Table of Warnings related to ITPLs


Table below shows the main sequences of each ITPL marked by the corresponding risks. The table has to be read together with the detailed Warning Notes as explained in this document. Warning Notes
High voltage (Life electrical Systems) High voltage (damaged Cables) Falling, tripping, slippering or hitting hazard

High voltage (Disconnection of cables)

2007-10-29 EN Approved

Lng. Status

ITPL and Sections of ITPL Steps


1 Generator, Short Circuit Test Preparation for Short Circuit Test Test and Adjustments in Short Circuit Test Normalize the System Generator, Neutral Point Precommissioning Tests and Checks Earthing Point Cubicle BUS Duct Precommissioning Tests and Checks HV Test Generator Breaker (ABB HEC) Precommissioning Tests and Checks Commissioning Generator Breaker (AREVA) Precommissioning Tests and Checks Commissioning Transformer, Oil-cooled Precommissioning Tests and Checks Insulation Resistance Ratio Test Protective Devices Oil Sample Tests Check of the Coolers / Motors Tap Change and Voltage Control Transformer, Air-cooled Precommissioning Tests and Checks Insulation Resistance Ratio Test Protective Devices Check of the Coolers / Motors SSD-LCI (ABB), Standstill Tests Precommissioning Tests and Checks Energizing of LV Systems step by step following the HW-Diagram Function Check Commissioning of Starting Main Breaker Test Program 1: Firing Pulses SRN Test Program 2: Firing Pulses SRM Test Program 3: Pulse Logic Test Program 4: Excitation Test Program 5: DC Link Short Circuit Test Test Program 6: Short Circuit Machine Side

2 x x x x x x x x x x x x x x x

6 x x x

10 x x x x x x x x x

11

12

13

14

Rev. Released

2
CJ

Type

x x x x x x

9561 HTCT652864

Dept. Document No.

x x x x x x x x x x x x x x

x x x x x x x x x x x x x x

x x x x x x x x x x x x x x x x x x x x x

x x x

. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ALSTOM (Switzerland) Ltd 2007. Form: FM 0501 en / Ae.02 / 01-09-07 / GTSQ

Hazard caused by batteries

Chemicals and corrosives

Rotating or moving part

Explosive atmosphere

Pressurized system

Automatic re-start

Gas containers

Falling hazard

Hot surface

Slippery

abcd

Revision:

Doc. Type:

Language:

Page:

CY

en

10/17

HTCT652864

High voltage (Disconnection of cables)

Warning Notes
High voltage (Life electrical Systems) High voltage (damaged Cables)

Falling, tripping, slippering or hitting hazard

ITPL and Sections of ITPL Steps


9 SSD-LCI (ABB), Motor Roll Precommissioning Tests and Checks Test Program 7: Motor Roll Pulse Mode Operation Machine Commutated Mode Run to Higher Speed Run to Max. Motor Roll Speed Fast / Forced Cooling Test SSD, Standstill Tests Precommissioning Tests and Checks Preliminary Tests Power Voltage Trials SSD, Motor Roll Precommissioning Tests and Checks Shaft Line Starting (Motor Roll Part 1) Shaft Line Starting (Motor Roll Part 2) Fast / Forced Cooling Test Washing Mode Test SSD-LCI (ABB) External, Standstill Tests / Motor Roll Standstill Tests Test Program 4: Excitation Precommissioning Tests and Checks Test Program 7: Motor Roll Pulse Mode Operation Machine Commutated Mode Run to Higher Speed Run to Max. Motor Roll Speed Fast / Forced Cooling Test SSD External, Standstill Tests / Motor Roll Standstill Tests Precommissioning Tests and Checks Shaft Line Starting (Motor Roll Part 1) Automatic Mode (Motor Roll Part 2) Fast / Forced Cooling Test Washing Mode Test Excitation, Standstill Tests Precommissioning Tests and Checks Standstill Tests Excitation, No Load Tests Precommissioning Tests and Checks Preparation for Generator Open Circuit Test No Load Test Volt / Hertz Limiter Generator No Load Characteristic No Load Test, Final Works Excitation, Load Tests Load Tests Excitation System, Short Circuit Test Preparation for Short Circuit Test (Static Excitation System) Preparation for Short Circuit Test (Excitation with Exciter Machine) Test and Adjustment at No Load, in Short Circuit Condition Normalize the System

2 x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

10 x x x x x x

11

12

13

14

x x x x x

x x x x x

2007-10-29 EN Approved

Lng. Status

10

Rev. Released

11

x x x x

x x x x

x x x

Type

CJ

12
9561 HTCT652864
Dept. Document No.

x x x x x x x x

x x x x x

x x x x x

13

x x x x x x x

x x x x x x x

14

15

x x

16 17

x x x

x x x

. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ALSTOM (Switzerland) Ltd 2007. Form: FM 0501 en / Ae.02 / 01-09-07 / GTSQ

Hazard caused by batteries

Chemicals and corrosives

Rotating or moving part

Explosive atmosphere

Pressurized system

Automatic re-start

Gas containers

Falling hazard

Hot surface

Slippery

abcd

Revision:

Doc. Type:

Language:

Page:

CY

en

11/17

HTCT652864

High voltage (Disconnection of cables)

Warning Notes
High voltage (Life electrical Systems) High voltage (damaged Cables)

Falling, tripping, slippering or hitting hazard

ITPL and Sections of ITPL Steps


18 Protection REG216, Standstill Tests Precommissioning Tests and Checks Hardware Side Software Side Check of Protection Functions Operation and Maintenance 19 Protection REG216, No Load Tests Precommissioning Tests and Checks Test and Adjustments on REG216 20 Protection REG216, Load Tests Load Tests 21 Protection REG316, Standstill Tests Precommissioning Tests and Checks Hardware Side Software Side Operation and Maintenance 22 Protection REG316, No Load Tests Precommissioning Tests and Checks Test and Adjustments on REG316 23 Protection REG316, Load Tests Load Tests 24 Protection RET316 Precommissioning Tests and Checks Hardware Side Software Side Operation and Maintenance Load Readings 25 Protection AREVA MICOM Standstill Tests Precommissioning Tests and Checks Hardware Side for Relay Type MICOM P343 Hardware Side for Relay Type MICOM P123 Hardware Side for Relay Type MICOM P921 Hardware Side for Relay Type MICOM P633 Software Side for Relay Type MICOM P343 Software Side for Relay Type MICOM P123 Software Side for Relay Type MICOM P921 Software Side for Relay Type MICOM P633 Check of Protection Functions 26 Protection AREVA MICOM No Load Tests Precommissioning Tests and Checks Open Circuit Test 27 Protection AREVA MICOM Load Tests Load Tests 28 Protection REG216, Short Circuit Test Preparation for Short Circuit Test Test and Adjustment on REG216 in Short Circuit Operation Normalize the System

2 x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

10 x

11 x

12

13

14

x x

2007-10-29 EN Approved

Lng. Status

Rev. Released

x x

Type

9561 HTCT652864

Dept. Document No.

CJ

x x

x x x x

. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ALSTOM (Switzerland) Ltd 2007. Form: FM 0501 en / Ae.02 / 01-09-07 / GTSQ

Hazard caused by batteries

Chemicals and corrosives

Rotating or moving part

Explosive atmosphere

Pressurized system

Automatic re-start

Gas containers

Falling hazard

Hot surface

Slippery

abcd

Revision:

Doc. Type:

Language:

Page:

CY

en

12/17

HTCT652864

High voltage (Disconnection of cables)

Warning Notes
High voltage (Life electrical Systems) High voltage (damaged Cables)

Falling, tripping, slippering or hitting hazard

ITPL and Sections of ITPL Steps


29 Synchronizing, Standstill Tests Precommissioning Tests and Checks Power Supply First Power Up Measuring Breaker Closing Time Backfeed Test Check Readings of Voltage & Frequencies in Positions during Backfeed Test Check Phase Rotation of Network on the Generator PT's 30 Synchronizing, No Load Tests Precommissioning Tests and Checks Synchronizing Tests 31 Plant Metering Precommissioning Tests and Checks Generator Electrical Transmitters (-U...) Generator Electrical Meters (-P...) MV Switchgear Transmitters LV Switchgear Transmitters DC / UPS Transmitters 32 Generator Outgoing and Measurement Cubicle Precommissioning Tests and Checks Commissioning 33 Medium Voltage System Precommissioning Tests and Checks Commissioning MCC Reclosing Function 34 Low Voltage System Precommissioning Tests and Checks Energizing via Temporary Supply Energizing and Insulation Check of Consumers Energizing via Final Supply MCC Reclosing Function 35 Battery Charger Precommissioning Tests and Checks Battery Charger Electrolyte Filling Battery Charging 36 DC System / Converter Precommissioning Tests and Checks DC / DC Converter Commissioning of DC Distribution Board 37 DC System Precommissioning Tests and Checks Commissioning of DC Distribution Board 38 UPS Precommissioning Tests and Checks UPS Converter Commissioning of UPS Distribution Board 39 Standby Diesel Generator Precommissioning Tests and Checks Commissioning of Synchronizing Device 40 Interface to HV / MV System Interface Testing

2 x x x x x x x x x x x x x x x x x

3 x

10 x

11 x x x x

12

13

14

x x x x x x x

2007-10-29 EN Approved

Lng. Status

Rev. Released

Type

CJ

9561 HTCT652864

Dept. Document No.

x x x x

x x x x

x x x

x x

x x x x x x x x x x x x x x x x x x x x x x x

x x x x

x x x

x x x x x x

x x

x x x x x x x x x x x x x x x

x x

. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ALSTOM (Switzerland) Ltd 2007. Form: FM 0501 en / Ae.02 / 01-09-07 / GTSQ

Hazard caused by batteries x

Chemicals and corrosives

Rotating or moving part

Explosive atmosphere

Pressurized system

Automatic re-start

Gas containers

Falling hazard

Hot surface

Slippery