Estimate Amount : 5,00,000 /Name of the Contractor : K.V.Balasubburamani Quantity executed of supplied ITEMS Since last Up to date certificate
CERTIFICATE
Scheme & Year : DPGF 2012 - 2013
Name of the Work : Providing Cement Concrete Pavement with Drainage in Thummagundu School Street at Thummagundu Panchayat
Amount Rate Per Up to date Earth Work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20B Cement concrete 1:5:10 mix using 40mm ISS metal fincluding cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed Supply and errection of Centering for sides and soffits with M.S.Sheet and country Wood Props including hire charges for materials and all labour charges etc., complete Collection and supply of Sand Filling with in one K.M. lead including cost and conveyance and stecking at road side to deptl gauge for taking precentand filling to the standard specification etc. complete Cement concrete 1:4:8 mix using 40mm ISS metal fincluding cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed Cement concrete 1:2:4 mix using 20mm ISS metal fincluding cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed TOTAL Since last certificate
16.90
16.90
36.00
Cum
608.40
608.40
5.62
5.62
2525.00
Cum
14190.50
14190.50
7.51
7.51
2924.50
Sqm
21963.00
21963.00
75.16
75.16
135.00
Cum
10146.60
10146.60
79.00
79.00
134.00
Cum
10586.00
10586.00
79.00
79.00
2675.00
Cum
211325.00
211325.00
63.29
63.29
3662.40
Cum
231793.30
231793.30
500612.79 500612.79
COMPLETION REPORT
Name of the Work : Providing Cement Concrete Pavement with Drainage in Thummagundu School Street at Thummagundu Panchayat Scheme & Year : DPGF 2012 - 2013 Estimate Amount : 5,00,000 /Name of the Contractor : K.V.Balasubburamani
As per Working Estimate Sl.No DESCRIPTION OF WORK Qty Earth Work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20B Cement concrete 1:5:10 mix using 40mm ISS metal fincluding cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed Rate Amount Qty
16.92
36.00
609
16.90
36.00
608.40
0.72
5.64
2525.00
14241
5.62
2525.00
14190.50
50.50
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed
7.52
2924.50
21992
7.51
2924.50
21963.00
29.24
Supply and errection of Centering for sides and soffits with M.S.Sheet and country Wood Props including hire charges for materials and all labour charges etc., complete Collection and supply of Sand Filling with in one K.M. lead including cost and conveyance and stecking at road side to deptl gauge for taking precentand filling to the standard specification etc. complete
75.16
135.00
10147
75.16
135.00
10146.60
79.00
134.00
10586
79.00
134.00
10586.00
Cement concrete 1:4:8 mix using 40mm ISS metal fincluding cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed
79.00
2675.00
211325
79.00
2675.00
211325.00
Cement concrete 1:2:4 mix using 20mm ISS metal fincluding cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed
63.29
3662.40
231793
63.29
3662.40
231793.30
8 9 10
Towadsthe Cost of Tar bad Charges Towadsthe Cost of Name Board Charges Towadsthe Cost of Photogaphic Charges
LS LS LS -693 500000 As per Estimate As per Excustion Total 500000 500612.79 -612.53 Increse Decrese 500612.79 -693.00 80.46 -612.54 -693.00 -693.00 80.46
11 Unforseen Charges
agundu Panchayat
Remarks
As per Estimate Sl.No DESCRIPTION OF WORK Qty Earth Work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20B Cement concrete 1:5:10 mix using 40mm ISS metal fincluding cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed Rate Amount
79.20
36.40
2883
16.92
36.00
609
2274
14.85
2525.28
37500
5.64
2525.00
14241
23259
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed
46.20
2924.70
135121
7.52
2924.50
21992
113129
Supply and errection of Centering for sides and soffits with M.S.Sheet and country Wood Props including hire charges for materials and all labour charges etc., complete Collection and supply of Sand Filling with in one K.M. lead including cost and conveyance and stecking at road side to deptl gauge for taking precentand filling to the standard specification etc. complete
330.00
135.00
44550
75.16
135.00
10147
34403
49.50
134.00
6633
79.00
134.00
10586
-3953
Cement concrete 1:4:8 mix using 40mm ISS metal fincluding cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed
49.50
2675.06
132415
79.00
2675.00
211325
-78910
Cement concrete 1:2:4 mix using 20mm ISS metal fincluding cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed
37.13
3662.49
135988
63.29
3662.40
231793
-95805
8 9 10
Towadsthe Cost of Tar bad Charges Towadsthe Cost of Name Board Charges Towadsthe Cost of Photogaphic Charges
LS LS LS
11 Unforseen Charges
500000 500000 0
Increse Decrese
-178668 178668 0
agundu Panchayat
Remarks
CONTRACT
Estimate Amount : 2,50,000 /Name of the Contractor : A.Ramakrishnan Quantity executed of supplied ITEMS Since last Up to date certificate
CERTIFICATE
Scheme & Year : I S S P 2012 - 2013 M.Book No : 258 / 2012-13
Name of the Work : Consrtruction of Statistical building @ K.Myladumparai Panchayat union office
Amount Rate Per Up to date Earth Work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20B Collection and supply of Sand Filling with in one K.M. lead including cost and conveyance and stecking at road side to deptl gauge for taking precentand filling to the standard specification etc. complete Cement concrete 1:4:8 mix using 40mm ISS metal fincluding cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed Since last certificate
20.50
20.50
72.50
Cum
1486.25
1486.25
3.40
3.40
128.00
Cum
435.20
435.20
5.62
5.62
2256.00
Cum
12678.72
12678.72
17.50
17.50
R.R. masonry in CM1:5 mix using rough stones and bond stones with simultaneous pointing including cost and conveyance of all materials to site and all labour charges etc., complete. Brick work in c.m 1:5 mix using country bricks including cost & conveyance of all materials to site and all labour charges etc., complete. Supply and errection of Centering for sides and soffits with M.S.Sheet and country Wood Props including hire charges for materials and all labour charges etc., complete
2085.50
Cum
36496.25
36496.25
12.73
12.73
3015.00
Cum
38380.95
38380.95
36.53
36.53
330.00
Sqm
12054.90
12054.90
467.00
467.00
Supplying and fabrication of steel rods including cost & conveyance of steel as per std. Specification etc., complete. RCC 1:1 1/2 :3 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete. TOTAL
60.20
Kg
28113.40
28113.40
4.40
4.40
4179.50
Cum
18389.80
18389.80
148035.47 148035.47