Project Location
Balo-i, Lanao del Norte
335.232 km
Bunawan, Davao City
(Construction)
DETAILS
ABAGA
(Construction)
TRANS. LINE
SUBSTATION
ISSUES
MARAMAG
(Completed)
DETAILS
BUNAWAN
Contractor Original Contract Period Contract Effectivity Original Contract Expiry Approved Time Extensions Revised Contract Expiry Contract Amount Original Variation Orders No. 1,2,& 3
Consortium of Hyundai Engg. Co., Ltd. & Hyundai Corp. 450 Calendar Days March 6, 2008 May 29, 2009 1st [121 CD]; 2ND [276 CD]; & 3RD [92 CD] September 30, 2010 US Dollar ($) 33.63 M 0.221 M Euro () 4.910 M 0.005 M Peso (PhP) 974.013 M 25.978 M
Revised
Total Contract Cost in Peso
33.851 M
4.915 M
PhP 2,801.922 M
999.991 M
A B
Non-IP
C
IP Non-IP
IP
(15.01 km) 4 brgys (9.56 km) 3 brgys
Non-IP 3 brgys
(27.20 km)
8 brgys
(20.16 km)
4 brgys
(26.47 km)
10 brgys
Bukidnon
Davao
(13.87 km) 4 brgys
Davao
(38.50 km)
12 brgys
Panabo
(7.98 km)
(42.21 km)
12 brgys
BUNAWAN
MARAMAG
Control House
230kV
230kV Switchyard
138/69kV Switchyard
Commissioning Works
PHYSICAL STATUS:
Activity
Overall Accomplishment
Supply of Materials/Delivery
PROJECT COMPONENTS: TRANSMISSION LINE 106.672 km, 2-795 MCM, DC-ST Construction/Erection/ Installation
Contractor Contract Period Contract Effectivity Original Contract Expiry Approved Time Extension Revised Contract Expiry Contract Amount Original Total Contract Cost in Peso
KALPATARU Power Transmission Ltd. 415 Calendar Days September 17, 2010 November 5, 2011 None None US Dollar ($) 16.856 M PhP 1,001.029 M Peso (PhP) 223.432 M
Actual / Total Workable Tower sites Workable In-between Tower sites Workable Stringing Section
TS PAPs Section
57 0 0 0
Activity
Overall Accomplishment Supply of Materials/Delivery Construction/Erection/ Installation
Contractor Contract Period Contract Effectivity Original Contract Expiry Approved Time Extension Revised Contract Expiry Contract Amount Original Total Contract Cost in Peso
KALPATARU Power Transmission Ltd. 450 Calendar Days April 6, 2010 June 29, 2011 None None US Dollar ($) 19.482 M PhP 1,234.228 M Peso (PhP) 300.489 M
Actual / Total Workable Tower sites Workable In-between Tower sites Workable Stringing Section
TS PAPs Section
86 76 47 8
Non-IP
Non-IP
Non-IP
(9.921 km) 3 brgys
Non-IP
3 brgys
(8.031 km)
Misamis Oriental
(25 km)
10 brgys
(62 km)
41 brgys
(13 km)
4 brgys
(22.183 km)
4 brgys
KIRAHON
ABAGA
Activity
Overall Accomplishment Supply of Materials/Delivery Construction/Erection/ Installation
SUBSTATIONS: 1. Abaga S/S (Expansion) 5- 138 kV PCB plus accessories; 2. Kirahon Switching Station (New) 16- 138 kV PCB plus accessories;
Contractor Contract Period Contract Effectivity Original Contract Expiry Approved Time Extension Revised Contract Expiry Contract Amount Original Total Contract Cost in Peso*
*Exchange Rate: 1US$ = PhP 44.347
XIAN Electric Engineering Co., Ltd. 365 Calendar Days May 20, 2010 May 19, 2011 None None US Dollar ($) 10.051 M PhP 811.132 M Peso (PhP) 365.389 M
Issues
Subject
1. ROW Acquisition
Issues
1.1 Refusal of Project Affected Person (PAP) to issue ROW Grant
Action(s) Taken
1.1 Formalize & document the offer then file the case.
Issues
Subject
2. Ancestral Domain
Issues
2.1 Long process of securing the Certification Precondition (CP) 2.2 Inaction to issue the CP
Action(s) Taken
2.1 Once the project is identified, immediately start negotiation with the ICC. 2.2 Elevate the problem to RDC/Mindanao Development Authority/President of the Phil. 3.1 Elevate the problem to RDC/Mindanao Development Authority/President of the Phil.
3. Military Reservation
Issues
Subject
4. Pilferage
Issues
4.1 Pilferage of tower parts and bolts; line materials; energized line materials
Action(s) Taken
Provide Security Officer in the organization to coordinate with PNP & AFP ground units. Organize intelligence network Neutralize markets or buying points of the pilfered materials Conduct (PNP/AFP) ground operation Coordination with PNP/AFP ground force for tactical operation.
5. Extortions
Issues
Subject
6. Quality control
Issues
6.1 Failure to attain designed compressive strength of concrete
Action(s) Taken
6.1 Conduct of Core drilling & testing. If sample fails, structure is either demolish & replaced or retrofitted. 6.2 Tie-up the final payment of the labor cost to the acceptance of the structure.
MARAMAG
MB-85 to 168
Abaga-Kirahon 230 kV T/L Project National Road to Iligan City Abaga S/S Abaga Creek/Falls AK - 3 Tower Site