ERECTION OF COIIIR.OI,LED
W
Type
BOILER
Erection.
CTRCI.II,ATION
Brief detail.s of
CC pu.urp
and motor
312.
Kgf /
Cm2
Suction pressure
195.6 Kgf /
4
Cm2
Quantity
pumped
8453
Lit,re/min.
3425 Kgs.
Type
Out put
354
KI{
3430C
208.5 KgflCm2
14s0
RPM.
84
AMPS
r
'1443 Kgs .
81-08 -O201T/L
04.97
of6
BOILER
Erection
Special. features of
1_
PumP motor
2.
Glanoiess.
Impel3-er is mounted on Ehe extended shaf t of motor. \:o. separate coupling is required,
cooled by
same
ERECTION OF CC PI]MPS
Conerolled circulat.ion 5OO MW Boiler is provideci with three Nos. circulating pumps of each of 50? capacity. The Boir-: water circulating pump comprises a single st,age centrifugal pump ciriven by a wet stator induction motor as shown in Fig. No. 1. The motor suspended beneath the pump casing is fi1led with wat,er at, fuII system pressure. Whilst. no seal exiscs between Ehe pump and motor, a baffle plus base clearance between the stator and motor casing neck, restrict solids and hot wat.er enLering the motor. The rotor shaf t. is supported by water lubricaEed,.tilt.ing pad ratlia] and thrust. bearing mounteC on the end of t.he staLor she11.
Each pump has a centre inlet and two tangent,ial discharges. Each discharges of the pump is prowided with the elbow down st.op check valve in the discharge lines. The discharge l.ines are connected to the front. bottom ring header.
kat
81-08-02O7T/2 of
04.97
Fl'
1
,i
ERECTION OF CONTROI,LED
BOILER
I
CTRCUI,ATION PUMPS
Erection
r..
1 eC PUl,lP
CASE INSTALLATION
ani cleaned.
Suction manifold and suction valves three Nos. with spool p:-eces are perfectly ]evelled. A1] three volutes are transported to furnace cavity anci slings are attached to erection eye bolts proviCed on the casing. Ifpica1 volute is shown in Fig. No.
2.
g
i t,
elevation
After alignment of volute with suct.ion spool, iE may be tackwelded. I{orizontarity of bot.tom flange is rechecked to keep it within 1/2 degree or -L/2 degree. Suction spool with volut.e is welded following the applicable procedure in welding manua1..
Radiography and sEress relieving are to be completed after compleLi-on of welding.
i, d
't
g
81-08 -02o7T/3
04.9'7
of
ERECTTON OF COIIIR.OLLED
BOILER
Erection
CIRCTTI,ATION PUMPS
and covers are fixed to Lhe bottom flange and nuEs are tightened to t.he requireci torque value inoicated by the pumo manufacturer.
Dummy
1..2
supporE.ed
to
2.
when mounEed, the pump should accommodate movement in t.he pipe without imposing exessive loads on t,he casing and branches.
sufficient. clearence should be arlowed beneath the moEor. t.o permit lowering of the motor from the pump case for maintenance. If removable floors are fitted after the motor is installed, ensure that the terminal boxes or l_ow pressure cooling water supply lines will not. foul them when the boiler is on load and the circurat.or moves downwards ciue to
thermal expansion.
Ensure the main system is free from solids before mounting the circulators. Hose d.own internplly,
81-08 -o2O7T/4
04.97
of
Rev. 00
t
I
ERECTION OF CO}[[ROI&ED
BOILER
Erection
1
CIRCTII,ATION PUI.itPS
the pump case, the valves and adjacent piping, eRsure the removal of all loose debris.
Lo
Motor assy is transported to furnace cavity and kept IN a verticai position, oD the motor cover stanci, and in
pump.
Inspection cover at the top of the transit canister is removed and drain plug is removed Eo drain off the inhibitor. Transit cani,ster is removed from the motor case.
Iugs.
Usi-ng long l-ifc power hoists, moEor is lifted to the position unt,il t.he mot,or impeller is about to ent,er the pump case. In this condition moLor }oaci is transferred to chain Lype hoist..
Dist.ance bet.ween the pump case and moLor f langes is measured at four 90 degree points on the flange periphery. If necessary moEor is adjusted to make the dist.ances equal all around.
Care is to be taken to see t.hat. the st.uds are cent.ered in t.he motor f lange ho1es.
With the chain hoists working in Unison motor is raised until an increase in the effort required on t.he hoist indicates t.hat Ehe gasket is in contact. with thJ pump
a
81-08-o2A7T/5 of
04.97
BOILER
Erection
case face. At this stage, the gap between the flange faces should be eoual all round the flange.
The stud t.hreads are coated with,high temp anti_seize
compound anci
hanci.
Nut.s are Lj_ght.ened with hydraulic st.ud tensioning unit following the procedure given by t.he manufacturers.
removed.
of Heat exchanger
Heat exchanger is loosely mounted on the motor case brackets with the heat exchanger wei_ght belng taken by t.he lifLing tackles. Heat exchanger is aligned paralrel Eo the motor as shown in the Fig. No. 4 by adjusting the screws on the bracket. on complecion of adjustment, adjusting screws are l0cked with l0cknuts and lifting tackles is Interconnecting
completed.
removed.
pipe work of
Heat
exchanger
IS
a-re insr-alIed.
CC pumps
are complet,ed.
8L-08-o2O7T/6 of
04.97
(SUCTION}
t{
LEr
DISCHARGE
>aI ' | / tl
- l.|
v
IIAII'J STUD
PUMP.E
IJ O
-DISCHARGE
II,lPELLER
PUMP.END
JOURNAL EEARING
I.IOTE:
STATOR WINOINGS
]L
ROTOR
,i r
iL
,,,
MOTOR CASE
-.
sTr,Toe t-AMt^!
^T!O^'S
(TILTING PAOI
THRUST BEARING
TERMINAL
GLAT.IO
GASKET
TEFIMINAL
coiii.lECTiOii
80x
MOTOR COVEB
SYSTENI PIPET{ORK
PUMP CASE
FABI? 3i A3
SYSTEI'I PIPEY/OR K
[ ['.8
i.u'''
RADIOGRAPHIC HOLE
PROCESS CONNECTION
LIFI'ING
EYEBOLT
PUMP'MOTOR FLANGE TO 8E
x6'i rzonrlu'trrlTH
vI
oEG
R E
FIG-2:
I
?
)
INSULATION
!:t
INSULATION
--//
SYSTENl PIPEI/VOR K
a
SFi ACK
LE
(Ref . Ontyl
HEAT EXCHANGEE
KEEP COOLER
IIIOTOR ASSEI,lSLY
FLEXIELE HOSE
TERMINAL 6OX
o
o
a LOOP SUPPLY CAELES..AT LEAST 600mrn TO -ALLOIY FOR CIRCULATOR EXPANSION
ALLO\I, AT LEAST 600mm FROI'I ANY OBSTACLE FOR THE MOTOR TO SINK L:,'HEN THE BOILER SYSTEM lS HEATED AND THE SYSTET\4 EXPANOS.
KEEP AR=A BENEATH MOTOR CLEAR OF ANCILLARY EOUIPMENT TO PERt\lIT SUBSOUENT T.IOTOR R Et\4OV AL. r,1 INIti1UM OISTANCE REOUIR ED lS 914-4mm-
ATTACHMNT TO *IOTOR
IlELD THIS
FLAT{GE UP
F
IRST
,AOJUSTING SCFEWS UNTIL CO}ITACT $'ITH HEAT EXCHANGER FOOT IS MADE LOCK SCRE$JS I^'ITH NUTS
NqTE:
NSUNE THAT INTER.cONNECTING PIPWORK ASSEMBLY IS MARKEO $/ITH. ANO MATCHS THE UNIT SERIAL NUMEER
INSTAI.I aTION