Sunteți pe pagina 1din 3

TIGERFLOW Booster Sizing Worksheet

Job Name: Customer:

2/3/2014

I. Pressure Required:
A. Pressure required at highest fixture
(Estimate 30-40 PSIG +/-, or specifed requirement)

PSI ft) 0.0 0.0 0.0 PSI PSI PSI PSI

B. Static head

(building height =

C. Piping and system friction loss (10% of static head) D. Required system processing
(A + B + C)

E. Subtract minimum suction pressure at pump station


(Minimum suction pressure at street minus pressure drop through backflow prevention and / or water meter)

F. Subtotal

(D + E)

0.0 5.0

PSI PSI

G. Internal booster station loss H. Total pump boost (differential) pressure required (F + G) I. Convert pump boost PSI to TDH (PSI x 2.31 =

5.0 11.6

PSI
ft, TDH)

II. Fixture Unit Table:


Fixture No. of Units Fixtures
8 6 2 5 10 5 4 2 20 4 4 2 3 3 2 6 2 4 2 1 1 6

Fixture
Bathroom group flush valve Bathroom group flush tank Lavatory Urinal - flush valve Water closet - flush valve Water closet - flush valve Bathtub - public Bathtub - private Bathtub - immersion Shower (standard) Sink - kitchen Sink - kitchen Sink - services Garbage disposal Garbage disposal Dishwasher Dishwasher Washing machine Washing machine Ice machine Steam tables Hose connection - 3/4"

Use
Public Private Public Public Public Private Public Private Public Public Public Private Public Public Private Public Private Public Private Public Public Public

Total
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Total Fixture Units

TIGERFLOW Systems, Inc., Copyright 2007

Sheet 1 of 3

TIGERFLOW Booster Sizing Worksheet


Typical System GPM Fixture Units 0 100 300 600 900 1200 1500 1650 1750 2000 2200 2500 3000 4000 5000 6000 7000 8000 10000 Apts / Office 0.0 70 80 100 120 140 150 170 180 190 210 220 250 300 350 400 450 500 550 Hotel / Motel 0.0 80 90 120 125 150 170 180 190 200 220 240 275 350 400 450 500 550 600 Hospital / School / Prison 100.0 100 100 130 140 160 190 200 210 220 230 260 300 375 450 500 550 600 650

2/3/2014

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

IV. Total System Demand (GPM):


Apts / Office 0.0 Hotel / Motel 0.0 Hospital / School / Prison 100.0 GPM GPM

A. System demand B. Special duty demands

(Total Chart III)

(Cooling tower makeup, etc.)

C. Total systems demand

GPM

Duplex: (0 - 300 GPM)


11.6 ft, head % of System GPM

50-50 33-67 65-65 100-100

Pump #1 GPM HP 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00

Pump #2 GPM HP 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00

Triplex: (301 - 3000+ GPM)


11.6 ft, head % of System GPM

10-50-50 20-40-40 33-33-33 50-50-50

Pump #1 GPM HP 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00

Pump #2 GPM HP 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00

Pump #3 GPM HP 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00

TIGERFLOW Systems, Inc., Copyright 2007

Sheet 2 of 3

TIGERFLOW Booster Sizing Worksheet


VI. Maximum Flow Rate (GPM) per Header Size: Size Flow (inches) (GPM)
3 4 6 8 10 300 600 1000 1800 2800

2/3/2014

Minimum header size for this job =

3 Inch

TIGERFLOW Systems, Inc.


4034 Mint Way Dallas, Texas 75237 214-337-8780 800-783-6756 214-333-2742 FAX www.tigerflow.com

TIGERFLOW Systems, Inc., Copyright 2007

Sheet 3 of 3

S-ar putea să vă placă și