Documente Academic
Documente Profesional
Documente Cultură
MINUTES of MEETING
TO
CLARIFICATION TENDER OF THE RENOVATION BATHROOM ALAM KULKUL RESORT
PROJECT
Date :
Time
Location
Attendees:
1. Mrs. Andi Basse
2. Mr. Bambang S.
3. Mr. Herman
4. Mr. Andi Daliandi
5. Mr. Agus P.
6. Mr. Didik W.
Distribution
(PT. AV)
(PT. AID)
(PT. AID)
(C)
(C)
(C)
: 1. All attendance
2. Mr. Faisol
3. Mrs. Jeanine
4. Mr. Aru
NO.
A.
(AB)
(BS)
(H)
(AD)
(AP)
(DW)
DESCRIPTION
Opening
ACTION
AB
Mrs. AB opening the Clarification Tender of The Alam KulKul Resort to all
Attendees and give authorization to AD to continue with clarification tender
explanation.
B.
Administration
AD
1.
2.
3.
Prepared by Cdesign
Page 1 of 4
d e s i g n
V. Floor work;
All marble ex. Citatah, Bandung.
No. 7 Around 530% over than cost plan.
Canceled No. 9 Loose pebble with dia. 2 cm.
Prepared by Cdesign
Page 2 of 4
d e s i g n
as
XIV. Landscape;
Revised No. 1, quantity change with 21.18 M2.
Prepared by,
DIDIK W.
Prepared by Cdesign
Page 3 of 4
d e s i g n
Prepared by Cdesign
Page 4 of 4