Sunteți pe pagina 1din 4

Check list items Site ID, Current BH connectivity updated in NPTS MBH dependencies View MW MW Visibility (From U2000)

Creating Fiber between NE/FE accurately - Auto not manually (From U2000) NE name correct according to the planned DCN design NE ID & Extended ID correct according to the planned DCN design. DCN configuration(VLAN, IP, SM) correct according to the planned DCN design ( DCN sheet 3G6 and 4G should be sent weekly to MS team ) Link TXRX CH correct according to the transmission design Link Channel Space correct according to the transmission design Link Modulation correct according to the transmission design Link Capacity correct according to the transmission design Link transmit power according to the transmission design Microwave signal strength should be within +/- 3dbm from the design value after 72 hours of continues monitoring. In case of 1+SD and 2+SD Microwave signal strength should be within +/6dbm from the design value after 72 hours of continues monitoring. In case of 1+HSB or 2+HSB Microwave signal strength should be within +/6dbm for HSB(Only) from the design value after 72 hours of continues monitoring. Protection type is configuration according to the transmission design Defining 2G, 3G, and 4G services without any duplication NE/FE (From U2000) Configuring a clock NE/FE (From U2000) Setting the date and time (From U2000) Synchronise the NE clock with NM Setting the performance monitoring period (From U2000) Setting/Querying the performance monitoring time (From U2000) Setting/Querying the performance monitoring status (From U2000) Setting the performance monitoring object (From U2000) Querying the current performance (From U2000) Querying the history performance (From U2000) ATPC is set as per design AM Function is set as per design Bit Errors testing, In case E1 configured XPIC Function testing XPD Value range testing ELAN Services configured Accurate without any duplication in NE/FE LAG testing (From U2000) Traffic Port power testing NE / FE (From U2000) HSB/SD Protection Switching testing All Alarms on NE/FE cleared Link stability for 72 hours (including RSL stability within the range and alarms on the Radio ) All cards which mention in Desgion on NE/FE installed accordingly All Cards installed According to Design Slots User Level { LCT Access Disabled} (From U2000) CWO

YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES

TFR# and / or NI# Number avaible in Trends CWO file avaible in STC server (TFS) with updated VLANs for 2G, 3G, 4G, and 4G O&M

YES YES

Final Remarks Ok Ok Ok Ok Ok In case we didnt get the updated DCN sheet and site information not found in old one , site will be rejected This Item will be the same " services affecting " Ok Ok Ok As approval from MS management (2 dbm tolerance) only for rejected sites till release your MDT, new submission will not be accepted As approval from MS management (8 dbm tolerance) only for rejected sites till release your MDT, new submission will not be accepted As approval from MS management (8 dbm tolerance) only for rejected sites till release your MDT, new submission will not be accepted As approval from MS management (8 dbm tolerance) only for rejected sites till release your MDT, new submission will not be accepted Ok Ok Ok Ok Ok Ok Ok Ok Ok Ok Ok Ok Ok Ok Ok Ok Ok Ok Ok Ok only LAN_LOC and change password alarms if you can't clear it by Navigator Tool I will do from NOC As per MNCO governance minimum 72 hours, unless there is power issue on the site Must follow the design As per MS managemen, Must follow the design Ok

Must follow Trends This Item will be the same till you get approval from MNCO governance

S-ar putea să vă placă și