Annex 8

Design, Monitoring and Evaluation Capacity
Development for BRA

Pembangunan Kapasitas Desain, Monitoring dan
Evaluasi untuk BRA

As part of the
Multi-Stakeholder Review of Post-Conflict Programming in Aceh (MSR)

Capacity Development and Reporting Led by
Rachel Schiller
Assisted by
Fritz Julianto Pakpahan

December 2008
Supported by UNDP and USAID-Serasi. Staff support from IOM.

The findings and opinions expressed in this report are those of the authors and should not
be attributed to the institutions they work with, nor any of the bodies who have supported
the MSR, nor the authors of the main MSR report.


Table of Contents / Dafter Isi

Final Report of the Capacity Building Program for BRA ................................................. 2
Report of the First Design, Monitoring and Evaluation Workshop and Mid-Term Review
of Capacity Development Component ................................................................................ 8
Manual for Design, Monitoring & Evaluation for BRA ................................................... 16
Panduan Merancang, Memonitoring & Mengevaluasi untuk BRA .................................. 62
Presentation on Design, Monitoring and Evaluation for BRA ....................................... 115
Presentasi untuk Desain, Monitoring & Evaluasi untuk BRA ........................................ 130
Contoh Logframe untuk Dewan Pengawas Reintegrasi-Damai Aceh dalam BRA......... 145
Contoh Logframe untuk Komisi Keberlanjutan Perdamaian Aceh ................................ 151

2


FINAL REPORT OF THE CAPACITY BUILDING
PROGRAM FOR BRA

SUBMITTED TO
UNDP & THE MULTI-STAKEHOLDER REVIEW OF POST-
CONFLICT PROGRAMMING IN ACEH (MSR)

BY
RACHEL SCHILLER
MONITORING AND EVALUATION CONSULTANT

DECEMBER 1, 2008


3

UPDATE OF NOVEMBERS ACTIVITIES:

Since the mid-term report submitted on November 1, 2008, I have undertaken the
following activities:

Completed a draft of the DM&E manual in English and Indonesian and submitted
it to UNDP for comments. The manual can be used as a self-study guide or as a
trainers manual and is attached to this report.
Completed 10 days of training with Bawas: 3 to prepare logic statements and
indicators for Bapels housing, diyat, scholarship and economic programs; 3 to
prepare a monitoring system and forms for use in the field for the team; 4 to
prepare a final evaluation of BRA for 2008.
Completed 8 days of training with APRC to apply design, monitoring and
evaluation to CoSPA, their gender program and the Political Party Peace Forum.
The resulting program documents are attached.

In total, 21 days of direct training have been conducted with Bawas and APRC over the
past 2 months.


II. PROBLEM IDENTIFICATION AND RECOMMENDATIONS FOR NEXT STEPS:
This section will explain some of the issues that surfaced in working with Bawas these
past months that prevent them from achieving maximal monitoring and evaluation.
Recommendations for follow up are provided where appropriate. Overall, I think the
Head of BRA and BRA staff deserve a lot of credit for achieving as much as they have
and for overcoming some serious political and administrative obstacles over the past few
years. The recommendations below are meant to offer constructive solutions rather than
criticism of the agency.

1. Bawas role: At the moment, there is confusion within Bawas about what their
role should be vis--vis Bapel. The SK Gubernor says that Bawas should conduct
internal monitoring of financial management and managerial, however it is not
clear what this means. Until now, Bapel has mainly used Bawas as a tool for
dealing with claims of false data. For example, when people come to Bapel asking
why their name wasnt included in the housing data, making accusations that
people who dont qualify assistance are included in the data while others who
meet the beneficiary criteria are excluded, Bapel refers these people to Bawas.
Bawas staff often help to resolve these cases either in the office or by going to the
field with the complainants. Given the frequency of these cases, Bawas spends
most of its time putting out fires and verifying data in the field. While this is a
useful function within BRA, it is not the equivalent of conducting proper
monitoring and evaluation of BRAs programs.

Moreover, Bawas staff have expressed concerns that if they were to conduct proper
monitoring and evaluation, they would be perceived as criticizing BRA, which they
4
worry could have a negative impact by playing into the hands of those in Jakarta who do
not support the agency or the peace process. Additionally, their role in relation to other
government agencies that conduct financial monitoring and auditing is unclear, and they
claim that officials are often resistant to giving them the financial information they would
need to conduct proper monitoring of financial management within the organization.
Bawas staff agree that it is important for the Head of the Agency and the Governor to
clarify in writing what role they are supposed to play and provide detailed job
descriptions for each team member.

Recommendation 1.1: It is important that BRA conduct proper monitoring
and evaluation of its programs in order to improve the quality of its service
delivery and impact on the peace process overall. To that end, a letter should
be submitted to Bawas signed by the Head of BRA (or even the Governor)
clarifying that their role is to conduct monitoring and evaluation of BRA
programs. It should explain that Bawas is expected to monitor and evaluate
progress toward BRAs program goals, objectives, outputs and activities and
submit monthly reports to the Head of the Agency. It should also specify
whether Bawas is to monitor expenditure of the BRA budget. The letter
should also clarify that Bawas will continue to investigate and mediate cases
of false data as requested by the Head of Bapel or the Governor and should
plan their time and budget accordingly.

Recommendation 1.2: Bawas should complete the design of its 2009
Monitoring documents and have them approved by the Head of BRA. This
should include logic statements, indicators, monitoring form, workplan and
budget for 2009. In this way, the Head of BRA will be informed of what
Bawas is doing and Bawas will have buy-in and direction from the Head of
BRA.
o Note: Bawas already have logic statements, indicators and a
monitoring form for the housing, economic empowerment and diyat
programs. They should complete the logic statements, indicators and
monitoring form for the scholarship program as well.
o These documents have been shared with the Head of BRA, but I do not
believe he has looked at them in depth. The final documents should be
signed off by the Head of BRA.
o Bawas should then develop a workplan and budget for 2009 and have
it approved by the Head of BRA

Recommendation 1.3: Bawas should submit a monthly monitoring report to
the Head of BRA that tracks progress against program indicators at all levels.

2. Attendance: A major problem with Bawas is that staff do not work a 40 hour
work week. They do not show up to work on time, and they frequently go home
early. This applies to all team members. Attendance and motivation has
improved since I have been working with them, but it is still very low. It appears
5
that noone is properly managing them or paying attention to what they are doing,
so there are no consequences and this behavior is perceived as acceptable.

Recommendation 2.1: The Head of BRA should issue a letter to all
BRA staff clarifying that staff are expected to work a minimum of 40
hours per work, and that working hours are from 9 am to 5 pm. Staff
not meeting this attendance requirement should be fired on this basis
alone.

Recommendation 2.2: The Head of BRA should issue a statement
that anyone running for office or supporting a campaign or political
party is expected to continue to work 40 hours per week and perform
their duties as usual. Anyone not performing will be immediately fired.
Elections should not be accepted as an excuse for poor performance or
attendance.

Recommendation 2.3: The Head of BRA should require the Head of
Bawas to submit job descriptions for each Bawas staff member, an
organizational chart and a performance evaluation system not later
than January 31, 2009. These documents should be approved by the
Head of BRA. Performance evaluations should be conducted every 6
months. Those who are not performing should be replaced.

3. Payment of salary: A major problem for the whole of BRA is that staff salaries
were not paid until August 2008. This situation has resulted in poor performance
for 2 reasons: 1. Most Bawas staff have second jobs to supplement their Bawas
income as it is not possible to live without an income for 8 months of the year.
Moreover, staff know that from at least January through April 2009 they will not
receive salaries again so they maintain a second source of income in order to plan
for this eventuality. Having a second job is a large reason why staff have poor
attendance and poor performance.

Recommendation 3.1: The Head of BRA should determine whether it
is possible to address this problem by either 1. Borrowing money from
the government to cover salaries while waiting for the budget to come
through 2. Borrowing money from an international organization to
cover these costs while waiting for the budget to come through or 3.
Determine that nothing can be done.

4. Operational costs: As of the end of November, Bawas has still not received the
funds for their operational budget from Dinsos. This has meant that all year, the
Head of Bawas has had to provide operational funds out of his own pocket or by
taking loans from Bapel to fund Bawas operational costs. This is a key cause of
poor performance and low motivation.

6
Recommendation 4.1: The Head of BRA should investigate why
Bawas has still not received operational funds this yearit may be
that Bawas is late in processing their fund request in addition to other
problems. He should then determine if it is possible to address this
problem by 1. Borrowing money from the government to cover
operational costs while waiting for the budget to come through 2.
Borrowing money from an international organization to cover these
costs while waiting for the budget to come through 3. Accepting a
grant from an international organization to cover operational costs 4.
Working with Bawas to make sure their finance and administration is
completed earlier in the year or 5. Determine that nothing can be done.

5. Finance and administration: Bawas finance and administration system is not
optimal. First, their budget is mixed into the APBN/APBA budgets, which dont
have separate sections for Bawas salaries and operational expenses. Instead, these
items are mixed in among other line items. Bawas staff seem to know how much
they have to work with, but they do not seem to have a financial management
system that clearly tracks and reports their expenditure against their budget.
Implementing such a system would greatly increase financial accountability and
help Bawas develop a workplan for 2009.

Recommendation 5.1: the Senior Advisor to the BRA should assist
Bawas in developing a workplan and budget for 2009 that plans for
how Bawas will spend its 2009 budget allocation. This should be
approved by the Head of BRA in writing and changes should be
approved in writing.
Recommendation 5.2: 1 person within Bawas should be a finance
officer. This person will be responsible for producing an expenditure
report each month that lists all expenses, compiles receipts and tracks
expenditure against the budget. The Senior Advisor to the BRA should
ensure this person is trained and performing.

6. Monitoring and Evaluation Capacity: When I arrived, monitoring and
evaluation capacity within Bawas was extremely low. Staff were not aware of
how to conduct monitoring and evaluation or how to design a system for
monitoring and evaluating BRAs performance. We have subsequently prepared a
monitoring system for Bawas to use in 2009 after funds have been dispersed, and
we have designed an evaluation of BRAs 2009 programming which they are
currently conducting. While this is a good start, Bawas will need approximately 3-
6 months of continued hands-on training/management to fully implement this
system and change existing norms.

Recommendation 6.1: The Senior Advisor to the BRA should provide
this training and management.

7
7. Report writing capacity: Bawas capacity to write reports remains extremely
low. In November, we designed a draft monitoring form to test in the field. Upon
returning from the field, 1 team of 2 people submitted transcripts of field
interviews, though the number of interviews did not meet the requested number.
The other team failed to ever produce documentation of interviews. The deputy
director of Bawas spent a few hours trying to write a monthly report for
November, but ultimately gave up and the report was never completed. It is clear
that noone on the team is comfortable writing reports.

Recommendation 7.1: I plan to spend Dec 2-5 helping them write the
final evaluation report, as hands-on training seems to be the most
effective way of increasing their capacity and I feel it is important to
help them complete the evaluation.

Recommendation 7.2: The Senior Advisor to the BRA should
carefully review all monthly reports and help Bawas improve the
quality of the report each month so that it becomes a useful tool for
decision-making by the head of the agency.


IV. ATTACHMENTS: The attached documents are draft documents that have been
developed with the staff and shared with the Head of BRA, but they have not yet been
approved by the Head of BRA as official operating documents. As such, they should be
read as examples of the work the teams are doing to develop program documents, not the
final implementing documents.

1. DM&E Manual English
2. DM&E Manual Indonesian
3. Bawas-Housing, Diyat, Scholarship and Economic Empowerment Logframes
4. Bawas Evaluation Design
5. APRCs CoSPA Logframe, Workplan, Budget







8

REPORT OF THE FIRST DESIGN, MONITORING AND
EVALUATION WORKSHOP AND MID-TERM
REVIEW OF CAPACITY DEVELOPMENT
COMPONENT


SUBMITTED TO
UNDP & THE MULTI-STAKEHOLDER REVIEW (MSR)


BY
RACHEL SCHILLER
MONITORING AND EVALUATION CONSULTANT

OCTOBER 31, 2008
9
This report will evaluate the outcomes of the Design, Monitoring and Evaluation
(DM&E) workshop held on October 20-22, 2008 at the Hotel Sulthan in Banda Aceh for
BRA staff and will make recommendations for next steps in the MSR capacity building
program.

I. BACKGROUND:

2 objectives were determined for the training:

Objective 1: To increase the capacity of BRA to design, monitor and evaluate
peacebuilding programs in Aceh.

Objective 2: To improve communication and coordination between the different
parts of BRA (Bawas, Bapel and APRC) necessary for strong design and
implementation of peacebuilding in Aceh.

The training objectives resulted from 1. a needs assessment conducted with Bawas staff
by IOM staff members Neven Knezevic and Fritz Edward prior to my arrival 2.
Discussions I had with Bawas, Bapel and APRC staff to update the assessment when I
arrived. One of the main concerns of the Bawas staff during these discussions was that
the lack of communication and information sharing between Bawas, Bapel and APRC
prevented them from doing their job. As such, Bawas suggested including Bapel and
APRC in the training.

A draft proposal and budget for the training program was submitted to Bob Richey at
IRD/APRC, who provided the funds for the training through the USAID/SERASI
program.

II. EVALUATION OF THE TRAINING:

Overall, participants reported that the workshop increased their capacity to design,
monitor and evaluate peacebuilding programs in Aceh. However, participants
unanimously agreed that the lack of participation from Bapel prevented the agency from
achieving the strong communication and coordination necessary for peacebuilding in
Aceh.

The participants agreed that the quality of the workshop was high (the average rating of
the facilitator was 9 out of 10, and the average rating of the material was 8.75 out of 10).
However, the level of participation was low. Only 18 out of 25 confirmed participants
attended the workshop, and only 7 of the 18 attended full time for the entire 3 days. Of
the 18, 6 were from APRC, 8 from Bawas, and 4 from Bapel. Of the 7 who attended full
time, 4 were from APRC, 3 from Bawas and none from Bapel
1
.

1
Bapel staff signed up for 12 places in the training and provided names of those who would participate.
However noone from Bapel participated in the whole workshop and noone demonstrated significant
mastery of the material. This is problematic not least because we paid 170,000 rupiah per person, wasting a
10

As such, participants agreed that the second objective of increasing communication and
coordination within BRA was met between Bawas and APRC, but not with Bapel.
Participants expressed significant dissatisfaction throughout the workshop as well as in
the evaluation with the lack of participation from Bapel. Many commented that Bapels
lack of participation was indicative of the larger problem of lack of communication and
coordination between the various bodies within BRA. All agreed that efforts should be
made to improve coordination with Bapel, as their work is linked to that of Bapel.

However, despite the failure to fully achieve Objective 2, significant progress was made
toward achieving Objective 1. Of the participants who attended the workshop, four
people demonstrated mastery of the material and the ability to continue to facilitate
discussions with their own teams (two from APRC and two from Bawas). Five others
demonstrated basic understanding of the material, but did not seem to grasp the material
enough to facilitate discussions independently (one from APRC, two from Bawas and
one from Bapel). Four others gained basic exposure to the material, but did not
demonstrate mastery of the material nor the ability to facilitate further discussions.

While the number of participants who have demonstrated mastery over the material and
can facilitate further discussions within their team is minimal, we do now have a core
group of staff within BRA who are familiar with the concepts and enthusiastic about
applying them to their programming.

This is evidenced by the fact that participants from both APRC and Bawas have taken the
initiative to follow up on the training by applying the concepts to their own work. These
initiatives are described below:

BAWAS: Immediately following the training, Hamzah, the Deputy Director of Bawas,
turned up in the office at 9am Thursday morning and began working on improving the
Bawas program documents. He shared with me a document that Bawas developed at the
beginning of 2008 titled Kerangka Kerja Pengawasan that was supposed to help guide
Bawas activities throughout 2008. Within this document, it specifies that Bawas will
develop a LogFrame and Monitoring and Evaluation plan for each BRA activity that will
specify the Goal, Outcome, Output and Activity for each program.

As this has not yet been done, Hamzah set to work trying to apply the concepts learned in
the DM&E training. He decided to start with three of BRAs biggest and most
problematic programs: housing, diyat and economic assistance. We spent the entirety of
Thursday and Friday designing logframes for these activities. For each activity, we
identified: the goal, objective, output and activities; the indicators for each; the questions
Bawas would need to ask in order to collect the information for the indicators and the
sources of data for each question. We then pulled all the questions into a monitoring form

total of 2,040,000 rupiah on the 12 Bapel staff who signed up for places in the training and did not notify us
that they would be unable to attend.

11
and briefed the two teams that were preparing to leave for the field on how to use the
monitoring form.

At the moment, 2 teams of 2 people each are conducting monitoring in 11 districts. In
each district they will conduct a minimum of 15 interviews with randomly selected
beneficiaries of the housing, diyat and economic empowerment programs. In theory, they
will return with data from 165 beneficiary interviews as well as data from several
interviews with BRA district staff.

When they return, we will work together to analyze the data and develop a monthly
report. We will also see how the monitoring system worked and try to improve the
system for the next field trip, which is scheduled to take place one week after they return.

I expect that through continuously working together throughout the cycle of preparing
documents, going to the field, returning and analyzing data and producing a report, we
will be able to significantly improve Bawas capacity to conduct quality monitoring and
evaluation of ongoing BRA programming.

APRC: I received extremely positive feedback about the workshop from Bart Ryan and
Rachel DuBois at APRC who said their staff were very enthusiastic about the content of
the training. They asked if I would continue to work with their staff to further apply the
concepts learned to their programs.

On October 27, I met with APRC staff including Pak Azwar, Pak Yarmen, Bart, Rachel,
Bob Richey from IRD and several APRC staff who attended the training to discuss how
to operationalize the concepts learned in the workshop. We agreed that Aguswandi would
facilitate a team meeting beginning Tuesday October 28 to begin to design logframes for
their projects. We agreed that we would resume working together on Tuesday Nov 4
from 2-5pm, Wednesday November 5 from 9-5, and Thursday November 6 from 9-5 to
continue to build on the results of their meeting.

Additionally, as Pak Azwar and Pak Yarmen were enthusiastic about the material, but not
familiar with its content, I conducted a 1 hour tutorial with them on October 27 to
introduce the concept of logframes, logic statements and indicators. Both grasped the
basic concepts and should now be able to participate constructively in APRC discussions,
though they have not yet practiced applying the concepts and are not ready to act as
facilitators.

I expect that we will be able to complete logframes for APRCs main activities before the
end of November.

III. RECOMMENDATIONS FOR NEXT STEPS:

1. Workshops Dual desk training: After evaluating the first DM&E workshop,
I believe it will be most effective to continue the capacity building program by
working side by side with Bawas and APRC rather than conducting additional
12
workshops. As we now have a few key people trained in the basic concepts of
DM&E, I propose to continue the training by conducting further sessions with
Bawas and APRC, rather than reconvening the whole group. In this way, we can
focus on the immediate needs of each team. A proposed schedule is attached
below.

2. Data Management: The original training schedule proposed a one-day training
for Bawas staff in how to use Excel and Access. Assuming that IOM is still
willing to have Aulia teach this training, the training will take place toward the
middle or end of November, depending on the Bawas schedule.

While this training will take place, I believe it will not fully address the data management
needs of the Bawas team as they currently have no data management system. They keep
hard copies of incomplete beneficiary data that they get from Bapel in a highly
disorganized filing system. At no time do they ever use Excel or Access. Subsequently,
training them in Excel and Access will give them a picture of what these programs can
do, but it will not give them enough information to create a functional data management
system on their own.

The core problem they have with data management is that Bapel itself does not have a
complete system for data management. Each Bapel korbid (section) keeps partial data for
their programs, and the korbid data also keeps some incomplete data for each program.
Because the data is incomplete, Bapel is unable to provide the data requested by Bawas.
This problem is compounded by personality clashes and a history of bad communication
and coordinatin. Subsequently, Bawas is unable to fully complete project monitoring and
evaluation.

While both SSPDA and UNORC have ongoing initiatives to create a BRA data
management system, neither are yet ready for use or accessible to Bawas. Subsequently, I
think the most helpful thing for Bawas would be to help them collect the remainder of the
data from Bapel in hard copy and create an organized filing system in their office.

We have begun working together to identify for which districts and which programs they
do not yet have data. I propose to visit Bapel with Hamzah and try to obtain the
remainder of the data and/or identify for which districts and programs data is not
available. We will then create a filing system at Bawas so they can easily access the data
when they go to the field.

Finally, I plan to teach the team how to use Excel to make simple graphics like pie charts
that will help present the results of their monitoring in a user-friendly report format.
13
PROPOSED TRAINING SCHEDULE


Activity
Month
October November December
6-10 13-17 20-24 27-31 3-7 10-14 17-21 24-28 1
Meeting with Stakeholders/
Needs Assessment
Preparation of Workshop
Curriculum & Material /
Logistics with IRD
DM&E Workshop
Dual Desk Training w
Bawas
UNDP Do No Harm Training
Write report of DM&E
Workshop, Update Training
Materials (English and
Indonesian)
Prepare Trainers DM&E
Manual
Dual-desk training w APRC
Dual-desk training w
Bawas
Final Report

3. BAPEL: While it is unfortunate that Bapel has been unable to participate in the
DM&E capacity building program, I think it is unrealistic given their current
workload to expect that they will participate in the program anytime before
December. To that end, I think it would be appropriate to support this training for
Bapel once all the money from Jakarta is spent in 2009. Only at that time will
they be free of the burden of collecting receipts and be able to focus on
strengthening peacebuilding activities in Aceh.

4. Bawas Training for Other Government Agencies: One of the objectives listed
in the TOR for the M&E Expert is to:

a. Develop a Training Curriculum in conjunction with the BRA M&E Team
that the BRA M&E Team can lead with the aim of building M&E capacity
of relevant government agencies.
b. Organize training to be led by BRA M&E toward relevant government
agencies.

The TOR specifies that the Monitoring and Evaluation Trainer Consultant will be
responsible for completed training led by BRA M&E for relevant government agencies
by the 42
nd
day.

I will complete a training curriculum/manual that BRA staff can use to train others in the
future. However, I propose that we remove the objective for Bawas to lead M&E training
for relevant government agencies within the timeframe of this assignment as Bawas staff
have expressed to me that they do not want to do training for other government agencies
at this time for several reasons. First, they feel that other government agencies will not
attend the training. Second, they do not have a budget to hold the trainings. Third, they
have a very tight schedule between now and December 15 and do not feel they have the
time to prepare for or hold trainings. Finally, they have not yet completed a project cycle
applying these techniques to their own work and do not feel prepared to teach these
techniques to others.

5. Complete DM&E Manuals: Fritz and I prepared a manual in Indonesian for the
first DM&E training that received extremely positive feedback from the
participants. Several requested that the manual be distributed widely to other
agencies and local partners. As such, I am updating the manual to reflect lessons
learned from the training and back translating it into English. I will leave the
Indonesian version, the English version and the trainers manual with BRA staff.

Attachments:
1. Attendance list per day
2. IRD Proposal and Budget
3. Training Material used in the workshop in Indonesian
4. Raw data from Training Evaluation
15

Attachment 1: Attendance List

No. Name Organization Day
1
Day
2
Day
3
Participated
the whole
day each
day (Y/N)
Demonstrated
mastery of
material (1-3
highest)
1 Darnifawan APRC X X X N 1
2 Amrad
Hasballah
APRC X X X Y 2
3 Aguswandi APRC X X X Y 3
4 Dadang
Budiana
APRC X X X Y 3
5 Liza Fitri APRC X N 2
6 Rahmadi APRC X N 1
7 Hamzah Bawas X X X Y 3
8 Maria Ulfa Bawas X X N 1
9 Usman Bawas X X N 1
10 Tri Antoni Bawas X X X N 2
11 Saifuddin Bawas X X X Y 3
12 Alfina
Telaum
Banua
Bawas X N 0
13 Abdul Hadi Bawas X N 0
14 Fadli Bawas X N 0
15 Maimun
Ibrahim
Bapel-Sosbud X 1/4 N 2
16 Muawiz Bapel-Humas X N 0
17 Asmawati Bapel-Sosbud X X N 2
18 Nurhadi Bapel-Data &
MONEV
X N 0
19 Regina Bapel-
Pendidikan
N 0
20 Nur Husin Bapel-Sosbud N 0
21 Ahmad
Ridha
Bapel-Sosbud N 0
22 Tgk Tahir Bapel-Humas N 0
23 Tgk Fauzi Bapel-Data &
MONEV
N 0
24 Afrizal Bapel-
Ekonomi
N 0
25 Silfi Bapel-
Ekonomi
N 0
26 Faurizal
Muchtar

Bapel-
Ekonomi
N 0
16

MANUAL FOR DESIGN, MONITORING &
EVALUATION FOR BRA




I n d o n e s i a



SUBMITTED TO
UNDP & THE MULTI-STAKEHOLDER REVIEW OF POST-
CONFLICT PROGRAMMING IN ACEH (MSR)

BY
RACHEL SCHILLER
MONITORING AND EVALUATION CONSULTANT

DECEMBER 2008

17

TABLE OF CONTENTS

1. Introduction
2. DM&E Project Cycle
3. Project Design Process
a. Sample LogFrame
4. Logic Statements
5. Indicators
6. Monitoring
a. Sample Monitoring Form
7. Evaluation
a. How do I evaluate my project?
b. Terms of Reference
c. Options for Evaluation Objectives
d. Evaluation Workplan
8. Appendix 1: Example of Complete Program Documents for a Peacebuilding
Program
a. Logic Statements
b. Indicators
c. Monitoring Form
d. Workplan
e. Budget
9. Appendix 2: Schedule for 3-day DM&E Training
10. Appendix 3: Evaluation Form for DM&E Workshop
11. Appendix 4: Additional Resources/Further Reading

18

INTRODUCTION

Dear Colleagues,

This manual is a practical guide to assist you in improving the design, monitoring and
evaluation of your peacebuilding projects. You can read it by yourself or use it as a
training manual. If you choose to use it as a training manual, you can follow the 3-day
training schedule suggested in Appendix 2 or adapt it to your own program needs.

A power point presentation is included on the attached CD that you can use during the
training to guide you through the sessions and related activities. You will see each section
begins with Objectives and Outcomes that you can present at the beginning and end of
the session to make sure participants are focused on the most important concepts in each
session.

The training is designed to encourage active learning, which requires participants to learn
by doing. As a trainer, your task will be to draw on the knowledge and experience of the
participants and help them apply the concepts to their own projects.

It takes approximately 3 full days to train participants in the basic concepts of DM&E. It
will take an additional 5-7 days for participants to apply the concepts to their own
projects. Ultimately, each project should have

Logic Statements & Assumptions
Indicators
Monitoring Form
Workplan
Budget

I congratulate you on your initiative to improve the quality of your peacebuilding
programs and wish you a challenging and successful experience in program design,
monitoring and evaluation.


Rachel Schiller
November 15, 2008
19

THE DM&E PROJECT CYCLE

OBJECTIVE:
To give participants an understanding of the steps in the DM&E project cycle
To give participants an understanding of where monitoring and evaluation falls
within the DM&E project cycle

OUTCOME: at the end of the session participants will have:
An understanding of the key steps in the DM&E project cycle including conflict
analysis, design, baseline data, implementation, monitoring and evaluation (mid-
term, final and impact).



Below is a basic explanation of the components of the DM&E project cycle. In this
workshop, we will focus extensively on design, monitoring and evaluation. Due to time
constraints, we will not teach participants how to conduct a conflict analysis in this
workshop, but a list of references is provided below in case participants want to explore
further how to conduct a conflict analysis. Refer to the DM&E project cycle picture
below as we discuss each component of the cycle.

Conflict analysis: Conflict analysis is an exploration of the realities of the conflict and
its root causes. It should be conducted before the program is designed in order that it can
give important inputs into the design of the program. Were not going to cover how to
conduct a conflict analysis in this workshop, but it is important for participants to realize
that this is the first step in the DM&E project cycle.

There are many tools that can be used to conduct a conflict analysis. Here are some
references if you want to learn more. Most are available on the internet:

Do No Harm CDA Collaborative Learning Projects
FAST Methodology Swiss Peace
Strategic Conflict Assessment DFID
Conflict Analysis Framework World Bank
Conflict Assessment Framework CMM USAID
Conflict and Policy Assessment Framework Clingendael
Conflict Analysis and Response Definition FEWER
Conflict-Sensitive Approaches to Development, Humanitarian Assistance and
Peacebuilding, published by Safeworld and partners. Available at
http://www.saferworld.org.uk/publications.php?id=148

Design: There are several tools that can be used to design a project. The Logical
Framework, or LogFrame, and the Results Framework are among the two most widely
used. In this workshop, we will learn how to use the Logical Framework, or LogFrame,
to design a project. It is important to note that monitoring and evaluation are part of the
20

process of designing a project. We will focus in depth on project design throughout the
workshop.

Baseline: Baseline data is data collected after the project design process, but before you
begin your intervention in order to get an idea of where your targeted beneficiaries are
starting from before your intervention. Collecting baseline data will allow you to measure
the change in the target population between the beginning and end of the project by
comparing baseline results to results of monitoring and evaluation data. In other words,
by comparing baseline data to monitoring and evaluation data, you will be able to track
and measure changes in the target population over time.

Monitoring: Monitoring will help you measure how far youve come in achieving the
desired results of the project. We will discuss how to conduct monitoring in detail in this
workshop.

Evaluation: There are three types of evaluation:
Mid-term evaluation, also known as formative evaluation
Final evaluation, also known as summative evaluation
Impact evaluation

We will cover Evaluation at length in this works
21

2

2
Picture provided by Cheyanne Church, The Fletcher School of Law and Diplomacy, Tufts University.
22

THE PROJECT DESIGN PROCESS

OBJECTIVE:
To give participants an understanding of how to conduct the project design
process.

OUTCOMES: at the end of the session participants will:
Have an introduction to how to use Logical Frameworks (LogFrames) to design a
project.


There are several tools that can be used to design a project. Two of the most common are
the Logical Framework (LogFrame) and the Results Framework. In this workshop, we
will use the LogFrame, though both are effective tools for project design.

What is a Logical Framework (LogFrame)?
Logframes are a powerful tool used to design, implement and evaluate programs.
They can be used in almost any context, across all sectors and types of programs
to identify what the program is trying to achieve and how it fits into a larger
strategy.
If logframes are constantly referred to and reported on, people will understand
what they are doing and why.
Logframes set up a framework for monitoring and evaluation through which you
can compare planned and actual results.
Logframes are living documents that should be reviewed regularly during project
implementation and updated as needed. They are dynamic, not static, and
therefore subject to change.
They can also act as a tool to facilitate the exchange of views and good
communication among stakeholders, determine the role(s) to be played by
different participants, and provide a schedule of actions that need to be taken.
Completing a logframe requires a team process with good leadership and
facilitation skills to be most effective.


THE LOGIC OF A LOGFRAME

IF/AND/THEN

Project Logic Indicators M&E Risks and
Assumptions
Inputs
Goal
Objectives
Outputs
Activities
IF

AND


THEN
23

IF we undertake the Activities AND the Assumptions hold true, THEN we will create the
Outputs.

IF we create the Outputs AND the Assumptions hold true, THEN we will achieve the
Objectives.

IF we achieve the Objectives AND the Assumptions hold true, THEN we will contribute
to the Goal.

HOW TO COMPLETE A LOGFRAME

Start with Column 1 and 4, then return to columns 2, 3 and 5 later.

Column 1:
Project Logic
Column 2:
Indicators
Column 3:
Monitoring
and
Evaluation
Column 4:
Risks and
Assumptions
Column 5:
Inputs
Goal
Objective
Outputs
Activities

Step 1: Conduct a conflict analysis. There are three main points you should include in
any conflict analysis:

Problem Identification. Before you begin designing a project, it is important to
understand the roots of the problem that has caused the conflict. A problem tree
can be a useful tool for problem identification. Instructions for how to complete a
problem tree are contained in the box below.

Stakeholder identification. Identify all the stakeholders who may have an
interest in the project at the local, provincial and national levels. Consider their
interests, what benefit they may derive from the project and their capacities for
peace or war.

Conflict Sensitivity: You can use the Do No Harm framework to identify
connectors and dividers among stakeholders. What institutions, attitudes or
symbols connect and divide stakeholders or parties to the conflict? What local
capacities for peace and war exist? After you design your program, make sure that
your project reduces tensions or dividers and increases connectors, or local
capacities for peace.

Step 2: Fill in Column 1-Logic Statements
Define the Goal
Define the Objectives. There are usually 2-3 per project.
Define the Outputs
24

Define the Activities and Make a Workplan

Step 3: Fill in Column 4: Risks and Assumptions. Identify the assumptions you are
making for your activities, outputs, objectives and goals. Identify the risks that could
prevent you from achieving your goal. If the risks are too high, you may need to redesign
your project logic statements.

Step 4: Use the If/And/Then logic to test the logic in your logic statements and
assumptions. If the logic holds, continue to Step 5. If not, redesign your logic statements.

Step 5: Fill in Column 2: Indicators. Identify indicators for the goal, objectives and
outputs.

Step 6: Monitoring and Evaluation. There are several steps to follow to design a strong
M&E plan during the design phase.

Monitoring:
Identify the list of questions you will need to ask in order to measure your
indicators.
Identify where you will get this information. From who? Where? Interviews
with beneficiaries in the districts? Reports from the provincial departments?
Create a monitoring form that can be used to collect this information.
Decide when you will collect this information and schedule time in your
workplan for monitoring.
Ensure you have inserted funds necessary for Monitoring in the Budget.

Evaluation:
Determine whether you will conduct a mid-term, final or impact evaluation, or
a combination of these
Develop a Terms of Reference for the Evaluation
Ensure you schedule time in the Workplan to conduct the Evaluation
Ensure you have inserted funds for the Evaluation in the Budget.

Step VII: Complete Column 5: Inputs. List in detail all of the resources you will need
to complete your project. People, computers, cars, skills, etc. Dont forget to list
resources you will need for Monitoring and Evaluation. When you complete this list,
insert it into your budget.
25

LOGICAL FRAMEWORK (LOGFRAME)



Problem Statement:



Logic Statements

I ndicators

Monitoring and
Evaluation

Risks and
Assumptions

I nputs


Goal



Objectives



Outputs



Activities

26

LOGIC STATEMENTS

OBJECTIVES:
To provide participants with an understanding of how to conduct the project
design process
To provide participants with a methodology for conducting the project design
process

OUTCOMES: at the end of this session participants will have:
An understanding of how to write goals, objectives, outputs and activities
Participants will identify the goals, objectives, outputs and activities for their own
projects



Summary:
The projects narrative or logic statements are column 1 of the LogFrame. They include
the Goal, Objectives, Outputs and Activities. First complete the logic statements in
column 1, then identify the associated risks and assumptions in column 4. Logic
statements should be SMART: Specific, Measurable, Achievable, Realistic, and Time-
Bound.

Goal:
The desired change in the conflict
What you are seeking to achieve through your intervention vis--vis the conflict
The long-term change resulting from the intervention
Note 1: A group of projects may share a common goal.
Note 2: The goal should be achievable with the resources of your organization.
Do not write a goal that is seeking to achieve Peace Writ Large-- ultimately the
desired result in a conflict context, but beyond any agencys ability to achieve it.
The goal should be measurable, even if it cannot be measured within the
timeframe of the project.

Objectives:
The expected outcomes or results from the project
The types of change necessary to achieve the goal
the intended immediate effects of the program

Outputs: The immediate, tangible deliverables of the project. What you are going to do.

Activities: The Activities are the steps you need to take to achieve your Outputs.

Risks and Assumptions (Column 4): What conditions are necessary for you to achieve
the project Goal, Objectives, Outputs and Activities? What are the risks that these
conditions will change? What assumptions are you making about the theory of change
27

implicit in the project? If the risks or assumptions are too great, you will need to redesign
your project logic statements to ensure they are achievable.

Examples:
Assumption: If we build a school for youth, they will attend school. If they attend
school, they will not want to join political organizations.
o If this assumption is wrong, we will not achieve our goal of reducing the
number of youth involved in political organizations even though we built a
school or youth attend school. Perhaps because school is only half a day,
they continue to be involved with political organizations in the afternoon.
If this is true, our assumption will be wrong and we will not achieve our
goal, despite achieving our outputs and objectives.
Risk: The security situation is conducive enough for field travel.
o If it is not, we will not achieve our outputs because we will not be able to
travel to the field to implement the project.


EXAMPLES:

Putting It All Together
Adapted from Designing for Results, p. 36

Example of logic statements and assumptions for a peacebuilding project:

Note: Activities are not shown here because they will be included in an attached
workplan.
Project Narrative/Logic Assumptions
Goal To reduce the incidence of
youth violence in five
countries by 40% in three
years
Youth violence is largely
due to alienation, isolation
and weak social
connections with the larger
community
Objective 1 Increase safe, no-violence
areas
Perpetrators will continue to
respect no-violence zones
Output 1a Organize an additional
3safe sites in addition to the
existing 12 no-violence
zones
Police can expand coverage
to fully patrol additional
sites
Output 1b Introduce community
policing in heavily
impacted neighborhoods
Assumes neighborhood will
participate in community
policing
Objective 2 Promote collaborative
relationships between major
youth groups
Bridges between local
youth groups will reduce
the amount of inter-group
violence
Output 2a Train 120 young leaders in Assumes youth leaders will
28

non-violent communication
and conflict resolution skills
apply their training to local
conflicts
Output 2b Provide financial and
programmatic support to
youth groups
Assumes additional support
will help youth groups
attract new members and
retain existing members
Output 2c Organize youth forums
about non-violence and the
creation of no-violence
zones
Assumes forums can be
constructive means for
youth to express needs and
interests
Objective 3 Improve relationships
between communities and
youth groups
Improved relations between
youth and adults will
contribute to a reduction in
violence
Output 3a Establish advisory
commissions of young
people attached to local
government offices that
work on issues of interest to
youth
Local politicians and
authorities will consider
proposals from youth in
exercising their duties


29



ECONOMIC EMPOWERMENT PROGRAM FOR VICTIMS OF CONFLICT

LOGIC
STATEMENTS
ASSUMPTIONS INDICATOR QUESTIONS SOURCE OF
DATA AND
METHOD OF
DATA
COLLECTION
GOAL To increase the
likelihood that victims
of conflict do not want
to return to war.

If conflict victims are
able to meet their
basic needs, they
wont want to return to
conflict.

% beneficiaries who
report they dont
want to return to war

Do you still want
to return to war?
If yes, why. If
no, why.

Interview with
beneficiaries
% beneficiaries who
feel they the
government has paid
attention to them and
assisted them

Do you feel the
government has
paid attention to
you?

Interview with
beneficiaries
% beneficiaries who
report that they have
benefited from the
peace process

Do you feel you
have benefited
from the peace
process?

Interview with
beneficiaries
OBJ 1 To increase the ability
of 18,930 people to
meet their basic needs
by providing them
with opportunities to
increase their income
through livelihood
development.

If beneficiaries have a
source of income, they
will be able to mee
their basic needs.

% beneficiaries who
state that they are
able to meet their
basic food needs.

Are you able to
meet your basic
food needs each
day?

Interview with
beneficiaries
% beneficiaries who
report they are able to
afford
docter/medicine fees
as necessary

Are you able to
afford
docter/medicine
fees?

Interview with
beneficiaries
% beneficiaries who
report they are able to
afford school fees for
their children

Are you able to
afford school
fees for your
children?

Interview with
beneficiaries
% beneficiaries who
have a source of
income/business

Do you own
your own
business or have
a source of
income?

Interview with
beneficiaries
30

% beneficiaries who
report they own their
own business 6
months after they
receive assistance.

Ask 6 months
after the
distribution of
assistance: Do
you still own
your own
business or have
a source of
income?

Interview with
beneficiaries
OUTP
UT 1
Provide business
capital to 18,930
people (915 ex-
prisoners; 500 ex-
combatants; 17, 515
victims of conflict
women should be
prioritized) in the
amount of $1,000 each
in 30 districts by
December 15, 2008.

% of 18,930 people
who receive business
capital in the amount
of $1000.

Did you receive
business capital?
How much?
Interview with
beneficiaries
% of 18,930 people
who are ex-prisoners,
ex-combatants and
victims of conflict.

Analyze
beneficiary data
Beneficiary data
% of 18,930
beneficiaries who are
women.

Analyze
beneficiary data
Beneficiary data
OUTP
UT 2
Form a Mentoring
Committees in each
district office to
provide business
mentoring to
beneficiaries.



% beneficiaries who
report they have
received mentoring

Have you
received
mentoring?
Interview with
beneficiaries
% of 30 districts that
have formed
Mentoring
Committees.

Have you formed
a Mentoring
Committee?
Interview with
district offices

31

INDICATORS
How can I measure the success of my project?


OBJECTIVES:
To provide participants with an understanding of what indicators are and how
they can be used to ensure quality monitoring and evaluation

OUTCOMES: at the end of this session, participants will have:
An understanding of the function of indicators
An understanding of how to write indicators
An understanding of how to write indicators for their own projects


Youve just finished writing your Logic Statements the problem statement, goal,
objective, outputs and activities. Now you can move onto column 2Indicators.

WHAT IS AN INDICATOR?
Indicators are a tool used to measure the success of your project, or progress
toward your Logic Statements.
Indicators are used to measure the change you are trying to achieve.
Indicators answer the questions How do I know if I have achieved my Goal,
Objective, Output and Activities? or How do I measure my Goal, Objective,
Output and Activities?

WHAT ARE INDICATORS USED FOR?
Indicators are used for Monitoring and Evaluation. This means they are used to
measure progress during the program, performance at the end of the program, and
the impact of the program after the program ends.
We measure the progress or success of our project because:
o If we know where we are succeeding and failing, we can make changes to
the project design to ensure that we ultimately achieve our goal
o To learn from our mistakes and prevent making the same mistake twice
o We are accountable to the donor and the beneficiaries so we have a
responsibility to measure and demonstrate the success or failure of our
programs

HOW DO I WRITE AN INDICATOR?

Try to write indicators with a percent whenever possible.
o If you write X youth attend school, you may learn that 100 students
attend school. However, you will not know that 1000 students do not
attend school.
o If you write X% of school aged youth attend school, you will collect the
information in the boxes below and learn that only 10% of students attend
school.
32










Indicators should be:
o Feasible: it will be possible to collect the information needed given the
staff and financial resources you have.
o Useful in decision-making: the data will be useful for policy-makers, ie:
Ketua Harian BRA dan Gubernor
o Reliable: the finding will be consistent regardless of who makes the
measurement

Indicators should measure Quantity and Quality:
o Quantitative indicators relate to:
Frequency of meetings
The number of people involved
Growth rates
Prices
School enrollment
Seeds
Children vaccinated
Implementation of new technologies, manuals, newsletters or
guidelines

o Qualitative indicators relate to:
The level of participation of a stakeholder group
Stakeholder opinions or satisfaction
Aesthetic judgements; e.g. taste, texture, colour, size, shape, etc
Decision-making ability
Change in attitude
Changes in behavior
The emergence of leadership
The ability to self-monitor
The development of groups
Evidence of consensus

Indicators should NOT include words like:
o effective
o appropriate
o good
o successful

X% of school-aged
youth who attend
school
Total youth that attend
school

Total school-aged youth

33

They are not specific. Try to clearly define the change you are trying to achieve.

NOTE: Writing indicators for outputs and activities will be easy. But writing indicators
for objectives and goals will be difficult. You need to be creative!

WHAT IS THE DIFFERENCE BETWEEN AN INDICATOR AND A TARGET?
WHAT IS BASELINE DATA?

Indicator vs. Target

This is an indicator X% of school-aged youth attend school

This is a target, not an indicator 80% of school-aged youth attend school

Write your indicators during the project design process so that you will be able to
measure the success of your project. To set a target from your indicator, you can use two
tools:

1. Collect Baseline Data: Baseline data is data you collect after you complete the
project design process, but before you conduct your intervention with the
beneficiaries. This will give you an idea of where the beneficiary population is
starting from before your intervention. It will also be used later to conduct
evaluation. When you collect evaluation data, you will be able to compare it to
Baseline data and measure the change.

Baseline data can also be used to translate your indicator into a target. For
example, if you know that at the beginning of the project before your intervention
40% of youth attend school, you may set your target at 85% of youth attend
school. However, if you begin with 0% of youth attending school, you may want
to set a lower target, such as 70%. The process of setting a target is quite
subjective, but baseline data will help give you an idea of where to start.

2. Evaluations of Previous Projects: You can use data from evaluation of past
projects to help you set targets. For example, if 75% of beneficiaries from an
economic empowerment project were able to increase their income by the end of
the project, it is possible that you will be able to achieve the same thing again. It
may therefore be realistic to set the target at 75% or 80%.

In sum, write indicators when you design your project. After you have collected baseline
data and look at data from past evaluations, set your targets. Dont forget to set targets as
they will be important in conducting evaluation later. Evaluations are in effect a
comparison between the targets and the achievements.

Tip 1: Dont set your target at 100%. Set realistic targets. However, dont set low targets
just so you make sure you can achieve them.

34

Tip 2: Writing indicators is one of the most challenging parts of the project design
process. Dont be discouraged. Be creative and make sure that every project has
indicators. This is the only way we will be able to improve the quality of monitoring and
evaluation.

35

MONITORING AND EVALUATION

Objective:
To understand how to design a monitoring and evaluation system

Outcomes: at the end of this session, participants will understand:
What is Monitoring
What is Evaluation
What is the difference between Monitoring and Evaluation
How to make a Workplan
What information needs to be collected to monitor and evaluate a project
How to make a monitoring form to use in the field for your project



Monitoring and Evaluation are related, but not the same activity. However, they have the
same goal: to provide information that improves decision-making and facilitates learning.

WHAT IS MONITORING?
Monitoring is an ongoing process that generates information to inform decisions
about the program while it is being implemented.
It helps answer the question Are we doing what we said we would do?
Monitoring should inform day-to-day decision-making and should provide
decision-makers with information that will inform decisions on how to improve
the project.
Monitoring is not the same thing as data collection. Data collection is part of
monitoring. You need to be able to analyze the data you collect and make sure
that it is useful for monitoring progress of your activities, outputs, objectives and
goal.
There are three main types of monitoring in peacebuilding:
3


a. Project I mplementation Monitoring: Implementation Monitoring tracks
progress toward activities and outputs. It will help you understand how the
project is running and provides key information for project managers and
participants as well as information for reports to donors and stakeholders.
Data from implementation monitoring can help explain what has been
implemented.

b. Results Monitoring: Tracks progress toward change by monitoring
progress toward the Objectives.


3
Church, Cheyanne and Mark M. Rogers, Designing for Results: Integrating Monitoring
and Evaluation in Conflict Transformation Programs Search for Common Ground, 2006.
p. 82-89.
36

c. Conflict and Context Monitoring: Conflict and Context Monitoring helps
you continuously update your conflict analysis and consider the factors
that could escalate or deescalate the conflict. Conflict and Context
Monitoring helps to answer the following questions:
4


Are our assumptions about the conflict still valid?
Are our interventions strategic?
Are there new opportunities?
Are there other activities that previously werent viable that might
work now?
What other approaches should we consider?
If everything else has changed, why continue to do the same things
weve always done?


Good monitoringlooks for what is going well and what is not progressing in terms of
progress towards intended results. It then records this in reports, makes recommendations
and follows up with decisions and action.

Source: Handbook for Monitoring and Evaluating for Results, UNDP, p. 31.


WHAT IS EVALUATION?
Evaluation focuses on why things happened.
Evaluation helps answer the question Are we doing what needs to be done?
There are three types of evaluation:

a. Mid-term evaluation (formative evaluation): conducted in the middle of
the project cycle. Determines progress to date and how to improve the
project.

b. Final evaluation (summative evaluation): conducted at the end of the
project. Provides an assessment of the projects value or contribution.

c. I mpact evaluation: conducted after the completion of the project.
Assesses the results of the project and the sustainability of those results.

Impact evaluations are rarely conducted, as they require significant resources to
develop an effective methodology and conduct the necessary research. Most
projects will conduct either a mid-term or final evaluation, or both depending on
the length of the project and the resources available.


4
Church and Ross, Designing for Results, p. 86
37

WHAT ARE THE DIFFERENCES BETWEEN MONITORING AND
EVALUATION?
5



Monitoring Evaluation
What is it? Ongoing collection and
analysis of data on
progress toward Goal,
Objective, Outputs and
Activities
changes in the context or
conflict
strategy
implementation
Reviewing what has
happened and why, and
determining relevance,
efficiency, effectiveness,
impact, etc
Why do it? Inform day-to-day
decision-making
Accountability and
Reporting
Strengthen future
programming
Provide evidence of
success or failure
Deepen our
understanding of how and
why things work
Who does it? Program staff, partners
and/or participants
External consultant, staff,
participants, or a
combination of these groups
When to plan for it At design stage At design stage, but revised
prior to conducting the
evaluation
When to implement it Throughout the program Mid-term Evaluation: in
the middle of the project
Final Evaluation: at the
end of the project
Impact Evaluation: after
the project is finished

MONITORING EVALUATION

Monitoring = Information you collect during the project to track the
implementation of the project.

Evaluation= a measurement of the change achieved by the project


5
Church and Ross, Designing for Results, p. 83.
38

HOW DO I MONITOR MY PROJECT?

1. After you write your Logic Statements-Goal, Objectives, Outputs and Activities
and prepare the Workplan for your activities, go on to column 3, Monitoring and
Evaluation.

2. For each Indicator, answer the question How will I collect the information I need
to know if I have achieved the Goal, Objectives, Outputs and Activities? or
How will I collect the information to measure my Indicator. You will need to
answer the following questions:

a. What information do I need to measure my indicator? List all the
questions you will need to answer.
b. Where will I find the answers to these questions? Do I need to ask the
beneficiaries or government officials; or does this information come from
data I will need to collect from the health center, head of school or bureau
of statistics?
c. What methodology will I use to answer these questions? Interviews, focus
group discussions, questionnaires, participatory techniques, etc?
d. How will I analyze the data I collect?
e. Who from my team will be responsible for asking these questions?
f. When will we ask these questions?

3. Make a Monitoring Form that will be used as a tool for monitoring by staff in the
field. It should list all the questions staff will have to ask, explain where they will
get this information, and specify the methodology they should use in the field
such as interviews, focus groups discussions, participatory techniques, etc. A
sample Monitoring Form is included below.

4. Add Monitoring into your Workplan to make sure you allocate time for collecting
the data, analyzing the data and writing the report.

39

SAMPLE MONITORING FORM

NOTE: THESE QUESTIONS ARE BASED ON THE INDICATORS DEVELOPED BY THE PROJECT
TEAM

I. Before you go to the field:

1. Get the list of beneficiaries for the housing and economic empowerment programs
from the Social Welfare Department in Banda Aceh.

2. Analyze the data to answer the following questions:

For Economic Empowerment:
How many people have received capital?
How much money has been received by each person?
What percentage of beneficiaries are ex-political prisoners?
What percentage of beneficiaries are GAM who surrendered before the MoU?
What percentage of beneficiaries are widows?
What percentage of beneficiaries are victims of sexual violence?
What percentage of beneficiaries were held at TNI/Police posts?
What percentage of beneficiaries are physically disabled or sick?
What percentage of beneficiaries are women/men?

For Housing:
How many people have received assistance?
How much money have they each received?

3. Analyse the data with a pie chart and narrative and put it into the report.

II. In the field:

1. Spot check the data above by locating five people for each program in each district
(5 people for housing and 5 people for economic empowerment in each district) who
are a multiple of the number 7 on the list of beneficiaries. As them the following
questions and record their answers.

For Beneficiaries of the Economic Empowerment Program:
Have your received capital?
How much money did you receive?
Have you already started your business?
(Ask 6 months after the business started) Do you still have your business?
Have your received coaching? How many times? What benefit do you feel you
received from this coaching?
Are you able to meet your basic food needs each day?
Are you able to buy medicine as necessary?
Are you able to pay school fees, uniform, books etc for your children?
Are you a victim of the conflict?
Do you want to return to conflict? Why or why not?
Do you feel the government has helped you?
40

Do you feel you have benefited from the peace process?

For Beneficiaries of the Housing Program:
Have you received housing assistance?
Did you receive 40 million to build your house?
Did you receive the money through your bank account?
Is the quality of your house good enough to live in?
Was your house burned down or broken during the conflict?
Have you received coaching (pendampingan) in building your house?
Do you feel comfortable living in your house?
Do you want to return to conflict? Why or why not?
Do you feel the government has helped you?
Do you feel you have benefited from the peace process?

For Beneficiaries of the Diyat (payment to widows):
Have you received your diyat payment?
How much did you receive?
Are you the rightful inheriter of the property of the person who died? What is the
name of the person who died?
Have you ever received a diyat payment before? How many times?
Did you receive the payment through your bank account?
Are you able to meet your basic food needs each day?
Are you able to buy medicine as necessary?
Are you able to pay school fees, uniform, books etc for your children?
Are you a victim of the conflict?
Do you want to return to conflict? Why or why not?
Do you feel the government has helped you?
Do you feel you have benefited from the peace process?

2. Ask the district offices:

For Economic Empowerment:
Is the coaching team for the economic empowerment program formed?
Ask the coaches: How many people have you coached? For how long?

For the Housing Program:
How many coaches do you have for each sub-district?
How many beneficiaries does each coach coach?




41

HOW DO I EVALUATE MY PROJECT?

There are three main steps to evaluation:

1. Preparation: You will need to answer the following questions:
What do you want to learn?
Who is the audience? Your organization, donors, stakeholders, etc?
Who will conduct the evaluation?
When will it happen?
What is the budget for the evaluation?

2. Management:
a. Develop the Terms of Reference (TOR): The TOR is a guide to the
evaluation and should be developed by the project team 4-6 months before
the evaluation starts. A sample TOR is included below.

b. Create an Evaluation Workplan: The Evaluation Workplan provides a
structure for designing the evaluation and can be a useful communication
tool among the various stakeholders. The plan should be completed by the
project team in partnership with the evaluator or evaluation team. See
example below.

c. Recruit evaluation team

d. Implement evaluation

3. Using the Evaluation:
i. Debrief the Evaluation Report with the project team so that
everybody understands the results
ii. Reflect as a team on what worked, what didnt work and what
should be changed.
iii. Apply the lessons learned to your project
iv. Share new thinking with the office, the organization and the
broader peacebuilding field.



42

TERMS OF REFERENCE (TOR)
FOR EVALUATION
6


I. Overview: Summarizes the key elements of the evaluation including:

1. Evaluation type
2. Dates
3. Duration
4. Intervention
5. Country
6. Request for applications

II. Background:
a. Intervention Summary: This is a maximum of 2 pages and can be
supplemented by the logical framework (LogFrame). It should include:

Project Goals
Project Objectives
Current activities
Location of activities
Target audience
Size or scale of project
Duration of project

b. Organization Overview:
Organizational mission
Years in existence
Size in staff, country offices and budget
Length of time in country
Types of programming

III. The Evaluation

a. Evaluation Goal: What is the goal of the evaluation?

b. Evaluation Objectives: See the chart below Options for Evaluation
Objectives and Lines of Inquiry

c. Lines of Inquiry: A list of questions that provide greater detail on what
you want to find out. See the chart below Options for Evaluation
Objectives and Lines of Inquiry

d. Audience: who will use the results of the evaluation?


6
Church and Ross, Designing for Results, Chapter 9Evaluation Management.
43

e. Evaluation Methods: What methods will be used to collect this
information? Be specific. Specify any monitoring data that is already
available. What has already been collected, when and by whom?

IV. Implementation Information

a. Evaluation Manager: Who will manage the evaluation? This person will
be in charge of hiring evaluators, approving the evaluation plan, ensuring
that milestones and deadlines are met and signing off on the final
evaluation.

b. Location: describe the project locations. If there are multiple locations,
you may want to consider a representative sample. Evaluators can help
determine this.

c. Deliverables: What products do you want from the evaluation? A report?
A shorter summary report? A power point presentation? Photos? Stories?
A standard evaluation report includes:

i. Table of contents
ii. List of acronyms
iii. Executive summary
iv. Overview of the context
v. Organization and program background
vi. Evaluation methodology
vii. Evidence-based conclusions: findings and analysis (what the
findings mean).
viii. Recommendations
ix. Appendices
1. Appendix A: Terms of Reference
2. Appendix B: List of those interviewed (if not confidential)
3. Appendix C: If there are dissenting opinions these could be
included here.

d. Duration: Specify the number of working days and the dates of the
evaluation.

e. Deadlines: Specify the deadlines for recruitment of the evaluator,
implementation of the evaluation, the draft report and the final report.

f. Logistical Support: do you need transportation, translators, handphones,
fotocopies, office space, help arranging meetings, etc.

V. The Evaluation Team

44

a. Evaluators Responsibilities: what do you expect the evaluator to do?
Develop the evaluation plan? Finalize the report? Describe your
expectations.

b. Evaluators Qualifications: What qualifications do you want the
evaluator to have? Language skills, country-specific knowledge,
evaluation experience, facilitation skills, conflict analysis knowledge,
peacebuilding experience, research skills, etc.

VI. Application Guidelines: how can interested evaluators apply? What should they
submit and to whom?

45

OPTIONS FOR EVALUATION OBJECTIVES
& LINES OF INQUIRY
7


No Type of
Evaluation
Objective
What it Can Tell You Lines of Inquiry: Example
Questions for the Evaluation
Form
When it is
Conducted
1 Appropriateness of
intervention
Is your intervention
strategy the best for
the situation and the
desired goal? Does
your theory of change
lead to the desired
goal? Is the strategy
based on the needs of
the target population?
What was the quality of the
conflict analysis?
What is the link between the
conflict analysis and the
intervention strategy?
What is the theory of
change?
Is it appropriate for the
context?
Are there other
strategies/theories of change
that could be more
appropriate?
Mid-term
(formative)
evaluation,
Final
(summative)
evaluation
2 Objective/Outcome
Identification
What are the changes
that result from the
projects outputs and
activities? Ex: A
decrease in violence or
an increase in
collaboration between
communities
What outcomes or results of
objectives occurred?
Were the outcomes in line
with the expectations based
on planning documents? If
not, why?
What unintended positive
and negative changes
occurred?
What part of the project was
most important in creating
the change?
What was the process
(environment, community,
personal) that led to the
change?
Was a prior smaller change
required to happen before
this outcome could occur?
Mid-term
(formative)
evaluation,
Final
(summative)
evaluation
3 Output
Identification
What are the
immediate, tangible
results of your
project? Ex: Number
of people trained,
What outputs were
produced?
Were they of appropriate
quality?
Were the outputs in line with
Mid-term
(formative)
evaluation,
Final
(summative)

7
Adapted from Church and Ross, Designing for Results, Chapter 9.

46

number of books
printed, number of
mediation cases
handled, number of
radio minutes
produced
the expectations based on
planning documents? If not,
why?
evaluation
4 Impact Evaluation What is the impact of
the project on the
conflict? An impact
evaluation looks not
only at whether
youve achieved your
goal, but what effect
that has had on the
wider conflict. This is
costly and requires a
lot of time and
resources.
What change in the conflict
resulted due to the
intervention?
Is there evidence that a
transfer of the change
occurred from the
participants of the project to
the wider community?
Is there evidence of the
outcomes of the project being
used?
Were there any unintended
positive or negative effects
due to the project?
If the changes were not
sustainable, why?
Final
(summative)
evaluation,
Impact
evaluation
5 Strategic Alignment
Evaluation
Is the project in line
with the organizations
mission and
principles?
How does the project
contribute to the
organizations mission?
Did the project reflec the
principals of the
organization, ie: gender
equality?
Does the intervention use the
organizations unique
expertise or experience?
Are there other organizations
that could do this project
better due to their expertise
or situation?
Mid-term
(formative)
evaluation,
Final
(summative)
evaluation
6 Management and
Administration
Evaluation
How well was the
project organized and
run? Covers
supervision,
communication and
implementation.
Was the direction,
supervision and support
provided to the project
appropriate?
Were all aspects of the
intervention well organized?
Were monitoring systems
utilized to guide decisions
and support reporting?
Were working relationships
Mid-term
(formative)
evaluation,
Final
(summative)
evaluation
47

with partners effective?
(Good communication, clear
roles, etc)
Were all the activities in the
project workplan completed?
If not, why?
7 Cost Accountability
Evaluation
Who has responsibility
for financial decisions
and how do they affect
the implementation of
the project? Are there
ways to save money
that dont harm the
project? This is not an
audit because it does
not review technical
accounting practices.
Were costs projected
accurately and tracked
regularly?
Were alternatives considered
to maximize the use of funds
when designing the project?
Did management decisions
result in significantly higher
costs?
Does the organization try to
use economies of scale where
possible?
Mid-term
(formative)
evaluation,
Final
(summative)
evaluation

It is not necessary to include all of the options in the evaluation objectives. Choose the
ones that will help you improve your project and that are feasible given the difficulty of
data collection for each objective and the size of your budget. Usually 1, 2 and 3 are
conducted together.


48

THE EVALUATION PLAN
8


Evaluation
Objective
Indicators,
Standards or
Other
Questions
Data
Collection
Method
Data
Source
Location
of Data
Collection
Context/
Conflict
Considerations
Means
of
Analysis
Time
Needed
(Days)










Context / Conflict considerations: Is there anything that needs to be considered due to the
context? For example, what is the security situation? Can some people move with more
security than others? Are special considerations necessary for women evaluators? Are
certain languages considered politically biased? What implications does the identify of
the evaluator have with the community?


8
Church and Ross, Designing for Results, p. 153-163.
49

APPENDIX 1:
SAMPLE DOCUMENTS FOR A PEACEBUILDING PROGRAM

LOGIC STATEMENTS / INDICATORS / MONITORING QUESTIONS
LOGIC
STATEMENTS
ASSUMPTIONS INDICATORS QUESTIONS SOURCE OF
DATA AND
METHOD OF
DATA
COLLECTION
GOAL To ensure that the parties
dont use violence to
solve problems that
result from the
implementation of the
peace agreement.


If the parties have a
forum for dialogue,
they wont use violence
to solve problems
related to the
implementation of the
peace agreement.
% of Party A
participants who
report that they are
willing to interact with
the political
institutions of Party B

1. Are you willing to
interact with the
following political
institutions of Party
B?
- National political
parties, Government
Departments, and
Parliament, Military,
Police, Heads of
Districts and Sub-
districts
Interview with
Party A
participants 3
times per year
(after every 4
th

meeting)
% of participants from
Party B who report
that they are willing to
interact with local
political parties,
former combatants and
elected officials from
Party A

1. Are you willing to
interact with Local
political parties,
former combatants
and elected officials
from Party A? Why
or why not?

Interview with
Party B
participants 3
times per year
(after every 4
th

meeting)
% of violent incidents
related to politics each
month

Are violent incidents
related to political
issues increasing or
decreasing each
month?
World Bank
Conflict
Monitoring
Update
OBJ 1 To increase
understanding and
agreement between the
parties to the peace
agreement, respond to
security incidents, and
push the parties to use
dialogue to resolve
disputes.

Both factions of Party
A will sit at the same
table


# of press releases that
follow meetings in
which the parties make
joint statements
Have the parties
made joint statements
in press releases
following the
meeting?

Check press
releases
following each
meeting
Other forums for
dialogue will not
undermine the
legitimacy of this
meeting
50

% of statements in the
press in which Party A
and B dont give
conflicting
information regarding
security incidents.

Do statements in the
press give conflicting
information
regarding:
- whether an incident
occurred
- Is the incident
political or criminal
in nature
- the solution or next
steps

Check
statements in the
media by each
party every day
% of issues that are
agreed upon out of the
total number of issues
that are discussed in
each meeting


1. How many
problems are
discussed in each
meeting?
2. How many of the
issues that are
discussed reach
agreement between
the parties?
Check minutes
of each meeting
% of participants who
state they understand
the perception of the
other party even if
they dont agree.

Do you understand
the perception of the
other party regarding
issues discussed in
the meeting even if
you dont agree?

Interview with
participants 3
times per year
(after every 4
th

meeting)
% of violent incidents
per month that are
handled by the police
with the support of the
parties



Do you support the
handling of violent
incidents by the
police or relevant
authorities?

Interview with
participants 3
times per year
(after every 4
th

meeting)
% of violent incidents
that are discussed in
the meeting.




What percent of
violent incidents each
month are discussed
in the meeting?
Newspaper
clippings,
meeting minutes
% participants for each
party who state that
they support the
solutions reached in
the meeting

Do you support the
solutions that were
reached in the
meeting?
Interview with
participants 3
times per year
(after every 4
th

meeting)
OUTP
UT 1.1
Monthly meeting in
alternating districts
throughout the province

% of participants
invited who attend the
meeting

How many
participants who are
invited attend the
meeting?


Compare
invitation list to
attendance list
51

% of participants who
are the same each
month

Of the 10 core
participants, how
many are the same
each month?
Attendance lists
District-level
representatives of each
party attend the
meeting in their
district

Do representatives of
Party A and B attend
the meetings when it
is in their district?
Attendance lists
Meeting takes place
each month

How many times
does the meeting take
place in 12 months?

Meeting Minutes
50% of districts host a
meeting at least once

How many of the 30
districts host a
meeting at least
once?


Meeting Minutes
52

MONITORING FORM


I. Ask the following questions to meeting participants from Party A after every
4
th
meeting:

1. Are you willing to interact with the following political institutions of Party B?

National political parties
Government Departments (Health, Social Welfare, etc)
National parliament
Military
Police
Heads of districts and sub-districts

2. Do you understand the perception of the other party regarding issued
discussed in the meeting even if you dont agree?

3. Do you support the handling of violent incidents by the police or relevant
authorities?

4. Do you support the solutions that were reached in the meeting?


II. Ask the following questions to meeting participants from Party B after every
4
th
meeting:

1. Are you willing to interact with the following political institutions of Party A?
Local political parties
The leadership of former combatants
Elected officials from Party B

2. Do you understand the perception of the other party regarding issues
discussed in the meeting even if you dont agree?

3. Do you support the handling of violent incidents by the police or relevant
authorities?

4. Do you support the solutions that were reached in the meeting?


III. Get the following information from the World Banks Conflict Monitoring
Update:

1. Are violent incidents related to political issues increasing or decreasing each
month?
53

IV. Monitor the local papers each week for:

1. Joint Press Releases by the parties

2. Statements by either party regarding:

Violent incidents
Whether the issue is identified as political or criminal
What the parties say should be the solution or next steps

3. Count number of violent incidents related to politics (attacks on either partys
personnel or offices) that occurred

V. Check the minutes of each meeting to determine:

1. How many problems are discussed in each meeting?
2. How many of the problems that are discussed reach agreement?
3. How many of the violent incidents noted in the press are discussed in the
meeting?
4. How many times does the meeting occur in 12 months?
5. How many of the 30 districts host a meeting at least once?

VI. Review attendance lists of each meeting to determine:

1. How many participants who are invited to the meeting attend the meeting?
2. Of the 10 core participants, how many are the same each month?
3. Do district-level representatives of Party A and B attend the meetings when it
is in their districts?
54

EXAMPLE WORKPLAN
No Activity
Name of person
responsible
Month
Jan Feb
17-21 24-28 1-5 8-12 15-19 22-26
Output
1.1.
Monthly meeting between the
parties to the peace agreement
1.1.1. Write the invitation
1.1.2
Confirm with participants they will
attend
1.1.3
Advance Team goes to the district to
invite local authorities, prepare police
letter, rent a venue, prepare
lunch/coffee breaks, get hotel rooms and
arrange for transportation for
participants.
1.1.4
Prepare finance/get money to pay
participants
1.1.5 Meeting with Party B to get input
1.1.6 Meeting with Party B to get input
1.1.7 Meeting with key donors to get input
1.1.8
Staff meeting to update agenda for
meeting
1.1.10
Pay honorariums and transportation
money to participants
1.1.11 Submit receipts to office
1.1.12 Monitoring-Interviews with the parties
1.1.13 Monitoring-Newspaper clippings
1.1.14
Monitoring-Check Meeting
Minutes/Attendance Lists
1.1.15
Monitoring-Get World Banks Conflict
Monitoring Update
55

EXAMPLE BUDGET

No Item
Units
Months Price (USD) Total (USD) Units Label
Output 1.1 Monthly Meeting
1
Per Diem for Advance Team to
prepare the meeting in the district 12
3 persons x
4 days 14
2
Gas for Advance Team to prepare
district meeting 1 Car 14
3
Hotel for Advance Team to prepare
the meeting 12
3 people x 4
nights 14
4
Letter from Police to hold the meeting
in the district 1 Payment 14
5 Rent a venue 1 Venue 14
6
Lunch and 2 coffee breaks for the
meeting 40 People 14
7 Internet fees in the district 1 People 14
8 Honorarium for 10 participants 10 People 14
9
Transportation for meeting
participants 8 car/plane 14
10 Hotel for participants 20 Rooms 14
11
Honorarium for speakers at the
meeting 1 people 8
12 Hotel for speakers 1 people 8
13
Lunch/Dinner Meetings with meeting
stakeholders before/after the meeting 3 orang 14
TOTAL X
56

APPENDIX 2:
SCHEDULE FOR 3-DAY DM&E TRAINING

DAY 1: DM&E TRAINING FOR BRA

Time Core Skill Activities Resource Material
9:00 Introductions (30
minutes)
Trainer and participants introduce
themselves
Introduce Objectives and Outcomes
for the training


Slides 2, 3
9:30 DM&E Project
Cycle (1 hr 15)
Introduce Objectives and Outcomes
Introduce concept of DM&E Cycle
(30 minutes)
Activity: Where are you in your
project cycle? (15 minutes)
Presentations (30 minutes)
Slide 4
Slide 5, p.
4-6
Slide 6
10:45 Coffee Break
11:00 Project Design
Process + Project
Logic Statements
(1 hr)
Introduce Objectives and Outcomes
Introduce LogFrames. What is a
LogFrame and how does it work?
How do you use a LogFrame? (30
minutes)
Introduce Objectives and Outcomes
Introduce Logic Statements: Goal,
Objective, Output and Activities.
Present example Workplan for
Activities.
Activity (30 minutes)
Slide 7

Slide 8, p.
7-10

Slide 9
Slide 10-11;
p.11-15


Slide 12
12:00 Lunch
1:00 Project Logic
Statements Contd
(2 hrs)
Activity: Identify the logic statements
for your own project + Make your
project Workplan (2 hrs)
Slide 12
3:00 Coffee Break
3:15 Project Logic
Statements Contd
Presentations: Facilitator helps
groups improve Project Logic
Statements and make sure workplan
is detailed enough (1 hr 15 min)

4:30 Reflection (30
min)
Review objectives for the day
Answer questions
Preview of Day 2
Slides 2-11
5:00 Closing

57

DAY 2: DM&E TRAINING FOR BRA

Time Core Skill Activities Resource
Materials
9:00 Objectives for
Day 2 (30 min)
Review Day 1: Review Project
Design Cycle, Project Design
Process, Logic Statements
Introduce Day 2: Indicators and M&E
Slides 2-11


Slide 13
9:30 Indicators (1 hr
30 min)
Introduce Objectives and Outcomes
for Indicators
Give examples of indicators for
peacebuilding projects (30 minutes)
Activity: Write indicators for your
own project (1 hr)
Slide 14 -15

Slide 16; p.
14-19

Slide 17
11:00 Coffee Break
11:15 Indicators
contd
(1 hr)
Presentations/Facilitator helps groups
improve indicators (1 hour)


12:15 Lunch
1:15 Monitoring &
Evaluation (1
hr)
Introduce Objective and Outcome of
M&E
What is Monitoring?
What is Evaluation?
What is Baseline data?
What are the differences between
M&E?
How do I monitor my project? (1 hr)
Slide 18-19

Slide 20-21;
p. 20-22



Slide 22; p.
23-25

2:00 Monitoring in
the Field (1 hr
15)
Activity: What information do I need
to monitor my project? (1 hr 15
minutes)
Slide 23
3:15 Coffee Break
3:30 Monitoring in
the Field contd
(1 hr)
Activity: Designing monitoring forms
for use in the field (1 hr)
Presentation
p. 23-25
4:30 Reflection (30
minutes)
Review objectives for the day
Answer questions
Preview of Day 3

Slide 13
5:00 Closing

58

DAY 3: DM&E TRAINING FOR BRA



Time Core Skill Activity Resource Materials
9:00 Introduction
(30 min)
Review Day 2

Introduce objectives for Day 3
Slide 13, 16, 19,
20
Slide 24
9:30 Evaluation (1
hr 30)
How do I evaluate my project?
(30 min)
Activity: Prepare a TOR for
evaluating your project (1 hr)
Slides 25; p. 26-
33
Slide 26
11:00 Coffee Break
11:15 Evaluation
contd
Presentation of TORs (1 hr)
12:15 Lunch
1:15 Financial
Planning for
M&E (1 hr
15)
Making a budget for M&E (15
minutes)
Activity: make your budget for
M&E + continue working on
unfinished logic statements,
indicators and monitoring forms
(2 hrs)
p. 40
3:15 Coffee Break
3:30 Next Steps /
Review (1 hr
15)
Participants should now have
started Project Logic Statements,
Indicators, Workplan,
Monitoring Form, Evaluation
TOR and Budget for their
projects, but they will likely be
incomplete. Activity: Teams
should identify next steps and a
time schedule for completing
these documents (30 min)
Answer Questions (30 min)
Review objectives of Day 3
Review objectives of workshop
Slide 27










Slide 24
Slides 2-3
4:45 Close (15
minutes)
Evaluation of workshop P. 45-46
59

Training Evaluation Questionnaire

Name :

Organization :


1. Do you feel the objective of the workshop have been met? Why or why not?

Objective 1: To increase the capacity of participants to design, monitor and evaluate
peacebuilding programs







2. What did you like best about the training?





3. What did you not like about the training?






4. What benefit do you feel youve gotten from this training?





5. If we do more training, what would you like to learn?





6. From 1-10, how do you rate the quality of the material in this training?
CCCCC1
Very bad Very good
Why?
60






7. From 1-10, how do you rate the quality of the facilitator in conveying the material
in this training?
CCCCC1
Very Bad Very Good

Why?







APPENDIX 4:
ADDITIONAL RESOURCES/FURTHER READING

AUSAID, AusGuideline 3.3: The Logical Framework Approach, October 2005.

Church, Cheyanne and Mark M. Rogers, Designing for Results: Integrating Monitoring and
Evaluation in Conflict Transformation Programs Search for Common Ground, 2006.

DFID Performance and Effectiveness Department, Tools for Development: A Handbook for
Those Engaged in Development Activity, March 2003.

SIDA, The Logical Framework Approach: A Summary of the Theory Behind the LFA Method,
January 2004.

The World Bank, Monitoring and Evaluation: Some Tools, Methods and Approaches,
Washington DC, 2004.

UNDP Evaluation Department, Handbook on Monitoring and Evaluating for Results, 2002.

USAID Center for Development Information and Evaluation, Performance Monitoring and
Evaluation Tips: Building a Results Framework, Number 13 USAID, 2000.

62
PANDUAN MERANCANG, MEMONITORING &
MENGEVALUASI UNTUK BRA




I n d o n e s i a



SUBMITTED TO
UNDP AND MULTI-STAKEHOLDER REVIEW OF POST-CONFLICT
PROGRAMMING IN ACEH (MSR)

BY
RACHEL SCHILLER
MONITORING AND EVALUATION CONSULTANT

DECEMBER 2008
63
DAFTAR ISI


12. Pendahuluan
1 Siklus Proyek DM&E
2 Proses perancangan sebuah proyek
2.1 Contoh LogFrame
3 Pernyataan Logis
4 Indikator-Indikator
5 Monitoring
5.1 Contoh Formulir Monitoring
6 Evaluasi
6.1 Bagaimana saya mengevaluasi proyek saya ?
6.2 Terms of Reference
6.3 Opsi dari sasaran evaluasi
6.4 Evaluasi Rencana Kerja
7 Lampiran 1: Contoh dari Dokumen Lengkap Program untuk Peacebuilding Program
7.1 Pernyataan Logis
7.2 Indikator
7.3 Formulir Monitoring
7.4 Rencana Kerja
7.5 Anggaran / Biaya
8 Lampiran 2: Rencana untuk 3 hari pelatihan DM&E
1. Lampiran 3: Formulir Evaluasi untuk pelatihan DM&E
2. Lampiran 4: Sumber Lain tentang DM&E

64
PENGANTAR


Yang terhormat ,

Buku ini merupakan panduan praktis untuk membantu anda dalam meningkatkan kualitas disain,
monitoring dan evaluasi dari proyek pembangunan perdamaian (peacebuilding) anda. Anda
dapat membaca pedoman ini dengan sendiri atau menggunakannya sebagai manual pelatihan.
Apabila anda dapat menggunakan pedoman ini sebagai manual pelatihan, anda dapat mengikuti
3 hari rencana pelatihan yang disarankan dalam lampiran 2 atau anda dapat merubah sesuai
dengan kebutuhan program anda.

Presentasi menggunakan termasuk dalam CD yang sudah ada yang dapat anda gunakan selama
pelatihan berlangsung yang dijadikan pedoman setiap sesinya dan keterkaitan kegiatan. Anda
dapat melihat setiap sesinya di mulai dengan sasaran dan output yang dapat anda tampilkan dari
awal sampai akhir dari setiap sesi untuk memastikan para peserta dapat fokus terhadap konsep-
konsep apa saja yang penting di setiap sesinya.

Pelatihan ini di rancang untuk meningkatkan pembelajaran yang aktif, yang diharapkan bekerja
sambil belajar. Sebagai instruktur, tugas anda di tuntut dan di arahkan untuk mendukung
pengetahuan dan pengalaman dari setiap para peserta dan membantu mereka untuk menerapkan
konsep ini kedalam proyek mereka.

Kegiatan ini membutuhkan waktu 3 hari penuh untuk melatih peserta untuk mengetahui dasar
dari konsep DM&E. Kegiatan ini akan membutuhkan adanya waktu tambahan sekitar 5-7 hari
kepada peserta untuk menerapkan konsep ini kedalam masing-masing proyek mereka.
Akhirnya setiap proyek mereka memiliki :
Pernyataan Logis & Asumsi
Indikator
Formulir Monitoring
Rencana Kerja
Anggaran / Biaya

Saya mengucapkan selamat kepada anda untuk berusaha meningkatkan kualitas dari program
peacebuilding dan mengharapkan ini sebuah tantangan dan pengalaman yang sukses dalam
program merancang, memonitoring dan mengevaluasi.




Rachel Schiller
November 15, 2008
65
SIKLUS PROYEK DM&E

SASARAN :
Untuk memberikan peserta pengertian terhadap langkah apa saja dalam Siklus Proyek
DM&E
Untuk memberikan peserta pengertian terhadap dimanakah letak monitoring dan evaluasi
dalam siklus proyek.

HASIL-HASIL: pada akhir sesi ini, para peserta akan dapat :
Memahami kunci tingkatan dari mendesain, memonitoring dan mengevaluasi siklus
proyek termasuk analisis konflik, desain, garis dasar, implementasi, monitoring, evaluasi
mid-term, evaluasi final dan dampak evaluasi.




Dibawah ini adalah penjelasan dasar dari komponen DM&E Siklus Proyek. Dalam Workshop
ini, kita akan berfokus secara ekstensif pada mendesain, memonitoring dan mengevaluasi. Untuk
mengajarkan para peserta melakukan analisis terhadap konflik merupakan di luar lingkup dari
workshop ini, tetapi kita akan memberikan sumber yang bisa dipakai sebagai referensi untuk
belajar lebih dalam tentang konsep analisis konflik. Lihat gambar pada halaman 3 untuk Siklus
Proyek DM&E.

Analisis Konflik : Analisa konflik merupakan explorasi dari realitas konflik dan akar dari
permasalahan. Analisis konflik seharusnya di lakukan sebelum program di rancang karena
analisis ini akan memberikan masukan dalam perencanaan proyek. Kita tidak akan mempelajari
bagaimana untuk melakukan analisis konflik dalam workshop ini, tetapi para peserta harus
menyadari bahwa hal ini merupakan langkah pertama dalam DM&E Siklus Proyek.

Banyak sekali alat ukur dari analisa konflik yang dapat anda gunakan termasuk :

Do No HarmCDA Collaborative Learning Projects
FAST MethodologySwiss Peace
Strategic Conflict AssessmentDFID
Conflict Analysis FrameworkWorld Bank
Conflict Assessment FrameworkCMM USAID
Conflict and Policy Assessment FrameworkClingendael
Conflict Analysis and Response Definition--FEWER
Conflict-Sensitive Approaches to Development, Humanitarian Assistance and
Peacebuilding, published by Safeworld and partners. Available at
http://www.saferworld.org.uk/publications.php?id=148

Rancangan :
Ada beberapa macam alat ukur yang dapat dipergunakan dalam mendesign sebuah proyek.
Kerangka acuan yang logis atau yang disebut sebagai LogFrame dan hasil dari kerangka acuan
tersebut merupakan dua hal yang sering dipergunakan pada umumnya. Dalam Workshop ini,
66
kita akan menggunakan kerangka acuan yang logis (LogFrame) untuk mempelajari bagaimana
mendesain sebuah proyek. Rencana Monitoring dan Evaluasi merupakan bagian dari mendesain
sebuah proyek. Kita akan membahas lebih dalam lagi selama workshop ini berlangsung.

Data Dasar (Baseline) :
Baseline data merupakan pengumpulan data setelah proses mendesign sebuah proyek, tetapi
sebelum kita memulai intervensi kita untuk mendapatkan sebuah gagasan/ide terhadap apa yang
menjadi sasaran penerima bantuan mulailah dengan data yang sudah ada sebelum intervensi
anda. Pengumpulan data akan memberikan anda sebuah pengukuran terhadap perubahan sasaran
terhadap populasi antara sebelum dan sesudah proyek dilaksanakan, dengan membandingkan
hasil dari baseline terhadap hasil data Monitoring dan Evaluasi. Di lain pihak, dengan
membandingkan baseline data terhadap data Monitoring dan Evaluasi, anda akan dapat
mengikuti dan mengukur perubahan yang akan terjadi dalam target populasi sepanjang hari.

Monitoring : Monitoring akan membantu anda untuk mengukur sampai sejauh mana anda
melangkah dalam pencapaian hasil proyek anda. Cara monitoring akan di bahas lebih lanjut
dalam workshop ini.

Evaluasi : Ada 3 tipe dari Evaluasi :
Evaluasi Pertengahan, dikenal dalam bahasa Inggris sebagai Mid-term Evaluation atau
Formative Evaluation.
Evaluasi Akhir, dikenal dalam bahasa Inggris sebagai Final Evaluation or Summative
Evaluation.
Dampak Evaluasi, dikenal dalam bahasa Inggris sebagai Impact Evaluation.

Kita akan membahas semuanya itu dalam workshop ini.


PROSES MENDESAIN SEBUAH PROYEK



SASARAN :
Untuk memberikan peserta pemahaman terhadap bagaimana melakukan proses
mendesain sebuah proyek.

HASIL-HASIL : pada akhir sesi ini, para peserta akan dapat :
Pengantar bagaimana kerangka acuan yang logis (LogFrame) dapat dipergunakan untuk
melakukan mendesain sebuah proyek.


Ada beberapa macam kerangka acuan yang biasanya di gunakan untuk mendesain sebuah
proyek. Kerangka acuan yang logis beserta hasilnya merupakan hal yang lazim. Dalam workshop
ini, kita akan mempelajari kerangka acuan yang logis, yang biasa kita sebut sebai LogFrame.

Apa itu Kerangka Acuan yang Logis (LogFrame) ?

LogFrame adalah suatu alat yang di pergunakan sebagai alat merencanakan,
mengimplementasi dan mengevaluasi sebuah proyek.
LogFrame mengidentifikasi terhadap program apa yang sedang di coba untuk mencapai
dan bagaimana semua ini masuk ke dalam rencana strategi yang luas. Jika LogFrame ini
sering dipakai dan menjadi dasar laporan, maka semua orang dapat mengetahui apa yang
sedang mereka kerjakan dan mengapa.
LogFrame menyediakan kerangka dasar yang di pergunakan sebagai alat Monitoring dan
Evaluasi.
LogFrame adalah dokumen yang hidup dan perlu diperbaruhui selama implementasi
proyek berjalan dan perlu diperbaruhi dengan kebutuhan yang ada. Kerangka acuan ini
sifatnya dinamis, tidak statis, dan mereka perlu untuk di sesuaikan dalam siklus proyek.
LogFrame ini juga bertindak sebagai alat untuk memfasilitasi pertukaran pandangan dan
komunikasi yang baik di antara para pemangku kepentingan (stakeholders) yang ada
didalamnya, menentukan peran yang akan dijalankan oleh para peserta yang berbeda, dan
menyediakan jadwal dari siapa, apa dan kapan.
Untuk menyelesaikan LogFrame ini diperlukan partisipasi dari semua angotta tim. Yang
artinya semua yang berkepentingan dalam pelaksanaan program tersebut harus ikut ambil
bagian dalam proses ini.






69
LOGIKA LOGFRAME

JIKA/DAN/MAKA

Logika Proyek Indikasi M&E Resiko dan
Asumsi
Masukan
Tujuan
Sasaran
Output
Kegiatan
JIKA

DAN


JIKA kita melakukan Kegiatan DAN Asumsi mengatakan benar, MAKA kita akan mencapai
Output.

JIKA kita melakukan Output DAN Asumsi mengatakan benar, MAKA kita akan mencapai
Sasaran.

JIKA kita melakukan Sasaran DAN Asumsi mengatakan benar, MAKA kita akan mencapai
Tujuan.



BAGAIMANA MENYELESAIKAN LOGFRAME ?


Kolom 1:
Logika Proyek
Kolom 2:
Indikator
Kolom 3:
Monitoring
dan
Evaluation
Kolom 4:
Masalah dan
Asumsi
Kolom 5:
Masukan
Tujuan :
Sasaran :
Output :
Kegiatan :


Langkah I : Lakukan suatu analisa konflik. Ada tiga poin utama yang harus diikutkan dalam
analisis konflik.

Mengidentifikasikan Permasalahan . Sebelum anda memulai mendesign sebuah
proyek, dimana hal ini merupakan hal yang penting untuk mengerti akar permasalahan
dari sebuah permasalahan yang mengakibatkan konflik. Suatu pokok permasalahan dapat
digunakan sebagai alat yang bermanfaat untuk mengidentifikasikan suatu masalah.
Instruksi bagaimana cara untuk menyelesaikan suatu pokok permasalahan akan di
jelaskan di bawah ini :

MAKA
70
Mengidentifikasikan para pemangku kepentingan. Identifikasikan semua para
pemangku kepentingan yang mempunyai sebuah hubungan terhadap proyek lokal,
provinsi dan tingkat nasional. Pertimbangkan minat mereka, manfaat apa yang dapat
dihasilkan dari proyek dan kapasitas dari perdamaian atau perang.

Kepekaan Konflik : Anda dapat menggunakan kerangka dari Do No Harm untuk
mengidentifikasikan keterkaitan dan pembagian antara para pemangku kepentingan. Apa
institusinya, sikap atau keterkaitan symbol dan pembagian para pemangku kepentingan
atau peserta dari konflik tersebut ? Kapasitas lokal apa yang di pergunakan bagi
perdamaian dan peperangan yang ada ? Sesudah anda mendesign program anda, pastikan
bahwa proyek anda dapat mengurangi tegangan atau jangka dan meningkatkan
keterkaitan, atau kapsitas lokal untuk perdamaian.

Langkah II : Sempurnakan kolom I
Definisi Tujuan
Definisi Sasaran. Biasanya menggunakan 2-3 sasaran dari setiap proyek
Definisi Output
Definisi Aktivitas

Langkah III : Sempurnakan kolom 4 : Resiko dan Asumsi.
Identifikasikan resiko dan asumsi dari tujuan, sasaran, output dan kegiatan. Jika masalah yang
ada mengandung resiko yang besar, rancang kembali pernyataan proyek di kolom I.

Langkah IV : Gunakan Jika/Dan/Maka uji untuk mengetes logika anda.

Langkah V : Sempurnakan Kolom 2 Indikator .
Identifikasikan indikator dari tujuan, sasaran, output dan kegiatan

Langkah VI : Sempurnakan kolom 3 dengan mengembangkan Rencana Monitoring dan
Evaluasi. Ada tiga langkah untuk membuat sebuah design yang kuat dari rencana M&E selama
periode design berlangsung.

Monitoring :
Identifikasikan informasi apa yang akan kita butuhkan dalam mengumpulkan ukuran
dari indikator.
Sumber data apa yang akan saudara gunakan untuk memverifikasikan indikator
tersebut ? Pelaporan, survey, statistik, wawancara, dll. Bagaimana anda mendapatkan
ini ?
Persiapkan formulir yang anda gunakan untuk ke lapangan untuk mendapatkan
informasi ini.
Membuat rencana kerja proyek: rencanakan waktu untuk monitoring di dalam
rencana kerja tersebut.
Pastikan anda sudah memasukkan dana yang penting yang di pergunakan untuk biaya
Monitoring.


71
Evaluasi :
Tentukan apakah anda akan melakukan Evaluasi pertengahan (Mid-term), Akhir
(Final) atau Dampak Evaluasi (Impact Evaluation), atau mengkombinasikan ketiga
hal ini.
Merancang TOR yang di pergunakan sebagai Evaluasi
Memastikan bahwa jadwal waktu di rencana kerja anda dapat melaksanakan evaluasi.
Memastikan bahwa anda dapat memasukkan dana yang akan dapat dipergunakan
sebagai evaluasi dalam budget biaya.

Langkah VII : Sempurnakan kolom 5 : Masukan.
Masukan apa yang anda butuhkan untuk menerapkan kegiatan dalam rencana kerja anda ?
Orang, Komputer, Mobil, Ketrampilan, dll. Jangan lupa untuk memasukkan sumber dari
Monitoring dan Evaluasi. Termasuk masukan ini ke dalam anggaran.

72
BAGAN DESAIN PROYEK (LOGFRAME)



Pernyataan Permasalahan :



Narasi
Proyek/Pernyataan
Logis

I ndikator-indikator

Monitoring &
Evaluasi

Resiko & Asumsi

Masukan


Tujuan



Sasaran/Hasil



Output



Kegiatan/
Langka Kerja

73
NARASI PROYEK / PERNYATAAN LOGIS


SASARAN :
Untuk memberikan pengertian para peserta untuk memahami bagaimana
melakukan proses desain proyek.
Untuk memberikan peserta dengan metologi untuk melaksanakan proses desain
proyek.

HASIL-HASIL: pada akhir sesi ini, para peserta akan dapat :
Untuk mengetahui bagaimana menulis tujuan, sasaran, output dan kegiatan.
Para peserta akan mengidentifikasi tujuan, sasaran, output dan kegiatan dari
proyek mereka.


Ringkasan :
Narasi proyek atau pernyataan logis berasal dari kolom 1 dari LogFrame. Semuanya
terangkum dalam tujuan proyek, sasaran, output dan kegiatan. Pernyataan Logis
menganut sistem SMART : Spesifik, Terukur, Terjangkau, Realistis dan Batas waktu.
Pertama sempurnakan pernyataan logis dalam kolom 1, kemudian identifikasikan
hubungan resiko dan asumsi pada kolom 4.

Tujuan :
Perubahan atau dampak terhadap konflik yang diharapkan
Apa yang anda cari-cari untuk mencapai terhadap konflik dari intervensi anda
Perubahan dalam konflik itu sendiri atau perubahan jangka panjang dari intervensi
anda
Dampak masa yang panjang dari sebuah program
Catatan 1: Beberapa proyek bisa memiliki satu tujuan yang sama, walapun
proyek berbeda.
Catatan 2: Tujuan harus terjangkau dengan sumber dari organisasi anda.
Jangan menulis tujuan untuk mencapai Perdamaian yang luas. Organisasi
anda harus mampu untuk mencapai Tujuan tersebut.

Sasaran/Hasil :
Hasil yang ingin dicapai
Perubahan yang dibutuhkan untuk mencapai tujuan
Peningkatan atau perubahan apa yang akan di terapkan dalam program?

Output : Apa yang akan dilakukan

Kegiatan/Langka Kerja: Apa yang anda akan lakukan dalam rangka memenuhi output
anda dan bagaimana akan melaksanakannya?

Resiko dan Asumsi (Kolom 4): Kondisi apa yang Anda asumsikan akan ada, terjadi atau
tidak terjadi terhadap Tujuan, Efek, Obyektif dan Aktifitas Anda sejalan dengan rencana.
74
Berhati-hati dalam hal ini saat sekarang sehingga bila kejadian didepan terjadi yang tidak
Anda harapkan, Anda dapat mengidentifikasikan faktor-faktor penyebab proyek tidak
berhasil. Apabila Anda mendaftarkan Resiko dan Asumsi terlihat tinggi akan terjadi,
kurangi kecenderungan berhasil pada tingkat minimal, Anda mungkin memutuskan
proyek ini sebab resikonya telalu besar pada saat ini.

Contoh:
Asumsi : Jika kita membagun sebuah bangunan sekolah untuk pemuda, mereka
akan mengurus sekolah tersebut. Jika mereka ikut ambil bagian dalam sekolah
tersebut, mereka tidak akan terpengaruh untuk mengikuti sebuah organisasi
politik.
o Jika asumsi ini salah, kita tidak akan mencapai tujuan kita untuk
mengurangi jumlah pemuda yang terlibat dalam sebuah organisasi politik
meskipun kita telah membangun sebuah sekolah bagi mereka. Kita
berharap dengan adanya sekolah ini mereka dapat bersekolah hanya
setengah hari saja, dan mereka dapat melanjutkan untuk terlibat dengan
organisasi politiknya pada malam harinya. Apabila hal ini benar atau
asumsi kita akan salah maka kita tidak akan mencapai tujuan dari yang
kita inginkan walaupun tujuan dan output kita sudah tercapai.
Resiko : Situasi dari keamanan memungkinkan kita untuk melakukan sebuah
perjalanan ke lapangan.
o Apabila situasi ini tidak memungkinkan, Output yang kita rancang tidak
dapat tercapai dikarenakan kita tidak dapat melakukan perjalanan ke
lapangan untuk mengimplementasikan proyek kita.






















75
CONTOH :
Narasi proyek dan Resiko/Asumsi
Sumber: Designing for Results, p. 36

Contoh narasi proyek/pernyataan logis dan asumsi untuk proyek membangun
perdamaian.
Catatan: Kegiatan tidak akan di tampilkan disini karena semuanya itu akan mencakup
dalam Rencana Kerja.

Narasi Proyek/Logis Asumsi
Tujuan Untuk mengurangi
timbulnya kekerasan pada
pemuda di 5 negara dengan
40 % dalam 3 tahun
Kekerasan pemuda
merupakan sebagian besar
yang terjadi selama
pengasingan dan hubungan
sosial yang lemah dengan
masyarakat umum
Sasaran 1 Untuk menciptakan daerah
tanpa kekerasaan
Pelaku kekerasan akan
melanjut untuk
menghormati wilayah tanpa
kekerasan
Output 1a Mengatur penambahan 35
lokasi aman ke dalam 12
wilayah tanpa kekerasan
Polisi dapat memperluas
wilayah untuk berpatroli
penuh di penambahan
lokasi.
Output 1b Membangun sistem
keamanan yang terpadu di
masyarakat yang terkena
dampak konflik
Mengasumsikan tetangga
dapat ikut ambil bagian
dalam menjaga ketertiban
sekitar.
Sasaran 2 Memajukan hubungan
kolaborasi antara kelompok
utama pemuda
Menjembatani antara
kelompok pemuda local
yang akan mengurangi
jumlah kekerasan yang
terjadi dalam kelompok
tersebut.
Output 2a Melatih 120 pemimpin
pemuda dalam komunikasi
dan ketrampilan dalam
menyelesaikan sebuah
konflik.
Mengasumsikan bahwa
pemimpin pemuda tersebut
akan mempergunakan
kemampuan yang sudah ada
ke dalam
permasalahan/konflik lokal.
Output 2b Memberikan keuangan dan
program yang bersifat
memberikan bantuan
kepada kelompok pemuda.
Asumsi penambahan
bantuan yang akan
membantu kelompok
pemuda untuk menarik
anggota baru dan
mempertahankan kelompok
76
yang sudah ada.
Output 2c Mengatur forum pemuda
tentang tanpa kekerasan dan
menciptakan wilayah tanpa
kekerasan.
Mengasumsikan bahwa
forum tersebut dapat
bersifat membangun yang
artinya bagi pemuda untuk
menyediakan kebutuhan
dan perhatian yang tepat.
Sasaran 3 Meningkatkan hubungan
antara masyarakat dan
kelompok pemuda.
Meningkatkan hubungan
antara pemuda dan orang
dewasa yang akan ikut
ambil bagian untuk
mengurangi kekerasan.
Output 3a Menetapkan dewan
penasehat dari para
pemuda-pemuda yang
terkait dengan lokal
pemerintah yang bekerja
sama dengan masalah yang
berkaitan dengan pemuda.
Para pelaku politik lokal
dan para pejabat yang
berwenang akan lebih
memperhatikan proposal
yang berasal dari pemuda
dalam berlatih
melaksanakan tugas
mereka.

77
PROGRAM EKONOMI BRA

PERNYATAAN
LOGIKA
ASUMSI INDIKATOR PERTANYAAN
YANG HARUS DI
JAWAB*
TUJUAN Untuk memastikan para
korban agar tidak lagi
berkeinginan
(berpikiran) kembali ke
suasana konflik
(perang).
Jika mereka sudah
dapat memenuhi
kebutuhan dasar
hidupnya, maka
mereka tidak akan
mau berkonflik lagi
% penerima bantuan
yang melapor
(menyatakan) bahwa
mereka tidak punya
keinginan untuk
kembali kepada suasana
berkonflik (Perang)

Apakah anda masih
ingin kembali ke suasana
konflik? Kalau ya
kenapa, kalau tidak
kenapa?

% penerima yang
merasa sudah terbantu
atau telah merasa
diperhatikan oleh
pemerintah

Apakah anda merasa
terbantu oleh
pemerintah?

% penerima bantuan
yang menyatakan
bahwa mereka
menerima manfaat yang
proses perdamaian.

Apakah anda merasa
manfaat dari perdamaian
ini?

SASARAN 1 Untuk memastikan
18.930 jiwa berdaya
dalam memenuhi
kebutuhan dasar
ekonomi melalui
pengembangan usaha
ekonomi produktif.

Jika 18.930 jiwa
penerima bantuan
sudah memiliki usaha
ekonomi produktif
maka mereka dapat
memenuhi kebutuhan
dasar ekonominya.
% penerima bantuan
yang menyatakan
bahwa mereka sudah
mampu memenuhi
penyediaan makanan
pokok.

Apa bantuan yang anda
terima sudah dapat
memenuhi kebutuhan
makanan pokok sehari ?

% penerima bantuan
yang menyatakan
bahwa mereka telah
mampu memenuhi dana
untuk berobat

Apakah anda telah
mampu menyediakan
uang untuk beli obat ?

% penerima bantuan
yang menyatakan
bahwa mereka telah
mampu membiayai
pendidikan dasar anak-
anaknya.

Apakah anda telah
mampu membiayai
sekolah anak anda ?

% penerima bantuan
yang memiliki usaha
ekonomi

Apakah anda sudah bisa
memiliki usaha sendiri ?

78
% penerima bantuan
masih memiliki usaha
setelah enam bulan dari
waktu diberikan
bantuan.
Apakah anda masih
memiliki usaha ?
(Ditanya enam bulan
kemudia)

OUTPUT 1 Memberikan Modal
Usaha kepada 18.930
orang masing-masing
menerima Rp.
10.000.000,- terdiri
dari 915 Tapol/Napol,
500 orang untuk GAM
menyerah pra MoU,
dan 17.515 orang yang
termasuk dalam
katagori Janda,
Pelecahan Seksual,
ditahan di pos
TNI/Polri, dan cacat
fisik/penyakit di 23
kabupaten/kota di Aceh
pada 15 Desember
2008, dengan
mengutamakan
perempuan.

% dari 18.930 orang
sudah menerima modal
usaha masing-masing
Rp. 10.000.000,-


% dari 18.930 orang
terdiri dari
Tapol/Napol, Gam
Menyerah Pra MoU,
Janda, Pelecahan
Seksual, ditahan di pos
TNI/Polri, dan cacat
fisik/penyakit


% dari 18.930 orang
yang berjenis kelamin
perempuan.



OUTPUT 2 Memberikan
pendampingan kepada
penerima bantuan
melalui pembentukan
UPP-PE di setiap
kabupaten/kota.



% dari penerima
bantuan yang
menyatakan bahwa
mereka sudah ada
pendampingan

% dari setiap 23
kabupaten/kota yang
telah terbentuk UPP-PE


See monitoring form for sources of data

79
PROGRAM DIYAT BRA

PERNYATAAN
LOGIKA
ASUMSI INDIKATOR PERTANYAAN
YANG HARUS DI
JAWAB*
TUJUAN Untuk memastikan para
korban agar tidak lagi
berkeinginan
(berpikiran) kembali ke
suasana konflik (perang).
Jika mereka sudah
dapat memenuhi
kebutuhan dasar
hidupnya, maka
mereka tidak akan
mau berkonflik lagi
% penerima bantuan
yang melapor
(menyatakan) bahwa
mereka tidak punya
keinginan untuk
kembali kepada suasana
berkonflik (Perang)

Apakah anda masih
ingin kembali ke suasana
konflik? Kalau ya
kenapa, kalau tidak
kenapa?

% penerima yang
merasa sudah terbantu
atau telah merasa
diperhatikan oleh
pemerintah

Apakah anda merasa
terbantu oleh
pemerintah?

% penerima bantuan
yang menyatakan
bahawa mereka
menerima manfaat yang
proses perdamaian.

Apakah anda merasa
manfaat dari perdamaian
ini?

SASARAN 1 Untuk memastikan
22,353 ahli waris
berdaya dalam
memenuhi kebutuhan
dasar ekonomi.
Jika 22,353 jiwa
penerima bantuan ahli
waris sudah dapat
memenuhi kebutuhan
dasar ekonominya.
% penerima bantuan
yang menyatakan
bahwa mereka sudah
mampu memenuhi
penyediaan makanan
pokok.

Apa bantuan yang anda
terima sudah dapat
memenuhi kebutuhan
makanan pokok sehari?

% penerima bantuan
yang menyatakan
bahwa mereka telah
mampu memenuhi dana
untuk berobat

Apakah anda telah
mampu menyediakan
uang untuk beli obat?

% penerima bantuan
yang menyatakan
bahwa mereka telah
mampu membiayai
pendidikan dasar anak-
anaknya.

Apakah anda telah
mampu membiayai
sekolah anak anda?


80

OUTPUT 1 Untuk memberikan
banutan diyat kepada
3,303 orang ahli waris
masing masing Rp 6 juta
dengan kategori belum
pernah menerima sama
sekali di 23 kab/kota
pada 15 Desember 2008
% 3,303 penerima diyat
yang melapor bahwa
sudah menerima
bantuan diyat

Apakah anda sudah
menerima bantuan diyat?

% 3,303 penerima diyat
yang melapor bahwa
sudah menerima 6 juta

Apakah anda sudah
menerima 6 juta?

% 3,303 penerima diyat
yang melapor bahwa
mereka ahli waris dari
korban konflik

Apakah anda benar ahli
waris? Dari siapa?
%3,303 penerima diyat
yang melapor bahwa
mereka belum pernah
menerima bantuan
diyat.

Apakah anda pernah
menerima bantuan diyat
sebelumnya?

Apakah anda menerima
melalui rekening atau
bagaimana?

OUTPUT 2 Untuk memberikan
bantuan diyat kepada
19,050 ahli waris masing
masing Rp 3 juta dengan
kategori sudah menerima
satu kali di 23 kab/kota
pada 15 Desember 2008


% 19,050 penerima
diyat yang melapor
bahwa mereka sudah
menerima bantuan diyat

Apakah anda sudah
menerima bantuan diyat?

% 19,050 penerima
diyat yang melapor
bahwa sudah menerima
3 juta

Apakah anda sudah
menerima 3 juta?

% 19,050 penerima
diyat yang melapor
bahwa mereka ahli
waris dari korban
konflik

Apakah anda benar ahli
waris? Dari siapa?

81
% 19,050 penerima
diyat yang melapor
bahwa mereka sudah
menerima bantuan diyat
satu kali.

Apakah anda pernah
menerima bantuan diyat
sebelumnya? Berapa
kali?

* See monitoring form for sources of data

82
INDIKATOR-INDIKATOR
Bagaimana saya mengukur keberhasilan dari Proyek saya ?



Sasaran :
Memberikan peserta dengan pengertian dari indikator dan bagaimana mereka
dapat menggunakan untuk memastikan kualitas Monitoring dan Evaluasi.

Hasil-hasil : pada akhir sesi ini, para peserta akan dapat :
Pemahaman mengenai fungsi dari Indikator
Pemahaman tentang bagaimana menulis sebuah indikator
Pemahaman tentang bagaimana menentukan indikator untuk proyek masing-
masing




Anda baru saja menyelesaikan Pernyataan LogisPernyataan Permasalahan, Tujuan,
Sasaran, Output dan Aktifitas. Sekarang Anda akan menulis Indikator-indikator.


APAKAH INDIKATOR ?
Indikator digunakan untuk mengukur keberhasilan dari Pernyataan Logis anda,
atau keberhasilan dari proyek anda.
Indikator di gunakan untuk mengukur perubahan yang sedang anda usahakan
untuk mencapai tujuan yang di inginkan.
Indikator menjawab pertanyaan Bagaimana Anda mengetahui bahwa Anda telah
memperoleh Tujuan, Sasaran, Output dan Aktifitas ? Atau Bagaimana Anda
mengukur Tujuan, Sasaran, Output dan Aktifitas ?

MENGGUNAKAN INDIKATOR UNTUK APA ?
Indikator ini akan di gunakan untuk Monitoring dan Evaluasi. Dimana mereka
menggunakan indikator ini untuk mengukur perkembangan selama program
berjalan, dan dampak dari program sesudah selesai.
Kita mengukur keberhasilan proyek kita karena :
o Jika kita mengetahui sampai sejauh mana keberhasilan dan kegagalan, kita
dapat melakukan perubahan desain proyek dan pada akhirnya kita dapat
mencapai tujuan akhir.
o Sebagai jalan pengembangan dari keberhasilan masa lalu dan menghindari
kesalahan yang sama untuk ke dua kalinya.
o Kita bertanggung jawab baik terhadap donor dan penerima bantuan,
sehingga memiliki tanggung jawab untuk mengukur dan
mendemonstrasikan keberhasilan, atau kegagalan, dari proyek kita.


83
BAGAIMANA MENYUSUN SEBUAH INDIKATOR ?

Tulis indikator dengan sebuah target dengan persen atau angka yang dapat
dihitung sebisa mungkin.
o Bila saya menulis satu indikator Yang diasumsikan sebagai X pemuda
menghadiri sekolah, apa yang Anda ketahui? Anda ketahui 100 pemuda
menghadiri sekolah. Tetapi, Anda tidak mengetahui bahwa terdapat 200
pemuda yang tidak menghadiri sekolah. Namun bila saya menulis satu
Indikator katakanlah X% dari pemuda yang menghadiri sekolah, informasi
apa yang Anda kumpulkan?








Anda akan mengetahui sebagai contoh bahwa 33% (100/300) dari pemuda
menghadiri sekolah. Sekarang dari satu persentase, Anda mengetahui
berapa banyak total anak-anak di sana, berapa banyak yang menghadiri
sekolah dan berapa banyak yang tidak menghadiri sekolah.

Indikator harusnya:
o Mungkin (Feasible): Ini akan mungkin terjadi untuk mengumpulkan
informasi yang di perlukan untuk diberikan kepada para staff dan sumber
keuangan yang anda miliki.
o Bermanfaat bagi pembuat keputusan (Useful in decision-making) : Data
akan berguna bagi pembuat kebijakan. Contoh: Ketua Harian BRA dan
Gubernur bisa pakai informasi dari indicator untuk mengambil keputusan.
o Dapat dipercaya (Reliable) : Data temuan akan sama bagi siapapun yang
mengambil data tersebut di lapangan.

Indikator seharusnya mengukur baik Kuantitas dan Kualitas.
o Indikator Kuantitatif berhubungan dengan:
Frekuensi pertemuan
Jumlah orang yang terlibat
Pertumbuhan dasar
Harga
Pendaftaran sekolah
Benih
Imunisasi Anak
Implementasi teknologi baru, dasar, Koran atau pedoman.

o Indikator Kuantitatif berhubungan dengan :
Tingkat partisipasi peserta dalam group pemangku kepentingan

X% dari pemuda
menghadiri sekolah
Jumlah pemuda yang
bersekolah

Jumlah total pemuda

84
Opini dari pemangku kepentingan atau kepuasan
Estetis pertimbangan Misal : rasa, tekstur, warna, ukuran, bentuk,
etc
Kemampuan masyarakat untuk mengambil keputusan
Perubahan sikap
Perubahan perilaku
Timbulnya seorang pemimpin baru
Kemampuan untuk memonitoring sendiri
Mengembangkan kelompok
Petunjuk konsensus

Indikator seharusnya TIDAK termasuk dalam kata seperti :
o Efektif/effective
o Sesuai/appropriate
o Baik/good
o Berhasil/successful

Mereka semuanya tidak spesifik/khusus. Berusaha untuk menggambarkan dengan
jelas perubahan yang akan anda ubah untuk mencapainya.

CATATAN : Menuliskan indikator untuk output dan kegiatan akan lebih mudah. Tetapi
menuliskan indikator untuk Sasaran dan Tujuan lebih sulit. Anda di tuntut untuk lebih
kreatif !!!

APA PERBEDAAN INDIKATOR DAN TARGET ? DAN APA ITU BASELINE
DATA ?

Indikator VS Target

Ini adalah sebuah Indikator X% dari pemuda menghadiri sekolah dasar

Ini adalah Target, bukan satu Indikator 80% dari pemuda menghadiri sekolah dasar.


Apakah perbedaan antara Indikator dan Target? Sebuah Indikator adalah yang Anda tulis
selama Proses Desain Proyek sehingga Anda mengetahui bagaimana mengukur
keberhasilan proyek Anda. Ditulis seperti X% dari Ini adalah sebuah alat ukur.
Untuk memindahkan Indikator menjadi Target Anda membutuhkan 2 hal :

1. Mengumpulkan Data Baseline - Anda mengumpulkan data Baseline untuk
mendapatkan gambaran berada di mana penerima bantuan pada awal proyek. Ini berarti
Anda akan mengumpulkan data Baseline SETELAH Anda menyeleksi penerima bantuan
tersebut, namun sebelum melakukan intervensi. Data Baseline adalah apa yang Anda
kerjakan ketika proyek Anda berjalanbukan sebagai bagian dari Proses Desain Proyek.
Dalam rangka men-set target, Anda akan butuh untuk mengumpulkan Data Baseline
untuk mendapatkan gambaran dimana partisipan dimulai. Bila Anda memulai proyek
85
40% dari partisipan menghadiri sekolah, mungkin target realistis adalah 85% dari anak-
anak menghadiri sekolah pada akhir proyek. Namun bila Anda memulai dengan 0%
anak-anak yang menghadiri sekolah, mungkin Anda sebaiknya men-set target yang lebih
rendah seperti 70% atau 75%. Target adalah hal yang relatif. Gunakan akal sehat dan
realistis.

2. Evaluasi dari Proyek Sebelumnya - Gunakan evaluasi dari proyek sebelum untuk
men-set target realistis. Sebagai contoh, bila 75% dari penerima bantuan dari proyek
pemberdayaan ekonomi terdahulu untuk peningkatan pendapatan satu setelah
pelaksanaan proyek, mungkin lebih aman untuk mengasumsikan persentase yang sama
terhadap keberhasilan proyek baru. Sehingga, mungkin Anda men-set target 75% atau
80%.

Jadi, tulis Indikator ketika anda mendesain proyek Anda. Setelah Anda mengumpulkan
Data Baseline dan melihat evaluasi data dari proyek sebelumnya, lihat kembali dan set
Target-target. Adalah penting bahwa Anda jangan melupakan untuk men-set Target!!
Target adalah apa yang Anda tujukan untuk diraih melalui proyek Anda. Kita
menggunakan target untuk Evaluasi. Evaluasi adalah perbandingan antara Target
dan Perolehan apa yang telah Anda tentukan untuk diraih dibandingkan dengan apa
yang sesungguhnya Anda raih.

Tip 1: Target JANGAN PERNAH 100%. 100% bukan realistis untuk proyek-proyek
yang melibatkan kemanusian. Set Target-target realistis yang dimudahi meskipun dalam
proyek-proyek terbaik tidak berjalan dan secara statik tidak mungkin kita meraih 100%
dalam segala hal.

Tip 2: Mebuat Indikator mungkin akan lebih memusingkan otak Anda ketimbang bagian
lain dari Proses Desain Proyek. Ini wajar. Akan jadi sulit. Yang paling penting, pastikan
bahwa SETIAP PROYEK MEMILIKI INDIKATOR. Ini adalah satu-satunya cara agar
kita dapat melakukan Evaluasi Proyek secara serius !!!
86
MONITORING DAN EVALUASI


SASARAN :
Mengetahui keperluan apa saja yang diperlukan dalam merancang suatu sistem
Monitoring dan Evaluasi

HASIL-HASIL : PADA AKHIR SESI INI, PARA PESERTA AKAN DAPAT :
Apakah Monitoring
Apakah Evaluasi
Apakah perbedaan antara Monitoring dan Evaluasi
Bagaimana mengidentifikasikan informasi yang harus dikumpulkan untuk
memonitor proyek anda
Menciptakan Formulir Monitoring yang akan di pergunakan di lapangan untuk
memonitor proyek anda.



Monitoring and Evaluasi berhubungan erat satu dengan lainnya, tapi masih dalam
kegiatan yang sama. Bagaimanapun juga mereka memiliki satu tujuan yang sama : untuk
memberikan informasi yang dapat meningkatkan pembuat keputusan dan pembelajaran
fasilitasi.

APA ITU MONITORING ?
Monitoring adalah proses yang berjalan selama program sedang
terimplementasikan dan harus menginformasikan sebuah keputusan tentang
program.
Monitoring akan menjawab pertanyaan Apa yang kita lakukan sesuai dengan apa
yang sudah di rancang pada saat perencanaan ?
Monitoring seharusnya menginformasikan hari ke hari kepada pembuat keputusan
dan memberikan pembuat keputusan dengan informasi yang akan membuat
keputusan mengenai bagaimana memperbaiki proyek.
Monitoring merupakan hal yang tidak sama dengan pengambilan data.
Pengambilan data merupakan bagian dari Monitoring. Anda membutuhkan untuk
dapat menganalisis data yang anda ambil dan memastikan data tersebut berguna
untuk memonitoring perkembangan dari kegiatan, output, sasaran dan tujuan.
Ada 3 hal utama dalam memonitoring proyek proyek perdamaian atau
peacebuilding.
9


o Monitoring Implementasi Proyek : Memantau bagaimana proyek berjalan
dan menyediakan kunci informasi untuk keputusan bagi project manager
dan peserta yang merupakan informasi untuk keperluan pelaporan kepada

9
Church, Cheyanne and Mark M. Rogers, Designing for Results: Integrating Monitoring
and Evaluation in Conflict Transformation Programs Search for Common Ground, 2006.
p. 82-89.
87
pihak pemberi bantuan dan pemangku kepentingan. Data yang berasal dari
implementasi monitoring akan dapat membantu dalam menjelaskan apa
saja yang sudah di implementasikan.
o Monitoring Hasil Proyek : Telusuri kemajuan perubahan dengan
memonitoring perkembangan dari Sasaran yang ada.

o Konflik dan Konteks Monitoring: Memperbaruhi secara kontinyu
mengenai analisis konflik. Mempertimbangkan faktor yang dapat
memperluas atau mengurangi terjadinya konflik. Berusaha untuk
menjawab beberapa pertanyaan :
10


Apakah asumsi kita mengenai konflik masih benar ?
Apakah intervensi kita masih masuk akal?
Apakah ada peluang baru?
Apakah ada akitvitas yang sebelumnya tidak dapat dijalankan,
tetapi sekarang bisa dijalankan?
Apakah ada pendekatan lain yang harus kita pertimbangkan ?
Jika hal lainnya telah berubah, mengapa kita tetap menjalankan hal
yang sama meskipun sudah dilaksanakan sebelumnya ?


Monitoring yang bagusmelihat apa yang berjalan bagus dan apa yang tidak berjalan
sesuai dengan apa yang diinginkan. Semuanya itu dicatat dalam sebuah laporan yang
membuat rekomendasi. Dan akhirnya di tindak lanjuti dengan keputusan dan tindakan.

Sumber: Handbook for Monitoring and Evaluating for Results, UNDP, p. 31.


APA ITU EVALUASI ?
Evaluasi berfokus pada gambaran yang besar, dan mengapa kejadian ini terjadi.
Evaluasi akan menjawab pertanyaan Apa yang kita kerjakan sesuai dengan apa
yang perlu dilakukan?
Ada 3 tipe dari Evaluasi :

o Evaluasi Pertengahan (Mid-term Evaluation) : Melaksanakan
pertengahan dari siklus proyek. Menetapkan kemajuan sampai disitu dan
bagaimana memperbaiki proyek.

o Evaluasi Final (Final Evaluation) : Dilaksanakan akhir dari proyek.
Memberikan penilaian terhadap nilai atau kontribusi dari sebuah proyek.

o Evaluasi Dampak (Impact Evaluation) : Dilaksanakan sesudah proyek
telah selesai. Menilai hasil dari sebuah proyek dan keberlanjutan dalam
seluruh hasil.

10
Church and Ross, Designing for Results, p. 86
88

Evaluasi Dampak jarang sekali dilakukan dekarenakan sumber yang diperlukan
untuk membuat sebuah metodologi yang efektif dan melakukan sebuah penelitian
yang berkualitas jarang ada. Kebanyakan proyek yang sudah dilakukan
menggunakan Evaluasi Pertengahan (mid-term) atau Evaluasi Final (final
evaluation), atau kedua duanya tergantung terhadap waktu dan sumber yang ada.



APA PERBEDAAN ANTARA MONITORING DAN EVALUASI ?


Monitoring Evaluation
Apa ? Pengumpulan dan analisis
data tentang:
Kemajuan mendekati
Tujuan, Sasaran, Output
dan Kegiatan.
Perubahan dalam konflik
atau konteks
Strategi
Implementasi
Meninjau kembali apa yang
sedang terjadi dan kenapa,
dan menentukan
keterkaitan, efisiensi,
efektivitas, dampak, dll .
Kenapa ? Menginformasikan
keputusan hari demi hari
Tanggung jawab dan
pelaporan.
Memperkuat program di
masa depan
Menyediakan bukti dari
kesuksesan dan
kegagalan.
Memperdalam pengertian
kita mengenai bagaimana
dan kenapa hasil dapat
terjadi.
Siapa ? Staff Program, Mitra dan /
atau peserta
Consultant External, staff,
peserta, atau kombinasi dari
grup ini.
Kapan merencanakan ? Tahapan perancangan Tahapan Perancangan,
tetapi lebih dulu meninjau
kembali sebelum
melaksanakan evaluasi.
Kapan
mengimplementasikan ?
Selama program berjalan Evaluasi pertengahan: Di
dalam pertengahan
proyek.
Evaluasi Final: Di akhir
proyek
Dampak Evaluasi:
Sesudah proyek selesai.
Sumber: Designing for Results, p. 83
89

90
MONITORING EVALUASI

Monitoring = Informasi yang Anda kumpulkan selama proyek untuk memonitor
implementasi proyek

Evaluasi = Pengukuran terhadap perubahan yang di capai pada sebuah proyek



BAGAIMANA SAYA DAPAT MEMONITORING SEBUAH PROYEK ?


5. Setelah Anda menulis Indikator Tujuan, Sasaran, Output dan Kegiatan, DAN
menyiapkan Rencana Kerja untuk menjadwalkan Kegiatan anda, lanjutkan
dengan kolom 3 Monitoring and Evaluasi.

6. Untuk setiap Indikator, jawablah pertanyaan Bagaimana saya mengumpulkan
informasi yang saya butuhkan untuk mengetahui sampai sejauh mana saya telah
mencapai Tujuan, Sasaran, Output dan Kegiatan? atau Bagaimana saya
mengumpulkan informasi untuk mengukur Indikator saya? Anda memerlukan
jawaban atas pertanyaan sebagai berikut :

a. Informasi apakah yang saya perlukan untuk mengukur indikator saya ?
Tulis semuanya kedalam pertanyaan yang akan anda jawab.
b. Dimanakah akan saya dapatkan jawaban dari pertanyaan ini ? Apakah
saya perlu menanya kepada penerima bantuan atau kantor pemerintahan ?
atau apakah informasi ini berasal dari data yang saya perlukan untuk di
kumpulkan dari pusat kesehatan, kepala sekolah atau biro statistik ?
c. Metodologi apa yang akan saya pergunakan untuk menjawab semua
pertanyaan ini ? Wawancara, Kerja kelompok, Pertanyaan, Teknik
pendampingan, dll ?
d. Bagaimanakah saya menganalisa data yang telah saya kumpulkan ?
e. Siapakah dari team saya yang bertanggung jawab dalam menanyakan
pertanyaan ini ?
f. Kapan akan kita tanyakan pertanyaan ini ?

7. Buatlah sebuah Formulir Monitoring yang akan di pergunakan sebagai perangkat
sebuah monitoring yang akan di pergunakan oleh staff yang berada di lapangan.
Semua pertanyaan yang ingin di pertanyakan harus di catat dalam formulir ini.
Sesudah itu, tuliskan sumber dari informasi tersebut dan tetapkan metode apa
yang akan di pergunakan di lapangan nantinya diantaranya wawancara, diskusi
kelompok, teknik partispasi, dll. Contoh dari Formulir Monitoring akan di
tampilkan di bawah ini.

8. Tambahkan Monitoring kedalam Rencana Kerja anda untuk mengalokasikan
waktu dari pengumpulan data, Analisis data tersebut dan buatlah laporannya.
91
CONTOH FORMULIR MONITORING


III. Sebelum berangkat ke lapangan, seselesaikan :

4. Ambil daftar penerima bantuan untuk ekonomi dan perumahan dari Dinas Sosial
atau Bapel di Banda Aceh

5. Menjawab pertanyaan berikut :

Untuk Ekonomi :
Berapa orang yang telah menerima bantuan modal ?
Berapa jumlah uang yang diterima oleh masing-masing penerima bantuan ?
Berapa jumlah dan persentasi Tapol/Napol ?
Berapa jumlah dan persentasi GAM Menyerah pra MoU ?
Berapa jumlah persentasi janda ?
Berapa jumlah/persentasi pelecahan seksual ?
Berapa jumlah/persentasi yang ditahan di Pos TNI/Polri ?
Berapa jumlah/persentasi yang cacat fisik/penyakit ?
Berapa jumlah/persentasi yang perempuan ?

Untuk Perumahan :
Berapa orang yang telah menerima bantuan rumah ?
Berapa jumlah uang yang diterima oleh masing-masing penerima bantuan ?

6. Menganalisa data tersebut dalam bentuk narasi dan pie chart di format laporan.

IV. Di lapangan :

1. Croscheck ke 5 orang di setiap kab-kota yang memiliki nomor urut 7 di daftar
penerima bantuan per jenis bantuan (perumahan, ekonomi, diyat, dll). Tanyakan
kepada mereka pertanyaan berikut dan catat jawaban untuk setiap masing-masing
pertanyaan.

Untuk Penerima Bantuan Ekonomi :
Apakah anda sudah menerima bantuan modal ?
Berapa jumlah uang yang anda terima ?
Apakah anda sudah bisa memiliki usaha sendiri ?
(Ditanya enam bulan sesudah usaha mulan): Apakah anda masih memiliki usaha
?
Apakah anda sudah menerima pendampingan? Berapa kali?, dan apa saja yang
diterima atau manfaat dari pendampingan tersebut ?
Apakah anda bisa memenuhi kebutuhan makanan pokok sehari?
Apakah anda telah mampu menyediakan uang untuk beli obat ?
Apakah anda telah mampu membiayai sekolah anak anda ?
Apakah anda sebagai korban konflik ?
Apakah anda masih ingin kembali ke suasana konflik ? Kalau Ya kenapa, kalau
Tidak kenapa ?
Apakah anda merasa terbantu oleh pemerintah ?
Apakah anda merasa manfaat dari perdamaian ini ?
92

Untuk Penerima Bantuan Perumahan :
Apakah anda sudah memperoleh bantuan rumah ?
Apakah anda sudah menerima Rp 40 juta untuk membangun rumah ?
Apakah anda memperoleh bantuan melalui rekening bank ?
Apakah rumah anda sekarang layak dihuni ?
Apakah rumah anda dulu dibakar atau dirusak waktu konflik ?
Apakah anda mendapat pendampingan dalam membangun rumah ?
Apakah anda merasa terbantu dengan ada pendampingan ? Kenapa ?
Apakah anda merasa nyaman tinggal di rumah sekarang ?
Apakah anda merasa dibantu dan diperhatikan oleh pemerintah ?
Apakah anda masih ingin kembali ke suasana konflik? Kalau ya kenapa, kalau tidak
kenapa ?
Apakah anda merasa manfaat dari perdamaian ini ?

Untuk Penerima Bantuan Diyat :
Apakah anda sudah menerima bantuan diyat ?
Berapa jumlah bantuan yang anda terima ?
Apakah anda benar ahli waris ? Dari siapa ?
Apakah anda pernah menerima bantuan diyat sebelumnya ? Berapa kali ?
Apakah anda menerima melalui rekening atau bagaimana ?
Apakah anda bisa memenuhi kebutuhan makanan pokok sehari?
Apakah anda telah mampu menyediakan uang untuk beli obat ?
Apakah anda telah mampu membiayai sekolah anak anda ?
Apakah anda merasa dibantu dan diperhatikan oleh pemerintah ?
Apakah anda masih ingin kembali ke suasana konflik? Kalau ya kenapa, kalau tidak
kenapa ?
Apakah anda merasa manfaat dari perdamaian ini ?

2. Bertanya kepada BRA kabupaten/kota :

Untuk Program Ekonomi :
Apakah UPP-PE sudah terbentuk ?
Tanya kepada Pendamping, Sudah berapa orang yang telah didampingi ? Berapa
lama ?.

Untuk Program Perumahan :
Berapa jumlah pendamping pada setiap kecamatan ?
Berapa orang masing-masing pendamping mendampingi penerima rumah ?

93
BAGAIMANA UNTUK MENGEVALUASI SEBUAH PROYEK ?

Ada 3 langkah dalam mengevaluasi :

1. Persiapan : Tentukan
Apa yang ingin di dapatkan atau dipelajari ?
Siapakah akan membaca atau menggunakan laporan dari evalusi
itu ? Organisasi anda, donor, pemangku kepentingan
(stakeholders), dll ?
Siapa yang melakukan evaluasi ini ?
Kapan evaluasi akan dilakukan ?
Berapa anggaran yang dikeluarkan untuk evaluasi ini ?

4. Manajemen :
a. Merancang Kerangka Acuan (TOR): TOR merupakan pedoman untuk
evaluasi dan seharusnya di kembangkan oleh team proyek selama 4-6
bulan sebelum evaluasi di mulai. Contoh dari TOR termasuk di bawah ini .

b. Menciptakan Rencana Kerja Evaluasi : Rencana Kerja Evaluasi
memberikan sebuah struktur desain dari evaluasi dan dapat di gunakan
sebagai alat untuk komunikasi dalam berbagai pemangku kepentingan.
Rencana ini seharusnya dilakukan oleh tim proyek yang dikoordinasikan
dengan tim evaluasi. Lihat contoh di bawah.

c. Merekrut Tim Evaluasi

d. Evaluasi Implementasi

5. Menggunakan Evaluasi :
i. Mengadakan diskusi kelompok terhadap pelaporan Evaluasi
dengan team proyek sehingga setiap orang dapat memahami
hasilnya.
ii. Merefleksikan terhadap apa yang sudah berhasil dengan baik oleh
team, apa yang tidak berhasil dan apa yang seharusnya di ganti.
iii. Mempergunakan apa yang sudah dipelajari untuk proyek anda.
iv. Beritahukan hal baru di dalam kantor, organisasi dan
peacebuilding lapangan yang lebih luas.


94
TERMS OF REFERENCE (TOR)
EVALUASI
11


VII. Ringkasan : Simpulkan kunci utama dalam evaluasi termasuk :
7. Tipe Evaluasi
8. Tanggal
9. Durasi
10. Intervensi
11. Negara
12. Permintaan dari peserta / aplican

VIII. Latar Belakang :
a. Ringkasan Intervensi : Maksimum 2 halaman dan dapat di lampirkan dalam
kerangaka acuan yang logis (LogFrame). Yang terdiri dari :
Tujuan Proyek
Sasaran Proyek
Kegiatan sehari-hari
Lokasi kegiatan
Target peserta
Ukuran dan lingkup dari sebuah proyek
Lama waktu sebuah proyek

b. Pandangan Organisasi :
Misi Organisasi
Tahun keberadaan
Jumlah Staff, kantor perwakilan Negara dan anggaran
Lamanya waktu di sebuah Negara
Jenis dari program

IX. Evaluasi

a. Tujuan Evaluasi : Tujuan apakah yang ingin dicapai dari evaluasi ?

b. Sasaran Evaluasi : Lihat diagram di bawah Pilihan untuk sasaran
evaluasi dan bentuk dari pemeriksaan

c. Bentuk Pemeriksaan: Daftar pertanyaan yang menyediakan gambaran
yang umum mengenai apa yang anda cari dan inginkan. Lihat diagram
dibawah Pilihan untuk sasaran evaluasi dan bentuk dari pemeriksaan

d. Peserta : Siapa yang akan menggunakan hasil evaluasi ini ?

e. Metode Evaluasi : Metode apa yang akan di gunakan untuk
mengumpulkan informasi ini ? Lebih spesifik. Tetapkan beberapa data

11
Designing for Results, Chapter 9Evaluation Management
95
monitoring yang sudah ada. Apa yang sudah di kumpulkan, kapan dan
oleh siapa ?

X. Informasi Implementasi

a. Pimpinan Evaluasi : Siapa yang akan memimpin evaluasi ini? Orang ini
akan bertanggung jawab keseluruhan untuk evaluasi ini. Dia akan
memasitkan bahwa rencana evaluasi sudah siap dan pekerjaan dan batas
waktu di tepati. Dia akan tandatanganan laporan akhir evaluasi.

b. Lokasi : Menjelaskan lokasi evaluasi. Apabila di tempat lokasi yang
berbeda, anda harus mempertimbangkan apakah semua bisa dicpai atau
kalau sample mau diambil. Evaluator dapat membantu dalam menentukan
hal ini.

c. Hasil yang dicapai : Hasil apa yang anda inginkan dari evaluasi ini ?
Pelaporan ? Sebuah ringkasan laporan ? Presentasi power point ? Foto?
Alur cerita? Laporan standar evaluasi termasuk :

i. Daftar Isi
ii. Daftar akronim
iii. Ringkasan Umum
iv. Latar belakang Intisar dari konteks Ringkasan
v. Latar belakang dari organisasi dan program
vi. Metodologi Evaluasi
vii. Kesimpulan
viii. Rekomendasi
ix. Lampiran
1. Lampiran A: Terms of Reference
2. Lampiran B: Daftar dari seluruh kandidat (Jika tidak
rahasia)
3. Lampiran C: Jika anda sedang berselisih pendapat
masukkan dalam lampiran ini.

d. Durasi : Tetapkan jumlah dari hari kerja dan tanggal dari evaluasi.
e. Batas Waktu : Tetapkan batas waktu dari pengrekuitment dari evaluator,
implementasi dari evaluator, draft pelaporan dan Laporan akhir.

f. Dukungan Logistik : dAnda membutuhkan transportasi, penterjemah,
handphone, fotocopy, ruang kantor, yang mengatur jadwal pertemuan, dll






96
XI. Tim Evaluasi

a. Tanggung Jawab Evaluator : Apa yang anda harapkan dari pekerjaan
seorang evaluator ? Membangun Rencana Evaluasi ? Mempastikan
pelaporan akhir ? Gambarkan apa yang anda harapkan.

b. Kualifikasi Evaluator : Kualifikasi apa saja yang diinginkan bagi
seorang evaluator ? Kemampuan bahasa, pengetahuan terhdap Negara
tersebut, pengalaman evaluasi, kemampuan fasilitasi, pengetahuan
menganalisa konflik, pengalaman peacebuilding, kemampuan sebagai
peneliti, dll.


XII. Pedoman pelamar : Bagaimana membuat orang tertarik untuk melamar sebagai
seorang evaluator ? Kepada siapa mereka kirim dan untuk siapa ?



97
JENIS SASARAN EVALUASI

No Tipe dari Sasaran
Evaluasi
Apa yang dapat
kamu katakan
Contoh pertanyaan untuk
Formulir Evaluasi
Kapan ini
akan
terlaksana
1 Kelayakan Anda
dalam intervensi
Apakah strategi
intervensi anda
merupakan hal yang
sesuai dengan situasi
yang ada dan tujuan
yang di inginkan ?
Apakah teori anda
tentang bagaimana
menciptakan
perubahan sehingga
mendapat mencapai
tujuan yang
diinginkan? Apakah
strategi ini
berdasarkan pada
kebutuhan dari sasaran
populasi ?
Apa yang menjadi kualitas
dari analisis konflik ?
Apa yang menjadi hubungan
antara analisis konflik dan
strategi intervensi ?
Apa yang menjadi teori
perubahan ?
Apakah ini sesuai dengan
konteks yang ada ?
Apakah ada strategi/teori
yang lain untuk merubah
menjadi lebih sesuai lagi ?
Evaluasi
Pertengahan
(formative),
Evaluasi
Final
(summative)
2 Sasaran / Hasil
Identifikasi
Perubahan apa yang
akan dihasilkan oleh
output proyek dan
kegiatan ? Contoh :
Penurunan kekerasan
atau peningkatan
dalam kolaborasi
dengan masyarakat .
Apa hasil dari sasaran yang
terjadi ?
Apakah hasil yang
didapatkan sesuai dengan
hasil yang diharapkan ? Jika
tidak, mengapa?
Perubahan positif dan negatif
apa yang terjadi ?
Bagian dari proyek apa yang
lebih penting untuk
menciptakan perubahan ?
Proses apakah (lingkungan,
masyarakat, pribadi) ?
Apakah perubahan yang
lebih kecil diperlukan
sebelum keluarannya terjadi?
Evalausi
Pertengahan
(formative),
Evaluasi
Final
(summative)
3 Output Identifikasi Apa yang segera, hasil
terukur dalam proyek
anda ? Contoh :
Jumlah orang yang
melatih, Jumlah buku
yang di print, Jumlah
kasus mediasi yang
sudah ditangani,
Output apa yang telah di
hasilkan ?
Apakah kualitasnya sesuai
atau tidak ?
Apakah output sesuai dengan
yang diharapkan dalam
dokumen perencanaan ? Jika
Tidak, mengapa ?
Evalausi
Pertengahan
(formative),
Evaluasi
Final
(summative)
98
Jumlah produksi radio
per menitnya .
4 Dampak Evaluasi Apakah dampak dari
proyek dalam konflik?
Dampak dari evaluasi
kelihatannya tidak
hanya jika kamu telah
mencapai tujuanmu,
tapi efeknya adalah
mempunyai konflik
yang lebih besar.
Evaluasi ini mahal dan
memerlukan banyak
waktu dan sumber
daya.
Perubahan apa yang terjadi
dalam konflik yang muncul
selama intervensi ?
Apakah bukti temuan di
masyarakat penerima
bantuan ditransfer ke dalam
masyarakat yang lebih luas ?
Apakah ada bukti yang
menyatakan bahwa hasil
proyek tetap digunakan?
Adakah efek positif atau
negatif selama proyek
berjalan ?
Apabila output dari proyek
tidak dapat dipergunakan
terus, mengapa ?
Evaluasi
Final,
Dampak
evaluasi
5 Penyesuaian
Strategi
Apakah proyek telah
sesuai dengan misi
dan visi dari
organisasi anda ?
Bagaimanakah kontribusi
proyek dalam misi organisasi
anda ?
Apakah proyek tersebut
menggambarkan terhadap
dasar dari organisasi seperti :
persamaan gender ?
Apakah keahlian yang
dimiliki organisasi anda
dapat dipergunakan dalam
proyek ini ?
Adakah organisasi lain yang
dapat menyelesaikan proyek
ini dengan lebih baik yang
disesuaikan dengan keahlian
atau situasi ?
Evaluasi
Pertengahan ,
Evaluasi
Final
6 Management dan
Administrasi
Bagaimanakah proyek
dapat diatur dan di
jalankan ?
Melingkupi bimbingan
Komunikasi dan
Implementasi
Apakah arahan, bimbingan
dan dukungan terhadap
proyek cukup ?
Apakah semua aspek dari
intervensi telah di organisir ?
Dimanakah sistem
monitoring yang digunakan
untuk memberikan pedoman
dan masukan terhadap
pelaporan ?
Apakah hubungan dengan
mitra efektif ? (Komunikasi
Mid-term
(formative)
evaluation,
Final
(summative)
evaluation
99
yang baik, Peraturan yang
jelas, dll)
Apa semua kegiatan yang di
rancang selesai ? Jika Tidak,
kenapa ?
7 Pertanggung
jawaban anggaran
Siapa yang menjadi
penanggung jawab
untuk bidang
keuangan dan
bagaimana
mempengaruhi
implementasi sebuah
proyek ? Apakah
mereka memiliki cara
untuk menyimpan
uang tanpa merugikan
proyek ? Ini bukan
merupakan audit
karena tidak
membahas mengenai
pelatihan akuntasi
umum
Dimanakah pengeluaran
proyek terjadi dan
dilacak/ditelusuri secara
regular ?
Bagaimanakah
mempertimbangkan alternatif
untuk memaksimalkan
penggunaan dana selama
perencanaan proyek ?
Apakah keputusan
manajemen menjadi harga
lebih naik ?
Apakah organisasi
menggunakan skala ekonomi
dimana skala tersebut masuk
akal ?
Mid-term
(formative)
evaluation,
Final
(summative)
evaluation
Adapted from the Conflict Transformation Evaluation Framework, Designing for
Results, p. 105



Tidak penting untuk memasukkan semua pilihan dalam tujuan evaluasi. Pilih beberapa
yang akan membantu kamu mengembangkan proyek kamu dan memungkinkan bahwa
kamu bisa mendapatkan data tersebut dengan sumber daya yang ada. Biasanya 1,2 dan 3
dilakukan bersamaan.

100
RENCANA EVALUASI


Sasaran
Evaluasi
Indikator,
Standar atau
Pertanyaan
lain
Metode
pengumpulan
data
Sumber
Data
Lokasi dari
pengumpulan
data
Konteks/
Pertimbangan
konflik
Cara
Menganalisa
data
Waktu
yang di
perlukan
(Hari)











Konteks/Pertimbangan konflik : Apakah ada hal yang perlu dipertimbangkan dalam
konteks situasi konflik ? Sebagai contoh : Bagaimanaka situasi keamanan ? Dapatkah
seseorang berhati -hati di lapangan ? Adakah pertimbangan khusus untuk perempuan ?
Apakah beberapa bahasa dapat dipertimbangkan dalam wadah politik ? Apakah
implikasi yang di identifikasikan oleh evaluator dalam masyarakat ?




101
LAMPIRAN 1 :
CONTOH DOKUMEN UNTUK PROGRAM PEACE BUILDING

PERNYATAAN LOGIS / INDIKATOR / PERTANYAAN MONITORING
PERNYATAAN
LOGIS
ASUMSI INDIKATOR PERTANYAAN SUMBER
DATA DAN
METODE
PENGUMPUL
AN DATA
TUJUAN Untuk memastikan
kedua belah pihak
untuk tidak
menggunakan
kekerasan untuk
menyelesaikan
permasalahan yang
merupakan hasil
implementasi proses
perdamaian.

Jika kedua belah pihak
telah melaksanakan
forum diskusi, mereka
tidak akan
menggunakan
kekerasan lagi untuk
menyelesaikan sebuah
permasalahan yang
berhubungan dengan
implementasi dari
proses perdamaian.


% peserta dari pihak
A yang akan saling
bekerjasama dengan
institusi politik dari
pihak B.


1. Apakah anda akan
dapat bekerjasama
dengan mengikuti
institusi politik
dengan pihak B ?
- Partai politik
Nasional,
Departement
Pemerintahan, dan
Parlemen, Militer,
Polisi, Bupati dan
Camat
Wawancara
dengan peserta
pihak A 3x
dalam setahun
(setelah setiap
pertemuan ke 4)
% dari peserta pihak B
yang melaporkan
bahwa dapat
bekerjasama dengan
kelompok politik
lokal, Mantan GAM
dan pejabat yang
dipilih dari pihak A
1. Apakah anda akan
bergabung dengan
kelompok partai
local, mantan GAM
dan pejabat yang di
pilih dari pihak A?
Kenapa / Kenapa
tidak ?

Wawancara
dengan peserta
pihak B 3x
dalam setahun
(setelah setiap
pertemuan ke 4)
% dari kejadian
kekerasan yang terjadi
yang berhubungan
dengan politik dalam
tiap bulannya

Apakah kejadian
kekerasan
berhubungan dengan
peningkatan isu
politik atau
penurunan dalam tiap
bulannya ?
Update
Monitoring
Konflik Bank
Dunia
Sasaran 1 Untuk meningkatkan
pemahaman dan
perjanjian antara
kedua belah pihak
untuk perjanjian
perdamaian,
menanggapi peristiwa
keamanan, dan
mendesak kedua belah
Kedua-duanya fraksi
dari kelompok A akan
duduk bersama dalam
satu meja.

# dari pemberitaan di
media yang mengikuti
pertemuan ini dimana
kedua belah pihak
membuat pernyataan
bersama
Apakah beberapa
pihak membuat
sebuah pernyataan
bersama dalam
pemberitaan di media
dalam mengikuti
pertemuan?

Periksa seluruh
pernyataan di
media di setiap
pertemuan
Pertemuan forum lain
untuk dialog tidak akan
merusak legitimasi dari
pertemuan ini
102
pihak untuk
menggunakan
percakapan dalam
menyelesaikan
perselisihan.

% dari pernyataan
dalam media dimana
masing-masing pihak
A dan B tidak
memberikan sebuah
informasi konflik
mengenai kejadian
keamanan

Apakah pernyataan
dalam media
memberikan
informasi konflik
mengenai :
- Kapan kejadian
terjadi
- Apakah kejadian
politik atau kriminal
memang murni
- Solusi atau langkah
selanjutnya

Periksa
pernyataan di
media setiap
beberapa pihak
setiap harinya
% dari isu setuju dari
jumlah total angka isu
yang ada yang telah di
diskusikan di setiap
pertemuan



1. Berapa banyak
permasalahan yang
telah di diskusikan
dalam setiap
pertemuannya ?
2. Berapa banyak
dari isu yang telah di
diskusikan dengan
mencapai persetujuan
antara kedua belah
pihak ?
Periksa notulen
pertemuan
% dari peserta yang
dapat mengerti dari
persepsi dari pihak
yang lain meskipun
mereka tidak setuju
Apakah anda
mengerti persepsi
dari pihak yang lain
mengenai isu yang
dibicarakan dalam
pertemuan meskipun
anda tidak setuju ?
Wawancara
dengan peserta
3x dalam setahun
(Setiap
pertemuan ke 4)
% dari peristiwa
kekerasan setiap bulan
yang dapat ditangani
oleh polisi dengan di
dukung oleh kedua
belah pihak
Apakah anda
mendukung
menagani dari
peristiwa kekerasan
oleh polisi atau pihak
lain yang terkait ?
Wawancara
dengan peserta
3x dalam setahun
(Setiap
pertemuan ke 4)
% dari peristiwa
kekerasan yang telah
di diskusikan dalam
pertemuan

Berapa persen dari
peristiwa kekerasan
dalam setiap
bulannya yang telah
di diskusikan dalam
pertemuan ?
Kliping Koran,
Notulen
pertemuan
% peserta dari masing-
masing pihak siapa
yang akan mendukung
dari pencapaian solusi
dalam pertemuan
Apakah anda akan
mendukung dari
solusi yang telah
dicapai dalam
pertemuan ?
Wawancara
dengan peserta
3x dalam setahun
(Setiap
pertemuan ke 4)
OUTPUT
1.1
Rapat bulanan yang
dilakukan secara
bergantian di masing-
masing kabupaten
dalam satu propinsi
% dari peserta yang di
undang untuk
menghadiri pertemuan
Berapa banyak
peserta yang akan di
undang menghadiri
pertemuan ?


Bandingkan
siapa saja yang
diundang dengan
peserta yang ada
103
% dari peserta yang
selalu hadir dalam
setiap bulannya

Dari 10 peserta
utama, berapa banyak
dari mereka yang
menghadiri
pertemuan tiap
bulannya ?
Daftar Hadir
Perwakilan dari
tingkat Kabupaten dari
beberapa pihak yang
menghadiri pertemuan
di setiap kabupaten
Apakah perwakilan
dari masing-masing
pihak A dan B
menghadiri
pertemuan yang
dilaksanakan di
setiap kabupaten ?
Daftar Hadir
Pertemuan
berlangsung setiap
bulan

Berapa banyak
pertemuan di lakukan
dalam 1 tahun ?
Notulen
Pertemuan
50% dari tuan rumah
(Kabupaten) yang
melakukan pertemuan
sedikitnya sekali
Berapa banyak dari
30 Kabupaten yang
melakukan
pertemuan sedikitnya
sekali ?


Notulen
Pertemuan
104
FORMULIR MONITORING


II. Tanyakan pertanyaan di bawah ini kepada peserta pertemuan dari pihak A
setiap pertemuan ke 4 :

5. Apakah anda ingin berhubungan dengan institusi pihak B sebagai berikut ?
Parta Politik Nasional
Lembaga Pemerintahan (Kesehatan, Kesejahteraan Sosial, dll)
Parlemen Nasional
Militer
Polisi
Bupati dan Camat

6. Apakah anda mengerti sudut pandang pihak lain mengenai permasalahan yang
didiskusikan dalam pertemuan meskipun anda tidak setuju ?

7. Apakah anda mendukung dengan penanganan peristiwa kekerasan yang
dilakukan oleh polisi atau pihak yang berwenang lainnya ?

8. Apakah anda setuju dengan solusi yang telah dicapai dalam pertemuan ?


III. Tanyakan pertanyaan di bawah ini kepada peserta dari Pihak B setiap
pertemuan ke 4 :

1. Apakah anda ingin berhubungan dengan institusi politik partai A sebagai
berikut ?
Partai politik lokal
Pemimpin mantan GAM
Pejabat yang di pilih dari partai B

2. Apakah anda mengerti sudut pandang partai lain mengenai permasalahan yang
di diskusikan dalam pertemuan meskipun anda tidak setuju ?

3. Apakah anda mendukung terhadap penanganan peristiwa kekerasan yang
dilakukan oleh polisi atau pihak berwenang lainnya ?

4. Apakah anda setuju dengan solusi yang telah dicapai dalam pertemuan ?


IV. Raihlah informasi berikut ini dari update Monitoring Konflik Bank Dunia :

5. Apakah peristiwa kekerasan yang berhubungan dengan masalah politik
meningkat atau menurun setiap bulan ?

105
V. Monitor Koran lokal setiap minggu untuk :

6. Press Releases gabungan yang dilakukan oleh partai

7. Pernyataan yang dikeluarkan oleh partai mengenai :
Peristiwa Kekerasan
Apakah permasalahan tersebut di identifikasikan sebagai masalah
politik atau kejahatan
Apakah solusi atau langkah selanjutnya yang harus di tentukan oleh
partai

8. Hitung jumlah peristiwa kekerasan yang berhubungan dengan politik
(menyerang personil atau pejabat partai) yang terjadi

VI. Periksa setiap menit pertemuan untuk menentukan :

9. Berapa banyak masalah yang didiskusikan dalam setiap pertemuan ?
10. Berapa banyak permasalahan yang di diskusikan yang mencapai kesepakatan?
11. Berapa banyak peristiwa kekerasan yang di tulis saat press yang didiskusikan
di pertemuan?
12. Berpa kalai pertemuan diadakan selama 12 bulan?
13. Berapa banyak pertemuan yang diadakan oleh 30 Kabupaten yang dilakukan
sedikitnya satu kali?

VII. Mengkaji ulang daftar hadir setiap pertemuan untuk menentukan:

14. Berapa banyak peserta yang diundang untuk menghadiri pertemuan?
15. Dari 10 peserta inti, berapa banyak yang setiap bulannya selalu hadir?
16. Apakah perwakilan partai A dan B selalu menghadiri pertemuan setiap kali
dilaksanakan di daerah mereka?















106
CONTOH RENCANA KERJA
No Aktivitas / Kegiatan
Nama Penanggung
Jawab
Bulan
Januari Februari
17-21 24-28 1-5 8-12 15-19 22-26
Output
1.1.
Rapat bulanan antara kedua belah
pihak untuk proses perdamaian
1.1.1. Menulis Undangan
1.1.2
Konfirmasi dengan peserta yang akan
hadir
1.1.3
Tim Advance pergi ke kabupaten untuk
mengundang perwakilan dari lokal,
menyiapkan surat dari polisi, biaya
sewa, menyiapkan makan siang/coffe
break, Mendapatkan ruangan hotel dan
mengatur transportasi untuk peserta.
1.1.4
Menyiapkan keuanganPrepare
finance/mendapatkan uang untuk
membayar peserta
1.1.5
Rapat dengan Pihak A untuk
mendapatkan masukan
1.1.6
Rapat dengan Pihak B untuk
mendapatkan masukan
1.1.7
Rapat dengan pemberi bantuan untuk
mendapatkan masukan
1.1.8
Pertemuan staff untuk mengupdate
agenda dari pertemuan
1.1.10
Membayar uang Honor dan transportasi
kepada peserta
1.1.11 Pengiriman pengeluaran ke kantor
1.1.12
Monitoring-Wawancara dengan kedua
belah pihak
1.1.13 Monitoring- Kliping Koran
1.1.14
Monitoring- Notulen Pertemuan / Daftar
Hadir
1.1.15
Monitoring- Dapatkan Update Monitoring
Konflik Bank Dunia
107
CONTOH BUDGET / ANGGARAN

No Keterangan
Units
Bulan Harga (USD) Total (USD) Units Label
Output 1.1 Pertemuan Bulanan
1
Tunjangan per hari untuk tim
Advance menyiapkan pertemuan
Kabupaten 12
3 orang x 4
hari 14
2
Bensin untuk Tim Advance untuk
menyiapkan pertemuan Kabupaten 1 Mobil 14
3
Hotel untuk tim Advance untuk
menyiapkan pertemuan 12
3 orang x 4
malam 14
4
Surat dari Polisi untuk menjaga
pertemuan Kabupaten 1 Pembayaran 14
5 Biaya sewa 1 Sewa 14
6
Makan siang dan 2 coffee breaks
untuk pertemuan 40 Orang 14
7 Biaya Internet di Kabupaten 1 Orang 14
8 Biaya 10 peserta 10 Orang 14
9
Transportas untuk pertemuan
peserta 8 Mobil/Pesawat 14
10 Hotel untuk peserta 20 Ruangan 14
11 Biaya pembicara dalam pertemuan 1 Orang 8
12 Hotel untuk pembicara 1 Orang 8
13
Makan Siang/Malam/ pertemuan
dengan pertemuan pemangku
kepentingan sesudah/sebelum
pertemuan 3 Orang 14
TOTAL X
108
LAMPIRAN 2 :
JADWAL PELATIHAN DM&E SELAMA 3 HARI

HARI 1: PELATIHAN DM&E BAGI BRA

Waktu Kemampuan
Utama
Aktivitas / Kegiatan Sumber Materi
9:00 Pembukaan
(30 Menit)
Instruktur dan peserta
memperkenalkan masing-masing
Memperkenalkan Sasaran dan
Hasil-hasil dari kegiatan pelatihan
ini


Slides 2, 3
9:30 Siklus Proyek
DM&E (1 Jam 15
Menit)
Memperkenalkan Sasaran dan
Hasil-hasil
Memperkenalkan Konsep dari
Siklus DM&E (30 Menit)
Kegiatan: Dimanakah proyek anda
saat ini ? (15 Menit)
Presentasi (30 Menit)
Slide 4

Slide 5; p.
4-6
Slide 6
10:45 Coffee Break
11:00 Proses Design
sebuah proyek +
Pernyataan Logis
proyek (1 Jam)
Memperkenalkan Sasaran dan
Hasil-hasil
Memperkenalkan LogFrame.
Apakah LogFrame dan bagaimana
LogFrame ini dapat bekerja?
Bagaimana anda menggunakan
LogFrame ini ? (30 Menit)
Memperkenalkan Sasaran dan
Hasil-hasil
Memperkenalkan Pernyataan
Logis: Tujuan, Sasaran, Output,
Kegiatan (30 Menit)
Slide 7

Slide 8; p.
7-11



Slide 9

Slide 10-
11; p. 11-
15




12:00 Makan Siang
1:00 Pernyataan Logis
Proyek (2 Jam)
Kegiatan: Identifikasikan
Pernyataan Logis untuk proyek
anda sendiri dan buat Rencana
Kerja untuk proyek anda (2 Jam)
Slide 12
3:00 Coffee Break
3:15 Pernyataan Logis
Proyek

Presentasi: Fasilitator membantu
kelompok untuk meningkatkan
pernyataan logis proyek dan
memastikan bahwa rencana kerja

109
telah tercukupi (1 jam 15 menit)
4:30 Kesimpulan (30
Menit)
Mengulang kembali Sasaran
selama satu hari
Jawab Pertanyaan
Gambaran umum hari ke-2
Slide 2-11
5:00 Penutupan

110
HARI 2 : PELATIHAN DM&E BAGI BRA

Waktu Kemampuan
Utama
Aktivitas/Kegiatan Sumber Materi
9:00 Sasaran hari ke 2
(30 Menit)
Gambaran Hari 1: Gambaran
Siklus Desain Proyek, Proses
Desain Proyek, Pernyataan Logis
Memperkenalkan Sasaran hari 2 :
Indikator dan M&E
Slides 2-11


Slide 13
9:30 Indikator (1 Jam
30 Menit)
Memperkenalkan Sasaran dan
Hasil-hasil untuk Indikator-
indikator
Memberikan contoh dari indikator
untuk proyek peacebuilding (30
Menit)
Kegiatan: Tulis Indikator dari
proyek anda sendiri (1 Jam)
Slide 14-15


Slide 16; p.
16-19

Slide 17
11:00 Coffee Break
11:15 Indikator
(1 Jam)
Presentasi/Fasilitator membantu
kelompok untuk meningkatkan
indikator (1 Jam)


12:15 Makan Siang
1:15 Monitoring &
Evaluation (1
Jam)
Memperkenalkan Sasaran dan
Hasil-hasil dari M&E
Apakah Monitoring ?
Apakah Evaluasi ?
Apakah data Baseline?
Apakah perbedaan antara M&E ?
Bagaimana saya memonitoring
proyek saya ? (1 Jam)
Slide 18-19

Slide 20-21;
p. 25-27


Slide 22; p.
27-30

2:00 Monitoring
Lapangan (1 Jam
15 Menit)
Kegiatan : Informasi apa yang
diperlukan untuk memonitoring
proyek saya? (1 Jam 15 Menit)
Slide 23
3:15 Coffee Break
3:30 Monitoring
Lapangan contd
(1 hr)
Kegiatan : Mendesain Formulir
Monitoring untuk di gunakan di
lapangan (1 Jam)
Presentasi
P. 28-30
4:30 Kesimpulan (30
Menit)
Mengulang kembali Sasaran
selama satu hari
Jawab Pertanyaan
Gambaran umum Hari 3

Slide 13
5:00 Penutupan
111
HARI 3 : PELATIHAN DM&E BAGI BRA



Waktu Kemampuan
Umum
Aktivitas / Kegiatan Sumber Materi
9:00 Pembukaan
(30 Menit)
Mengulang kembali hari 2

Memperkenalkan Sasaran dari hari 3
Slide 13, 16,
19, 20
Slide 24
9:30 Evaluasi (1
Jam 30 Menit)
Bagaimana Saya Dapat
Mengevaluasi Proyek Saya? (30
Menit)
Kegiatan : Menyiapkan TOR untuk
mengevaluasi proyek anda (1 Jam)
Slides 25; p.
31-38

Slide 26
11:00 Coffee Break
11:15 Evaluasi Presentasi dari TOR (1 Jam)
12:15 Makan Siang
1:15 Perencanaan
Keuangan
untuk M&E (1
Jam 15 Menit)
Membuat anggaran untuk (15 Menit)
Kegiatan : Buatlah anggaran untuk
M&E + menyelesaikan pernyataan
logis, indicator-indikator dan
formulir monitoring jika belum
selesai. (2 Jam)
P. 40
3:15 Coffee Break
3:30 Langkah
selanjutnya /
Pengulangan
(1 Jam
15Menit)
Seharusnya peserta sudah punya
Pernyataan Logis proyek, Indikator,
Rencana Kerja, Formulir Monitoring,
Evaluasi TOR dan anggaran dari
masing-masing proyek, tapi mungkin
semuanya belum selesai. Kegiatan :
Tim harus dapat mengidentifikasi
langkah selanjutnya dan jadwal
waktu untuk menyelesaikan dokumen
ini (30 Menit)
Jawab Pertanyaan (30 Menit)
Mengulang kembali Sasaran dari
Hari ke 3
Mengulang kembali Sasaran dari
pelatihan ini
Slide 27










Slide 24

Slide 2-3
4:45 Penutupan (15
Menit)
Evaluasi Pelatihan P. 50-51
112
Daftar Pertanyaan
Untuk Mengevaluasi Workshop Ini


Nama :

Lembaga :


8. Menurut Anda, apakah sasaran dari workshop ini telah tercapai. Jika Tidak,
Mengapa ?

Sasaran 1: Untuk meningkatkan kapasitas peserta untuk merancang, memonitor dan
mengevaluasi program peacebuilding.







9. Pengalaman apa yang paling menyenangkan dari pelatihan ini ?





10. Pengalaman apa yang paling tidak menyenangkan dari pelatihan ini ?






11. Manfaat apa yang anda dapatkan dari pelatihan ini untuk pekerjaan sehari-hari
anda ?





12. Apabila kami ingin melakukan training lagi setelah ini, Materi apa yang menurut
pendapat anda yang sangat dibutuhkan oleh para staff ?


113



13. Dari angka 1 10, bagaimana anda menilai materi yang di sampaikan dalam
pelatihan ini ? CCCCC1
Sangat Jelek Sangat Bagus
Mengapa ?





14. Dari angka 1 10, bagaimana anda menilai fasilitator dalam menyampaikan
materi pada pelatihan ini ? CCCCC1
Sangat Jelek Sangat Bagus

Mengapa ?







114


LAMPIRAN 4 :
DAFTAR PUSTAKA / PELENGKAP


AUSAID, AusGuideline 3.3: The Logical Framework Approach, October 2005.

Church, Cheyanne and Mark M. Rogers, Designing for Results: Integrating Monitoring
and Evaluation in Conflict Transformation Programs Search for Common Ground, 2006.

DFID Performance and Effectiveness Department, Tools for Development: A Handbook
for Those Engaged in Development Activity, March 2003.

SIDA, The Logical Framework Approach: A Summary of the Theory Behind the LFA
Method, January 2004.

The World Bank, Monitoring and Evaluation: Some Tools, Methods and Approaches,
Washington DC, 2004.

UNDP Evaluation Department, Handbook on Monitoring and Evaluating for Results,
2002.

USAID Center for Development Information and Evaluation, Performance Monitoring
and Evaluation Tips: Building a Results Framework, Number 13 USAID, 2000.











115
PRESENTATION ON DESIGN, MONITORING AND
EVALUATION FOR BRA



I n d o n e s i a



SUBMITTED TO
UNDP & THE MULTI-STAKEHOLDER REVIEW OF POST-
CONFLICT PROGRAMMING IN ACEH (MSR)

BY
RACHEL SCHILLER
MONITORING AND EVALUATION CONSULTANT

DECEMBER 2008
116
117
118
119
120
121
122
123
124
125
126
127
128

129


130
PRESENTASI UNTUK DESAIN, MONITORING &
EVALUASI UNTUK BRA



I n d o n e s i a


SUBMITTED TO
UNDP & THE MULTI-STAKEHOLDER REVIEW OF POST-
CONFLICT PROGRAMMING IN ACEH (MSR)
BY
RACHEL SCHILLER
MONITORING AND EVALUATION CONSULTANT

DECEMBER 2008
131
132
133
134
135
136
137
138
139
140
141
142
143

144

145
CONTOH LOGFRAME UNTUK DEWAN PENGAWAS
REINTEGRASI-DAMAI ACEH DALAM BRA

Sample Logframe for the Aceh Peace-
Reintegration Monitoring Council within BRA


SUBMITTED TO
UNDP & THE MULTI-STAKEHOLDER REVIEW OF POST-
CONFLICT PROGRAMMING IN ACEH (MSR)

BY
RACHEL SCHILLER
MONITORING AND EVALUATION CONSULTANT

DECEMBER 1, 2008


146

BRA PROGRAM PEMBERDAYAAN EKONOMI

PERNYATAAN LOGIKA ASUMSI INDIKATOR PERTANYAAN
YANG HARUS DI
JAWAB*
TUJUAN Untuk memastikan para
korban agar tidak lagi
berkeinginan (berpikiran)
kembali ke suasana konflik
(perang).
Jika mereka sudah
dapat memenuhi
kebutuhan dasar
hidupnya, maka
mereka tidak akan
mau berkonflik lagi
% penerima bantuan
yang melapor
(menyatakan) bahwa
mereka tidak punya
keinginan untuk
kembali kepada suasana
berkonflik (Perang)

Apakah anda masih
ingin kembali ke suasana
konflik? Kalau ya
kenapa, kalau tidak
kenapa?

% penerima yang
merasa sudah terbantu
atau telah merasa
diperhatikan oleh
pemerintah

Apakah anda merasa
terbantu oleh
pemerintah?

% penerima bantuan
yang menyatakan
bahawa mereka
menerima manfaat yang
proses perdamaian.

Apakah anda merasa
manfaat dari perdamaian
ini?

SASARA
N 1
Untuk memastikan 18.930
jiwa berdaya dalam
memenuhi kebutuhan dasar
ekonomi melalui
pengembangan usaha
ekonomi produktif.

Jika 18.930 jiwa
penerima bantuan
sudah memiliki usaha
ekonomi produktif
maka mereka dapat
memenuhi kebutuhan
dasar ekonominya.
% penerima bantuan
yang menyatakan
bahwa mereka sudah
mampu memenuhi
penyediaan makanan
pokok.

Apa bantuan yang anda
terima sudah dapat
memenuhi kebutuhan
makanan pokok sehari?

% penerima bantuan
yang menyatakan
bahwa mereka telah
mampu memenuhi dana
untuk berobat

Apakah anda telah
mampu menyediakan
uang untuk beli obat?

% penerima bantuan
yang menyatakan
bahwa mereka telah
mampu membiayai
pendidikan dasar anak-
anaknya.

Apakah anda telah
mampu membiayai
sekolah anak anda?

147
% penerima bantuan
yang memiliki usaha
ekonomi

Apakah anda sudah bisa
memiliki usaha sendiri?

% penerima bantuan
masih memiliki usaha
setelah enam bulan dari
waktu diberikan
bantuan.

Apakah anda masih
memiliki usaha?
(Ditanya enam bulan
kemudia)

OUTPUT
1
Memberikan Modal Usaha
kepada 18.930 orang
masing-masing menerima
Rp. 10.000.000,- terdiri dari
915 Tapol/Napol, 500 orang
untuk GAM menyerah pra
MoU, dan 17.515 orang
yang termasuk dalam
katagori Janda, Pelecahan
Seksual, ditahan di pos
TNI/Polri, dan cacat
fisik/penyakit di 23
kabupaten/kota di Aceh
pada 15 Desember 2008,
dengan mengutamakan
perempuan.

% dari 18.930 orang
sudah menerima modal
usaha masing-masing
Rp. 10.000.000,-


% dari 18.930 orang
terdiri dari
Tapol/Napol, Gam
Menyerah Pra MoU,
Janda, Pelecahan
Seksual, ditahan di pos
TNI/Polri, dan cacat
fisik/penyakit


% dari 18.930 orang
yang berjenis kelamin
perempuan.



OUTPUT
2
Memberikan pendampingan
kepada penerima bantuan
melalui pembentukan UPP-
PE di setiap kabupaten/kota.



% dari penerima
bantuan yang
menyatakan bahwa
mereka sudah ada
pendampingan

% dari setiap 23
kabupaten/kota yang
telah terbentuk UPP-PE


See monitoring form for sources of data

148
BRA DIYAT PROGRAM

PERNYATAAN LOGIKA ASUMSI INDIKATOR PERTANYAAN
YANG HARUS DI
JAWAB*
TUJUAN Untuk memastikan para
korban agar tidak lagi
berkeinginan (berpikiran)
kembali ke suasana konflik
(perang).
Jika mereka sudah
dapat memenuhi
kebutuhan dasar
hidupnya, maka
mereka tidak akan
mau berkonflik lagi
% penerima bantuan
yang melapor
(menyatakan) bahwa
mereka tidak punya
keinginan untuk
kembali kepada suasana
berkonflik (Perang)

Apakah anda masih
ingin kembali ke suasana
konflik? Kalau ya
kenapa, kalau tidak
kenapa?

% penerima yang
merasa sudah terbantu
atau telah merasa
diperhatikan oleh
pemerintah

Apakah anda merasa
terbantu oleh
pemerintah?

% penerima bantuan
yang menyatakan
bahawa mereka
menerima manfaat yang
proses perdamaian.

Apakah anda merasa
manfaat dari perdamaian
ini?

SASARA
N 1
Untuk memastikan 22,353
ahli waris berdaya dalam
memenuhi kebutuhan dasar
ekonomi.
Jika 22,353 jiwa
penerima bantuan ahli
waris sudah dapat
memenuhi kebutuhan
dasar ekonominya.
% penerima bantuan
yang menyatakan
bahwa mereka sudah
mampu memenuhi
penyediaan makanan
pokok.

Apa bantuan yang anda
terima sudah dapat
memenuhi kebutuhan
makanan pokok sehari?

% penerima bantuan
yang menyatakan
bahwa mereka telah
mampu memenuhi dana
untuk berobat

Apakah anda telah
mampu menyediakan
uang untuk beli obat?

% penerima bantuan
yang menyatakan
bahwa mereka telah
mampu membiayai
pendidikan dasar anak-
anaknya.

Apakah anda telah
mampu membiayai
sekolah anak anda?


149

OUTPUT
1
Untuk memberikan banutan
diyat kepada 3,303 orang
ahli waris masing masing
Rp 6 juta dengan kategori
belum pernah menerima
sama sekali di 23 keb/kota
pada 15 Desember 2008
% 3,303 penerima diyat
yang melapor bahwa
sudah menerima
bantuan diyat

Apakah anda sudah
menerima bantuan diyat?

% 3,303 penerima diyat
yang melapor bahwa
sudah menerima 6 juta

Apakah anda sudah
menerima 6 juta?

% 3,303 penerima diyat
yang melapor bahwa
mereka ahli waris dari
korban konflik

Apakah anda benar ahli
waris? Dari siapa?
%3,303 penerima diyat
yang melapor bahwa
mereka belum pernah
menerima bantuan
diyat.

Apakah anda pernah
menerima bantuan diyat
sebelumnya?

Apakah anda menerima
melalui rekening atau
bagaimana?

OUTPUT
2
Untuk memberikan bantuan
diyat kepada 19,050 ahli
waris masing masing Rp 3
juta dengan kategori sudah
menerima satu kali di 23
keb/kota pada 15 Desember
2008


% 19,050 penerima
diyat yang melapor
bahwa mereka sudah
menerima bantuan diyat

Apakah anda sudah
menerima bantuan diyat?

% 19,050 penerima
diyat yang melapor
bahwa sudah menerima
3 juta

Apakah anda sudah
menerima 3 juta?

% 19,050 penerima
diyat yang melapor
bahwa mereka ahli
waris dari korban
konflik

Apakah anda benar ahli
waris? Dari siapa?

150
% 19,050 penerima
diyat yang melapor
bahwa mereka sudah
menerima bantuan diyat
satu kali.

Apakah anda pernah
menerima bantuan diyat
sebelumnya? Berapa
kali?

* See monitoring form for sources of data


151

CONTOH LOGFRAME UNTUK KOMISI
KEBERLANJUTAN PERDAMAIAN ACEH

Sample Logframe for the Commission on
Sustaining Peace in Aceh


SUBMITTED TO
UNDP & THE MULTI-STAKEHOLDER REVIEW OF POST-
CONFLICT PROGRAMMING IN ACEH (MSR)

BY
RACHEL SCHILLER
MONITORING AND EVALUATION CONSULTANT

DECEMBER 1, 2008

152
BRA PROGRAM PERUMAHAN

PERNYATAAN LOGIKA ASUMSI INDIKATOR PERTANYAAN
YANG HARUS DI
JAWAB*
TUJUAN Untuk memastikan para
korban agar tidak lagi
berkeinginan (berpikiran)
kembali ke suasana konflik
(perang).
Jika mereka sudah
dapat memenuhi
kebutuhan dasar
hidupnya, maka
mereka tidak akan
mau berkonflik lagi
% penerima bantuan
yang melapor
(menyatakan) bahwa
mereka tidak punya
keinginan untuk
kembali kepada suasana
berkonflik (Perang)

Apakah anda masih
ingin kembali ke suasana
konflik? Kalau ya
kenapa, kalau tidak
kenapa?

% penerima yang
merasa sudah terbantu
atau telah merasa
diperhatikan oleh
pemerintah

Apakah anda merasa
terbantu oleh
pemerintah?

% penerima bantuan
yang menyatakan
bahawa mereka
menerima manfaat yang
proses perdamaian.

Apakah anda merasa
manfaat dari perdamaian
ini?

SASARA
N 1
Agar Penerima rumah
merasa nyaman dan merasa
diperhatikan oleh
pemerintah
X % penerima rumah
yang menyatakan bahwa
mereka merasa nyaman
tinggal di rumah yang
telah dibangun

Apakah anda merasa
nyaman tinggal dirumah
sekarang? (ada komentar
dan alasan-alasannya)

% penerima rumah
yang menyatakan
bahwa mereka merasa
diperhatikan oleh
pemerintah
Apakah anda merasa
diperhatikan oleh
pemerintah sekarang,
terutama masalah
perumahan?

153
OUTPUT
1
Membangun 8.415 unit
rumah yang dibakar/dirusak
total sewaktu konflik di 23
kabupaten/kota pada akhir
Desember 2008, dengan
anggaran Rp. 40.000.000,-
per unit rumah
% 8.415 penerimah
rumah yang
terbangun

Apakah anda sudah
memperoleh bantuan
rumah?

% 8.415 penerimah
rumah yang memperoleh
anggaran masing-masing
Rp. 40.000.000,-

Apakah anda sudah
memperoleh dana
sebesar Rp. 40 juta untuk
membangun rumah?
% 8.415 unit rumah yang
dibakar/dirusak total

Kenapa anda
memperoleh rumah?
Karena di bakar atau
.....?

% penerima rumah
yang menerima dana
bantuan melalui
rekening bank

Apakah anda menerima
dana melalui rekening
Bank?

% penerima rumah
yang menyatakan
bahwa rumah mereka
layak huni
Apakah rumah anda
sekarang layak huni?
OUTPUT
2
Pendampingan terhadap
8.415 unit rumah yng
dibangun dengan
menempatkan satu orang
pendamping di setiap
kecamatan yang ada
bantuan rumah dalam 23
kabupaten/kota.


% penerima rumah yang
menyatakan bahwa
mereka menerima
pendampingan dari
pendamping

Apakah anda mendapat
pendampinagn dalam
pembangunan rumah?
X % Penerima rumah
yang menyatakan bahwa
pendampingan sangat
membantu penerima
dalam proses pembangun
rumah


Apakah merasa terbantu
dengan adanya
pendampingan ?
* See monitoring form for sources of data



154
COSPA
PERNYATAAN
LOGIKA
ASUMSI INDIKATOR PERTANYAAN
YANG HARUS DI
JAWAB
SUMBER &
METODE
PENGAMBILA
N DATA
TUJ
UA
N
Untuk memastikan para
pihak tidak kembali
menggunakan kekerasan
dalam menyelesaikan
setiap masalah yang
muncul selama
pelaksanaan MoU Helsinki
dan UUPA.

% peserta GAM yang
menyatakan bahwa
mereka mau
berinteraksi dengan
infrastruktur politik
yang ada di Indonesia


Apakah anda mau
berinteraksi dengan
pranata politik
Indonesia?
- Partai politik
Nasional, Dinas-
Dinas Pemerintah,
Parlemen, TNI,
Polisi, Camat/
Bupati/Walikota,
FKK Desk Aceh. Jika
tidak, kenapa?
Wawancara dg
peserta cospa dari
unsur GAM
setelah 4 kali
pertemuan.
% peserta unsur
pemerintah Indonesia
yang menyatakan mau
berinteraksi dengan
Parlok Aceh, KPA,
Gubernur/ Wakil
Gubernur Aceh.

Apakah anda (FKK)
mau berinteraksi
dengan unsur
GAM/Partai
Aceh/KPA dan
Gubernur/ Wakil
Gubernur Aceh?
Jika tidak, kenapa?
Wawancara dg
peserta cospa dari
unsur Indonesia
setelah 4 kali
pertemuan.
% peserta CoSPA yang
sepakat mengunakan
metode dialog dalam
menyelesaikan
persoalan yang timbul.
Apakah anda sepakat
mengunakan cara
cara dialog dalam
menyelesaikan setiap
persoalan yang ada
dan timbul
menyangkut masalah
keamanan dan
pelaksanaan MoU
dan UUPA?
Wawancara
dengan peserta
CoSPA setelah 4
kali pertemuan.
% peserta CoSPA yang
menyatakan bahwa
CoSPA sebagai forum
yang tepat untuk
berdialog
Apakah anda merasa
CoSPA sebagai
forum yang tepat
untuk berdialog? Jika
tidak, forum apa yang
sebaiknya?
Wawancara
dengan peserta
CoSPA setelah 4
kali pertemuan.
% inciden kekerasan
yang menyangkut
politik setiap bulan

Apakah inciden
kekerasaan
menyangkut politik
naik atau turun setiap
bulan?

World Bank
Conflict
Monitoring
Update, La
Kaspia-Conflict
Early Warning
System CEWS
155
SAS
AR
AN
1
Meningkatkan pengertian
dan membangun
kesepakatan para pihak
dalam implementasi MoU
Helsinki dan UUPA dan
merespon situasi
perkembangan keamanan
di Aceh serta mendorong
para pihak mengutamakan
dialog dalam penyelesaian
masalah.


Dua belah pihak dari
GAM akan ikut dan
berpartisipasi dalam
COSPA
Dalam press release
yang dihasilkan dari
CoSPA meeting, kedua
pihak membuat
kesepakatan bersama
Apakah kedua pihak
(ada) membuat
kesepakatan bersama
dalam Press Release
yang dihasilkan
CoSPA?

check Press
Release setalah
setiap CoSPA
Interpeace akan bekerja
sama untuk mendukung
forum dialog
Adanya pernyataan
yang terkoordinasi di
media massa dari pihak
RI & GAM dalam
merespon
perkembangan situasi
keamanan

Apakah ada
pernyataan yang
terkoordinasi di
Media Massa dari
pihak GAM dan RI
mengenai
perkembangan situasi
keamanan yang
dibicarakan dalam
CoSPA?
* pernyataan
terkoordinasi:
- Kejadian (ada/ tidak
ada)
- latar belakang (
kriminal/ politis)
- solusi/ follow up
Pengecekan
terhadap berita di
media setiap
harinya.
% isu yang disepakati
dari sejumlah isu yang
di bahas
1.Berapa banyak
permasalahan yang
dibahas dalam rapat
CoSPA?
2. Berapa banyak
permasalahan yang
dapat disepakati dari
sejumlah
permasalahan yang
dibahas dalam
CoSPA?
Check minute of
meeting dan press
release
% dari pasal pasal di
UUPA yang telah
dilaksanakan (273
pasal)

Berapa pasal dari
UUPA sudah
dilaksanakan melalui
peraturan pemerintah
(PP), Peraturan
Presiden, Qanun,
Peraturan Gubernor.
Memonitor
penyiapan
legislasi/aturan
berbagai tingkatan
dan pelaksanaan
pasal UUPA
melalui matrix
evaluasi UUPA


% dari 71 pasal MoU
yang telah dilaksanakan
Berapa pasal dari
MoU sudah
terlaksana
Memonitor
melalui matrix
evaluasi MoU
156
% peserta CoSPA yang
menyatakan mengerti
terhadap persepsi pihak
lain
Apakah anda paham
terhadap persepsi
(GAM/ FKK)
mengenai persoalan-
persoalan yang
dibahas dalam
CoSPA ini, terlepas
anda setuju atau
tidak?
Wawancara
dengan peserta
CoSPA setelah 4
kali pertemuan

% Insiden kekerasan
ditangani aparat
keamanan yang
didukung para pihak



Apakah anda
(GAM/FKK)
mendukung
penanganan setiap
insiden kekerasan
yang ditangani oleh
aparat keamanan?
Wawancara
dengan peserta
CoSPA setelah 4
kali pertemuan
% insiden kekerasan di
bahas dalam CoSPA




Berapa persen dari
jumlah kekerasan
yang terjadi dalam
sebulan dibahas
dalam CoSPA
meeting?
Membandingkan
minut meeting
CoSPA dengan
World Bank
Conflict
Monitoring
Update

OU
TPU
T
1.1
Pertemuan bulanan para
pihak di tempat berbeda di
Aceh.

% dari undangan yang
dikirimkan APRC
hadir.






Persentase dapat
dilihat dari
perbandingan jumlah
undangan yang
dikirim dan jumlah
peserta yang terdaftar
di daftar hadir.

Undangan dan
daftar hadir
GAM dan Pemerintah
mengakui resmi CoSPA
sebagai salah satu
forum dialog


Apakah anda setujuh
bahwa CoSPA
menjadi salah satu
forum dialog
perdamaian
Wawancara
dengan peserta
CoSPA setelah 4
kali pertemuan


157
Terwakilinya unsur-
unsur para pihak di
setiap distrik
(GAM/KPA/PA,
Pemda, TNI/POLRI,
civil society)

Apakah
GAM/PA/KPA,
Pemda, TNI/POLRI,
tokoh masyarakat dan
civil society hadir?
Daftar hadir rapat
CoSPA yang
dilaksanakan di
daerah.
CoSPA terlaksana
setiap bulan.

Apakah CoSPA
terlaksana setiap
bulan?
Check minutes of
meeting
50% dari total
kabupaten/ kota di
Aceh akan menjadi
tempat pelaksanaan
CoSPA

Berapa
kebupaten/kota
menjadi tempat
pelaksanaan CoSPA?
Dapat dilihat dari
workplan tentang
perencanaan
tempat
pelaksanaan
CoSPA setiap
bulannya.



OU
TPU
T
1.2
Adanya tindak lanjut
rekomendasi hasil
pertemuan CoSPA
% dari hasil
rekomendasi
diterjemahkan logframe





Berapa banyak
rekomendasi CoSPA
yang diterjemahkan
ke dalam log frame
APRC?

Dapat dilihat dari
log frame APRC
% Persentase
rekomendasi CoSPA
terlaksana

Berapa rekomendasi
CoSPA telah
dilaksanakan?
Membuat Matrix
Follow-up
Rekomendasi
CoSPADadang
OU
TPU
T
1.3
Pertemuan bulanan para
pihak di 9 titik dimulai
pada Februari 2009
% 9 titik yang punya
CoSPA meeting pada
Februari



Berapa daerah yang
telah melaksanakan
CoSPA distrik pada
akhir Februari?





Laporan
pelaksanaan
CoSPA daerah
dari
Bupati/Walikota
kepada ketua
CoSPA propinsi
Jumlah pertemuan yang
terlaksana di setiap
kebupaten/kota dalam
2009




Berapa jumlah
pertemuan
dilaksanakan di
setiap daerah dalam
tahun 2009?
Kompilasi laporan
pelaksanaan
CoSPA daerah

158
SAS
AR
AN
2
Meningkatkan kepercayaan
masyarakat terhadap para
pihak dalam melaksanakan
MoU Helsinki, UUPA dan
penanganan masalah
masalah keamanan yang
mengangu perdamaian

% masyarakat yang
menyatakan bahwa
mereka percaya kepada
para pihak dalam
menyelsaikan
pelaksanaan MoU dan
UUPA atau insiden
keamanan
Apakah anda percaya
kepada para pihak
untuk pelaksanaan
MoU dan UUPA
bersama sama?


Wawancara
dengan 30 orang
setiap bulan di
tempat CoSPA
daerah

% masyarakat
menyatakan bahwa
COPSA adalah forum
yang tepat dan
bermanfaat untuk
membicarakan berbagai
hal yang menyangkut
perdamaian Aceh
Apakah anda tahu
tentang CoSPA?

Dari mana anda tahu
tentang CoSPA?
Radio, Koran, lisan,
tv, website?

Apakah anda merasa
bahwa CoSPA adalah
forum yang tepat dan
bermanfaat untuk
membicarakan
berbagai hal yang
menyangkut
perdamaian Aceh?

Apakah ada hal hal
yang menyangkut
inciden yang
mengangu
perdamaian
terselesaikan dalam
rapat CoSPA?

Wawancara
dengan 30 orang
setiap bulan di
tempat CoSPA
daerah

OU
TPU
T
2.1
Mempublikasi materi hasil
pertemuan CoSPA melalui
10 koran
dan Talk show di radio
daerah setalah setiap
COSPA Propinsi
Terpublikasinya hasil
pertemuan CoSPA
memelalui 10 media
cetak dan 2 media
elektronik

Berapa banyak media
massa & media
elektronik yang
memuat hasil
kesepakatan CoSPA
meeting dalam setiap
pelaksanaan CoSPA?

Clipping media
massa.

Record dari
tv/radio
OU
TPU
T
2.2
Menyebarkan pesan-pesan
perdamaian melalui Talk
show di TV sebulan sekali
di Aceh TV dan TVRI
Banda Aceh dan PSA 4
kali 1 tahun
% CoSPA propinsi
yang diikuti dengan talk
show di radio
Berapa CoSPA
propinsi yang diikuti
dengan talk show di
radio
Rekaman
talkshow
OU
TPU
T
2.3
Diskusi Jurnalis tentang
CoSPA dan perdamaian di
APRC 6 kali setahun
% 6 diskusi yang
dilaksanakan
Berapa kali diskusi
jurnalis
dilaksanakan?

Absensi meeting,
berita media
masa, laporan
kegiatan APRC

% peserta diskusi yang
menyatakan bahwa
diskusi tentang COSPA
bermanfaat
Apakah diskusi ini
ada manfaat untuk
anda? Jika ya, apa?
Wawancara
dan/atau teknik
partisipatoris
159

S-ar putea să vă placă și