Documente Academic
Documente Profesional
Documente Cultură
Target Field
Family-owned firm 56 years strong Seven geographic office locations Five industry-specific operating groups Industry leaders in technology & sustainability 2,175 team members Leadership, stability & financial strength
2010 2005
24
33
> > > > > > > > > > > > 2nd 2nd 7th 7th 11th 12th 13th 14th 15th 18th 20th 89th Sports Wind Power Data Centers Healthcare Telecommunications Manufacturing Power Generation Green Building Commercial Offices Domestic General Building Airports Top 225 Global Contractors
39
Geographic Focus
The Construction of
Target Field
Project Team
OWNERS
Hennepin County Minnesota Twins Minnesota Ballpark Authority
OWNERS REPRESENTATIVE
Tegra Group
DESIGN CONSULTANT
Architect: Populous Structural Engineer: Walter P Moore Others: HGA, Meyer Borgman and Johnson, URS, SRF, American Engineering and Testing, Braun Intertec, etc.
Site History
Railroad Bed
Parking Lot
4D Snapshots
Model Shots
Model Shots
Model Shots
Schedule
Bonding Bill Start Infra-structure Start Ballpark Complete Ballpark (2 months early) May 2006 May 2007 August 2007 December 2009 April 2010
First Game
Piling: 8/2007-6/2008 3,396 piles driven 327,400 ft. (~62 miles) Avg. Length: 95 ft.
Construction Challenges
Adjacent Roadways & Structures
Architectural Precast
Structural Precast
Sod Harvest
Practice Cage
Locker Room
Hydro Therapy
Legends Club
573 Club
Hrbeks
Metropolitan Club
Celebration Sign
Plaza6th Street
Play Ball
Skyline
Night Scene
QUESTIONS?