Sunteți pe pagina 1din 3

Package CP02

Code

Reference number of the document

Ver

English Title of the document

Resp.

Deadline to reply

Time left to reply

Current Status

Remarks

PSC-MTS-00058-13-B PSC-MTS-00062-13-B PSC-MTS-00062-13-B PSC-MTS-00062-13-B PSC-MTS-00065-13-B PSC-MTS-00065-13-B PSC-MTS-00066-13-B PSC-MTS-00067-13-B PSC-MTS-00068-13-B

PSC-IMP-TRE-WSE-S00-00018-B PSC-IMP-PRC-ZTO-S00-00002-E/V PSC-IMP-PRC-ZTO-S00-00003-E/V PSC-IMP-PRC-ZTO-S00-00004-E/V PSC-IMP-GDD-WSE-S02-08022-B PSC-IMP-PPG-WSE-S00-00005-E/V PSC-IMP-TRE-WSE-S00-00019-B PSC-IMP-PPG-WSE-S00-00020-B PSC-IMP-PRC-ZTO-S00-00005-B

1A 1A 1A 1A 2A

Subcontractor for Bored Pile Test (Subcon 4) Sampling and testing of Reinforcement steel Testing of bentonite slurry Sampling and testing of steel tube for sonic test Faade detail of Gate and Fence-Station 2

13-Dec-13 18-Dec-13 18-Dec-13 18-Dec-13 23-Dec-13 23-Dec-13 23-Dec-13 23-Dec-13 23-Dec-13

-10 -5 -5 -5 1 1 0 1 1

UNDER REVIEW UNDER REVIEW UNDER REVIEW UNDER REVIEW UNDER REVIEW 10 copies submission for approval SUBMITTED 10 copies submission for approval SUBMITTED UNDER REVIEW UNDER REVIEW

3A Method Statement for Site Clearing and Demolition 1B 1A 1A Concrete mix design No. 1 Equipment mobilization plan for testing of pilot pile1st mobilization Coding for inspection and acceptance minutes Construction design drawing: Pilot pile for lateral load test Traffic Management Plan-Elevated station 3 (Phu Dien)-Construction stage 1

PSC-MTS-00069-13-B

PSC-IMP-TRE-WSE-S02-00001-B

1A

24-Dec-13

UNDER REVIEW

PSC-MTS-00070-13-B CP05

PSC-IMP-PPG-ZPO-S03-00001-E/V

1A

24-Dec-13

WRITING

HNC-MTS-00194-13-B

HNC-IMP-TRE-HBS-D00-10001-B

1A

Construction design Drawing Design data from cp05 to cp-06 about depot equipment,telecommunication and signaling in workshops (4,5,7,8-11,12,15,17 and 19) Construction design Drawing Calculation of low voltage power : The load of LPS1 & 2 and generator from the cp-05 to cp-06 Construction design Drawing Design data from cp05 to cp-06 for BMS and Lan inside occ building Construction design Drawing Design data from cp05 to cp-09 for BMS and Lan inside occ building

26-Oct-13

-58

UNDER REVIEW

HNC-MTS-00195-13-B

HNC-IMP-TRE-HBS-D00-10002-B

1A

26-Oct-13

-58

UNDER REVIEW

HNC-MTS-00196-13-B

HNC-IMP-TRE-HBS-D00-10003-B

1A

26-Oct-13

-58

UNDER REVIEW

HNC-MTS-00197-13-B

HNC-IMP-TRE-HBS-D00-10004-B

1A

29-Oct-13

-55

UNDER REVIEW

HNC-MTS-00216-13-B

HNC-IMP-TDR-WOO-D29-29001-B

2A

CONTRUCTION DESIGN REPORT FOR AREA NO 28 & 29 ( DRIVER &TECHNICAL STAFF ROOMS ) Contruction design report for area no 12 (Overhaul maintance workshop) CONSTRUCTION DESIGN DRAWINGS FOR AREA NO.12-MEP WORKS CONSTRUCTION DESIGN DRAWINGS FOR AREA NO.12-ARCHITECTURE WORKS CONSTRUCTION DESIGN DRAWINGS FOR AREA NO.12-FOUNDATION WORKS CONSTRUCTION DESIGN DRAWINGS FOR AREA NO.12-STRUCTURE WORKS REPORT TEST RESULT OF PILE FOR AREA NO.1,2,14,31A REPORT TEST RESULT OF PILE FOR AREA NO.5 Report Test result of pile for area no 6 REPORT TEST RESULT OF PILE FOR AREA NO.12 Report 3 months rolling program Report Test result of pile for area no 7 CONSTRUCTION METHOD OF PERMANENT PILES BUILDING NO.7 Contruction design drawing For are n0.7 (Pit wheel lathe workshop ) - Detailed design of Permanent pile works

23-Nov-13

-30

UNDER REVIEW

HNC-MTS-00217-13-B HNC-MTS-00217-13-B HNC-MTS-00217-13-B HNC-MTS-00217-13-B HNC-MTS-00217-13-B HNC-MTS-00229-13-B HNC-MTS-00229-13-B HNC-MTS-00229-13-B HNC-MTS-00229-13-B HNC-MTS-00231-13-B HNC-MTS-00231-13-B HNC-MTS-00232-13-B

HNC-IMP-TDR-WOO-D12-12001-B HNC-IMP-TRE-HBS-D12-00001-B HNC-IMP-TRE-WAR-D12-00001-B HNC-IMP-TRE-WDS-D12-00001-B HNC-IMP-TRE-WDS-D12-00002-B HNC-IMP-TRE-WDO-D01-00001-B HNC-IMP-TRE-WDO-D05-00001-B HNC-IMP-TRE-WDO-D06-00001-B HNC-IMP-TRE-WDO-D12-00001-B HNC-IMP-PDS-ZPT-D00-00012-B HNC-IMP-TRE-WDO-D07-00001-B HNC-IMP-TDR-WDS-D07-00003-B

2A 1A 1A 1A 1A 2A 2A 2A 2A 2A 3A 1A

27-Nov-13 27-Nov-13 27-Nov-13 27-Nov-13 27-Nov-13 10-Dec-13 10-Dec-13 10-Dec-13 10-Dec-13 17-Dec-13 17-Dec-13 18-Dec-13

-26 -26 -26 -26 -26 -13 -13 -13 -13 -6 -6 -4

UNDER REVIEW UNDER REVIEW UNDER REVIEW UNDER REVIEW UNDER REVIEW SUBMITTED SUBMITTED SUBMITTED SUBMITTED UNDER REVIEW SUBMITTED UNDER REVIEW A3 A3 A3 A3

HNC-MTS-00232-13-B

HNC-IMP-TRE-WDS-D07-00004-B

2A

18-Dec-13

-4

UNDER REVIEW

10 copies submission for approval 10 copies submission for approval