PROCESS & INSTRUMENTATION DIAGRAM (P&ID)

Item 1 2 3 4 5 6 7 8 My companys document/drawing # Client document # Title block: including the By/Approved/Checked blocks filled and signed, Date, Rev. all company logos, client signoff block All equipment tagged, title above equip, spelling of names correct Line arrows are on each turn of a line, in the correct direction Vessels Size, design temperature/design pressure, Instruments are right type, local/transmitted, control type, block/bypass valves shown Instrumentation signal lines are correct line type, local/DCS code correct Control valve type, failure mode shown, block/bypass valves, reducers, the sizes used are the latest from controls department Pressure Relief Valves: set pressure, PSV size is latest, inlet/discharge size and pipe spec match latest calculations, the relief outlet goes to drain/flare/atmosphere Block valves: show if they are normally open or closed, car sealed open or closed Drain valves present, use smaller gate valve symbol, they are between checks/gates/etc Pipe specs are all shown and correct, spec breaks over valves/PSVs, steam and electrical tracing is shown Note whenever any items must be within sight of each other (e.g. ensure level gauge can be seen by someone operating this manual globe valve) Utility P&IDs tie in correctly to main drawings, and show connect to utility stations & analyzers Header line numbers include all header block valves (so that when the header is built the block valves are installed with the header, not any branch lines) When lines cross, vertical lines break for horizontal lines except that instrumentation lines break for process lines. All Notes/Holds are ok? Is it clear what they refer to? Spelling? Are the general project notes and holds, that must be added to each drawing, in place? All the mark-ups were applied by the drafters correctly, spelling is correct Check the drafting process did not introduce any random new errors or mistakes. Are revision triangles, clouds, and other markings in the revision process added or deleted as required? Taking a look at the set of P&IDs as a whole, the stream connections between the drawings are correct Straight length (Recommended by flow metering requirements) Reference of Design Checklist Pipe Schedule & Thickness Selection Piping Specification & Ratings Inter Discipline Check stamping OK Not OK Remarks

9 10 11 12 13 14 15 16

17 18 19 20 21 22 23 24 25 26

S-ar putea să vă placă și