No Job Title Job description Equipments & instruments

1 Pipeline construction - Mine and bomb clearing and disposal - Forster bomb and mines
Bed1 – Elhamra 12” – oil - Right of way grading using blasting demolition detectors.
Petrojet for BABETCO for 30 m wide corridor 167 Km long across - ROC 601 – BBE 5701 drifter
Sep 1986 – March 1987 Qattara Depression. drilling crawlers
( BAPETCO= Badr Petroleum - Pipe line trench close proximity blasting - Nitro Consult Vibrameter.
company) excavation 10 meters distant from existing - CI 15- CI 160 VA – RKA1
GUPCO live pipeline. Capacitor Blasting machines
2 Pipe line construction - Intervention of Assuit oil production facilities - ROC 601 – BBE 5701 drifter
El Menya – Assuit 16” – Oil for Storage tanks foundations. drilling crawler Nomis 5400
products. - Demolition of rock obstructions to the pipeline digital seismograph.
Petrojet for PPC rout. - CI 600 VA capacitor blasting
March 1987 – Jun 1987 - Pipeline Trench blasting excavation 126Km machine.
( PPC – Pipelines petroleum - Cautious blasting process close to 500KV
company – Mostorod) power lines using VA – HU shoot firing system
Nitro Nobel
3 Pipeline construction - Right of way grading by blasting for 288 KM - ROC 601 – BBE 5701 drifter
Ras Shukeir – Suez – Cairo 24” long of pipeline rout across Red sea Mountains drilling crawler
Perojet for PPC of 800000 cu m. - CI 300 VA – CI 160 VA
Jun 1987 –Nov 1987 - Pipe line trench blasting 422 Km long 5 meters capacitor blasting machine.
( PPC – Pipelines petroleum distant from existing PPC live pipeline using - MANITO exploders.
company – Mostorod) ICI Magnadet system. - Nomis digital seismograph.
4 Under water Blasting - Under water blasting operation for excavation - Barge mounted, water flushing
NitroMisr consultants of the fishing port of Hurgada Red sea using Roc 601 BBE5701 drilling
Red Sea fishing authority - Hurgada Fragmex charges and 8” line pipe charges. machine.
Nov 1987 - VA – OD shoot firing system.
- Cutter suck dredger.
- CI 15 VA – CI 160 VA blasting
machines
No Job Title Job description Equipments & instruments
5 East Zeit Gas gathering unit - Underwater blasting operation for sea bed - Odex 115- cop 4 drilling
Petrojet for ESSO east Zeit intervention rout 3 Km long, 14 meters wide machine.
Dec 1987 – March 1988 down to 35 meters water depth. - Barge mounted, water flushing
- Controlled underwater blasting to safeguard the Roc 604 cop 150 EB
existing SOCO 24” export line 15 meters - VA – OD shoot firing system.
distant. - Cutter suck dredger.
- Rock demolition for dead man anchoring winch CI 15 VA – CI 160 VA
for pipeline pull. blasting machines
- Blasting excavation for the landfall point trench - UVS 1608 multi channel
to tie the 16” Esso Gas pipeline 5 meters depth time history recorder
6 meters width. Using ODEX drilling system.
6 LPG Berth – South Sinai - Underwater blasting operation for sea bed - Odex 115 - cop 4 drilling
Petrojet for PETROBEL intervention rout 6 Km long, 12 meters wide machine.
April 1988 – Aug 1988 down to 45 meters water depth. - Barge mounted, water flushing
- Controlled underwater blasting to safeguard the Roc 604 cop 150 EB
existing Petrobel 24” export line 10 meters - VA – OD shoot firing system.
distant using air bubble curtain. - Cutter suck dredger.
- Rock demolition for dead man anchoring winch CI 15 VA – CI 160 VA
for pipeline pull. Blasting machines.
- Demolition of the dead man anchor by - UVS 1608 multi channel
explosives after job completion. Time history recorder.
- Blasting excavation for the landfall point trench
to tie the 6” & 8” gas export lines meters depth
6 meters width. Using ODEX drilling system.
- Blasting excavation for mooring line anchor s
locations15x8x6 to lay the anchoring system for
the berth using shaped charges
80 lb.
No Job Title Job Description Equipments & instruments
7 AMAL 10 production platform - Risk investigation for using explosives close to - VA – OD shoot firing
Total Proch Orient the existing platform. System.
Zeit bay – Red sea - Sea bed intervention for AMAL 10 production CI 15 VA – CI 160 VA
April 1989 platform 35 meter depth. Blasting machines.
- UVS 1608 multi channel
Time history recorder.

8 Sitra – Amereya gas trunk line 24” - Mine and bomb clearing and disposal - Forster bomb and mines
Petrojet for BABECTCO - Right of way grading using blasting demolition detectors.
April 1989 – Oct 1989 for 20 m wide corridor 275 Km long across - ROC 601 – BBE 5701, Rock
( BAPETCO= Badr Petroleum Qattara Depression. 701 –cop 131EB drilling
company) - Pipe line trench close proximity blasting crawlers
excavation 10 meters distant from existing - UVS 1201 vibration monitor,
GUPCO , WEPCO, BABETCO live pipelines UVS 1608 time history
for 268 Km long using ICI surface relays 40 ms recorders.
and VA electric detonators 25 ms. - CI 15- CI 160 VA exploders &
- Demolition blasting for open cut chambers for CI 600+700 VA Air powered
16 units block valve stations. Blasting machines.
- Pipeline road crossing using auger boring
machine assisted by controlled blasting in
extremely hard rock areas.
- Blasting excavation for foundations of the
scraper launcher.

9 West Razzak workshop - Risk investigation for using explosives close to - UVS 1201 vibration monitors,
Petrojet for GUBCO the existing production facilities, storage tanks, UVS 1608 time history
Oct 1989 and pipe racks. recorders.
- Fly rock control to safeguard the near by - Roc 701 – cop 131EB drills
structures using covering mats.
No Job Title Job Description Equipments & instruments
10 LPG Trunk line - Right of way grading using blasting demolition - ROC 601 – BBE 5701, Rock
Ras Shukeir – Suez 16” for 12 m wide corridor 60 Km. 701 –cop 131EB drilling
Petrojet for PPC - Pipe line trench blasting 34 Km long 6 meters crawlers
Nov 1989 – Dec 1989 distant from existing PPC live pipelines using - UVS 1201 vibration monitor,
( PPC – Pipelines petroleum VA firing system. UVS 1608 time history
company – Mostorod) - Risk analysis & Fly rock control to safeguard recorders.
ASRAAN fuel loading station premises. - CI 300XS- CI 160 VA
exploders
11 Shaped Charges - Technical advisor to design and fabricate under -
Nitro Misr blasting services. water shaped charges 40 Lb and 80 Lb – Line
Dec 1989 – Feb 1990 cutting charges for piles and pipelines to remove
abandoned offshore production facilities for the
GPC – Ras Bakr bay.
12 Pipeline construction - Right of way grading using blasting demolition - Forster bomb and mines
Petrojet for PPC for 24 m wide corridor 260 Km. detectors.
12”,16” crude & 26” LPG - High bench blasting 40 meters bench height - ROC 601 – BBE 5701, Rock
Feb 1990 – sep 1990 Through Red see heights ( Ras Abou Eldarg, 701 –cop 131EB drilling
( PPC – Pipelines petroleum Asraan, Sokhna , Zaafarana) crawlers
company – Mostorod) To create a suitable corridor for the bundled 3 - UVS 1201 vibration monitor,
deferent size, functions pipelines. UVS 1608 time history
- Pipe line trench blasting 162 Km long to lower recorders.
2 oil pipelines + 1 LPG trunk line). - CI 15- CI 160 VA exploders &
- Rock production backfill wide space blasting to CI 600+700 VA Air powered
support the pipelines rout in SOKHNA area. Blasting machines.
(Shallow water backfill).
- Pipeline road crossing by blasting in rock ( cut
and cover)
- Mine and bomb clearing and disposal.
No Job Title Job Description Equipments & instruments
13 Petrojet Marine Service Jetty - Dimensioning stones production to built the - Odex 115 - cop 4 drilling
Zeit Bay – Red sea main jetty retaining walls down to 12meters machine.
Sep 1990 – Oct 1990 water depth. - Barge mounted, water flushing
- Mixed size rock production to backfill the main Roc 604 cop 150 EB
jetty retaining walls. - VA – OD shoot firing system.
- Access road construction 15 meters wide 4 Km - Cutter suck dredger.
long using blasting produced aggregates for sub CI 300 VA XS – CI 160 VA
base and base layers. Blasting machines.
- Under water blasting for sea bed intervention to - UVS 1608 multi channel
remove the coral and rock formations in the Time history recorder.
water side access using shaped charges and 5”
line charges.
14 Underwater Blasting Operation - Sea Bottom sweep by explosives for pile - Odex 115 - cop 4 drilling
IDMC for PETROBEL driving of production platform WPH1 Ras machine.
RAS GARRA – South Sinai Garra. - Barge mounted, water flushing
Nov 1990 – Feb 1991 - Underwater demolition To remove 45000 cu m Roc 604 cop 150 EB
( IDMC = international diving and of coral and rock formation to create a corridor - VA – OD shoot firing system.
marine company – IMPRESUB- 15 m wide 3.5 Km long down to 23 meters CI 300 VA XS – CI 160 VA
Torino) water depth using 4000 units of shaped charges Blasting machines.
(PETROBEL = Belaeym petroleum 40 lb and Bangalore 4” charges, 80 grams - UVS 1608 multi channel
company) detonating cord. Time history recorder.
- Shore approach trench construction 15 meters 4 - UVS 1201 single channel
meters depth for pipeline shore stability. Vibration monitor.
- Blasting excavation for the dead man anchor
location for the beach pull.
- Controlled blasting job after platform
installation to hook up the riser pipe.
No Job Title Job Description Equipments & instruments
15 Water Structure Demolition - Risk investigation and complete hazard analysis - Odex 115 - cop 4, cop 5
Ismaelia main regulator – Shubra for the demolition of Shubra El Mazallat drilling system.
Mazallat - Cairo Watergate, sluice gates, navigation lock and - Barge mounted, water flushing
The Arab contractors overhead bridge on Ismaelya water canal – Roc 604 cop 150 EB
March 1991 – Sep 1991 Shubra. - VA – OD shoot firing system.
- Odex drilling system was used to drill through - Clam shell ,drag line
the main piers and abutments made of brick and excavators and barge mounted
plain concrete. excavators
- PVC coated line charged of mixed explosives to CI 300 VA XS – CI 160 VA
control the velocity of detonation to safeguard Blasting machines.
the nearby populated area. - UVS 1500 multi channel
- VA milli- second shot firing system was used to Time history recorder.
mitigate the induced vibration. - Ultra heavy blasting mats.
- Fly rock control plan to safeguard the near by
main bus station of Shubra - Mezallat Using
ultra heavy blast mats.
- Non Nitro glycerin explosives ware used to
avoid toxic products to the environment.
16 Pipeline construction - Right of way grading by blasting for 26KM - ROC 601 – BBE 5701, Rock
Petrojet for AGIBA long of pipeline rout in West Razzak 701 –cop 131EB drilling
Oct 1991 – Dec 1991 - Pipe line trench blasting 26 Km pipeline using crawlers
detonating cord and ICI dog bone 40 ms surface - CI 15- CI 160 VA exploders
relay.
17 Pipeline construction - Right of way grading by blasting for36KM long - ROC 601 – BBE 5701, Rock
Perojet For PPC of pipeline rout in Wadi Hagoul - Suez 701 –cop 131EB drilling
Wadi Hagoul – Suez Replacement - Pipe line trench blasting 36 Km pipeline to crawlers
24” replace the existing 16” deteriorated pipeline 10 - CI 15- CI 160 VA exploders
Jan 1992 – March 1992 meters apart using VA shot firing system.
No Job Title Job Description Equipments & instruments
18 Reinforced concrete coat removal - Stripping of left over reinforced concrete coated - Hand held breaker Atlas Copco
Petrojet for Petrobel – Ras Badran – 16”, 24” 26” ductile steel pipes ( complete pipes super TEX 11DKS , super
South Sinai and spools ) using locally fabricated line TEX 25E
April 1992 – July 1992 shaped charges initiated by 8 grams detonating - CB 20 exploder, Nitro Nobel.
cord
- 782 linear meters of pipes of deferent sizes were
striped for conventional use( on shore
application)
- NDT (non destructive testing) was carried out
after stripping qualifying a successful job as no
lamination or structural defects ware found.
19 Underwater blasting - Sea Bottom sweep by explosives to prepare for - Odex 115 - cop 4 drilling
Petrojet for Gaysoum oil co. pile driving of production platform QPL3 machine.
Gaysoum island – red sea - Underwater demolition To remove 33000 cu m - Barge mounted, water flushing
Aug 1992 – Nov 1992 of coral and rock formation to create a corridor Roc 604 cop 150 EB
8 m wide 6 Km long down to 31 meters water - VA – OD shoot firing system.
depth using 5200 units of shaped charges 40 lb CI 300 VA XS – CI 160 VA
,80lb and Bangalore 4” charges, 80 grams blasting machines.
detonating cord.
- Shore approach trench construction 8 meters 5
meters depth for pipeline shore stability.
- Blasting excavation for the dead man anchor
location for the beach pull.
No Job Title Job Description Equipments & instruments
20 Petrojet main Fabrication workshop - Controlled blasting operation for workshop site - ROC 601 – BBE 5701, Rock
and maintenance yard preparation 20800 sq m deferent levels. 701 –cop 131EB drilling
Southern branch- Qattameya - Close proximity blasting for the sewerage crawlers
Dec 1992 – Jan 1993 system, deep sewerage well (5m ring, 11m - UVS 1201 vibration monitor,
depth) raft foundation, isolated footings for the UVS 1608 time history
workshop. recorders.
- Fly rock control to safeguard the near by - CI 300XS- CI 160 VA
structures using heavy blasting mats. exploders.
- Blasting considering fresh concrete of the
foundations.
- Access and ring road construction in rock.
21 Under water blasting operation - Underwater blasting operation for sea bed - Odex 115 - cop 4, cop 5
Petrojet for AGIBA intervention rout 3.7 Km long, 14 meters wide drilling system.
Ashrafy coral project down to 36 meters water depth. - Barge mounted, water flushing
Zeit bay – Red sea - Controlled underwater blasting to safeguard the Roc 604 cop 150 EB
March 1993 –Aug 1993 existing SOCO 24” & ESSO 26 export lines 15 - VA – OD shoot firing system.
meters distant. - Clam shell ,drag line
- Rock demolition for dead man anchoring winch excavators and barge mounted
for pipeline pull. excavators
- Blasting excavation for the landfall point CI 300 VA XS – CI 160 VA
approach trench to tie the 26” Agiba export Blasting machines.
pipeline 5 meters depth 6 meters width. Using - UVS 1608 multi channel
ODEX drilling system. And concussion Time history recorder.
explosives charges. - Ultra heavy blasting mats.
22 Gas Trunk line - Right of way grading using blasting demolition for - ROC 601 – BBE 5701, Rock 701
Zaafarana – Koriamat 24” 20 m wide corridor 167 Km. –cop 131EB drilling crawlers
El Koraimat Power station - Pipe line trench blasting 167 Km long 12meters - UVS 1201 vibration monitor,
Petrojet for PPC distant from Koraimat – Zaafarana road using VA UVS 1608 time history recorders.
Oct 1993 – Feb 1994 firing system. - CI 300XS- CI 160 VA
- Risk analysis & Fly rock control to safeguard the -
magnetic field and towers of high tension power - exploders
lines 110 KVA.
No Job Title Job Description Equipments & instruments
23 Underwater pile cut - Underwater cutting of 4 units of 16” steel pipes - CB20 Nitro Nobel exploder
ASMADIVE CO for GPC to discard oil production platform in Ras Bakr
Ras Bakr - Ghareb bay. Using line shaped charges 4”.
March 1994
( GPC = General petroleum comp)
24 Vertical shaft excavation - Risk investigation for using explosives close to - Odex 115 - cop 4, cop 5
Hurgada – Red sea governorate the existing production facilities of storage drilling system.
Hassan Allam Contracting Co. water treatment tanks in Hurgada - Red Sea - Water flushing Roc 604 cop
May 1994 – Jan 1995 governorate to sink 6 sewerage reinforced 150 EB.
concrete shafts. 5 m Diameter 8 meters depth. (6 - Submerged hand held drillers
meters under water table.) Atlas copco
- Complete pre survey for the existing high tower - VA – OD shoot firing system.
water storage tanks - Clam shell excavators.
- Fly rock control to safeguard the near by CI 160 VA blasting
structures using covering mats. machines.
- Trenching by explosives for the sewerage mains - UVS 1608 multi channel
110 cm diameter of 2.6 Km long. Time history recorder.
- Ultra heavy blasting mats.

25 Under ground Road crossing tunnel - Blasting excavation of horizontal under ground - Odex 115 - cop 4, cop 5
ASMADIVE for the Arab road crossing for water and electricity cables drilling system.
Contractors. without cut open the road. - Roc 604 cops 150 EB.
( Marsa Matrouh) - Tunnel dimensions 4m wide 5 m height 188 m - VA – OD shoot firing system.
April 1995 – Dec 1995 long. The tunnel crest is 11 meters depth from CI 160 VA blasting
the blacktop. Machines.
- VA millisecond shot firing system was used for - Ultra heavy blasting mats.
best fragmentation and to avoid over break and
damage to the road texture.
- Drilling using OD drilling system.
No Job Title Job Description Equipments & instruments
26 Vertical shaft excavation - Risk investigation for using explosives close to - Odex 115 - cop 4, drilling
Marina resort - Matrouh the existing resort structures to sink 2 sewerage system.
Governorate reinforced concrete shafts. 5 m Diameter 8 - Water flushing Roc 604 cop
Hassan Allam Contracting Co. meters depth. (6 meters under water table.) 150 EB.
Dec 1995 – Jan 1996 - Fly rock control to safeguard the near by - Submerged hand held drillers
structures using covering mats. Atlas copco
- Trenching by explosives for the sewerage mains - VA – OD shoot firing system.
110 cm diameter of 1050 Km long. - Clam shell excavators.
CI 160 VA blasting
Machines.
- UVS 1608 multi channel
Time history recorder.
- Ultra heavy blasting mats.

27 Pipeline construction - Right of way grading using blasting - ROC 601 – BBE 5701, Rock
Petrojet for SUMED demolition for 26 m wide corridor 36 Km 701 –cop 131EB drilling
26” twin oil transfer pipelines Long across Wadi El Maskhara. crawlers
Wadi El Maskhara replacement - Pipe line trench close proximity blasting - UVS 1500 vibration monitor,
Feb 1996 – Sep 1996 excavation 10 meters distant from existing UVS 1608 time history
SUMED transfer live pipelines using VA recorders.
electric detonators 25 ms. - CI 300XS- CI 160 VA
- Demolition blasting for open cut chambers for exploders.
3 units block valve stations. - EG&G velocity of detonation
- Pipeline wadi crossing through backfilling 25 recorder.
meters height with blasted rock and sides
protection for pipeline rout to safeguard flood
destabilization

No Job Title Job Description Equipments & instruments


28 Surface quarrying operation - Contract for continuous risk analysis, vibration - Roc 801H Atlas Copco – COP
Nitrock For TPCC control and production optimization of blasting 1038 HB. Hydraulic Crawler.
Tourah Portland Cement Factory the main high bench to safeguard the Army - CI 330 XS exploders.
Sep 1996 – Oct.2004 under ground Storage facilities in WADI HOUF. - UVS 1500 vibration monitors.
- High bench ( 60 meters height) cautious blasting - UVS 1608 time history recorder.
The contractual relation with operation to produce material for the cement - Wind speed monitors.
TPCC started Sep 1996 and factory using multi decked charging system for
terminated Oct 2004 after TPCC better crushing fragmentation using VA MS
being sold to Suez Portland electric firing system in multi deck process.
cement company) - Delivery , installation and supervising of 4 units
of vibration monitoring instruments ( 2 units
UVS 1608 time history recorders – 2units of
UVS 1500 vibration monitors) for continuous
registration of vibration parameters.
- Delivery of a computerized work station
BLASTEC 4.0.
- Delivery of 2 units CBM – CI 330XS exploders.
- Delivery of 15000 units of electric detonators
VA 25 MS.
- Delivery of 10000 units of ICI dog bone surface
relays.
- Delivery of 12 sets of signal cables 100 m long
on reels.
- Delivery of 6 tri axial transducers ABEM
instruments AB.
No Job Title Job Description Equipments & instruments
29 Underwater Blasting Operation - Water section enlargements by explosive using - Roc 601 – BBE 5701 barge
SHARKEYA Irrigation and barge mounted water flushed drilling machines mounted , water flushed driller
drainage department. and locally produced ammonia gelatin dynamite - CI 160 VA exploders.
Main sewerage Channel ( Cairo loaded in PVC pipes. - UVS 1404 vibration monitor.
Abou Zaabal) - Caution blasting operation carried out in the
Oct 1996 – Feb 2001 vicinity of Railway Bridge. And 66 KVA high
tension power line.
- Fly rock control to safeguard electric signal
railway control room using heavy blasting mats.
- Millisecond electric shot firing system was used
to mitigate the induced vibration ( UEE HU
electric detonators)

30 Seismic Exploration - Exclusive explosive service providing contract - All equipment and instruments
Companie General De supporting seismic logging activities within the are provided by CGG.
Geophiysique Egypt as follows:
Nitrock For CGG 1- issuing the explosives use license from the
Sep 1997 – Recent EGPC and the general security authority and
the Egyptian army.
2- Storage of explosives and detonators
3- Transportation of explosives material from
producers to the local site storage.
4- Clearing imported explosives from
ports/airports of arrival and transferring to
main explosives depots.
5- Mobilizing licensed trained explosives
loaders and shooters.
6- Destruction of left over material including
destruction license .
No Job Title Job Description Equipments & instruments
31 Main Activity and Country Nitrock Engineers is an explosives service provider
Representation founded in Egypt in 1997 according to the Egyptian
Regulation of explosives practice supporting oil and
mining engineering for explosives practice.
Nitrock represents the following companies in Egypt:
- ABEM instruments AB – Sweden.
- Nitro Bickford company – France
- PBS ( precision blasting services ) - USA

S-ar putea să vă placă și