Safety InstructIon

i\S you a all aware, every day day we are dealing and
ex!)criencecl high risk of accident, either at the ground or higher
places of work.

TherE~fore for those who has subordinates under them niust


obsen/c the Safety Regulatios of their workers. Should an
accIdents occured on them, it means that the supervisor does
riot understand occupational safety and indirectly it will reject on
your" reputation as a supervisor.
I
1

SAfElY REGlJI.ATIONS

Supervisor/forelllan, Lead hand must be comply with Project


Safety Hules and regulations. The Supervisor/Foreman! Lead
hands have the responsibility and obligation to provided safe
working environment for all employees.

The success of safety health, fire prevention and security


I

pro~lram requires the support and cooperation of everyone in


rnanagement and workers.

The \Jltimate goal is to reduce exposure which causes injuries,


that result in human sufferings and excessive cost.

l~JI upervisors/forernan, Lead hand are responsible to report


lrnmediately without delay any personnel injury accident, fire all I

vehicle property damages caused of accident within their area.


l\ verbal repoli must be submitted immediately (followed by a
\Nritten report within 24 hours after accident has occurred) to
Transmission Line Office. The Site Office Management is then
responsible to notifying the Site Management of any serious
injury or other lncident of significant importance.

Supervisor/foreman, Lead hand shall designate an adequate


number qualified safety representative(s) to implement a safety
proCFam which will aid in creating and maintaining a safe
workinQ environment. The following general safety rules supply:

ach workman shall use personal protective


equipment

1.'1 Every crew should be informed about safety


regulations in written.

'1.2 If a worker permanently acts against safety


regulation, he should be dismissed from the site.
! 1\11 f~mployeesl visitors and vendors must wear a hard
hat wilen on site except in the office.
J

14 Shoes must be worn, bare feet or sandals are not


permitted.

'1.5 Safety belts & lifelines must be used when other safety
guard such as nets or scaffolding cannot be used.

Face shield, goggles must be worn when grinding,


chipping or when eyes are exposure flying object.
Protective lenses must be worn when welding, cutting
and burning.

)7 Hand gloves must be worn when handling material, or


! ""
rough objects likely to cause hand injuries.

Breathing protection must be worn when to exposed to


hazardous dust, fumes, mists or vapors.

'1.9 If the Site Management finds out, that one of the


workers in a coarse and permanent way against basic
safety regulations, The Site Management will stop the
vl/ork and write a warning letter to the worker and
leader (Supervisor/Foreman or Lead hand). The work
can start imlnediately after safety regulations according
to Indonesian law are fulfilled.

Ladders

2.1 Ladders must constructed of sound materials and


be in good condition.

if: \ABJ3S·ysi\.Sa./cly. doc


3

'2 Ladders must constructed of sound material and be in


£]ood condition.

2.:3 V\/hen used access, the ladder must be extend 3 feet


a bayed landing
,
(resting point).

'2.4 The slope of the ladder must be a 4 to 1 ratio ..

2.5 Precautions must be taken to prevent sidestep.

::L ca Ids and Tower Erecting Works

3.1 {"Ii scaffold nlust be erected and ,maintenance to


conform with good engineering practice.

:3.2 f\!I scaffold must be inspected daily by the responsible


person designated to perform this task.

3.3 All scaffold must be inspected by responsible person


af1er alternation or moving.

3.4 Scaffold must have solid footing capable of supporting


intended load.

3.5 I\ccess ladder to the platform must be provided.

3.6 Both ends of foothold board must be tightened firmly.

3.7 l\lI workers and engineers working under the tower


have to use safety hat.

3.8 Hand gloves and safety shoes have to be provided for


workers which handle steel.

3.9 Tools have to be checked before use. Tools in bad


condition have to be eliminated to avoid accidents.
4

:3,'1 0, ~:)rnall tools used for tower erection have to be secured


with some ropes from plunge down. The space for
tower erection in this project area is very small and
some workers have to performed the re tasks under
the tower during erection.

:3.1 Safety belt have to be worn during erecting the tower


or stringIng work at up side.

3.13. To erect tower parts in a temporary position sufficient


anchors have to be installed to take the loads save to
the around.
""'J~

~l
,,) ~ '1 4..1".
Ii
be inspected carefully by
1\\1 anchors have to
responsible person designated to perform this task.

() Excavation, Foundation Works and Trenches

4.1 All excavation and trenching operation must be


conform with established of safety standards.

il.:? Side of trenclles in soft or unsuitable material 4 feet


or more in depth shall be shored, braced, sloped, or
otherNise supported by means of suitable timbers.

4.3 Ladders are required for getting out of trenches that


are more than 4 feet depth.

4.4 J\dequate barricades must be provided on or near


trenches, ditches and other excavation.

4.5 Confirmation of cables, pipes, etc., underground


must be done before works starts.
5

";.f; E:xcavation of more than 1,5 depth have to be supported


with proper equipment, like planking and strutting to
prevent collapse of the soil.

4.7 Laborer inside the excavation always have to use safety


hats.

li.e: Excavation have to secured in a safe way with plastic


vlIarning bands planking or barbed wire or barricaded to
l

avoid that children or adult people fafl into the excavation.


V'je expect ground water and there is a danger to get
drowned.

~.~; E.xcavated material should not stored direct on the border


of the excavation. The free space should be 1,5 m .

. 10 Parents and their children from the nearby housing area


should be informed about the open excavation in the
proximity of houses .

.0 EIE'elri
5.'; Only authorized person are allo'vved to work on or repair
electrical equipment.
5" II pieces on cable must be properly made and insulated
to the standard of the original cable.

~.3 Ail energized wire in circuit breaker panels and junction


boxes must be corrected at all the times.

5.4 Damage or unsafe electrical cable, cord and plug must


be repaired or repiaced immediately.

c' 0 \,~
Idi n fJ Bit. C U Uin 9 0 r Grin din 9
c,The \vorker must be provided with proper eye
protection, I"land and head protection before welding and
~. lJ r!'"II!;r'h•.
I,) "J
-,'
6

6.2 Welding must not carried out in a hazardous area


without proper authorization.

El.3 ,<\11 gas cylinders must be stored and transported


in an upright position with the valve cap in playe.

6.4 \/\/hen in use, cylinder must be secured in an


upright position.

6.5 Fire extinguisher must be available near the


cutting and welding operation and soap water
cartridges must provided with cylinders for
investigating of gas leakage.

6.6 l.ll 'Nelding equipment must be properly earthen.

"I
Ii'
I)
\ rane & Heavy Duty Equipment Operations
"7.1 /1,.11 operators of hoisting equipment must be
certitled by authorized.

7.2 Only experienced and authorized personnel are


allowed to operate the heavy duty equipment.

7.3 The operator must not allowed anyone to ride the


load or hook.

7.4 ,A. load must never be carried over person below.

7c.,-) ?,:! stringing equipment (winch, tensioner,


cornpr'ession equipment etc.) should be .operated
only by skilled and experienced operators.

7.6 Tr,:: tleavy duty equipment's must be inspected


I{; iAD,L:Sj'si:.S::t/ety, doc
7
7. ~i The Operators must not leave their position during
loading operation.

1~lgln£1
8.'1 i\1I slings, wire rope, shackle & chains must be
inspected before use, they fT1ust be strong enough to
carry the load.

82 Safety latch must be provided on the hook to prevent


the sling from jumping out of the hook.

8.3 Oniy competent person shall be signal men, only as


rnany signal men as necessary shall be used.

Jj r Vehicle Equipment
9.'! All operator shall inspect his vehicle daily before using.
9.2 ./\11 operators must be experience and licensed to
operate a vehicle, an special driving permit id issued by
the author.
~~,3 f\lo personnel shall be permitted to ride in the vehicle
unless seated or secured.
£1./1 All speed limits shall be strictly adhered to.
9.5 In connection of the issuance of the traffic regulation No.
"14, 1992 with the effective date of 17 September 1993.
companies are obliged to remind to you and those
responsible for the company's vehicles the folJov'ing
points:
"j. To complete and check the eqUipment's of the cars
as required as follows:
1.a. P3K Box (First Aid Box)
1.b. Safety reflection Triangle
1 .c. -1"'001 Box.
"j ,d. Should always bring 10 Card U<TP) and valid
driving license.
1 .e. Should always bring Car License (STNK).
#j.f. Should always bring the Testing for cargo
delivery permit (for cargo vehicles).
8

:J. The driver must observe the validity of the STNK and has
to report at least 1(one)week before the expiration date
to the in charges person to extend the validity.

3. The driver must observe the traffic regulation in force.


Should the driver commit a nlistake the driver has to be
fully responsible.
In case the mistake/fault ",vas caused by the driver
himselC the company has the right to take firm action to
ware the driver.

4. The userlresponsible person of the vehicle has the right


and obliged to provide guidance and warn to the driver.
In case the driver does not observe and obey those
vilarn[ng r the responsible persons are urged to report and
take firm action.

5, Beside of that) due to safety safe the driver must observe


the following "13 Don't" bellows:
5.1. Do not over take cars at a cross point.

5.2. Do not force to pass a group of pedestrians at the


Zebra Crossing.

5.3. Do not over take an line vehicles from the left.

5.4. Do not over take at a Rail-Road Crossing.

h5
0 . . Do not over take at a curve / corner.

J:::.6
,) . . Do not park the car at the trotoar.

5.7. Do not over take while in the central area is bUsy.

5.8. Do not drive fast and zig - zag on the road (at Tal
Road Min. 60 Km Max 100 Km/Hour).
9

5.S). Do not be trapped at the yellow junction box at the


stopped protocol road crossing although the traffic
lights are green, while the traffic is very crowded.
5.10. Do not trespass the red traffic light, stop 'til! the green
light is on.
5.1 i. Do not over load the passenger and cargo more than
limit allowed.
5.12. Do t stopped where it is forbidden to stop or park.
5.13. Never park a car at the corner of tile road.

i 0 .~j [mergency first aid facilities should be available on


the site during the working hours.
'I L~) . 'J
.r:_ Report all injured workers must be submitted to the
Site Office as soonest as possible.

,0 ouse KeepinfJ

'j'l . 'I
Scrap materials shall be cleaned upon daily basIs. It
shall not be lifted to accumulate.
11.2 Nails protruding from used lumber shall be pulled
out from lumber or bent over.
11 .3 /\11 walkways passageways shall be kept free from
materials] supplies and obstructions at all times.
Waste material may not be burned on the site but
shall be collected and, disposed at scrap box
(container provided ).

ty oleeting

/\ safety talk viill be held at one day during every


month. The topic wil! be distributed to you on the
viorkday before,
10

12.2 On representative from each supervisor/ foreman


or lead hand is required to attend supervisory
safety meeting held on the first week of each
month, you will be notified of place and time and
date.

13.0 Prior Inspection of Equiplnent

'13.1 All equipment such as cranes, generator set,


welding machine, stringing equipment etc. must
be inspected by Field Service Dept. or Mechanic
before they are used.

13.2 Defective equipment never be lIsed in this project.