Documente Academic
Documente Profesional
Documente Cultură
Welcome, Guest
Login
Register
Joules QN
2769 View s
Ananthapadmanaban V Feb 23, 2012 5:15 AM (in response to Joules QN) Re: MB1C No stock posting possible for this material M7097 hi check out this In addition, for at least one of these materials afterwards the material type was set to 'Non-stock material' or to a material type which is not subject to inventory management in this plant. ref : Note 574593 - Error M7097 when trying to change reservation Edited by: AP on Feb 23, 2012 5:15 AM
Like (0)
Joules QN Mar 11, 2012 7:51 AM (in response to Ananthapadmanaban V) Re: MB1C No stock posting possible for this material M7097 Hi AP Thanks for the reply however Im not working with material reservatios on TC MB22, Im working on goods receipt MB1C mvt 561, and also this NOTE applies for older releases (up to release470) Im working on ECC 6.0 Any other suggestions?? Regards
https://scn.sap.com/thread/2144086
1/4
12/30/13
shiva m Feb 23, 2012 6:01 AM (in response to Joules QN) Re: MB1C No stock posting possible for this material M7097 hi, check materials are not blocked. Check the period closing for the materials... U can go with T.code MMPV and close the periods and then do PGI. I hope this may be the problem... Regards shiva
Like (0)
kulandaivelu rajasekaran Feb 23, 2012 6:20 AM (in response to Joules QN) Re: MB1C No stock posting possible for this material M7097 Hi, The main reasons for no stock posting will be 1. Qty and value updation not flagged against the particular plant in OMS2 2. Material type used may be of non stock material. Please check the above things in the client specific system which you are doing the MB1C trx. Regards, velu
Like (0)
Sandesh Sawant Feb 23, 2012 7:09 AM (in response to Joules QN) Re: MB1C No stock posting possible for this material M7097 Hi, Is the accounting view maintained for a material ? please check. And also you have to maintain qty and value update indicators in OMS2. Both option should be ticked. Regards, Sandesh Sawant
Like (0)
zafar karnalkar Feb 23, 2012 7:35 AM (in response to Sandesh Saw ant) Re: MB1C No stock posting possible for this material M7097 Hi, As you are facing to post in the previos period check in OMSY, for your company code whether posting in back period allowed or not also, in OMS2 check quanity and value update in the details of material type then in the quaity and value update on the LHS on that screen for your valuation area .
regards, zafar
Like (0)
Joules QN Feb 23, 2012 3:41 PM (in response to Sandesh Saw ant) Re: MB1C No stock posting possible for this material M7097 Hi all, Thanks for your valuable replies, unfortunatly all this settings are well mantained 1.- OMS2 aty and value indicators are marked for corresponding material type (std HALB) and particular plant
https://scn.sap.com/thread/2144086
2/4
12/30/13
Like (0)
Jrgen L Feb 23, 2012 4:28 PM (in response to Joules QN) Re: MB1C No stock posting possible for this material M7097 Can it be that this OMS2 customizing for quantity update was done recently, and it was without quantity update in the last period? Did the material master exist in the last period?
Like (0)
Joules QN Mar 11, 2012 7:51 AM (in response to Jrgen L) Re: MB1C No stock posting possible for this material M7097 Hi Jurgen Can it be that this OMS2 customizing for quantity update was done recently, and it was without quantity update in the last period? Did the material master exist in the last period? This is a new SAP installation and only I make changes to this customizing and the qty and value marks were there the first time I checked cos this came from standard with material type HALB, the material master was created on this period but I have done this before in other systems and this should not be the problem, but Im not 100% sure, if this is the problem then how would you sugest to solve it? Regards
Like (0)
Jrgen L Feb 23, 2012 5:26 PM (in response to Joules QN) Re: MB1C No stock posting possible for this material M7097 I dont have an answer. I think you have to debug. What I saw it the ABAPs that I get when looking up the where used list for this message number is relativly clear, the message either comes up if the posting string for movement is not correct, or in case the OMS2 customizing is not correct. And have not directly seen any relation to a period. In one of the ABAPs the material master is read right before the message is issued, so I think it is somewhere in the depth of the function modules where SAP is probably checking the material master settings for previous period. But the fields like valuation class in MBEW etc are automatically created for previous periods too when a new material is entered. did you roll the period, or just set the initial period to February 2012?
Like (0)
Sandesh Sawant Feb 24, 2012 10:20 AM (in response to Joules QN) Re: MB1C No stock posting possible for this material M7097 Please check moving average price for previous as well as for current date from report s_p00_07000139. (refer field Price/Unit bal) The error came might be due to inconsistancy occured in MAP. Please confirm. Regards,
https://scn.sap.com/thread/2144086
3/4
12/30/13
Sandesh Sawant
Like (0)
Copyright
Follow SCN
https://scn.sap.com/thread/2144086
4/4