Sunteți pe pagina 1din 2

PIPING SPOOLS RELEASE REPORT (FOR PAINTING)

DATE: Report No.: TCC-SR-P-202SR NO. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18


PREPARED BY: CONST. SUPERVISOR CHECKED BY: TCC-QC REVIEWED BY: DAELIM-QC

SMITP-F-001-01

SMIC-L-2040

Activity No.4.7

RFI NO.: TCC-PIP-

DRAWING NO.

LINE NO.

SPOOL NO.

JOINT NO

SIZE LINE SCH NO. (INCH) CLASS

DWIR NO.

PWHT RT PT

NDT INSPECTION MT PMI UT HT

SPOOL VISUAL & DIMESION CHECK

REMARKS

REVIEWED BY: SQIT Name : Asimuddin Khan Signature : Date :

Name :Xu hongcheng


Signature : Date :

Name :Syed Sadiq Ahmed


Signature : Date :

Name :Amanullah Khan Ghazi


Signature : Date :

Page: of
PIP-F-001

PIPING SPOOLS RELEASE REPORT (FOR SITE)


DATE: Report No.: TCC-SR-S-202SR NO. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
PREPARED BY: CONST. SUPERVISOR CHECKED BY: TCC-QC REVIEWED BY: DAELIM-QC

SMITP-F-001-01

SMIC-L-2038

Activity No.5.1

RFI NO.: TCC-PIP-

DRAWING NO.

LINE NO.

SPOOL NO.

JOINT NO

SIZE LINE SCH NO. (INCH) CLASS

DWIR NO.

PWHT RT PT

NDT INSPECTION MT PMI UT HT

SPOOL VISUAL & DIMESION CHECK

REMARKS

REVIEWED BY: SQIT Name : Signature : Date :

Name :
Signature : Date :

Name :
Signature : Date :

Name :
Signature : Date :

Page: of
PIP-F-002

S-ar putea să vă placă și