The Problem

Ampelmann

2/30

The Problem

Ampelmann

3/30

Offshore Access
Offshore access is difficult Turbine maintenance = important New model wind turbines Wind farms farther offshore Offshore access = big issue!

Ampelmann

4/30

Offshore Access
Horns Rev access by boat: 1st winter: 5/7 days 2nd winter: 1/7 days Limited to calm weather conditions

Ampelmann

5/30

Offshore Access

Expensive!

Costly, and requires deck

Ampelmann

6/30

Ampelmann
Solution based on the problem: Ship is moving, structure is NOT

Ampelmann

7/30

Ampelmann
Solution based on the problem: Ship is moving, structure is NOT

Active motion compensation

Ampelmann

8/30

Ampelmann

Ampelmann

9/30

Ampelmann
Invented by 2 TU Delft PhD students Wind Energy Conference, Berlin 2002 Code name Ampelmann
As easy as crossing the street

Ampelmann

10/30

Applications
Maintenance on Offshore Wind Farms Transfer of people Transfer of spare parts
Does it work?

Ampelmann

11/30

Proof of Concept

Ampelmann

12/30

Proof of Concept

Ampelmann

13/30

Proof of Concept

The concept works!

Ampelmann

14/30

Proof of Concept
Show that it works offshore & full-scale Prove that the system is safe Test the capabilities of the system
Build a prototype!

Ampelmann

15/30

Project

Jan van der Tempel - CEO - inventor Frederik Gerner - R & D Hydraulics - Finance Jillis Koch - Sales & Marketing

David Cerda Salzmann -R&D - PhD Ampelmann

Arjan Gbel - R & D Control

Ampelmann

16/30

Team
Jan van der Tempel - CEO - inventor Frederik Gerner - R & D Hydraulics - Finance Jillis Koch -Safety - Sales & Marketing

David Cerda Salzmann -R&D - PhD Ampelmann

Arjan Gbel - R & D Control

Ampelmann

17/30

Design Requirements
Cylinder stroke 2 meter Foot print 6 x 6 meter 50 meter vessel Hs = 2.5 m (workability 93%)

Ampelmann

18/30

Ampelmann Requirements
High workability through design No modification to structure Personnel & spare parts Heavy loads

Ampelmann

19/30

Design
Payloads:

Gangway:

2 ton

Central load: 10 ton

Central load: 4 ton

Ampelmann

20/30

Safety

Fail-operational philosophy Redundant system

Ampelmann

21/30

Planning

R & D Shell, Smit, Heerema Finance Prototype Design

Interest clients Demo Safety & certification Construct Onshore testing Offshore testing

Start company

Order components

Sept 2006

Sept. 2007

Ampelmann

22/30

Planning

R & D Shell, Smit, Heerema Finance Prototype Design

Interest clients Demo Safety & certification Construct Onshore testing Offshore testing

Start company

Order components

Sept 2006

Components in fabrication Safety system in development Programming control system Lloyd's Certification

Sept. 2007

Ampelmann

23/30

Planning

R & D Shell, Smit, Heerema Finance Prototype Design

Interest clients Demo Safety & certification Construct Onshore testing Offshore testing

Start company

Order components

Sept 2006

Sept. 2007

Testing this summer

Ampelmann

24/30

Planning

R & D Shell, Smit, Heerema Finance Prototype Design

Interest clients Demo Safety & certification Construct Onshore testing Offshore testing

Start company

Order components

Sept 2006

Sept. 2007

Commercialize after successful demo

Ampelmann

25/30

Motion Platform

Ampelmann

26/30

Gangway
Length: Yaw: Pitch: 9-16 meter 2 x 180 degrees +/- 20

Ampelmann

27/30

Components