PROJECT ACTIVITY MODEL -- Project Management


NOTES: PS PS PS PS PS PS PM_004
Scope of Work

Form 000 100 F1400 Form Date 19Mar2010 Sheet 1 of 1

PHASE 0 PM_001
Project Handover

PROJECT INITIATION PM_002


OSR / OSIP

PM_003
Prime Contract

PM_005
Project Execution Plan

PM_006
Cost Estimate

PM_007
Management Level Schedule

PM_008
Risk Assessment

PM_009
Project Commercial Baseline

PM_010
Project Baseline Repository

PM_011
Project Alignment

PM_012
Project Administration

PM_013
Project Reporting

PM_014
Project Close-Out

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

PHASE 1 PS -

SCOPE DEFINITION & CONCEPTUAL ENGINEERING PS PM_102


OSR / OSIP

PS -

PS -

PS -

PS -

PS -

PS -

PM_103
Prime Contract

PM_104
Scope of Work

PM_105
Project Execution Plan

PM_106
Cost Estimate

PM_107
Management Level Schedule

PM_108
Risk Assessment

PM_109
Project Commercial Baseline

PM_110
Project Baseline Repository

PM_111
Project Alignment

PM_112
Project Administration

PM_113
Project Reporting

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

PHASE 2 PS -

PRELIMINARY ENGINEERING / CONSTRUCTION PLANNING PS PM_202


OSR / OSIP

PS -

PS -

PS -

PS -

PS -

PS -

PM_203
Prime Contract

PM_204
Scope of Work

PM_205
Project Execution Plan

PM_206
Cost Estimate

PM_207
Management Level Schedule

PM_208
Risk Assessment

PM_209
Project Commercial Baseline

PM_210
Project Baseline Repository

PM_211
Project Alignment

PM_212
Project Administration

PM_213
Project Reporting

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

PHASE 3 PS -

DETAILED ENGINEERING / SITE INITIATION PS PM_302


OSR / OSIP

PS -

PS -

PS -

PS -

PS -

PM_303
Prime Contract

PM_304
Scope of Work

PM_305
Project Execution Plan

PM_306
Cost Estimate

PM_307
Management Level Schedule

PM_308
Risk Assessment

PM_309
Project Commercial Baseline

PM_310
Project Baseline Repository

PM_311
Project Alignment

PM_312
Project Administration

PM_313
Project Reporting

PM_314
Project Close-Out

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

PHASE 4 PS -

CONSTRUCTION / FINAL DESIGN / ENGINEERING SUPPORT FOR CONSTRUCTION PS PM_402


OSR / OSIP

PS -

PS -

PS -

PS -

PS -

PS -

PM_403
Prime Contract

PM_404
Scope of Work

PM_405
Project Execution Pl Plan

PM_406
Cost Estimate

PM_407
Management L lS h d l Level Schedule

PM_408
Risk Assessment

PM_409
Project C i l Commercial Baseline

PM_410
Project Baseline R it Repository

PM_411
Project Alignment

PM_412
Project Ad i i t ti Administration

PM_413
Project Reporting

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

PHASE 5 PS -

CHECKOUT / STARTUP SUPPORT PS PM_502


OSR / OSIP

PS -

PS -

PS PM_508
Risk Assessment

PS PM_509
Project Commercial Baseline

PS -

PS -

PS -

PS -

PS -

PS -

PM_503
Prime Contract

PM_510
Project Baseline Repository

PM_511
Project Alignment

PM_512
Project Administration

PM_513
Project Reporting

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

PHASE 6 PS -

PROJECT CLOSE-OUT PS PM_602


OSR / OSIP

PS -

PS -

PS PM_608
Risk Assessment

PS -

PS PM_611
Project Alignment

PS PM_612
Project Administration

PS -

PS -

PS -

PS -

PS -

PM_603
Prime Contract

PM_613
Project Reporting

PM_614
Project Close-Out

[01]

[01]

[01]

[01]

[01]

[01]

[01]

BLOCK LEGEND - Activity Title Area XXX HOME OFFICE [01] XXX OTHERS [14] XXX NOT EXECUTED [15] [10] XXX SUPPLIER [11] [06] XXX SUPPLIER & FLUOR [12] XXX CLIENT [07] XXX CONTRACTOR [13] [02] XXX CLIENT & FLUOR [08] XXX CONTRACTOR & FLUOR XXX SUPPORTING OFFICE [03] XXX HOME & SUPPORTING OFFICES XXX SITE [04] XXX LICENSOR [09] XXX LICENSOR & FLUOR [05] XXX HOME OFFICE & SITE

Optional Color Coding for Activity Code & Workshare Areas of Block XXX [NOT USED] XXX [NOT USED] XXX [NOT USED] XXX [NOT USED]

[a]

[b]

[c]

[d]

Rev.

Date

Revision Description

(Original Signed by:)

98 - 100%
Support Office Lead Office Prepared by Checked by Approved by

000.100.F1400 PAM Workbook R5.3 dtd 19Mar2010.xls

PAM is a service mark of Fluor Enterprises, Inc. / Copyright 2010 Fluor Enterprises, Inc.

86 - 98%

48 - 86% %

28 - 48%

12 - 28%

2 - 12%

0 - 2%

Project Activity Model

Client Project Project No.:

PROJECT ACTIVITY MODEL -- Engineering


NOTES: PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS -

Form 000 100 F1400 Form Date 19Mar2010 Sheet 1 of 1

PHASE 0 PS -

PROJECT INITIATION PS PS -

PHASE 1 ENG101 PRO

SCOPE DEFINITION & CONCEPTUAL ENGINEERING PS ENG103 HSE ENG104 MEC


Hazardous Area Classification Memorandum / Plan [01] Definition Package Units

PS ENG105 PIP ENG106 HSE ENG107 HSE ENG108 HSE ENG109 PIP ENG110
Tracing Philosophy

PS ENG114 HSE ENG116 PM_


Define Protection Project Revamp Planning Step1

PS ENG118 MEC ENG119


Interdiscipline Squad Checks Material Selection Diagram / Report

PS -

PRO

ENG111

PM_

ENG112

MEC

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

PHASE 2 ENG201 PRO

PRELIMINARY ENGINEERING / CONSTRUCTION PLANNING ENG202 PRO ENG203 HSE ENG204 MEC ENG205 MEC ENG206 HSE ENG207 MEC ENG208 HSE ENG209
Area Safety Review

HSE

ENG210

PIP

ENG211

HSE

ENG212

CMC

ENG213

CMC

ENG214
Implement Plant Protection Requirements

ENG215

PRO

ENG216

PM_

ENG217
As-Built Package for Revamp

ENG218

PM_

ENG219
Interdiscipline Squad Checks

ENG220

PDM

P&ID First Draft

P&ID Design Review

Hazardous Area Classification / Emission Source List [01]

Package Unit Specs for RFQ

Technical Packages for RFQ/RFP

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

PS ENG221 CMC ENG222 PM_ Temporary Facilities Layout, Scope & Temp. Power [01] Requirements for (Const.) Completion and Turnover [01]

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PHASE 3 ENG301
P&ID's AFD

DETAILED ENGINEERING / SITE INITIATION PS ENG302 PIP ENG303 HSE ENG304 MEC ENG305 MEC ENG306
Authority Engineering Implementation

PRO

ENG307

MEC

ENG308

HSE

ENG309

HSE

ENG310

HSE

ENG311

MAT

ENG312

HSE

ENG313

HSE

ENG315

MEC

ENG316
Detailed Revamp Plan Step3

ENG317

PIP

ENG318

HSE

ENG319
Interdiscipline Squad Checks

ENG320

PDM

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

PHASE 4 ENG401
P&IDs AFC

PIP

CONSTRUCTION / FINAL DESIGN / ENGINEERING SUPPORT FOR CONSTRUCTION PS PS ENG404 MEC ENG405 HSE ENG406
Package Unit Vendor Data Review HAZOP Vendor Packages Authority Engineering Implementation

PS ENG407
Final Noise Report

PS ENG409 PIP ENG411 MAT


3D Model Review #3 Supplier Inspection and Expediting

PS -

PS -

PS -

PS -

PS -

PS ENG418 PDM ENG419


Interdiscipline Squad Checks

MEC

ENG420

PDM

Design Books

Vendor Squad Checks

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

PS ENG421
P&IDs As Designed

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PIP

[01]

PHASE 5 PS -

CHECKOUT / STARTUP SUPPORT PS PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS ENG518
Turnover Documents

PS PDM -

PS -

[01]

PHASE 6 ENG601
As-Built Documents

PDM

PROJECT CLOSE-OUT PS ENG602 PDM


Authority Package As-Builts

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

[01]

[01]

BLOCK LEGEND - Activity Title Area XXX HOME OFFICE [01] XXX OTHERS [14] XXX NOT EXECUTED [15] 000.100.F1400 PAM Workbook R5.3 dtd 19Mar2010.xls [10] XXX SUPPLIER [11] [06] XXX SUPPLIER & FLUOR [12] XXX CLIENT [07] XXX CONTRACTOR [13] [02] XXX CLIENT & FLUOR [08] XXX CONTRACTOR & FLUOR XXX SUPPORTING OFFICE [03] XXX HOME & SUPPORTING OFFICES XXX SITE [04] XXX LICENSOR [09] XXX LICENSOR & FLUOR [05] XXX HOME OFFICE & SITE

Optional Color Coding for Activity Code & Workshare Areas of Block XXX [NOT USED] XXX [NOT USED] XXX [NOT USED] XXX [NOT USED]

[a]

[b]

[c]

[d]

98 - 100%
Support Office Lead Office Rev. Date Revision Description (Original Signed by:) PAM Facilitator

86 - 98%

48 - 86%

28 8 - 48%

3D Model Review #1

Hazardous Area Classification Design review

Technical Quotation Summary Package g Units

Package Unit Specs for PO

Noise Abatement Implementation

Process Hazard Analysis

Area Safety Review Close-out

Safety Integrity Level (SIL) Verification

Supplier Inspection and Expediting

Constructability, Maintainability, Operability Review

HAZOP Follow-up

Utility Consumption Control

3D Model Review #2

Risk Identification and Evaluation for Construction Sites

Vendor Squad Checks

12 - 28%

Authority Engineering Requirements Summary Preparation [01]

Noise Control Execution Plan

Preliminary Process Hazard Analysis

Plot Plan Design Review

Safety Integrity Level (SIL) Assignment

Constructability Review

Rigging Study

Utility Consumption Control

Project Revamp Planning step2

Define Handling of Material Certificates

Vendor Squad Checks

2 - 12%

P&ID Legend / Drafting Basis

3D Model Partition Index

Identify Authority Requirements

Noise Philosophy

Conceptual Hazard Analysis

Develop Overall and/or Area/Unit Plot Plan

Value Engineering

Maintenance / Spare Parts Philosophy

0 - 2%

----N/A Approved by

PAM is a service mark of Fluor Enterprises, Inc. / Copyright 2010 Fluor Enterprises, Inc.

Project Activity Model

Client Project Project No.:

PROJECT ACTIVITY MODEL -- Process


NOTES: PS PS PS PS PS PS PS PS PS PS PS PS PS # PRO004 Process Design Basis # PRO005 Process Guarantees # PRO006 Process Deliverables # PRO007 Plant/Unit Cap., Feedstock Def., Product Rate / Spec. [01]

Form 000 100 F1400 Form Date 19Mar2010 Sheet 1 of 1

PHASE 0 PRO001
Process Project Initiation Activities

PROJECT INITIATION
# PRO003 Basic Engineering Process Design Design Data Criteria

PRO002

[01]

[01]

[01]

[01]

[01]

[01]

PHASE 1
# PRO101 Configuration(s) Selection

SCOPE DEFINITION & CONCEPTUAL ENGINEERING PS


# PRO102 Licensor Evaluation # PRO103 Block Flow Diagrams # PRO104 Facility Modeling # PRO105 Overall Material Balances # PRO106 Process Flow Sketch # PRO107 Process Description # PRO108 # PRO109 Preliminary Utility Preliminary Balances Equipment List # PRO110 Input to Capital Cost Estimate # PRO111 Preliminary Catalysts & Chemicals Summary [01] # PRO112 Preliminary Operating & Maintenance Cost

PS -

PS -

PS -

PS -

PS -

PRO113
Economic Analysis

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

PHASE 2
# PRO201 Study Report

PRELIMINARY ENGINEERING / CONSTRUCTION PLANNING


# PRO202 Block Flow Diagram # PRO203 Process Simulation # PRO204 # PRO205 Heat and Material Process/Utility Balances Flow Diagrams (UFD's) # PRO206 Process Description # PRO207 Equipment List # PRO208 # PRO209 Material Selection Utility Balances Diagram and/or (Unit Basis) Memorandum # PRO210 Equipment Data Sheets or Duty Specifications # PRO211 P&IDs AFD

PRO212
Hydraulic Calculations

# PRO213 Line Stamping and Line & Flow Summary

# PRO214 Overall Utility Balances

PRO215
Pressure Relief Device Contingency Analysis [01]

# PRO216 # PRO217 Preliminary Relief Catalysts & Loads Chemicals Summary

# PRO218 # PRO219 # PRO220 Emission & Process Control & Process Effluent Summary Safeguarding Instrument Data Description Sheets

[01]

[01]

[01] # PRO223 Safeguarding Narratives 1st Draft

[01] # PRO224 Safeguarding (SIL) Classification Input [01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

PS
# PRO221 Relief Valve Data Sheets # PRO222 Process Control Narratives 1st Draft # PRO225 # PRO226 Develop Preliminary Performance Test Startup Plans Procedure

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PRO227
Input to Hazardous Area Dwg.

PRO228
Input to Fire Protection System

PRO229
P&ID Drafting

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

PHASE 3 PS -

DETAILED ENGINEERING / SITE INITIATION PS


# PRO302 Utility Distribution Drawings

PS # PRO307 Battery Limit Tieins List # PRO308 Process Control Narratives AFD # PRO309 Safeguarding Narratives AFD # PRO310 Operating Manuals # PRO311 Startup Planning # PRO312 Final Flare Load Summary

PS -

PS -

PS -

PS -

PS -

PRO303
Vendor Data Document Validation & Integration g [01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

PHASE 4
# PRO401 Turnover Systems Definition

CONSTRUCTION / FINAL DESIGN / ENGINEERING SUPPORT FOR CONSTRUCTION PS # PRO402 # PRO404 PRO403 PRO405 Precommissioning Plan & Procedures [01] Update P&IDs AFC Commissioning Plan & Procedures P&ID Drafting

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

[01]

[01]

[01]

[01]

PHASE 5 PRO501
Plant Checkout

CHECKOUT / STARTUP SUPPORT PS


# PRO502 Commissioning and Ready for Startup # PRO503 Start-up Assistance

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

[01]

[01]

[01]

PHASE 6 PRO601
Performance P f Test T t Report

PROJECT CLOSE-OUT PS
# PRO602 A B ild As-Build Documents

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

[01]

[01]

BLOCK LEGEND - Activity Title Area XXX HOME OFFICE [01] XXX OTHERS [14] XXX NOT EXECUTED [15] [10] XXX SUPPLIER [11] [06] XXX SUPPLIER & FLUOR [12] XXX CLIENT [07] XXX CONTRACTOR [13] [02] XXX CLIENT & FLUOR [08] XXX CONTRACTOR & FLUOR XXX SUPPORTING OFFICE [03] XXX HOME & SUPPORTING OFFICES XXX SITE [04] XXX LICENSOR [09] XXX LICENSOR & FLUOR [05] XXX HOME OFFICE & SITE

Optional Color Coding for Activity Code & Workshare Areas of Block XXX [NOT USED] XXX [NOT USED] XXX [NOT USED] XXX [NOT USED]

[a]

[b]

[c]

[d]

Rev.

Date

Revision Description

(Original Signed by:)

98 - 100% %
Support Office Lead Office Prepared by Checked by Approved by PAM is a service mark of Fluor Enterprises, Inc. / Copyright 2010 Fluor Enterprises, Inc.

000.100.F1400 PAM Workbook R5.3 dtd 19Mar2010.xls

86 - 98%

48 - 86%

28 8 - 48%

# PRO304 HAZOP Review

# PRO305 Instrument & Alarm Set Points and Ranges

PRO313
P&IDs AFC

PRO314
P&ID Drafting

12 - 28%

2 - 12%

# PRO114 Conceptual Engineering Reports

0 - 2%

Project Activity Model

Client Project Project No.:

PROJECT ACTIVITY MODEL -- Mechanical


NOTES: PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS -

Form 000 100 F1400 Form Date 19Mar2010 Sheet 1 of 1

PHASE 0 PS -

PROJECT INITIATION PS PS -

SEE "DMC" FOR LEVEL OF DISCIPLINE INVOLVEMENT DURING THIS PHASE

0 - 2%

1.) Equipment modeling may be performed by Mechanical or Piping as assigned on the project.

PHASE 1 PS -

SCOPE DEFINITION & CONCEPTUAL ENGINEERING PS PS MEC104


General Specifications

PS MEC106
Vessel Standard Drawings

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

[01]

[01]

PHASE 2 PS -

PRELIMINARY ENGINEERING / CONSTRUCTION PLANNING PS PS MEC202 MEC204


Thermal Design Heat Exchangers Narrative Equipment Specifications

PS MEC207
Equipment Outline Drawing

PS MEC208
Equipment Data Sheets RFQ

PS MEC211
3D Modeling Preliminary

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

MEC209
Requisitions for Equipment Inquiry

[01]

[01]

[01]

[01]

[01]

[01]

PHASE 3 MEC301
Equipment List

DETAILED ENGINEERING / SITE INITIATION PS PS MEC303 Technical Quotation Summary

PS MEC306
Nozzle Orientations and Elevations

PS MEC308
Equipment Datasheets for P.O.

PS MEC309
Requisitions for Equipment P.O.

PS MEC311
3D Model Reviews #1 & #2

PS MEC313
Contract / RFP Technical Content

PS -

PS -

PS -

PS -

PS -

PS -

[01]

[01]

[01]

[01]

[01]

[01]

[01]

PHASE 4 MEC401
Equipment List

CONSTRUCTION / FINAL DESIGN / ENGINEERING SUPPORT FOR CONSTRUCTION PS PS PS PS MEC406


Vessel Ladders, Pl tf d Platforms, and Pipe Support Layout Drawings [01]

PS MEC407
Review E i t Equipment Supplier Data & Drawings [01]

PS -

PS MEC411
3D Model Review #3

PS MEC413
Contractors P l Proposal Evaluation and Clarification [01]

PS MEC415
Spare Parts R t Report

PS MEC416
Lubrication List

PS MEC419
As-Built E i tD t Equipment Data Sheets / Drawings

PS -

[01]

[01]

[01]

[01]

[01]

PHASE 5 PS -

CHECKOUT / STARTUP SUPPORT PS MEC502 Field support

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

[01]

PHASE 6 PS -

PROJECT CLOSE-OUT PS PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

BLOCK LEGEND - Activity Title Area XXX HOME OFFICE [01] XXX OTHERS [14] XXX NOT EXECUTED [15] [10] XXX SUPPLIER [11] [06] XXX SUPPLIER & FLUOR [12] XXX CLIENT [07] XXX CONTRACTOR [13] [02] XXX CLIENT & FLUOR [08] XXX CONTRACTOR & FLUOR XXX SUPPORTING OFFICE [03] XXX HOME & SUPPORTING OFFICES XXX SITE [04] XXX LICENSOR [09] XXX LICENSOR & FLUOR [05] XXX HOME OFFICE & SITE

Optional Color Coding for Activity Code & Workshare Areas of Block XXX [NOT USED] XXX [NOT USED] XXX [NOT USED] XXX [NOT USED]

[a]

[b]

[c]

[d]

Rev.

Date

Revision Description

(Original Signed by:)

98 - 100%
Support Office Lead Office Prepared by Checked by Approved by 000.100.F1400 PAM Workbook R5.3 dtd 19Mar2010.xls PAM is a service mark of Fluor Enterprises, Inc. / Copyright 2010 Fluor Enterprises, Inc.

86 - 98%

48 - 86% %

28 - 48%

12 - 28%

2 - 12%

Project Activity Model

Client Project Project No.:

PROJECT ACTIVITY MODEL -- Control Systems


PROJECT INITIATION PS PS NOTES: PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS -

Form 000 100 F1400 Form Date 19Mar2010 Sheet 1 of 1

PHASE 0 PS -

PHASE 1
# CSE101 Functional Design Philosophy for Control and Safeguarding Systems [01]

SCOPE DEFINITION & CONCEPTUAL ENGINEERING PS PS PS -

PS -

PS CSE107
MAC / MIV Philosophy

PS -

PS CSE110
Functional Design Philosophy for Instrumentation

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS # CSE180 Enterprise and Manufacturing Execution (MES) Systems Philosophy [01]

[01]

[01]

PHASE 2
# CSE201 Input Control and Safeguarding Narrative Requirements # [01]

PRELIMINARY ENGINEERING / CONSTRUCTION PLANNING PS


# CSE202 Typical Control & Safeguarding Function Definition

CSE203
Cause and Effect Diagram Development

CSE204
DCS/PCS, SIS and Other Systems Specification (preliminary) [01]

# CSE205 # CSE206 # CSE207 Functional System Operator Interface MAC / MIV Scope Block Diagram Definition Definition

CSE208
Analyzer Systems (conceptual)

CSE210
General Instrument Design Criteria

# CSE211 Instrument Index Definition and Preliminary Index

CSE212
Instrument Calculations (preliminary)

CSE213
SmartPlant Instrumentation Implementation

CSE220
Define Equipment, Building, Main Cable Route Requirements [01]

CSE222
3D Modeling (preliminary)

CSE230
Instrument power / air consumers data (preliminary)

CSE240
Miscellaneous system block diagrams

CSE250
Format of Control Systems Deliverables

CSE270
Definition of Building Protection Systems

# CSE280 Enterprise and Manufacturing Execution (MES) Systems Definition [01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

PS
# CSE281 Telecommunicatio ns (Philosophy)

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

[01]

PHASE 3 CSE301
Input to Control and Safeguarding Narratives to AFD

DETAILED ENGINEERING / SITE INITIATION PS CSE302


Signal Interface Definition

CSE303
Cause and Effect Diagram Development

[01]

[01]

[01]

[01]

[01] # CSE354 Installation Contract: Scope of Work; Explanation; Evaluation (Unit Price) [01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

PS CSE330
Input to Electrical Load List (preliminary)

PS CSE350
Typical Instrument Installation Hookups / Details

PS CSE351
Installation Specifications

PS # CSE380 # CSE381 # CSE382 Enterprise Telecommunicatio Telecom Systems and MES ns (Definition) Calculations Execution and Radio coverage, Interface path analysis, fiber Management link budget, traffic [01] [01] [01]

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

CSE360
Loop Diagram Templates

[01]

[01]

[01]

[01]

PHASE 4 CSE401
Application Software Implementation Description Process Control [01]

CONSTRUCTION / FINAL DESIGN / ENGINEERING SUPPORT FOR CONSTRUCTION PS CSE403 CSE404 CSE405 CSE406
Cause and Effect Diagram Development I/O Schedule Process Graphic Display Logic Diagrams

CSE407
Range, Alarm and Trip Setting List

CSE408
Analyzer Systems (design)

# CSE411 Instrument Index (purchase information and design) [01]

CSE412
Instrument Sizing Calculations

CSE413
Intrinsic Safety Calculations

CSE415
P.O. Input for Equipment and Material

# CSE416 Fieldbus Segment Calculations

CSE417
Wireless Field Network Segment Calculations

CSE420
Cable Plans

CSE421
Equipment and Building Layouts

CSE422
3D Modeling

CSE423
Cable List / Cable Schedule

CSE424
Cable Drumming Schedule

# CSE425 Instrument and Junction Box Location Plan

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01] # CSE481 Telecommunicatio ns (Design)

[01]

[01]

[01] # CSE492 Factory / Site Acceptance Test (SAT/FAT)

PS CSE426
Junction box / Cabinet Connection Report (or Drawing) [01] # CSE427 Instruments and Computer Earthing / Grounding Plan

PS CSE428
Review In-line Items

PS CSE430
Input to Electrical Load List

PS CSE452
Material Take-off

CSE440
Miscellaneous Systems and Plans

CSE450
Installation Hookups / Details

CSE453
Revamp Work Packages

[01]

[01]

[01]

[01]

[01]

[01]

[01]

# CSE454 Installation Contract: Scope of Work; Explanation; Evaluation (Lump Sum) [01]

CSE460
Loop Diagrams

CSE470
Building Protection Plans

CSE480
Electrical Heat Tracing Design Data

CSE490
Home Office Field Support

CSE491
Supplier Equipment Inspection

[01]

[01]

[01]

[01]

[01]

[01]

[01]

PHASE 5 PS -

CHECKOUT / STARTUP SUPPORT PS PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PHASE 6 CSE601
As Built Documentation

PROJECT CLOSE-OUT PS PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

[01]

BLOCK LEGEND - Activity Title Area XXX HOME OFFICE [01] XXX OTHERS [14] XXX NOT EXECUTED [15] [10] XXX SUPPLIER [11] [06] XXX SUPPLIER & FLUOR [12] XXX CLIENT [07] XXX CONTRACTOR [13] [02] XXX CLIENT & FLUOR [08] XXX CONTRACTOR & FLUOR XXX SUPPORTING OFFICE [03] XXX HOME & SUPPORTING OFFICES XXX SITE [04] XXX LICENSOR [09] XXX LICENSOR & FLUOR [05] XXX HOME OFFICE & SITE

Optional Color Coding for Activity Code & Workshare Areas of Block XXX [NOT USED] XXX [NOT USED] XXX [NOT USED] XXX [NOT USED]

[a]

[b]

[c]

[d]

Rev.

Date

Revision Description

(Original Signed by:)

98 - 100%
Support Office Lead Office Prepared by Checked by Approved by PAM is a service mark of Fluor Enterprises, Inc. / Copyright 2010 Fluor Enterprises, Inc.

000.100.F1400 PAM Workbook R5.3 dtd 19Mar2010.xls

86 - 98% %

48 - 86%

28 - 48% 2

# CSE304 DCS/PCS. SIS, and Alarm Management Systems Specification [01]

# CSE305 Systems Hardware Configuration Diagram

CSE306
DCS/PCS and SIS Configuration

CSE307
MAC / MIV Execution and Interface Management

CSE308
Analyzer Systems (definition)

# CSE311 Instrument Index (inquiry information)

CSE312
Instrument Sizing Calculations

CSE313
Instrument Datasheets

# CSE314 Instrument Specifications

CSE315
RFQ and Bid Evaluation Input for Equipment and Material

# CSE316 Fieldbus Philosophy

CSE317
Wireless Field Network Philosophy

CSE320
Input to Aboveground and Underground Cable Routing

CSE321
Equipment layout and Buildings (preliminary)

CSE322
3D Modeling

CSE328
Define Inline Instrument (3D) Methodology

12 - 28%

2 - 12%

0 - 2%

Project Activity Model

Client Project Project No.:

PROJECT ACTIVITY MODEL -- Piping


NOTES: PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS -

Form 000 100 F1400 Form Date 19Mar2010 Sheet 1 of 1

PHASE 0 PS -

PROJECT INITIATION PS PS -

SEE "DMC" FOR LEVEL OF DISCIPLINE INVOLVEMENT DURING THIS PHASE

PHASE 1 PIP101
Piping Service (Class) Index

SCOPE DEFINITION & CONCEPTUAL ENGINEERING PS PIP102


Design (Layout) Specification

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PIP103
Drainage Philosophy

PIP104
Underground Piping Specification (Sewers & Utility Piping) [01]

PIP105
Pipe Stress Specifications

PIP106
Tracing Specification

PIP107
Overall & Unit 3D (Block) Model

PIP108
Piping Project Standard Drawings

PIP109
Nozzle Orientation Long Lead Equipment

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

PHASE 2 PIP201
Flow Diagram Transposition

PRELIMINARY ENGINEERING / CONSTRUCTION PLANNING PS PIP202


Tracing Transposition

PS PIP210
Underground Piping Studies (Sewers & Utility Piping) [01]

PS PIP212
PDS Reference Database

PS -

PIP203
First Issue Plot Plans

PIP204
Line List

PIP205
Narrative Piping Material Specification

PIP206
Piping Material Plan

PIP207
Material Component Calculation

PIP208
Itemized Piping Material Specification

PIP213
Piping Purchase Specifications

PIP214
Identification of Specialty Items

PIP215
Start Piping Layout - 3D Model

PIP216
Bulk Material Take-off

PIP217
Fabrication, Testing, and Various Specifications [01]

PIP218
Piping Stress Log

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

PS PIP221
UG Piping (Sewers & Utility Piping) Installation Specification [01]

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PIP222
UG Piping (Sewers & Utility Piping) Prelim Design & Space Mgmt [01]

PHASE 3 PIP301
Basic Piping Studies

DETAILED ENGINEERING / SITE INITIATION PS PIP302


Stress Isometrics Critical Piping

PS PIP307
Route Large Bore Piping

PS PIP320
Hydraulic Calculations of Sewers

PIP303
Utility Station, Eye Wash, and Safety Shower Location Plan [01]

PIP304
Plot Plan AFD

PIP305
Stress Review Critical Piping

PIP308
First Issue Location Control Plan

PIP309
Vessel-nozzle Orientation

PIP310
Piping Revamp Activity Sheets and Tie-in List

PIP311
Plot Plan AFC

PIP312
Stress and/or Material Sketches

PIP313
Material TakeOffs (MTO)

PIP314
Material RFQs

PIP315
Material Bid Reviews and Clarification Meetings g [01]

PIP316
Material Purchase Orders

PIP317
Stress Calculations Major Lines

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

PS PIP322
Contract / RFP Technical part

PS PIP323
Battery Limit Arrangement / Interface

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PIP324
Piping Isometric / Issue Schedule

PIP325
Contract / RFP Explanation and Site walks

PIP326
UG Piping (Sewers & Utility Piping) 3D Modeling and Space Coord. [01]

PIP327
UG Piping Drawings (CUP) & MTO

PIP328
UG Piping Isometrics & BOM

[01]

[01]

[01]

[01]

[01]

[01]

PHASE 4 PIP401
BID Evaluation of Piping Contracts

CONSTRUCTION / FINAL DESIGN / ENGINEERING SUPPORT FOR CONSTRUCTION PS PIP402 PIP403 PIP405 PIP406
Detail Piping Studies Stress Sketches Complete Stress Calculations Other than Major Lines Piping Arrangement Index Drawing

PS PIP407
Revamp Package: Demolition, Tie-in Drawings, etc.

PS -

PS -

PS -

PS -

PS -

PIP408
Isometrics and BOM

PIP409
Isometrics QA/QC

PIP410
Tracing Isometrics

PIP411
Authority Packages

PIP412
Piping Arrangements

PIP413
Field Support UG Piping

PIP414
UG Piping AsBuilt Drawings

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

PHASE 5 PIP501
Hydrotest P&IDs

CHECKOUT / STARTUP SUPPORT PS PIP502


Material Certificates & p Inspection Documents [01]

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PIP503
As-Built Drawings

PIP504
Field Support

[01]

[01]

[01]

PHASE 6 PS -

PROJECT CLOSE-OUT PS PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

[01]

BLOCK LEGEND - Activity Title Area XXX HOME OFFICE [01] XXX OTHERS [14] XXX NOT EXECUTED [15] 000.100.F1400 PAM Workbook R5.3 dtd 19Mar2010.xls [10] XXX SUPPLIER [11] [06] XXX SUPPLIER & FLUOR [12] XXX CLIENT [07] XXX CONTRACTOR [13] [02] XXX CLIENT & FLUOR [08] XXX CONTRACTOR & FLUOR XXX SUPPORTING OFFICE [03] XXX HOME & SUPPORTING OFFICES XXX SITE [04] XXX LICENSOR [09] XXX LICENSOR & FLUOR [05] XXX HOME OFFICE & SITE

Optional Color Coding for Activity Code & Workshare Areas of Block XXX [NOT USED] XXX [NOT USED] XXX [NOT USED] XXX [NOT USED]

[a]

[b]

[c]

[d]

Rev.

Date

Revision Description

(Original Signed by:)

98 - 100%
Support Office Lead Office Prepared by Checked by Approved by PAM is a service mark of Fluor Enterprises, Inc. / Copyright 2010 Fluor Enterprises, Inc.

86 - 98%

48 - 86%

28 - 48%

12 - 28%

2 - 12%

0 - 2%

Project Activity Model

Client Project Project No.:

PROJECT ACTIVITY MODEL -- Electrical


NOTES: PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS -

Form 000 100 F1400 Form Date 19Mar2010 Sheet 1 of 1

PHASE 0 PS -

PROJECT INITIATION PS PS -

PHASE 1 ELE101
General Electrical Systems Philosophy

SCOPE DEFINITION & CONCEPTUAL ENGINEERING PS ELE102


Power System Study Conceptual

PS -

PS -

PS ELE109
MEC / MEV Philosophy

PS -

PS ELE112
Electrical Load List (conceptual)

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

ELE103
Key Single Line Diagram Conceptual

ELE104
Power Supply Company Requirements

[01]

[01]

[01]

[01]

[01]

[01]

PHASE 2 ELE201
Earthing / Grounding Philosophy

PRELIMINARY ENGINEERING / CONSTRUCTION PLANNING PS ELE202


Power/ Systems Study (preliminary)

ELE203
Key Single Line Diagram (preliminary)

ELE204
Lighting Philosophy

ELE206
Input to Control Systems Philosophy

ELE209
MEC / MEV Scope Definition

ELE210
General Electrical Design Criteria

ELE211
Electrical Equipment List

ELE212
Electrical Load List (preliminary)

ELE213
Electrical Monitoring and Control Functional Diagram [01]

ELE214
SmartPlant Electrical Implementation

ELE216
Electrical Specifications (preliminary)

ELE218
Definition of Electrical Protection

ELE220
Define Equipment Layout, Buildings, Main Cable Route

ELE222
3D Modeling

ELE230
Hazardous Area Classification Plans (preliminary) [01]

ELE240
Miscellaneous system block diagrams

ELE250
Format of Electrical Deliverables

ELE270
Definition of Building Protection and Communication systems [01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

PHASE 3 PS -

DETAILED ENGINEERING / SITE INITIATION ELE302


Power system study (Detailed)

ELE303
Key Single Line Diagram

ELE304
Switchgear Single Line Diagram

ELE305
Typical Schematic Diagram

ELE306
Input to Control Systems Signal Interface Definition [01]

ELE307
Instrument Power Supply Single Line Diagram

ELE308
Cable Sizing, Earthing and Lighting Calculations [01]

ELE309
MEC / MEV Execution and Interface Management [01]

ELE312
Electrical load list

ELE313
Electrical Monitoring and Control Interface Definition [01]

ELE314
Electrical Monitoring and Control Hardware Configuration Diagram [01]

ELE316
Electrical Specifications

ELE317
RFQ and Bid Evaluation Input for Equipment and Material [01]

ELE318
Protection & Interlock Diagram

ELE320
Above-ground and Underground Cable Routing

ELE321
Equipment Layouts and Building Drawings (preliminary) [01]

ELE322
3D Modeling

ELE330
Hazardous Area Classification Plans

ELE350
Typical Installation Details

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

PS -

PS ELE351
Installation Specifications

PS -

PS # ELE354 Installation Contract: Scope of Work; Explanation; p Evaluation (Unit [01]

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

[01]

PHASE 4 PS -

CONSTRUCTION / FINAL DESIGN / ENGINEERING SUPPORT FOR CONSTRUCTION PS PS ELE403 ELE405 ELE417
Motor Control Center and Distribution Board Schedules [01] Schematic Diagrams P.O. Input for Equipment and Material

PS ELE418
Relay Fuse Coordination Study Report

PS ELE420
Trench / Tray Routing Plan

ELE421
Equipment and Building Layouts

ELE422
3D Modeling

ELE423
Lighting Plan

ELE424
Earthing and Lightning Protection Plan

ELE425
Electrical Cable Plans

ELE426
Cable List / Cable Schedule

ELE427
Cable Drumming Schedule

ELE428
Connection Report (or Drawing)

ELE430
Hazardous Area Classification Plans and Sections [01]

ELE440
Miscellaneous Systems and Plans

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

PS ELE450
Installation Details

PS ELE452
Material take-off

PS ELE453
Revamp Work Packages # ELE454 Installation Contract: Scope of Work; Explanation; Evaluation (Lump [01]

PS ELE470
Building Protection Plans

PS -

PS -

PS ELE480
Electrical Heat Tracing Design Data

PS ELE481
Electrical Heat Tracing Deliverables

PS ELE490
Home Office Field support

PS -

ELE491
Supplier Equipment Inspection

# ELE492 Factory / Site Acceptance Test (SAT/FAT)

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

PHASE 5 PS -

CHECKOUT / STARTUP SUPPORT PS PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PHASE 6 ELE601
As Built Documentation

PROJECT CLOSE-OUT PS PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

[01]

BLOCK LEGEND - Activity Title Area XXX HOME OFFICE [01] XXX OTHERS [14] XXX NOT EXECUTED [15] 000.100.F1400 PAM Workbook R5.3 dtd 19Mar2010.xls [10] XXX SUPPLIER [11] [06] XXX SUPPLIER & FLUOR [12] XXX CLIENT [07] XXX CONTRACTOR [13] [02] XXX CLIENT & FLUOR [08] XXX CONTRACTOR & FLUOR XXX SUPPORTING OFFICE [03] XXX HOME & SUPPORTING OFFICES XXX SITE [04] XXX LICENSOR [09] XXX LICENSOR & FLUOR [05] XXX HOME OFFICE & SITE

Optional Color Coding for Activity Code & Workshare Areas of Block XXX [NOT USED] XXX [NOT USED] XXX [NOT USED] XXX [NOT USED]

[a]

[b]

[c]

[d]

Rev.

Date

Revision Description

(Original Signed by:)

98 - 100%
Support Office Lead Office Prepared by Checked by Approved by PAM is a service mark of Fluor Enterprises, Inc. / Copyright 2010 Fluor Enterprises, Inc.

86 - 98%

48 - 86%

28 - 48%

12 - 28%

2 - 12%

0 - 2%

Project Activity Model

Client Project Project No.:


Architectural PHASE 0 PS Bldg Permits PS PS PS

PROJECT ACTIVITY MODEL -- Architectural and Building Systems


HVAC PS PS PS PS PS PS PS Plumbing PS PS PS Fire Protection PS PS PS General NOTES: PS PROJECT INITIATION PS PS -

Form 000 100 F1400 Form Date 19Mar2010 Sheet 1 of 1

SEE "DMC" FOR LEVEL OF DISCIPLINE INVOLVEMENT DURING THIS PHASE

PHASE 1 ABS101
Architectural Building Types

SCOPE DEFINITION & CONCEPTUAL ENGINEERING PS ABS102 ABS104


Architectural / Conceptual Design HVAC / System Concepts Air and Water

PS ABS105
HVAC / Preliminary Calculations for Equipment [01]

PS -

PS ABS109
Space Requirements

PS -

PS ABS112
Plumbing / Material Selection Piping and Fixtures [01]

PS -

PS -

PS ABS116
Fire Protection / Code Review

PS ABS118
Equipment List

PS -

PS -

[01]

[01]

[01]

[01]

[01]

[01]

PS ABS121
Architectural Specification

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

[01]

PHASE 2 ABS201
Architectural / Specification

PRELIMINARY ENGINEERING / CONSTRUCTION PLANNING PS ABS202


Architectural Building Arrangement Design Development [01]

PS ABS208
HVAC Procurement / Identify Long Lead Equipment [01]

PS ABS209
HVAC / Identify Routing for Large Duct and Piping Mains [01]

PS ABS212
Plumbing / UG Piping Conceptual Design

PS -

PS ABS216
Fire Protection / Conceptual Design

PS ABS218
Update Equipment List

PS -

PS -

ABS203
Building - Overall Permit Application

ABS204
HVAC / Prepare Heating Cooling Calculations

ABS205
HVAC / Equipment Sizing

ABS210
HVAC / Develop Preliminary P&IDs

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

PS -

PS -

PS ABS224
HVAC / Identify Zones

PS -

PS -

PS -

PS -

PS -

PS -

PS ABS232
Plumbing / Identify Routing of Risers and Mains

PS ABS234
Plumbing / UG Piping Package AFC

PS -

PS -

PS -

PS -

PS -

PS -

[01]

[01]

[01]

PHASE 3 ABS301
Architectural / Detail Material Specification

DETAILED ENGINEERING / SITE INITIATION PS ABS302


Architectural / Final Building Arrangement Const. Docs. [01]

PS -

PS -

PS ABS310
HVAC / Plumbing / P&IDs

PS ABS312
Plumbing Distribution Design

PS -

PS -

PS ABS316
Fire Protection / Distribution Design

PS ABS318
Update Equipment List

PS ABS319
HVAC / Plumbing / FP / Equipment RFP

ABS303
Building - Detail Permit Application

ABS304
HVAC / Heating Cooling Load Calculations

ABS305
HVAC / Equipment Sizing

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

PS ABS321
Architectural / Block/ Volume Modeling

PS ABS324
HVAC / Distribution Design - Ductwork, and Piping [01]

PS ABS327
HVAC / HVAC Package AFC

PS -

PS -

PS ABS332
Plumbing / Isometrics

PS ABS333
Plumbing / Calculations

PS ABS336
Fire Protection / Hydraulic Calculations

PS ABS339
Arch / HVAC / Plumbing / FP / Specs/ Data Sheets [01]

ABS322
Architectural / Detailing

ABS325
HVAC / Calculations

ABS334
Plumbing / Plumbing Package AFC

ABS337
Fire Protection / FP Package AFC

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

PHASE 4 PS -

CONSTRUCTION / FINAL DESIGN / ENGINEERING SUPPORT FOR CONSTRUCTION PS PS PS PS ABS402 Architectural / Vendor Data Review

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS ABS418
HVAC , Plumbing, FP / Submittal Review

PS ABS419
Contractor Design Review

[01]

[01]

[01]

PHASE 5 ABS501
Architectural / Home Office

CHECKOUT / STARTUP SUPPORT PS ABS503


Building Authority Occupancy Permit

PS ABS504
HVAC, FP, Plumbing / Home Office - Field Support [01]

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS ABS518
RFP / Contracts / Field Support

PS ABS520

[01]

[01]

[01]

[01]

PHASE 6 PS -

PROJECT CLOSE-OUT PS PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

BLOCK LEGEND - Activity Title Area XXX HOME OFFICE [01] XXX OTHERS [14] XXX NOT EXECUTED [15] [10] XXX SUPPLIER [11] [06] XXX SUPPLIER & FLUOR [12] XXX CLIENT [07] XXX CONTRACTOR [13] [02] XXX CLIENT & FLUOR [08] XXX CONTRACTOR & FLUOR XXX SUPPORTING OFFICE [03] XXX HOME & SUPPORTING OFFICES XXX SITE [04] XXX LICENSOR [09] XXX LICENSOR & FLUOR [05] XXX HOME OFFICE & SITE

Optional Color Coding for Activity Code & Workshare Areas of Block XXX [NOT USED] XXX [NOT USED] XXX [NOT USED] XXX [NOT USED]

[a]

[b]

[c]

[d]

Rev.

Date

Revision Description

(Original Signed by:)

98 - 100%
Support Office Lead Office Prepared by Checked by Approved by 000.100.F1400 PAM Workbook R5.3 dtd 19Mar2010.xls PAM is a service mark of Fluor Enterprises, Inc. / Copyright 2010 Fluor Enterprises, Inc.

86 - 98% %

Arch, HVAC, Plumbing FP / AsPlumbing, Builts

48 - 86%

28 - 48%

12 - 28%

2 - 12%

0 - 2%

Project Activity Model

Client Project Project No.:


Survey PHASE 0 PS Geotechnical / Contamination PS PS C&S Design Criteria PS -

PROJECT ACTIVITY MODEL -- Civil and Structural


Bldg. Permits PS PS RFP / Contracts PS PS UG Piping PS PS Site Civil Infrastructure PS PS Piling PS PS Concrete PS PS Structural Steel NOTES: PS PS -

Form 000 100 F1400 Form Date 19Mar2010 Sheet 1 of 1

PROJECT INITIATION PS PS -

SEE "DMC" FOR LEVEL OF DISCIPLINE INVOLVEMENT DURING THIS PHASE

PHASE 1 CSA101
Initial Boundary / Topo Survey Specification

SCOPE DEFINITION & CONCEPTUAL ENGINEERING PS CSA102


Preliminary Boundary / Topographical Survey Report [01]

PS CSA108
RFP/Contracts/ Tech Pkgs Boundary/Topo/ UG / AG Survey [01]

PS CSA112
Site Infrastructure Study

PS CSA113
Material Availability Study

PS -

PS -

PS -

PS -

PS -

PS -

CSA103
Basic GeoTechnical / Contamination Specification [01]

CSA104
Basic GeoTechnical / Contamination Report [01]

CSA105
Civil Site Meteorological Design Criteria Data [01]

[01]

[01]

[01]

[01]

[01]

PHASE 2 PS -

PRELIMINARY ENGINEERING / CONSTRUCTION PLANNING PS CSA202


Detailed Topographical Report

CSA203
Geotech/Contam Specification

CSA204
Geotech/Contam Detailed Investigations & Recommendation s [01]

CSA205
Civil Eng Design Criteria & Material Selection Spec

CSA206
Structural Eng Design Criteria & Material Selection Spec [01]

CSA207
Building Authority / Overall Permit Application

CSA208
RFP/Contracts/ Tech Pkgs Piling, UG Piping, Civil

CSA209
RFP/Contracts/ Contractors Proposal Evaluation [01]

CSA210
UG Piping / Installation Specification

CSA211
UG Piping / Standards

CSA212
Site Infrastructure / Installation Specification

CSA213
Site Infrastructure / Standards

CSA214
Piling / Material Installation Specification & MTO [01]

CSA215
Piling / Standards

CSA216
Concrete / Construction Specification

CSA217
Concrete / Standards

CSA218
Structural Steel / Fabrication and Erection Spec

CSA219
Structural Steel / Standards

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

PS CSA221
Under Ground Survey Specification

PS CSA225
Structural Steel Fireproofing Specification

PS CSA226
Structural Data for Mechanical Equipment Specification [01]

PS -

PS CSA230
UG Piping / Preliminary Design

PS CSA231
UG Space Management

PS -

PS CSA236
Concrete / Preliminary Design & MTO

PS CSA238
Structural Steel / Preliminary Design & MTO

PS -

PS -

CSA222
Above Ground Survey Specification

CSA232
Site Infrastructure / Preliminary Design & MTO

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

PHASE 3 CSA301
Underground Survey Report

DETAILED ENGINEERING / SITE INITIATION PS CSA302


Above Ground Survey Report

PS CSA307
Building Authority / Detail Permit Application

PS CSA308
RFP/Contracts/ Tech Pkgs Bulk Matl & Const Subcontracts [01]

PS CSA314
Piling / Load Calculations and MTO

PS CSA316
Concrete / Detail Calculations

CSA303
Detailed Geotechnical / Contamination Specification p [01]

CSA304
Detailed GeoTechnical / Contamination Report p [01]

CSA309
RFP/Contracts/ Contractor's Proposal Evaluation [01]

CSA310
UG Piping / Hydraulic Calculation

CSA311
UG Piping / 3DPDS Modeling

CSA312
Site Infrastructure / Design Calculations

CSA317
Concrete / 3DPDS Modeling and Model Transfer [01]

CSA318
Structural Steel / Detail Calculations

CSA319
Structural Steel / 3D-PDS Modeling and Model Transfer [01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

PS CSA321
Topographical Survey 3D Modeling

PS -

PS -

PS -

PS -

PS -

PS -

PS CSA330
UG Piping / Design Drawings & MTO

PS CSA332
Site Infrastructure / 3D-PDS Modeling

PS CSA333
Site Infrastructure / Design Drawings & MTO

CSA334
Piling / 3D-PDS Modeling

CSA335
Piling / Plans and Schedules

CSA336
Concrete / Design Drawings & MTO

CSA337
Concrete / Rebar Bending Schedules & MTO

CSA338
Structural Steel / Design Drawings & MTO

CSA339
Structural Steel / Erection and Shop Documents

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

PHASE 4 PS -

CONSTRUCTION / FINAL DESIGN / ENGINEERING SUPPORT FOR CONSTRUCTION PS PS PS PS PS -

PS CSA407
Building Authority / Occupation Permit App

PS CSA410
UG Piping / Home Office Support

PS CSA412
Site Infrastructure / Home Office Support

PS CSA414
Piling / Home Office Support

PS CSA416
Concrete / Miscellaneous Home Office

CSA408
RFP / Contracts / Home Office Support

CSA417
Concrete / Vendor Document Review

CSA418
Structural Steel / Miscellaneous Home Office

CSA419
Structural Steel / Review Shop Drawings

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

[01]

PHASE 5 CSA501
Survey / Home Office As-Built

CHECKOUT / STARTUP SUPPORT PS PS -

PS -

PS -

PS CSA507
Building Authority / Home Office

PS -

PS CSA510
UG Piping / Asbuilt

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

[01]

[01]

[01]

PHASE 6 PS -

PROJECT CLOSE-OUT PS PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS -

PS SEE "DMC" FOR LEVEL OF DISCIPLINE INVOLVEMENT DU

BLOCK LEGEND - Activity Title Area XXX HOME OFFICE [01] XXX OTHERS [14] XXX NOT EXECUTED [15] 000.100.F1400 PAM Workbook R5.3 dtd 19Mar2010.xls [10] XXX SUPPLIER [11] [06] XXX SUPPLIER & FLUOR [12] XXX CLIENT [07] XXX CONTRACTOR [13] [02] XXX CLIENT & FLUOR [08] XXX CONTRACTOR & FLUOR XXX SUPPORTING OFFICE [03] XXX HOME & SUPPORTING OFFICES XXX SITE [04] XXX LICENSOR [09] XXX LICENSOR & FLUOR [05] XXX HOME OFFICE & SITE

Optional Color Coding for Activity Code & Workshare Areas of Block XXX [NOT USED] XXX [NOT USED] XXX [NOT USED] XXX [NOT USED]

[a]

[b]

[c]

[d]

Rev.

Date

Revision Description

(Original Signed by:)

98 - 100%
Support Office Lead Office Prepared by Checked by Approved by PAM is a service mark of Fluor Enterprises, Inc. / Copyright 2010 Fluor Enterprises, Inc.

86 - 98%

48 - 86%

28 - 48%

12 - 28%

2 - 12%

# CSA106 Structural Site Design Criteria Data Including FP Philosophy.

CSA109
RFP/Contracts/ Tech Packages Geotech / Contamination

0 - 2%

Project Activity Model

S-ar putea să vă placă și