DESIGN INPUT
ALIGNMENT OF RAIL TRACK & STATION LOCATION GEOLOGICAL -GEOTECHNICAL MODEL SITE INVESTIGATIONS (All previous data, desk study, other project data.)
DESIGN PROCESS
TBM Design
SETTLEMENT ANALYSIS Ground loss, shield loss, tailskin loss, sensitivity
SURVEYS FOR UTILITIES, ID NATURE OF MATERIAL & ALLOWABLE LIMITS OF DEFORMATION IDENTIFY & DESIGN PROTECTION WORKS
Segment Design Input 'field data' &/or correction factors into design
INSTRUMENTATION DESIGN
DESIGN OUTPUT
CONSTRUCTION INPUT
DESIGN OF TUNNEL ADVANCE Horizontal & Vertical Alignment - deeper tunnels have greater pressures, tight curves may require tapered rings Geotechnical Interpretation - possible geological hazards, mixed face conditions, geological boundaries Face Pressures - control of face pressure to avoid stress relaxation & overexcavation Weights / Volumes - assessment of weight based on range of in-situ density, assess likely use of soil conditioning Instrument Plan - types & distribution of instruments based on predicted settlements and location of buildings, frequency of reading Settlement Contours & Settlement Limits - assessment of extent of predicted settlement, allows a check to be carried out during construction Required Consolidation Works - building protection worked to prevent any adverse effects due to settlement. High Risk Areas, Structures & utilities- indicated on drawings to advise of additional care/reporting Anticipated Anomalies & Actions - Loss of face pressure, additional grout, overexcavation Probing - predicted geology, tates of penetration
Confirm /Reassess Geological profile and face pressures required to ensure settlements controlled.
CONSTRUCTION PROCESS
CONSTRUCTION Tunnelling TBM Operation Face pressure, Grouting Volume & Pressure Muck Volume Thrust Torque Speed of Advance Steering / Survey Control Lining Erection Build Quality / Repars Alignment Ground Treatment Drilling Grouting Verification Immediate Actions Alarm Plans Standard Operating Procedures Emergency Plans
TBM - GROUND INTERACTION Compliance with settlement limits Compliance with Face Pressure & Grout requirements Compliance with alignment
MONITORING TBM Parameters Face Pressure Grout Volume & Pressure Muck Volume Thrust, torque & Advance Speed Instrumentation Drilling Data against geological profile Planned against actual settlement Monitoring of Treated Areas Immediate Actions Reading Frequency Accuracy checks Visual Inspections of surface/buildings
SAFE TUNNELLING Controlled settlement, minimal impact on infrastructure, optimised face pressures, controlled progress
CONSTRUCTION OUTPUT