Documente Academic
Documente Profesional
Documente Cultură
Construction
Construction
Architectural Details:
Roof drain, parapet and scupper details Skylight and pipe penetration details Ceiling and mechanical details
Construction
Construction
Construction
Construction
Construction
Construction
Architectural Details:
1) 2) 3) 4) 5) 6) 7) 8) 9) 10) 11) 12) 13) 14) 15) AAC roof panel AAC wall panel Single ply or built up roofing Drain cap-dome strainer and roof drain PVC connector Fastener Metal coping with continuous cleats each side Parapet flashing Aluminum clad flashing membrane Fiber cant Elastomeric sealant continuous Aluminum anchorage collar soldered to scupper (Both sides) Aluminum thru-wall scupper Gravel stop Parapet flashing shall be torched on. Base ply parapet flashing to continue over top of parapet
Construction
Architectural Details:
1) 2) 3) 4) 5) 6) 7) 8) 9) 10) 11) 12) AAC floor/roof panel Single ply or built-up roofing Skylight Skylight frame Skylight fastener Steel header Mounting flange AAC roof panel beyond Pipe Fastener Floor/roof system Trim collar
Construction
Architectural Details:
1) 2) 3) 4) 5) 6) 7) 8) 9) 10) 11) 12) AAC floor/roof panel Floor/roof system Fastener Hanger Wire Ductwork Channel support Recessed light fixture unit Suspended ceiling Pipe support Clevis or strap hanger Header pipe Channel fastened to panel
10
Construction
11
Construction
12
Construction
Notes: 1) Use AAC thin bed mortar at all vertical joints between panels. 2) Immediately after erection install minimum of (2) corrugated nails per panel joint.
13
Construction
14
Construction
15
Construction
Foundation Details:
Monolithic slab with foundation anchor Stem wall with foundation anchor Existing monolithic slab with epoxied anchor
16
Construction
Note: Reinforcing bar can be used instead of threaded rod. Core must then be grouted
17
Construction
18
Construction
19
Construction
20
Construction
AAC Exterior Wall:
1) Cored AAC block 2) Concrete filled AAC lintel with reinforcing 3) AAC clean-out block 4) AAC compatible coating with mesh at discontinuities 5) Reinforced concrete slab 6) Foundation anchor 7) Threaded tie-down rod 8) Threaded coupler 9) Sleeve with cover plate top and bottom 10) Joist hanger 11) 2x Pressure treated ledger 12) Anchor bolt 13) Wood blocking 14) 3/8 thin bed mortar 15) Wood I joist 16) Floor decking 17) Roof truss 18) Truss anchor 19) AAC interior wall plaster of gypsum board 20) Gypsum board 21) Fill clean-out block opening with patch mortar
Note: Reinforcing bar can be used instead of threaded rod. Core must then be grouted
21
Construction
Foundation Details:
1) 2) 3) 4) 5) 6) 7) AAC clean-out block Cored AAC block CMU stem wall Reinforced concrete slab J-bolt cast in place Foundation anchor Threaded tie-down rod epoxied into existing concrete slab 6 minimum. Threaded tie-down rod Threaded coupler 3/8 thin bed mortar AAC interior wall plaster or gypsum board AAC compatible coating Fill clean-out block opening with AAC patch mortar
Note: Reinforcing bar can be used instead of threaded rod. Core must then be grouted
22
Construction
Note: Reinforcing bar can be used instead of threaded rod. Core must then be grouted
23
Construction
Interior Walls:
Wall partition detail Door lintel Partition joints
24
Construction
AAC Partitions:
1) 2) 3) 4) 5) 6) 7) 8) 9) AAC partition AAC exterior wall Roof truss 2x4 nailer @ 24 O.C. (max.) Metal corner bead used for lateral support 1/2 Styrofoam Temporary bracket (as required) Temporary wedges to raise and support wall partitions Drypack Mortar (When Drypak has cured, remove wedges and fill voids with thin bed mortar Gypsum board AAC interior wall plaster or gypsum board Mortar joint
25
Construction
AAC Partitions:
1) 2) 3) 4) AAC partition Lintel partition L-bracket 1/4 wide joint with polyurethane foam 5) Mortar joint
26
Construction
AAC Partitions:
1) AAC partition 2) AAC interior block wall 3) 1/4 wide joint with polyurethane foam fill 4) Mortar joint 5) AAC interior wall plaster or gypsum board
27
Construction
Plumbing Installation:
Plumbing chase
Cabinet Section:
Cabinet section
Fastening Details:
Exterior door jamb Interior door jamb Window jamb Interior trim Interior framing connection Garage door jamb
28
Construction
Electrical Installation:
1) 2) 3) 4) 5) 6) 7) 8) 9) 10) AAC block wall AAC partition 1 1/2 deep electrical chase Romex wire Backer rod Electrical outlet box AAC interior wall plaster Pressure treated furring strips Gypsum board Metal plates
29
Construction
Plumbing Installation:
1) 2) 3) 4) 5) AAC exterior wall AAC partition Plumbing stack Plumbing supply lines 1x pressure treated nailers secured with permaseal adhesive caulk and 3 Senco (Semcote) Pneumatic nails at 8 O.C. 6) Gypsum board 7) Mortar joint 8) Styrofoam with polyurethane foam fill
30
Construction
Cabinet Installation:
1) AAC wall 2) Attach cabinet to AAC wall with AAC compatible fastener (See fasteners information in the structural section)
31
Construction
1) Secure pressure treated buck strip to AAC wall with polyseamseal adhesive caulk and Senco (Semcote) pneumatic nails (Spacing per the design professional) 2) Install exterior door jamb per manufacturers specifications. 3) Fasten interior trim with 2 Senco (Semcote) Pneumatic nails 4) Trim out moulding, as necessary
1) Secure pressure treated 1/4 plywood to AAC wall with polyseamseal adhesive caulk and #8 Senco (Semcote) pneumatic nails (Spacing per the design professionals) 2) Install interior door jamb per manufacturers specifications 3) Fasten interior trim with #2 Senco (Semcote) Pneumatic nails
32
Construction
1) Secure pressure treated buck strip to AAC wall with Senco (Semcote) 2 staples (Spacing per the design professional) 2) Install window to buck strip per manufacturers specifications Note: Furring strips for gypsum board should be secured per item 1.
33
Construction
1) Secure wood framing to AAC wall with polyseamseal adhesive caulk and #8 Senco (Semcote) pneumatic nails at 16 O.C. and staggered.
1) Secure pressure treated 2x6 jamb for garage door using threaded rod epoxied into AAC wall
34
Construction
Foundation Details:
Monolithic slab Monolithic slab with concrete curb Stem wall Stem wall with concrete curb
35
Construction
36
Construction
37
Construction
38
Construction
39
Construction
40
Construction
41
Construction
42
Construction
43
Construction
Architectural Details:
1) 2) 3) 4) 5) 6) 7) AAC wall panel Glazing Fastener Gypsum board AAC compatible coating Hollow metal frame Masonry anchor coordinate location with panel joints 8) Grout filled hollowed metal wrap around frame
44
Construction
45
Construction
46
Construction
47
Construction
Foundation Details:
1) 2) 3) 4) 5) 6) AAC horizontal wall panel 3/8 thin bed mortar CMU stem wall Reinforced concrete slab Turndown concrete slab Continuous concrete curb
48
Construction
49
Construction
50
Construction
51
Construction
52
Construction
53
Construction
54
Construction
55
Construction
56