DIRECTION
We discussed how major trends could impact the stakeholders in GWPs marketplace over the next five years. We charted the major threats and opportunities that these stakeholders could create in our marketplace.
We identified trends
INCREASING WORLDWIDE ECONOMIC UNCERTAINTY INCREASING GROWTH IN CALIFORNIA AND THE WORLD HIGHER STANDARD OF LIVING AND SERVICES INCREASING CONCERN FOR HUMAN HEALTH AND THE ENVIRONMENT INCREASING CLIMATE CHANGE
We identified stakeholders
1. 2.
3.
4. 5.
6.
7. 8.
9.
Our customers conserve more water and energy Customers utilize more recycled water and solar Customers use real-time information through AMI GWP gains more green energy to reduce carbon footprint GWP sells more power outside the City GWP reduces its peak loads GWP receives positive publicity and support Joint resource projects increase GWPs access to power supplies Advanced technologies provide new efficiencies and solutions to GWP while creating potential new business
Plan priorities
6. WORK FORCE Hire, develop, and retain a safe, highly skilled, dedicated, and customer-focused work force 7. SYSTEMS Utilize new and existing information systems and technologies that reduce GWPs costs, enhance customer service, and increase operational effectiveness 8. CITY OF GLENDALE Collaboration to improve both the Citys and GWPs efficiency and public image
9. LEGISLATION AND REGULATION Influence local, state, and federal legislation and regulations to benefit GWP's operations
Our Mission
Description of the successes GWP will have achieved at the end of 5 years
Our Vision
Description of the successes GWP will have achieved at the end of 5 years
To deliver reliable, high quality, environmentally-sensitive, and sustainable water and power services to our customers in a caring and cost-competitive manner, while creating a stimulating and rewarding work experience for our employees
Our Values
Principles and beliefs that are the bedrock for GWPs existence and the decision criteria for major programs, policies, and expenditures
WATER SUPPLY
POWER SUPPLY
CUSTOMER SERVICE RATES
WATER INFRASTRUCTURE
POWER INFRASTRUCTURE WORKFORCE
SYSTEMS
CITY OF GLENDALE LEGISLATION & REGULATION
Goals
Measurable targets that describe the components of excellence in each GWP Key Result Area (KRA)
4.
Produce 3,856 AFY from Verdugo Basin by 2014 Serve 2,500 AFY recycled water by 2013 Institute a 2.5% PBC-like charge to fund water conservation measures by Dec 2010 Reduce water usage by 7% over 2006 base year by 2014
3.
4.
5.
Reduce electrical usage by 7% by 2014 Increase GPP efficiency to <10,000 heat rate by 2015 Reduce GHG emissions to 1990 levels by 2020 Achieve a balanced energy portfolio by 2020 Operate Energy Management Resources Group under defined metrics beginning July 2010
Goals
Measurable targets that describe the components of excellence in each GWP Key Result Area (KRA).
KRA: RATES
1.
2.
3.
Consistently achieve above average customer satisfaction scores from the CMUA survey by Dec 2010 Ensure that all affected customers and public are consistently notified of all GWP activities by Dec 2009 Restore minor power outages within 10 minutes and major outages within 20 minutes by 2014
2.
3.
4.
Establish water rates at or below 80% of the average rates in the area by 2014 Reduce electric rates to 35% below SCE by 2014 Increase annual electrical wholesale net revenue to $10M by 2014 Reduce electrical system losses to <10% by 2014
Goals
Measurable targets that describe the components of excellence in each GWP Key Result Area (KRA).
3. 4.
Reduce unaccounted-for water to 5% by June 2011 Replace all small meters installed before 2004 by June 2011 Replace/rehabilitate 25 miles of pipe by 2014 Implement effective asset management by 2013
Reduce number of outages to less than 25 per year by June Upgrade transmission system to 69 kV by June 2014 Convert distribution feeders from 4 kV to 12 kV by 2020 Replace all electromechanical relays with state-of-the-art relays by 2018
Implement effective asset management by 2013
5.
Goals
Measurable targets that describe the components of excellence in each GWP Key Result Area (KRA).
KRA: WORKFORCE
1.
KRA: SYSTEMS
1.
2. 3. 4.
5.
Continually improve job satisfaction of our employees beginning Nov 2009 Increase annual workforce availability to 87% by 2014 Have <5% vacancy rate by 2012 Achieve annual utility average OSHA incident rate of 2.0 beginning 2014 Have zero preventable vehicle accidents each year beginning June 2010
2.
3.
4.
5.
Achieve 100% AMI meter saturation by 2013 Operate GWP within a city-wide GIS beginning 2013 Implement new Dept of Finance processes for GWP transactions beginning Dec 2010 Create a GWP system integration that assures no redundant data entry by 2013 Launch profitable new business ventures beginning 2013
Goals
Measurable targets that describe the components of excellence in each GWP Key Result Area (KRA).
KRA: CITY OF GLENDALE KRA: LEGISLATION & 1. Improve communications with customers, REGULATION City Council, and City Departments
2.
3.
4.
beginning Nov 2009 Determine optimum value of transfer to provide mutual benefits to City and GWP by 2014 Implement communications vehicles to improve GWPs public image beginning 2011 Implement new collaborative ventures with City departments beginning Dec 2011
1.
2.
3.
4.
Continue compliance with state and federal regulatory requirements beginning Feb 2009 Establish and continue on-going relationships with state and federal legislators and regulators beginning Jan 2010 Develop specific GWP legislative strategy and initiatives beginning June 2010 Provide quarterly reports on major activities and successes beginning Jan 2010
INITIA TIV E
Kavoun as
Kavoun as Takidin
1.3 Institute a 2.5% PBC-like charge to fund wate r conservation measures 1.3.1 Redoing Water Rates 1.4 Reduce water usage by 7 percent ove r 2006 b ase year 1.4.1 Water Is Life, Don't Waste It
2 POWER SUPPLY
2.1 Reduce electrical usag e by 7% 2.1.1 Save a Little, Save a Lot 2.2 Increa se GPP efficiency to <10,00 0 heat rate 2.2.1 Project Mode rnize Bassin Kuennen Lins Lins Marke t energy efficiency pro grams to save 1% per year Enhance/modify EE p rograms to improve savings Develop resource mo del Develop portfolio metrics analysis Decision on new units New units installed Develop resource mo del Develop portfolio metrics analysis Techno logy portfolio decision Project acquisition Develop resource mo del Develop portfolio metrics analysis Portfolio fuel mix decision Supply resou rce acquisition Define scope of measurement Reta in consu ltant Develop mod el Measure trading performance
Lins Lins
Lins Lins
2.5 Operate Energy Management Resources Group under defined metrics 2.5.1 Project Trading Metrics
Lins Lins
KRA GOAL INITIA TIV E INITIA TIV E INITIA TIV E INITIA TIV E
3 CUSTOMER SERVICE
3.1 Consistently achieve above average custo mer satisfaction scores from th e CMUA Vallier su rvey 3.1.1 Customer Co ntact Surveys Benson Conduct q uarterly customer conta ct survey 3.1.2 GWP Custo mer Surveys Kuennen Conduct GWP ann ual customer surveys 3.1.3 Customer Service Training Cline Provide 4-6 hours customer focused training / year 3.1.4 Migration of Trouble Orders to CIS Herman System Set-up Training 3.2 Ensure that all affected customers and public are co nsistently no tified of all GWP Bassin activities 3.2.1 Mass Notifica tion System Kuennen Implement system Arrange for no tification of planned outages Arrange for no tification of unp lanne d outages and est. time of re storation 3.3 Restore minor po wer outage s with in 10 minutes and major outages within 20 minutes Abueg 3.3.1 SCADA System Germond Factory Acce ptance Test Delive ry RFP for Insta llation Insta llation Contract Award Insta llation Site Acceptance Test / Imple mentation 3.3.2 Fiber SONET Insta llation Germond Delive ry Insta ll Test an d Commission 3.3.3 Fuse Coordinatio n on Feeders Abra ri No. 6 Montrose No. 8 Montrose No. 7 Scholl No. 7 Columbus No. 2 Western No. 9 Tropico 3.3.4 Glorietta Sub station Upgrade Abra ri Comple te prequa lification of b idders Submit RFP to Council Commu nity meeting CEQA Construction Operate upgrade d sub station 3.3.5 Grandview Substation Upgrad e Abra ri Start design Comple te stu dies and specifications Construction Operate upgrade d sub station 3.3.6 Disturbance Monitors Installatio n Abra ri Operate upgrade d Kellogg Operate upgrade d Rossmoyne 3.3.7 Outag e Management System Abueg Prep are specifications Vendor se lection Delive ry and installa tion Implementation
INITIA TIV E
INITIA TIV E
INITIA TIV E
INITIA TIV E
4 RATES
4.1 Establish water rates at or below 80% of the average rates in the area 4.1.1 Redoing Water Rates 4.1.2 BAM (Better Asset Manage ment) Kavoun as Kavoun as Kavoun as Financial analysis Ordinance modification Hire advisor/business consultant In hou se training Create asset register CIP validation Main tenance procedures/automatio n Operations manu al/documentation Engage principals in negotia tion Develop long -te rm stra tegy for land fill gas Litigate existing contract Retire associated Grayson un its Initiate fea sib ility study Create political/community support Implement trash to ene rgy project Litigate existing contract Finalize ra te analysis Implement public education programs Finalize portfolio study Operate trading group with new metrics Bill a nd co llect co st allocation for services Review historical performance Cata logue all historical and known trading strategies Input all strategies into metrics mo del Decision on wholesale vs. re tail allo cation Acquire all necessary trading tools and staff Wholesale net trading reve nue $3 Millio n Wholesale net trading reve nue $5 Millio n Wholesale net trading reve nue $1 0 Million Convert 4 kV to 12 kV distribu tion feeders Identify un metere d loads Insta ll master mete rs Insta ll metering instrume nts at substatio ns - Co lumbus Substation Utilize metering data in new SCADA Eliminate 69 kV/3 4.5 kV tra nsformers - Mon tro se an d Western Implement AMI Document procedures Provide training Identify theft and recover Assess level of the ft
INITIA TIV E
4.2 Reduce electrical rates to 35% b elow SCE 4.2.1 Renegotia te Scholl Canyon Gas
Steiger Steiger
Dec
INITIA TIV E
Steiger
INITIA TIV E INITIA TIV E INITIA TIV E INITIA TIV E GOAL INITIA TIV E
4.2.3 PGE Contract Re configuration 4.2.4 Tran sfer Stabilization at 2008 Le vels 4.2.5 GWP Revenue In crease 4.2.6 Customer Service Cost Plan 4.3 Increa se an nual electrical wholesale revenu e to $1 0M 4.3.1 Project Optimize
4.4 Reduce electrical system losses to <10% 4.4.1 Distribu tion System Loss Reduction 4.4.2 Metering
INITIA TIV E
Vallier
5 WATER INFRASTRUCTURE
5.1 Reduce unaccounte d-for water to 5 % 5.1.1 (BAM) Better Asset Management Kavoun as Kavoun as Hire advisor/business con sultant In hou se training Create asset register CIP validation Main tenance procedures/automatio n Operations manu al/documentation Re-issu e CIP Design and bu ild p rojects Award AMI installation contract AMI fu lly implemented Re-issu e CIP Design & build proje cts Hire advisor/business con sultant In hou se training Create asset register CIP validation Main tenance procedures/automatio n Operations manu al/documentation Hire GWP GIS professional Award RFP contract to po pulate GIS with GWP system Implement full GIS use
INITIA TIV E
5.1.2 Fix the Pipe s 5.2 Replace all small meters installed befo re 2004 5.2.1 AMI Fully Imp lemented 5.3 Replace/rehabilitate 25 miles of pipe 5.3.1 Fix the Pipe s 5.4 Implement effe ctive asset manage men t 5.4.1 BAM (Better Asset Manag emen t)
Dec
INITIA TIV E
Herman
6 POWER INFRASTRUCTURE
6.1 Reduce number of outages to less than 25 per year 6.1.1 SCADA System Abueg Germond Factory Acce ptance Test Delive ry RFP for insta llation Insta llation contract award Insta llation Site Acceptance Test / Imple mentation Delive ry Insta ll Test an d Commission No. 6 Montrose upgrade d No. 8 Montrose upgrade d No. 7 Scholl upgraded No. 7 Columbus upgraded No. 2 Western upg raded No. 9 Tropico upgraded Comple te prequa lification of b idders Submit RFP to Council Commu nity meeting CEQA Construction Operate upgrade d sub station Start design Comple te stu dies and specifications Construction Operate upgrade d sub station Operate upgrade d Kellogg Operate upgrade d Rossmoyne Prep are specifications Vendor se lection Delive ry and installation Implementation Create three-way transmission (Rossmoyne -Montrose-Glorietta) Upgrade Montrose-Bel Aire to Montrose-Western Comple te Grandview reconstruction of circu its Comple te Grandview conversions - tran sfer of loads Upgrade Grandview Substatio n to 69kV/12kV Reconstru ct Bel Aire service area Upgrade 1-2 feeders per year Operate upgrade d Kellogg Operate upgrade d Rossmoyne Glen dale - Howard Transmission Line Rossmoyne - Howard Transmissio n Line Glen dale - Fremont Transmission L ine Rossmoyne - Scholl Transmissio n Line Trop ico - Scholl Transmissio n Line Trop ico - Acacia Transmission Lin e Prep are cost-bene fit analysis Evaluate options (joint system or sepa rate) Implement plan Integrate with GIS, AMI and SCADA Hire a GWP GIS professiona l Award RFP contract to pop ulate GIS with GWP System Implement full GIS use
INITIA TIV E
Germond
INITIA TIV E
Abra ri
INITIA TIV E
Abra ri
INITIA TIV E
Abra ri
Abra ri Abueg
6.2 Upgrade tran smission system to 69 kV 6.2.1 Tran smission Conversion to 6 9 kV 6.3 Convert distribu tion feeders from 4 kV to 12 kV 6.3.1 Stations Upgrade to 12 kV
INITIA TIV E
6.3.2 Distribu tion Fee ders Upgra de to 1 2 kV 6.4 Replace all electromechanical re lays with state -of-the-art relays 6.4.1 Disturbance Monitors Installation 6.4.2 New De sign and Replace Relays
INITIA TIV E
6.5 Implement effective asset manage ment 6.5.1 Electric Asset Management System
Abueg Abueg
INITIA TIV E
Herman
7 WORKFORCE
7.1 Continually impro ve job satisfactio n of ou r employee s 7.1.1 Staffing Leve ls 7.1.2 Competitive Salaries
INITIA TIV E
INITIA TIV E
Kuennen Cline
INITIA TIV E
7.2 Increa se an nual workforce availability to 87% 7.2.1 Present and ready to go
Bassin Cline
7.3 Have <5% va cancy rate 7.3.1 Fill the voids 7.4 Achieve annual u tility average OSHA incident rate of 2.0 7.4.1 Safety is No Accident
7.5 Have zero preventable vehicle accidents each year 7.5.1 Driving for Safety
Bassin Bassin
Sep Dec
8 SYSTEMS
8.1 Achieve 100% AMI meter satu ration 8.1.1 AMI Fully Imp lemented 8.2 Operate GWP within a city-wide GIS 8.2.1 City-wide GIS Vallier Kuennen Bassin Herman Award AMI installation contract Insta ll AMI Hire a GWP GIS Pro fessional Award RFP Contra ct to Populate GIS w/ GWP System Implement full GIS use Re-evalua te position Re-submit to City Council Hire AGM Fina nce Provide education to new AGM RMI survey Develop software Create collabo ration Develop software Identify redundant data bases Migrate trouble and meter data to CIS Eliminate re dundant data bases Implement new system Conduct tra ining on ne w system Assess feasibility of new ven tures Implement expanded fiber-optics syste m Extend AMI to othe r utilities Assess feasibility of expanding water initiatives Marke t Ch rome 6 treatment technology Sell recycled water outside of Glendale
8.3 Implement new Dept of Finance pro cesses for GWP tra nsactions 8.3.1 AGM Finance On Board
Steiger Steiger
8.3.2 Office Links 8.3.3 Streamlined Purchasing a nd Contracts 8.4 Create a GWP system integra tion that assures no redu ndant data entry 8.4.1 No Re dundant Data
INITIA TIV E
8.4.2 Migration of Trouble Orders to CIS 8.5 Launch profitable new business ventures 8.5.1 New Busin ess Ventures
INITIA TIV E
Kavoun as
9 CITY OF GLENDALE
9.1 Improve communications with customers, City Council, and City Dep artments Steiger 9.1.1 City Council Commu nica tions Steiger 9.1.2 Public Communications Steiger Create regularly sched uled workshops Initiate periodic me etings with CC membe rs Implement website b log Implement mass notification system Implement GTV6 TV show specific to GWP Implement periodic update mee tings with City dep artmen ts Implement citywid e scoreboard disp lay for GWP g oal results Prep are educatio nal materia l Initative s 8.5.1, 8.5.2, 4.4.3, 4.3.1 Evaluate co mmunication vehicles to improve GWP Image Implement a method ology for id entifying issues re lated to image Implement plan to inform customers and improve image Identify op portunities of mutual interest Develop budget and other implementa tion requirements Implement inter-d epartmental collaborations
INITIA TIV E
INITIA TIV E
9.1.3 City Department Commun ications 9.2 Develop optimium transfer level fo r mutual ben efit 9.2.1 Create Awareness 9.2.2 New Re venue Sources 9.3 Implement co mmunication vehicles to improve GWPs public image 9.3.1 Project Outrea ch
9.4 Implement new collaborative ventures with City depa rtments 9.4.1 Joint Venture s
Steiger
10.2 Establish and contin ue on-going relationships with state and federal legislators Lins and re gulators 10.3 Develop specific GWP legislative strategy and initiatives Lins
10.4 Provide quarterly reports on compliance, strategies, relationships and major activities Lins
The GWP Strategy Scoreboard will be implemented along with the strategic plan. This scoreboard will evaluate GWPs progress towards each goal in the plan.
KRA & GOALS WATER SUPPLY 1 Produce 3,856 AFY from Verdugo Basin 2 Serve 2,500 AFY recycled water 3 Institute a 2.5% PBC-like charge to fund water conservation measures POWER SUPPLY 1 Reduce electrical usage by 7% 2 Increase GPP efficiency to <10,000 heat rate 3 Reduce GHG emissions to 1990 levels 4 Achieve a balanced energy portfolio 5 Operate Energy Management Resources Group under defined metrics CUSTOMER SERVICE Consistently achieve above average customer satisfaction scores from the CMUA 1 survey Ensure that all affected customers and public are consistently notified of all GWP 2 activities 3 Restore minor power outages within 10 minutes and major outages within 20 minutes 4 Implement all facets of the Water System Asset Management Project
Due
QQQQ
2014 Kavounas Dec 2013 Kavounas Dec 2010 Kavounas 2014 2015 2020 2020 Jul 2010 Dec 2010 Dec 2009 2014 Bassin Lins Lins Lins Lins Vallier Bassin Abueg
Due
Q Q Q Q
RATES 1 Water rates at or below 80% of the average rates in the area 2 Reduce electrical rates to 25% below SCE 3 Increase annual electrical wholesale revenue to $10M WORKFORCE 1 Continually improve job satisfaction of our employees 2RATES Increase annual workforce availability to 87% Assure that water rates are less than 80% of the highest water rates among the 1 Kavounas surrounding municipal utilities 3 2Have <5% vacancy Reduce electrical rates to 25% below SCErate 2014 Steiger 3 Increase annual electrical wholesale revenue to $10M 2014 Lins WORKFORCE 4 1Achieve annual utility average OSHA incident rate of 2.0 Continually improve job satisfaction of our employees Nov 2009 Steiger Increase annual workforce availability to 87% 2014 Bassin 52 Have zero preventable vehicle accidentsJun each year 3 Have <5% vacancy rate 2012 Bassin 4 Achieve annual utility average OSHA incident rate of 2.0 2014 Bassin SYSTEMS 5 Have zero preventable vehicle accidents each year Jun 2010 Bassin SYSTEMS Achieve 100% AMI meter saturation Dec 2013 Vallier 11 Achieve 100% AMI meter saturation 2 Operate GWP within a city-wide GIS Dec 2013 Bassin 3 Implement new Dept of Finance processes for GWP transactions 2CITY Operate GWP within a city-wide GIS Dec 2010 Steiger OF GLENDALE 1 Improve communications with customers, City Council, and City Departments Nov 2009 Steiger 3 2Implement new Dept GWP transactions Stabilize amount of transfer at 2006 level of Finance processes 2014forSteiger 3 Create a culture of collaboration with GWPs primary stakeholders Dec 2012 Steiger LEGISLATION & REGULATION CITY OF GLENDALE 1 Continue compliance with state and federal regulatory requirements Feb 2009 Lins Establish and continue on-going relationships with state and federal legislators and 1 2Improve communications with customers, Council, and City Departments JanCity 2010 Lins regulators 3 Provide quarterly report on major activities and successes Jan 2010 Lins 2 Stabilize amount of transfer at 2006 level 3 Create a culture of collaboration with GWPs primary stakeholders LEGISLATION & REGULATION 1 Continue compliance with state and federal regulatory requirements Establish and continue on-going relationships with state and federal legislators and 2 regulators 3 Provide quarterly report on major activities and successes
2014 2014 Nov 2009 2014 Jun 2012 2014 Jun 2010 Dec 2013 Dec 2013 Dec 2010 Nov 2009 2014 Dec 2012 Feb 2009 Jan 2010 Jan 2010
Kavounas Steiger Lins Steiger Bassin Bassin Bassin Bassin Vallier Bassin Steiger Steiger Steiger Steiger Lins Lins Lins