HARYANA POWER GENERATION CORPORATION LIMITED

EIA/ EMP Studies for additional !""# MW unit at DCRTPP$ Ya%unana&ar$ Har'ana

Executive Summary
(# INTROD)CTION Haryana Power Generation Corporation Limited (HPGCL) proposed to set up an additional coal based unit of 66 !" capacity at t#e existin$ %x & !" 'eenband#u C##otu (am ('C() t#ermal power plant in )amunana$ar district* Haryana+ ,o obtain clearance from !-E. in environmental an$le t#e present report is prepared as per t#e procedure specified in /0 t# September % 6 1otification of !inistry of .orest and Environment (!oE2.)+ *(# *( PRO+ECT DESCRIPTION Lo,ation ,#e proposed site of t#e power pro3ect is located nei$#bourin$ t#e villa$es 4alanaur* (attanpur* 5s#arpur* (ampur6!a3ra * Lapara* !andauli and ,a3a7pur in )amunana$ar* 'istrict )amunana$ar in Haryana+ ,#e site is 6 7m away from 8mbala+ ,#e site is covered under Survey of 5ndia topos#eet no+ H0&L9 bounded between latitude & : 6; 1 and lon$itude <<: % ; E+ ,#e nearest rail #ead is 4alanaur railway station on broad $au$e !u$alsarai68mbala6=a$ad#ri6Sa#aranpur section of 1ort#ern (ailway at a distance of about % 7m from site+ ,#e 1ational Hi$#way from )amunana$ar to Sa#aranpur is runnin$ alon$ t#e sout#ern boundary of t#e plant area+ 8 metalled road connectin$ t#e 1ational Hi$#way to ,a3a7pur runs alon$ t#e western boundary of t#e plant area+ *(* PRO+ECT AREA ,otal land area re>uired for t#e proposed plant facilities is % acres w#ic# includes? 0@ acres of land for t#e plant 2 e>uipment switc# yard and /@@ acres for additional railway sidin$ 2 coal #andlin$ system+ HPGCL #as already ac>uired // < acres of land+ ,#e existin$ plant #as ta7en &/9 acres for plant and e>uipment* %// acres for as# disposal and //% acres for colony+ 1o additional land is ac>uired for t#e expansion pro3ect includin$ as# pond as per ,-(+ ,#e existin$ residential colony developed is in an area of //% acres for %x& !" pro3ect+ 8dditional dwellin$ unit will be planned wit#in t#e land available in t#e existin$ colony by construction of multi story units+ -ut of @ meters wide belt of land for buffer Aone between t#e sout#ern boundary of t#e plant and 8mbala 6 Sa#aranpur Hi$#way earlier maintained as per !-E. re>uirement coverin$ about %<@ acres of land area* a %@ meters wide belt of land #as been used for t#e development of additional railway mars#allin$ yard* coal stora$e yard* additional water reservoir of t#e proposed unit+ *(Pro.e,t ,ost ,#e total pro3ect cost (as completed) #as been estimated to be (s+ &969+&% crores ((upees t#ree ,#ousand ei$#t Hundred and sixty ei$#t crores only)+ ,#e capital cost of environmental control measures is (s+ %&% crores and t#at of Environmental !onitorin$ facilities is (s+ /0 crores+ ,#e total capital cost of environmental control and monitorin$ facilities comes to about (s+ %/9 crores w#ic# is included in t#e pro3ect cost+

2011 MECON Limited. All rights reserved

ES/ 1

HARYANA POWER GENERATION CORPORATION LIMITED

EIA/ EMP Studies for additional !""# MW unit at DCRTPP$ Ya%unana&ar$ Har'ana

*(0

Water re1uire%ent 5rri$ation 'eptt* Government of Haryana #ad sanctioned drawl of // cusecs (// mBC#r) of water for t#e proposed unit from "estern )amuna Canal (")C) vide letter 1o+ @9DD6@D dated %9+/ +% D and /0 cusec (/0 mBC#r) Sewa$e ,reatment Plant (S,P) water vide %&+ %+% / + !a7e up water re>uirement for t#is pro3ect would be about %/ mBC#r considerin$ as# water system operated in re6circulation mode wit# @+ C-C+

*(2

3uel Re1uire%ent ,#e proposed power plant will be fueled by coal+ 8t !C(* t#e estimated maximum coal re>uirement annual will be &+% !t at D E plant load factor+ ,#e coal will be ta7en from Central Coal Limited (CCL)+

*("

Main Plant E1ui4%ent ,#e proposed plant will comprise of Steam Generators and 8ccessories* Steam ,urbine Generator and 8ccessories* Condensate Pumps* Foiler .eed Pumps* Heaters* 'eGaerators* .uel -il System* Lube -il Purification System* C#emical 'osin$ System* Compressed air System* one no+ of %<@ m #i$# sin$le flue (CC c#imney+

*(5

As6 6andlin& s'ste% Considerin$ desi$n coal (as# content as 0 E of 0 6+% tC#)* at maximum continuous ratin$* as# $eneration will be /6%+@ tonnes C #our+ Considerin$ 9 E fly as# and % E bottom as#* t#e proposed power plant will $enerate about /& tC#our of fly as# and about &%+@ tC# of bottom as#+ ,#e as# $enerated will be collected in t#ree forms 6 Fottom 8s#* EconomiAer 8s# and .ly 8s# ,#e bottom as#* will be collected in t#e water impounded* refractory lined furnace #opper+ 8 #eavy duty clin7er $rinder and a 3et pump will be mounted at eac# of t#e #opper outlet to crus# t#e as# clin7ers and transported in slurry pipe lines to t#e sump of as# slurry pump #ouse+ ,#e slurry from t#e sump will be furt#er disposed of to t#e as# pond by means of as# slurry disposal pumps+ 8s# collected in economiAer #opper will drop continuously t#rou$# suitable vertical pipe connections to t#e flus#in$ e>uipment serves to mix t#e as# wit# water and disc#ar$e t#e as# in t#e form of slurry+ ,#e as# slurry from economiAer flus#in$ apparatus s#all be led to t#e bottom as# #opper to be removed se>uentially to t#e as# slurry sump by 3et pumps of t#e bottom as# #opper+ ,#e fly as# will be collected in dry form at t#e ESP* 8ir Pre6#eaters and stac7 #opper+ 8 two sta$e conveyin$ system #as been envisa$ed+ ,#e first sta$e will include extraction of dry fly as# from ESPC8PHCstac7 #oppers to intermediate C buffer stora$e tan7s+ 5n t#e second sta$e as# will be conveyed C transported from under t#ese buffer #oppers to t#e stora$e silos+ .ly as# s#all be made available as per !-E 2 . notifications dated /0+ D+/DDD* %<+ 9+% & or as per latest amendments t#ereof+ Provision #as been 7ept for dumpin$ t#e un6utilised as# in existin$ lined as# ponds+ ,#e unused as# from fly as# silos will be disposed off by Hi$# concentration slurry disposal system to as# pond+

2011 MECON Limited. All rights reserved

ES/ 2

HARYANA POWER GENERATION CORPORATION LIMITED

EIA/ EMP Studies for additional !""# MW unit at DCRTPP$ Ya%unana&ar$ Har'ana

-(# -(

EN7IRONMNETAL ASPECTS General ,#e study area #as been ta7en as / 7m radius around t#e pro3ect site+ ,#e baseline environmental data were $enerated durin$ "inter Season by field study +

-(* Meteorolo&' 8 meteorolo$ical station was set up at )amunana$ar plant site for t#ree mont#s+ 'urin$ t#e monitorin$ period t#e predominant wind directions were 1" and SE+ Calm conditions are more durin$ ni$#t time compared to daytime+ 5n $eneral wind is wea7 in t#is area durin$ t#e study period+ ,#e wind velocity was mostly between +00 G %+ mCs+ However* #i$# winds are also recorded durin$ t#e monitorin$ period+ -(- A%8ient Air ,en(/ ) 88H monitorin$ stations were monitored+ ,#e avera$e values for (SP were wit#in t#e norms of 5ndustrial* (esidential* (ural 2 -t#er 8reas at all t#e stations in t#e winter season+ Ialues of S-% and 1ox were also well wit#in t#e norms for industrial* residential* rural and ot#er areas+ Ta8le ES( 9 Su%%arised Results of AA: Monitorin& Para%eters
P! / P! %+@ !ax !in+ 8v$+ !ax !in+ 8v$+ !ax !in+ 8v$+ !ax !in+ 8v$+ !ax !in+ 8v$+ !ax !in+ 8v$+ >a%i Ma.ra ;A = /%& 9% D9 6 @& @@ %D /& /D @% /9 &< @@ &/ 0& + 6 + 0 + @

Results ;<&/%-=
Mandauli ;A*= /%/ D0 D< @D 0@ 0D %/ /% /< 06 %@ &/ 0D %D 0/ + @ + & + 0 La4ra ;A-= /%@ 9& D9 6/ @/ @6 %D /@ %/ @9 &/ 0@ 66 &/ 0% + < + @ + 6 Is6er4ur ;A0= /%% D% D6 @% %9 0/ %% /& /< 0% %@ &0 0D %/ &0 + 6 + % + 0 Ya%unana&ar ;A2= /%@ 99 D9 6 @0 @< %D /@ %/ @6 &/ 00 66 &/ 0% + < + @ + 6

S-% 1-J

-& H$

Para%eters
P! / !ax !in+ 8v$+ Ti&6ri ;A"= /% D/ D@

Results ;<&/%-=
Sa8e4ur ?e6ra%4ur Tirat6 na&ar ;A5= ;A@= ;AA= /%/ /%/ //9 9& 9@ 9D D< D9 D6 >a%al4ur ;A #= D% <9 96

2011 MECON Limited. All rights reserved

ES/ 3

HARYANA POWER GENERATION CORPORATION LIMITED

EIA/ EMP Studies for additional !""# MW unit at DCRTPP$ Ya%unana&ar$ Har'ana

Para%eters
P! %+@ !ax !in+ 8v$+ !ax !in+ 8v$+ !ax !in+ 8v$+ !ax !in+ 8v$+ !ax !in+ 8v$+ Ti&6ri ;A"= @9 @0 @6 /< /% /0 @/ %0 &@ 06 %9 &9 + @ + 0 + 0

Results ;<&/%-=
Sa8e4ur ?e6ra%4ur Tirat6 na&ar ;A5= ;A@= ;AA= @@ @9 @< &D @/ @/ 0< @< @0 /D %0 %0 9 /% /6 /& /@ % 0@ 0D @0 /< %0 && %D &@ 0/ @0 @% 0D %9 %0 %< &9 &9 &9 + @ + 0 + 6 + & + % + 0 + 0 + & + @ >a%al4ur ;A #= 0D && 0% /9 D /& 0< %< && 0@ &/ &D + @ + & + 0

S-% 1-J

-& H$

-(0 Water EnBiron%ent .ive(@) $round water samples* and 0 Surface water samples were collected+ 8nalysis results of $round water (as per 5SK / @ ? /DD/* amendment no+/* /DD& 6 norms for drin7in$ water) reveal t#at values mar$inally exceedin$ t#e limits in case of 5ron at one location+ 8ll ot#er values at all t#e stations were well wit#in t#e prescribed norms+ 8ll t#e parameters in different surface water were wit#in t#e CPCF norms for Classes C+ -(2 Soil Soil samples were analysed at 0 locations includin$ as# pond area and from proposed site+ ,#e soil pH is in t#e ran$e of 6+& to <+/+ 5n t#e tested soil samples* availability of p#osp#orus is low to #i$#+ 8vailable 1itro$en is #i$#+ -r$anic carbon content is medium to #i$# w#ile potassium content is low to #i$#+ -(" A%8ient Noise 1oise mmonitorin$ stations were located at @ locations in t#e study area+ 8ll t#e noise monitorin$ stations were in residential areas and t#e avera$e values of noise level at all t#e locations were found to be well wit#in t#e norms durin$ bot# day and ni$#t period except 4ami !a3ra+ -(5 E,olo&i,al 3eatures ,#e study area is a part of t#e Lpper Gan$etic Plain+ ,#e climate is mar7ed by very #ot and dry summers and cold winters+ !a3ority of t#e study area is rural+ ,#e area is flat and consists of a$ricultural land and fallow lands criss6crossed by canals and irri$ation drains+ ,#e (iver )amuna flows t#rou$# t#e eastern part of t#e study area+ ,#ere is no Fiosp#ere (eserve* 1ational Par7s* and "ildlife Sanctuary wit#in /@ 7m radius of t#e proposed pro3ect+ ,#e natural ve$etation of t#e pro3ect area and its immediate surroundin$s is restricted mostly to s#rubs and $rasses+

2011 MECON Limited. All rights reserved

ES/ 4

HARYANA POWER GENERATION CORPORATION LIMITED

EIA/ EMP Studies for additional !""# MW unit at DCRTPP$ Ya%unana&ar$ Har'ana

,#ere are no reserved or protected forests wit#in / 7m of t#e pro3ect site except for some social forests+ 0(# 0( IMPACTS ON EN7IRONMENT D)E TO PROPOSED POWER PLANT Air EnBiron%ent ,#e prediction of $round level concentration (GLC) of pollutants from operation of t#e proposed units of t#e power plant complex was carried out wit# t#e #elp of air >uality simulation model 5SCS,6& released by LSEP8+ ,#e emission concentrations of P!* S- % 2 1-x for pulverised coal fired boilers are computed based on followin$K a) Particulate matter (P!) emission is calculated considerin$ emission rate of / m$C1m &+ However* wit# t#e DD+DE efficiency of ESP t#e emission rate of SP! will be muc# lower t#an t#is value+ b) Sulp#ur content of t#e coal #as been assumed to be +@E as per CPCF $uidelines c) 1-x emissions #ave been estimated based on manufacturerMs desi$ned fi$ure of <@ m$ of 1-x per 1m& of flue $as $enerated+ PREDICTED MACIM)M 7AL)ES O3 GRO)ND LE7EL CONCENTRATIONS

Sl( No / % &

Des,ri4tion Predicted $round level concentrations !onitored maximum concentrations 8vera$e bac7$round PM +D< (//* D) D9 DD /

PollutantsD SO* NO! /<+@ 6+9 (//* D) (//* D) %/ &9+@ 9 0@ @/+9 9

,otal maximum concentrations Nor%s /+ 5ndustrial* (esidential * (ural and -t#er 8reas

*Concentrations are in g/m3 and of 24hours averaging time Values in the parenthesis indicate the coordinates of the grid points in Km in the direction of occurrence from the plant stacks. Plant location at !"# !"$ ,#e maximum predicted Ground Level Concentrations are added to t#e maximum avera$e bac7$round concentrations* (P! levels would be DD N$Cm&* S-% levels &9+@ N$Cm& and 1-x levels @/+9 N$Cm& w#ic# are well wit#in norms Miti&ation Measures 8ir pollution control measures envisa$ed will be desi$ned suitably so as to meet t#e air emission norms as $iven by !-E2. and CPCF Stac7 monitorin$ to ensure proper functionin$ of different ma3or stac7s 8ir monitorin$ in t#e "or76Aone to ensure proper functionin$ of fu$itive emission control

2011 MECON Limited. All rights reserved

ES/ 5

HARYANA POWER GENERATION CORPORATION LIMITED

EIA/ EMP Studies for additional !""# MW unit at DCRTPP$ Ya%unana&ar$ Har'ana

(*

facilities+ ,o reduce emissions of SP! from t#e stac7s* electrostatic precipitators (ESPOs) will be installed+ ,#e ESPOs will #ave a minimum efficiency of DD+DE+ ,#is will limit t#e emission of SP! from eac# flue to less t#an / m$C1m &+ Proposed stac7 #ei$#t will be of %<@ m #i$# to ensure sufficient dispersion (i+e+ dilution) of t#e pollutants+ 1ecessary space provision #as been made for installin$ .lue Gas 'esulp#uriAation (.G') plant+ Low 1-x burner will be provided so as to produce less >uantities of 1-x+ ,o reduce fu$itive dust emission due to #andlin$ of coal and as#* dust extraction and dust suppression systems will be installed at appropriate locations Water EnBiron%ent9 I%4a,ts

Pero disc#ar$e of effluents is envisa$ed from t#e plant+ Close circuit coolin$ water system wit# Coolin$ ,owers re>uires only ma7eup water+ Coolin$ tower blow down will be used for as# #andlin$+ 8 suitable as#6water recovery system #as also been envisa$ed to recover t#e overflow water from t#e as# pond+ ,#is recovered water will be recycled and will be re6used+ "aste water #avin$ li$#t density fine suspended particles from different areas as well as ot#er effluents suc# as boiler blow down* '! plant effluent (i+e+) (e$eneration effluent from '! plant will be neutraliAed in a neutraliAation pit will be collected in waste water sump+ 8s# pond overflow will be re6circulated t#rou$# as# water recovery system+ Miti&ation Measures Effluent mana$ement sc#eme would be implemented wit# t#e ob3ective of optimiAation of various water systems so as to reduce inta7e water re>uirement w#ic# would result in lesser waste water disc#ar$e+ ,#e effluent mana$ement sc#eme would essentially involve collection* treatment and recirculation C disposal of various effluents+ 8de>uate treatment facilities would be provided to all t#e waste streams emanatin$ from t#e power plant to control water pollution+ Effluent from t#e pretreatment plant (clarifier and filtration plants) will comprise slud$e and water+ Slud$e will be separated and compacted in slud$e presses and will be disposed off in solid form as landfill+ ,#e balance water will a$ain re6cycled in clarifier alon$ wit# raw water available from t#e reservoir+ Effluents from t#e demineraliAer plant resin re$eneration circuit* $enerally acidic from t#e cation units and al7aline from t#e anion units will be neutraliAed in a neutraliAin$ pit+ ,#e neutraliAed effluent will #ave less t#an / m$Cl suspended solids and a pH value of about <+@ to 9+ + ,#e neutraliAed effluents will be led into t#e $uard pond+ ,#e coolin$ tower blow down will be utiliAed for as# disposal in slurry form+ ,#e Foiler Flowdown will be controlled to maintain system solids loadin$ wit#in normal limits for proper water c#emistry+ ,#e effluent will #ave less t#an / ppm suspended solids and will be led into t#e station sump mix wit# ot#er station effluents and will be led to $uard pond+ ,#e run6off from t#e coal #andlin$ area will flow t#rou$# c#annels around t#e coal stora$e area and coal #andlin$ buildin$s into a common basin (settlin$ tan7) from w#ere it will be pumped into t#e waste water sump+

2011 MECON Limited. All rights reserved

ES/ 6

HARYANA POWER GENERATION CORPORATION LIMITED

EIA/ EMP Studies for additional !""# MW unit at DCRTPP$ Ya%unana&ar$ Har'ana

,#e oil6water mixture collected in t#e existin$ drains* provided around t#e oil unloadin$ area and t#e pump #ouse* etc+ is led to an oil6water separator+ ,#e separated water containin$ less t#an prescribed limit of oil and $rease and will be led into t#e draina$e system w#ic# will be finally disc#ar$ed into waste water sump and to $uard pond+ ,#e waste oil as separated out will be reutiliAed* if possible+ ,#e sewa$e from t#e various buildin$s in t#e power plant will be routed t#rou$# a soa7 pit+ ,#e existin$ as# pond is already lined to prevent in$ress of as# water in sub soil+ 5n t#e later years* w#en as# utiliAation is pro$ressively increased* lower >uantity of raw water will be re>uired and more treated effluent water will be used for CHP dust suppression* F8 #opper refractory coolin$ and waterin$ of $reen belt+ *(Solid Waste %ana&e%ent ,#e principal solid waste produced by any coal based t#ermal power plant is as# (fly as# and bottom as#)+ ,#e proposed power plant will produce a total of &/% tCd of fly as# and <9 tCd of bottom as# daily+ .ly as# can be used for manufacture of burnt bric7s (in combination wit# clay* red6mud or lime)* fly as# based poAollana cement* fly as# based #ollow concrete bloc7s* tiles (in combination wit# clay* red6mud)* fly as# based synt#etic refractory a$$re$ates* fly as# based abrasive resistant tiles etc+ HPGCL will promote t#e use of fly as# as per latest !-E 2 . notification+ However t#ere will also be an alternate arran$ement for wet disposal of fly as#+ ,#e unutiliAed fly as# will be converted into slurry alon$ wit# t#e bottom as# and dumped in t#e as# pond+ 0(0 Noise LeBels9 I%4a,ts 'urin$ normal operations of t#e plant* ambient noise levels will increase only close to t#e turbines but t#is will be confined to wit#in few #undred metres of t#e sources+ Since t#e turbine s#all be #oused* t#e noise will confine to wit#in t#e wall and will not #ave si$nificant impact outside boundary limit+ Miti&ation Measures9 5n proposed power plant* t#e power $eneratin$ sets* fans and pumps will be t#e ma3or sources of noise+ 1oise $eneration levels will be considered w#ile selectin$ e>uipment+ 8coustic enclosures s#all be provided to control t#e noise level wit#in t#e norms of 9@ dF (8) for 9#rs+ "#erever re>uired noisy e>uipment will be placed on vibration isolators or surrounded by baffles covered wit# noise absorbin$ material+ Personnel wor7in$ in #i$# noise Aones will be issued wit# personal protection e>uipment+ 0(2 E,olo&i,al 3eatures9 I%4a,t Since t#e c#an$e in ambient air >uality due to emissions from t#e proposed power plant will be small* ve$etation in study area will not be dama$ed+ ,#e effluent disc#ar$e is occasional from t#e plant will meet t#e surface water disc#ar$e norm t#us t#ere will be no impact on t#e ecolo$ical components of surface water bodies in t#e area+

2011 MECON Limited. All rights reserved

ES/ 7

HARYANA POWER GENERATION CORPORATION LIMITED

EIA/ EMP Studies for additional !""# MW unit at DCRTPP$ Ya%unana&ar$ Har'ana

Miti&ation Measures9 Green ?elt DeBelo4%ent 8 total of &&E of t#e total pro3ect area will be developed as $reen belt+ ,#e widt#s of t#e belt will be @ m to < m as per t#e space availability around t#e plant+ ,#e widt# of $reen belt on t#e outer perip#ery of as# pond is @ m+ 8 very elaborate $reen belt development plan followin$ t#e $uidelines of CPCF #as been drawn for t#e proposed plant+ However as already plantation exists in some portion of t#e pro3ect area* t#e same will be retained (as far as possible) and will be furt#er re6stren$t#ened+ ,#e areas* w#ic# need special attention re$ardin$ $reen belt development in t#e industrial area* areK 2(# 8lon$ Plant Foundary 8lon$ (oad Side 8round Iarious S#ops 8round -ffice and -t#er Fuildin$s Stretc# of -pen Land (Floc7 Plantation) 5n and 8round ,owns#ip 8round 8s# Pond

OCC)PATIONAL SA3ETY AND HEALTH ,#e main factors of occupational #ealt# in coal based t#ermal power plants are dust (coal and as#)* #eat and noise+ .ollowin$ measures will be underta7en in t#e installation for occupational safety and #ealt# of wor7ers+ 5nspection and maintenance of pollution control systems will be underta7en only after c#ec7in$ t#at t#e e>uipment #as been properly s#ut down or wit# permission of aut#orised officer+ 5mmediate removal of waste accumulated in wor7in$ areas+ 5nsulation of #ot surfaces+ 8ll safety measures will be strictly implemented+ .ire fi$#tin$ e>uipment will be tested re$ularly to ensure t#eir full serviceability+ Contin$ency plans drawn up to deal wit# accidents will be re#earsed by all personnel+ ,rainin$ of employees for use of safety appliances and first aid+ (e$ular medical c#ec7 up of personnel will be carried out+

"(#

DISASTERMANAGEMENT PLAN 8n Emer$ency Plan #as been prepared to ta7e care of any disaster in t#e proposed plant and surroundin$ areas and is detailed as underK 5n order to prevent occurrence of any disaster* t#e plant will be provided wit# various safety and disaster control facilities+ 1ormally* in t#e power plant no ma3or disaster affectin$ nearby population areas are foreseen+ However* accidents inside t#e plant affectin$ wor7place in vicinity cannot be ruled out+ 8n Emer$ency Plan #as been prepared to ta7e care of any disaster in t#e proposed plant and surroundin$ areas+

5(#

POLL)TION MONITORING 5n t#e proposed plant* an Environment !ana$ement 'epartment (E!') will be constituted to operate and maintain all pollution control systems* or$aniAe necessary environmental monitorin$

2011 MECON Limited. All rights reserved

ES/ 8

HARYANA POWER GENERATION CORPORATION LIMITED

EIA/ EMP Studies for additional !""# MW unit at DCRTPP$ Ya%unana&ar$ Har'ana

and maintain records+ ,#e proposed Environmental !ana$ement 'epartment will #ave Pollution !onitorin$ facilities in t#e Plant;s Environmental Laboratory+ ,#e Plants Environmental Laboratory will be e>uipped wit# pollution monitorin$ facilities to monitor meteorolo$y* air >uality* noise* and water >uality* emissions from stac7s* effluents and $eneration of solid wastes+ ,#e fre>uency of samplin$ will be as per Central and State Pollution Control Foard $uidelines+ ,#e stac7s of t#e proposed plant will be e>uipped wit# on line monitorin$ facilities for monitorin$ of S- %* 1-x* C-%* C- and P!+ 8 total of four permanent 8mbient 8ir Huality (88H) station will be installed around t#e plant premises for measurement of 88H in t#e vicinity of t#e proposed plant+ @(# S)MMARY AND CONCL)SION 5n t#e plant desi$n itself latest state of art tec#nolo$y #as been envisa$ed so as to ac#ieve t#e air emissions and noise levels from plant operation and t#e effluent >uality at t#e outlet below statutory norms+ .urt#er* maximum re6use and re6utilisation of $enerated solid waste and wastewater #as been envisa$ed+ ,#e E58 report #as t#orou$#ly assessed all t#e potential environmental impacts associated wit# t#e pro3ect+ ,#e environmental impacts identified by t#e study are mana$eable+ Site specific and practically suitable miti$ation measures are recommended to miti$ate t#e impacts+ .urt#er* a suitably desi$ned monitorin$ plan #as been provided to monitor and control t#e effectiveness of envisa$ed miti$ation measures durin$ t#e operation p#ase+

2011 MECON Limited. All rights reserved

ES/ 9