Universiti Malaysia Q PAHANG

FINAL EXAMINATION COURSE COURSE CODE LECTURER DATE DURATION SESSION/SEMESTER PROGRAM CODE : : : : : : :

Engineering Technology CreaUiiy

FACULTY OF CIVIL ENGINEERING & EARTH RESOURCES

PROJECT MANAGEMENT IN CONSTRUCTION BAA3023 AHMAD TARMIZI BIN HARON 19 JUNE 2013 2 HOURS 30 MINUTES SESSION 2012/2013 SEMESTER II BAAIBAE

INSTRUCTIONS TO CANDIDATE: 1. 2. 3. 4. Answer ALL questions. All answers to a new question should start on new page. All calculations must be shown and assumptions clearly stated. Candidates are not allowed to bring any material other than those allowed by the invigilator into the examination room.

EXAMINATION REQUIREMENTS 1. Graph paper DO NOT TURN THIS PAGE UNTIL YOU ARE TOLD TO DO SO This examination paper consists of SIX (6) printed pages including front page.

CONFIDENTIAL

BAA/BAE/1213111BAA3023

QUESTION 1 a) Discuss the problems that may arise from the following situations i. ii. Designer fails to give adequate attention to the impact of a design selection on the cost and schedule during the construction phase. Contractor's project manager fails to coordinate subcontractors to work together to achieve project's objectives (8 marks) b) Project Management requires the application of knowledge, skills, tools and techniques to complete a series of activities for accomplishing project's objectives. i. List five functions of project management (2 marks) ii. By using the answer in question 2 (a) above, discuss the IMPORTANCE of each function in managing a construction of residential college in University Malaysia Pahang. (10 marks)

CONFIDENTIAL

BAAJBAE/1213111BAA3023

QUESTION 2 Construction project involves intensive use of interrelated resources, consists of money, manpower, materials and machineries. Therefore, the task of managing the project becomes very challenging to satisfy the time, cost and quality requirement. A wellstructured organisation is crucial to ensure the successful delivery of a project. Discuss the relative advantages and disadvantages of the functional and project organisation to manage a project. You must relate your answer to satisfy the time, cost and quality requirement. (12 marks)

a)

b)

Describe the roles of project manager in functional organisation (8 marks)

CONFIDENTIAL

BAA/BAE/1213111BAA3023

QUESTION 3
Table 3 shows the activity list with durations and relationships for a construction of wood-framed house. By using the information that is provided, answer the following question: a) b) Draw a CPM precedence diagram for the project

(8 marks) (14 marks) (8 marks)

Calculate the early start, early finish, late start, late finish and total float for each activity.

C)

Prepare the Gantt chart for the project by using a graph paper

Table 3 Aetivitv list for a construction of wood-framed house

Activity ID
A B C D E F G H I J K L M N 0 P Q R S T U

Description
Clear site Building layout Form/Pour footings Pier masonry Wood floor system Rough framing walls Rough framing roof Doors and windows External wall board External wall insulation Rough plumbing Rough HVAC Rough electricity Shingles External sliding External finish carpentry Hang drywall Finish drywall Cabinets External paint Internal finish carpentry Internal paint Finish plumbing Finish HVAC Finish electricity Flooring Grading & landscaping Punch list

Durations
3 2 4 3
5

Successors
B C D E F G

7
5 5

I
J, P H,K,L Q N M T T,P,Z1 J 0 R S,X,Y U,W V

3 2 S 4 4 4 4 3
5 5

3 4
5

Z
Z2 Z V V Z2 Z2

V
W X Y Z Zi Z2

4 3 4 3 4
5

CONFIDENTIAL

BAAJBAE/1213I11BAA3023

QUESTION 4 Table 4 shows a list of activities that are required to complete the construction of a sidewalk project. By using the information that is provided, answer the following question: a) b) Draw an activity on arrow (AOA) diagram for the project. (5 marks) Solve the question 4 (a) by delivering the forward pass and backward pass calculation and determine the critical path of the project. (11 marks)
C)

If the project starts on 1st July 2013, based on 6 working days per week and public holiday on 5th and 15 th October 2011, determine: i) ii) iii) iv) Completion date for the project Early start date for activity G Late finish date for activity J Sketch the histograms, showing the distribution of labors that is required to complete the project. Simply draw your answer on the answer sheet and not on the graph paper. (5 marks) Please use the following calendar to assist your answer: AUGUST T 4 11 18 F 5 12 S 6 13 4 11 18 5 12 6 13 7 14 S M T W T F S (3 marks) (3 marks) (3 marks)

JULY S M 1 7 14 21 8 15 T 2 9 16 W 3 10 17

123 8 15 9 16 10 17

19 20

22 23 24 25 26 27

19 20 21

22 23 24

28 29 30 31

25 26 27 28 29 30 31

CONFIDENTIAL

BAA/BAE/121311/BAA3023

QUESTION 4 (Continued from the previous page) Table 4: The construction of a Sidewalk Project Activity A- Mobilization B- Excavation C- Surface Grading D- Procure plywood E- Procure reinforcement F- Pre-fabricate formworks G- Fixing Formworks H- Compacting Base I- Fixing reinforcement J- Concreting K- Striping Formworks L- Cleanup Duration (days) 2 3 2 6 10 4 3 2 1 1 3 2 Immediate Predecessor (s) A B D C,F G H,E I J with 10 working days of lag K Number of labors 3 2 2 0 0 4 3 2 2
5

2 3

END OF QUESTION PAPER