Sunteți pe pagina 1din 129
PROCESS PLANT COMMISSIONING David Horsley Process plant commissioning Auser guide Second edition Process plant commissioning Auser guide Second edition Edited by David Horsley David Horsley, FIChemE, worked with ICI before studying chemical engineering at university. After graduating, he joined British Nuclear Fuels (BNFL) in 1978 as a senior safety engineer and by 1982 had assumed responsibility for the commissioning of the Sellafeld fuel handling plant, As Head of the Effluent Plants Project Office in 1989, David was responsible for the design, construction and commissioning of plants with a capital cost of £500 million. In 1991, he became Assistant Director for BNFL Engineering, Safety and Technical funetions. Working with the Newcastle University Engineering Design Centre where he is a visiting professor, David has eneouraged developments in advanced Computational modelling and simutation which can greatly reduce risk, time anil cost, He fetains a keen interest in project management and plant commissioning in particular, and he also is Concemed with encouraging development in design integration and ‘multiple criteria decision ms IChem

S-ar putea să vă placă și