANT FOOD WASTE FERMENTATION PLANT SEWAGE SLUDGE TREATMENT PLANT MECHANICAL AND BIOLOGICAL TREATMENT PLANT LANDFILL

WASTE HEAT RECOVERY PLANT INCINERATION PLANT REFUSE DERIVED FUEL PLANT COMBINED HEAT & POWER PLANT

BIOMASS POWER PLANT

11

PROJECT EXPERIENCE

KOREA ENGINEERING CONSULTA CONSULTANTS CORP WINDFLOWER BIOBIO-ENERGY INCORPORATED

MECHANICAL AND BIOLOGICAL TREATMENT


TROMMEL TROMMEL SCREEN SCREEN WIND WIND SEPARATOR SEPARATOR
SIC
M

PI
M

Air

BIO REACTOR COMPOSTING


XA XL HS

MAGNETIC SEPARATOR UNCOMBUSTABLE UNCOMBUSTABLE TO LANDFILL

CRUSHER

PELLET RDF RDF

PELLET

FLUFF WASTERDF TO ENERGY

COMBUSTABLE

12

PROJECT EXPERIENCE
RECYCLING PLANT

KOREA ENGINEERING CONSULTA CONSULTANTS CORP WINDFLOWER BIOBIO-ENERGY INCORPORATED

ANSAN RECYCLING PLANT BASIC PLANNING (100T/D) JEJU RECYCLING PLANT DETAIL DESIGN (32T/D) DANGJIN RECYCLING PLANT DETAIL DESIGN (35T/D) JEONJU RECYCLING PLANT DETAIL DESIGN (80T/D)

ANSAN RECYCLING PLANT

13

PROJECT EXPERIENCE
RECYCLING SYSTEM

KOREA ENGINEERING CONSULTA CONSULTANTS CORP WINDFLOWER BIOBIO-ENERGY INCORPORATED

14

PROJECT EXPERIENCE
RDF MACHINE

KOREA ENGINEERING CONSULTA CONSULTANTS CORP WINDFLOWER BIOBIO-ENERGY INCORPORATED

15

PROJECT EXPERIENCE
FOOD WASTE FERMENTATION PLANT

KOREA ENGINEERING CONSULTA CONSULTANTS CORP WINDFLOWER BIOBIO-ENERGY INCORPORATED

CHEONGJU FOOD WASTE FERMENTATION PLANT

NAMYANGJU FOOD WASTE PLANT DESIGN (120T/D) CHUNGJU FOOD WASTE DETAIL DESIGN(100T/D) HWASUNG FOOD WASTE PLANT DETAIL DESIGN(45T/D) CHUNCHEON FOOD WASTE PLANT SUPERVISION(50T/D) KANGNAM FOOD WASTE PLANT BASIC DESIGN(300T/D)

16

PROJECT EXPERIENCE

KOREA ENGINEERING CONSULTA CONSULTANTS CORP WINDFLOWER BIOBIO-ENERGY INCORPORATED

ODOR TREATMENT SYSTEM

17

PROJECT EXPERIENCE PROJECT EXPERIENCE

WINDFLOWER BIOBIO-ENERGY INCORPORATED

SEWAGE SLUDGE TREATMENT PLANT


POCHUN SLUDGE TREATMENT PLANT FEASIBILITY STUDY PAJU SLUDGE TREATMENT PLANT FEASIBILITY STUDY TONGBOK SLUDGE TREATHENT PLANT DESIGN(300KL/D) JEONGWON SLUDGE BASIC & DETAIL DESIGN (220KL/D)

18

PROJECT EXPERIENCE

KOREA ENGINEERING CONSULTA CONSULTANTS CORP WINDFLOWER BIOBIO-ENERGY INCORPORATED

SEWAGE SLUDGE TREATMENT SYSTEM


CABONIZATION

SOLIDIFICATION

DRYING SYSTEM

19

PROJECT EXPERIENCE PROJECT EXPERIENCE


LANDFILL

KOREA ENGINEERING CONSULTA CONSULTANTS CORP WINDFLOWER BIOBIO-ENERGY INCORPORATED

ANSEONG LANDFILL DETAIL DESIGN JANGSU LANDFILL BASIC & DETAIL DESIGN KWANGJU LANDFILL FEASIBILITY STUDY GAPYEONG LANDFILL SUPERVISION NAMJEJU LANDFILL BASIC & DETAIL DESIGN GURI LANDFILL SUPERVISION

22 20

PROJECT EXPERIENCE

KOREA ENGINEERING CONSULTA CONSULTANTS CORP WINDFLOWER BIOBIO-ENERGY INCORPORATED

LANDFILL METHOD

21

PROJECT EXPERIENCE
LANDFILL LINERS

KOREA ENGINEERING CONSULTA CONSULTANTS CORP WINDFLOWER BIOBIO-ENERGY INCORPORATED

Classification

Installation plan Geo-textile(500g/) + Clay mineral series layer(50cm) + HDPE(2.0mm) + Geo-textile(1,000g/) + Leachate drainage layer(gravel, t=30cm) (Shotcrete) + Geo-textile(500g/) + Bentonite mat + HDPE(2.0mm) + Geotextile(1,000g/)

Bottom part

Slope part

22

PROJECT EXPERIENCE
LANDFILL GAS

KOREA ENGINEERING CONSULTA CONSULTANTS CORP WINDFLOWER BIOBIO-ENERGY INCORPORATED

23

PROJECT EXPERIENCE

KOREA ENGINEERING CONSULTA CONSULTANTS CORP WINDFLOWER BIOBIO-ENERGY INCORPORATED

WE ARE PERFORMING TOTAL ENGINEERING SUCH AS, FEASIBILITY STUDY, ENVIRONMENTAL ASSESSMENT, PLANNING, BASIC & DETAIL DESIGN AND CONSTRUCTION SUPERVISION

BOILER SHOP

24

PROJECT EXPERIENCE
ASSEMBLING WATER WALL TUBE

KOREA ENGINEERING CONSULTA CONSULTANTS CORP WINDFLOWER BIOBIO-ENERGY INCORPORATED

25

PROJECT EXPERIENCE
DAEGU WOOD CHIP BOILER PLANT

KOREA ENGINEERING CONSULTA CONSULTANTS CORP WINDFLOWER BIOBIO-ENERGY INCORPORATED

CAPACITY : 27.7 T/H, 42 BAR, 388 C SUPERHEATED STEAM TYPE : TRAVELLING GRATE TWO DRUM TYPE COMMISSIONING : 2009

26

PROJECT EXPERIENCE

KOREA ENGINEERING CONSULTA CONSULTANTS CORP WINDFLOWER BIOBIO-ENERGY INCORPORATED

EAGON CHILE BIOMASS BOILER PLANT


CAPACITY : 35 T/H, 18 BAR, SATURATED STEAM TYPE : TWO DRUM VERTICAL TYPE COMMISSIONING : 2008

27

PROJECT EXPERIENCE

KOREA ENGINEERING CONSULTA CONSULTANTS CORP WINDFLOWER BIOBIO-ENERGY INCORPORATED

KOREA PAPER WASTE HEAT BOILER PLANT


CAPACITY : 40 T/H, 18 BAR, SATURATED STEAM TYPE : TWO DRUM VERTICAL STOKER TYPE COMMISSIONING : 2008

28

PROJECT EXPERIENCE

KOREA ENGINEERING CONSULTA CONSULTANTS CORP WINDFLOWER BIOBIO-ENERGY INCORPORATED

KWANGWON WOOD CHIP BOILER PLANT


CAPACITY : 25 T/H, 16 BAR, SATURATED STEAM TYPE : STOKER TYPE COMMISSIONING : 2009

29

PROJECT EXPERIENCE
TRAVELLING GRATE

KOREA ENGINEERING CONSULTA CONSULTANTS CORP WINDFLOWER BIOBIO-ENERGY INCORPORATED

30

PROJECT EXPERIENCE

WINDFLOWER BIOBIO-ENERGY INCORPORATED

WE ARE PERFORMING TOTAL ENGINEERING SUCH AS, FEASIBILITY STUDY, ENVIRONMENTAL ASSESSMENT, PLANNING, BASIC & DETAIL DESIGN AND CONSTRUCTION SUPERVISION FOR WASTE TO ENERGY PLANT YONGIN WASTE TO ENERGY PLANT JEONJU WASTE TO ENERGY PLANT

LOCATION : YONGIN

LOCATION : JEONJU

AREA : 32,000 CAPACITY : 200 ton/day TYPE : STOKER TYPE COMMISSIONING : 2006

AREA : 133,000 CAPACITY : 400 ton/day (200ton/day2UNITS) TYPE : STOKER TYPE COMMISSIONING : 2006

31

PROJECT EXPERIENCE PROJECT EXPERIENCE


DAEGU WASTE TO ENERGY PLANT

KOREA ENGINEERING CONSULTA CONSULTANTS CORP WINDFLOWER BIOBIO-ENERGY INCORPORATED

JINCHEON WASTE TO ENERGY PLANT

LOCATION : DAEGU DALSUNG AREA : 12,000 CAPACITY : 50 ton/day TYPE : FBC+MELTING TYPE COMMISSIONING : 2008

LOCATION : JINCHEON AREA : 5,000 CAPACITY : 50 ton/day TYPE : STOKER TYPE COMMISSIONING : 2006

32 24

PROJECT EXPERIENCE
ICHEON WASTE TO ENERGY PLANT

KOREA ENGINEERING CONSULTA CONSULTANTS CORP WINDFLOWER BIOBIO-ENERGY INCORPORATED

CHEONGJU WASTE TO ENERGY PLANT

LOCATION : ICHEON AREA : 91,000 CAPACITY : 300 ton/day TYPE : STOKER TYPE COMMISSIONING : 2008

LOCATION : CHEONGJU AREA : 71,000 CAPACITY : 200 ton/day TYPE : STOKER TYPE COMMISSIONING : 2009

33

PROJECT EXPERIENCE
IKSAN WASTE TO ENERGY PLANT

KOREA ENGINEERING CONSULTA CONSULTANTS CORP WINDFLOWER BIOBIO-ENERGY INCORPORATED

HWASUNG WASTE TO ENERGY PLANT

LOCATION : IKSAN AREA : 55,000 CAPACITY : 200 ton/day TYPE : STOKER TYPE COMMISSIONING : 2009

LOCATION : HWASUNG AREA : 74,000 CAPACITY : 300 ton/day TYPE : FBC+MELTING TYPE COMMISSIONING : 2010

34

TYPE OF WASTE TO ENERGY PLANT

KOREA ENGINEERING CONSULTA CONSULTANTS CORP WINDFLOWER BIOBIO-ENERGY INCORPORATED

STOKER : PROVEN DESIGN, EMISSIVE F B C : QUICK START-UP OPERATION ROTARY : EFFECTIVE FOR INDUSTRIAL WASTE PYROLYSIS : PRODUCE SYN-GAS, EXPLOSIVE GASIFY & MELT : HIGH TEMP & OPERATING COST PLASMA : HIGH POWER CONSUMPTION UPDATE STOKER : PROVEN DESIGN, EMISSION FREE
35

PROJECT EXPERIENCE
PLANT LAYOUT
BIOMASS FEEDING SYSTEM

KOREA ENGINEERING CONSULTA CONSULTANTS CORP WINDFLOWER BIOBIO-ENERGY INCORPORATED

BOILER PROPER

FLUE GAS TREATMENT

RECEPTION HALL

PUMP, TANK WASTE BUNKER WASTE WATER TREATMENT

36

PROJECT EXPERIENCE
FLUENT DIAGRAM

KOREA ENGINEERING CONSULTA CONSULTANTS CORP WINDFLOWER BIOBIO-ENERGY INCORPORATED

37

PROJECT EXPERIENCE

KOREA ENGINEERING CONSULTA CONSULTANTS CORP WINDFLOWER BIOBIO-ENERGY INCORPORATED

250 t/d MSW HEAT AND MASS BALANCE ( POWER PLANT )

38

PROJECT EXPERIENCE

KOREA ENGINEERING CONSULTA CONSULTANTS CORP WINDFLOWER BIOBIO-ENERGY INCORPORATED

250 t/d MSW HEAT AND MASS BALANCE ( CHP PLANT )

39

PROJECT EXPERIENCE

KOREA ENGINEERING CONSULTA CONSULTANTS CORP WINDFLOWER BIOBIO-ENERGY INCORPORATED

250 t/d MSW HEAT AND MASS BALANCE (AIR AND FLUE GAS)

40

PROJECT EXPERIENCE

KOREA ENGINEERING CONSULTA CONSULTANTS CORP WINDFLOWER BIOBIO-ENERGY INCORPORATED

17.5MW BIOMASS HEAT AND MASS BALANCE (FEED WATER AND STEAM)

41

PROJECT EXPERIENCE

KOREA ENGINEERING CONSULTA CONSULTANTS CORP WINDFLOWER BIOBIO-ENERGY INCORPORATED

17.5MW BIOMASS HEAT AND MASS BALANCE (AIR AND FLUE GAS)

42

PROJECT EXPERIENCE
PLOT PLAN

KOREA ENGINEERING CONSULTA CONSULTANTS CORP WINDFLOWER BIOBIO-ENERGY INCORPORATED

43

PROJECT EXPERIENCE

KOREA ENGINEERING CONSULTA CONSULTANTS CORP WINDFLOWER BIOBIO-ENERGY INCORPORATED

35 MW POWER PLANT
MSW LOW HEAT VALUE ( kcal/kg ) : FUEL FEED RATE ( ton/day ) : COMBUSTION AIR( Nm3/hr ) : FLUE GAS FLOW ( Nm3/hr ) : BOILER EFFICIENCY ( % ) : 2,400 1,620 386,000 443,000 79 WOOD 3,000 910 188,000 215,000 88 44

PROJECT EXPERIENCE
STOKER TYPE
STEAM DRUM

KOREA ENGINEERING CONSULTA CONSULTANTS CORP WINDFLOWER BIOBIO-ENERGY INCORPORATED

WASTE

WATER WALL

ECONOMIZER

EVAPORATOR HOPPER

FEEDER FLUE GAS STOKER ASH AUX BURNER

ASH EXTRACTOR

45

PROJECT EXPERIENCE

KOREA ENGINEERING CONSULTA CONSULTANTS CORP WINDFLOWER BIOBIO-ENERGY INCORPORATED

TRAVELLING GRATE TYPE

46

PROJECT EXPERIENCE

KOREA ENGINEERING CONSULTA CONSULTANTS CORP WINDFLOWER BIOBIO-ENERGY INCORPORATED

VIBRATING GRATE TYPE

47

PROJECT EXPERIENCE
FLUIDIZED BED TYPE

KOREA ENGINEERING CONSULTA CONSULTANTS CORP WINDFLOWER BIOBIO-ENERGY INCORPORATED

WASTE

FLUE GAS

FLUDIZING AIR ASH, SAND ASH, SAND

AIR NOZZLE

REFRACTORY

WIND BOX ASH, SAND ASH, SAND

48

PROJECT EXPERIENCE
CFB TYPE

KOREA ENGINEERING CONSULTA CONSULTANTS CORP WINDFLOWER BIOBIO-ENERGY INCORPORATED

49

PROJECT EXPERIENCE
ROTARY KILN TYPE

KOREA ENGINEERING CONSULTA CONSULTANTS CORP WINDFLOWER BIOBIO-ENERGY INCORPORATED

HOT AIR

SYNTHETIC GAS

HOT AIR

ASH WASTE

50

PROJECT EXPERIENCE

KOREA ENGINEERING CONSULTA CONSULTANTS CORP WINDFLOWER BIOBIO-ENERGY INCORPORATED

PYROLYSIS & MELTING TYPE

CO, H2, CO2, H2O 1ST AIR WASTE

SYNTHETIC GAS

FLUE GAS

2ND AIR HOT AIR 3RD AIR

SLAG COMBUSTOR DRYING PYROLYSIS GASIFICATION SLAGGING

AIR HEATER

BY PRODUCT

WATER COOLING

51

PROJECT EXPERIENCE
BOILER PROPER

KOREA ENGINEERING CONSULTA CONSULTANTS CORP WINDFLOWER BIOBIO-ENERGY INCORPORATED

2ND AIR

EVAPORATOR SUPERHEATER

ECONOMIZER

2ND COMBUSTOR

CHUTE

STOKER GRATE
PREVENT CORROSION SUFFICIENT COOLING
1ST COMBUSTOR

AERODYNAMIC
TURBULANCE COMPLETE MIXING

STAGING COMBUSTOR
DRY ZONE BURNING ZONE POST BURNING ZONE
ASH EXTRACTOR

RETENTION TIME
IGNITION LOSS LESS THAN 2%

52

PROJECT EXPERIENCE

KOREA ENGINEERING CONSULTA CONSULTANTS CORP WINDFLOWER BIOBIO-ENERGY INCORPORATED

FLUS GAS TREATMENT SYSTEM

53

PROJECT EXPERIENCE

KOREA ENGINEERING CONSULTA CONSULTANTS CORP WINDFLOWER BIOBIO-ENERGY INCORPORATED

FLUS GAS TREATMENT SYSTEM

SCRUBBER
Sox < 20 ppm Hcl < 20 ppm

SCR
Dioxin < 0.05ng/m3 Nox < 50 ppm

BAG FILTER
Dust < 10 mg/m3

54

PROJECT EXPERIENCE

KOREA ENGINEERING CONSULTA CONSULTANTS CORP WINDFLOWER BIOBIO-ENERGY INCORPORATED

FLUS GAS TREATMENT SYSTEM

CASE CASE1 1

SNCR SNCR

SDR SDR

ACT. ACT.CARBON CARBON

BAG BAGFILTER FILTER

PJT PJT::KWANGMYUNG, KWANGMYUNG,CHANGWON, CHANGWON,CHEONGLA, CHEONGLA,ANSAN ANSAN

CASE CASE2 2

SDR SDR

ACT. ACT.CARBON CARBON

BAG BAGFILTER FILTER

SCR SCR

PJT: PJT:KURI, KURI,SUWON, SUWON,KWACHEON, KWACHEON,SANGMOO SANGMOO

CASE CASE3 3

EP EP

WET WETSCRUBBER SCRUBBER

SCR SCR

PJT: PJT:NOWON, NOWON,SUNGNAM SUNGNAM

CASE CASE4 4

SNCR SNCR

SDR SDR

ACT. ACT.CARBON CARBON

BAG BAGFITER FITER

SCR SCR

PJT: PJT:KANGNAM KANGNAM

55

ADVANTAGE

KOREA ENGINEERING CONSULTA CONSULTANTS CORP WINDFLOWER BIOBIO-ENERGY INCORPORATED

WASTE TO ENERGY PLANT

REDUCE WASTE VOLUME EFFECTIVELY PRODUCE ENERGY SUCH AS STEAM AND POWER SAVE FOSSIL FUEL SUCH AS COAL, OIL & NATURAL GAS REDUCE GREEN HOUSE GAS EMISSION BURN OUT INFECTIOUS DISEASES SAFELY

56

PROJECT EXPERIENCE

WINDFLOWER BIOBIO-ENERGY INCORPORATED

WASTE TO ENERGY MAIN FOCUS FOR PLANNING & DESIGN


- HIGH COMBUSTION EFFICIENCY - LOW EMISSION RATE - SUPPLY ENERGY SUCH AS STEAM AND POWER - CLEAN DEVELOPMENT MECHANISM

57

PROJECT EXPERIENCE

KOREA ENGINEERING CONSULTA CONSULTANTS CORP WINDFLOWER BIOBIO-ENERGY INCORPORATED

RECREATION FACILITIES
v SWIMMING POOL

v v v v v

SOCCER GROUND BADMINTON GROUND GATE BALL GROUND ROLLER SKATE GROUND PARKING AREA

GATE BALL

ROLLER SKATE

SWIMMING POOL

SOCCER

BADMINTON

58

ECOMONIC ANALYSIS
250 t/d MSW CONSTRUCTION COST ( CHP PLANT ):
ENGINEERING AND DESIGN : CIVIL AND BUILDING : MSW HANDLING EQUIPMENT : STOKER AND BOILER : FLUE GAS SYSTEM : TURBINE AND GENERATOR : CONTROL AND ELECTRIFICATION : FIELD ERECTION AND COMMISSIONING : INDIRECT COST :

KOREA ENGINEERING CONSULTA CONSULTANTS CORP WINDFLOWER BIOBIO-ENERGY INCORPORATED

USD 33,892,000 33,892,000


798,000 1,890,000 1,214,000 3,670,000 1,214,000 2,501,000 3,690,000 7,063,000 11,852,000

ANNUAL REVENUE :
POWER : ( 2,000 kwh x 7,500 hr/year x 0.12 USD/kwh ) STEAM : ( 26t/h x 85% x 7,500h/year x 45 USD/t ) Tipping Fee : ( 250 t/d x 300 d/year x 20 USD/t )

USD 10,500,000
1,800,000 7,459,000 1,500,000

ANNUAL OPERATION COST :


ASH TREATMENT : ( 250 t/d x 15% x 300 d/year x 50 USD/t ) MAINTENANCE COST : ( 4% OF CONSTRUCTION COST ) LABOR COST : ( 30 MEN x 2 SHIFT x 6,000 USD/MAN ) INSURANCE : (0.4% OF CONSTRUCTION COST) GENERAL EXPENSE : (30% OF LABOR COST)

USD 2,522,000
563,000 1,356,000 360,000 136,000 108,000

AVERAGE INTEREST OF LOAN :

8%

USD 1,356,000 USD 2,259,000 USD 1,387,000 USD 3,235,000 18 %

ANNUAL DEPRECIATION for 15 years ANNUAL TAX: 30% ANNUAL INCOME after TAX and AMORTIZATION: IRR:

59

ECOMONIC ANALYSIS
35MW BIOMASS CONSTRUCTION COST :
ENGINEERING AND DESIGN : CIVIL AND BUILDING : BIOMASS HANDLING EQUIPMENT : STOKER AND BOILER : FLUE GAS SYSTEM : TURBINE AND GENERATOR : CONTROL AND ELECTRIFICATION : FIELD ERECTION AND COMMISSIONING : TRUCK FOR BIOMASS / LAND : INDIRECT COST :

KOREA ENGINEERING CONSULTA CONSULTANTS CORP WINDFLOWER BIOBIO-ENERGY INCORPORATED

USD 85,000,000
1,423,000 6,520,000 3,620,000 9,837,000 2,169,000 9,640,000 8,410,000 13,369,000 4,250,000 25,762,000

ANNUAL REVENUE :
POWER : ( 32,000 kwh x 7,500 hr/year x 0.167 USD/kwh )

USD 40,080,000
40,080,000

ANNUAL OPERATION COST :


BIOMASS COST : ( 920TON/DAY x 315DAY/YEAR x 35 USD/TON ) CHEMICAL , ASH TREATMENT , OIL : ( 40% OF BIOMASS COST ) MAINTENANCE COST : ( 4% OF CONSTRUCTION COST ) LABOR COST : ( 36 MEN x 2 SHIFT x 6,000 USD/MAN ) TRUCK DRIVER & DIESEL OIL : ( 46 TRUCKS ) INSURANCE : (0.4% OF CONSTRUCTION COST) GENERAL EXPENSE : (30% OF LABOR COST)

USD 19,897,000
10,143,000 4,057,000 3,400,000 432,000 1,260,000 340,000 265,000

AVERAGE INTEREST OF LOAN :

8%

USD 3,400,000 USD 5,667,000 USD 1,112,000 USD USD 10,005,000 19 %

ANNUAL DEPRECIATION for 15 years ANNUAL TAX: 10% ANNUAL INCOME after TAX and AMORTIZATION: IRR:

60

RENEWABLE ENERGY ACT OF PHILIPPINES

DOE
Register as Renewable energy project

NREB
Request Feed-in Tariff of 7 peso/kwh

ERC
Approve

NGCP
Contract and pay for 20 years

BIOMASS POWER PLANT


DOE : Department of Energy ERC : Energy Regulatory Commission Philippines NREB : National Renewable Energy Board NGCP : National Grid Corporation of

61

EDCF LOAN PROCEDURE CHART

Loan Request

Minister of MOSF

Notify

Minister of MOFAT

Feasibility Studies

NEDA

Request Review

Request Review

Loan Request Feasibility Studies

Korean Exim Bank

KOICA

Municipality

EDCF: Economic Development Cooperation Fund NEDA: National Economic and Development Authority MOSF : Ministry of Strategy and Finance MOFAT : Ministry of Foreign Affairs and Trade KOICA : Korea International Cooperation Agency

62

THANK YOU
website - http://www.kecc.co.kr