Sunteți pe pagina 1din 66

Welcome

Keene School District Public Hearing 14 January 2014

State of New Hampshire School Warrant


6 Articles
7 Articles by Petition from the Public First Session: Saturday, 8 February

2014; 9:00 AM KHS Auditorium Second Session (Vote at the Polls!): Tuesday, 11 March 2014

Ensuring Sustainable Resources for Future Years

Article 1:

Elementary School Bond

Shall the District raise and appropriate the sum of $12,850,000 for renovations and alterations at the elementary schools of the District; with such sum to be raised through the issuance of bonds or notes in accordance with the provisions of the Municipal Finance Act (RSA Chapter 33); and to authorize the Board of Education to issue and negotiate such bonds or notes and to determine the rate of interest on the bonds or notes; and to raise and appropriate an additional sum of $332,494 for the first years interest payment on the bond?
(Note: This appropriation is in addition to Article 2, the operating budget article. Approval of this article will require a 3/5ths ballot vote at the second session. The Board of Education recommends a yes vote upon this question.) 14 January 2014 Keene School District Bond, Budget, &

Elementary School Restructuring Bond

January 14, 2014 Wayne Woolridge Superintendent

Restructuring of Keene Elementary Schools


Where Are We Now?
In the spring, the Keene Board of Education

requested that the design team develop detailed engineering drawings of the proposed additions and renovations
Engelberth Construction, the selected estimator /

construction manager for the project, would use these detailed drawings to provide an accurate cost estimate

14 January 2014

Keene School District

Bond, Budget, &

Work Completed: Summer 2013


Architects met with school staff & administration

to finalize floor plans and space details Site surveys completed of Symonds, Franklin, Fuller Geotechnical engineering studies completed Met with Keene Fire Dept. representatives for input Met with NH Dept. of Education and received approval Structural, Mechanical, Electrical engineers analyzed existing systems in all schools to determine necessary upgrades and to integrate new work Site work grading, drainage, water lines designed 2014 Comprehensive design documents completed 14 January Keene School District Bond, Budget, &

Work Included in Project


Renovated areas shown as Blue in the floor plans Additions shown as Green in the floor plans Site work associated with the additions New sprinkler systems at all five schools New water lines to three schools to serve sprinklers Heat conversion from steam to hot water in all schools Mechanical upgrades to all schools to replace obsolete fans and equipment, and to provide code-mandated fresh air to all classrooms (no fresh air in many now) New DDC controls to regulate classroom temperatures 14 January Keene School lighting District Budget, & 2014 Fire alarm, emergency upgrades to Bond, meet

Fuller

Franklin

Wheelock

Symonds

Jonathan Daniels

Project Budget

Projected Savings

14 January 2014

The savings from this project pay for the bond in full and still create additional savings.
Keene School District

Bond, Budget, &

Details on the Savings


Savings will be even Greater with Heating Upgrades
JD Operating Budget

So right now we should have between at least $200K to $300K starting in 2015-16 and those savings will continue to inflate by not carrying the Salaries & Operating Budget.

$100 K

$980K $1.2 M in Salaries Moving from 280.65 FTEs at Elementary Schools to 261.22 FTEs.

The savings from this project pay for the bond in full and still create additional savings.
2015-16 Bond Costs

2015-16 Savings
14 January 2014 Keene School District

Bond, Budget, &

14 January 2014

Keene School District

Bond, Budget, &

Why?
Quality of Life Fire Safety Finances

We have old buildings where too many students are too hot throughout the year and do not get fresh air. We spend a lot of money as a district but dont cover these basics. Our students deserve better and why would we continue to treat our youngest, most vulnerable students in this manner?

14 January 2014

Keene School District

Bond, Budget, &

Why?
Quality of Life Fire Safety Finances

Our buildings are safe, but we have not kept up with Fire Codes for our older buildings. If we want to do any renovations we need to put in sprinkler systems in the buildings. We spend a lot of money as a district but dont cover basic fire codes our students deserve better. Why would we not solve this problem that affects our youngest and most vulnerable students?

14 January 2014

Keene School District

Bond, Budget, &

Why?
Quality of Life Fire Safety Finances

We only have enough students for four Elementary School Buildings but we fully staff and fully run five. This is not a sustainable model and how we compare around the State of NH shows in terms of our finances.

14 January 2014

Keene School District

Bond, Budget, &

Kindergarten Distribution
25
20 15 10 5 0 16 16 22 22 23 23 23 20 20 20

1st Grade Distribution


25
20 18 19

22
18 14 17 16

22

22

20 15 14

14

14

15 10 5

2nd Grade Distribution


25
20 15 10 13 12 13 12

3rd Grade Distribution


25
16 20 20 16 17 20 20 20

21

19

21 15
16 14

15

15 10

15

16

17

17

15

5
0

5
0

4th Grade Distribution


25 20 15 13 13

5th Grade Distribution


21 13 14 25 20 15 16 16 16

20 15
16

20

20

21

22

18 15

20
16 17

19

21

15

14

10
5 0

10
5 0

$17,000

2012 Per Pupil Spending Keene HS to Comparison Districts


+28%
$15,000

+3%
$14,931

+9%
$14,954

$14,930
** % Change from 2009 **

$13,000

+14% +9%
$11,422

+40%
$12,398

+1%
$12,634

+10%
$12,941

+13%
$13,101

+19%
$13,287

+19%
$11,485

$12,232

$11,000

$9,000

$7,000

$5,000
Concord Rochester Londonderry Salem Exeter Region Cooperative (612) Merrimack State Average Keene Laconia Portsmouth Winnacunnet Cooperative

Keene HS moved 4 spots to the more expensive side since 2009

2009 & 2012 Data Only

14 January 2014

Keene School District

Bond, Budget, &

$17,000

2012 Per Pupil Spending Keene MS to Comparison Districts


+18%
$15,000 ** % Change from 2009 **

+17% +21% $15,809


$15,229

+4% +21% $14,155 +13% +20% $13,521


$13,006

$14,865

$13,000

$12,606

+12%
$11,411
$11,000

+21%
$11,573

+5%
$11,629

+9%
$9,105
$9,000

$7,000

$5,000
Salem Londonderry Rochester Exeter Region Cooperative State Average Concord Merrimack Hampton Keene Laconia Portsmouth

2009 & 2012 Data Only

Keene MS moved 1 spots to the more expensive side since 2009

14 January 2014

Keene School District

Bond, Budget, &

$19,000

2012 Per Pupil Spending Keene ESs to Comparison Districts


Gap between the next School grew from $1228 in 2009 to $2209 in 2012 $17,000 ** % Change from 2009 **

+11%
$16,795

$15,000

-2% -1% +8%


$13,070

+11%
$14,008

+5% +19% $14,586


$14,150

+9%
$13,170

+12%
$13,201

+11%
$13,414

$13,910

$13,000

+16% $12,644
$12,023

$11,000

$9,000

$7,000

$5,000
Salem Hampton Laconia Rochester Merrimack State Average Portsmouth Concord Londonderry Exeter Keene

2009 & 2012 Data Only

14 January 2014

Keene School District

Bond, Budget, &

A Slow Redistricting Process 2014 to 2020


The only group that begins the redistricting process in 2015-16 would be incoming, new Kindergarteners & their Families. We would use the Flexible Zones highlighted on the Map.

1)

Current J. Daniels K to 3rd Grade (by 2015-16 would be 2nd to 5th) join Franklin School Community. (About 85 Families) Current Surry students (K to 3 about 40) join the Wheelock School Community. New Kindergarteners in JDs old attendance area go to Fuller or Symonds. Keeping families together in the same school would trump this policy.

2) 3)

354 1 Old to Zones 5 New K Zones Fuller

343 1 to 5 K Franklin
(Old Franklin+ New JD)

217 1 to 5 K
(Old Wheelock+ New ALL Surry)

339 Old 1 to Zones 5 New K Zones Symonds

New Zones

New Zones

Wheelock

More Details on Redistricting


After this change class size stays under 20 throughout the district (at most 22)
Grade Fuller Franklin Wheelock Symonds

K 1st 2nd 3rd 4th 5th 2015-16 1 to 5 K


New Zones
14 January 2014 Warrant 2014/2015

60 60 71 49 64 50 2016-17
2 to 5

60 60 63 65 44 51 2017-18
3 to 5

35 35 39 40 39 29 2018-19
4 5

53 53 59 62 41 61 2019-20
5

K New Zones K New Zones 1 2 1


Keene School District

New Zones K to 3

K to 4
Bond, Budget, &

None of These Issues Go Away


This project basically deals with three major issues for our Elementary Schools all at once.

Quality of Life

Fire Safety

Finances

If we dont solve them with this project these issues are not going away. We will have to address these issues in the future until they are solved. If the Bond is not passed we need to find the money in the Operating Budget Which means taking away staff, programs, and opportunities for all students K to 12, without realizing the savings in this project.
14 January 2014 Warrant 2014/2015 Keene School District Bond, Budget, &

To Conclude: school taxes only


Budget
Total increase School Tax/ $100, 000 $100, 000

% tax

$ increase/

Bond Interest Payment $332,494 1.06% $1,722


14 January 2014 Warrant 2014/2015

$18.00

Keene School District

Bond, Budget, &

Questions?

Article 2:

Main Budget Article

Shall the District raise and appropriate as an operating budget, not including appropriations by special warrant articles and other appropriations voted separately, the amounts set forth on the budget posted with the warrant, or as amended by vote of the first session, for the purposes set forth therein, totaling $63,255,581? Should this article be defeated, the operating budget shall be $63,578,424, which is the same as last year, with certain adjustments required by previous action of the District or by law; or the governing body may hold one special meeting in accordance with RSA 40:13, X and XVI, to take up the issue of the revised operating budget only.
(Note: This appropriation does not include appropriations in 14 January 2014 Bond, Budget, & Articles 1, 2, and 5). Keene School District Warrant 2014/2015

Where we started
2013-2014 Operating Budget $62,756,947
$63,255,581

2014-2015 School Board Budget Net Increase 0.79% $498,634

(Note: School Board Budget was approved by the Board of Education on Saturday, 11 January 2014.)
14 January 2014 Warrant 2014/2015 Keene School District Bond, Budget, &

Major Expense Increases 2014-2015


Contractual salaries & benefits

$196,751
(6 bargaining groups KEA not included)

Mandatory health insurance

$458,826
Less in Debt Service Payments

$50,498
Special Education Out-of-District Placement

$800,000
Less Special Warrant Articles (Bldgs.Maint.& Athletic Funds)

-$370,000
14 January 2014 Warrant 2014/2015 Keene School District Net Increase Expense:

1.65%

Bond, Budget, &

Major revenue decreases/increases:


N.H. Adequacy Aid $206,634 N.H. Catastrophic Aid $182,598 Medicaid Reimbursement $200,000 Unreserved Fund Balance (Surplus) $1,302,179

Net Decrease in revenues: $554,744 14 January 2014 Keene School District


Warrant 2014/2015

Bond, Budget, &

Where we are
2014-2015 School Board Budget $63,255,581 (increase of $498,634)
2014-2015 Budget $63,792,026
with mandatory expenses

Cuts necessary to reach budget target


14 January 2014 Warrant 2014/2015 Keene School District

$536,445
Bond, Budget, &

Understanding the 2014-15 Budget


It is a pragmatic budget that moves at the pace of the Strategic Plan. The District is ready. These are not radical changes, or changes that are too fast paced. We are making steps in a positive direction for all the areas we need to address. 2 1 Rigorous Curriculum for ALL students More Robust Academic RtI Cultural RtI

Differentiation

Balanced Literacy

3 A New Evaluation Model


Keene School District Bond, Budget, &

14 January 2014 Warrant 2014/2015

Looking in the Mirror


Whats different about this years budget process is that I asked all Principals and Cost Center Managers to think about the following three questions because they guided my decision making process on where changes needed to be made and I asked them do to the same for their own cost center:

1) Does your cost center focus its resources on students effectively? 2) Is your cost center financially sustainable? 3) Is your cost center effective at educating our students?

14 January 2014 Warrant 2014/2015

Keene School District

Bond, Budget, &

Keene Elementary Schools


Budgets were developed. We then had to adjust to pay for our out of district placements. This accounts for the range of changes that happens across the Elementary Schools.
Cost Center 2014-15 School/Admin. Request Amount Changed from 2013-14 Percentage Change from 2013-14

Name

2013-14 Budget

1 2 3 7 8 9

J. Daniels Franklin Fuller Symonds Wheelock Gen. Elem.

$2,417,323 $2,915,319 $3,622,705 $3,619,385 $2,093,948 $397,711

$2,439,199 $2,877,093 $3,736,621 $3,547,498 $2,146,321 $393,719

$21,876 -$38,226 $113,916 -$71,887 $52,373 -$3,992

0.9% -1.3% 3.1% -2.0% 2.5% -1.0%

To reach our overall budget target, Keene Elementary Schools did not restore investments back into the General Elementary Account and had to reduce 13 tutors across the five schools.
14 January 2014 Warrant 2014/2015 Keene School District Bond, Budget, &

$19,000

2012 Per Pupil Spending Keene Elementary Schools to Comparison Districts


$17,000 ** % Change from 2009 ** Gap between the next School grew from $1228 in 2009 to $2209 in 2012

+11%
$16,795

$15,000

-2% -1% +8%


$13,070

+11%
$14,008

+5% +19% $14,586


$14,150

+9%
$13,170

+12%
$13,201

+11%
$13,414

$13,910

$13,000

+16% $12,644
$12,023

$11,000

$9,000

$7,000

$5,000
Salem Hampton Laconia Rochester Merrimack State Average Portsmouth Concord Londonderry Exeter Keene

14 January 2014 Warrant 2014/2015

Keene School District

2009 & 2012 Data Only

Bond, Budget, &

Tutor Decision
We have an unconscionable Achievement Gap in our district when it comes to our IEP students in both Reading and Math. We cannot continue with our current system of Shared Tutor Support as is. It is not addressing or helping our students. We cannot expect our most vulnerable students to be best served by the least qualified adults in our schools.
100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0%
90% 80% 70% 60% 50% 40% 30% 20% 10% 0%

Gap in Math for IEP vs Non-IEP Students in Keene 2006 to 2012 Average Proficiency Scores
83% 83% 83% 80% 76% 71% 43% 31% 43% 39% 19% 36% 5th 30% 6th 24% 7th 21% 21% 8th

48%

43%

49%

5%

4%

3rd

4th

11th

Students with IEP

State Average Students with IEP

Students without IEP

Gap in Reading for IEP vs Non-IEP Students in Keene 2006 to 2012 Average Proficiency Scores
90% 91% 90% 88% 87% 86% 90%

49%

42%

43%

38% 34% 6th

35% 32% 7th

38% 34% 8th

30% 27% 11th

39% 3rd

35% 4th

35% 5th

Students with IEP

State Average Students with IEP

Students without IEP

14 January 2014 Warrant 2014/2015

Keene School District

Bond, Budget, &

Tutor Decision Part 2


Besides the fact that is not an effective model we also uncovered that we do not currently align our Tutor numbers to actual need based on IEPs. The reductions represent that alignment so that every child who has a Shared Tutor in their IEP still has that Tutor in place for 2014-15.

Schools also have a buffer of one to two extra Tutors, based on hours, in their buildin year to make sure they are able to handle new arrivals and other factors we cannot plan for. Where we are heading with our Model Inclusion

1) We are investing in Professional Development for Special and General Education teachers to make small steps towards a Co-Teaching Model next year and this w continue until our schools are ready.

2) We are investing in Professional Development around Classroom Management and tasking a small group at each school to build a robust Multi-Tiered Culture Model to promote the culture and behaviors wanted, and respond to the ones we dont.
14 January 2014 Warrant 2014/2015 Keene School District Bond, Budget, &

Tutor Decision Part 3

We could continue to spend money in perpetuity on a model that doesnt work or we could invest in the hard work that serves our students best. All students in Keene with an IEP deserve the right to have the following structures and systems in place for their Support and Benefit:

1) A challenging and meaningful curriculum. 2) Differentiated daily lessons that target their specific needs and interests, and engage them in the instruction. 3) Modifications and accommodations in place that are outlined in their IEP and beyond those outlined. 4) A Multi-Tiered approach to culture and behavior in every classroom and school that reinforces the behavior we expect in classrooms, and responds appropriately to beha we dont want. 5) A robust Response to Instruction (RtI) model that is embedded in all the systems of th School so that no student falls through the cracks in terms of academics or behavior. Students certainly can chose to not be engaged and/or to fail, but we cannot allow thi behavior on their part. 6) An inclusive classroom that partners General Education Teachers with Special Educa Teachers to ensure the five strategies above are in place for every student.
14 January 2014 Warrant 2014/2015 Keene School District Bond, Budget, &

Keene Middle School


Cost Center Name 2013-14 Budget 2014-15 School/Admin. Request $7,419,893 Amount Changed from 2013-14 $148,810 Percentage Change from 2013-14 2.0% 10 KMS $7,271,083

Keene Middle School is investing in a Gifted & Talented Coordinator. With the need for Differentiation, a Rigorous Curriculum, and the new Growth Model for the Evaluation System this is a smart and prudent investment for KMS. KMS has transformed itself into a financially sustainable school restructured their costs over many years and continues to be the leader in the District when it comes to our Strategic Plan. Holding back this organization was not a prudent, forward thinking, or good long-term strategy as a District.

14 January 2014 Warrant 2014/2015

Keene School District

Bond, Budget, &

Keene HS and CCC


Cost Center Name 2013-14 Budget

2014-15 School/Admin. Request


$13,917,618 $1,694,485

Amount Changed from 2013-14

Percentage Change from 2013-14


-0.7% 2.4%

11 12

KHS CCC

$14,019,578 $1,655,385

-$101,960 $39,100

KHS will take a few more steps to adjust how it functions to lower general enrollment than just a few years ago. Enrollment is down about 200 students since 2009.

There is a reduction in the budget of 3 teacher positions (~$230K), adjusting tutor num IEPs which saved about (~$80K).

KHS made investments in Professional Development for Staff (~$70K) and Technolog Upgrades (~$30K).

14 January 2014 Warrant 2014/2015

Keene School District

Bond, Budget, &

Other Cost Centers


Cost Center Name 2013-14 Budget 2014-15 School/Admin. Request Amount Changed from 2013-14 Percentage Change from 2013-14 16 17 Maintenance Alumni Field $4,936,875 $224,654 $4,939,091 $228,080 $2,216 $3,426 0.0% 1.5%

21

School Board/SAU

$1,866,077

$1,820,589

-$45,488

-2.4%

22 23

Public Info. Gen. District

$74,553 $7,072,664

$62,491 $6,588,340

-$12,062 -$484,324

-16.2% -6.8%

24

Curr./Staff Develop.

$277,907

$416,377

$138,470

49.8%

25 32 37 91

Technology Gen. SPED Preschool ELL

$962,096 $4,149,295 $1,355,907 $145,990

$903,836 $4,969,222 $1,370749 $156,365

-$58,260 $819,927 $14,842 $10,375

-6.1% 19.8% 1.1% 7.1%

99

Debt Service

$3,678,492

$3,627,994

-$50,498

-1.4%

Every Cost Center has their own story and own reasoning for their changes.

14 January 2014 Warrant 2014/2015

Keene School District

Bond, Budget, &

To Conclude: school taxes only


Budget
Total
increase $100, 000 School Tax/ $100, 000 Article 2: 2014-2015 Proposed Budget Increase $498,634 3.36% $57.04 $1,761 Article 1: Bond Interest Payment $332,494 1.06% $18.00 $1,722
14 January 2014 Warrant 2014/2015 Keene School District Bond, Budget, &

% tax

$ increase/

Questions?

Article 3: Negotiations KEA Sanborn


Article
Shall the District approve the cost items included in the collective bargaining agreement reached between the Board of Education and the Keene Education Association (KEA), and accordingly shall the District raise and appropriate the sum of $530,470, such amount required to fund in fiscal year 2014-2015 the increased costs of such new agreement over the funds that would be paid at current staffing levels in accordance with the current collective bargaining agreement? At current staffing levels, the increased cost of the new agreement for its term of four years is estimated to be $536, 300 in 2015-2016; $541,526 in 2016-2017; and $668,343 in 2017-2018.
(Note: This appropriation is in addition to Article 2, the operating budget article. The Board of Education recommends a yes vote 14 January 2014 Keene School District Bond, Budget, & upon this question.) Warrant 2014/2015

Facts about the Proposed Keene Education Association (KEA) Contract 2014-2018
The Keene Education Association (KEA) consists of

347 classroom teachers, specialists, and nurses. The proposed Keene Education Association (KEA) Contract is a four year deal.

Salaries:
2014-2015: total compensation increases by 1.9% (salary

increases of 2.6% are offset by increased employee health contribution). 2015-2016: total compensation increases by 1.9% (salary increases of 2.6% are offset by increased employee health contribution). 2016-2017: total compensation increases by 1.9% (salary increases of 2.5% are offset by increased employee health contribution to 80% of Keene planSchool chosen). 14 January 2014 District Bond, Budget, &
Warrant 2014/2015

Provisions:
Health/Dental Insurance:
Employees pay a greater share of their health insurance

for each of the first three years. All employees will pay at least 20% of their health insurance in years three and four. The District must offer the HMO1 plan, but may choose the additional plans of its choice. Health insurance buyout, amount paid to employees securing insurance elsewhere, increases from $2,500 to $5,500 in years three and four. District contributions towards dental insurance increase from $800 to $1,000 in years three and four.
Keene School District Bond, Budget, &

14 January 2014 Warrant 2014/2015

Health Insurance Savings Over the Life of the Contract:


Year One Year Two Year Three & Four $56, 000 $117,000 $248,000

Cumulative Savings: $421,000

14 January 2014 Warrant 2014/2015

Keene School District

Bond, Budget, &

Other Provisions:
Teacher workshop days are increased from 6 per year to 7

per year for the purpose of Professional Development. Personal days are limited to 2 per year, with no carry forward days. Unused days shall be purchased by the District at $50.00 each. Employees with perfect attendance shall receive $500.00 at the end of the school year. Tuition reimbursement fund increases $3,000 (from $52,000 to $55,000) in 2014-2015 and $5,000 (from $55,000 to $60,000) in the final three years of the contract, 2015-2018. Early retirement eligibility is limited to employees hired 14 January 2014 Keene School District Bond, Budget, & prior to July 1, 2014. Warrant 2014/2015

Voter Approval:
In 2014-2015, the District will need to raise and appropriate an additional $530,470 for 2014-2015 pay and benefits as a result of the contract. This will result in an increase of $28.72 annual in property taxes on a $100,000 home if the assessment remains constant from 2014-2015. The approximate increased cost for the next three years are: 2015-2016 $536,300 2016-2017 $541,526 2017-2018 $668,343
14 January 2014 Warrant 2014/2015 Keene School District Bond, Budget, &

To Conclude: school taxes only


Budget
Total % tax $ increase/ $

increase
School Tax/ $100, 000 Article 3: KEA Agreement $530,470 1.69%

$100, 000

$28.72

$1,733

Article 2: 2014-2015 Proposed Budget Increase $498,634 3.36% $57.04 Article 1: Bond Interest Payment $332,494 1.06% $18.00
14 January 2014 Warrant 2014/2015 Keene School District

$1,761

$1,722
Bond, Budget, &

Questions?

Article 4:

RSA 197:3

Shall the District, if Article 3 is defeated, authorize the Board of Education to call one special meeting, at its option, to address Article 3 cost items only?

14 January 2014 Warrant 2014/2015

Keene School District

Bond, Budget, &

Questions?

Article 5: unexpended appropriations to


maintenance fund Shall the District raise and appropriate the sum of up to $100,000, to be added to the school building maintenance fund, for the purpose of repairing and maintaining the school buildings within the District as established by the voters at the 2010 annual meeting? This sum will come from the June 30, 2014 unexpended balance of 2013-2014 appropriations available for transfer on July 1, 2014, and will not be raised by taxation in 2014-2015.
(Note: The Board of Education recommends a yes vote upon this question.)
14 January 2014 Warrant 2014/2015 Keene School District Bond, Budget, &

To Conclude: school taxes only


Budget
Total % tax $ increase/ $

increase
School Tax/ $100, 000 Article 5: Building Maintenance Fund $100,000 0.32% $5.41 Article 3: KEA Agreement $530,470 1.69%

$100, 000

$1,709

$28.72

$1,733

Article 2: 2014-2015 Proposed Budget Increase $498,634 3.36% $57.04


Article 1: Bond Interest Payment $332,494 1.06% $18.00
14 January 2014 Warrant 2014/2015 Keene School District

$1,761

$1,722
Bond, Budget, &

Questions?

Article 6:

land purchase

Shall the District authorize the Board of Education to lease or purchase land or land and buildings for school purposes as such land or land and buildings may be adjacent to any school buildings within the District and/or adjacent to streets which border such school buildings within the District?

14 January 2014 Warrant 2014/2015

Keene School District

Bond, Budget, &

Questions?

To Conclude: school taxes only


Budget
% tax $ increase/ increase $100, 000 School Tax/ $100, 000 Article 5: Building Maintenance Fund $100,000 0.32% $5.41 $1,709 Article 3: KEA Agreement $530,470 1.69% $1,733 $ Total

$28.72

Article 2: 2014-2015 Proposed Budget Increase $498,634 3.36% $57.04 $1,761 Article 1: Bond Interest Payment $332,494 1.06% $1,722 14 January 2014 Keene School District

$18.00
Bond, Budget, & Warrant 2014/2015

Public Input
Please state your name and address for the Official Record. Please limit your remarks to three minutes. Thank you!

Join us
First Deliberative Session: Saturday, 8

February 2014 9:00 AM, KHS Auditorium


Second Session: Vote at the Polls!

Tuesday, 11 March 2014


Wards 1, 2, & 3 vote at the Keene Recreation Center

312 Washington Street


Wards 4 & 5 vote at the First Baptist Church

105 Maple Avenue

Thank you!
Please enjoy the remainder of your evening.

S-ar putea să vă placă și