The Construction of

Target Field

Company Introduction & Overview

Building a Legacy of Success

> > > > > >

Family-owned firm 56 years strong Seven geographic office locations Five industry-specific operating groups Industry leaders in technology & sustainability 2,175 team members Leadership, stability & financial strength

ENR Industry Position


steady growth through Engineering News-Record top 400 ranks since 1969
2000 1990 1969
Top 400 Top 50

2010 2005

24

33
> > > > > > > > > > > > 2nd 2nd 7th 7th 11th 12th 13th 14th 15th 18th 20th 89th Sports Wind Power Data Centers Healthcare Telecommunications Manufacturing Power Generation Green Building Commercial Offices Domestic General Building Airports Top 225 Global Contractors

39

Geographic Focus

we go where you need us

Leaders in Virtual Design & Construction


Improving the overall construction process
> > > > > > > Precise MEP coordination Maximized pre-fabrication Improved project visualization Drives schedule control Virtual mock-ups to increase quality Captures and applies end-use input O&M integration

Leaders in Virtual Design & Construction

Building whats green.


As Part of Our Work
More than $5 billion in green/sustainable projects Leader in renewable power construction 275 LEED certified team members Green Advancement Team established to support green building research and promote best practices

In Our Project Sites


Waste management program diverts 50% or more of all construction waste from landfills.

Within Our Operations


100% of electricity usage for our U.S. offices powered by renewable energy credits Fuel-efficient vehicle fleet Recycling programs in place in every location

The Construction of

Target Field

Project Team
OWNERS
Hennepin County Minnesota Twins Minnesota Ballpark Authority

OWNERS REPRESENTATIVE
Tegra Group

DESIGN CONSULTANT
Architect: Populous Structural Engineer: Walter P Moore Others: HGA, Meyer Borgman and Johnson, URS, SRF, American Engineering and Testing, Braun Intertec, etc.

CONSTRUCTION MANAGER/GENERAL CONTRACTOR


Mortenson Construction Thor Construction

Site History

Railroad Bed

Parking Lot

Inter Modal Facility

Construction Challenges Site Logistics

4D Snapshots

Model Shots

Model Shots

Model Shots

Schedule
Bonding Bill Start Infra-structure Start Ballpark Complete Ballpark (2 months early) May 2006 May 2007 August 2007 December 2009 April 2010

First Game

Construction Deep Foundations

Piling: 8/2007-6/2008 3,396 piles driven 327,400 ft. (~62 miles) Avg. Length: 95 ft.

Construction - Piles & Pile Caps

Construction Challenges Winter Construction

Construction Challenges
Adjacent Roadways & Structures

Construction Challenges BNSF Corridor

Concrete Deck Construction

Concrete Deck Construction

Architectural Precast

Structural Precast

Canopy Steel Erection

Scoreboard Steel Erection

Playing Field Construction

Playing Field Drainage & Irrigation

Playing Field Heat System

Sod Harvest

Field Quality Assurance

Practice Cage

Locker Room

Hydro Therapy

Town Ball Tavern

Legends Club

573 Club

Hrbeks

Metropolitan Club

Celebration Sign

Plaza- 7th Street

Plaza6th Street

Play Ball

Behind Home Plate

Skyline

Night Scene

QUESTIONS?

S-ar putea să vă placă și